L10: Budgeting and Cost Control. Olivier de Weck



Similar documents
700 Analysis and Reporting

Brief Introduction to Earned Value Management (EVM)

INSE 6230 Total Quality Project Management

Appendix D Glossary Of Terms

Earned Value Management Tutorial Module 8: Reporting. Prepared by:

Earned Value Formulae

AACE International Recommended Practice No. 86R 14

An introduction to Earned Value Analysis

Estimating Cost at Completion - Judgment & EV Information

Essential Views of the Integrated Program Management Reports. Thomas J. Coonce Glen B. Alleman

Brainstorm. What is Cost and Project Cost Management?

COINS EVA Earned Value Analysis

DCMA DCMA-EA PAM October 2012

Earned Value Management and the Government Program Office. Blair Alan Knapp Jr. MSPM PMP

EARNED VALUE MANAGEMENT. CASE STUDY USING MICROSOFT PROJECT

FERMI RESEARCH ALLIANCE PROCEDURES PROJECT MANAGEMENT. Head, Office of Project Management Oversight

Rules on using templates. MECH 896 Professional Development for MEng Students. Assignment #6A: Questions. Homework Discussion

Project Cost Management

Using Earned Value Management for Improving Processes. By Cynthia K. West

Introduction to earn value management in Civil Engineering

Earned Value Exercise. Su-Cheng Wu. MET AD 644: Project Risk, and Cost Management. Paul B. Cook, PhD PMP

PROJECT RESOURCES CONTROL

This EVMS Training Snippet sponsored by the Office of Acquisition and Project Management (OAPM) covers Firm Fixed Price (or FFP type) subcontracts.

Earned Value Management Best Practices

DATA ITEM DESCRIPTION Title: Integrated Program Management Report (IPMR) Number: DI-MGMT Approval Date:

How To Manage A Project

Earned Value Management Changes to the Glossary and Chapter 7 of the PMBOK Guide Third Edition.

PROJECTS SCHEDULING AND COST CONTROLS

Earned Value Management (EVM) is a technique that is used to track the progress and status of a project and forecast its likely future performance.

Basic Concepts of Earned Value Management (EVM)

Earned Value. Valerie Colber, MBA, PMP, SCPM. Not for duplication nor distribution 1

EVM.01. Earned Value Analysis Why it Doesn't Work

Create Stoplight charts using Milestones Professional

Chapter 7: Project Cost Management. Munawar

Earned Value and Agile Reporting

SUCCESSFULLY INTEGRATING AGILE WITH EARNED VALUE MANAGEMENT

THE APPLICATION OF PERFORMANCE MEASUREMENT TECHNIQUE IN PROJECT MANAGEMENT : THE EARNED VALUE MANAGEMENT (EVM) APPROACH

A Gentle Introduction to Earned Value Management Systems

Project Management Using Earned Value

plans based on actual cost, schedule and technical progress of work [1, 9].

CPM -100: Principles of Project Management

Chapter 7. (PMBOK Guide)

Earned Value Management System (EVMS) and. Project Analysis Standard Operating Procedure (EPASOP)

Earned Value Management Tutorial Module 6: Metrics, Performance Measurements and Forecasting. Prepared by:

Applied Project Management ( APM )

Integration of Income Management and Cost Management: A Complementary for Financial Analysis of Projects. Abstract. Introduction

Percorso di Eccellenza in PROJECT MANAGEMENT. Cost estimating and estimate to completion. Ing. Locatelli Giorgio.

Project Execution - PM Elements

earned value management

PERCEPTION. Tracking Progress & EAC

Simple Earned Value (Using MS Project 2010)

Lecture Slides for Managing and Leading Software Projects. Chapter 8: Measuring and Controlling Work Processes

Earned Value Management System Description

Patricia Mast (LCLS Project Controls Manager) Mark Reichanadter (LCLS Deputy Project Director) Signature Date

EARNED VALUE MANAGEMENT SYSTEM AS A PROJECT MANAGEMENT TOOL FOR MAJOR MULTI-DISCIPLINARY PROJECTS

Procurement Management S# What? Formula Additional Notes CPPC CPFF CPAF CPIF T&M FPEPA FPAF FPIF FFP

IQPC IT Project Management Conference Sydney Recent Advances in Project Prediction Techniques

MTAT Software Economics. Lecture 6: Software Cost Estimation (part II)

Project Cost Management

Big Data Meets Earned Value Management

+ The Killer Question For Every Manager

USING THE EARNED VALUE COST MANAGEMENT REPORT TO EVALUATE THE CONTRACTOR'S ESTIMATE AT COMPLETION. David S. Christensen, Ph.D.

IST 302 : Project Cost Management

Earned Value Management Tutorial Module 1: Introduction to Earned Value Management. Prepared by:

Basics of Cost and Schedule Control

IS EARNED VALUE + AGILE A MATCH MADE IN HEAVEN?

Earned Value Management Systems Application Guide

Tracking Software Development Progress with Earned Value and Use Case Point

Since 1985, the Test Program Set (TPS) development

PROJECT MANAGEMENT PLAN <PROJECT NAME>

10.1 Communications Planning 10.2 Information Distribution Figure Performance Reporting 10.1 Communications Planning 10.

Over Target Baseline and Over Target Schedule Guide

Pune, MH, India. 2 P.G. Student, Imperial College of Engineering & Research, Wagholi, Pune, MH, India. wit.vaishnavi@gmail.com

BEYOND EARNED VALUE: A Better Practice for Monitoring Project Performance 2012 Dr. Kenneth F. Smith, PMP ; Project Management Consultant

Software Project Scheduling. - Introduction - Project scheduling - Task network - Timeline chart - Earned value analysis

Project Control with ProTrack

Tracking Budgets and Schedules

Profesor: Francisco Javier Sanz Pérez. by fjspsv, PMP Test C07_01

Information Technology Project Management, Sixth Edition. Note: See the text itself for full citations. More courses at cie-wc.edu

// Benchmarking Project Schedules

Principles of Project Management

technical tips and tricks

Earned Value Management Systems Application Guide

Contract Cash Flow & Performance Analysis. PERCEPTION Helping The Shipyard Stay On Budget

Project Management Glossary

Financial Management and Program Management: Integration and Intersections

A Guide to Managing Programs Using Predictive Measures

Earned Value Management Guidelines

Earned Value Management for Enterprise Resource Planning Implementations

Project Management System Description (PMSD)

What is the Health of my Project?

Predicting progress on your project

Unit 5: Cost Management (PMBOK Guide, Chapter 7)

Project Management: Tracking Progress and Earned Value with MS Project 2003

Project Control System Manual. Jefferson Science Associates, LLC. 600 Progress Status. Project Control System Manual Revision

Cost & Schedule Risk Assessment 6.0. Timothy J. Havranek, MBA, PMP Leigh Hostetter, PMP

Chapter 5: Project Cost Management

PROJECT TRACKING and CONTROL

Assessing Schedule Performance with Earned Value

Project Management. ZEUS Student Seminar on 14 th November 2003 by Riko Wichmann. Riko Wichmann, MPY Zeus Student Seminar - PM,

Transcription:

ESD.36 System Project Management + L10: Budgeting and Cost Control Instructor(s) Olivier de Weck Lecture 10 Oct. 11, 2012

System Project Management ESD.36 Framework Project Preparation Enterprise has chosen what product or system to develop Next Project Project Planning Project Control Project Adaptation Project Learning Project Monitoring Project Completion ESD.36J SPM 2

Outline Tracking of Resource Consumption and Progress Creating Measurable Plans Schedule, Cost Tracking easy Scope/Progress Tracking hard Risk Tracking how? (dedicated lecture to risk management) Industrial Practice Earned Value Management (EVM) Role of Metrics in Project Management Processrelated metrics Productrelated metrics ESD.36J SPM 3

Discussion Point What should we track on projects and why should we track it? ESD.36J SPM 4

Project Tracking Challenges CPM/PERT, DSM, SD our project planning tools are intended to help us establish a credible baseline for planned schedule, project and product cost tracking should then be easy, right? But Timely data suited to direct use for project tracking is difficult to access Competing agendas in project resource organizations make the already difficult task of technical progress assessment even harder Fitting the data into the proper context for project assessment requires time and judgment The fidelity of tracking can be no better than the corresponding plan detailed and realistic planning requires significant effort ESD.36J SPM 5

Source Notes Many following examples and methods draw upon DOD/aerospace practices Methods originated in industry Initial application found to be resourceintensive DOD applied due to project size and complexity Commercial practices are converging with defense (movement in both directions) as IT infrastructure enables data acquisition and analyses Practices are coming full circle Stagegate processes require tracking metrics Tailoring for your organization and project is essential ESD.36J SPM 6

Creating Measurable Plans 1. DEFINE THE WORK 2. SCHEDULE THE WORK $$ BUDGET BASE Mgmt Reserve 3. ALLOCATE BUDGETS 100 40 60 15 25 30 30 Source: USAF www.acq.osd.mil/evm ESD.36J SPM TIME 7

Planning Resolution & Timing Work Packages Detailed, shortspan tasks, or material items, required to accomplish the objectives, typically in the near term Planning Packages Future work that has not been detail planned as work packages. They are always scheduled to occur in the future. (include costs & completion criteria) Work Packages Planning Packages Task 1 Task 2 Task 3 Task 4 Task 5 Source: MCG www.acq.osd.mil/evm ESD.36J SPM 8

Mapping Work to Resources SELECTED PSWBS ELEMENTS Product Development SOFTWARE INTEGRATION PROGRAM Master Planning SELECTED REPORTING ELEMENTS Ada Products Software Tools Standards CWBS EXTENSION Ada Study Ada Conversion Ada Approach FUNCTIONAL ORGANIZATION CPCI #1 MOS CPCI #2 MOLE CPCI #3 MAC VP/GM Marketing Engineering Operations Software Engineering Hardware Engineering Ada Applications Secure Systems LAN Applications Control Account Control Account Control Account Control Account Control Account Control Account BCWS BCWP ACWP BAC EAC Planning Packages Work Packages WBS DATA SUMMARIZATION OBS DATA SUMMARIZATION Source: public domain; MCG www.acq.osd.mil/evm Oct 14 2008 ESD.36J SPM 9

Project Planning & Control Context Project/program manager tasks Project management cycle Preparation Planning Execute/Monitor Adapt/Control Close out organize the work and the teams control changes authorize work properly corrective actions develop a realistic plan of the work scope, the budget, and the schedule performance reporting understand variances forecast of final cost and schedule ESD.36J SPM 10

Data Sources for Project Tracking Project cost is usually tracked in development organization finance system Data should be tracked on a per task, per resource basis to be most useful As outsourcing becomes a major strategy, similar costs must be gathered from suppliers Reporting requirements need to be contractually specified Work completion is usually measured by milestone, but requires detailed planning and costed tasksthis is often the most problematic measurement Percent complete measurements are notoriously unreliable Milestonebased reporting is least ambiguous, but requires substantial planning effort ESD.36J SPM 11

Earned Value Management Initially developed in industry (1970s) DOD adopted initially as CSSR, imposed on major contracts CSSR = Cost, Schedule, Status Reporting Has converged into current Earned Value Management System (EVMS) in both commercial and DOD use ANSI/EIA7481998, Earned Value Management Systems (latest version 748B 2007) If based on reasonable plan, excellent source of risk identification and project control metrics ESD.36J SPM 12

Implementation Spectrum Where Small Companies Commercial or Defense Larger Companies Government Organic Foreign Countries Major Defense Contractors When as desired corporate policy, enterprise wide FFP contracts? DoD NonMajor Contracts (>12 months) <$6M* >$6M DoD Major Contracts >$70M RDT&E >$300M Prod Reports streamlined, no paper? tailored to needs C/SSR CPR Core EV Principles Tailored Applications ANSI/EIA7481998 (32 criteria) ESD.36J SPM 13

3+2=5 Key Elements B C W S B C W P B udgeted C ost of W ork S cheduled B udgeted C ost of W ork P erform ed Planned Value Earned Value A C W P A ctual C ost of W ork P erform ed Actual Cost BAC B udget at C om pletion EAC E stim ate at C om pletion ESD.36J SPM 14

Schedule Variance BUDGET BASED BC WS BC WP of the work I scheduled to have done, how much did I budget for it to cost? of the work I actually performed, how much did I budget for it to cost? SCHEDULE VARIANCE is the difference between work scheduled and work performed (expressed in terms of budget dollars) formula: SV $ = BCWP BCWS example: SV = BCWP BCWS = $1,000 $2,000 SV= $1,000 (negative = behind schedule) ESD.36J SPM 15

Cost Variance BC WP AC WP PERFORMANCE BASED of the work I actually performed, how much did I budget for it to cost? of the work I actually performed, how much did it actually cost? COST VARIANCE is the difference between budgeted cost and actual cost formula: CV $ = BCWP ACWP example: CV = BCWP ACWP = $1,000 $2,400 CV= $1,400 (negative = cost overrun) ESD.36J SPM 16

Variance at Completion (VAC) B AC E AC what the total job is supposed to cost what the total job is expected to cost VARIANCE AT COMPLETION is the difference between what the total job is supposed to cost and what the total job is now expected to cost. FORMULA: VAC = BAC EAC Example: VAC = $5,000 $7,500 VAC = $2,500 (negative = overrun) ESD.36J SPM 17

5 Basic Questions/Parameters QUESTION ANSWER ACRONYM How much work should Budgeted Cost for BCWS be done? Work Scheduled How much work is done? Budgeted Cost for BCWP Work Performed How much did the is done Actual Cost of ACWP work cost? Work Performed What was the total job Budget at Completion BAC supposed to cost? What do we now expect the Estimate at Completion EAC total job to cost? ESD.36J SPM 18

Concept Question 1 Which of these 5 quantities is most difficult to track? (and why?) BCWS BCWP ACWP BAC EAC ESD.36J SPM 19

Earned Value Data Elements 6000 Time Now 5000 4000 CBB 3000 MR BAC (PMB) 2000 1000 BCWP BCWS ACWP 0 Jan Mar May Jul Sep Nov Jan Mar May Source: MCG www.acq.osd.mil/evm ESD.36J SPM 20

6000 EV Data Elements Variances Time Now 5000 4000 CBB 3000 MR BAC (PMB) 2000 BCWS ACWP 1000 BCWP Cost Variance Schedule Variance 0 Jan Mar May Jul Sep Nov Jan Mar May Schedule Slip Source: MCG www.acq.osd.mil/evm ESD.36J SPM 21

EV Data Elements Projections 6000 5000 4000 Time Now CBB ETC EAC VAC 3000 MR BAC (PMB) 2000 1000 BCWS ACWP BCWP Projected Program Delay 0 Jan Mar May Jul Sep Nov Jan Mar May Schedule Slip Cost Variance Schedule Variance Source: MCG www.acq.osd.mil/evm ESD.36J SPM 22

Data Analysis Relationships Term Percent Complete Cost Performance Index or Performance Factor To Complete Performance Index or Verification Factor Schedule Performance Index Estimate At Completion Estimate To Complete ESD.36J SPM Symbol % Done CPI or PF TCPI or VF SPI EAC ETC Formula BCWP BAC BCWP ACWP BAC BCWP EAC ACWP BCWP BCWS ETC + ACWP BAC BCWP CPI Source: MCG www.acq.osd.mil/evm Checklist Actions Ratio of work accomplished in terms of the total amount of work to do. Ratio of work accomplished against money spent (Efficiency Rating: Work Done for Resources Expended) Ratio of work remaining against money remaining (Efficiency which must be achieved to complete the remaining work with the expected remaining money) Ratio of work accomplished against what should have been done (Efficiency Rating: Work done as compared to what should have been done) Calculation of the estimate to complete plus the money spent Calculation of the budgeted work remaining against the performance factor 23

Risk Indicators EVM provides several metrics that can flag potential problems (risks) either as trends or thresholds. CPI: Good = 1.0 SPI: Good = 1.0 1.06 1.04 1.02 1 0.98 0.96 0.94 Jan Feb Mar Apr May CPI SPI ESD.36J SPM 24

Concept Question 2 The ACWP of a project is $5.5M, the BCWS is $6.0M and the BCWP is $5M. The SPI and CPI are: SPI=1.2, CPI=0.83 SPI=0.91, CPI=1.2 SPI=0.83, CPI=0.91 SPI=1.2, CPI=0.83 SPI=0.91, CPI=1.05 ESD.36J SPM 25

Risk Indicators corrupted Email excerpt from one of my NASA sponsored projects:.they passed on to us new EVM color coding guidelines from the Chief Engineer. We all frantically updated our charts. The failure to communicate was that I did not pass these new guideline to the PI's and COTR's before I left. In my defense, I only got a paper copy of the rules. So it was not straight forward to transfer. The main change is that being higher then 1.1 on your CPI or SPI is bad and colored that way. So you need to cover that in your comments. The new standards for CPI/SPI's are: 0.9 <= CPI/SPI <= 1.1 GREEN 0.8 <= CPI/SPI < 0.9 YELLOW 1.1 < CPI/SPI <= 1.2 YELLOW CPI/SPI < 0.8 or CPI/SPI > 1.2 RED We will use these for the next Monthly reports. Question to the class: What message does this send? ESD.36J SPM 26

Planning Granularity To use EVMS with a reasonable amount of management resources, plan at the appropriate level of detail Avoid % complete estimation Plan work packages with short duration, estimated package cost, and clear deliverable Assign earned value at discrete levels, e.g.: Zero value until work package start 50% value while executing Full value when deliverable is complete ESD.36J SPM 27

Management Reserve Calculate total project management reserve required based on statistical modeling past experience 4000 3500 3000 2500 2000 1500 1000 500 Management Reserve BCWS Total Funds BAC Schedule Reserve 0 Jan Mar May Jul Sep Nov Jan Mar May ESD.36J SPM 28

Project Control & Leverage Management reserve (cost and schedule) are important project management tools Amounts based on statistical analyses, past experiences typically in the 1030% range Reserves should be planned and validated with the overall project plan The project manager owns management reserve and unallocated budget/schedule Release of Management Reserve should be part of a formal, riskdriven process Requests for reserve allocation should follow a quantitative template ESD.36J SPM 29

Formulation of Project Metrics May be marginal, absolute, probabilistic = X% improvement in = X value of = X value of with 90% confidence Tradition is metric based on benefit/performance (with cost*, schedule and risk assessed later) Current practice is metric based on benefit/performance and cost Ideal would be metrics which include benefit/performance, schedule, cost and risk * cost can include liens on resources in addition to $ ESD.36J SPM 30

Metric Value Metric Tracking Subtract Resources Example: F/A18 E/F Gross Takeoff Weight (GTOW) Tracking target Expected Development Add Resources Crisis Time ESD.36J SPM 31

Problems with Metrics Identifying real and appropriate metrics is often one of the most difficult parts of engineering system design and projects customer often does not vocalize real metric often have several metrics (must treat independently or combine) Metrics don t necessarily add linearly mass does, cost doesn t (can push cost to another element easily) hard to flow metrics down ESD.36J SPM 32

Earned Value Management GOLD CARD Please see https://acc.dau.mil/gc Oct 14 2008 ESD.36J SPM 33

Summary Budgeting and Cost Control Need to monitor Schedule, Cost, Technical Progress vs Budget Risk Identification and Tracking is crucial, but challenging (next week) Formalized methods exist, e.g. EVM, but need to adapt to needs of particular projects Large government project >$1B class commercial product development $10M100M class small entrepreneurial firm <$10M ESD.36J SPM 34