EDF Nuclear plant under decommissioning programme. CIDEN organization. Projects achievement
|
|
|
- Verity Sharp
- 10 years ago
- Views:
Transcription
1 EDF Nuclear plant under decommissioning programme CIDEN organization Projects achievement
2 Content EDF Nuclear plant under decommissioning programme CIDEN Organization 2
3 EDF Nuclear plants in France In operation : 58 PWR nuclear plants PWR : Pressurized water Reactor 34 PWR 900 MW 20 PWR 1300 MW 4 PWR 1450 MW On 19 sites 3
4 EDF nuclear plants under decommissioning Rhône 9 reators under decommissioning 1 Pressrized water reactor (PWR) Chooz A (300MW) : Heavy water reactor Brennilis (70 MW) : (EDF/CEA) 6 Gaz graphite reators (UNGG) Chinon A1 (70MW) : Chinon A2 (200MW) : Chinon A3 (480MW) : Saint-Laurent A1 (480MW) : Saint-Laurent A2 (515MW) : Bugey 1 (540MW) : Fast Breeder reactor Creys-Malville (1240MW) : Brennilis Loire Chinon Brennilis Paris Vienne St-Laurent Chinon A Bugey Chooz St Laurent A Chooz A Creys- Malville Bugey 1 Creys Malville Graphite sleeves silos at St Laurent A
5 Decommissioning strategy (1) To perform total decommissioning of 9 reactors within 25 years in tow waves 8 reactors so called first generation reactors Creys-Malville First wave of decommissioning gathering : Brennilis, Creys-Malville, Chooz A, Bugey 1, Second wave of decommissioning with the last 5 GGR (Chinon A1, A2 et A3, Saint-Laurent A1 et A2). And graphite sleeves retrieval from St Laurent silos. 5
6 Decommissioning strategy (2) Decommissioning chronology is based on the following considerations : For Brennilis, EDF and CEA undertook to do decommissioning by the horizon 2015 therefore Brennilis must be inside the first wave, Creys.Malville belong to the first wave for the same reason with a decommissioning schedule over 25 years, Chooz A, is the only PWR reactor and belongs to the first wave as regard to the strategic impact of PWR decommissioning feed back, 6 EDF/JAPC COOPERATION AGREEMENT
7 GGR - Decommissioning strategy (3) Gaz Graphite Reactors have technical and waste generic aspects : Regarding graphite retrieval and treatment, Regarding decommissioning technique and high volume concrete management, EDF decided to perform a first in line GGR decommissioning to develop decommissioning technique to be adapted to other GGR, and consolidate the operation safety Bugey has been chosen has the first in line reactor because : Its radiological state no alpha inside the bunker Bugey SG integrated technology, assuming that decommissioning difficulties will cover all GGR decommissioning issues, The good progress of level 2 working phases allowing to prepared easily the level 3 working phases, 7 EDF/JAPC COOPERATION AGREEMENT
8 GGR Decommissioning strategy GGR under water decommissioning with Bugey first in line for St Laurent A1 and A2, Chinon A3 GGR on air decommissioning with Chinon A2 first in line for Chinon A1 Strategic port folio issued 2004 and revised 2009 Five rules have been guiding the GGR strategy Graphite retrieval if a dedicated waste route is available in time EDF attitude since 2004 Strategic port folio include an internal structure resistance justification Graphite retreival «not after the year 2022 horizon» Writing from French safety authority dated April 2010 Graphite retrieval in serie to avoid the futur disposal center saturation 8 EDF/JAPC COOPERATION AGREEMENT
9 GGR Decommissioning strategy GGR decommissioning strategy is global reactors decommissionings are interconnected and linked to graphite waste route ugey 1 n n+1 n+2 n+3 n+4 n+5 n+6 n+7 n+8 n+9 n+10 n+11 n+12 n+13 n+14 n+15 n+16 n+17 n+18 n+19 n+20 n+21 n+22 n+23 n+24 GGR schedule guided DAC filière Mise en eau DMT réacteur REX FILIERE OUVERTE Graphite Int Inférieur Graphite PLATFORM REUSING Assainis SILOS DE ST LAURENT Dem+réha (1) Feed back from Bugey (2) Graphite retrieval in serie (3) High value tooling reusing (to be confirmed) 2 ST LAURENT A2 DMT Réacteur Graphite Int Inférieur Assainis Dem+réha REUTILISATION PLATEFORME 9 air 3 ST LAURENT A1 Bugey 1 St Laurent A1 St Laurent A2 and Chinon A3 decommissioned under water under water DMT Réacteur Graphite DMT Int Inférieur Réacteur Assai Graphite Dem+réha Int Inférieur Assainis Dem+ DMT Réacteur Int Assainis Dem+réha 4 CHINON A3 DMT Réacteur Graphite Bugey 1 St Laurent A1 St Laurent A2 and Chinon A3 decommissioned 5 CHINON A2 DMT Réacteur 6 CHINON A1 Graphite Chinon A2 and Chinon A1 decommissioned on air Chinon A2 and Chinon A1 decommissioned on Int Inférieur Assainis Dem+ré DMT Réacteur Graphite Int Inférieur Assainis Dem+ré
10 Decommissioning programme 10 EDF/JAPC COOPERATION AGREEMENT
11 Content EDF Nuclear plant under decommissioning programme CIDEN Organization 11 EDF/JAPC COOPERATION AGREEMENT
12 CIDEN inside EDF Power Plants Directorate Direction Production- Ingénierie EDF Autres Directions Other directorates Division Combustibl e Nucléaire Division Production Nucléaire Division Ingénierie Nucléaire Division Production Ingénierie Thermique Division Production Ingénierie Hydraulique Division Services DCN DPN DIN DPIT DPIH DS CNPE (des sites en Nuclear déconstruction) power plants Bugey Chinon Chooz Saint Laurent Unités d Ingénierie CIPN Ingineering units CIDEN CNEN CNEPE SEPTEN CEIDRE 12 EDF/JAPC COOPERATION AGREEMENT
13 13 Decommissioning responsibilities in EDF organization Public Nuclear safety Radioprotection Environment Waste producer Nuclear operator NPP (ou CIDEN) Owner Master builder CIDEN Study programme implementation: - Budget - Scheduling - Technical aspect Security (1994 s decree) Evacuation Schedule SAFETY AUTHORITY ANDRA and other waste producer Suppliers Studies and works
14 CIDEN Project management Baker Engineering division director Reporting Strategic program management CIDEN deputy director Operational project management Project manager CIDEN Organization IS focusing on project management with supporting structure 14 EDF/JAPC COOPERATION AGREEMENT
15 CIDEN Organization Director Alain ENSUQUE Deputy directors Philippe BERNET Gilles LABRIAUD Human Resources Financial Management Management System Risk Control (Nuclear safety, conventional security, health physics, environment) Programme Management Communication Cost Control Informatics, Provisional and Logistic Department Project manager Brennilis Bugey 1 Chinon A and Saint Laurent A Niv 2 Chinon A and Saint Laurent A Niv 3 Chooz A Creys-Malville ICEDA Back end of nuclear fuel ANDRA wastes storages Environment Support to operating units EPR International ISM Futur of AMI Sites Brennilis Bugey 1 Chinon A Chooz A Creys Saint Laurent Dismantling Works and Operation department DTE Scopes Operations / Wastes Dismantling Works Engineering Studies Department DIE Specialized Branches Decommissioning Risks control and Process Environment 15 EDF/JAPC COOPERATION AGREEMENT
16 Reporting - Data management at various levels Strategic level, for CIDEN management and backer Long term vision (scheduling, reference costs, waste, technical reference scenario) A data book updated every 3 years : strategic scheduling, important hypothesis, expenses, engineering and operation resources, waste production by project and sub project and spreading until the end of project Risk and solution analysis Prepared by program manager and project managers Project agreement by project Mid term vision (5 years) : Mid Term Plan include key stones and allocated resources Global indicators allowing to control the projects evolution and data book adequacy: working and financial progress Consolidated by program management Risk review (semester) Annual vision N+1 : Annual Achievement Contract includes annual important step and allocated resources Monthly checking of business indicators (program management), project expenses and hours (financial support) 16 EDF/JAPC COOPERATION AGREEMENT
17 Reporting - Data management at various levels Program/project level for CIDEN management Annual peer review (project team), quarterly project management chart examination, quarterly report (Program management) Operational level, for project manager and project team Studies and works plan allowing resources allocations on each projects (project team) Project scheduling quarterly updated according with resources allocations (planner, program management) Project expenses monthly checking and new forecasting (financial support) Project technical progress checking : significant actions (hierarchy, technical department) Project risk management (action plan, progress): project team Lotus Notes software Short term operational level, for project team and technical department Project weekly meeting to coordinate short term operations Work detailed scheduling update (site, weekly basis) As much as necessary treatment of real time issues (by useful means) 17 EDF/JAPC COOPERATION AGREEMENT
18 Planning used for project management Project planning software Planisware (OGOPA), with miles stone planning sharing Programme Global framework level 1 Purchase (AAICS) DIE (Studies) Projects Master Planning Level 2 wastes L3 Multi-projects Study resources allocation DTE (Works) Work execution Level 3 L3 Waste production EDF/JAPC COOPERATION AGREEMENT
19 Project quarterly management chart : global management Digest data from various CIDEN structures and purchasing division Project manager Objectives control Significant actions DIE Study DTE Work work progress Works remaining Call for bid control Realized expenses PGI MGP Program management AAICS Purchase 19 EDF/JAPC COOPERATION AGREEMENT MGF Finance Consolidate by MGP through data from Planisware and PGI Softeware quarterly updated
20 Deadline, achievement and cost Management chart include 6 charts for each project : Deadlines Work indicators and project miles stone control Achievement Example of work indicator and project mile stone chart Project work and financial progress Significant actions achievement Important contract and call for bid up to respectively 4,5 M et and 3 M Costs Realized purchase and others expenses TdB 2T 2010 ChoozA Devis programme : Dépenses en cumulé Montant (k 2008) Global au trimestre Contribution du trimestre CAP : Achats en cumulé Source des données Les achats budgétés au trimestre sont ceux prévus dans le cadre du CAP pour le projet. Le dépensé est issu de la consolidation des dépenses d achats par MGF (tableau achats MGF) Lecture Le trimestre en cours est repéré en orange Les montants sont en k. Budgété Réel Ecart ,3% ,4% T1 T2 T3 T4 Example of significant actions chart Achats réalisés (cumulés, k ) Cible à fin d'année (dernière RP) Achats budgétés début 2010 (pré-rp1) (cumulés, k ) Budget et dépenses 4T09 1T10 2T10 3T10 4T Budget Budgété Devis programme recalé s ur PMT 13, M 2008 Dépensé M 2008 CAP : Main d œuvre, induits et taxes Main Induits et d'œuvre taxes (k ) CIDEN (k ) CAP (Pré RP1) RP Réalisé fin T % T2/ CAP 60% 53% Source des données Les chiffres sont fournis par MGF (Annexe 3 du reporting programme : état des reprises sur provisions) Example of purchase and other expenses chart Tableau de bord pro gra mme de déconstructio n 20 EDF/JAPC COOPERATION AGREEMENT 7
21 Work and finance progress indicator Following baker requirement work progress indicator is calculated and issued on a quarterly basis Subproject ratio is proportional to its financial ratio within the project Each subproject includes limited representative tasks or operations. Progress measurement is based on unit of work (%, miles stone, waste weight), with a ratio proportional to the task or operation cost within the subproject Passed mile stone are recorded and compare to the program reference and the new forecast (Excel file) Work progress indicator is compared to the project financial progress ratio Allow to globally know if projects and programme are progressing in the same way and if expenses progress is coherent with works progress (time evolution comparison) EDF/JAPC COOPERATION AGREEMENT
22 Content EDF Nuclear plant under decommissioning programme CIDEN Organization 22 EDF/JAPC COOPERATION AGREEMENT
23 Project regulatory achievement Project Authorisation/safety case file issue Public enquiry Decommissioning /creation decree Creys Malville 06/05/03 April 04 21/03/06 Brennilis 25/07/08 October 09 27/07/11 (partial) Chooz A 30/11/04 August 06 29/09/07 Bugey 1 29/09/05 August 06 20/11/08 St Laurent A 11/10/06 January 07 18/05/10 Chinon A3 29/09/06 March 07 18/05/10 ICEDA 05/10/05 (creation) June 06 23/04/10 (creation) Chinon A1 A2* / / / *Plants in care and maintenance situation 23 EDF/JAPC COOPERATION AGREEMENT
NUCLEAR NEW BUILD Presentation to NucSIG December 9 th,2009
NUCLEAR NEW BUILD Presentation to NucSIG December 9 th,2009 Gautier COSSART Quality Assurance / Safety & Regulations Division ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND)
Post-Fukushima development of operating severe accident management and ERO. Vienna (Autriche) 19/03/2014
Post-Fukushima development of operating severe accident management and ERO Vienna (Autriche) 19/03/2014 SEVERE ACCIDENT DEVELOPMENT IN THE LIGHT OF POST-FUKUSHIMA 2 IAEA Vienna - 19 March 2014 SEVERE ACCIDENT
Need for and requirements of national monitoring for prisons and jails within a sovereign State
Philippe Combessie Sociologue, professeur des universités, Département de sociologie, Université de Paris X - Nanterre (2000) Need for and requirements of national monitoring for prisons and jails within
First-half 2012 Results. August 29 th, 2012. Jean-Paul AGON. Chairman and CEO
First-half 2012 Results August 29 th, 2012 Jean-Paul AGON Chairman and CEO First-half 2012 Results +11.4% +10.8% Operating profit 1,702.3 1,896.5 Net profit after non-controlling interests 1,625.2 1,466.6
OFFICIAL 55 DOCUMENTS
OFFICIAL 55 DOCUMENTS The World Bank 1818 H Street N.W. (202) 473-1000 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Washington, D.C. 20433 Cable Address: INTBAFRAD INTERNATIONAL DEVELOPMENT ASSOCIATION
Very low level waste management in Spain and in France
Very low level waste management in Spain and in France From safety to waste acceptance criteria Industrial experiences Elena Vico, Mariano Navarro ENRESA - Spain Michel Dutzer ANDRA - France Disponet Peine
SUPPLEMENT N 4 DATED 12 May 2014 TO THE BASE PROSPECTUS DATED 22 NOVEMBER 2013. BPCE Euro 40,000,000,000 Euro Medium Term Note Programme
SUPPLEMENT N 4 DATED 12 May 2014 TO THE BASE PROSPECTUS DATED 22 NOVEMBER 2013 BPCE Euro 40,000,000,000 Euro Medium Term Note Programme BPCE (the Issuer ) may, subject to compliance with all relevant laws,
Introduction au BIM. ESEB 38170 Seyssinet-Pariset Economie de la construction email : [email protected]
Quel est l objectif? 1 La France n est pas le seul pays impliqué 2 Une démarche obligatoire 3 Une organisation plus efficace 4 Le contexte 5 Risque d erreur INTERVENANTS : - Architecte - Économiste - Contrôleur
Nuclear Consultancy & Engineering Services
Insert a caption to go with the photograph in here ITER, France Wednesday, 14 December 2011 Nuclear Consultancy & Engineering Services T H E N U C L E A R A T K I N S A S S Y S T E M A L L I A N C E CONSTRUCTION
The Premium Review. 7 December 2006
The Premium Review 7 December 2006 The L Oréal Business Model Growth Perspectives : 4 illustrations L Oréal Highlights 3 Worldwide leader in Cosmetics 2005 Sales : 14 533 M A unique expertise : A Pure
M. Jean-Paul AGON. Chief Executive Officer. February 16 th 2010
M. Jean-Paul AGON Chief Executive Officer February 16 th 2010 COSMETICS MARKET Worldwide cosmetics market* Estimates** Sell-in 2009 (shipments) MASS MARKET PHARMACIES LUXURY HAIR SALONS TOTAL *excluding
site et appel d'offres
Définition des besoins et élaboration de l'avant-projet Publication par le client de l'offre (opération sur le externe) Start: 16/07/02 Finish: 16/07/02 ID: 1 Dur: 0 days site et appel d'offres Milestone
Archived Content. Contenu archivé
ARCHIVED - Archiving Content ARCHIVÉE - Contenu archivé Archived Content Contenu archivé Information identified as archived is provided for reference, research or recordkeeping purposes. It is not subject
Office of the Auditor General / Bureau du vérificateur général FOLLOW-UP TO THE 2007 AUDIT OF THE DISPOSAL OF PAVEMENT LINE MARKER EQUIPMENT 2009
Office of the Auditor General / Bureau du vérificateur général FOLLOW-UP TO THE 2007 AUDIT OF THE DISPOSAL OF PAVEMENT LINE MARKER EQUIPMENT 2009 SUIVI DE LA VÉRIFICATION DE L ALIÉNATION D UNE TRACEUSE
Centre International de Hautes Etudes Agronomiques MÄditerranÄennes. International Centre for Advanced Mediterranean Agronomic Studies POINT 9
Centre International de Hautes Etudes Agronomiques MÄditerranÄennes International Centre for Advanced Mediterranean Agronomic Studies 126 CA (11) 8 POINT 9 QUESTIONS DIVERSES / MISCELLANEOUS IAM/MAI CHANIA
Deploying Clusters at Electricité de France. Jean-Yves Berthou
Electricit é Deploying Clusters at Workshop Operating Systems, Tools and Methods for High Performance Computing on Linux Clusters Jean-Yves Berthou Head of the Applied Scientific Computing Group EDF R&D
2 RENSEIGNEMENTS CONCERNANT L ASSURÉ SI CELUI-CI N EST PAS LE REQUÉRANT INFORMATION CONCERNING THE INSURED PERSON IF OTHER THAN THE APPLICANT
SÉCURITÉ SOCIALE SOCIAL SECURITY ACCORD DU 9 FÉVRIER 1979 ENTRE LA FRANCE ET LE CANADA AGREEMENT OF FEBRUARY 9, 1979 BETWEEN FRANCE AND CANADA Formulaire FORM SE 401-06 INSTRUCTION D UNE DEMANDE DE PENSION
Legislative and institutional framework for renewable energies in Algeria.
Commission de Régulation de l Electricité et du Gaz Commission for Electricity and Gas regulation ضبط لجنة الكھرباء و الغاز Legislative and institutional framework for renewable energies in Algeria. AHK
The new French regulation on gaming: Anything new in terms of payment?
[Prénom Nwww.ulys.net The new French regulation on gaming: Anything new in terms of payment? Etienne Wery Attorney at law at Brussels and Paris Bars Senior lecturer at university [email protected]
Radioactive Waste Management the French case
Radioactive Waste Management the French case Dr Gérald OUZOUNIAN ANDRA, Director [email protected] ATOMEXPO 2012 Content General policy principles and rules in France Status of radioactive waste
International Action Plan On The Decommissioning of Nuclear Facilities
International Action Plan On The Decommissioning of Nuclear Facilities A. Introduction Decommissioning is defined by the International Atomic Energy Agency (the Agency) as the administrative and technical
RAPPORT FINANCIER ANNUEL PORTANT SUR LES COMPTES 2014
RAPPORT FINANCIER ANNUEL PORTANT SUR LES COMPTES 2014 En application de la loi du Luxembourg du 11 janvier 2008 relative aux obligations de transparence sur les émetteurs de valeurs mobilières. CREDIT
Checking of quality on production
Checking of quality on production Jean CORCOS Industrial Division Industrial Waste Management Solution Unit Waste Acceptance Department, and Major-Producer Relations Denis POMBET Risk Management Division
Brief description of the paper/report. Identification
Brief description of the paper/report Argument Original reference A holonic framework for coordination and optimization in oil and gas production complexes E. Chacon, I. Besembel, Univ. Los Andes, Mérida,
Donnez des couleurs à votre évènement. Give your event more colours
Donnez des couleurs à votre évènement Give your event more colours SEAN ACROPOLIS 1 esplanade Kennedy 06300 NICE Tel +33 (0)4 93 92 83 00 www.nice-acropolis.com CONDITIONS GENERALES GENERAL SALES CONDITIONS
Unrealized Gains in Stocks from the Viewpoint of Investment Risk Management
Unrealized Gains in Stocks from the Viewpoint of Investment Risk Management Naoki Matsuyama Investment Administration Department, The Neiji Mutual Life Insurance Company, 1-1 Marunouchi, 2-chome, Chiyoda-ku,
Paris Fintech Forum. January 28, 2016. pre registration (/index.php/pre-insciption-en/) AGENDA SPEAKERS CONNECTED EVENTS PARTNERS & SPONSORS
Page 1 sur 9 Paris Fintech Forum January 28, 2016 pre registration (/index.php/pre-insciption-en/) AGENDA SPEAKERS CONNECTED EVENTS PARTNERS & SPONSORS Page 2 sur 9 What s the Paris Fintech Forum? (http://fr.linkedin.com/in/laurentnizri)
Personnalisez votre intérieur avec les revêtements imprimés ALYOS design
Plafond tendu à froid ALYOS technology ALYOS technology vous propose un ensemble de solutions techniques pour vos intérieurs. Spécialiste dans le domaine du plafond tendu, nous avons conçu et développé
Hydro-Québec Distribution
1. Références : Evidence of Mark Drazen, Tableau 4, note 2, page 8 Préambule : Dans sa note 2, l'expert de la Coalition fait référence à la disposition par le Distributeur du principe de passthrough appliqué
Archived Content. Contenu archivé
ARCHIVED - Archiving Content ARCHIVÉE - Contenu archivé Archived Content Contenu archivé Information identified as archived is provided for reference, research or recordkeeping purposes. It is not subject
REQUEST FORM FORMULAIRE DE REQUETE
REQUEST FORM FORMULAIRE DE REQUETE ON THE BASIS OF THIS REQUEST FORM, AND PROVIDED THE INTERVENTION IS ELIGIBLE, THE PROJECT MANAGEMENT UNIT WILL DISCUSS WITH YOU THE DRAFTING OF THE TERMS OF REFERENCES
Archived Content. Contenu archivé
ARCHIVED - Archiving Content ARCHIVÉE - Contenu archivé Archived Content Contenu archivé Information identified as archived is provided for reference, research or recordkeeping purposes. It is not subject
REQUEST FORM FORMULAIRE DE REQUÊTE
REQUEST FORM FORMULAIRE DE REQUÊTE ON THE BASIS OF THIS REQUEST FORM, AND PROVIDED THE INTERVENTION IS ELIGIBLE, THE PROJECT MANAGEMENT UNIT WILL DISCUSS WITH YOU THE DRAFTING OF THE TERMS OF REFERENCES
Installation troubleshooting guide
Installation troubleshooting guide Content ERROR CODE PROBLEMS... 3 Error code 301: Unknown protection system. Verify the installation.... 3 Error code 302: The software cannot be used. The computer date
How To Become A Foreign Language Teacher
Université d Artois U.F.R. de Langues Etrangères MASTER A DISTANCE Master Arts, Lettres et Langues Spécialité «CLE/ CLS en milieu scolaire» Voie Professionnelle ou Voie Recherche University of Artois Faculty
Implementation of SAP-GRC with the Pictet Group
Implementation of SAP-GRC with the Pictet Group Olivier VERDAN, Risk Manager, Group Risk, Pictet & Cie 11 th December 2013 Zürich Table of contents 1 Overview of the Pictet Group 2 Operational Risk Management
STAGE INTERNATIONAL DE KENDO KENDO INTERNATIONAL SEMINAR
F F J D A. C O M I T É N A T I O N A L D E K E N D O E T D I S C I P L I N E S R A T T A C H É E S P a g e 1 Destinataires. Recipients : FEDERATIONS INTERNATIONALES DE KENDO / INTERNATIONAL KENDO FEDERATIONS
Summary of the project
Summary of the project Youth exchange 1. The principle of youth exchange What does youth exchange means (Action 1.1 of Youth in Action Programme)? This is a meeting with one or more countries which takes
Keywords: inspection; nuclear material control and accountancy (NMC&A); quality management system
French Domestic Safeguards inspections with regard to quality management system of the operators, in the field of nuclear material control and accountancy Julie LASNEL-PAYAN, Flavien LEMOINE, Bruno AUTRUSSON,
Il est repris ci-dessous sans aucune complétude - quelques éléments de cet article, dont il est fait des citations (texte entre guillemets).
Modélisation déclarative et sémantique, ontologies, assemblage et intégration de modèles, génération de code Declarative and semantic modelling, ontologies, model linking and integration, code generation
Nuclear Education & Training in France. Support to Newcomer and Expanding Countries
Nuclear Education & Training in France Support to Newcomer and Expanding Countries H.E. Ms. Marion Paradas Permanent Representative of France to the IAEA Mr. Yves Fanjas Academia & Research: Mr. François
SCHOLARSHIP ANSTO FRENCH EMBASSY (SAFE) PROGRAM 2016 APPLICATION FORM
SCHOLARSHIP ANSTO FRENCH EMBASSY (SAFE) PROGRAM 2016 APPLICATION FORM APPLICATION FORM / FORMULAIRE DE CANDIDATURE Applications close 4 November 2015/ Date de clôture de l appel à candidatures 4 e novembre
MANAGEMENT SYSTEM FOR A NUCLEAR FACILITY
GUIDE YVL A.3 / 2 June 2014 MANAGEMENT SYSTEM FOR A NUCLEAR FACILITY 1 Introduction 5 2 Scope of application 6 3 Management system 6 3.1 Planning, implementation, maintenance, and improvement of the management
The SIST-GIRE Plate-form, an example of link between research and communication for the development
1 The SIST-GIRE Plate-form, an example of link between research and communication for the development Patrick BISSON 1, MAHAMAT 5 Abou AMANI 2, Robert DESSOUASSI 3, Christophe LE PAGE 4, Brahim 1. UMR
CFT 100000930 ICT review Questions/Answers
CFT 100000930 ICT review Questions/Answers 1. Est-ce que la stratégie métier est formalisée dans un document détaillant les priorités? Yes, there are two strategic documents, the STRATEGIC ORIENTATIONS
We would appreciate your help in disseminating this announcement to any institution in your country in the field of physics and optic.
Dear colleagues, Please find enclosed a short project description from Limoges University : they are preparing a Tempus project in the field of electronics and optic with Algerian universities. They are
REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL
EUROPEAN COMMISSION Brussels, 3.3.2015 COM(2015) 78 final REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL on the implementation of the work under the nuclear decommissioning assistance
Measuring Policing Complexity: A Research Based Agenda
ARCHIVED - Archiving Content ARCHIVÉE - Contenu archivé Archived Content Contenu archivé Information identified as archived is provided for reference, research or recordkeeping purposes. It is not subject
PRESENT ISSUES FOR CENTRE DE LA MANCHE DISPOSAL FACILITY
PRESENT ISSUES FOR CENTRE DE LA MANCHE DISPOSAL FACILITY M. DUTZER, J.P. VERVIALLE, P. CHARTON Andra - Agence Nationale pour la Gestion des Déchets Radioactifs 1-7 rue Jean Monnet, 92298 Châtenay-Malabry
BILL C-665 PROJET DE LOI C-665 C-665 C-665 HOUSE OF COMMONS OF CANADA CHAMBRE DES COMMUNES DU CANADA
C-665 C-665 Second Session, Forty-first Parliament, Deuxième session, quarante et unième législature, HOUSE OF COMMONS OF CANADA CHAMBRE DES COMMUNES DU CANADA BILL C-665 PROJET DE LOI C-665 An Act to
NUCLEAR POWER OVERALL GOOD FOR THE SOCIETY Finnish German Energy Day, 7th November 2012
NUCLEAR POWER OVERALL GOOD FOR THE SOCIETY Finnish German Energy Day, 7th November 2012 Tanhua Jarmo Teollisuuden Voima Oyj 2 EU ENERGY ROADMAP 2050 NUCLEAR POWER IN ALL SCENARIOS Consumption of electricity
> 09/ 2010 : Université Claude Bernard Lyon 1, IUT Lyon 1, département de Génie Civil
Xuan Hong VU Nom / Last Name : VU Prénom / First Name : Xuan Hong Maître de Conférences Docteur en Génie Civil [Associate Professor, Doctor in Civil Engineering] Université Claude Bernard Lyon 1 IUT Lyon
WYDO Newsletter. 24 June 2013. Get together and organize your own activity! Index. World Young Doctors Day Journée Mondiale des Jeunes Médecins
WYDO Newsletter The newsletter of the World Young Doctors' Organization June 2013 vol. 3, special issue 24 June 2013 World Young Doctors Day Journée Mondiale des Jeunes Médecins Theme: Internet, Social
ENERGY SERVICES& ESCOS & THE ROLE OFBELESCO LIEVEN VANSTRAELEN IN BELGIUM
ENERGY SERVICES& ESCOS IN BELGIUM & THE ROLE OFBELESCO LIEVEN VANSTRAELEN CO-CEO& OWNER OF ENERGINVEST PRESIDENT OF BELESCO SENIOR CONSULTANT AT THE FEDESCO KNOWLEDGECENTER EnergInvest sprl Rue J. Coosemans
French Property Registering System: Evolution to a Numeric Format?
Frantz DERLICH, France Key words: Property - Registering - Numeric system France Mortgages. ABSTRACT French property registering system is based on the Napoleon system: the cadastre is only a fiscal guarantee
OECD Best Practices for Budget Transparency
OECD Best Practices for Budget Transparency OECD, 2002. Software: 1987-1996, Acrobat is a trademark of ADOBE. All rights reserved. OECD grants you the right to use one copy of this Program for your personal
How To Write A Police Budget
ARCHIVED - Archiving Content ARCHIVÉE - Contenu archivé Archived Content Contenu archivé Information identified as archived is provided for reference, research or recordkeeping purposes. It is not subject
STUDENT APPLICATION FORM (Dossier d Inscription) ACADEMIC YEAR 2010-2011 (Année Scolaire 2010-2011)
Institut d Administration des Entreprises SOCRATES/ERASMUS APPLICATION DEADLINE : 20th November 2010 OTHER (Autre) STUDENT APPLICATION FORM (Dossier d Inscription) ACADEMIC YEAR 2010-2011 (Année Scolaire
Archived Content. Contenu archivé
ARCHIVED - Archiving Content ARCHIVÉE - Contenu archivé Archived Content Contenu archivé Information identified as archived is provided for reference, research or recordkeeping purposes. It is not subject
Enterprise Informa/on Modeling: An Integrated Way to Track and Measure Asset Performance
Enterprise Informa/on Modeling: An Integrated Way to Track and Measure Asset Performance This session will provide a0endees with insight on how to track and measure the performance of their assets from
REQUEST FORM FORMULAIRE DE REQUÊTE
REQUEST FORM FORMULAIRE DE REQUÊTE ON THE BASIS OF THIS REQUEST FORM, AND PROVIDED THE INTERVENTION IS ELIGIBLE, THE PROJECT MANAGEMENT UNIT WILL DISCUSS WITH YOU THE DRAFTING OF THE TERMS OF REFERENCES
MAURICE S PUBLISHED WORKS. (not a definitive list) (*indicates written with others ; **indicates adaptation of a speech)
MAURICE S PUBLISHED WORKS (not a definitive list) (*indicates written with others ; **indicates adaptation of a speech) 1. La Pensée haïtienne (The Haitian Way of Thinking), reprint of an article that
Safety Analysis for Nuclear Power Plants
Regulatory Document Safety Analysis for Nuclear Power Plants February 2008 CNSC REGULATORY DOCUMENTS The Canadian Nuclear Safety Commission (CNSC) develops regulatory documents under the authority of paragraphs
Survey on use of Taser International 21ft cartridges
ARCHIVED - Archiving Content ARCHIVÉE - Contenu archivé Archived Content Contenu archivé Information identified as archived is provided for reference, research or recordkeeping purposes. It is not subject
Determination of idling emission factors for Liantang/Heung Yuen Wai BCP
Determination of idling emission factors for Liantang/Heung Yuen Wai BCP 1. Background Emissions from idling engines in the VHA of the new BCP are one of the major issues in determining the environmental
Archived Content. Contenu archivé
ARCHIVED - Archiving Content ARCHIVÉE - Contenu archivé Archived Content Contenu archivé Information identified as archived is provided for reference, research or recordkeeping purposes. It is not subject
Decommissioning situation of Nuclear Power Plant in Japan
Decommissioning situation of Nuclear Power Plant in Japan April, 2015 The Japan Atomic Power Co. The Kansai Electric Power Co., Inc. General Description 1 Operational years of commercial NPP in Japan 40
Start Here. Installation and Documentation Reference. Sun StorEdgeTM 6120 Array
Start Here Installation and Documentation Reference Sun StorEdgeTM 6120 Array 1 Access the Online Documentation These documents and other related documents are available online at http://www.sun.com/documentation
Nuclear decommissioning and waste management : a field of open innovation at INSTN experience
Seminar on Education and Training in Nuclear Decommissioning Birmingham, UK 16th and 17th April 2015 Nuclear decommissioning and waste management : a field of open innovation at INSTN experience www-instn.cea.fr
EVALUATION OF REACTIVITY SHUTDOWN MARGIN FOR NUCLEAR FUEL RELOAD OPTIMIZATION
re Direction des Etudes et Recherches FR9701093 SERVICE RÉACTEURS NUCLÉAIRES ET ECHANGEURS Département Physique des Réacteurs 1996 ENGRANDP. WONG H.I. MALDONADO G.I. EVALUATION DE LA MARGE D'ANTI-REACTIVITE
Product / Produit Description Duration /Days Total / Total
DELL Budget Proposal / Proposition Budgétaire Solutions Design Centre N o : 200903201602 Centre de Design de Solutions Date: 2009-03-23 Proposition valide pour 30 jours / Proposal valid for 30 days Customer
RESULTS OF R&D ON FUTURE FUEL CYCLE AND ASSOCIATED HL WASTE DISPOSAL: THE FRENCH CASE
IGDTP_SNETP_EF4, October 29-30, 2013, Praha RESULTS OF R&D ON FUTURE FUEL CYCLE AND ASSOCIATED HL WASTE DISPOSAL: THE FRENCH CASE Dominique Warin CEA / Nuclear Energy Direction 29 OCTOBRE 2013 14 juin
Audit de sécurité avec Backtrack 5
Audit de sécurité avec Backtrack 5 DUMITRESCU Andrei EL RAOUSTI Habib Université de Versailles Saint-Quentin-En-Yvelines 24-05-2012 UVSQ - Audit de sécurité avec Backtrack 5 DUMITRESCU Andrei EL RAOUSTI
Veritas Storage Foundation 5.0 Software for SPARC
Veritas Storage Foundation 5.0 Software for SPARC Release Note Supplement Sun Microsystems, Inc. www.sun.com Part No. 819-7074-10 July 2006 Submit comments about this document at: http://www.sun.com/hwdocs/feedback