EXPERIMENT 10 CONSTANT HEAD METHOD



Similar documents
CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST

The University of Toledo Soil Mechanics Laboratory

PERMEABILITY TEST. To determine the coefficient of permeability of a soil using constant head method.

METHOD OF TEST FOR DETERMINATION OF PERMEABILITY OF GRANULAR SOILS

SOIL MECHANICS Assignment #4: Soil Permeability.

Interpretation of clogging effects on the hydraulic behavior of ion treated geotextiles

For Water to Move a driving force is needed

METHOD A10 (a) THE DETERMINATION OF THE IN-PLACE DRY DENSITY OF SOIL OR GRAVEL BY THE SAND REPLACEMENT METHOD

CHAPTER: 6 FLOW OF WATER THROUGH SOILS

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

Figure CPT Equipment

LABORATORY DETERMINATION OF CALIFORNIA BEARING RATIO

XI / PHYSICS FLUIDS IN MOTION 11/PA

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

POWDER PROPERTIES LABORATORY

Stormwater Management Design Brief. Proposed Commercial Redevelopment 5830 Hazeldean Road Ottawa (Stittsville), Ontario.

Standard Test Procedures Manual

VISCOSITY OF A LIQUID. To determine the viscosity of a lubricating oil. Time permitting, the temperature variation of viscosity can also be studied.

A H M 531 Penetration & Ring & Ball & Ductility & Flash & Fire point By: Mu'men Al-Otoom

KWANG SING ENGINEERING PTE LTD

GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE

PART I SIEVE ANALYSIS OF MATERIAL RETAINED ON THE 425 M (NO. 40) SIEVE

Stormwater/Wetland Pond Construction Inspection Checklist

Apr 17, 2000 LAB MANUAL

METHOD A7 THE DETERMINATION OF THE MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT OF GRAVEL, SOIL AND SAND

Commonwealth of Pennsylvania PA Test Method No. 632 Department of Transportation October Pages LABORATORY TESTING SECTION. Method of Test for

SECTION 1 GENERAL REQUIREMENTS

Attachment G-1: Pit Latrine Diagram. Fig E.1a: Pit Latrine. Fig E.1b: Plan View of Twin Pits

Diffusion and Fluid Flow

The University of Toledo Soil Mechanics Laboratory

PHYSICAL AND PLASTICITY CHARACTERISTICS

Apr 17, 2000 LAB MANUAL PARTICLE SIZE ANALYSIS OF SOILS AASHTO Designation T 88 (Mn/DOT Modified)

How fast water travels through soils?

LAB #3: MEASURING SPECIFIC GRAVITY AND DENSITY. Set-up and Materials for Experiment

Mercury is poured into a U-tube as in Figure (14.18a). The left arm of the tube has crosssectional

Emergency Spillways (Sediment basins)

SOIL-LIME TESTING. Test Procedure for. TxDOT Designation: Tex-121-E 1. SCOPE 2. APPARATUS 3. MATERIALS TXDOT DESIGNATION: TEX-121-E

CEEN Geotechnical Engineering Laboratory Session 7 - Direct Shear and Unconfined Compression Tests

United States Environmental Protection Agency Research and Development. Project Summary. Robert M. Koerner and George R. Koerner

C. Section TESTING LABORATORY SERVICE.

S.3.6. BULK DENSITY AND TAPPED DENSITY OF POWDERS. Final text for addition to The International Pharmacopoeia

Hydraulic Conductivity Tests for Soils. Hsin-yu Shan Dept. of Civil Engineering National Chiao Tung University

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

THE DETERMINATION OF THE MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT OF MATERIALS USING THE VIBRATORY HAMMER COMPACTION

SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE

CHAPTER 3: FORCES AND PRESSURE

TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL

SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST

GUIDELINES FOR TESTING FRESH SELF-COMPACTING CONCRETE

Homework 9. Problems: 12.31, 12.32, 14.4, 14.21

Dew Point Tester. Instruction Manual. CVS Regular Chiller Model A-2. CVS Regular Chiller Model A-2

Specification Guidelines: Allan Block Modular Retaining Wall Systems

CIVL451. Soil Exploration and Characterization

MEASUREMENT OF VISCOSITY OF LIQUIDS BY THE STOKE S METHOD

Physics 1114: Unit 6 Homework: Answers

EXPERIMENT NO.1. : Vicat s apparatus, plunger

Effect of grain size, gradation and relative density on shear strength and dynamic cone penetration index of Mahi, Sabarmati and Vatrak Sand

Preventing water damage in the basement

Unit 24: Applications of Pneumatics and Hydraulics

The University of Toledo Soil Mechanics Laboratory

A LAMINAR FLOW ELEMENT WITH A LINEAR PRESSURE DROP VERSUS VOLUMETRIC FLOW ASME Fluids Engineering Division Summer Meeting

9.00 THE USE OF HUNTER LAND DRAINAGE PERFORATED PIPES. Hunter Underground Systems

Penetration Tests in a Mold on Regolith Quasi-Analogues at Different Relative Densities

Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing

COSMOS 2012: Earthquakes in Action COSMOS 2012

Swissmetro travels at high speeds through a tunnel at low pressure. It will therefore undergo friction that can be due to:

Buoyant Force and Archimedes Principle

NOTE: FOR PROJECTS REQUIRING CONTRACTOR MIX DESIGN, THE DESIGN PROCEDURES ARE SPECIFIED IN THE SPECIAL PROVISIONS OF THE CONTRACT.

In-situ Density Determination by Sand Replacement Method

Advancements in Permeable Pavements

DRAINAGE MATS For Vertical: Flow 15-P For Horizontal: Flow 18-H

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

Area is a measure of how much space is occupied by a figure. 1cm 1cm

GUIDELINE FOR HAND HELD SHEAR VANE TEST

Lecture 24 - Surface tension, viscous flow, thermodynamics

Calibration of Volumetric Glassware

Treatment of a surface or structure to resist the passage of water in the absence of hydrostatic pressure. presence of hydrostatic pressure.

Math Matters: Dissecting Hydrometer Calculations

Period #16: Soil Compressibility and Consolidation (II)

Guidelines for Precast Concrete Grease Interceptors

The Manitoba Water Services Board SECTION Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

Soaking Up Solar Energy

Chemistry 112 Laboratory Experiment 6: The Reaction of Aluminum and Zinc with Hydrochloric Acid

Analysis of Double-Ring Infiltration Techniques and Development of a Simple Automatic Water Delivery System

Texas Building Pros Foundation Repair Services

EXHIBIT "A. Technical Specifications for Water and Sewer Service Lines

oil liquid water water liquid Answer, Key Homework 2 David McIntyre 1

Measurement of Soil Parameters by Using Penetrometer Needle Apparatus

Lecture 5 Hemodynamics. Description of fluid flow. The equation of continuity

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION

GRADATION OF AGGREGATE FOR CONCRETE BLOCK

product manual HS-4210 HS-4210_MAN_09.08 Digital Static Cone Penetrometer

FIELD SAMPLING AND TESTING MANUAL TESTING PROCEDURES FOR ALL TESTS

Fluid Mechanics: Static s Kinematics Dynamics Fluid

SURFACE TREATMENT BOND TEST

GUIDELINES FOR SOIL FILTER MEDIA IN BIORETENTION SYSTEMS (Version 2.01) March 2008

METHOD OF TEST FOR UNIT WEIGHT OF FRESH CONCRETE

8.9 - Flash Column Chromatography Guide

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS

Dimensional Analysis

Transcription:

EXPERIMENT 10 PERMEABILITY (HYDRAULIC CONDUCTIVITY) TEST CONSTANT HEAD METHOD 106 Purpose: The purpose of this test is to determine the permeability (hydraulic conductivity) of a sandy soil by the constant head test method. There are two general types of permeability test methods that are routinely performed in the laboratory: (1) the constant head test method, and (2) the falling head test method. The constant head test method is used for permeable soils (k>10-4 cm/s) and the falling head test is mainly used for less permeable soils (k<10-4 cm/s). Standard Reference: ASTM D 2434 - Standard Test Method for Permeability of Granular Soils (Constant Head) (Note: The Falling Head Test Method is not standardized) Significance: Permeability (or hydraulic conductivity) refers to the ease with which water can flow through a soil. This property is necessary for the calculation of seepage through earth dams or under sheet pile walls, the calculation of the seepage rate from waste storage facilities (landfills, ponds, etc.), and the calculation of the rate of settlement of clayey soil deposits.

107 Equipment: Permeameter, Tamper, Balance, Scoop, 1000 ml Graduated cylinders, Watch (or Stopwatch), Thermometer, Filter paper.

108

109 Test Procedure: (1) Measure the initial mass of the pan along with the dry soil (M 1 ). (2) Remove the cap and upper chamber of the permeameter by unscrewing the knurled cap nuts and lifting them off the tie rods. Measure the inside diameter of upper and lower chambers. Calculate the average inside diameter of the permeameter (D). (3) Place one porous stone on the inner support ring in the base of the chamber then place a filter paper on top of the porous stone (see Photo C). (4) Mix the soil with a sufficient quantity of distilled water to prevent the segregation of particle sizes during placement into the permeameter. Enough water should be added so that the mixture may flow freely (see Photo B). (5) Using a scoop, pour the prepared soil into the lower chamber using a circular motion to fill it to a depth of 1.5 cm. A uniform layer should be formed. (6) Use the tamping device to compact the layer of soil. Use approximately ten rams of the tamper per layer and provide uniform coverage of the soil surface. Repeat the compaction procedure until the soil is within 2 cm. of the top of the lower chamber section (see Photo D).

110 (7) Replace the upper chamber section, and don t forget the rubber gasket that goes between the chamber sections. Be careful not to disturb the soil that has already been compacted. Continue the placement operation until the level of the soil is about 2 cm. below the rim of the upper chamber. Level the top surface of the soil and place a filter paper and then the upper porous stone on it (see Photo E). (8) Place the compression spring on the porous stone and replace the chamber cap and its sealing gasket. Secure the cap firmly with the cap nuts (see Photo F). (9) Measure the sample length at four locations around the circumference of the permeameter and compute the average length. Record it as the sample length. (10) Keep the pan with remaining soil in the drying oven. (11) Adjust the level of the funnel to allow the constant water level in it to remain a few inches above the top of the soil. (12) Connect the flexible tube from the tail of the funnel to the bottom outlet of the permeameter and keep the valves on the top of the permeameter open (see Photo G). (13) Place tubing from the top outlet to the sink to collect any water that may come out (see Photo G).

111 (14) Open the bottom valve and allow the water to flow into the permeameter. (15) As soon as the water begins to flow out of the top control (deairing) valve, close the control valve, letting water flow out of the outlet for some time. (16) Close the bottom outlet valve and disconnect the tubing at the bottom. Connect the funnel tubing to the top side port (see Photo H). (17) Open the bottom outlet valve and raise the funnel to a convenient height to get a reasonable steady flow of water. (18) Allow adequate time for the flow pattern to stabilize (see Photo I). (19) Measure the time it takes to fill a volume of 750-1000 ml using the graduated cylinder, and then measure the temperature of the water. Repeat this process three times and compute the average time, average volume, and average temperature. Record the values as t, Q, and T, respectively (see Photo I). (20) Measure the vertical distance between the funnel head level and the chamber outflow level, and record the distance as h. (21) Repeat step 17 and 18 with different vertical distances. (22) Remove the pan from the drying oven and measure the final mass of the pan along with the dry soil (M 2 ).

112 Analysis: (1) Calculate the permeability, using the following equation: K = T QL Ath Where: K T = coefficient of permeability at temperature T, cm/sec. L = length of specimen in centimeters t = time for discharge in seconds Q = volume of discharge in cm 3 (assume 1 ml = 1 cm 3 ) π A = cross-sectional area of permeameter (= D 2, D= inside 4 diameter of the permeameter) h = hydraulic head difference across length L, in cm of water; or it is equal to the vertical distance between the constant funnel head level and the chamber overflow level. (2) The viscosity of the water changes with temperature. As temperature increases viscosity decreases and the permeability increases. The coefficient of permeability is standardized at 20 C, and the permeability at any temperature T is related to K 20 by the following ratio: Where: K = 20 η K T T η 20 η T and η 20 are the viscosities at the temperature T of the test and at 20 C, respectively. From Table 1 obtain the viscosities and compute K 20.

113 (3) Compute the volume of soil used from: V = LA. (4) Compute the mass of dry soil used in permeameter (M) = initial mass - final mass: M = M 1 -M 2 (5) Compute the dry density (ρ d ) of soil M ρ = d V

114 Table 1. Properties of Distilled Water (η = absolute) Temperature o C Density (g/cm 3 ) Viscosity (Poise*) 4 1.00000 0.01567 16 0.99897 0.01111 17 0.99880 0.01083 18 0.99862 0.01056 19 0.99844 0.01030 20 0.99823 0.01005 21 0.99802 0.00981 22 0.99780 0.00958 23 0.99757 0.00936 24 0.99733 0.00914 25 0.99708 0.00894 26 0.99682 0.00874 27 0.99655 0.00855 28 0.99627 0.00836 29 0. 99598 0.00818 30 0. 99568 0.00801 dyne s g *Poise = = cm 2 cm s

115 EXAMPLE DATA

116 HYDRAULIC CONDUCTIVITY TEST CONSTANT HEAD METHOD DATA SHEET Date Tested: October 10, 2002 Tested By: CEMM315 Class, Group A Project Name: CEMM315 Lab Sample Number: B-1, ST-10, 8-10 Visual Classification: Brown medium to fine sand, poorly graded, subrounded, dry. Initial Dry Mass of Soil + Pan (M 1 ) = 1675.0 g Length of Soil Specimen, L = 17 cm Diameter of the Soil Specimen (Permeameter), D = 6.4 cm Final Dry Mass of Soil + Pan (M 2 ) = 865.6 g Dry Mass of Soil Specimen (M) = 809.4 g Volume of Soil Specimen (V) = 846.9 cm 3 Dry Density of Soil (ρ d ) = 1.48 g/cm 3 Trial Number Constant Head, h (cm) Elapsed Time, t (seconds) Outflow Volume, Q (cm 3 ) Water Temp., T ( C) K T cm/sec K 20 cm/sec 1 30 84 750 22 0.157 0.149 2 50 55 750 22 0.144 0.137 3 60 48 750 22 0.137 0.130 4 70 38 750 22 0.149 0.142 Average K 20 = 0.139 cm/sec

117 BLANK DATA SHEETS

118 HYDRAULIC CONDUCTIVITY TEST CONSTANT HEAD METHOD DATA SHEET Date Tested: Tested By: Project Name: Sample Number: Visual Classification: Initial Dry Mass of Soil + Pan (M 1 ) = g Length of Soil Specimen, L = cm Diameter of the Soil Specimen (Permeameter), D = cm Final Dry Mass of Soil + Pan (M 2 ) = g Dry Mass of Soil Specimen (M) = g Volume of Soil Specimen (V) = cm 3 Dry Density of Soil (ρ d ) = g/cm 3 Trial Number 1 2 3 4 Constant Head, h (cm) Elapsed Time, t (seconds) Outflow Volume, Q (cm 3 ) Water Temp., T ( C) K T K 20 Average K 20 = cm/sec