Electrical Engineering

Similar documents
PROGRAM CRITERIA FOR ELECTRICAL ENGINEERING TECHNOLOGY

Engineering innovation

Electrical Distribution Services for Mining and Metals Industries

ETAP 11 The Future of Power Systems Engineering & Operation - Today

Power Plant Electrical Distribution Systems

Whitepaper Modular Integration of Process Equipment Packages for Oil and Gas Facilities

PMCS. Integrated Energy Management Solution. Unlock the Full Potential of Power Networks Through Integration. Complete Solution. Informed Decisions

Generic PCSR Sub-chapter 15.4 : Electrical Equipment

Containerized Infrastructure Solutions Fast and efficient deployment, anywhere, anytime

Nuclear Power Plant Electrical Power Supply System Requirements

Electric Power Systems An Overview. Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas

Designed for uptime. Defining data center availability via a tier classification system

Power Quality For The Digital Age INVERTING SOLAR POWER A N E N V IRONME N TA L P OT E N T I A L S W HI T E PA PER

ABB North America. Substation Automation Systems Innovative solutions for reliable and optimized power delivery

Freeport LNG Liquefaction Project

Offshore Platform Powered With New Electrical Motor Drive System

ELECTRICAL ENGINEERING DESIGN CRITERIA APPENDIX F

Power transformers. Generator step-up and system intertie power transformers Securing high-quality AC transmission

Increasing safety, reliability and efficiency for today s data centers

ABB Dedicated Products, Systems and Services for the Power Generation Industry

Design of electrical power system for a 1000MW nuclear power generating station

CONNECTING YOU TO SPECIALIST ELECTRICAL SUPPORT services

Portable Biogas Microturbine Power System Installation

Rule Fast Track Analysis for National Life Insurance Co.

REMOTE MONITORING AND CONTROL OF THE KAKKONDA GEOTHERMAL POWER PLANTS

FACT SHEET. BSES, Delhi - Distribution Network. Power Systems Consultancy from ABB

Switchgear Capabilities. NexGear is a Division of PowerSecure NASDAQ: POWR

Utility generation line card

For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V V V (at 50 Hz)

Paralleling Switchgear

Request for Payment Instructions Wholesale Distribution Access Tariff (WDAT) Attachment I - GIP

Part 1 System Modeling & Studies for Existing Systems

What are the basic electrical safety issues and remedies in solar photovoltaic installations?

Energy Strategic Plan Los Angeles Community College District Community College League Conference

CyberFortress Data Center at Innovation Park Infrastructure and Topology Guide. Innovation Park Charlotte. NC DRAFT V0.

C.I.8.2 Offsite Power System. C.I Description

Product overview brochure. ABB Medium Voltage Products Our one-stop approach for every medium voltage application

Green Energy Solutions

APEC CAPABILITIES PROJECT MANAGEMENT / SUPPORT

Fusible Disconnect Switch

4160: THE GREEN 480 MEDIUM VOLTAGE ELECTRICAL SYSTEMS

Up-to-Date with Electrical Equipment

ALL STAR ELECTRIC COMPANY 10,000 Trumbull SE, Suite #F Albuquerque, NM (505) voice & fax NM License

ANCILLARY EQUIPMENT AND ELECTRICAL EQUIPMENT Power Supply Systems and Electrical Equipment for Desalination Plants - Y.M. Hamud and A.H.

JUBILEE TECHNICAL TRAINING CENTRE TAKORADI POLYTECHNIC 2015 TRAINING PROGRAMMES

FULL ELECTRICAL LNG PLANTS: HIGHEST AVAILABILITY AND ENERGY EFFICIENCY THROUGH OVERALL SYSTEM DESIGN

ABB in data centers Comprehensive products and systems for your most critical infrastructure

Electrical Systems. <Presenter>

County of Riverside Building and Safety Department

Alain Nifenecker - General Electric Manager Controls Engineering

Fig. 2 Option 1 Integrated Design using Physical Separation. Fig. 1 Standard Modular Process Skid Design Concept

Process and Motor Controls in Central and Remote Buildings: PlantWeb Center, the Intelligent Remote Building

Addendum #2 Contract UK-11-13

Power transformers. Phase shifting transformers Reliable and efficient power flow control

Switchgear and Metal-Enclosed Bus

Harmonics and Noise in Photovoltaic (PV) Inverter and the Mitigation Strategies

Case Study -Sandy Grove Middle School First Net Positive Energy P3 School In North Carolina

Medium voltage products UniSec for Smart Grid Air-insulated medium-voltage secondary distribution switchgear

Eaton s Electrical Services & Systems. Technical Training Safety Training

Indoor coil is too warm in cooling mode or too cold in heating mode. Reversing valve or coil thermistor is faulty

SCADA. The Heart of an Energy Management System. Presented by: Doug Van Slyke SCADA Specialist

SOLARCARE SERIES PRODUCT AND APPLICATION GUIDE

ABB in data centers Comprehensive products and systems for your most critical infrastructure

Specifying a Variable Frequency Drive s

MEDIUM VOLTAGE. Michael Mosman, PE. CCG Facilities Integration Incorporated FACILITIES INTEGRATION INCORPORATED

Whitepaper. Modular Substation Cable Termination Design. Author: Allan Bozek P.Eng, MBA, EngWorks Inc, Calgary, Canada

Low Voltage Switchgear MNS is with MSpeed

RENEWABLE ENERGY SUBSTATIONS SOLAR PHOTOVOLTAIC AND WIND POWER. tgood.com. Energy. Fast.

Ontario Electrical Safety Code 25 th Edition/ 2012

Current state of plant Functioning as a peak and emergency centre. Statistics Accumulated operating hours:

FFI. Advances in Medium and Low Voltage Power Distribution ESS Metron Expo and Technical Seminars. Presented By: Greg Pelster & Robert Schmid

City of Riverside Building & Safety Division Phone: (951)

BEST PRACTICES TOWARDS ENERGY EFFECIENCY. UltraTech Cement Limited. (Unit -Kotputli Cement Works)

Turbine Controls Update

City of San Diego Residential Photovoltaic Systems Inspection Guidelines

MV, HV AND EHV SWITCHGEAR TESTING & COMMISSIONING

Training for Operations and Maintenance

Emergency Power System Services Industrial UPS, Batteries, Chargers, Inverters and Static Switches

Litigation Services & Information

16 West Coast Regional Plan

GROUND DETECTION CIRCUITS FOR STATIONARY APPLICATIONS (IN PLAIN DOWN TO EARTH LANGUAGE)

PSS SINCAL - Overview -

Customer connection enquiry form (For the connection of loads and generators)

21 st Century Facilities

SWITCHGEAR SOLUTIONS FOR MISSION CRITICAL APPLICATIONS. Presented by SAI Advanced Power Solutions

Products, systems and services for water and wastewater treatment plants Enhanced plant performance, efficiency and reliability

ABB Inc. April 19, 2011 Slide 1

April ABB in Norway. Power and productivity for a better world ABB. Slide 1

United Arab Emirates Helping to build the future

Comprehensive Range of Industrial Products and Solutions

Current Limiting Protector For Systems rated kV and continuous currents through 5000A.

HAZARDS, INCLUDING SHOCK, ARC FLASH AND FIRE

BGE Service Application Guidelines Residential Modification/Relocation Projects

NEW JERSEY CENTER OF EXCELLENCE

ABB solutions for combined cycle power plants ABB

Transcription:

Electrical Engineering

Trust our people. R eady is a professional engineering firm with highlyqualified electrical and controls personnel focused on providing solutions to meet your specific needs. Ready s niche in the electrical engineering industry is our ability to deliver complete, constructible design packages that minimize the cost of construction and contractor extras. Trust our expertise. Ready offers a complete array of electrical engineering services, from standard greenfield and brownfield power distribution to state of the art protection and control systems. Ready designs new power distribution systems from the ground up and retrofits new equipment into existing facilities. We design online equipment retrofits to maintain production, ensuring smooth integration and minimal interruptions to our customer s operations. Our extensive, multi-faceted electrical construction, operation, and maintenance experience leads to innovative designs and drawings adapted to suit the varying needs of all stakeholders.

Trust our solutions. Medium and low voltage AC and DC power distribution Substation and transmission models and applications to 500kV Hazardous area classification analysis Electrical equipment specification and procurement Protection and control systems design and specification Conceptual design and cost estimates Constructability reviews Electrical commissioning and testing facilitation VFD and motor starter specification and configuration Cable termination and equipment installation details Electrical Engineering Generator protection and control System grounding and equipment bonding Custom panel layouts for fabrication Equipment failure investigation and return to service Mechanical analysis of driven equipment systems Power distribution management: UPS, emergency power, and automatic transfer schemes Fire and gas detection Interior and exterior lighting Communication and instrumentation cabling and raceways Heat tracing Load flow Short-circuit / fault levels Protective device evaluation and coordination Arc flash Motor acceleration, with full mechanical analysis Voltage drop Power System Studies Harmonic load flow: mitigation and compliance Voltage droop Power management and load shedding Transient disturbances Single stage power factor correction Multistage power factor correction

Trust our experience. Coal Valley 1200 TPH Expansion Specification, design, installation, and commissioning of the control system and electrical power distribution for upgrade and expansion of the Coal Valley Preparation Plant, including the Wash Plant, Run Of Mine/Breaker Area, Thermal Dryer, and Train Load Out facilities. Electrical engineering scope included replacement of the power distribution system, comprised of the substation, switchgear, and MCCs. Introduction of 4160V to the site for motors 250HP and above, with other loads powered from new 600V substation and distribution. Bruce B Standby Generator Controls Upgrade Engineering review, corrective action recommendations, technical specifications (including instruments, protective relays, VFDs, AVR, auto-synchronizer, rectifier, inverter and OpLAN interface), testing and support documentation, relay settings migration, and review of complete control system upgrade for the four standby generators to meet requirements for Class III electrical distribution at the Bruce B station. Turbine Controls and Protection Upgrade Owner's Engineer for the replacement of a MK V turbine control system with an ABB DCS to provide turbine protection and control. GE and ABB logic comparison and review, design review, and factory acceptance testing (FAT). Coordination of wiring checkout, loop testing, and handover to operations for start up and function testing. Markup of existing site drawings and as-building associated systems. Concentrated Photovoltaic Solar Array Integration Integration of a 500kW Concentrated Photovoltaic (CPV) solar array with the electric grid. Upgrade of facility's service connection from the utility to meet local authority design requirements. System modeling analyzing efficiencies to determine a balance between system losses and design and installation costs.

Trust our experience. Various Multi-well Tie-in Facilities Complete Electrical Engineering services from Front End Engineering Design (FEED), through detailed design and on-site commissioning and start-up support. Projects included various facility development and site upgrade projects across Alberta and BC, including new multi-well tie-in systems, Separator skids, Wet Metering buildings, E&I buildings, generator packages, compressor installations, pump upgrades, and flare knock-out drums and stacks. Sheerness Generating Station Engineering design and project management for various capital and maintenance projects including WECC generator compliancy testing, installation of core vibration and shaft voltage monitoring systems for the 19kV turbine generators, specification and installation of new 4160V, 600HP air compressors, excitation transformer reliability study, and 400MVA, 19/245kV GSU transformer failure analysis and return to service. Coleville Facility Consolidation Project Design and specification of the 4160V and 480V electrical distribution systems consisting of switchgear, VFDs, motors, capacitors, and transformers. Design included power factor correction, harmonic filtering, motor protection, and grounding. Albian Sands Flocculant Facility Project management for the instrumentation, controls, and electrical design and construction of a new Flocculant & Coagulant building at the Jackpine site. Pulp and Paper Mill Project management and design reviews for various capital and maintenance projects including overall facility power system studies (load flow, short-circuit, coordination, arc flash, and motor starting), new O 2 plant addition, WECC generator testing, woodroom upgrade, and various MCC replacements (2400V and 600V). NSE Fuel & Lube Island and MEM Infrastructure Engineering design, ETAP power system modeling and studies, and Construction Work Package (CWP) development for power distribution and facility electrical systems to support the North Steepbank Extension projects. Projects included HV substation tie-in, substation and facility grounding, power and instrumentation cabling and raceway, high mast exterior and interior lighting, gas detection, fire alarm, mechanical equipment power, and interlocks for the new infrastructure and trailer facilities.

Ask us how we can help. Jordie Holton, P.Eng. Manager, Electrical Engineering 780.960.6663 x124 holton@readyengineering.com Jeff Whitt, PE Vice President 360.413.9800 x301 whitt@readyengineering.com