Case Study: Eskom Distribution Asset Management Assessment and Way Forward
|
|
|
- Branden Rice
- 9 years ago
- Views:
Transcription
1 Case Study: Eskom Distribution Asset Management Assessment and Way Forward The Challenge Eskom, the national power transmission company in South Africa, faces a number of significant challenges ahead. There is a national stated intent (included in the Constitution) to provide universal access to electricity by 2012 at present a large proportion of the rural community does not have access to electricity. A further complexity to this requirement is the strong desire (from national government level) to have a uniform rate for the supply of electricity regardless of where the customer is located. Very much in the public eye is the challenge for South Africa to host the soccer world cup in 2010, requiring major and immediate infrastructure build. Funding will be available to support necessary new infrastructure, but it will be imperative to demonstrate that appropriate and cost effective solutions are being proposed and delivered value for money. The economy of SA is anticipated to continue to grow at 6% for the foreseeable future. At present the electricity supply infrastructure does not have capacity to support this growth and significant investment will be required there are regular requests being made to the public to reduce power demand in order to manage peak supply shortfall. Many electrical infrastructure assets are also now reaching an age where replacement is becoming necessary. Reliability and service quality are becoming an issue related to both replacement and maintenance of existing assets. Eskom has been looking at how leading utilities across the world have responded to an increasingly challenging operating environment, and have recognised opportunities to learn from world best practice in particular the increasingly widespread adoption of asset management as a discipline and business model. Eon Consulting have been working closely with Eskom in supporting the development of solutions. It was agreed in 2006 that Eon Consulting would work with The Woodhouse Partnership Ltd to undertake Page 1
2 an assessment of asset management as currently applied in Eskom Distribution. The work was commissioned as a research and development project but with the expectation of developing a structured business improvement plan to close the gap on best practice and specifically to identify practical solutions. Eskom Distribution s assets have, in recent times, come under a lot of strain. This has resulted in a decline in network performance. The main reasons for this increase in strain include: The rapid expansion of the distribution network to serve South Africa s increasing electricity requirements; The aging of the distribution network and the management problems this causes; and The limited resources (money, people and information) available to manage the network assets. With this in mind it is clear that better asset management is required in order to improve the performance of the distribution network. The Solution The Benchmark for Asset Management Publicly Available Specification 55 (PAS 55), published by the British Standards Institution, is the only recognised standard for physical asset management. John Woodhouse (MD of TWPL) chaired the independent working party drawn from leading companies that drafted the specification on behalf of the Institute of Asset Management and BSI. Since its publication in 2004 it has been welcomed not only in the UK, but internationally, as representing a framework for describing what should be in place to enable physical asset-intensive businesses to deliver their targets sustainably while optimising the conflicting pulls of cost, risk and performance. Figure 1 below highlights the PAS 55 elements. Page 2
3 Figure 1 Working Together TWPL have taken a prominent position in developing an interactive assessment process for evaluating organisations against asset management capability, and have a mature methodology which has been tried and tested with clients over many years. It has been improved and aligned with PAS 55 since The international experience and track record of the TWPL team in asset management was a key contributor to the awarding of the contract. TWPL formed a strong partnership with Eon Consulting, who provided a team with local and technical knowledge, management consultancy expertise and, importantly, very good Eskom organisation knowledge. The initial phase of the project was a series of knowledge transfer training sessions, where TWPL trained the local Eon Consulting team in preparation for the assessments. The assessments were carried out as a series of interviews, focus groups and workshop sessions, leading to both a comprehensive diagnosis of the current situation and a pragmatic Roadmap of the options for the future. Page 3
4 The Assessment Process The assessment consisted of four elements: One-to-one interviews with a cross section of middle to executive management staff across Eskom Distribution. The interviews used a selection of options to evaluate the position of the company against a scale of innocence to excellence, using examples to help the candidate to agree to the current status of Eskom against the 21 elements of asset management as set out in PAS 55. Figure 2 Figure 2 is an example screen from the assessment database a set of more than 200 questions was used in the review. 50 interviews were carried out with a wide cross section of management staff, and statistical analysis was used to demonstrate that the sample was sufficiently robust to support meaningful conclusions. Focus group sessions where operational staff (front-line field staff and supervisors) participated in facilitated sessions where the practical application of Page 4
5 good practice in the delivery of asset management (such as planned maintenance and emergency response), was explored in a structured environment. This is a practical and essential exercise which reveals any disconnections between company policies and real life practice. About 73 people participated in the sessions. questionnaire an questionnaire was also sent out and this resulted in a further 84 contributions. Document and data check this is used for confirming some PAS 55 requirements, to validate or qualify the findings of the interviews and focus groups, and also probing into identified areas of weakness. Results were collated into a detailed report of findings and gaps, with a management summary including areas identified for improvement. The results against the 21 elements of PAS 55 were displayed using a variety of graphical techniques including radar plots. Figure 3 below shows such a typical summary (with scores modified to protect confidentiality). Page 5
6 PAS Section General Requirements AM Policy and Strategy Asset Management Policy Asset Management Strategy AM Information, Risk Assessment & Planning AM Information Systems Risk Identification Assessment & Control Legal, Regulatory & Statutory AM Objectives AM Performance & Condition Targets AM Plans Implementation & Operation Structure, Authority & Responsibility Training Awareness & Competence Consultation & Communication Documentation Document & Information Control Operational Control Emergency Preparedness & Response Checking & Corrective Action Performance & Condition Monitoring Failures, Incidents, Non-Conformance & Actions Records & Record Management Audit Management Review & Continual Improvement Eskom Distribution PAS 55 score Figure 3 The analysis also considered the consistency of asset management performance across the business comparing results across regions and departments. This identified a number of further improvement opportunities. The Roadmap The major findings and gaps were translated into an Asset Management Roadmap which is now being progressed with Eskom Distribution. This is in the form of an integrated programme plan for improvement which identifies a series of interdependent projects together with their potential benefits. Page 6
7 Figure 4 Eon Consulting and TWPL are now continuing to work together with Eskom Distribution in developing and implementing the improvement plan for asset management. Ends Page 7
8 For further information on this or other related subjects, please call: Julie Fowler Education & Communications Department The Woodhouse Partnership Ltd 19 Prince Henry House Kingsclere Business Park Kingsclere Hampshire RG20 4SW Tel: + 44 (0) EDITOR NOTES: Eskom, one of the top 10 electricity utilities in the world measured on revenue, generates, transmits and distributes electricity in South Africa. It serves a diverse customer base ranging from large industrial firms and municipalities down to poor households in rural areas. The South African government have given Eskom the mandate of building an infrastructure that will support rapid economic growth while giving all South Africans access to electricity. The Woodhouse Partnership Limited (TWPL) was formed in 1995 by a team of former senior managers of UK blue chip organisations (including Shell, UKAEA, MoD, Philips and Kvaerner). It has grown to become a world leading authority and source of expertise in the optimal, sustainable management of physical assets. It has offices in the UK, USA and Latin America, with clients in over 25 countries, covering most industry sectors. Eon Consulting for the optimal was initially set up in 1998 as a joint venture between Ke Consulting and Eskom Enterprises. They are a black economic empowered organisation supplying professional services and skills into the power Page 8
9 and telecommunications environment with a long and successful history of providing consultancy services to Eskom. PAS 55 is a British Standards requirements specification for the optimal management of physical infrastructure assets. It is rapidly becoming an accepted international benchmark for good practice. For example Ofgem, the UK regulator for electricity and gas sectors, has recently required all such network operators to show PAS 55 compliance by April Page 9
Drawing up an Asset Management plan that delivers Operational Reliability
Drawing up an Asset Management plan that delivers Operational Reliability John Woodhouse CEO, TWPL Chair of Faculty, IAM 1 Who we are Founded 1995 by 8 senior managers from Shell, Philips, MoD, AEA, Kvaerner
The Self-Assessment Methodology - Guidance
The Self-Assessment Methodology - Guidance Version 1 June 2014 General Guidance Notes for using the SAM: a Self-Assessment Methodology for use with BSI PAS 55:2008 and ISO 55000/1/2:2014 Copyright The
A Decade of Fruitful Network Asset Management in CLP Power Chris Cheung & Chi-Pui Ng, CLP Power Hong Kong
A Decade of Fruitful Network Asset Management in CLP Power Chris Cheung & Chi-Pui Ng, CLP Power Hong Kong The Power Systems Business Group (PSBG) of CLP Power has developed and implemented a structured
ISO 9001 It s in the detail Your implementation guide
ISO 9001 It s in the detail Your implementation guide ISO 9001 - Quality Management Background ISO 9001 is the world s most popular quality management system standard and is all about keeping customers
ISO 55000 ASSET MANAGEMENT FOR POWER
ISO 55000 ASSET MANAGEMENT FOR POWER Applying new standards to the power industry for improved performance ADVANCING HIGH PERFORMERS DEVELOPING POWER EXECUTIVES PAN AFRICAN TRAINING FORUM FOCUSING ON ENHANCING
Customer Experience Benchmarking
HOWTOEXPERIENCE are experts in Customer Experience Strategy and Implementation. I d highly recommend David and his team for any customer experience project. Nicola Collister, Customer Experience Director,
BUSINESS CONTINUITY POLICY
BUSINESS CONTINUITY POLICY Document Type Corporate Policy Unique Identifier CO-038 Document Purpose To provide a structure through which: i. A comprehensive business continuity management system (BCMS)
Asset Management Excellence Utilising the AMCL Asset Management Excellence Model (AMEM) to achieve world class Asset Management.
Excellence Utilising the AMCL Excellence Model (AMEM) to achieve world class. What is Excellence is the culmination of a long history of development in the management of physical assets. It is about asset
Asset Management Policy March 2014
Asset Management Policy March 2014 In February 2011, we published our current Asset Management Policy. This is the first update incorporating further developments in our thinking on capacity planning and
Guideline. Records Management Strategy. Public Record Office Victoria PROS 10/10 Strategic Management. Version Number: 1.0. Issue Date: 19/07/2010
Public Record Office Victoria PROS 10/10 Strategic Management Guideline 5 Records Management Strategy Version Number: 1.0 Issue Date: 19/07/2010 Expiry Date: 19/07/2015 State of Victoria 2010 Version 1.0
HR ADVISORY SERVICES The Leader for Exceptional Client Service
Audit Advisory Tax HR ADVISORY SERVICES The Leader for Exceptional Client Service WELCOME BDO IN SOUTH AFRICA PROVIDES AUDIT, ADVISORY AND TAX SERVICES TO A BROAD RANGE OF CLIENTS - FROM LARGE JSE-LISTED
JOB TITLE: JIG TECHNICAL MANAGER JOB PURPOSE:
1 JOB TITLE: JIG TECHNICAL MANAGER REPORTS TO: General Manager, JIG JOB PURPOSE: The Technical Manager role supports all the technical elements of JIG Committee work. Additionally, the Technical Manager
Specialist Cloud Services Lot 4 Cloud Printing and Imaging Consultancy Services
Specialist Cloud Services Lot 4 Cloud Printing and Imaging Consultancy Services Page 1 1 Contents 1 Contents... 2 2 Transcend360 Introduction... 3 3 Service overview... 4 3.1 Service introduction... 4
Specialist Cloud Services Lot 4 Cloud EDRM Consultancy Services
Specialist Cloud Services Lot 4 Cloud EDRM Consultancy Services Page 1 1 Contents 1 Contents... 2 2 Transcend360 Introduction... 3 3 Service overview... 4 3.1 Service introduction... 4 3.2 Service description...
Health Informatics Service Accreditation Manual. Assessment Process. May 2013, Version 1
Health Informatics Service Accreditation Manual Assessment Process May 2013, Version 1 Contents 1. Contacts... 2 2. Introduction... 3 3. Assessment principles... 6 4. Assessment outcome... 7 5. Planning
How To Help Your Organisation Be Ethical
Audit Advisory Tax RISK ADVISORY SERVICES MEASURING AND MONITORING ETHICS In association with The Leader for Exceptional Client Service BDO IN SOUTH AFRICA PROVIDES AUDIT, ADVISORY AND TAX SERVICES TO
IT SERVICE MANAGEMENT. An Overview
ITSM White Paper IT SERVICE MANAGEMENT An Overview ISSUE 2 Uncontrolled Document Michael Davies Principal Consultant ProActive Services Pty Ltd Head Office: NSW: New Zealand Level 4, 60 Albert Road South
Compliance. Group Standard
Group Standard Compliance Serco is committed to good governance practices and the management of risks supported by a robust business compliance process SMS-GS-G2 Compliance July 2014 v1.0 Serco Public
IT Governance Charter
Version : 1.01 Date : 16 September 2009 IT Governance Network South Africa USA UK Switzerland www.itgovernance.co.za [email protected] 0825588732 IT Governance Network, Copyright 2009 Page 1 1 Terms
To be determined but likely to include a Regional HR Manager (to be appointed) London or Nairobi with significant travel to the East Africa region
ROLE DESCRIPTION Job Title: Reports To: Direct reports: Location: Head of HR (Africa Programmes) Africa Operations Director To be determined but likely to include a Regional HR Manager (to be appointed)
Cyber Security and Privacy Services. Working in partnership with you to protect your organisation from cyber security threats and data theft
Cyber Security and Privacy Services Working in partnership with you to protect your organisation from cyber security threats and data theft 2 Cyber Security and Privacy Services What drives your security
POSITION DESCRIPTION, PERFORMANCE MEASURES AND TARGETS
POSITION DESCRIPTION, PERFORMANCE MEASURES AND TARGETS Attachment 1 Position Title: Programs & Client Relations Manager Responsible to: Chief Executive Officer Responsibility: Programs Management and Client
Infrastructure Asset Management Report
Infrastructure Asset Management Report From Inspiration to Practical Application Achieving Holistic Asset Management 16th- 18th March 2015, London Supported by Table of contents Introduction Executive
Business Continuity Management Policy
Business Continuity Management Policy Business Continuity Policy Version 1.0 1 Version control Version Date Changes Author 0.1 April 13 1 st draft PH 0.2 June 13 Amendments in line with guidance PH 0.3
IT Professional Standards. Information Security Discipline. Sub-discipline 605 Information Security Testing and Information Assurance Methodologies
IT Professional Standards Information Security Discipline Sub-discipline 605 Information Security Testing and Information Assurance Methodologies December 2012 Draft Version 0.6 DOCUMENT REVIEW Document
Physical Asset Management: What is it all about and why?
Physical Asset Management: What is it all about and why? Lisbon, May 2013 Kari Komonen, EFNMS Asset Management Committee EFNMSvzw 1 Section 1 What is physical asset management? 2 What is Asset (ISO55000
Business Continuity Policy and Business Continuity Management System
Business Continuity Policy and Business Continuity Management System Summary: This policy sets out the structure for ensuring that the PCT has effective Business Continuity Plans in place in order to maintain
JOB DESCRIPTION. Contract Management and Business Intelligence
JOB DESCRIPTION DIRECTORATE: DEPARTMENT: JOB TITLE: Contract Management and Business Intelligence Business Intelligence Business Insight Manager BAND: 7 BASE: REPORTS TO: Various Business Intelligence
Total Asset Management Capability Tool
TOTAL ASSET MANAGEMENT Total Asset Management Capability Tool September 2004 TAM04-15 TAM Total Asset Management Capability Tool i Total asset management capability tool September 2004 TAM04-15 ISBN 0
Digital Strategy. Digital Strategy. 2015 CGI IT UK Ltd. Digital Innovation. Enablement Services
Digital Strategy Digital Strategy Digital Innovation Enablement Services 2015 CGI IT UK Ltd. Contents Digital strategy overview Business drivers Anatomy of a solution Digital strategy in practice Delivery
How To Understand And Implement Pas 55
White Paper June 2009 Enabling the benefits of PAS 55: The new standard for asset management in the industry Page 2 Contents 2 Introduction 2 The PAS 55 asset management standard 4 The scope of PAS 55
QUALITY ASSESSMENT & IMPROVEMENT. Workforce ACUTE HOSPITAL SERVICES. Supporting services to deliver quality healthcare JUNE 2013
QUALITY ASSESSMENT & IMPROVEMENT ACUTE HOSPITAL SERVICES JUNE 2013 Workforce Supporting services to deliver quality healthcare Effective Care and Support Safe Care and Support Person Centred Care and
The Asset Management Landscape
The Asset Management Landscape ISBN 978-0-9871799-1-3 Issued November 2011 www.gfmam.org The Asset Management Landscape www.gfmam.org ISBN 978-0-9871799-1-3 Published November 2011 This version replaces
Financial Planning Assessment Vale of Glamorgan County Borough Council. Audit year: 2013-14 Issued: January 2015 Document reference: 620A2014
Financial Planning Assessment Vale of Glamorgan County Borough Council Audit year: 2013-14 Issued: January 2015 Document reference: 620A2014 Status of report This document has been prepared for the internal
PMOs. White Paper. 1 www.mosaicprojects.com.au. 1 For more papers on PMOs see: http://www.mosaicprojects.com.au/resources_papers.
s A 1 will have various roles and responsibilities according to whether the service (or support) is focused at the project, program or portfolio level. Project management offices (PjMO) provide centralised
CUSTOMER INSIGHT. Industry case study from Huntswood
CUSTOMER INSIGHT Industry case study from Huntswood 1. Customer insight Contents Customer insight...3 Major international high st. bank...4 International credit card company...5 International general insurance
BT Advise Connect. Delivering intelligent network capability around the globe. BT Connect IQ Quick Start. BT Advise
BT Advise Connect Delivering intelligent network capability around the globe BT Connect IQ Quick Start BT Advise BT Connect IQ Quick Start In today s complex market, the network and delivery of network
Developing Excellence in Leadership, Training and Science
DELTAS Africa Initiative Outline Developing Excellence in Leadership, Training and Science August 2014 Improving School Governance 1 The Wellcome Trust and its partners have launched an initiative with
Risks to customers from performance management at firms
Guidance consultation 15/1 Risks to customers from performance management at firms Thematic review and guidance for firms March 2015 Contents 1 Approach and findings 2 2 Guidance to firms 8 3 Next steps
RESEARCH DEGREES HANDBOOK 2014-15
RESEARCH DEGREES HANDBOOK 2014-15 Section C: Framework for Postgraduate Student Training IN THIS SECTION: C1 C2 C3 C1 Context The Components of the Programme Management and Quality Assurance CONTEXT C1.1
Role Activity Grade 5 PAS Professional Officer
Role Activity Grade 5 PAS Generic Post Job Title: Market Insight Officer Title: Reporting to: Head of Market Insight School/ External & Community Relations Department: Job Family: Professional and Administrative
Capital Maintenance Planning From a historical and future perspective
Capital Maintenance Planning From a historical and future perspective This paper has been written by Anglian Water as a contribution to Water 2020, Ofwat s programme for determining the form of the 2019
INFORMATION GOVERNANCE POLICY
INFORMATION GOVERNANCE POLICY Version: 3.2 Authorisation Committee: Date of Authorisation: May 2014 Ratification Committee Level 1 documents): Date of Ratification Level 1 documents): Signature of ratifying
Technical & Engineering: OIL & GAS
Providing Qualified Professionals Be Exceptional About us Recruitment Process Compliance Client Support Payroll Control Our Clients Oil & Gas Industry Contact About us Cordant Technical & Engineering Recruitment
AER reference: 52454; D14/54321 ACCC_09/14_865
Commonwealth of Australia 2014 This work is copyright. In addition to any use permitted under the Copyright Act 1968, all material contained within this work is provided under a Creative Commons Attribution
Third party assurance services
TECHNOLOGY RISK SERVICES Third party assurance services Delivering assurance over your service providers The current third party service provider environment Corporate UK has been transformed in recent
Leadership & People Management WSQ
Our frontline leaders in SIA are empowered to lead our service teams to achieve the highest levels of service excellence. They are trained in core functional skills as well as given the opportunity to
Codification World Forum Industry and Defence working together
Codification World Forum Industry and Defence working together John Stratton OBE - Director Maritime Equipment 1 Industry and Defence working together Defence Support encompasses all those activities that
Report of External Evaluation and Review
Report of External Evaluation and Review Quality Environmental Consulting Limited Confident in educational performance Confident in capability in self-assessment Date of report: 3 September 2014 Contents
DCA metrics for the approval of Auditing Firms for Certifications Scheme VERSION 1.0
DCA metrics for the approval of Auditing Firms for Certifications Scheme VERSION 1.0 2013, Data Centre Alliance Limited (www.datacentrealliance.org). All rights reserved. This publication may not be reproduced
The Asset Information Model using BIM
AIM - PAS 1192:3:2014 The Asset Information Model using BIM Figure 1 PAS1192-2 and PAS1192-3 by: Rob Manning BIS BIM Task Group Introduction In this article we look at how the approach outlined in document
Gateway review guidebook. for project owners and review teams
Gateway review guidebook for project owners and review teams The State of Queensland (Queensland Treasury and Trade) 2013. First published by the Queensland Government, Department of Infrastructure and
Improving Resident and Customer Services Strategy
Improving Resident and Customer Services Strategy 2014 2018 ABOUT WOKINGHAM BOROUGH & OUR CUSTOMERS Wokingham Borough Council lies at the centre of a strong regional economy and has a generally healthy,
Quality Assurance Checklist
Internal Audit Foundations Standards 1000, 1010, 1100, 1110, 1111, 1120, 1130, 1300, 1310, 1320, 1321, 1322, 2000, 2040 There is an Internal Audit Charter in place Internal Audit Charter is in place The
Business Separation Statement of Compliance
Business Separation Statement of Compliance SP Transmission plc SP Distribution plc SP Manweb plc 1 Introduction This document sets out the practices, procedures and systems that SP Transmission, SP Distribution
Best Practice Asset Management
Case Study Best Practice Asset Management An example of an Activity Management Plan, published by the Working Group Case Study AMP 01-2014 The Working Group was established by the Road Efficiency Group
Employee Performance Management Policy
Employee Performance Management Policy Contents 1. Policy Statement... 2 2. Scope... 2 3. Roles and Responsibilities... 3 4. Competency Based Performance Management... 4 5. Corporate and Service Priorities
We hope all the questions are understandable, If you have any difficulties please email
Appendix 2- FEEDBACK QUESTIONNAIRE (word format) Thank you for taking the time to respond to our questions We hope all the questions are understandable, If you have any difficulties please email Once the
iso20000templates.com
iso20000templates.com Public IT Limited 2011 IT Service Policy Document Ref. ITSM01001 Version: 1.0 Draft 1 Document Author: Document Owner: V 1.0 Draft 1 Page 1 of 11 Revision History Version Date RFC
Department of Performance Monitoring and Evaluation in the Presidency. Management Performance Assessment Tool (MPAT) User's Guide
Department of Performance Monitoring and Evaluation in the Presidency Management Performance Assessment Tool (MPAT) User's Guide Contact Details Ismail Akhalwaya DDG:PSOA Branch DPME [email protected] Contents
A Framework of Quality Assurance for Responsible Officers and Revalidation
A Framework of Quality Assurance for Responsible Officers and Revalidation Supporting responsible officers and designated bodies in providing assurance that they are discharging their statutory responsibilities.
4 Adoption of Asset Management Policy and Strategy
4 Adoption of Asset Management Policy and Strategy Abstract The report recommends the adoption of an updated Asset Management Policy 2014 and an Asset Management Strategy 2014-2019. Both documents are
Business Intelligence Maturity Audit (bima) - Specialist Cloud Services
www.steria.com/uk Business Intelligence Maturity Audit (bima) - Specialist Cloud Services As Public Sector organisations adopt Cloud services as a result of business demands, changing technology and budgetary
BT Conferencing Business Continuity Management. Planning to stay in business
BT Conferencing Business Continuity Management Planning to stay in business Planning for the unexpected In today s connected world, businesses are increasingly dependent on their communications and networked
Introduction to Social Compliance & Its Business Benefits
Proposal for Conducting Seminar on Introduction to Social Compliance & Its Business Benefits Submitted to: Environment Agency, Abu Dhabi Table of Contents Summary..02 Seminar Objectives 02 Content Outline..02
Financial Sustainability Information Paper 8. Long-term Financial Plans
Financial Sustainability Information Paper 8 Long-term Financial Plans Revised January 2012 Introduction This Information Paper is one of a series of Information Papers about Financial Sustainability and
SUBJECT: Talent Management Strategy 2016 2020. Councillor Sandra Walmsley (Cabinet Member for Resources and Regulation)
REPORT FOR DECISION DECISION OF: CABINET DATE: 13 APRIL 2016 SUBJECT: Talent Management Strategy 2016 2020 REPORT FROM: Councillor Sandra Walmsley (Cabinet Member for Resources and Regulation) CONTACT
UK collaboration in Malaysia: institutional case studies. University of Nottingham Malaysia Campus
UK collaboration in Malaysia: institutional case studies University of Nottingham Malaysia Campus March 2010 The Quality Assurance Agency for Higher Education 2010 ISBN 978 1 84979 187 8 All QAA's publications
TÜV UK Ltd Guidance & Self Evaluation Checklist
ISO 9001:2015 Revision TÜV UK Ltd Guidance & Self Evaluation Checklist Why ISO 9001 is changing All ISO management system standards are subject to a periodic review under the rules by which they are written.
ISO/IEC 27001 Information Security Management. Securing your information assets Product Guide
ISO/IEC 27001 Information Security Management Securing your information assets Product Guide What is ISO/IEC 27001? ISO/IEC 27001 is the international standard for information security management and details
Occupational Profile and Curriculum Summary
Occupational Profile and Curriculum Summary Presented for Comment OFO code 143905 Related Occupation Contact Centre Manager Table of Content Occupational Profile and Curriculum Summary... 1 Presented for
WHITE PAPER IT SERVICE MANAGEMENT IT SERVICE DESIGN 101
WHITE PAPER IT SERVICE MANAGEMENT IT SERVICE DESIGN 101 Prepared by: Phillip Bailey, Service Management Consultant Steve Ingall, Head of Service Management Consultancy 60 Lombard Street London EC3V 9EA
ASSET MANAGEMENT. John Woodhouse. The Woodhouse Partnership Ltd
ASSET MANAGEMENT John Woodhouse The Woodhouse Partnership Ltd 1 What is Asset Management? Another catch-phrase, another management initiative or just re-working of good old common sense? We have certainly
What is world class commissioning?
...? series New title The NHS and HTA Supported by sanofi-aventis What is world class commissioning? Michael Sobanja Dip HSM Dip IoD Cert HE FRSM Chief Executive, NHS Alliance For further titles in the
CONFIGURATION COMMITTEE. Terms of Reference
SWBTB (8/13) 166 (g) CONFIGURATION COMMITTEE Terms of Reference 1. CONSTITUTION 1.1 The Board hereby resolves to establish a Committee of the Board to be known as the Configuration Committee (The Committee).
STATEMENT OF MARK A.S. HOUSE OF REPRESENTATIVES
STATEMENT OF MARK A. FORMAN ASSOCIATE DIRECTOR FOR INFORMATION TECHNOLOGY AND ELECTRONIC GOVERNMENT OFFICE OF MANAGEMENT AND BUDGET BEFORE THE COMMITTEE ON GOVERNMENT REFORM SUBCOMMITTEE ON GOVERNMENT
Science and Engineering Professional Framework
Contents: Introduction... 2 Who is the professional framework for?... 2 Using the science and engineering professional framework... 2 Summary of the Science and Engineering Professional Framework... 3
Managing Complex Transformations Achieving excellence
Managing Complex Transformations Achieving excellence A summary of our transformation management and programme leadership capability in the mining industry February 2009 Contents Introduction 1 Our approach
JOB DESCRIPTION. Organisation Chart. Customer BI Lead. Business Insight Lead. Business Insight Manager
JOB DESCRIPTION DIRECTORATE: DEPARTMENT: JOB TITLE: BAND: BASE: REPORTS TO: IT and Business Intelligence Business Intelligence Business Insight Lead 8a Various Customer BI Lead RESPONSIBLE FOR: Business
Intelligent Customer Function (ICF)
CAPABILITY AUDIT FOR HEIs Higher Education Institutions (HEIs) should organically develop their own to successfully manage the process of strategic sourcing. The capability audit provides an assessment
ITAG RESEARCH INSTITUTE
ITAG RESEARCH INSTITUTE Control and Governance Maturity Survey Establishing a reference benchmark and a self-assessment tool Erik Guldentops Wim Van Grembergen Steven De Haes Control and Governance Maturity
A framework of operating principles for managing invited reviews within healthcare
A framework of operating principles for managing invited reviews within healthcare January 2016 Background 03 Introduction 04 01 Purpose 05 02 Responsibility 06 03 Scope 07 04 Indemnity 08 05 Advisory
DEPARTMENT OF PERFORMANCE MONITORING AND EVALUATION IN THE PRESIDENCY
The Presidency Department of Performance Monitoring and Evaluation DEPARTMENT OF PERFORMANCE MONITORING AND EVALUATION IN THE PRESIDENCY Version: 060112 Date of presentation: 17 January 2012 Establishment
OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEMS
Environment, Health and Safety Committee Note on: OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEMS This note aims to give background information on the various occupational health and safety management