PROJECT CONTROL PROCEDURE (PROJECT STANDARDS AND SPECIFICATIONS)



Similar documents
Quick Reference Guide Interactive PDF Project Management Processes for a Project

AIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART B CERTIFIED PRACTISING PROJECT PRACTITIONER (CPPP)

Project Integration Management

USFWC Project Management Workshop May 31 st, 2014

Certificate In Project Management (CIPM)

Integration Mgmt / Initiating Process Group 4.1 Develop Project Charter

SECTION COST LOADED CRITICAL PATH SCHEDULE

This EVMS Training Snippet sponsored by the Office of Acquisition and Project Management (OAPM) covers Firm Fixed Price (or FFP type) subcontracts.

SOUTH FLORIDA WATER MANAGEMENT DISTRICT CONTRACTOR CPM SCHEDULE SUBMITTAL - DISTRICT REVIEW General Contractor CPM Schedule

The 10 Knowledge Areas & ITTOs

SCHEDULE AND BUDGETING

Design Consultant Project Management Requirements

Project Management Concepts

Contract / Construction Management. November 2006

THE PROJECT MANAGEMENT KNOWLEDGE AREAS

Spec. Standard: 11/27/ Revision: 11/27/06

Develop Project Charter. Develop Project Management Plan

10.1 Communications Planning 10.2 Information Distribution Figure Performance Reporting 10.1 Communications Planning 10.

PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME >

Demonstrate and apply knowledge of project management in

Project Management Tools

ENGINEERING COMPETENCIES ENTRY LEVEL ENGINEER. Occupation Specific Technical Requirements

Chapter 9 Computer Scheduling Projects should be scheduled one byte at a time

Cash flow is the life line of a business. Many start-up

Subcontractor Involvement Project Tracking Progress Curves. CSTM 462 Fall 2012

EXHIBIT 2-2-C PROGRESS SCHEDULES

Cost & Schedule Risk Assessment 6.0. Timothy J. Havranek, MBA, PMP Leigh Hostetter, PMP

<project name> COMMUNICATIONS PLAN

CPM Scheduling with Primavera Unifier

Contract No. E22PS02. PROJECT CONFIGURATION MANAGEMENT PLAN (CMP) for PRELIMINARY ENGINEERING AND DESIGN/BUILD PROCUREMENT

PROJECT TRACKING and CONTROL

Minnesota Health Insurance Exchange (MNHIX)

Basics of Cost and Schedule Control

PROJECT MANAGEMENT PLAN CHECKLIST

Schedule analytics tool

Dashboards and Reporting for Program Management

Input, Output and Tools of all Processes

SPECIFICATIONS - DETAILED PROVISIONS Section Project Control Schedule C O N T E N T S

Project Management Using Earned Value

MNLARS Project Audit Checklist

Project Management Certificate (IT Professionals)

PMP SAMPLE QUESTIONS BASED ON PMBOK 5TH EDITION

Planning and Scheduling Time it Right

INTEGRATED COST AND SCHEDULE CONTROL IN PROJECT MANAGEMENT


Project Cost & Schedule Monitoring Process Using MS Excel & MS Project

MICROSOFT OFFICE PROJECT - SYLLABUS

An Information Security and Privacy Perspective for Procurement Services Projects

Department of Training and Workforce Development Western Australia. RPL Assessment Tool Kit. BSB41507 Certificate IV in Project Management

Department of Training and Workforce Development Western Australia. RPL Assessment Tool Kit. BSB51407 Diploma of Project Management

Chapter 7c Project Cash Flow. Dave Ludwick

Time Management. Herb Pollard III

Construction Management Standards of Practice

Kathy Schwalbe, Ph.D., PMP Augsburg College. ; \ COURSE TECHNOLOGY *» CENGAGE Learning-

Practical Aspects of Construction Scheduling

Earned Value Reports from PMPlan Enterprise

NE-50413B Mastering Microsoft Project 2010

CONSTRUCTION PROGRESS DOCUMENTATION (SCHEDULING)

JAGAN RAO ADELAIDE, TUESDAY, 3 DECEMBER 2013

SECTION PROJECT PLANNING AND SCHEDULING PART 1: GENERAL 1.1 DEFINITIONS

Project Management Professional (Certified by PMI)

PMP Exam Preparation Answer Key

Minnesota Health Insurance Exchange Project (MNHIX) Deliverable Definition Document (DDD) For Project Management Plan Date:

AIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART C CERTIFIED PRACTISING PROJECT MANAGER (CPPM)

Cost Estimating Procedure. Table of Contents

LOGISTICS & SUPPLY CHAIN MANAGEMENT

SIMULATION TOOL FOR MANPOWER FORECAST LOADING AND RESOURCE LEVELING. Mikhail Hanna Janaka Y. Ruwanpura

PROCESS GROUP: PLANNING PROCESS GROUP: INITIATION. Oracle Projects. PMBOK Oracle Mapping. Scope Planning. Develop Project Charter

Certification Exam Objectives: PK0-003

Project Management Glossary

Project Management Concepts, Methods, and Techniques

Project Management Tools & Techniques

SYLLABUS 12/14/2012 CONE 425 Construction Planning, Scheduling, & Control Spring, 2013 Rev. 0. Syllabus Spring, 2013

Abar Solutions Petroleum Consultancy & Training Qualified From KPC Training & Consulting Services Provider. Code Period Language Start End Location

BSB41513 Certificate IV in Project Management Practice

Release 1. BSBPMG410A Apply project time-management techniques

Project Time Management an essential element to project success

763XXX Timing Analysis, Critical Path Method (CPM) Project Schedule

RULES OF CREDIT FOR EWP S WHY GO THERE??? Presenter Glen Warren Co-Chair COAA WFP Committee

WORK PROGRAM GUIDELINES

Internal Control Evaluation Progress Report for Frisco Independent School District. March 7, 2011

1.040 Project Management

Project Management Chapter 3

Stakeholder management and. communication PROJECT ADVISORY. Leadership Series 3

Summary of GAO Cost Estimate Development Best Practices and GAO Cost Estimate Audit Criteria

CRITICAL PATH METHOD (CPM) SCHEDULES

MANAGING INFORMATION TECHNOLOGY PROJECTS

Sample Examination Questions

Effective Project Management FIFTH EDITION

IMCPM04 Project Scheduling and Cost Control. Course Outline

CSC 443: IT Project Management Midterm 1 exam - Spring semester March 21 st, 2012

General Comparison between 4D Software

Project Management for IT/IS Projects

IT Project Management Methodology. Project Execution Support Guide. Version 0.3

PROJECT HUMAN RESOURCE MANAGEMENT

Transcription:

TABLE OF CONTENTS Page 1 of 18 PURPOSE 2 SCOPE 2 DEFINITION 2 ORGANIZATION AND RESPONSIBILITIES 2 Organization and Function 2 Integration of Control Functions 5 7 Introduction 7 Planning and Scheduling 7 Progress Planning 9 Progress Reporting 13 Progress Meeting 14 RECORDS 16 REFERENCES 16 ATTACHMENTS 17 Attachment 1 CONTRACTORS Organization Chart 17 Attachment 2 Manpower Histogram 18

Page 2 of 18 PURPOSE The purpose of this procedure Is to establish a method for planning and control for the execution of the PROJECT This procedure describes the approach to the planning and controls that are to be performed In the PROJECT In case of any conflict and inconsistency between this procedure and Contract, the Contract will prevail. SCOPE This procedure defines the Planning, Scheduling. Progress Control and Reporting requirements for each phase of the PROJECT implementation including: 1. Detail Design and Engineering 2. Procurement 3. Construction 4. Commissioning and Start-up DEFINITION 1. Construction is divided into two (2) distinct section; Construction/Precommissioning and Commissioning/Start-up. 2. EDMS means Engineering Documents Management System which is a. document control software with database used by CONTRACTOR. ORGANIZATION AND RESPONSIBILITIES Organization end Function The responsibility for the overall project control will rest with the Project Management Team in CONTRACTOR Office until engineering has almost been completed (over 90% progress) and all major equipment have been delivered to the Site, alter which

Page 3 of 18 the overall project control function will pass to the Field Control Team at the Site as at that time the majority of the project activities will be carried out at the Site. A. Organization The Project Control Team is shown in Attachment 1 (CONTRACTOR's Organization Chart). The Project Control Team will be responsible for determining the project control strategy and overall project control. After engineering has substantially been completed and ell major equipments have been delivered to the Site, the Field Control Team at the Site will be responsible for overall project control. The Project Control Team will be organized under the Project Control Manager for: 1. Schedule Control 2. Cost Control 3. Change Control 4. Document Control The Field Control team at the Site will be organized under the Field Control Manager for: 1. Field Schedule Control 2. Cost Control 3. Change Control 4. Document Control 5. Material Control B. Responsibilities 1. The Project Control Manager will be responsible for all project control matters, such as planning, controlling and reporting for the Project and will report to the Project Manager. The Field Control Manager will be responsible for ell project control matters at the Site and will report to the Construction Manager.

Page 4 of 18 The prime duties of the Project Control Manager and Field Control Manager will, as appropriate, be Establishing schedule strategy Issuing and maintaining schedule control procedures Identifying project activities and integrating engineering, procurement and construction activities into one comprehensive project execution plan. Developing and issuing various types of project schedules Identifying the critical paths Resource Planning and optimal resource mobilization Actual status monitoring and date collection Analyzing schedule trends. Physical progress and resource performance Identifying schedule problematic areas Planning and initiating corrective actions Updating and monitoring the schedules, incorporating any changes occurring during project execution Preparing and issuing schedule and progress reports Cost estimation and budgeting Change order handling Project cost control (monitoring. analyzing, forecasting, reporting, etc.) Planning and coordinating with reference sections for IT infrastructures Preparing and issuing the IT plan 2. Schedule Engineer who will; Analyze project requirements and prepare a project schedule that integrates constraints and strategies for engineering, procurement and construction.

Page 5 of 18 Prepare logic diagrams. in accordance with the Work Breakdown Structure, which form the basis for detailed level schedule reporting and analysis. Issue detailed activity schedules and expedite the return of schedule updating data. Monitor progress against baseline schedules, analyze deviations and recommend remedial action. Prepare agenda items for schedule review meetings. Prepare and maintain progress curve for engineering, procurement and construction. 3. Cost Engineer who will: Maintain and update the project budget and cash flow. Lead check estimate. Analyze cost trends and variance. Prepare changes in the work estimates In the formats agreed with OWNER Coordinate the work of the related disciplines and project groups tor cost matters. Prepare end maintain Change Order Logs and Change Order Status Report. 4. Project Administration Manager who will; Gather and record of Project documents and main EDMS for CONTRACTOR s and vendors documents. Report document status. Create document exception report for expediting of document Issue end revisions. 5. The Field Control Manager who will; Issue detailed activity schedules and expedite the return of schedule updating data.