NUCLEAR NEW BUILD Presentation to NucSIG December 9 th,2009

Similar documents
NNB GENERATION COMPANY LTD

Horizon NSL Pre-Application Intervention Strategy

Employee Engagement in EDF Energy Generation

Hinkley Point Nuclear Power Point

Building our industrial future. Hinkley Point C Supply Chain be part of it

Office for Nuclear Regulation

Flamanville 3 Nuclear Power Plant

The Essential Guide to the new build nuclear supply chain

Foratom event 29 April 2015

Nuclear Consultancy & Engineering Services

The Essential Guide for the nuclear new build supply chain

Office for Nuclear Regulation

Business Continuity Guidance for Suppliers & Contractors. Blackburn with Darwen Borough Council

Join the UK Nuclear Renaissance. Procurement & Quality Process

Ensuring Quality Going Down the Supply Chain

Human Factors in Design and Construction Regulatory Perspective

Health, safety and environment policy and management arrangements

Roles & Grades Rate Cards and Applicable SFIA Skills

Profile. Marine ingenuity In just two words, we show what we do, how we do it, and what makes us different. Dredging and Marine Contractors

Standard Job Advertisements: Physical Resources Management Units: Provincial Departments of Education Posts funded in the Division of Revenue Act

Building New Generation Nuclear Plants Worldwide : AREVA's Experience

Training in Sustainable Supply Chain

Basics of Sustainability. Environmental Management Systems (EMS)

EDF ENERGY S CONSOLIDATED SEGMENTAL STATEMENT YEAR ENDED 31 DECEMBER 2013

Position Description. Te Aho o Te Kura Pounamu. Purpose Statement

BECOMING A CONSTRUCTIONLINE MEMBER

EDF Nuclear plant under decommissioning programme. CIDEN organization. Projects achievement

Olkiluoto 3 Project. AREVA Suppliers Day Warsaw October 4, 2011

FM & SECURITY SOLUTIONS. SSS Managed Services. Impartial, innovative, involved

Hinkley Point new nuclear power plant: the story so far

CHAPTER 49 RELIABILITY & MAINTAINABILITY (R&M) PLANS & PROGRAMMES CONTENT

Quality Manual. This manual is proprietary and no part thereof shall be copied without written authorisation from the company. Ref: Quality Manual.

BUILDING A STRATEGY FOR BIM

Director of Asset Management and Repairs

quality, health & safety and environment training and consulting

TOTAL CAPABILITY IN SCAFFOLDING & ACCESS SYSTEMS REACHING NEW HEIGHTS OF INNOVATION & SAFETY

PLANNING & FORENSIC DELAY ANALYSIS

KEY CONSIDERATIONS IN POWER PURCHASE AGREEMENT (PPA) RISK ALLOCATION AND COMMON CLAUSES WHICH FORM PART OF A PPA

Olkiluoto 3 Experience

QSS 0: Products and Services without Bespoke Contracts.

EUROPEAN COMMISSION. Brussels, C(2013) 9073 final

NUCLEAR POWER OVERALL GOOD FOR THE SOCIETY Finnish German Energy Day, 7th November 2012

Sustainability in Global Supply Chains Information and Guidance for Companies

Code of practice for accurate bills

CHAPTER 24: ENVIRONMENTAL MANAGEMENT

MISSION REPORT ON THE INTEGRATED NUCLEAR INFRASTRUCTURE REVIEW (INIR)

Road Safety ROAD SAFETY

Safe management of healthcare waste

A guide to our company and our services.

Responsibility Deal between the UK, Scottish and Welsh Governments and the direct marketing sector November 2011

OW BUNKER ANNOUNCES INTENTION TO LAUNCH AN IPO AND TO SEEK A LISTING ON NASDAQ OMX COPENHAGEN

LIABILITIES FOR DESIGN DEFECTS IN A COLLABORATIVE, INTEGRATED DIGITAL AGE. A presentation on the UK experience By Karen Gough, Barrister

Cyber Security and Data Privacy Acumin Specialist Cloud Services

Statement of Compliance

Introduction to the UK Electricity Industry

Application Value Assessment

Case Study: Eskom Distribution Asset Management Assessment and Way Forward

QUALITY ASSURANCE GUIDE FOR GREEN BUILDING RATING TOOLS

Core Fittings C-Core and CD-Core Fittings

Long term operation integrated processes for delivering extended asset performance

1 - SOGS_General Presentation_V SPIE Oil & Gas Services

Our Commitment to Information Security

MERGER BETWEEN BRITISH AEROSPACE PLC AND THE MARCONI ELECTRONIC SYSTEMS BUSINESS OF THE GENERAL ELECTRIC COMPANY PLC

Contract risk and assurance

By. Mr. Chomnaphas Tangsook Business Director BSI Group ( Thailand) Co., Ltd

Regional Center of Excellence ACES. For Land and Marine Surveying

Management System Manual International Nuclear Services Ltd and Pacific Nuclear Transport Ltd

IT Governance Charter

Project Governance. Dr. David Wilson Mr. Doug Connell Master Research Australasia Pty Ltd

Project Charter. Project Sponsor: Prepared By: S. Vassilatos

Installation, future demands for recruitment and competencies. Speaker: Hans Schneider Date: 4 April 2013

Risk Consulting. At a Glance

Internal Audit Report. Chief Executive s Unit. Review of Contract Management

E-Zec Medical Transport Services Ltd

ARCHITECTS, ENGINEERS, SURVEYORS & CONSTRUCTION INDUSTRIES PROFESSIONAL INDEMNITY INSURANCE PROPOSAL FORM

INTEGRATED RISK MANAGEMENT SOLUTIONS

AREVA, an unparalleled experience in building nuclear reactors

Patient Administration Systems A National Approach. Alan Price IPMS Programme Manager

TfNSW Standard Requirements TSR T Technical Management

SCHEDULE AND BUDGETING

Preliminary Information Memorandum. Thanet Offshore Transmission Assets. July 2009

Specific Responsibilities Associated Performance Measures 1. Excellence in Commercial Management 2. Excellence in Contract Performance

R000. Revision Summary Revision Number Date Description of Revisions R000 Feb. 18, 2011 Initial issue of the document.

Transcription:

NUCLEAR NEW BUILD Presentation to NucSIG December 9 th,2009 Gautier COSSART Quality Assurance / Safety & Regulations Division ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER S NAME HERE / ADD DATE HERE Copyright EDF Energy. All rights reserved.

Presentation Contents Overview of NNB GenCo and EPR team Overview of the Programme NNB GenCo & Quality Assurance organisation Copyright EDF Energy plc. All rights reserved. 2009. 2

Overview of NNB GenCo NNB GenCo will be the Licensee for the New Nuclear Construction in UK NNB corporate structure driven by long term safety and commercial considerations tied to standardisation of EPRs NNB established as a separate Licensee from Existing Nuclear. Safety benefit achieved by UK EPRs being similar but not identical to other EPRs. Learn from OL3, FL3 and others during construction and throughout operation. Utilise DIN and UK DIN expertise. NNB organisation is coming together Basic roles and responsibilities defined at the Function level, further governance under development Management Prospectus and Nuclear Baseline Organisation. More to come, including robust features for QA Copyright EDF Energy plc. All rights reserved. 2009. 3

Nuclear New Build Generation Company Ownership ELECTRICITE DE DE FRANCE S.A. S.A. EDF INTERNATIONAL SA CENTRICA PLC EDF ENERGY (UK) LIMITED EDF DEVELOPMENT COMPANY LIMITED GB GB GAS HOLDINGS LIMITED EDF ENERGY GROUP HOLDINGS HOLDINGS LIMITED / PLC (to be re-registered) 20% 20% 80% 80% LAKE ACQUISITIONS LIMITED LAKE ACQUISITIONS LIMITED NNB NNB HOLDING HOLDING COMPANY COMPANY AND THE BRITISH ENERGY (to be incorporated) COMPANIES WHICH IT HOLDS Transfer of relevant contracts NNB GENERATION NNB COMPANY (to be incorporated) Copyright EDF Energy plc. All rights reserved. 2009. 4

EPR Team Overview Nuclear New Build (NNB) Holding Company Board (EDF Energy + Centrica) NNB (Site Licence Company) Formal Arrangements Architect Engineer Nuclear Engineering Division (DIN) (including UK subsidiary) and EDF Purchasing Division Suppliers NSSS Turbine Island Earth Works Civil Work Marine Work etc Copyright EDF Energy plc. All rights reserved. 2009. 5

Overall Programme HP UNIT C1 HP UNIT C2 SZ UNIT C1 SZ UNIT C2 6 Copyright EDF Energy plc. All rights reserved. 2009. 6

Main Milestones for Unit HPC1 VESSEL INSTALLATION OVERALL COMMISSIONING 7 Copyright 11 décembre EDF Energy 2009 plc. All rights EDF/DIN/CNEN reserved. 2009. 7

Hinkley Point C (mid 2019) Copyright EDF Energy plc. All rights reserved. 2009. 8

NNB Generation Company Organisation UK DIN Board Humphrey Cadoux-Hudson MD Nuclear New Build Jean Dulac Director of UK DIN Chris Bakken Director of NNB Operations, Safety and Licensing Henri Herkelmann Director of NNB Procurement & Construction Richard Mayson Director of Planning & External Affairs Nigel Land Finance Director Barbara Jones Human Resources Director Graeme Bellingham Director of CCGT Construction Copyright EDF Energy plc. All rights reserved. 2009. 9

Procurement and Construction Henri Herkelmann Director NNB Procurement & Construction HPC Site Construction Director NNB Project Control Quality Control Industrial Safety NNB Procurement & Contract Management Copyright EDF Energy plc. All rights reserved. 2009. 10

Operations, Safety and Licensing Chris Bakken Director NNB Operations Safety & Licensing Licensing Design Authority NNB QA & SRD Management Arrangements Operational Development Training Copyright EDF Energy plc. All rights reserved. 2009. 11

Quality Assurance Note : One team leader will have be also Deputy head of QA. Gautier Cossart NNB QA / SRD PA (shared) Management Controls Team QA Audit Team Quality Control Programming Team SRD Branch TO BE DEFINED LATER Copyright EDF Energy plc. All rights reserved. 2009. 12

Quality Arrangements Interface Procedures MANAGEMENT SYSTEMS (ISO 9001 + 50-C-Q) Architect Engineer EDF DIN Nuclear New Build Generation Company Integrated Management system (aiming compliance with GS-R-3, ISO 9001, ISO 14001, OHSAS 18001, PAS 55-1) CNEN Project Instructions CNEPE CEIDRE SEPTEN CIDEN CIPN UNDER DEVELOPMENT MANAGEMENT SYSTEMS (ISO 9001 as reference) GQAS Contractor 1 Sub-contractor 1.1 Sub-contractor 1.1.1 Sub-contractor 1.1.2 Sub-contractor 1.2 Sub-contractor 1.3 GQAS General Quality Assurance Specification OTHERS CONTRACTORS GQAS GQAS Contractor 2 Sub-contractor 2.1 Sub-contractor 2.2 Sub-contractor 2.2.1 Sub-contractor 2.3 Sub-contractor 2.4 GQAS Copyright EDF Energy plc. All rights reserved. 2009. 13

THANK YOU ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER S NAME HERE / ADD DATE HERE Copyright EDF Energy. All rights reserved.