CONCREBOL 2015. 2.3 There is no restriction regarding the number of participants in each team.



Similar documents
OUSADIA It is allowed the inscription of at the most 4 (four) projects per educational institution.

PCI BIG BEAM COMPETITION

Shotcrete Quality Control and Testing for an Underground Mine in Canada

INTERNATIONAL HOCKEY FEDERATION PERFORMANCE REQUIREMENTS AND TEST PROCEDURES FOR HOCKEY BALLS. Published: April 1999

Fire-Damage or Freeze-Thaw of Strengthening Concrete Using Ultra High Performance Concrete

Construction Materials Testing. Classes of Test

NOTE: FOR PROJECTS REQUIRING CONTRACTOR MIX DESIGN, THE DESIGN PROCEDURES ARE SPECIFIED IN THE SPECIAL PROVISIONS OF THE CONTRACT.

Dubai Municipality Standard DMS 1: Part 5: 2004

EFFECT OF NANO-SILICA ON CONCRETE CONTAINING METAKAOLIN

EXPERIMENTAL INVESTIGATION ON BEHAVIOUR OF NANO CONCRETE

XI / PHYSICS FLUIDS IN MOTION 11/PA

Tex-421-A, Splitting Tensile Strength of Cylindrical Concrete Specimens

Overview of Topics. Stress-Strain Behavior in Concrete. Elastic Behavior. Non-Linear Inelastic Behavior. Stress Distribution.

Shrinkage and Creep Properties of High-Strength Concrete Up To 120 MPa

SPECIFICATIONS. INTERLOCKING CONCRETE POROUS PAVING UNITS or Permeable Interlocking Concrete Pavers (PICP)

The entire document shall be read and understood before proceeding with a test. ISTA 3B Page 1 of 35

PROPERTIES AND MIX DESIGNATIONS

2. PREPARATION OF TEST SPECIMENS

Manufacturing Quality Concrete Products

SECTION PRECAST CONCRETE STRUCTURES

Participants are permitted to compete in this event one year only. Under no circumstances may a student repeat in this event.

SPECIAL COMPOUND FOR RHEOPLASTIC AND ANTI-CORROSION SUPERCONCRETE WITH VERY HIGH DURABILITY

NRMCA Quality Certification. Ready Mixed Concrete Quality Management System. Certification Criteria Document

1.5 Concrete (Part I)

Treatment of a surface or structure to resist the passage of water in the absence of hydrostatic pressure. presence of hydrostatic pressure.

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 888 PORTLAND CEMENT CONCRETE PAVEMENT USING QC/QA.

Commonwealth of Pennsylvania PA Test Method No. 632 Department of Transportation October Pages LABORATORY TESTING SECTION. Method of Test for

PHY121 #8 Midterm I

C. Section TESTING LABORATORY SERVICE.

GRADATION OF AGGREGATE FOR CONCRETE BLOCK

JIS G3472 Electric Resistance Welded Carbon Steel Tubes for Automobile Structural Purposes

Example Specification for Concrete using Current Building Code Requirements

Strength and Workability Characteristics of Concrete by Using Different Super Plasticizers

THERMA-TUBE preinsulated pipes and fittings Catalogue of products

PHYSICAL QUANTITIES AND UNITS

Concrete for industrial floors

NASA Explorer Schools Pre-Algebra Unit Lesson 2 Student Workbook. Solar System Math. Comparing Mass, Gravity, Composition, & Density

STUDY OF STRENGTH OF CONCRETE WITH PALM OIL FUEL ASH AS CEMENT REPLACEMENT

SOIL-LIME TESTING. Test Procedure for. TxDOT Designation: Tex-121-E 1. SCOPE 2. APPARATUS 3. MATERIALS TXDOT DESIGNATION: TEX-121-E

Inspections: Central Laboratory of the Regions

Lab 1 Concrete Proportioning, Mixing, and Testing

Pavement Thickness. esign and RCC-Pave Software. Roller-Compacted Concrete Pavement: Design and Construction. October 24, 2006 Atlanta, Georgia

The atomic packing factor is defined as the ratio of sphere volume to the total unit cell volume, or APF = V S V C. = 2(sphere volume) = 2 = V C = 4R

LABORATORY DETERMINATION OF CALIFORNIA BEARING RATIO

TABLE TENNIS SINGLES RULES

Notes on Polymer Rheology Outline

POLISH NORDIC WALKING FAMILY CUP 2011 REGULATIONS

NorthEast Transportation Training and Certification Program (NETTCP) Course Registration Form

Chapter 8 Design of Concrete Mixes

Effects of Temperature and Fly Ash on Compressive Strength and Permeability of High-Performance Concrete*

Specifications, Product Testing and Terminology

CGA Standard Practices Series. Article 600 Standard for Pozzolan Enhanced Grouts Used in Annular Seals & Well Destruction

Optiffuser. High-performance, high bandwidth lightweight 1D diffuser.

Effect of basalt aggregates and plasticizer on the compressive strength of concrete

SECTION 18 - CAST IN PLACE HIGH PERFORMANCE CONCRETE (HPC)

EXPANDED POLYSTYRENE (EPS) INSULATION BOARD SPECIFICATIONS

BERGEN KARATE KLUBB. HATLEVEIEN BERGEN Org. nr Stiftet 1. september

Strength of Concrete

TABLE TENNIS TABLE TENNIS

Subject A3B99RO ROBOTS in bachelor's program Cybernetics and Robotics at the CTU FEE in Prague.

EUROLAB 25 years. The role of metrology and testing to characterize materials and products. EUROLAB 25th Anniversary Seminar

A COMPREHENSIVE STUDY ON PARTIAL REPLACEMENT OF CEMENT WITH SUGARCANE BAGASSE ASH, RICE HUSK ASH & STONE DUST

The AASHO Road Test site (which eventually became part of I-80) at Ottawa, Illinois, was typical of northern climates (see Table 1).

Life-365 Service Life Prediction Model Version 2.0

ANALYSIS FOR BEHAVIOR AND ULTIMATE STRENGTH OF CONCRETE CORBELS WITH HYBRID REINFORCEMENT

SPREFIX SPRAY INSULATION _ in the marine market.

Guide to Specifying Concrete Performance

Exam 2 is at 7 pm tomorrow Conflict is at 5:15 pm in 151 Loomis

Solution for Homework #1

INFLUENCE OF STEEL FIBERS AS ADMIX IN NORMAL CONCRETE MIX

1. Fluids Mechanics and Fluid Properties. 1.1 Objectives of this section. 1.2 Fluids

DENSITY MEASURING SYSTEMS

Rules for the IEEE Very Small Competition Version 1.0

SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES

CARBON/DYNEEMA INTRALAMINAR HYBRIDS: NEW STRATEGY TO INCREASE IMPACT RESISTANCE OR DECREASE MASS OF CARBON FIBER COMPOSITES

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: CONCRETE ROOF TILES REPORT HOLDER:

TABLE OF CONTENTS CHAPTER NO. TITLE PAGE NO. ABSTRACT

Physics 2A, Sec B00: Mechanics -- Winter 2011 Instructor: B. Grinstein Final Exam

St. Paul University Philippines Tuguegarao City 3500 CONTESTS MECHANICS

4 Thermomechanical Analysis (TMA)

E/ECE/324/Rev.2/Add.116/Rev.2/Amend.2 E/ECE/TRANS/505/Rev.2/Add.116/Rev.2/Amend.2

CHAPTER 4 CONCRETE TRAINING AND QUALIFICATIONPROGRAM

USE OF CFRP LAMINATES FOR STRENGTHENING OF REINFORCED CONCRETE CORBELS

CONCRETE: CONTRACTOR S QUALITY CONTROL PLAN

Apr 17, 2000 LAB MANUAL

Quality Assurance Program. June by Texas Department of Transportation (512) all rights reserved

EXPERIMENT NO.1. : Vicat s apparatus, plunger

Mass Concrete. Robert Moser CEE8813A Material Science of Concrete. Definitions & Standards, Thermal Cracking, and Temperature Rise

A Study on Recycling of CRT Glass Waste

cement Masonry Cement Engineered for quality and reliability, Lafarge cements for masonry deliver consistent performance. page 2 Lafarge Cement

Properties of Concrete with Blast-Furnace Slag Cement Made from Clinker with Adjusted Mineral Composition

AMENDMENTS TO REGULATION WITH EFFECT ON

COMPACTING BITUMINOUS SPECIMENS USING THE SUPERPAVE GYRATORY COMPACTOR (SGC)

Section 16: Neutral Axis and Parallel Axis Theorem 16-1

2 THE LAWS OF TABLE TENNIS

How To Test Water Penetration On Concrete Block And Mortar

The Influence of Porosity & Aspect Ratio on the Compressive Behavior of Pervious Concrete. Alexander Hango

VeMet, Utrecht, NL «Solution in Wear Protection» Dipl.-Ing. Wolfgang Leichnitz. Quit

Specification for the Manufacture, Curing & Testing of Glassfibre Reinforced Concrete (GRC) Products.

Transcription:

12 nd CONTEST REGULATION 1/11 CONCREBOL 2015 1 OBJECTIVE 1.1 This contest intends to test the competitors ability in developing construction methods and the production of lightweight homogeneous concrete with optimized strength parameters. 1.2 The proposed challenge is to build a sphere (BALL) of lightweight concrete able to roll in a rectilinear trajectory, within the materials and dimensions established in this Regulation. 1.3 This Regulation sets the requirements to be attended in order to participate in this Contest, provides the guidelines to prepare the specimen and defines the classification criteria. It also provides information about the offered prizes by IBRACON to the winner teams in this challenge. 2 PARTICIPATION 2.1 To participate in this Contest, the teams must be composed by technology or architecture and civil engineering or students from any states of Brazil or from other countries, since the students are enrolled in academic year in a program authorized by Ministério da Educação (MEC) or respective higher education agency from foreign countries. 2.2 Each team must be composed by students from a single educational institution and it is mandatory that at least one component of the team must be registered in the 57 th Brazilian Concrete Congress 2015. 2.3 There is no restriction regarding the number of participants in each team. 2.4 The team must elect one of its students as the team s leader. This student must be an IBRACON membership. 2.5 It is allowed the inscription of at the most two BALLS per educational institution. In other words, if the institution is represented by only one team, they can participate at the most with two BALLS. 2.6 It is not allowed the participation of any member in more than one team. 2.7 Each team must be guided by a professor from the respective educational institution. This professor must be an IBRACON membership and ensure the team

2/11 conformity with the rules established in this Regulation, signing the Technical Report (Annex 2) and the Responsibility Term (Annex 3) for the team participation in this competition. 3 TEAMS APPLICATION 3.1 To perform the application, each team must submit the Application Form (Annex 1) properly filled until July 30, 2015. 3.2 The Technical Report (Annex 2) properly filled and the Term of Responsibility (Annex 3), both signed by the team s professor mentor, must be submitted until September 30, 2015. 3.3 The documents above described must be submitted by e-mail to concrebol@ibracon.org.br until the deadlines. 4 HANDLING THE BALL 4.1 The BALL must be handled at the Contests Arena in the Convention Center of Bonito/MS, where the 57 th Brazilian Concrete Congress takes place. 4.2 The handling shall be realized on October 27 th, 2015, from 5pm to 8:30pm. 4.3 As soon as the Organizer Committee receives the BALL, they must verify if it meets the dimensional, form and mass requirements, according to 5.2.1. The performance of these procedures must be accompanied by a member of each team. The noncompliance of these requirements disqualifies the team. 4.4 If the BALL is accepted because of meeting the 4.3 requirements, the team will receive identification from the Organizing Committee that confirms its participation in the Contest and the BALL will be retained by the Commission until the moment of the tests. 4.5 It will not be accepted any BALL handled by thirds or after the deadline. 4.6 It will not be allowed any changes in the BALL after it has been delivered. 4.7 The tests will take place at 2pm on October 30, 2015.

3/11 5 MOUNTING THE BALL 5.1 Materials 5.1.1 Portland Cement and active mineral cementitious materials For concrete mixture, any type of Portland cement currently commercialized or normalized by Brazilian Association of Technical Standards (ABNT NBR 5732, ABNT NBR 5733, ABNT NBR 5735, ABNT NBR 5736, ABNT NBR 5737, ABNT NBR 11578, ABNT NBR 12989 or ABNT NBR 13116) or by ASTM C 150, must be used. It is allowed the use of active mineral cementitious materials normalized by ABNT, as silica fume (ABNT NBR 13956), metakaolin (ABNT NBR 15894) and other pozzolanic materials (ABNT NBR 12653). In the case of teams from foreign countries, the use of cementitious material shall be restricted to the similar standards in Brazil, and its characterization and Technical Standard must be informed. It is not allowed the use of other types of binders such as adhesives and polymers with organic origin. NOTE: The concrete samples of the winner teams may be analyzed through specific tests to check the use of materials that is not provided in this regulation. 5.1.2 Aggregates The used aggregates shall have stony nature, according to ABNT NBR 7211.It is forbidden the use of aggregates with other origins (metal, glass beads, etc.), with the exception of lightweight aggregates provided in ABNT NBR 7213 and pearls of expanded polystyrene. 5.1.3 Fibers It is not allowed the use of any kind of fibers. The verification of the presence of any kind of fibers in the concrete (minerals, vegetables, metals, propylene, polyethylene or other) will disqualify the team. 5.1.4 Chemical Admixtures It is allowed the use of admixtures according to ABNT NBR 11768. In the case of teams from foreign countries, the use of chemical admixtures must be restricted to equivalents products in Brazil. The characterization and the Technical Standard of this product shall be informed. 5.2 Executive Procedure 5.2.1 BALL Characteristics The BALL shall have a spherical shape, diameter ranging from 210 mm to 240 mm

and mass smaller or equal to 10 000 g (see 6.2 and 6.3). 4/11 5.2.2 Curing The curing process can be chosen by the teams. It is allowed moist-cure at ambient temperature, thermo-controlled cure and other procedures, since described in the Technical Report. 5.2.3 Laboratory Procedures The laboratorial procedures must follow the Brazilian Technical Standard (ABNT) requirements, when relevant. 5.2.4 Markings It is allowed to identify the BALL with the logo or name of the team s institution. If this identification is made by adhesive, it must be easy to remove. The Organizing Committee may request the removal or repositioning of this adhesive on the ball. 5.2.5 Homogeneity and finishing The BALL shall be homogeneous, with the same composition throughout its mass. The BALL cannot contain special cores and flat surfaces; it cannot be painted as well, under penalty of disqualification of the team. 6 TESTING 6.1 Steps The test consists of four steps, as described from 6.2 to 6.5: Step 1: diameter and volume of the BALL; Step 2: BALL mass and density of concrete; Step 3: BALL uniformity; Step 4: concrete strength. 6.2 Step 1: diameter and volume of the BALL For each BALL, three determinations of diameter must be realized. These dimensions will be realized by the Organizer Committee through different orthogonal planes. The average diameter of the BALL must be between 210 mm and 240 mm and corresponds to the average of the three dimensions, realized with 1 mm accuracy. This value is used to calculate the volume and the final score to classify the teams.

6.3 Step 2: BALL mass and density of concrete 5/11 The mass of the BALL shall be determined in balance with a resolution of 1g, and must be smaller than 10 000 g. This value is used to calculate the final score to classify the teams. Calculate the density of the concrete used to prepare the BALL, considering the mass and the volume of the BALL (the volume is the one calculated in Step 1). The value of the density will be used in the event of a tie. 6.4 Step 3: BALL uniformity At this step, the uniformity of the BALL will be evaluated according to its capacity to roll, going on a straight route (through a lane) and converting this movement to a Goal, considering the BALL starts the movement because of an initial force. In order to provide an equal impulse to the BALLS, it will be used an equipment showed in Figure 1, that consists of a 20 kg mass pendulum, with an 80 cm lever arm, released at an angle of 37º (thirty-seven degrees). FIGURE 1: Drive equipment, Track and Goal The concrete BALL shall be placed over the penalty mark (marked on the track) and, at the time of the test, be driven as shown in Figure 2. To obtain the highest score, the BALL must run through the 4m length track and enter the Goal (Figures 1 and 2).

6/11 FIGURA 2: Equipment in the position to kick the BALL The Figures 1 and 2 show the dimensions of the track and the goal, as well as its alignment considering the axis of an impact point on the BALL. To each BALL, the team will have only one chance to try to score the Goal. Independently of the success of the kick, it will be attributed a C 1 coefficient, according to Table 1, and it will be part of the final score, to elect the winner team of the Contest. Table 1 Valores do coeficiente C1 em função do Gol Evento C 1 O chute é convertido em gol 1,00 O chute não é convertido em gol 0,60 It will be considered a Goal when more than a half of the ball crosses the line that limits the track from the Goal area. Each team must choose one of its members to be the Captain, who will be responsible for the position of the ball on the penalty mark. It is not allowed to lean on the track during the positioning. 6.5 Step 4: concrete strength After the realization of Steps 1 to 3, the BALL will be submitted by a compressive load in an upper swash plate under a (0.90 ± 0.15) MPa/s loading velocity. The maximum breaking load (F) obtained shall be registered with three decimal places, in kilonewtons (kn). This value is used to calculate the final score to classify the teams. 6.6 Final score The final score (PF) of each BALL shall be calculated by the following equation.

3 4.. r F PF. C 3. M 1 7/11 Where: PF is the value of the final score; F is the maximum load registered in the compressive strength test, in kilonewtons (kn) r is the radius of the BALL, calculated as a half of the average diameter obtained in Step 1 (see 6.2), in meters (m); M is the mass of the BALL, in kilograms (kg); C 1 is the uniformity coefficient, determined by the capacity to convert the BALL movement to a Goal over the equipment provided in this Regulation (Table 1). The value of the final score will be presented with a four decimal places accuracy. 7 RANKING OF THE TEAMS 7.1 Ascending sort by results The ranking of the teams will be based on the final score for the tested BALLS, in a descending order. It will be considered the winner the team which the BALL obtains the highest final score. The second and third places will be from the teams with BALLS rated on this sequence. Teams who registered more than a BALL will be rated by the BALL with the best performance. In this case, the BALL with the lowest score of each team will be disregarded. The noncompliance of this Regulation disqualifies the team, even after the ending of the Congress. The BALLS of the five best-rated teams may be collected for verification as to its compliance. Disqualified teams will have its procedures evaluated by the Judging Commission and may be prevented from participate for one or two editions of this contest. 7.2 Tiebreaker In the event of a tie for the final score, the winner team will be the one which the BALL has the lowest density. During the realization of the event, the mass of each BALL will be known only by the team that prepared it and the Organizer Committee.

8 ORGANIZER COMMITTEE 8/11 The Organizer Committee is formed by IBRACON members that represent the region of the event and the National Coordination. The members of the Organizer Committee will be revealed during the 57 th Brazilian Concrete Congress 2015. The Organizer Committee is responsible for receiving and verifying the BALLS, realizing the tests and evaluating the compliance of this Regulation. The divulgation of results will be made by IBRACON s Direction on the awards event of the 57 th Brazilian Concrete Congress. More information can be reported to the Organizer Commission by the e-mail concrebol@ibracon.org.br. 9 PRIZES The team winning first place will be awarded a cash prize (the value of which will be released from 30/04 on the contest website). The three teams with highest scores will receive, during the awards ceremony of the 57th Brazilian Concrete Congress, the plates allusive to the reached result in this contest.

ANNEX 1 APPLICATION FORM 9/11 12 nd CONCREBOL CONTEST BONITO/MS - 2015 Educational Institution Name E-mail Registration number IBRACON s membership number Team members Professor mentor Team s Captain -- PS: At the time of registration, attach the logo of the educational institution and the team photo to this Application Form.

Educational Institution: ANNEX 2 TECHNICAL REPORT 12 nd CONCREBOL CONTEST BONITO/MS 2015 Material proprieties of concrete components 10/11 Material Cement Water Aggregate 1 Aggregate 2 Aggregate 3 Cementitious Material 1 Cementitious Material 2 Admixture 1 Identificatio n/ type/brand Precedence/ producer Density kg/m 3 Admixture 2 Annex the Technical Report of the used cement Concrete composition Material Quantity kg/m³ Determination Maximum dimension of the aggregate mm Fineness modulus of the aggregate Concrete properties Used method (Technical Standard) Value Observations Cement Slump Mm Water Air-entrained Compressive strength Unit MPa Aggregate 1 Information about the BALL s execution process Aggregate 2 Molding date (day/month/year) Aggregate 3 Cementitious Material 1 Cementitious Material 2 Admixture 1 Admixture 2 Temperature and curing process Detail the preparation of the formwork, concrete, weighing the materials, etc. and include photos of every step. Team s professor mentor signature o C

ANNEX 3 RESPONSABILITY TERN 11/11 12 nd CONCREBOL CONTEST BONITO/MS - 2015 TO INSTITUTO BRASILEIRO DO CONCRETO A/C: 12 nd CONCREBOL ORGANIZER COMMITTEE RESPONSABILITY TERM I,... (Name of the mentor professor), RG..., (CI, CREA or CAU)..., Mentor Professor of the team..., from...(name of education institution)..., send to the 12 nd IBRACON Competition CONCREBOL 2015 Organizer Committee this Responsibility Term in which I declare that the BALLS registered on this competition are in conformity with the respective Regulation. I certificate that all the registered students are architecture, engineering or technology students of this educational institution. I also declare to be aware that any noncompliance with the Regulation will disqualify the team, that will have its procedures evaluated by the Judging Commission and may be prevented from participate for one or two editions of this competition....,... 2015. (Full name and signature of the mentor professor) (Registration number on respective education institution)