Modeling Building Automation and Control Systems Jim Sinopoli, Managing Principal Smart Buildings, LLC
|
|
|
- Moses Andrews
- 9 years ago
- Views:
Transcription
1 Modeling Building Automation and Control Systems Jim Sinopoli, Managing Principal Smart Buildings, LLC 2013 Many building owners and facility managers lack good documentation for their automation control systems. Documentation has value; lack of system documentation can cost an organization and will increase risk. Lack of documentation means troubleshooting and work orders take longer, are more expensive and it extends the time it takes to resolve issues for tenants or occupants. It also may mean preventative maintenance isn t done because you don t know what the PM schedule is, possibly shortening the life of the equipment. Or it may mean that facility personnel really do know a lot about their systems but if they move to another organization or company or retire, all that knowledge or system documentation leaves with them. This lack of documentation for automation and control systems is caused by inadequate organization and planning in the handoff from construction to building operations and the fact that much of the documentation is in a paper format. Help is on its way. The buildingsmart alliance with the input of the US Army Corps of Engineers has developed and proposed a data structure for representing information related to automation and controls. It falls under a large umbrella called Building Information Modeling or BIM. BIM If you ve had any involvement in new building design and construction you re probably familiar with BIM. You may be aware or exposed to the 3-D modeling of a building and its components and understand the value it can provide in avoiding potential collisions between the designs created by different engineers. Likewise, the usefulness this modeling can provide to contractors in fabricating building systems and components. Major designers and construction companies have embraced BIM and rightfully so; it can reduce change orders, assist in maintaining schedules and generally produce better buildings. The larger picture and the utilization of BIM should be an approach of a life-cycle asset management tool. Such a tool is used increating and acquiring data during design and construction which is then delivered to facility management. It s the building operations that will be 85 to 95 percent of a building s lifecycle. 1
2 To facilitate the exchange of information from design and construction to building operation, a standard called Construction Operations Building Information Exchange (COBie) was developed by a laboratory of the US Army Corps of Engineers. COBie is a format of data for building assets. It s associated with BIM, but doesn t involve spatial modeling. It is part of the National Building Information Model. COBie may include data such as preventative maintenance schedules, model numbers, warranty information, product data sheets, and everything needed to operate and maintain the particular asset. Industry Foundation Class (IFC) The modeling of automation systems involves the development of a specific IFC for automation and control systems. An IFC is an open and neutral data model that describes building and construction industry data to facilitate interoperability of the data between designers, contractors and facility management. The IFC model specification is registered by the International Organization for Standardization (ISO) and is an official International Standard (ISO 16739:2013). The effort is referred to as Building Automation Modeling Information Exchange or BAMie. The proposed IFC for the Buildings Controls Domain has core entities to represent automation and control systems. During the design phase, when different design elements are being determined, the data exchange between automation and control systems can be coordinated with other design elements. The proposed domain models for automation systems are controllers, sensors, actuators, alarms and instruments, and control elements that have integrated panels and indicators. The model definitions are organized into addresses, configurations, connections, performance and components and types. 2
3 1. Connections - The model definition of connections has logical and physical connections. The IfcRelationship entity can then model the connections. Inputs and outputs for devices such as controllers, actuators, thermostats and sensors can be mapped. 2. Components and Types Initially design components may be generic but at some stage of a project specific product data is needed and a product template can be used to organize the data. In this case an IfcType Object entity may be used to acquire product specifications and IfcDocument References can used to provide links to installation and O&M manuals Addresses This model definition provides an addressing format for specific data points. It also seems like an area where Project Haystack could add some value. Project Haystack is an open source initiative that has developed naming conventions and taxonomies for building equipment and operational data. Standardizing addressing formats and binding addresses of data points to other objects in a building or buildings facilitates integration of the data and enriches the context of the data point by incorporating related data. 4. Configuration BAMie is ambitious in documenting automation and control system configurations. The idea is to make the information exchange between the system contractor, other designers, contractors and the facility manager or building owner more efficient. Configuration data can include data such as set points for specific building spaces, schedules, even alarm conditions. The usefulness of documenting system configurations for information exchange may depend on the specific automation and control system, specifically the management workstations of the system, where configurations can be set. 5. Performance The proposed model definition for performance is interesting. Because BAMie data includes relationships between objects and artifacts and can produce a fluent exchange of data, it can facilitate the creation of performance metrics that an automation and control system would not be able to do, for example creating 3D models or color coded floor plans of energy consumption trends over a time series. 3
4 The building automation industry is abuzz with data analytics. Analytic software solutions for complex HVAC systems have shown substantial benefits in operations and energy management. The key is data. The proposed BAMie is not only a repository for comprehensive data in automation and control systems, but it provides a means that the data can be easily exchanged with other systems and other various colleagues involved in design, construction and operation of the building. The building automation industry needs to embrace and support the BAMie effort. Construction Directors and Facility Managers should request designers and contractors provide system data and submittals in electronic format. Finally, the industry experience with BIM and information exchange to date is somewhat isolated to just architects, design engineers and construction companies. Not many facility management organizations have consumed and used BIM data despite the fact that the greatest benefits of BIM are in building operations. There are a number of facility management systems that can import BIM and populate FM applications such as asset management, preventative maintenance and document management. 4
5 If we can acquire automation and control system data digitally in the proposed format from the start of a project, enrich the data with digital relationships within the building, coordinate it with other designers and finally populate our facility management systems, we will be on the road to better building performance. For more information, write us at [email protected]. Photos courtesy of Google and Bing Images 5
Using BIM In HVAC Design
This article was published in ASHRAE Journal, June 2010. Copyright 2010 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. Posted at www.ashrae.org. This article may not be
Industry Foundation Classes (IFC)
Industry Foundation Classes (IFC) BIM Interoperability Through a Vendor-Independent File Format A Bentley White Paper Volker Thein IFC Product Manager September 2011 Executive Overview buildingsmart International,
OPEN BIM and the future: BIM and GIS integration. Building the DND Real Property Spatial Data Framework
OPEN BIM and the future: BIM and GIS integration Building the DND Real Property Spatial Data Framework Assistant Deputy Minister (Infrastructure & Environment) Director Real Property Planning Director
Cityzenith s 5D Smart City platform empowers users with a simple way to make sense of the torrent of data in our cities, corporate
5D Smart City Cityzenith s 5D Smart City platform empowers users with a simple way to make sense of the torrent of data in our cities, corporate campuses, and universities, revolutionizing the way we access,
Security Issues with Integrated Smart Buildings
Security Issues with Integrated Smart Buildings Jim Sinopoli, Managing Principal Smart Buildings, LLC The building automation industry is now at a point where we have legitimate and reasonable concern
Incorporating BIM into Facilities Management
Incorporating BIM into Facilities Management Greg Alevras, VP of Business Development, North America Sam Arabia CM-BIM, Director, Torcon Facilities Solutions Meet Our Presenter(s): Greg Alevras - ARCHIBUS
Building the Asset Information Model
Building the Asset Information Model BIM: Let s Get Started Contractors Survey https://www.surveymonkey.com/s/nfbbim Hypothesis: Government as a client can derive significant improvements in cost, value
Supporting ANY PRODUCT employing
Supporting ANY PRODUCT employing -BackNet -LonWorks -ModBus - XML -SNMP -OPC WEB controllers (JACE-Java Application Control Engine) - Provides server and internet power at the building level - Open & legacy
How Do Smart Buildings Make A Building Green?
"Technology means the systematic application of scientific or other organized knowledge to practical tasks John Kenneth Galbraith, Economist, Author How Do Smart Buildings Make A Building Green? Integrating
A Systems Approach to HVAC Contractor Security
LLNL-JRNL-653695 A Systems Approach to HVAC Contractor Security K. M. Masica April 24, 2014 A Systems Approach to HVAC Contractor Security Disclaimer This document was prepared as an account of work sponsored
Tool With Best Project Management Skills
The Value of BIM We ADD TO PROJECTS : Tool With Best Project Management Skills - To save time, material management & cash flows - Project reviews and Management reporting - Issueless work at sites - Easy
Mitra Innovation Leverages WSO2's Open Source Middleware to Build BIM Exchange Platform
Mitra Innovation Leverages WSO2's Open Source Middleware to Build BIM Exchange Platform May 2015 Contents 1. Introduction... 3 2. What is BIM... 3 2.1. History of BIM... 3 2.2. Why Implement BIM... 4 2.3.
NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING TECHNOLOGIES. Level III Content Outline
Fire Alarm Systems Level III Content Outline The skills and knowledge listed under each task are suggestive of those involved in that task, but are not intended to constitute an exhaustive listing. 3.1
Philips helps create a comfortable, productive and sustainable environment at The Edge
Connected office lighting The Edge Case study Philips helps create a comfortable, productive and sustainable environment at The Edge The Edge is an innovative, multi-tenant office building in Amsterdam.
H.V.A.C. Design Plumbing Design
H.V.A.C. Design H.V.A.C. Design Mira Costa College Arts Complex CP Upgrade 1. PART 1 GENERAL 1.1. DESCRIPTION SECTION 23 09 00 HVAC INSTRUMENTATION AND CONTROL 2. PART 2 - PRODUCTS 2.1. Materials
Foreword. Version 1.0 27.03.2012 Parties to the COBIM project
Series 12 author Insinööritoimisto Olof Granlund Oy: Markku Jokela, Tuomas Laine, Reijo Hänninen Foreword The publication series Common BIM 2012 is the result of a broadbased development project entitled
How To Design A Bim Project
BIM Virtual Construction & Integrated Project Delivery Randy LaNear BIM Manager Barnhart - Heery Synonyms & Related Terms Integrated Practice Integrated Project Delivery Virtual Building (Environment)
CEN/BT/WG 215 N 045 4 th draft BUSINESS PLAN
CEN/BT/WG 215 N 045 4 th draft BUSINESS PLAN CEN/TC XXX Building Information Modelling (BIM) CEN/TC XXX Business Plan Date:2014-09-16 Version: Draft #7 Page: 1 EXECUTIVE SUMMARY Business Environment [to
BIM and Facilities Management
AUTODESK WHITEPAPER BIM and Facilities Management Building information modeling (BIM) is changing the way buildings are designed and constructed but is it changing how they re operated and maintained?
FR309 EMERGING APPLICATIONS OF BIM TO FACILITIES MANAGEMENT: WHAT ARCHITECTS NEED TO KNOW ABOUT CONNECTING DESIGN AND OPERATIONS
FR309 EMERGING APPLICATIONS OF BIM TO FACILITIES MANAGEMENT: WHAT ARCHITECTS NEED TO KNOW ABOUT CONNECTING DESIGN AND OPERATIONS 5/18/2012, 4:00:00 PM 5:30:00 PM 1.50 LU HSW Program Description The application
At Automated Logic, we ve been doing data for more than 30 years.
At Automated Logic, we ve been doing data for more than 30 years. No company knows better than us how to design and develop analytical tools you and your personnel can use to run your facility even more
Establishing Commissioning Costs
Establishing Commissioning Costs Portland Energy Conservation, Inc. (PECI) 9/12/00; Revised 02/14/02 The following summarizes the latest information on commissioning costs taking into account costing studies
www.repstor.com Maximise your Microsoft investment to provide Legal Matter Management
www.repstor.com Maximise your Microsoft investment to provide Legal Matter Management Maximise your Microsoft investment to provide Legal Matter Management custodian for legal extends the powerful document
Guide Specification SECTION 23 08 00 - COMMISSIONING OF HVAC PART 1 - GENERAL 1.1 SUMMARY
SECTION 23 08 00 - COMMISSIONING OF HVAC PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. HVAC Commissioning description. 2. HVAC Commissioning responsibilities. 1.2 REFERENCES A. American Society
Standardizing the Internet of Things; Boiling the Ocean
Standardizing the Internet of Things; Boiling the Ocean Jim Sinopoli, PE, LEED AP Smart Buildings LLC By now, we all know the basics of the Internet of Things (IoT). Everything will be connected to every
HP SOA Systinet software
HP SOA Systinet software Govern the Lifecycle of SOA-based Applications Complete Lifecycle Governance: Accelerate application modernization and gain IT agility through more rapid and consistent SOA adoption
GRAPHISOFT ArchiCAD and COBie2. How to Prepare your ArchiCAD 17 Project for COBie2 Documentation
GRAPHISOFT ArchiCAD and COBie2 How to Prepare your ArchiCAD 17 Project for COBie2 Documentation GRAPHISOFT Visit the GRAPHISOFT website at http://www.graphisoft.com for local distributor and product availability
BIM UNDERSTANDING THE PROCESS The State of the Art Tool in Design and Construction SPONSORED BY SAME, DC POST IN ASSOCIATION WITH ACEC M/W
BIM UNDERSTANDING THE PROCESS The State of the Art Tool in Design and Construction SPONSORED BY SAME, DC POST IN ASSOCIATION WITH ACEC M/W Insanity: doing the same thing over and over again and expecting
Smart Data Center Solutions
Smart Data Center Solutions New Data Center Challenges Require New Solutions Data Center Architecture. Inside and Out. Data centers are mission-critical facilities. A silo-based approach to designing,
PREPARING A BUINDLING INFORMATION MODEL FOR FACILITY MAINTENANCE AND MANAGEMENT
PREPARING A BUINDLING INFORMATION MODEL FOR FACILITY MAINTENANCE AND MANAGEMENT Anoop Sattenini, Salman Azhar*, and Joseph Thuston McWhorter School of Building Science, Auburn University, Auburn, Alabama,
Collaborative Project Management Made Simple
Collaborative Project Management Made Simple Construction businesses in the building, energy, and infrastructure sectors find Viewpoint For Projects to be an ideal fit. That s because all team members
Concur Customer Experience 2015 REPORT. Concur // Customer Experience 2015 Report
Concur Customer Experience 2015 REPORT 1 Contents 3 Welcome Contents 4 Gathering feedback 5 The impact of your feedback 5 User experience evolution 5 Product reliability 7 Looking toward the future 7 Customer
IBM Maximo. Doug Wood, Architect Tivoli CTO s Office Esther Burwell, Tech Lead Tivoli CTO s Office. 07-Dec-2011 COBie CMMS/CAFM Challenge 1
IBM Maximo Doug Wood, Architect Tivoli CTO s Office Esther Burwell, Tech Lead Tivoli CTO s Office 07-Dec-2011 COBie CMMS/CAFM Challenge 1 Maximo Asset Management Asset Management Facilities, Operations,
Trends In Data Quality And Business Process Alignment
A Custom Technology Adoption Profile Commissioned by Trillium Software November, 2011 Introduction Enterprise organizations indicate that they place significant importance on data quality and make a strong
The problem with privileged users: What you don t know can hurt you
The problem with privileged users: What you don t know can hurt you FOUR STEPS TO Why all the fuss about privileged users? Today s users need easy anytime, anywhere access to information and services so
AP1000 European 18. Human Factors Engineering Design Control Document
18.2 Human Factors Engineering Program Management The purpose of this section is to describe the goals of the AP1000 human factors engineering program, the technical program to accomplish these goals,
Building Energy Management: Using Data as a Tool
Building Energy Management: Using Data as a Tool Issue Brief Melissa Donnelly Program Analyst, Institute for Building Efficiency, Johnson Controls October 2012 1 http://www.energystar. gov/index.cfm?c=comm_
Personna PC web-based software. Q-AdminTM client. Lighting management hub (floor 1)
Lutron / Trane BACnet Integration Application Note #523 Revision A August 2014 Quantum Overview GreenGlance client Personna PC web-based software ipad with Q-Control+ app Corporate Building Network Quantum
BIM to Sim. Drury B. Crawley, Ph.D. FASHRAE, BEMP, FIBPSA, AIA Bentley Systems, Inc.
BIM to Sim (How do I get that rich data into my simulations without re-entering?) Drury B. Crawley, Ph.D. FASHRAE, BEMP, FIBPSA, AIA Bentley Systems, Inc. Building Energy Simulation Forum 18 December 2013
Secure and Semantic Web of Automation
Secure and Semantic Web of Automation Wolfgang Kastner 1, Andreas Fernbach 1, Wolfgang Granzer 2 1 Technische Universität Wien 2 NETxAutomation Software GmbH Automation Systems Group Computer Engineering/Software
Industrial Roadmap for Connected Machines. Sal Spada Research Director ARC Advisory Group [email protected]
Industrial Roadmap for Connected Machines Sal Spada Research Director ARC Advisory Group [email protected] Industrial Internet of Things (IoT) Based upon enhanced connectivity of this stuff Connecting
The Phios Whole Product Solution Methodology
Phios Corporation White Paper The Phios Whole Product Solution Methodology Norm Kashdan Phios Chief Technology Officer 2010 Phios Corporation Page 1 1 Introduction The senior staff at Phios has several
Jotne EPM Technology
Jotne EPM Technology Data Modeling by Janne Aas-Jakobsen EPM Technology Jotne EPM Technology a member of the Jotne Group, specialising in information technology Since 1990 the company has developed database
Getting Started with BIM (Building Information Modeling)
Getting Started with BIM (Building Information Modeling) Curt Egli Synergis Building Solutions Engineer Session Summary This session will walk you through issues you should consider when strategizing,
GETTING STARTED WITH ANDROID DEVELOPMENT FOR EMBEDDED SYSTEMS
Embedded Systems White Paper GETTING STARTED WITH ANDROID DEVELOPMENT FOR EMBEDDED SYSTEMS September 2009 ABSTRACT Android is an open source platform built by Google that includes an operating system,
How to Create a Business Focused Data Quality Assessment. Dylan Jones, Editor/Community Manager [email protected]
How to Create a Business Focused Data Quality Assessment Dylan Jones, Editor/Community Manager [email protected] Why Do We Need a Data Quality Assessment? We need to perform a data quality assessment
Business Process Services. White Paper. Leveraging the Internet of Things and Analytics for Smart Energy Management
Business Process Services White Paper Leveraging the Internet of Things and Analytics for Smart Energy Management About the Author Akhil Bhardwaj Akhil Bhardwaj is a Senior Manager in the Analytics and
218 Chapter 11. Conclusions. Therefore, this thesis aims to contribute to improving productivity of SMEs through DM and Project Communication.
218 Chapter 11. Conclusions 11. Conclusions 11.1. General conclusions The final objective of whatever research is to improve the knowledge and provide tools to improve it. In whatever company and in whatever
INTEGRATING BIM AND GIS FOR ASSET MANAGEMENT
INTEGRATING BIM AND GIS FOR ASSET MANAGEMENT Andy Chan MHKIBIM Project Manager Spatial Technology Limited Agenda Introduction of Asset Management Why GIS is not sufficient for Asset Management Data model
Practical Strategy and Workflow for Large Projects: A Realistic Solution
Practical Strategy and Workflow for Large Projects: A Realistic Solution Marco Brasiel/Diego Faria Frazillio & Ferroni SE3193 This class presents a strategy for development of structural projects using
BIM: FOR PROJECT MANAGERS. 2011 CSI Southwest Region Conference Program 1B 8:45am 11:00am
BIM: FOR PROJECT MANAGERS ANA BAKER BRANDON GARRETT 2011 CSI Southwest Region Conference Program 1B 8:45am 11:00am 1 2 3 4 BIM Overview BIM Level of Development Evolution of the Drawing Process BIM Workflow
Virtual Machine Manager Domains
This chapter contains the following sections: Cisco ACI VM Networking Supports Multiple Vendors' Virtual Machine Managers, page 1 VMM Domain Policy Model, page 2 Virtual Machine Manager Domain Main Components,
for Revit MEP The professional s choice for Building Services
for Revit MEP The professional s choice for Building Services The professional s choice for Building Services With MagiCAD, all modelling is highly automated, fast and accurate. Checking the model and
Rational Reporting. Module 3: IBM Rational Insight and IBM Cognos Data Manager
Rational Reporting Module 3: IBM Rational Insight and IBM Cognos Data Manager 1 Copyright IBM Corporation 2012 What s next? Module 1: RRDI and IBM Rational Insight Introduction Module 2: IBM Rational Insight
ISA CERTIFIED AUTOMATION PROFESSIONAL (CAP ) CLASSIFICATION SYSTEM
ISA CERTIFIED AUTOMATION PROFESSIONAL (CAP ) CLASSIFICATION SYSTEM Domain I: Feasibility Study - identify, scope and justify the automation project Task 1: Define the preliminary scope through currently
Personna PC web-based software. Q-AdminTM client. Lighting management hub (floor 2) Lighting management hub (floor 1)
Lutron / Tridium BACnet Integration Application Note #525 Revision A August 2014 Quantum Overview GreenGlance client Personna PC web-based software ipad with Q-Control+ app Corporate Building Network Quantum
Express Technology. Maintenance Solutions www.expresstechnology.com 251.929.3200. 2011 Express Technology Inc.
EQUIPMENT MANAGEMENT PREVENTATIVE MAINTENANCE BREAKDOWN MAINTENANCE DOWNTIME TRACKING WORK ORDERS MAINTENANCE HISTORY PARTS INVENTORY PARTS RECEIVING PURCHASE ORDERS Express Technology Maintenance Solutions
NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING TECHNOLOGIES www.nicet.org 888-476-4238. Fire Alarm Systems
Fire Alarm Systems Level IV Content Outline Standard Model/CBT The skills and knowledge listed under each task are suggestive of those involved in that task, but are not intended to constitute an exhaustive
Facility Operations Integration
Facility Operations Integration James Bartone, Schneider Electric Kevin Dalton, Digital Realty Trust Philip Beatty, Bradford Engineers Jason Schafer, Schneider Electric Michael Jordan, Vantage Data Centers
A Standardized Structure for Defining and Managing BIM Project Deliverables
A Standardized Structure for Defining and Managing BIM Project Deliverables Dianne Davis, CSI AEC Infosystems, Inc. CSI- Co-Chair OmniClass Development National BIM Standards North American IDM Coordinator
Realizing business flexibility through integrated SOA policy management.
SOA policy management White paper April 2009 Realizing business flexibility through integrated How integrated management supports business flexibility, consistency and accountability John Falkl, distinguished
AB Suite in the Application Lifecycle
AB Suite in the Application Lifecycle By: Alan Hood White Paper The application lifecycle goes well beyond simply writing applications and testing them. It includes everything from the initial collection
oj microline touch thermostats PRODUCT PROGRAMME intelligent thermostat design in three dimensions Floor Heating ELECTRIC Hvac CONTROLS & POWER
intelligent thermostat design in three dimensions Floor Heating ELECTRIC Floor Heating HYDRONIC Hvac CONTROLS & POWER oj microline touch thermostats PRODUCT PROGRAMME Three different needs one floor heating
Medicaid Information Technology Architecture (MITA) Overview Compiled from MITA Framework 2.0 documents issued by CMS - March 2006
Medicaid Information Technology Architecture (MITA) Overview Compiled from MITA Framework 2.0 documents issued by CMS - March 2006 CMS has worked with a number of stakeholders over the past two years to
Getting to a Facility Management BIM
Getting to a Facility Management BIM By: Duane Gleason Lake Constance 5D-Conference 2013 Constance, 28th-29th of October Introduction The evolution of building information modeling (BIM) has been very
Service Oriented Architecture and the DBA Kathy Komer Aetna Inc. New England DB2 Users Group. Tuesday June 12 1:00-2:15
Service Oriented Architecture and the DBA Kathy Komer Aetna Inc. New England DB2 Users Group Tuesday June 12 1:00-2:15 Service Oriented Architecture and the DBA What is Service Oriented Architecture (SOA)
ULTIMATE GUIDE TO BUILDING AUTOMATION SYSTEM (BAS)
ULTIMATE GUIDE TO BUILDING AUTOMATION SYSTEM (BAS) Building Automation is monitoring and controlling a building s systems including: mechanical, security, fire and flood safety, lighting, heating, ventilation,
Supervision software for Intrusion detection, Fire detection and CCTV systems
Supervision software for Intrusion detection, Fire detection and CCTV systems elmospa.com Global security solutions Globalpro GLOBALPRO is the new supervision software that allows to obtain a powerful
Collaborating Across Disciplines with Revit Architecture, MEP, and Structure
Collaborating Across Disciplines with Revit Architecture, MEP, and Structure David Cohn AB104-3 Are you ready to take the next step and use building information modeling to share data across the entire
Energy Design Resources Commissioning Plan Outline Template
IMPORTANT NOTICE: This sample document is provided for instructional purposes only. CCC is not rendering advice concerning any commission project or practices. This document is neither approved nor intended
Using the Autodesk Revit GSA Spatial Template
Autodesk Revit Template for the U.S. General Services Administration Using the Autodesk Revit GSA Spatial Template This document helps you to get started in using the GSA Spatial Template Revit file in
Criticism of Implementation of ITSM & ISO20000 in IT Banking Industry. Presented by: Agus Sutiawan, MIT, CISA, CISM, ITIL, BSMR3
Criticism of Implementation of ITSM & ISO20000 in IT Banking Industry Presented by: Agus Sutiawan, MIT, CISA, CISM, ITIL, BSMR3 Outline What is IT Service Management What is ISO 20000 Step by step implementation
BIM Test At ASHRAE HQ
This article was published in ASHRAE Journal, April 2011. Copyright 2011 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. Posted at www.ashrae.org. This article may not be
CA Oblicore Guarantee for Managed Service Providers
PRODUCT SHEET CA Oblicore Guarantee for Managed Service Providers CA Oblicore Guarantee for Managed Service Providers Value proposition CA Oblicore Guarantee is designed to automate, activate and accelerate
Adopting the DMBOK. Mike Beauchamp Member of the TELUS team Enterprise Data World 16 March 2010
Adopting the DMBOK Mike Beauchamp Member of the TELUS team Enterprise Data World 16 March 2010 Agenda The Birth of a DMO at TELUS TELUS DMO Functions DMO Guidance DMBOK functions and TELUS Priorities Adoption
5178 EOI Direct Digital Controls Systems Strategic Plan Schedule A. Technical Submission. City of Richmond
Schedule A Technical Submission City of Richmond TABLE OF CONTENTS... 3 1 Company information... 4 1.1 Service Organization... 4 1.2 Construction Organization... 4 2 Programming Language... 5 2.1 Example
E-vote 2011 Version: 1.0 Testing and Approval Date: 26/10/2009. E-vote 2011. SSA-U Appendix 5 Testing and Approval Project: E-vote 2011
E-vote 2011 SSA-U Appendix 5 Testing and Approval Project: E-vote 2011 Change log Version Date Author Description/changes 0.1 26.10.09 First version Page 1 CONTENT 1. INTRODUCTION 3 2. TESTING PROCESS
Service Portfolio Management PinkVERIFY
-11-G-001 General Criteria Does the tool use ITIL 2011 Edition process terms and align to ITIL 2011 Edition workflows and process integrations? -11-G-002 Does the tool have security controls in place to
Design Document Version 0.0
Software Development Templates Design Document Version 0.0 Description of Project DOCUMENT NO: VERSION: CONTACT: EMAIL: Ivan Walsh DATE: 4/13/2004 Distribution is subject to copyright. Design Document
The role of integrated requirements management in software delivery.
Software development White paper October 2007 The role of integrated requirements Jim Heumann, requirements evangelist, IBM Rational 2 Contents 2 Introduction 2 What is integrated requirements management?
Data Center Solutions
Data Center Solutions New Data Center Challenges Require New Solutions Data Center Architecture. Inside and Out. Data centers are mission-critical facilities. A silo-based approach to designing, deploying
From COBie to Asset Management
BIM Prospects Conference: From COBie to Asset Management 27 th March 2015 - RIBA, London Jeff Stephens, Head of BIM [email protected] 1 Experiences creating COBie data for Asset Management
UNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-23 09 93 (November 2015) ----------------------------- Preparing Activity: USACE Superseding UFGS-23 09 23 (May 2011) UNIFIED FACILITIES GUIDE SPECIFICATIONS References
Cracking the Code on Software License Management
Cracking the Code on Software License Management Overview of IT Asset Management Integration Integration of the physical, financial, and contractual attributes of IT assets Enables the delivery of timely
Analytics Software for a World of Smart Devices. Find What Matters in the Data from Equipment Systems and Smart Devices
Analytics Software for a World of Smart Devices Find What Matters in the Data from Equipment Systems and Smart Devices The Challenge Turn Data Into Actionable Intelligence SkySpark Analytics Software automatically