Upstream Manhole Number 96746 55.9. Dry. Circumferential Location. Image Ref. At / From. Joint



Similar documents
SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)

DIVISION 4300 STORM DRAINAGE

SECTION STORM DRAINAGE SYSTEM

SECTION 7- STORM SEWER

Storm Sewer Trenchless Upgrade Alternatives and Recommendations

Infrastructure Condition Assessment and Certification Programs (PACPMACP/LACP)

San Antonio Water System Standard Specifications for Construction ITEM NO POINT REPAIRS AND OBSTRUCTION REMOVALS

SECTION STORM DRAIN SYSTEM

SECTION 5 DRAFTING STANDARDS

Sewer System Inspection: Techniques and Resources. Presented by: Doug Severson

Wastewater Capital Projects Management Standard Construction Specification

CLEANING, INSPECTION, AND TESTING OF SEWERS

CCTV PIPE INSPECTION AND EVALUATION RUNWAY 17L-35R

SECTION STORM DRAINAGE TABLE OF CONTENTS

Section 402. STORM SEWERS

CHAPTER 3 STORM DRAINAGE SYSTEMS

PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY

Sewer Rehabilitation Design Requirements

CCTV INSPECTION OF SEWER LINES. A. Section Sanitary Gravity Sewer Lines. B. Section Sanitary Gravity Sewer Line Testing

CHAPTER 5. Storm Sewer

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

Manhole Assessment. Pipeline Assessment and Certification Program (PACP) & Manhole Assessment Certification Program (MACP)

Section 2100-Trenching and Tunneling

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION STORM DRAIN SYSTEMS PART 1 - GENERAL

SECTION 724 PIPE CULVERTS

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

CLARK COUNTY REGIONAL FLOOD CONTROL DISTRICT HYDROLOGIC CRITERIA AND DRAINAGE DESIGN MANUAL SECTION 800 STORM SEWER SYSTEMS TABLE OF CONTENTS

INSTALLATION OF INSITUFORM LINER

SECTION SANITARY SEWER AND STORM DRAIN SYSTEMS

SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD

STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F

SECTION STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

STANDARD SPECIFICATIONS SECTION CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS

Elev. A = , Elev. B = , horizontal distance = 1625 feet a. 7.7 b..077 c d. 1.28

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

Using Frequent Sewer Inspection to Prioritize Asset Management. May 1, John Schroeder, P.E., BCEE Drew Richards, EI Tim Fallara, P.E.

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

SECTION CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE

Storm Drainage Systems

City of Regina Standard Construction Specification SECTION 1320 SEWERMAIN TESTING

SECTION INLETS INLET LOCATIONS

STANDARD SPECIFICATIONS SECTION CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER MAINS, MANHOLES AND LATERALS

Request for Proposals Sanitary Sewer System Condition Assessment (PILOT PROJECT)

Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology

Teksam Pipe Cast CV 2600

City of Shelbyville Site Inspection Checklist

Sanitary Sewer Overflow (SSO) Incident Report Form

Section SEWER PIPE INSTALLATION AND TESTING

San Antonio Water System Standard Specifications for Construction ITEM NO SLIP-LINING SANITARY SEWERS

STANDARD SPECIFICATIONS & CONSTRUCTION DETAILS MANUAL SECTION 5 - STORM DRAINAGE Design

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.

SANITARY SEWER SPECIFICATIONS

Section 4 Pipe and Maintenance Hole Inspection and Condition Assessment Plan

REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS. Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC

Quantifying Inflow and Infiltration via Dyed Water Flooding

SECTION IV - TESTS AND INSPECTIONS PART 1 - GENERAL Testing - General

Memorandum. PROJECT: Postmark Emergency Storm Repair Alternative Analysis

Trouble Shooting for Trenchless Liner Installation During Sewer Line Rehabilitation

March 2006 DIVISION 3 - CW 2140-R3 TABLE OF CONTENTS

STORM DRAINS CHAPTER 7

CITY OF ANN ARBOR PUBLIC SERVICES PLAN REVIEW CHECKLIST

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES SITE UTILITIES

Coast Trunk Sewer Rehabilitation Project for the Orange County Sanitation District

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

PART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET

Utilizing Remaining Useful Life for Asset Management of Critical Wastewater Assets

CURED-IN-PLACE PIPE MINIMIZING RISK BY DEFECT CODING

Condition Assessment of Underground Pipes April 2015 With excerpts from: Condition Assessment of Wastewater Collection Systems, EPA/600/R-09/049

Top 10+ Mistakes of DWV plumbing design

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST BID PROPOSAL

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS

STANDARD SPECIFICATIONS SECTION INSTALLATION OF GRAVITY SEWER PIPELINES. 1. Trenching, Backfilling and Compacting: 02223

SECTION 6A STORM DRAIN DESIGN Mar S E C T I O N 6A STORM DRAIN - DESIGN

Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority

SEWER LINE EXTENSION DESIGN CHECKLIST

CCTV of Stormwater Systems. Cairns Regional Council. Commentary Guidelines #

Estimating Stormwater System Annual Maintenance and Repair Costs - A GIS Approach

Table 4.9 Storm Drain Inlet Protetion Applicable for

ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT

Premature Storm Drainage System Repairs and Replacement

SECTION POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

GIS Applications for Regulatory Compliance

City of Springfield, Illinois Office of Public Works Sewer Division Sewer Overflow Report

SECTION 5 - STORM DRAINS

SECTION 3 SANITARY SEWER DESIGN

Small Dam Repair The Stone Lake Dam Story. Joe Barron, P.E. SynTerra formerly the Fletcher Group, Inc. 148 River St. Suite 220 Greenville, S.C.

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

CORPORATION OF THE CITY OF BURLINGTON SPECIFICATION INDEX FOR CCTV VIDEO INSPECTION OF PROPOSED STORM SEWERS (SPEC. NO. SS7) 1. Scope of Work SS7-1

VIDEO INSPECTION AND LASER DEFLECTION TESTING FOR POST CONSTRUCTION QC/QA SPECIFICATIONS AND MAINTENANCE INSPECTIONS

SECTION ACCEPTANCE TESTING FOR SANITARY SEWERS

STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION

Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses.

Transcription:

Surveyors name P/O No. U-71-1168 System Owner COA Pipeline Segment Reference 936 1614 Shape Circular H Rim to Invert RCP Sewer Category Grade to Invert Ln. Method Pre-Cleaning No PreCleaning Group/ Descriptor. ACB.. 6.6 9. 9. 1.1 1.1..8 4. 4. 47.3. 4.9 4.9 MWL OBZ LL MGO OBZ OBZ MGO TB TB LL ISSRL LR MMC MSC RPR JO MSA Modifier/ severity S/M/L Inches 1st nd S1 Use of Sewer Stormwater Sheet Joint Image Ref. At / From To 1 9 7 1 % Locality Grade to Invert Year Laid Rim to Grade Flow Control Year Rehabilitated Height Tape / Media Number 1-449_8 beginning inspection 4 of pipe 936 from inlet heading downstream to an unknown inlet named 1-449_UKGI_1 Circumferential Location Value Continuous defect Rim to Invert Rim to Grade Pipe Joint Length 8 Cleaned Code Distance (Feet) Location (Street Name and number) Upstream Manhole Number Manhole Number 1-449_UKGI_1 Drainage Area 1 1:6 Further Location details 119 Brazos St Width Survey Customer Struct. O&M Grade Grade Remarks beginning inspection 4 from ACB heading downstream to alley behind 11 Congress Ave grated inlet ACB1. Will relabel identifications. Pipe exits to the North. Will stop at 7' preset 4 continuing on from a 9' preset due to 9 degree turn. F1 7 7 new connections A A 9 3 9 1 1 1 S J L mastic pipe changes to non reinforced concrete pipe changes size from repair pipe is replaces with tube to repair causing offset joint pipe is offset at RPR abandoning inspection 8 due to failing patch repair Generated on Tuesday, 6/19/1 at 4:1 PM by the PipeTech TV inspection system.

Surveyors name P/O No. U-71-1168 System Owner COA Pipeline Segment Reference 936 1614 H Shape Circular Rim to Invert RCP Sewer Category Grade to Invert Ln. Method Pre-Cleaning No PreCleaning S/M/L Joint Image Ref. At / From % Year Laid Flow Control Year Rehabilitated Height Tape / Media Number 1-449_8 beginning inspection 4 of pipe 936 from inlet heading downstream to an unknown inlet named 1-449_UKGI_1 Circumferential Location Inches 1st nd Rim to Grade Struct. O&M Grade Grade To Remarks Segment Grade Rating Quick Index Grade 1 Grade Grade 3 Grade 4 Grade Rating Quick Index Grade 1 Grade Grade 3 Grade 4 Grade Rating Quick Index Overall Grade 4 O&M Grade 3 Structural Grade Modifier/ severity Use of Sewer Stormwater Grade to Invert Grade 1 Group/ Descriptor Value Continuous defect Sheet Locality Rim to Invert Rim to Grade Pipe Joint Length 8 Cleaned Code Distance (Feet) Location (Street Name and number) Upstream Manhole Number Manhole Number 1-449_UKGI_1 Drainage Area 1:6 Further Location details 119 Brazos St Width Survey Customer 1-449_8 1. 8 4 14 414. 1 4 16 41. Generated on Tuesday, 6/19/1 at 4:1 PM by the PipeTech TV inspection system.

PACP Inspection Report MH 1-449_UKGI_1 U-71-1168 119 Brazos St 1614 1:6 beginning inspection 4 of pipe 936 from inlet heading downstream to an unknown inlet named 1-449_UKGI_1 Ftg. Code Description. ACB Access Point - Catch Basin Position Comment beginning inspection 4 from ACB heading downstream to alley behind 11 Congress Ave grated inlet ACB1. Will relabel identifications. Pipe exits to the North. Will stop at 7' preset. MWL Water Level. OBZ Obstacle - Other Objects 6.6 LL Line - Left to 7 9. MGO General Observation 9. OBZ continuing on from a 9' preset due to 9 degree turn. Obstacle - Other Objects to 7 1.1 OBZ Obstacle - Other Objects 1.1 MGO General Observation to 7..8 TBA TBA 4. LL new connections Tap, Break-in / Hammer: Active Tap, Break-in / Hammer: Active Line - Left 4. ISSRL Intruding Seal - Sealing Ring: Loose/Poorly Fitting 47.3 LR 9 3 9 to 1 mastic Line - Right. MMC Change pipe changes to non reinforced concrete 4.9 MSC Dimension/Shape Change 4.9 RPR Point Repair - Pipe Replaced pipe changes size from repair pipe is replaces with tube to repair causing offset joint pipe is offset at RPR abandoning inspection 8 due to failing patch repair JOL Joint Offset (displaced): Large MSA Survey Abandoned Generated on Tuesday, 6/19/1 at 4:1 PM by the PipeTech TV inspection system.

MH 1-449_UKGI_1 U-71-1168 119 Brazos St 1614 1:6 beginning inspection 4 of pipe 936 from inlet heading downstream to an unknown inlet named 1-449_UKGI_1 ACB - Access Point - Catch Basin @. ft. beginning inspection 4 from ACB heading downstream to alley behind 11 Congress Ave grated inlet ACB1. Will relabel identifications. Pipe exits to the North. Will stop at 7' preset OBZ - Obstacle - Other Objects @. ft. MWL - Water Level @. ft. LL - Line - Left @ 6.6 ft. Generated on Tuesday, 6/19/1 at 4:1 PM by the PipeTech TV inspection system.

MH 1-449_UKGI_1 U-71-1168 119 Brazos St 1614 1:6 beginning inspection 4 of pipe 936 from inlet heading downstream to an unknown inlet named 1-449_UKGI_1 MGO - General Observation @ 9. ft. continuing on from a 9' preset due to 9 degree turn. OBZ - Obstacle - Other Objects @ 1.1 ft. OBZ - Obstacle - Other Objects @ 9. ft. MGO - General Observation @ 1.1 ft. new connections Generated on Tuesday, 6/19/1 at 4:1 PM by the PipeTech TV inspection system.

MH 1-449_UKGI_1 U-71-1168 119 Brazos St 1614 1:6 beginning inspection 4 of pipe 936 from inlet heading downstream to an unknown inlet named 1-449_UKGI_1 TBA - Tap, Break-in / Hammer: Active @. ft. TBA - Tap, Break-in / Hammer: Active @.8 ft. LL - Line - Left @ 4. ft. ISSRL - Intruding Seal - Sealing Ring: Loose/Poorly Fitting @ 4. ft. mastic Generated on Tuesday, 6/19/1 at 4:1 PM by the PipeTech TV inspection system.

MH 1-449_UKGI_1 U-71-1168 119 Brazos St 1614 1:6 beginning inspection 4 of pipe 936 from inlet heading downstream to an unknown inlet named 1-449_UKGI_1 LR - Line - Right @ 47.3 ft. MMC - Change @. ft. pipe changes to non reinforced concrete MSC - Dimension/Shape Change @ 4.9 ft. pipe changes size from repair RPR - Point Repair - Pipe Replaced @ 4.9 ft. pipe is replaces with tube to repair causing offset joint Generated on Tuesday, 6/19/1 at 4:1 PM by the PipeTech TV inspection system.

MH 1-449_UKGI_1 U-71-1168 119 Brazos St 1614 1:6 beginning inspection 4 of pipe 936 from inlet heading downstream to an unknown inlet named 1-449_UKGI_1 JOL - Joint Offset (displaced): Large @ ft. pipe is offset at RPR MSA - Survey Abandoned @ ft. abandoning inspection 8 due to failing patch repair Generated on Tuesday, 6/19/1 at 4:1 PM by the PipeTech TV inspection system.