Gomaa Mostafa Mohamed El-Gazzar Mechanical Commissioning Manager PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS



Similar documents
MEC-C-S-1980 Mechanical Superintendent PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS CHRONOLOGICAL EXPERIENCE RECORD

OROT RABIN POWER STATION UNITS x 350 MW

EFFICIENT ENERGY SUPPLY (ELECTRICITY AND DISTRICT HEAT) FOR THE CITY OF LINZ

SRS: THE STANDARDIZED REPOWERING SOLUTION FOR 300MW STEAM POWER PLANTS IN RUSSIA. Matthias Fränkle Siemens Power Generation (PG), Germany

The main steam enters the building in the basement mechanical room; this is where the condensate line also leaves the building.

Fortum bygger Sveriges största biokraftvärmeverk i Stockholms stad. Daniel Nilsson Värme & Kraftkonferensen, Stockholm 12 november 2014

Factory owners must ensure the boiler is:

Combined Cycle Control Overview

AT&T Global Network Client for Windows Product Support Matrix January 29, 2015

Maximizing Boiler Plant Efficiency. Presenter: Dan Watkins, LEED BD+C Sales Engineer Bornquist, Inc.

Performance Monitoring & Optimization

Sixth Annual Conference on Carbon Capture & Sequestration

HOW TO SELECT A LOW VOLUME (L.V ) BOILER

PI System O&M Management Tool in Power Generation Industry. 27 October Barış Başer O&M Group Manager

Subject: Technology Collaboration for Gas Turbine and its auxiliaries of a 1.5 MW (ISO) rating, suitable for marine (defence) application.

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

MC (Multi-Circulation) f o r S A G D a n d I n d u s t r i a l A p p l i c a t i o n s

MHI Air-Blown IGCC Technology & Application to Chinese Project

Energy Division Lahmeyer International GmbH Rehabilitation Vasilikos PS Unit 5 CCPP after Naval Base explosion

The Technology and Business of Power Andrew Valencia, P.E. Lower Colorado River Authority

Olkiluoto 3 Project. AREVA Suppliers Day Warsaw October 4, 2011

THE EUROPEAN GREEN BUILDING PROGRAMME. Technical Module on Combined Heat and Power

INTEC Engineering GmbH Heating Solutions for the Marine Industry

NEW JERSEY CENTER OF EXCELLENCE

PERFORMANCE EVALUATION OF NGCC AND COAL-FIRED STEAM POWER PLANTS WITH INTEGRATED CCS AND ORC SYSTEMS

Sea Water Heat Pump Project

Design and Test Operation Performance of 1,500 C Class Gas Turbine Combined-Cycle Power Plant:

Applicazione di tecniche di controllo predittivo multivariabile ad impianti di produzione a Ciclo Combinato

REMOTE MONITORING AND CONTROL OF THE KAKKONDA GEOTHERMAL POWER PLANTS

Case 2:08-cv ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138. Exhibit 8

Introduction to ESB Group

REQUEST FOR QUOTATIONS

Boiler & Pressure Vessel Inspection discrepancies and failures

Committed to make a better world

Efficiency Metrics for CHP Systems: Total System and Effective Electric Efficiencies

Alain Nifenecker - General Electric Manager Controls Engineering

LPG Burning Gas Turbine for Power Generation

INSTRUCTION MANUAL. Boil-Out TABLE OF CONTENTS SAFETY WARNINGS 2-3 RESPONSIBILITY 3 INTRODUCTION 3 PRE-BOIL OUT PROCEDURES 3-5 BOIL OUT PROCESS 5-9

Originators of the Flexible Water Tube design

Natural Gas Conversions of Existing Coal-Fired Boilers

Codes and High Performance Hot Water Systems. Gary Klein Affiliated International Management, LLC

BOUNDARY DAM CCS CROSSES THE FINISH LINE. October 2014

10 Strategic Steps to Reducing Your Energy Costs AEE Regional Chapter Meeting February 2, 2005

Power Generation Division

Enhanced Vessel Traffic Management System Booking Slots Available and Vessels Booked per Day From 12-JAN-2016 To 30-JUN-2017

CSP. Feranova Reflect Technology. klimaneutral natureoffice.com DE gedruckt

Computing & Telecommunications Services Monthly Report March 2015

Steam Power Plants as Partners for Renewable Energy Systems

Financial Summary 3rd quarter of FY2012. January 29, 2013 Tohoku Electric Power Co., Inc.

Making power plants energy efficient ABB, integrated power and automation solutions

Facility Support Services

Dallas/Fort Worth International Airport District Energy Plant Upgrades Project Making More with Less Sustainable Communities Conference Dallas, TX

Job Grading Appeal Decision Under Section 5346 of Title 5, United States Code

Routine and Emergency Boiler Operation

Boiler Preparation, Start-Up and Shutdown

EIGHTH ANNUAL CONFERENCE ON CARBON CAPTURE & SEQUESTRATION

Piping Systems for Nuclear Power Industry. Prague, October 2011

MHI s Energy Efficient Flue Gas CO 2 Capture Technology and Large Scale CCS Demonstration Test at Coal-fired Power Plants in USA

General information on TAQA JLEC Power Plant

Making power plants energy efficient

10 Nuclear Power Reactors Figure 10.1

Current state of plant Functioning as a peak and emergency centre. Statistics Accumulated operating hours:

SURALAYA SPP (Indonesia Power Generation Business Unit)

The Power Industry Specialists

Department of Veterans Affairs VHA DIRECTIVE Veterans Health Administration Washington, DC October 15, 2008 BOILER PLANT OPERATIONS

Condensing Boiler Efficiency

ASME QRO Certification Program

TEACHING SUSTAINABLE ENERGY SYSTEMS A CASE STUDY

Power Island. Industrial Power Plants. / energy

Plant Optimization & Performance Software

Steam Turbine Concepts for the Future Volatile Power Market

NAWTEC CONCEPTS AND EXPERIENCES FOR HIGHER PLANT EFFICIENCY WITH MODERN ADVANCED BOILER AND INCINERATION TECHNOLOGY

Analysis One Code Desc. Transaction Amount. Fiscal Period

Improved Modern Control Station for High Pressure Bypass System in Thermal Power Plant

R ENEWABLE SOURCES CSP. Sustainable and cost-efficient solar thermal energy

University of Maryland College Park District Energy System. IDEA Campus Energy Conference February 9, 2012

DESIGN CHALLENGES AND OPERATIONAL EXPERIENCE OF A MEGA MED SEAWATER DESALINATION PLANT IN TIANJIN

CHP Plant based on a Hybrid Biomass and Solar System of the Next Generation EU project No. ENER/FP7/249800/"SUNSTORE 4" Dipl.-Ing. Alfred Hammerschmid

Management/Consulting. Engineering. Project Management. Management/ Consulting. Site Management. Commissioning. Services

12 November 2008 *** I:\CIRC\MEPC\01\642.DOC INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR

Renewable Energy in Egypt Grid-Connected Projects

Jeff Haby, P.E. Director Sewer System Improvements. September 15, Agenda

ABSTRACT DCMCCT PROJECT OVERVIEW

Princeton University Microgrid

Energy Audit of a Brewery A Case Study of Vitamalt Nig. Plc, Agbara

Jarad Daniels U.S. Department of Energy Office of Fossil Energy

Backup Fuel Oil System Decommissioning & Restoration Plan

February 19, Senior Fellow, Nuclear Energy Systems & Services Division Power Systems Company

Tutkimuksen merkitys menestyvässä liiketoiminnassa- Innovaatiosta tuotteeksi

Company Profile. New and overhauled Power Plants for sale

CyberFortress Data Center at Innovation Park Infrastructure and Topology Guide. Innovation Park Charlotte. NC DRAFT V0.

GE Oil & Gas. Air cooled heat exchangers Robust and reliable for all loads and applications

Overview of Integrated Coal Gasification Combined-cycle Technology Using Low-rank Coal

A CASE STUDY: PERFORMANCE AND ACCEPTANCE TEST OF A POWER AND DESALINATION PLANT. Keywords : Power Plant, Boiler Capacity, Electrical Power

Adapting Gas-Power Generation to New Role in Low-Carbon Energy Systems

Long-Term Demonstration of CO2 Recovery from the Flue Gas of a Coal-Fired Power Station

LANDFILL GAS TO ENERGY- COMBINED ENGINE AND ORC-PROCESS

BANGLADESH POWER DEVELOPMENT BOARD. Consulting Services for Ghorasal 365 MW Combined Cycle Power Plant Construction Project

Miglioramenti nella flessibilità dei cicli combinati: esperienze recenti di Ansaldo Energia. Alice Pesenti Federico Calzolari

Transcription:

Gomaa Mostafa Mohamed El-Gazzar Mechanical Commissioning Manager Holds a B. Sc. in Mechanical Power Engineering and has over 27 years experience in fossil fuel power generating stations from testing through start-up and operation. Expertise in Mechanical Engineering, experienced in Electrical and I&C Start-up Engineering, turnover packages and performance testing. PERSONAL DATA Nationality : Egyptian Birth Year : 1965 Gender : Male Marital Status : Married Residence : Tanta EDUCATION : B. Sc. in Mechanical Power Engineering, Menoufia University, 1987 LANGUAGES Arabic English : Native Language : Good COMPUTER SKILLS : Windows, MS Office, Internet : MS Project TRAINING COURSES AND CERTIFICATIONS : 30 Hours PMP training for PMP Examination. : Occupational safety and health Administration training (OSHA), 30 hours course by American University. : Advanced Operation & Maintenance Training, Schnactady, New York, for El-Kureimat Thermal Power Station. Training offered by GE Turbine Generator and Boiler Feed Water Pump. : Off-Site Training in Japan, Training Course of the Safe and Efficient Operation and Maintenance of the Boiler, Turbine, Generator and Auxiliaries, offered by Mitsubishi and Toshiba for Assiut Thermal Power Plant Unit No. 1 (1x325MW). : Advanced Operation Training, Shoubra El-Kheima Thermal Power Plant (4x325MW), Ansaldo Front & Rear Natural gas: HFO fuel, Natural Circulation Boiler, Westinghouse T/G, training offered by Bechtel and EEA. : FIDIC Contracts understanding and use course, AUC Cairo. www.egyptrol.com Page 1 of 5 Updated: May 2015

CHRONOLOGICAL EXPERIENCE RECORD Date : From Sep. 2008 till now Employer : EGYPTROL Projects : Assiut Simple Cycle Power Plant 8x125MW GE (gas fired) Damietta Simple Cycle Power Plant 4x125MW GE (gas fired) Banha Combined Cycle Power Plant (1x750MW Gas fire) Qurrayahh Independent Power Plant (QIPP 6x750MW CCPP) 6 th of October Power Plant 4x150MW Gas Fired ANSALDO GTs Abu Qir 2x650MW Gas/Oil fired Boilers IRAQ Erbil - Gas Turbine Power Plant 2x125MW GE IRAQ Al-Solaimanyah - Gas Turbine Power Plant 2x125MW GE IRAQ Dohuk - Gas Turbine Power Plant 4x125MW GE Gas T. El-Atf Combined Cycle Power Plant (1x750MW Gas Fired) Sidi Krir Combined Cycle Power Plant (1x750MW Gas Fired) Job title : Company Commissioning Manager Job Description : Manage and coordinate all commissioning projects activities, starting from prepare commissioning proposals, prepare time schedules, select staff members, follow up execution, resolve conflicts, etc. Date : From Nov. 2010 till Dec. 2011 Employer : EGYPTROL, Seconded to SOCOIN (Project Consultant) Project : DEIR ALI 2 Extension CCPP 750MW (2x2x1) SYRIA Job title : Mechanical Expert & Training Coordinator Job Description : Lead the site design review team and coordination meetings. Act as Deputy Site Manager. Issued the training inception report. Prepare the training time schedule. Conduct on-job training for owner s engineers. Dates : From Jan. 2008 till Aug. 2008 Employer : KOCH/MAN Consortium Company Iran Project : Fajr 1 Petrochemical & Power Generation, IRAN: Two gas turbines General Electric (GE) frame 9E (125MW each). The control Mark V. Generator (ALSTOM). Job title : Commissioning & Start-up Leader Job Description : Prepared the commissioning program in Microsoft Project. Assign all commissioning staff daily activities. Prepare the equipment check lists. Evaluate and report daily and weekly activities progress. Review and test the complete operating logics functions. Lead cold and hot function tests of the unit. Conducted the water and oil systems flushing. Participate in conducting the reliability run test. Conduct Client Training (two weeks class/site) on behalf of GE. www.egyptrol.com Page 2 of 5 Updated: May 2015

Dates : From Feb. 2007 till Dec. 2007 Employer : KOCH/SIEMENS Consortium Company Project : Al Naserria Power Plant Extension SYRIA: The project consists of: 3 units of combined cycles which have 3 Fiat Avio gas turbines, 115MW each (existing) + one steam turbine Siemens 150MW. NEM HRSG, forced recirculation pumps. Job title : Start-up & Shift Charge Engineer Job Description : Responsible for cold and hot function tests of the unit. Conduct the water systems flushing and boiler chemical cleaning. Conduct the boiler and steam piping blowout. Participate in conducting the reliability run test. Prepare the operation instructions documents for each alarm signal. Dates : From Dec. 2006 till Feb. 2007 Employer : ALSTOM PEMCO (Power Equipment & Materials Co. LTD) Project : Rabigh Power Plant KSA: Overhaul for unit 2 & 4, 2x260MW Crude/HFO fired CE drum type controlled circulation reheat boiler. MHI steam turbine. MHI H2 cooled Generator. MHI sea water cooled Condenser. Job title : PTW & Coordination Engineer Job Description : Define units existing problems to be corrected during the overhaul by analyzing all the units operating parameters before shutdown. Responsible for issuing all plant permits to work during the overhaul. Leading all coordination meetings between the Client and the overhaul Contractor Team. Responsible for conducting Boiler performance tests prior and following the overhaul. Dates : From Oct. 2005 till Jul. 2006 Employer : ALSTOM POWER Project : Shoaiba Power Station Stage 2 KSA: 6x400MW Crude/HFO fired CE drum type controlled circulation reheat boiler. ABB condensing steam turbine. ABB H2 cooled Generator. ABB sea water cooled Condenser. ABB control system ADVANT Emergency & Black start diesel Generators, Fuel handling system, Auxiliary boiler system, Hydrogen production system and all other BoP equipment. Job title : Shift Leader Job Description : Coordinate and monitor systems flushing procedures, steam blows. Coordinate and monitor systems pneumatic and hydrostatic testing. Supervise the operational testing, commissioning and start-up. Perform isolation and safety tag out of equipment. Equipment operation training for the Client personnel. Developed the unit cold start-up curves that proved success. www.egyptrol.com Page 3 of 5 Updated: May 2015

Participate in the Reliability and Performance testing. Conduct all the plant tests on completion (Run-back, Load rejection, different equipment change over tests and all unit overhaul automatic cold, worm and hot start-up operation demonstration). Dates : From Oct. 2004 till Oct. 2005 Employer : PGESCo. (Power Generation & Engineering and Service Company) Project : Nubaria Power Station (2x750MW Combined Cycle) consists of: 4x250MW SIEMENS Gas Turbine. ALSTOM Heat Recovery & DCS. Mitsubishi Heavy Industry Steam Turbine. METITO Water treatment. CONSIS Switchyard live line wash system. INITEC Balance of Plant. Job title : Lead Mechanical Start-up Engineer Job Description : Support engineering, operation by scoping for drawings to finish the simple cycle at the target date. Participate in preparing the plant construction Contract Packages. Review the commissioning procedures and support the contractors to meet the project schedule. Review, approve and accept all plant cold & hot function tests. Prepare for flushing, chemical cleaning and steam blow-out. Dates : From Apr. 2001 till Jul. 2004 Employer : ALSTOM POWER Project : Shoaiba Power Station Stage 1 KSA: 5x400MW Croud/HFO fired (same description as above). Job Description : Same duties as above. Dates : From Jan. 2000 till Apr. 2001 Employer : PGESCo. (Power Generation & Engineering and Service Company) Project : Ayoun Moussa Thermal Power Station 2x320MW Job title : Start-up & Shift Charge Engineer Job Description : Review the commissioning procedures and support the contractors to meet the project schedule. Review, approve and accept all plant cold & hot function tests. Prepare for flushing, chemical cleaning and steam blow-out. Participate in the Reliability and Performance testing. Conduct all the plant tests on completion (Run-back, Load rejection, different equipment change over tests and all unit overhaul automatic cold, worm and hot start-up operation demonstration). Dates : From Jul. 1999 till Nov. 1999 Employer : ABB SIM - Jorf Lasfar Energy Company (JLEC) Project : Jorf Lasfar Thermal Power Station Units 3 & 4 MOROCCO: 2x345MW Forced Circulation, Coal/HFO Fired, ABB (Combustion Engineering) design boiler, ABB (Power Generation Limited) www.egyptrol.com Page 4 of 5 Updated: May 2015

Job title Turbine/Generator & DCS, ABB (Sae Sadelmi) B.O.P., Aquatech Water Treatment System. : Commissioning & Start-up Engineer Dates : From May 1999 till Jul. 1999 Employer : Babcock Wilcox (B&W) Project : Ayoun Moussa Thermal Power Station 2x320MW: Natural circulation boilers (2 boilers and auxiliary boilers). Forced draft fans and Gas recirculation fans and 18 burners. Job title : Commissioning Engineer Dates : From May 1996 till May 1999 Project : El-Kureimat Thermal Power Station: 2x627MW Natural Circulation, Natural gas/hfo Fired B&W "El Paso" design boiler, GE T/G with Mark V control, Fisher HP/LP Bypass System and Westinghouse WDPF (DCS). Bamag Water Treatment System. Job Description : Follow system flushes, steam blows & hydrostatic & pneumatic testing. Coordinate the operational testing, commissioning and start-up. Conduct isolation and safety tag-out of equipment. Train operators in safety and the proper care of equipment. Dates : From Apr. 1990 till May 1996 Project : Assiut Thermal Power Station: 2x325MW Mitsubishi (CE designed) Forced circulation, Natural gas/hfo Fired Boiler with ABC Control, Toshiba T/G and its auxiliaries, HP/LP Bypass System, Toshiba DAS, Mitsubishi BOP. Job Description : Design review for boiler, turbine and generator and BOP as per contract, tracking the progress and work quality of the mechanical contractors, primarily Toshiba, Mitsubishi, Ansaldo and SAE Sadelmi. Review welding procedure and perform inspection. Dates : From Jan. 1988 till Apr. 1990 Project : Shoubra El-Kheima Thermal Power Plant: 4x325MW Ansaldo Natural circulation front & rear Natural gas/hfo Fired Boiler, Westinghouse T/G, HP/LP Bypass System. Job title : Operation Engineer www.egyptrol.com Page 5 of 5 Updated: May 2015