UST RULES CHANGES. Heather Peters, Environmental Specialist



Similar documents
Northern Region. Underground Storage Tank

DRAFT REVISED Musts For USTs DRAFT. Printed on Recycled Paper. Updated June 2015

Underground Storage Tank Operational Compliance Field Guide

Straight Talk On Tanks Leak Detection Methods For Petroleum Underground Storage Tanks And Piping

Application for the Construction or Installation of Aboveground Storage Tank (AST) Systems or Associated Underground or Over-water Piping Systems

This page left intentionally blank

UST System Inspection Checklist

Welcome UST Owners & Operators!!

UST Site Inspection Guidance Document


Maryland Containment System Testing Protocol. The individual performing the inspection and testing as outlined in this protocol must be either:

STANDARD FOR SECONDARY CONTAINMENT TESTING OF UNDERGROUND STORAGE TANK SYSTEMS I. INTRODUCTION

Spill Containment Device and Containment Sump Testing Protocols. Introduction

Petroleum Storage Tank Compliance 101

ALL UST SYSTEMS. MOTOR FUEL, USED OIL, BULK HEATING OIL STORAGE (Federal/State Regulated Systems)

The Fuel Storage Tank Regulations 2009

Underground Storage Tanks

Daily Inventory and. Statistical Inventory Analysis. Daily Inventory and Statistical Inventory Analysis (SIA) are inventory control

Secondary Containment & Spill Buckets Inspection, Testing, and Repair Solutions. Allen Porter May 28, 2015

Brian Derge Tanknology Inc. February 26, 2015

UST Regulatory Compliance Inspection Training. State Water Resources Control Board Underground Storage Tank Program September 2004

1. Who is your current pollution carrier? Expiration Date: Premium: Retroactive Date:

MAINE DEPARTMENT OF ENVIRONMENTAL PROTECTION

Storage Tank Guidance for Real Estate Professionals

Spill Containment Manholes

Petroleum Storage Tank Spill and Overfill Prevention

UPDATE ON MAINE'S UNDERGROUND TANK LAWS

OREGON FIRE CODE Interpretations and Technical Advisories

NEW JERSEY SMALL BUSINESS ENVIRONMENTAL ASSISTANCE PROGRAM. New Jersey Fuel Dispensing Facilities Compliance Calendar

The following definitions apply with regard to requirements specified in this document:

YOUR PETROLEUM STORAGE TANK FACILITY INSPECTION GUIDE

Inspections Standard Operating Procedure 5 Aboveground Storage Tanks

Figure 1 Plugged Dispenser Filter vs. new

NFPA31FuelOilPiping 1 Revised

Technical Requirements for Aboveground Storage Tanks (ASTs) Storing Class IIIB Liquids (other than used oil)

Line Leak Detection Systems, UST Leak Detection Equipment, Mag Sump Sensor, and Other Sensors

Inventory Control for Underground Storage Tanks

AUTOMATIC TANK GAUGING SYSTEMS Achieving Compliance. John D. Sieger, Tanknology

MODEL INSTALLATION INSTRUCTIONS

Morrison Bros. Co. General Product Specifications

COMPLIANCE MANAGEMENT STRATEGIES. Presented by: Megan Kazmierczak, ECS Eclipse

ENGINEERED DRAWINGS FOR PETROLEUM STORAGE TANKS

TLS-300C UST Monitoring and Leak Detection System

Universal Installation and Maintenance Instructions Double Wall Spill Containment Bucket (5 and 15 gal)

Doing Inventory Control Right For Underground Storage Tanks

Tanks: What's in store?

Secondary Containment Testing Report Form

TLS-350R Monitoring Systems. Business Inventory Management.

Spill Prevention, Control and Countermeasure (SPCC) Rule

The following definitions apply with regard to requirements specified in this document:

Waste Oil Collection / Storage

Spill Control Prevention Plan (SCPP)

Shop Fabricated Aboveground Tank Construction Standards

Underground Storage Tank Flood Guide

List of Frequently Utilized Storage Tank Standards and Practices

DIRECTIVE 055: STORAGE REQUIREMENTS FOR THE UPSTREAM PETROLEUM INDUSTRY. August 2012

Recommended Fuel Piping Specification For UPP Piping, UL-971

FIBERGLASS UNDERGROUND STORAGE TANKS Special Installation Instructions for New York City Gasoline and Diesel Motor Fuels

Secondary Containment Options for Aboveground and Underground Tanks. Wayne Geyer Steel Tank Institute

Frequent Mishaps and Solutions with Regulated Aboveground Storage Tanks in Pennsylvania

Fuels Safety Program. Liquid Fuels Handling Code Adoption Document Amendment

District of Columbia Municipal Regulations UNDERGROUND STORAGE TANKS: GENERAL PROVISIONS 5500 COMPLIANCE WITH OTHER DISTRICT LAWS

UST Regulations Revision Update

September 2008 AFC (2) Page 1 of 5. Maximum Size and Aggregate Capacities of Aboveground Storage Tank Systems at Fuel Dispensing Stations

SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN

PMMIC 2013 Inspection Findings. Brian Pottebaum Rounds & Associates/PMMIC

MPM. Customer Service Representative Training. Class C Fuel Spill Handling

SAMPLE REPORTS. Contents

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

Operation, Maintenance, and Inspection of UST System Release Detection and Prevention Equipment

OPW EDGE Double-Wall Spill Containers

Leak free means a system where no gasoline is leaked while the system is

CITY OF WASHINGTON SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN

UNIVERSITY OF WISCONSIN MADISON

Healy Enhanced Vapor Recovery Troubleshooting Guide

ENVIRONMENTAL QUESTIONNAIRE - REAL ESTATE SECURED LOANS

Good Housekeeping Practices for DPW/Fleet Maintenance Facilities

Depending on your facility and the equipment contained within, all or part of the checklists/logs can be printed for use.

A GROUNDWATER PROTECTION PLAN FOR HOME HEATING OIL TANKS

PREVENTING GROUNDWATER POLLUTION: SECONDARY CONTAINMENT

OIL STORAGE REQUIREMENTS OF THE SPCC REGULATIONS. Christopher J. Ecsedy, P.E. Fuss & O'Neill, Inc. 146 Hartford Road Manchester, CT 06040

CDS TROUBLESHOOTING SECTION I. VACUUM Weak vacuum at wand. Gauge reads normal (10hg to 14hg)

TYPICAL FIRE SAFETY INSPECTION VIOLATIONS

Below Grade Spill Containment Manholes Gallon Gallon Gallon. Installation Instructions

MODULE IV Secondary Containment, Oil Spill Control & Spill Prediction

Indirect-Fired Storage Water Heater Models WH-30 through WH-80 INSTALLATION AND OPERATING INSTRUCTIONS

Steel Tank Institute AST Inspections. Dana Schmidt, PE STI/SPFA

Introduction. Safety Guidelines. Part Numbers. Operation and Maintenance Manual. Operation and Maintenance Manual

Universal Installation and Maintenance Instructions 71CD-1212 Spill Containment Bucket

Transcription:

UST RULES CHANGES Heather Peters, Environmental Specialist

Today s Topic 2011 Rule package- what s left? Upcoming rule changes Federal Regulation Changes & Testing Protocols How are you doing?

2011 Rule Package You: Provided input and experience Suggested new and creative solutions Identified pitfalls and problems Got involved! THANK YOU!

What are we still working to enact? Emergency generator tank issues Lining inspections (repair/compatibility) High throughput facilities SIR records Updating new installation certifications Out of use tanks

Emergency generators Limited tank release detection options: ATG, Manual gauging (only USTs under 2,000 gallons), Groundwater monitoring (not recommended) Pressurized piping Can use sump sensors (alarm) instead of LLD Safe or unsafe suction

Safe suction Operates at less than atmospheric pressure Sloped so that all contents will drain back into the storage tank Only one check valve and it is immediately below the pump (in dispenser or at day tank/inside pump) Cannot have valve at tank top

Safe suction: Ball valves are open

UST UNSAFE SUCTION

Tank higher than Generator=Unsafe Suction

Tank top valves=unsafe Suction

U n s a f e

Piping Release detection Safe suction: No monitoring required Unsafe suction Line tightness test every 3 years Monthly/Continuous Interstitial monitoring Monthly Groundwater monitoring (not recommend)

Lining inspections Lined tanks must be inspected within 10 years of initial install, every 5 years, maintained and repaired (pass integrity test) Upgraded Lining repaired tank (even if using cathodic protection) Compatibility (even if fiberglass tank)

High throughput facilities Individual tank systems with over 800,000 gallon throughput per month No matter the throughput- must be conducting monthly monitoring Struggling to capture throughput/ identify these facilities

Statistical Inventory Reconciliation (SIR) To be a valid SIR report, it must include: Be NWGLDE listed to detect 0.2 gph leak Each tank individually (unless siphon tanks) Meet SIR vendor requirements Tank read every day to the nearest 1/8 Each full monthly report (no summaries) Include date report was completed (within 15 days) Include leak rate and pass/fail/inconclusive

New Installations Going great! Thank you for scheduling updates! Reminders: Update your certifications Provide current insurance to Dept. of Ag. Backfill must meet manufacturer spec Unique designs- CALL US!

Out of Use Tanks Within 12 months- site assessment Closure site assessment Within 5 years (of pump out date)- closure Removal or fill in place May be able to use the site assessment at closure May be able to re-open

Upcoming Rulemaking State specific changes Secondary containment (double walled) Operator Training Other Federal Regulation changes

Groundwater Monitoring Vapor Monitoring

State Specific Changes/Discussions Release Detection Sunset groundwater/vapor monitoring Limit throughput on SIR Revisit high-throughput threshold Require ATGs to maintain backup Data upload or battery backup power

Interior Linings

State Specific Changes/Discussions Interior linings Interior lining inspections must include photo/video documentation Interior lining repair/install technician must be NACE or ICC certified Include UL 1856 No interior lining inspection required IF conducting interstitial monitoring

State Specific Changes/Discussions Repairs/ Upgrades Cannot re-repair a spill basin CP protected metal piping must be replaced if not protected for more than 90 days

State Specific Changes/Discussions Installs Cannot install a UST within 300 feet of well Change install notification from 30 to 14 days Post-installation tank tightness tests must be NWGLDE certified as a tightness test Tie-down all new USTs Revisit UL1856 stand alone system Establish a section for marinas

Secondary containment New (including replacement) tanks only Piping replacement (50% or more of a piping system within 1 year) Does not apply to existing systems (until replaced) Effective July 1, 2017

Secondary containment Double wall tanks Double wall piping Containment sumps Interstitial monitoring the system We will not include spill basins, siphon piping, remote fills or vent piping.

*Courtesy of Steel Tank Institute

Secondary containment terminology Inner wall = primary Outer wall = secondary Space in between = interstice Monitoring between the two walls = interstitial monitoring *Courtesy of Steel Tank Institute

*Courtesy of Franklin Fueling

OUTER PIPE INNER PIPE

Interstitial monitoring Liquid detection (sensor in interstice or in containment sumps) Brine measurements Vacuum/pressure testing or monitoring

Brine Interstitial Monitoring

50% piping system replacement Within 12 month period For a piping system Single tank s piping (single product) 50% of manifolded piping Not of the total site piping Do not combine same products unless piping is manifolded The entire piping system must be double walled with containment sumps and monitoring.

Based on individual tank systems Does not matter how many different systems/products are beneath the dispenser May have to install containment sumps under dispensers with other piping runs entering

Manifold piping (all connected) counts as a system Even if only affects one half of the manifold, all of the connected piping must comply Includes sumps at each end and transition

Operator Training Training/testing online 2014 By January 1, 2016 qualified Class A/B Must pass Missouri s online training/testing Be certified in an adjacent/bordering state By January 1, 2016 trained or test Class C

Other Federal Requirements On-site walk-through checks Testing: Secondary Containment Spill basin Overfill prevention equipment Release Detection New regulated tanks: Airport hydrant/fueling USTs, Field constructed (concrete), Oil/ water separators??

Routine Site Checks (O&M) Dispensers All tank top manholes/containment sumps Release detection equipment Spill basins Monitoring wells Cathodic protection (if present) Document these checks

Things to consider Location of tanks Create a checklist for the site Type (weight) of all drive plates Safety- cones, vests Dispenser keys at facility

Testing procedures PEI RP 1200 Petroleum Equipment Institute (PEI) RP 1200 Manufacturer test procedure The following slides provide a general overview of the procedures DO NOT USE AS A PROTOCOL!

Sump testing Check liquid level in backfill Clean sump and close test boots Temporarily remove interstitial sensors Must be able to read measuring device/stick to nearest 1/16 Fill with water 4 above highest entry/seam Wait 15 minutes (allow for sump settling)

Sump testing Insert measuring device (lowest point) Take reading (ideally leave stick in place) Wait one hour and take reading again If within 1/8 of original reading- pass If greater than 1/8 difference- fail Dispose of water properly

Things to consider Number of sump penetration s Location of sump penetrations Types of containment sumps Entry boots- type and installation Seal all electrical conduits well Keep the sumps clean and free of product

Spill bucket testing Hydrostatic (water) test Vacuum test Interstitial vacuum test *Courtesy of OPW

Spill bucket testing - Hydrostatic Clean spill basin Check for cracks, loose seals Check drain valve and fill for tight seal Fill with water 1.5 from top Wait 5 minutes to allow settling

Sump bucket testing- Hydrostatic Take first reading Wait 1 hour and take second reading If within 1/8 of original reading- pass If greater than 1/8 difference- fail Dispose of water properly

Alternative spill bucket testing Vacuum test of the primary spill basin Vacuum test of interstice on double walled spill basin Permanent liquid sensor in spill basin interstice (??)

Overfill testing Do not overfill the tank to test!! Flapper valves - 95% tank volume Ball float valves - 90% tank volume Alarms- 90% tank volume

Overfill testing- Flapper valves Remove drop tube Confirm no obstructions in tank Visually inspect auto shutoff Move the float mechanism Close and confirm shutoff valve closes (drop tube flow restriction) Confirm 95% (height of flapper)

Overfill testing- Ball float valves Remove ball float valve assembly Visually inspect No damage on ball (holes, cracks) Cage pieces secure and unbroken Ball can move freely Ball can seat tightly in vent Confirm ball seats at 90%

Overfill testing- Ball float valves Review site for incompatibilities: Coaxial drop tubes Open tank top fittings Remote fill pipes or evidence of pressure deliveries (e.g. tank is higher than fill box) Suction piping Fail on any of these items Fail

Overfill testing- Alarms Check manufacturer protocol Manually measure product level in tank and compare to ATG Verify alarm circuit ok on monitor Activate alarm warning

Overfill testing- Alarms Remove ATG cap, disconnect probe wire Remove ATG probe Check floats are mobile (if applicable) Reconnect ATG probe cable Set float in middle of probe and confirm reading is accurate (use tank chart) Move probe up until alarm. Confirm 90% Reinstall ATG probe

Overfill testing- Alarms This protocol will not work for all probe types Consult manufacturer s ATG probe and alarm test procedures Should be done by manufacturer certified technician If does not pass, repair or install alternative overfill prevention equipment

Inspection Compliance Rates From three years of inspections: 3740 compliance inspections 92% of our active site inspections find something Only 3% needed an LOW Approximately 1% have been issued an NOV

Three Years of Inspections In Compliance at Inspection Letter only LOW issued NOV issued

Coming together is a beginning; keeping together is progress; working together is success. --Henry Ford