BIM Extension into Later Stages of Project Life Cycle



Similar documents
Teaching Using 3D Laser Scans

Building Information Modelling (BIM); How it Improves Building Performance. R.P. Kumanayake Lecturer, Department of Civil Engineering

Automated construction schedule creation using project information model

BIM Department. BIM Modeling Using Faro Focus3D Laser Scanner

Olilo's AEC Design Services. SrinSoft Inc, Partners of

Certified Instructors & Curriculum

BIM GUIDE. Developed for

Industrial Case Study of Electronic Design, Cost and Schedule Integration

NAPCS Product List for NAICS 54134: Drafting Services

Turner Innovation Series BIM Conference Istanbul May Brian Krause, Dan Gramer, Turner Construction Company

A 3D Point-cloud-based Verification of As-built Construction Progress

2012 BIM Guidelines and Standards (Rev. 00) University at Albany

Execution Plan Template Design Modeling

STATE OF MINNESOTA. BIM GUIDELINE State of Minnesota s Facilities Administration Data Capture Plan

SRISHTI TECHNICAL SERVICES L.L.C

SECTION 3: ANNEX J UNC CHARLOTTE ILM IMPLEMENTATION PLAN (New Section)

Specifying Laser Scanning Services. A Quantapoint White Paper

d e n v e r a r t m u s e u m

INTRODUCTION OF CONSTRUCTION MANAGEMENT INTEGRATED SYSTEM USING BIM IN THE HONAM HIGH-SPEED RAILWAY LOT NO. 4-2

Feasibility Analysis of Initiating Building Information Modeling (BIM) for HVAC systems by General Contractors

Building Information Modeling (BIM): A New Paradigm for Visual Interactive Modeling and Simulation for Construction Projects

Autodesk Revit LEARNING PATH BUILDING DESIGN SUITE

Safety Plan Reviews in 3D Christopher Santulli, PE. April 23, 2012 Times Square Marriott Marquis

NEW YORK CITY DEPARTMENT OF DESIGN + CONSTRUCTION

BIM: FOR PROJECT MANAGERS CSI Southwest Region Conference Program 1B 8:45am 11:00am

Innovative capture and modeling of existing building conditions using 3D laser scanning. Entry B Submission

Mobile 2D Barcode/BIM-based Facilities Maintaining Management System

A BIM Case Study: SELCEN Mimarlik

ENGINEERING AND TECHNOLOGY DEPARTMENT

AUTOMATED PROJECT SCHEDULE AND INVENTORY MONITORING USING RFID

From 3D Laser Scanning to Revit. Processes, Products and Questions

Using Autodesk Fabrication Software from TSI

BIM.03. Leveraging the Power of 4D Models for Analyzing and Presenting CPM Schedule Delay Analyses

Evaluation of Building Information Modeling (BIM) Estimating Methods in Construction Education

Laser Scanning for an Integrated BIM

3D Laser Scanning Software Solutions

School Building Authority of West Virginia BUILDING INFORMATION MODELING (BIM) EXECUTION PLAN SBA FORM 191

H:\forms\handouts\bldg049 1 of 11 Revised Mar 2/15/dh

Using Building Information Modeling (BIM) for Estimating and Scheduling, Adoption Barriers

Applications of Building Information Modeling (BIM) to Real Estate Projects of Ahmedabad

AUTOMATED CONSTRUCTION PLANNING FOR MULTI-STORY BUILDINGS

Revit MEP. Autodesk Navisworks

3D Laser Scanning for Manufacturing Facilities Developing the Business Case. By Bill Campbell Founder, Digital Dimensions 360, LLC

PROJECT MANAGEMENT INNOVATION BASED ON BUILDING INFORMATION MODELING

Exceptional... Everytime!

Proceedings of Meetings on Acoustics

University of Northern Iowa Design Documents Standards. October 2014

How To Design A Bim Project

Building Information Modeling (BIM) Requirements for PT Projects Today s Capabilities for a BIM based Design

BIM and Digital Fabrication

LACCD Building Information Modeling Standards For Design-Bid Build Projects

Scope of Building Information Modeling (BIM) in India

The use of BIM in plumbing projects creates deeper project knowledge, delivers a more robust product, and can reduce total project costs.

@hba_sudbury. Buying A New Home. Presented in Partnership with. Greater Sudbury Public Library PHONE SDHBA:

Collaborating Across Disciplines with Revit Architecture, MEP, and Structure

WESTERN MICHIGAN UNIVERSITY

ESSENTIAL CURRICULUM ARCHITECTURAL DESIGN ACADEMY

Streamline your design-to-cost processes with Autodesk Navisworks

Building Information Modeling Management To Facility Management

Request for Proposal Autodesk CAD Support

Virtual Reality Applications in Project Management Scheduling

Drawing a Bedroom Floorplan

SharePoint for Engineering Document Management & Control

Explore. Analyze. Optimize. AutoCAD. Civil 3d

and 2010: rprise Increasingly, must ation, es, partners, s intelligence.

Residential Building Permits

1 TABLE OF CONTENTS. 1. BIM Execution Plan. BIM Execution Plan- UF Minor Projects Template UF of 20 pages Processes...

A COMBINED TEXT MINING METHOD TO IMPROVE DOCUMENT MANAGEMENT IN CONSTRUCTION PROJECTS

Setting a New Standard for 2D Design

Abstract: BIM: A Technological Advancement in the Field of Architecture. Introduction:

BIM Test At ASHRAE HQ

Using the Coordination Monitoring Feature in Revit Structure to Manage Projects Across Disciplines

CAD Standards Guideline For Facility Documentation and Construction Projects

Design/Construction Integration thru Virtual Construction for Improved Constructability Walid Thabet, Virginia Tech

Professional CAD System

OFFICE OF PERSONNEL MANAGEMENT ATLANTA OVERSIGHT DIVISION ATLANTA, GEORGIA

Life-cycle Information Flow Management System

MASTER CLASS INTEGRATED PROJECT MANAGEMENT SOFTWARE REPORT Timo Hartmann

Structural BIM Technology Certificate Program

Design & Drafting Services

Explore. Analyze. Optimize. AutoCAD. Civil 3d

CITY OF YORBA LINDA P.O. BOX CALIFORNIA

Advancements in Close-Range Photogrammetry for Crime Scene Reconstruction

Internships and graduation jobs Development

PREPARING A BUINDLING INFORMATION MODEL FOR FACILITY MAINTENANCE AND MANAGEMENT

reality Revit check Autodesk have long Identify possible Utilize structural Tool Works Building bcg.com

BIM Project Management Professional (PMP) Technology Certificate Program

Effective Collaboration

Simpson Engineering A state licensed engineering firm F-1607

Radiological characterisation by means of 3D-laser modelling and positioning of measurements

Using BIM to Eliminate Construction Site Hazards Life Cycle Safety Stage Repair, Operations, and Maintenance Brian Krause, Turner Construction Company

DIA Survey Requirements. Thomas Breitnauer, PLS DIA Land Surveyor December 10, 2014

BIM and DWF REVIT BUILDING INFORMATION MODELING. About DWF. BIM and DWF

REQUIREMENTS FOR SUBMITTING PLANS FOR NEW CONSTRUCTION

Transcription:

BIM Extension into Later Stages of Project Life Cycle Pavan Meadati, Ph.D. Southern Polytechnic State University Marietta, Georgia This paper discusses the process for extending the implementation of the Building Information Modeling (BIM) into the later stages of the project life cycle. The project life cycle includes planning, design, construction, operation and maintenance, and decommissioning. BIM is a process and it provides the framework to develop data rich product models. This model serves as gateway to provide any time access to insert, extract, update, or modify data by all the project participants involved in the life cycle. Though the BIM implementation offers several benefits to the project participants of the life cycle, but the current practices facilitate the implementation of BIM upto early stage of construction phase. BIM implementation stops beyond early stage of the construction phase due to unavailability of three dimensional (3D) as-built model and lack of integration of the construction process documents to the 3D as-built model. This paper discusses the means for collecting 3D as-built coordinates, developing 3D as-built model, developing four dimensional (4D) as-built model and integration of construction process documents for facilitating BIM implementation during the maintenance and decommissioning phase of the life cycle. Key Words: Building Information Modeling, BIM, 3D as-built, 4D as-built, Lifecycle Introduction The life cycle of the project includes planning, design, construction, operation & maintenance, and decommissioning. The construction phase can be divided into pre-construction, actual construction, and post construction stages. In each phase lot of information is exchanged among various project participants. This information can be categorized into graphical and non-graphical data. The graphical data includes 2D and 3D drawings and non-graphical data includes other project documents. Traditionally, these two information categories exist as independent entities and are not linked to each other. This non-linkage decreases the project participants productivity due to implementation of time consuming information retrieval methods, and regeneration of data. Implementation of Building Information Modeling (BIM) increases the project participants productivity by facilitating easy information access, and reusage of data. BIM is a process of representing a facility through a 3D digital model and linking the information associated to it. Some of the benefits offered by BIM implementation include four dimensional (4D) modeling, five dimensional (5D) modeling, hazard analysis, and risk analysis. However, the existing industry practices facilitate the implementation of BIM only up to the early stage of the construction phase. This is partially due to unavailability of 3D as-built model and lack of integration of the construction process documents to the model. The objective of this paper is to study the feasibility of BIM extension beyond pre-construction phase by creating a single repository of facility data for operation and maintenance phase of the project lifecycle. This paper discusses a process for extending the BIM beyond the pre-construction stage and facilitating its implementation during the maintenance and decommissioning phase of the life cycle. The paper also presents a case study conducted to demonstrate the feasibility of the process by using commercially available BIM software products. Building Information Modeling (BIM) BIM is a process. It provides a framework to develop data rich product model and facilitates to realize the integrated benefits. In this process the real world elements of a facility such as walls, doors, windows and beams are represented as objects in a three dimensional digital model. In addition to modeling, facility information from conception to demolition is integrated to the model. Thus the model serves as a gateway to provide any time access to insert, extract, update, or modify digital data by all the project participants involved in the facility life cycle.

Implementation of BIM offers benefits in all the phases of the project life. The solutions offered by BIM include integration for fragmentation, reuse of model based digital data instead of data regeneration, and using spread sheet type product modeling tools instead of traditional CAD systems to reduce errors and mistakes. Current Scenario of BIM in Construction Phase The traditional media of communication among various phases of life cycle is two dimensional (2D) drawings. During the construction phase, 2D drawings are interpreted to prepare the pre-construction schedule and cost estimates. Information exchanged between the designers and constructors in 2D format are often subject to misinterpretation resulting in request for information (RFI) and change order requests. The advent of object oriented computer aided design (CAD) software facilitated usage of 3D graphical models as media of communication between planning and design phases. Three dimensional (3D) models facilitate easy visualization, reduce misinterpretation, and reduce rework. To some extent these 3D models are used during pre-construction to resolve constructability problems, space conflict problems, hazard analysis, and resource allocation. Additionally, 3D models are also useful for developing 4D models and 5D models during the pre-construction phase. The preconstruction 4D models are developed by linking design 3D model with pre-construction schedule. These 4D were used for visualization of project progress, interference check and space conflict problems identification and effective site utilization (Koo & Fischer 2000; Chau et al. 2004). The integration of 3D model with time and cost estimates results in five dimensional (5D) modeling. This facilitates easy demonstration of the impact of changes on the project and helps in decision making for owners, project engineers, or managers (Tanyer & Aoudad 2005). Kim et al. 2005 developed and demonstrated the feasibility of 5D data model integration with resources and specifications to a high rise steel structure apartment building. The integration of 3D model with schedule and cost is extended only up to pre-construction disregarding construction and post construction phases. The 3D models were successfully used for pre-construction stage applications such as visualization, resolving constructability problems, space conflict problems, resource allocation, and hazard analysis. However, little has been done to extend the usage of 3D model into construction, post construction and maintenance stages in the project life cycle. Construction and post construction phases continue to be accomplished using 2D drawings. During the process of construction, project participants exchange construction process documents such as request for information (RFI), submittals, change orders, shop drawings, specifications, and site photos. These are not linked to either the 2D or 3D models. By using current practices, when the information of a building component is to be retrieved during its operation and maintenance phase, the facility manger needs to search 2D as-built drawings for spatial aspects and multiple construction documents for other information. Much of the engineer s time is spent on non-value added works such as searching and validating information due of the lack of linkage of information to either 2D or 3D models. Though the information exists during the construction process, lack of quick access to the information during operation and maintenance phase is resulting in unnecessary expenses. The current status of graphical data and non graphical data in the construction phase is shown in Figure-1. It shows the 2D as-built drawings developed in the post construction stage and the related documents exist as independent entities. The 3D model developed in early stages of the life cycle is generally not in use after the pre-construction stage. The implementation of BIM needs a 3D product model and association of relevant information to each component to serve as information resource. Thus by using the existing practices BIM implementation process tends to stop at the pre-construction phase leaving large amounts of relevant data out of the final model needed by facilities management for operations, maintenance, and possible recommissioning or decommissioning efforts.

Figure 1: Current status of BIM in construction phase Desired State of BIM in Construction Phase Two reasons for not achieving BIM during post construction of the facility are (1) unavailability of 3D as-built model and (2) lack of integration of construction process information to the 3D as-built model. The desired status of information flow from the construction phase to operation and maintenance phase that facilitate BIM implementation is shown in Figure-2. The existing 2D as-built drawings have to be replaced with 3D as-built model. Project data such as RFI, submittals, change orders, shop drawings, specifications, site photos, actual cost, and actual schedule must be attached to the 3D as-built model. This integration of construction process documents to the 3D as-built model facilitates BIM implementation beyond the pre-construction stage.

Figure 2: Desired status of BIM in construction phase Methodology for Extension of BIM into Later Stages of Life Cycle This section discusses about the methodology adopted for a case study conducted to demonstrate the feasibility of achieving the desired status of BIM. A two-story residential house of 2400 square feet was considered for this study. The owner was interested to develop 3D as-built model and link the information to the model to create a single repository for BIM implementation during operation and maintenance phase of the building. The steps involved to extend implementation of BIM into maintenance and decommissioning phase of the lifecycle include development of 3D as-built model, 4D as-built model, and integration of the construction process information to the model. This was accomplished by using Autodesk s commercially available BIM software. Objective driven data acquisition technique was used for developing 3D as-built model. In this method an individual target object is selected and x, y, and z coordinates of a minimum number of points are acquired to represent the object in a 3D as-built model. The 3D as-built model is developed by selecting the target object from parametrically defined graphical objects stored in the database and placing it spatially using the scanned x, y and z coordinates (Cho et al. 2002). For small size projects this process is a cost effective alternative for developing 3D as-built model than compared to the 3D laser scanning process. The accuracy attained by this process is less than the 3D laser scanning accuracy. But the accuracy achieved through this process is well within the tolerances needed for subsequent repairs, maintenance, and renovation (Goedert & Meadati, 2008). A 4D as-built model was developed by integrating the 3D as-built model with the actual construction using Navisworks. Additionally, construction process documents and other useful information were associated to the 3D as-built model. The information which was available in paper format was scanned and converted into digital formats. Development of 3D as-built model The development of 3D as-built model included collection of x, y, and z coordinates of the as-built components and development of 3D as-built model. The x, y, and z coordinates of the as-built conditions were acquired using a robotic total station. The x, y, and z coordinates of the target points were collected depending upon the shape, orientation and cross section of an element. The target points of each component were selected to place and match the parametrically defined graphical object that represents the actual component. Using AutoCAD these x, y, and z coordinates were joined and a 3D as-built guide line layout was developed. This AutoCAD file was then imported into Revit and used as an underlay to place the various components by using guide layout lines as reference lines. For example, in Revit, the placement options for the wall object include Wall Centerline, Core Centerline, Finish

Face Exterior, and Finish Face Interior. Depending upon whether the collected 3D coordinates represent an exterior or interior face appropriate placement option was used for developing the 3D as-built model. The plumbing 3D asbuilt model developed by placing the respective building components over the guiding layout is shown in Figure-3. Figure 3: Plumbing 3D as-builts Development of 4D as-built model The traditional practice has been to use CPM based networks and bar charts to show the actual schedule, to use the 2D as-built drawings to show the spatial aspects and to capture the project progress through photographs taken at regular intervals. These CPM based networks and bar charts help to coordinate the activities of the construction project but do not provide any information pertaining to the spatial context complexities of the project. These traditional methods do not depict the relationships between the actual construction schedule and various activities. Therefore, to understand actual progress of the project the users must look at 2D as-built drawings for spatial aspects of the project and identify the activity from CPM networks and bar chart and mentally visualize the relationships between them. In this project, to depict the actual construction progress a 4D as-built model was developed by integrating the 3D as-built model with the actual construction schedule. A screen shot of the 4D as-built simulation is shown in Figure-4. The typical wall objects available in the Revit software are useful to represent the finished component but cannot serve to depict the actual construction progress. For example, an interior partition wall is constructed in stages which include stud installation and drywall installation. This interior partition wall can be represented directly by using Basic Wall: Interior 4-7/8 partition object available from the wall object library. When this object is used, during 4D simulation the construction of the interior partition wall will be reflected as single entity construction since the studs and drywalls cannot be ungrouped to reflect as separate components. Due to this reason, the wall object component cannot be used to directly to depict the actual construction process. In this project, to depict the actual construction process the various components of the wall are represented as individual components. The actual construction schedule was developed by using Suretrak scheduling software. The necessary information for developing schedule was collected by making regular site visits. Photographs taken at regular intervals were also used for documenting the construction progress.

Figure 4: 4D as-built model Integration of Construction Documents The different types of documents exchanged during the construction process are classified into five data types. They are structured data files (estimate, and schedule files), semi structured data files (HTML, and XML files), unstructured data files (word or text files), unstructured graphic files (drawings in binary format), and unstructured multimedia files (photographs, audio, and video files) (Caldas et al. 2002). In this study, unstructured data files, unstructured graphic files, and unstructured multimedia files are integrated to the 3D as-built model. Most of the exchanged documents of this case study were in paper format. The paper based documents were scanned and converted into digital documents. The information was then attached to the 3D as-built model. This integration allows the constructor to hand over a data rich digital 3D as-built model to the owner for the BIM implementation. Figure-5 shows the details of manufacturer name, manufacturer website, color, edge finish, and lead time of the selected granite countertop. It also displays picture showing the texture and color of the granite retrieved by clicking the link given in the Color Picture parameter. The advantage of BIM implementation can be explained by considering a renovation scenario. For example, consider owner wants to renovate the kitchen by changing the locations of the appliances from Figure-6 to Figure-7. The actual location of the existing drain pipes can be obtained from the plumbing 3D as-built model. The documents linked to the drain pipe provide specifications, size, and manufacturer information and help the owner for placing the purchase orders from the supplier. Similarly the documents linked to the counter top and casework provide the required information for placing orders from the suppliers. The quick and easy access to information facilitated by BIM implementation helps the owner in expediting the renovation process. Conclusion The building industry considered BIM as a means to provide an integrated and coherent information management strategy. BIM eliminates industry fragmentation and provide seamless flow of facility information among the planning/design, construction, and operation and maintenance phases. Implementation of BIM offers benefits in all the phases of the project life. It gives any time access to digital data to the owners, clients, engineers, architects, contractors, facility managers, maintenance and operations engineers, safety and security personnel and many others involved in the building life cycle. Existing practices facilitate the implementation of BIM only up to the preconstruction phase. The unavailability of a 3D as-built model and lack of integration of the construction process documents to the 3D as-built model are barriers impeding the extension of BIM further into the lifecycle of a project. The methodology discussed in this paper serves as initial step to extend BIM beyond the pre-construction phase and facilitate seamless flow of information from initial stage to the final stage of the project life cycle

Figure 5: Integration of information to the countertop in the 3D as-built model Figure 6: Existing layout of appliances in the kitchen

Figure 7:Renovated layout of appliances in the kitchen References Caldas, C.H., Soibelman, L. & Han, J. (2002). Automated classification of construction project documents. Journal of Computing in Civil Engineering, 16(4), 234-243 Chau, K.W., Anson, M. & Zhang, J.P. (2004). Four-dimensional visualization of construction scheduling and site utilization. Journal of Construction Engineering and Management, 130(4), 598-606. Cho, Y.K., Haas, C.T., Liapi, K. & Sreenivasan, S.V. (2002). A framework for rapid local area modeling for construction automation. Automation in Construction, 16, 629-641 Goedert, J.D. & Meadati, P. (2008). Integration of construction process documentation into Building Information Modeling, Journal of Construction Engineering and Management, 134(7), 509-516. Kim, K.J., Lee, C.K., Kim, J.R., Shin, E.Y., & Cho, M.Y. (2005). Collaborative work model under distributed construction environments. Canadian Journal of Civil Engineering, 32, 299-313. Koo, B. & Fisher, M. (2000). Feasibility study of 4D CAD in commercial construction. Journal of Construction Engineering and Management, 126(4), 251-260. Tanyer, A.M. & Aouad, G. (2005). Moving beyond the fourth dimension with an IFC-based single project database. Automation in Construction, 14(1), 15-32.