Supplier Portal. Doing Business with HM Dunn Aerospace GUIDELINES



Similar documents
SUPPLIER FIRST ARTICLE INSPECTION INSTRUCTIONS AND FORMS

First Article Inspection (FAI) Training

GMP-Z Annex 15: Kwalificatie en validatie

Cessna - Interiors Manufacturing Facility (IMF) Supplier Quality System Requirements

GMP-Z Hoofdstuk 4 Documentatie. Inleiding

Unincorporated changes to Revision J of the SPOC Manual UPDATED November 22, 2011

Supplier Quality Assurance Requirements Manual

Supplier Quality Assurance

CO-BRANDING RICHTLIJNEN

Assuring the Cloud. Hans Bootsma Deloitte Risk Services +31 (0)

Supplier Quality. Assurance Provisions. Manual. SQAP-001 Rev. E

Bogue Machine Company, Inc. Business Instruction

Supplier Quality Assurance Requirements Manual

Q2A First Article Inspection (FAI) AS9102

Q2A First Article Inspection (FAI) AS9102 * Revised ** Added

GARDNER AEROSPACE SUPPLIER QUALITY REQUIREMENTS MANUAL

Platform voor Informatiebeveiliging IB Governance en management dashboards

Distributors In addition to the requirements noted herein, Distributors shall have a Quality System

Supplier Quality Requirements and Clauses

Chandler-Arrow Division Arrow Supplier Quality Requirements

(Optioneel: We will include the review report and the financial statements reviewed by us in an overall report that will be conveyed to you.

INTRODUCTION: PURPOSE:

Voorbeeld. Preview ISO INTERNATIONAL STANDARD. Cranes Requirements for test loads

Network Assessment Client Risk Report Demo

Quality Assurance Requirements. For. Pratt & Whitney/Space Propulsion, Chemical Systems Division

Purchase Order Clauses and Conditions

Supplier Quality Requirements F16 Program

verklaring (E) 101/Application for (E) 101 certificate

ATTACHMENT "Q" PURCHASE ORDER QUALITY CLAUSES

Is het nodig risico s te beheersen op basis van een aanname..

Suriname Tourist visa Application

OGH: : 11g in de praktijk

Quality Management System General

Supplier Requirements Manual M M 0 3

IP-NBM. Copyright Capgemini All Rights Reserved

Making, Moving and Shaking a Community of Young Global Citizens Resultaten Nulmeting GET IT DONE

QP-740. Supplier Management Handbook

Quality Management System Manual Revision L

Risk-Based Monitoring

SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE

Virtualisatie. voor desktop en beginners. Gert Schepens Slides & Notities op gertschepens.be

AANMELDING. International student - Berkeley College

Citrix Access Gateway: Implementing Enterprise Edition Feature 9.0

SUPPLIER QUALITY ASSURANCE REQUIREMENTS

Helical Products Co., Inc.

Storage in Microsoft Azure Wat moet ik daarmee? Bert

AS9100 Quality Manual

Sample test Secretaries/administrative. Secretarial Staff Administrative Staff

Voorbeeld. Preview ISO INTERNATIONAL STANDARD. Quality management Guidelines on people involvement and competence

Load Balancing Lync Jaap Wesselius

If you have any questions during your application process, please call to speak with a customer service representative.

How To Ensure Quality Assurance

Copies of this document shall be classified either as Controlled or Uncontrolled, and shall be identified as such on the cover sheet.

UvA college Governance and Portfolio Management

L-3 Communications Corporation AMI Purchase Order Supplement No. 3 Quality Assurance

Quality Control Procedures QCP 5.4 Page 1 of 5

Relationele Databases 2002/2003

Quality Assurance Provisions

New Program Quality Requirements for Suppliers (NPQR) For Limited Manufacturing of Components and/or Processes for Engineering Certification

IC Rating NPSP Composieten BV. 9 juni 2010 Variopool

ONTIC UK SUPPLIER QUALITY SURVEY

Product Order Quality Requirements Meggitt (Orange County), Inc.

Self-Audit Checklist

EUROPEAN COMMITTEE FOR STANDARDIZATION COMITÉ EUROPÉEN DE NORMALISATION EUROPÄISCHES KOMITEE FÜR NORMUNG

Camar Aircraft Parts Co. Procedures Manual

Purchase Order Attachment 1600 Revision 02 June Raytheon Aircraft Company Supplier Quality Requirements Document

RIPE NCC Update. Axel Pawlik. APNIC 16, 22 August, Seoul.

ISO/TC 176/SC Quality management systems Requirements

Shopper Marketing Model: case Chocomel Hot. Eric van Blanken 20th October 2009

Quality Requirements for Suppliers

How To Design A 3D Model In A Computer Program

IT-waardeketen management op basis van eeuwenoude supply chain kennis

THE EMOTIONAL VALUE OF PAID FOR MAGAZINES. Intomart GfK 2013 Emotionele Waarde Betaald vs. Gratis Tijdschrift April

GLB QM 02. Supplier Quality Manual 03. 7/11/12 Supplier Quality 1 of 18. Revision Level. Issue Date Issuing Department Page

Lockheed Martin Supplier Quality Management Website

EA E S A A S Eerste uitbreiding

Logging en Monitoring - privacy, beveiliging en compliance Enkele praktijkvoorbeelden

New Program Quality Requirements for Suppliers (NPQR) For Limited Manufacturing of Components and/or Processes for Engineering Certification

Transcription:

Supplier Portal Doing Business with HM Dunn Aerospace GUIDELINES

Business Questionnaire Instructions The HM Dunn Supplier Business Questionnaire is located on the HM Dunn Supplier Portal This document is used by HM Dunn Aerospace to gain a good understanding of the Supplier s capabilities, which will help HM Dunn Aerospace direct the right work to the right Supplier Please open this document and save a copy to your hard drive or server Fill out in as much detail as possible When completed, please email to the following email address Stephanie Franklin Strategic Supplier Development Stephanie.franklin@hmdunn.com (316) 522-5426 x1450

Specification Access FileBound is HM Dunn Aerospace s OEM Specification depository Supplier access to specifications is limited to quoting and contract specific specification The HM Dunn Aerospace shall issue a User Name and Password to the Supplier for access to the Supplier Portal, they shall also be used to access FileBound Prior to a Supplier accessing ITAR Restricted documents in FileBound they must complete a QA-191 Supplier Access to FileBound, which shall be supplied by HM Dunn Aerospace

Packaging Requirements Unless specified in the HM Dunn Aerospace Purchase Order or Quality Clauses the following Packaging Requirements Apply Good Industry Practices shall be adhered to when packaging product to be shipped to HM Dunn Aerospace Package product to prevent damage in transit Use intermediate containers if the product is heavy enough to wear through the packaging material in transit Foam Peanuts, News Paper or Shredded Materials are not acceptable Dunnage

Gulfstream C of C Requirement Gulfstream requires with each shipment a Gulfstream form 803 C of C or HM Dunn QA-035 C of C Note: If the Supplier has their own C of C and it captures everything in the Gulfstream C of C, it is acceptable to use their own. But it must be a stand alone document and not embedded in the shipper or packing slip

Performance Expectations Quality Performance On Time Delivery Performance Late Delivery Root Cause & Corrective Action Process

Delivered Quality Performance The HM Dunn Aerospace Goal is 100% Delivered Quality Performance to our Customers Suppliers are responsible to maintain a Delivered Quality Performance Rating to support this goal The rating ranges to the right shall be used to measure supplier performance

On Time Delivery Performance The HM Dunn Aerospace Goal is 100% On Time Delivery Performance to our Customers Suppliers are responsible to maintain a On Time Delivery Performance Rating to support this goal The rating ranges to the right shall be used to measure supplier performance

Late Delivery RCCA Process Suppliers with late deliveries that impact HM Dunn s Customer s Production Line shall receive an HM Dunn Aerospace QA-183 Shortage RCCA and Approval form The Supplier shall complete the form in accordance with the following instructions and return to their buyer within 2 working days

QA-183 Shortage RCCA Form

QA-183 Shortage RCCA Form Page 1 The QA-183 Shortage RCCA and Approval form Page 1 shall be completed as follows: HM Dunn shall enter the date the form was generated in Block 1. HM Dunn shall enter the HM Dunn Division in Block 2. HM Dunn shall enter the response due date in Block 3. HM Dunn shall enter part number/name in Block 4. HM Dunn shall enter the finding/event in Block 5. The Supplier shall enter the direct cause for why the part/material is late in Block 6. The Supplier shall enter the contributing cause for why the part/material is late in Block 7. The Supplier shall enter the root cause for why the part/material is late in Block 8.

QA-183 Shortage RCCA Form Page 2 The QA-183 Shortage RCCA and Approval form Page 2 shall be completed as follows: The Supplier shall enter the specific corrective action in Block 9. The Supplier shall enter the projected completion date or unit number that the corrective action will be incorporated in Block 10. The Supplier shall enter the preventive corrective action in Block 11. The Supplier shall enter the projected completion date or unit number that the preventive corrective action will be incorporated in Block 12. The Supplier shall enter their signature in Block 13. The Supplier shall enter their job title in Block 14. The Supplier shall enter the date they completed the form in Block 15. HM Dunn shall enter an X if the Suppliers Response was accepted in Block 16. HM Dunn shall enter an X if the Suppliers Response was rejected in Block 17. HM Dunn shall enter remark (as applicable) in Block 18. HM Dunn shall enter the name of the person performing the review in Block 19. HM Dunn shall enter signature of the person performing the review in Block 20. HM Dunn shall enter dated the document was reviewed in Block 21.

AS9100 FAI Requirements OEM Unique Requirements Most of HM Dunn s Customers follow AS9102 Requirements The following Pages are setup for those Customers that require Unique Requirements and must be followed by our Suppliers

Fokker/Cessna AS9102 Requirements The following three pages are an example of a completed AS9102 form for a Fokker Cessna part with clarification notes added Note: Fokker Date format must be Day Month Year on all FAI Documentation. Example: 10 APR 2013

Fokker/Cessna AS9102 Requirements Form # Field # AS9102 QMS-4040 Information required for project: Cessna FORM 1 Box 1 FAI Form 1 (R) Part Number: Number of the part (FAI part). (R) Part Number: Nummer van het deel [FAI deel] Information required for project: Cessna Sovereign, CJ3 and CJ4 1) Partnumber (conform the partslist) 2) For a temporary deviated /condition of supplier part (COS) the temporary number (part # + suffix) will be noted below partnummer see 1). FORM 1 Box 2 FORM 1 Box 3 FORM 1 Box 4 FORM 1 Box 5 (R) Part Name: Name of the part as shown on the drawing. (R) Part Name: Naam van het deel zoals op tekening vermeld staat (CR) Serial number: (CR) Part serial number: Serial number of part. Serienummer van het deel (O) FAI Report Number: (R) FAI Report Number: Reference number that BAAN order nummer. identifies the FAI. This may be an internal report number. (CR) Part Revision Level: Latest part revision that affects the part being first article inspected. If there is no revision, indicate as such. Note: The latest drawing revision (Field 7) does not always affect all parts contained on a drawing. (R) Part List Revision: Revisie part list vermelden. Detail revision Drawing / Parts List associated with the FAI part. Part name conform partslist If applicable Baan order number or Reference number that identifies the FAI. This may be an internal report number. Or own ordertrackingnumber (suppliers) Part Rev Level

Fokker/Cessna AS9102 Requirements FORM 1 Box 6 FORM 1 Box 7 FORM 1 Box 8 (CR) Drawing Number: Drawing number associated with the FAI part. (CR) Drawing Revision Level: The revision level of the engineering drawing. If there is no revision, indicate as such. (CR) Additional Changes: Provide reference number(s) of any changes that are incorporated in the product but not reflected in referenced drawing/part revision level (e.g., change in design, engineering changes, manufacturing changes, deviation or exclusion from certain drawing requirement, etc.). (R) Drawing Number/Revision: Tekening nummer van het betreffende FAI deel, indien van toepassing ook revisie vermelden. (CR) Drawing Sheet/ Revision: Tekening revisie per tekeningblad. (CR) Additional Changes: Geef referentie nummers aan van de van toepassing zijnde wijzigingen welke niet opgeroepen worden middels tekening of onderdeel revisie [b.v. ontwerp wijziging, gewijzigde productie opzet, wijziging productie methode, afwijken of uitsluiten tekening eisen etc.] Eventueel EN nummer en revisie noteren. Main revision Drawing / Parts List associated with the FAI part. N/A, unless applicable Engineers changes are not yet incorporated in the drawing. Drawing number Main Drawing / Parts List revision DDA when applicable

FORM 1 Box 9 Fokker/Cessna AS9102 Requirements (R) Manufacturing Process Reference: A reference number that provides traceability to the manufacturing record of the FAI part (e.g., router number, manufacturing plan number, etc.) FORM 1 Box 10 (R) Organization Name: Name of the Organization performing this FAI. FORM 1 Box 11 (O) Supplier Code: Supplier Code is a unique number given by Customer to the Organization. It is sometimes referred to as Vendor Code, Vendor Identification Number, Supplier Number, etc. FORM 1 Box 12 (O) P.O. Number: Enter Customer Purchase Order number, if applicable or required. FORM 1 Box 13 (R) Detail part or an Assembly FAI: Check as appropriate. (R) Program Name: Programma naam (R) Organization Name: Stork Fokker AESP B.V. (O) Supplier Code: Supplier Code is een uniek door de klant aan ons gegeven nummer. Het wordt soms aangeduid als Vendor code, Vendor Identification Number, Supplier Number etc. [ kan anders zijn dan Cage code] (O) P.O. Number: Vul, indien noodzakelijk of voorgeschreven, klant order nummer in. (R) Detail part or an Assembly FAI: Vul in wat van toepassing is. 365061 Suppliers: Fokker ASL code per QMS- 4045 Fokker internal FAI PO number not required For Suppliers FAI PO number required per QMS-4045 Baan order number or Supplier ordertrackingnumber Per AS9102 For outside companies the unique supplier code given by Customer to the Organization. If no number is available, use Cage code. The purchase order number. For purchased parts, add line item. Rev. AS9102

Fokker/Cessna AS9102 Requirements FORM 1 Box14 (R) Full FAI or Partial FAI: Check as appropriate. For a partial FAI, provide the baseline part number (including revision level) to which this partial FAI is performed and the reason for it. For example, changes in design, process, manufacturing location, etc. FORM 1 Box15 15, 16, 17 and 18: This section t/m 18 is required only if the part number in Field 1 is an assembly requiring lower level parts to be installed into the assembly. (R) Full FAI or Partial FAI: Vul in wat van toepassing is. Verstrek in geval van een partial FAI het onderliggende partnummer waar de FAI op uitgevoerd is en vermeld de aanleiding. Bijv. wijziging ontwerp, proces, locatie enz. 15, 16, 17 en 18: Dienen alleen gevuld te worden indien het onderdeel uit vak 1 een samenstelling betreft welke onderliggende delen oproept of als een verwijzing plaatsvindt naar andere part nummers waar een gelijksoortige FAI op uitgevoerd is Fokker internal referencing to BaaN order number for baseline FAI is allowed. Full of Partial, when partial, the reason must be filled out. Fokker internal reference to BaaN order number for baseline FAI is allowed. This section is required only if the part number in Field 1 is an assembly requiring lower level parts to be installed into the assembly. FORM 1 Box15 (CR) Part Number: Detail or next level sub-assembly part number to be included in the assembly. FORM 1 Box16 (CR) Part Name, as shown on the drawing. (CR) Part Number: Onderdeel of opvolgend sub-assy nummer wat opgenomen wordt in de samenstelling (CR) Part Name, zoals op tekening vermeld (CR) Part Number: Detail or next level sub-assembly part number to be included in the assembly. (CR) Part Name, as shown on the drawing.

Fokker/Cessna AS9102 Requirements FORM 1 Box 17 (CR) Part Serial Number of the part that is installed in the assembly, when applicable. (CR) Part Serial Number van in assy geinstallerde deel, indien van toepassing N/A FORM 1 Box 18 (O) FAI Report Number for detail part. (O) FAI Report Number: BAAN ordernummer van in box 15 opgeroepen deel/assy FAI report number of P/N in block 15 FAI report number of P/N in block 15 FORM 1 Box 19 (R) Signature: Name and signature of (R) Prepared by Signature and stamp of responsible the person who prepared FAI Form 1. Production planning: Naam person that accepts the FAI report. Also check appropriate box if this FAI opsteller. is complete per 5.4. Note: The signature on this form certifies the following two things: 1) that all characteristics are accounted for; meet drawing requirements or are properly documented for disposition. 2) if this FAI is complete per 5.4. Check as appropriate. Signature and stamp of responsible person that accepts the FAI report. 5.4 Nonconformance Handling: The FAI is not complete until the Organization closes all nonconformances affecting the part and implements corrective actions. The Organization shall re-do an FAI for those affected characteristics and shall record the results.

Fokker/Cessna AS9102 Requirements FORM 1 Box 20 20) (R) Date when this FAI Form 1 was prepared. FORM 1 Box 21 21) (O) Name of the person from the Organization who approved FAI report (R) Date: datum gereed opstellen. 21) (R) Released by Quality Engineering or authorized production planner: Naam en handtekening Opm.: Ondertekening geeft aan dat aan alle productie start voorwaarden wordt voldaan en dat alle karakteristieken afgedekt zijn. Fokker internal: only in case block 19 has been signed by delegated Q inspector signature and stamp is required. If not the NA. Fokker Suppliers: Optional depending on Quality system of the Supplier. Rev. AS9102 Fokker Suppliers: Optional depending on Quality system of the Supplier. FORM 1 Box 22 22) (O) Date when the FAI report is approved. FORM 1 Box 23 23) (O) Customer Approval. This field is used by Customer to record approval, if required. (R) Date: datum van ondertekening (R) Partial FAI: ja/nee, aangeven of n.a.v. deze FAI nog een deel FAI noodzakelijk is. Tevens naam en handtekening. Fokker internal: Approval of Cessna Source Inspector is required. Fokker Suppliers: Approval of Fokker and Cessna Source Inspector is required. Rev. AS9102 Fokker internal: Approval of Cessna Source Inspector is required. Fokker Suppliers: Approval of Fokker Source Inspector is required. Cessna Source inspection if notified in advanced to supplier. FORM 1 Box 24 24) (O) Date Customer approved this FAI form. (R) Date: datum van ondertekening door QC Rev. AS9102

Fokker/Cessna AS9102 Requirements Form # Field # AS9102 QMS-4040 Information required for project: Cessna FAI Form 2 FORM 2 Box 1 FORM 2 Box 2 (R) Part Number: Number of the part (FAI part). (R) Part Number: nummer van het FAI deel (R) Part Name: Name of the (R) Part Name: Naam van part as shown on the drawing. het deel zoals weergegeven op tekening Information required for project: Cessna Sovereign, CJ3 and CJ4 Partnumber (from the partslist) Name of the part as shown on the drawing. FORM 2 Box 3 FORM 2 Box 4 (CR) Part serial number: Serial number of the part. (O) FAI Report Number: Reference number that identifies the FAI. This may be an internal report number (CR) Part serial number: Serienummer van het deel (R) FAI Report Number: BAAN order nummer. If applicable Baan order number or own order tracking number (suppliers)

Fokker/Cessna AS9102 Requirements FORM 2 Material and Articles FORM 2 Box 5 (CR) Material or Process: Enter the name of material or process. FORM 2 Box 6 (CR) Specification: Enter material or process specifications number (include permitted alternates, if used), class, and material form (e.g., sheet, bar, etc.). Include all Make From materials that are incorporated into the FAI part. For raw materials, include all materials that are incorporated into the FAI part, (e.g., weld/braze filler materials, balls for ball brazing, etc.), and Standard Catalog hardware (e.g., AN, MS fasteners); but do not include processing materials such as acid etchants. FORM 2 Box 7 (O) Code: Enter any required code from the Customer for material or process listing, when required. (CR) Material or Process: Vermeldt naam van materiaal of proces (CR) Specification: Vermeldt materiaal of proces specificatie [ inclusief toegestane alternatieven indien toegepast]. Voer alle materialen op die verwerkt worden in het FAIdeel. T.a.v. ruw materiaal geldt dat alle in het FAI deel verwerkte materialen [ook b.v. vulmiddelen] en standaard catalogus delen [b.v. AN en MS bouten]opgevoerd dienen te worden. Procesvloeistoffen zoals b.v. beitsmiddelen vallen hier niet onder. (R) Code: Voer warencode of -indien van toepassing- door klant vereiste materiaalof procescode op. N/A The material or proces name, as listed in the Cessna specifications Rev. AS9102 Reference to the Cessna material specifications (QPL)

FORM 2 Box 8 FORM 2 Box 9 Fokker/Cessna AS9102 Requirements Special Process Supplier Code: Customer given Supplier code of the organization performing special process(es) or supplying material, as applicable. Also add, Special process supplier name and address. (CR) Customer Approval Verification: Indicate if the special process or material source is approved by the Customer. Write NA if Customer approval is not required. FORM 2 Box 10 (CR) Certificate of Conformance number: Number of the certificate (e.g., special process completion certification, raw material test report number, Standard Catalog hardware compliance report number, traceability number). (CR) Special Process Supplier Code: ASL code van de leverancier m.b.t uit te voeren speciale processen of te leveren materiaal. (CR) Customer Approval Verification: Geef aan of het speciale proces of de materiaal leverancier goedgekeurd is door de klant. Vermeld NA als klant goedkeuring niet is vereist. (CR) Certificate of Conformance number: Vermeld in geval van materiaal de partijcode zoals aangegeven op afgiftelijst en certificaat. In geval van speciaal proces wordt het vrijgave document vermeld conform Special Process List. Fokker Suppliers: ASL cage code Verification of supplied material is per applicable Qualified Producers list (i.e. CMMP025) is required. Supplier code of approved Cessna special processors as listed on www.supplier.cessna.com For special processes as listed on www.supplier.cessna.com. Verification of supplied material is per applicable Qualified Producers list (i.e. CMMP025) is required. Certifcate of conformance number of the used material. Or if the material is delivered by Fokker Aerostructures, the receiving goods Number. For Special processes the applicable CoC of the Cessna approved Special Process supplier. FORM 2 Box 11 (CR) Stamp: Gemachtigde. Functional Test Procedure called out as Design Requirement, when applicable

Fokker/Cessna AS9102 Requirements FORM 2 PROCESSES FORM 2 Box 5 FORM 2 Box 6 FORM 2 Box 7 (CR) Material or Process: Enter the name of material or process. (CR) Specification: Enter material or process specifications number (include permitted alternates, if used), class, and material form (e.g., sheet, bar, etc.). Include (CR) Material or Process: Vermeldt naam van materiaal of proces (CR) Specification: Vermeldt materiaal of proces specificatie [ inclusief toegestane alternatieven indien toegepast]. Voer alle all Make From materials that are materialen op die verwerkt incorporated into the FAI part. worden in het FAIdeel. For raw materials, include all T.a.v. ruw materiaal geldt materials that are incorporated dat alle in het FAI deel into the FAI part, (e.g., verwerkte materialen [ook weld/braze filler materials, balls for ball brazing, etc.), and Standard Catalog hardware (e.g., AN, MS fasteners); but do not include processing materials such as acid etchants. (O) Code: Enter any required code from the Customer for material or process listing, when required. b.v. vulmiddelen] en standaard catalogus delen [b.v. AN en MS bouten]opgevoerd dienen te worden. Procesvloeistoffen zoals b.v. beitsmiddelen vallen hier niet onder. (CR) Code: Voer warencode of -indien van toepassing- door klant vereiste materiaal- of procescode op. N/A The material or proces name, as listed in the Cessna specifications The in the engineering data mentioned Cessna Process specification and if applicable Specification Deviation Request (SDR) number Cessna process specification code

FORM 2 Box 8 FORM 2 Box 9 Fokker/Cessna AS9102 Requirements (CR) Special Process Supplier Code: Customer given Supplier code of the organization performing special process(es) or supplying material, as applicable. Also add, Special process supplier name and address. (CR) Customer Approval Verification: Indicate if the special process or material source is approved by the Customer. Write NA if Customer approval is not required. FORM 2 Box 10 (CR) Certificate of Conformance number: Number of the certificate (e.g., special process completion certification, raw material test report number, Standard Catalog hardware compliance report number, traceability number). FORM 2 Box 11 (CR) Functional Test Procedure Number: Functional Test Procedure called out as Design Requirement. (CR) Special Process Supplier Code: ASL code van de leverancier m.b.t uit te voeren speciale processen of te leveren materiaal. (CR) Customer Approval Verification: Geef aan of het speciale proces of de materiaal leverancier goedgekeurd is door de klant. Vermeld NA als klant goedkeuring niet is vereist. (CR) Vermeld in geval van materiaal de partijcode (lotnummers) zoals aangegeven op afgiftelijst en certificaat. In geval van speciaal proces wordt het vrijgave document vermeld conform Special Process List. Fokker internal: 365061 Fokker Suppliers: ASL cage code Customer approval verification is required zie onderstaand veld N/A N/A Fokker internal: 365061 Fokker Suppliers: Approved Suppliers List cage code Only approved Special process suppliers can be referenced as listed on www.supplier.cessna.com. For materials reference to the Qualified Producers List per applicable process specification. Certifcate of conformance number of the used material. For special processes as listed on www.supplier.cessna.com

Fokker/Cessna AS9102 Requirements FORM 2 Box 12 (CR) Acceptance Report zie onderstaand veld N/A N/A Number: The functional test certification indicating that test requirements have been met. FORM 2 Box 13 (O) Comments: As applicable. zie onderstaand veld If applicable FORM 2 Box 14 (R) Prepared By: Name of the person who prepared this form. FORM 2 Box 15 (R) Date: Date when this form was completed. zie onderstaand veld Name of the person who prepared the FAI. Date when the FAI was completed

Fokker/Cessna AS9102 Requirements FORM 3 Box 1 FORM 3 Box 2 FORM 3 Box 3 FAI Form 3 (R) Part Number: Number of the part (FAI part). (R) Part Name: Name of the part as shown on the drawing. (CR) Part serial number: Serial number of the part. (R) Part Number: nummer van het FAI deel (R) Part Name: Naam van het deel zoals weergegeven op tekening (CR) Part serial number: Serienummer van het deel Partnumber (from the partslist) Name of the part as shown on the drawing. If applicable FORM 3 Box 4 FORM 3 Box 5 FORM 3 Box 5 (O) FAI Report Number: Reference number that identifies the FAI. This may be an internal report number (R) Characteristic Number: Unique assigned number for each Design Characteristic. (R) Characteristic Number: Unique assigned number for each Design Characteristic. (R) FAI Report Number: BAAN order nummer. 5a) (R) Routing Step: Bewerkingsgang nummer 5b) (R) Characteristic Number: Ieder ontwerp karakteristiek dient een uniek nummer te krijgen. Baan order number or own ordertrackingnumber (suppliers) A consecutive number for every signal engineering requirement. A consecutive number for every signal engineering requirement.

Fokker/Cessna AS9102 Requirements FORM 3 Box 6 FORM 3 Box 7 FORM 3 Box 8 (CR) Reference Location: Location of the Design Characteristic (e.g., drawing zone (page number and section), specification, etc.) (CR) Characteristic Designator: If applicable, record characteristic type (e.g., key, flight safety, critical, major, etc.). (R) Requirement: Specified requirement for the Design Characteristic (e.g., drawing dimensional characteristics with nominal and tolerances included, drawing notes, specification requirements, etc.). (CR) Reference Location: Lokatie van de ontwerp karakteristiek [b.v. tekening zone, bladzijde en sectie, specificatie enz.] (CR) Characteristic Designator: Vermeldt indien van toepassing de soort karakteristiek [b.v., key, flight safety, critical, major, enz.] (R) Requirement: Specifieke eisen t.a.v. de ontwerp karakteristieken [b.v. nominale maten inclusief toleranties, tekening notes, eisen uit specificaties, enz.]. Indien er speciale eisen gelden betreffende de manier waarop karakteristieken gemeten moeten worden, dan dient dit hier aangegeven te worden [b.v. NDO alleen door level 2 personeel]. Name the source that gives you the information Minor Name every engineering requirement including the tolerances

Fokker/Cessna AS9102 Requirements FORM 3 Box 9 (R) Results: List measurement(s) obtained for the Design Characteristics. For Multiple Characteristics list each characteristic as individual values or list once with the minimum and maximum of measured values attained. If a characteristic is found to be nonconforming then that characteristic must be listed separately with the measured value noted. If a Design Requirement requires verification testing, then the actual results will be recorded on the form. If a laboratory report or certificate of test is included in the FAIR, then these results need not be written on the form, record the reference number in this field. The laboratory report or certificate of test must show specific values for requirements and actual results. For metallurgical characteristics with visual verification requirement that are rated against standard photographs, list the photo number of the closest comparison. A statement of conformance is acceptable (record the reference number in this field). For processes that require verification per Design Characteristic, include statement of compliance (e.g., certification of compliance, verification indicator such as accept, etc.). For part marking, ensure that marking is legible, correct in content and size and properly located, per applicable specification. (R) Results: Vermeld meetresultaten per ontwerpkarakteristiek. Indien een proces aantoonbaar beheerst is kan volstaan worden met een selectie van representatieve karakteristieken [ b.v. verificatie van NC data bij het boren van grote aantallen pilot holes in geval van een aantoonbaar beheerst boorproces] Deze aanpak dient beschreven te zijn in het door Quality Engineering op te stellen Quality Control Plan. Opm.: Bij gebruik van computer gestuurde meetmachines is het toegestaan te refereren aan prints hiervan mits deze de karakteristiek nummers vermelden. In geval van Multiple Characteristics [zie begrippen en definities] dient iedere karakteristiek apart vastgelegd te worden. Vastlegging per cluster is toegestaan, geef hierbij minimum en maximum gemeten waarde aan. Indien een karakteristiek buiten spec ligt, dan dient deze separaat, inclusief gemeten waarde, genoteerd te worden. Indien een ontwerp eis verificatie middels testen inhoud, dan dienen de behaalde resultaten op dit formulier vast gelegd te worden. Als laboratorium rapporten of test certificaten onderdeel vormen van de FAI rapportage kan volstaan worden met een referentie hiernaar. Laboratorium rapporten of test certificaten dienen zowel specifieke eisen als ook gemeten waarden te vermelden. Voor metallurgische karakteristieken welke aan de hand van standaard foto s beoordeeld worden dient het nummer van de meest overeen komende foto vermeld te worden. Een schriftelijke verklaring dat voldaan wordt is acceptabel [ referentie nummer hiervan dient in dit veld vermeld te worden]. Bij processen welke om een verificatie van een ontwerpeis vragen dient verklaart te worden dat voldaan wordt [b.v. middels een certificaat, of vermelding dat voldaan wordt accept ] Stel bij het merken van delen zeker dat markering leesbaar en juist is, de voorgeschreven afmeting heeft en op de juiste plaats staat. For multiple characteristics that are non-conforming these actuals must be noted on a separate line, where the actuals may be noted as min. and max deviations. Measurement results must be substantiated with i.e. measuring reports, CMM data, test results or other media

Fokker/Cessna AS9102 Requirements FORM 3 Box 10 (CR) Designed Tooling: If a specially designed tooling (CR) Designed Tooling/Prescribed (including NC programming) is Equipment: Indien een used as a media of inspection, record the tool identification number. speciaal ontworpen gereedschap wordt gebruikt als inspectiemedium dient het identificatienummer hiervan te worden genoteerd. FORM 3 Box 11 (CR) Non-Conformance Number: Record a nonconformance document reference number if the characteristic is found to be non-conforming. (CR) Non-Conformance Number: Vermeld NCR nummer indien karakteristiek buiten spec valt. FORM 3 Box 12 (R) Prepared By: Name of the Stamp Operator: person who prepared this form. Uitvoerende FORM 3 Box 13 (R) Date: Date when this form Stamp QC: QC was completed. gemachtigde FORM 3 Box 14 (R) This field area is reserved Gebruiken we niet for optional fields. Add additional columns as required by the Organization or Customer. All used tooling numbers geometric, model data. Reference to the Fokker non conformance report number Name of the person who prepared the FAI. Date when the FAI was completed When requested.

Fokker FAI Examples The following Pages show examples for the Fokker First Article Forms Mouse Over the Notes to see instruction text

1. Part Number 6934004-7-01 5. Part Revision Level - 9. Manufacturing Process Reference Job # 13. Detail FAI Assembly FAI AS9102 Rev B First Article Form 1: Part Accountability 2. Part Name CLIP, INBD-ELEV 6. Drawing Number 6934004 PL 6934004-7 SHT 1 6934004±7±1020±SCHETS±INDEX ±A.MODEL 6934004-7_1020 SHT 1 RELEASE SHT 1-3 10. Organization Name NEX-TECH AEROSPACE 14. Full FAI Partial FAI Reason for Partial FAI: a) If above part number is a detail part only, go to Field 19 b) If above part number is an assembly, go to the INDEX section below. 3. Serial Number N/A 7. Drawing Revision Level O - A A/1 P 11. Supplier Code 1NHY6 4. FAI Report Number (Job No.) Job # 8. Additional Changes N/A 12. P.O. Number PO & LINE Baseline Number Including Revision Level INDEX of part numbers or sub-assembly numbers required to make the assembly noted above. 15. Part Number 16. Part Name 17. Part Serial Number 18. FAI Report Number (Job No.) N/A N/A N/A N/A 1) Signature indicates that all characteristics are accounted for; meet drawing requirements or are properly documented for disposition. Also indicate if the FAI is complete per Section 5.4: FAI complete FAI not Complete 19. Signature: PRINT, SIGN, AND STAMP 20 Date: 19/DEC/2011 21. Reviewed By: PRINT AND SIGN 22 Date: DD/MMM/YYYY 23. Customer Approval: 24. Date: Sheet 1 of 1 4201 S. 119 th St. West - Wichita, Kansas 67215 Phone 316-522-5426 Fax 316-522-3672 1252 S. Vandeventer Ave St. Louis, Missouri 63110 Phone 314-535-6684 Fax 314-535-6686 NTA-006 (QWI 7.1.3 - AS9102 Rev B Form 1) 12/30/10

AS9102 Rev B First Article Form 2: Part Accountability Raw Material, Specifications and Special Process (es), Functional Testing 1. Part Number 6934004-7-01 2. Part Name CLIP, INBD-ELEV 3. Serial Number N/A 4. FAI Report Number (Job No.) Job # 5. Material or Process Name 7050-T7451 AMS 4050 REV. _ CMMP025 REV. _ 6. Specification Number 7. Code 8. Special Process Supplier Code A443222 MILL NAME & DISTRIBUTOR NAME CHEMICAL CLEAN CSFS035 REV. _ N/A PROCESSOR # PROCESSOR NAME PENETRANT INSP. CSTI002 REV. _ N/A PROCESSOR # PROCESSOR NAME CHEM FILM CSFS027 REV. _ F340 PROCESSOR # PROCESSOR NAME PRIMER CSFS084 REV. _ 220 PROCESSOR # PROCESSOR NAME PART MARK CSTI029 REV. _ N/A PROCESSOR # PROCESSOR NAME 9. Customer Approval Verification (Yes/No/NA) YES N/A YES YES YES N/A 10.Certificate of Conformance number HEAT LOT NUMBER CERT NUMBER CERT NUMBER CERT NUMBER CERT NUMBER CERT NUMBER 11. Functional Test Procedure Number N/A 12. Acceptance report number, if applicable N/A 13. Comments: N/A 14. Prepared By: PRINT AND SIGN 15. Date: 19/DEC/2011 Sheet 1 of 1 4201 S. 119 th St. West - Wichita, Kansas 67215 Phone 316-522-5426 Fax 316-522-3672 1252 S. Vandeventer Ave St. Louis, Missouri 63110 Phone 314-535-6684 Fax 314-535-6686 NTA-006 (QWI 7.1.3 - AS9102 Rev B Form 2) 12/30/10

AS9102 Rev B First Article Form 3: Characteristic Accountability, Verification and Compatibility Evaluation 1. Part Number 6934004-7-01 5. Char No. 6. Reference Location 2. Part Name CLIP, INBD-ELEV 3. Serial Number N/A Characteristic Accountability Inspection / Test Results 7. Characteristic Designator 1 RS3-N/A MINOR 2 RS3-N/A MINOR 8 RS3-N/A MINOR 9 RS3-N/A MINOR 8. Requirement 9. Results 10. Designed Tooling THIS DRAWING IS STORED IN THE CDM DATABASE. PENETRANT INSPECT PER CSTI002 AFTER MACHINING. ALL MACHINED SURFACES 63 RA OR BETTER. INSTALL SPACER WET WITH EPOXY PRIMERAE PER CSFS031 AFTER REAMING. 11. Non- Conformance Number NOTED N/A N/A ACCEPT N/A N/A ACTUAL RA MAX 60 1020-2B MINOR º.083 +.004 / -.001 ACTUAL READING ## SHT/ZN MINOR 14 X Ø.125 +.010 / -.010 S/N of TOOL USED N/A N/A N/A N/A 14 X (MIN - MAX READING) ## SHT/ZN MAJOR KEY CHARACTERISTIC ACTUAL READING S/N of TOOL USED S/N of TOOL USED S/N of TOOL USED N/A N/A N/A 4. FAI Report (Job No.) JOB # 14. [Insert columns, etc, as required by Organization or Customer] The signature indicates that all characteristics are accounted for; meet drawing requirements or are properly documented for disposition. 12. Prepared By: PRINT AND SIGN 4201 S. 119 th 13. Date: 19/DEC/2011 St. West - Wichita, Kansas 67215 Phone 316-522-5426 Fax 316-522-3672 1252 S. Vandeventer Ave St. Louis, Missouri 63110 Phone 314-535-6684 Fax 314-535-6686 Sheet 1 of NTA-006 (QWI 7.1.3 - AS9102 Rev B Form 3) 12/30/10

Gulfstream AS9102 Requirements AS9102 FAI forms 2 column 6 shall require the specification and the latest Specification SCN Form 3 column 10 shall require the serial number of the measurement instrument used to perform each measurement

Product Quality Requirements Supplier Non-Conformance found at the Supplier HM Dunn Aerospace Supplied Material If the Supplier generates a non-conforming part on HM Dunn Aerospace supplied material, they follow shall be performed by the Supplier Tool Proof Part Submit a Supplier Generated Non-Conformance Report detailing the Root Cause and Corrective Action Production Part - Submit a Supplier Generated Non-Conformance Report detailing the Root Cause and Corrective Action along with a supporting RCCA 5 Why Analysis Contact the HM Dunn Aerospace Supplier Liaison for a copy of a RCCA 5 Why form if none are available at the supplier

Product Quality Requirements Supplier Supplied Material If the Supplier generates a non-conforming part on their own supplied material, they follow shall be performed by the Supplier Tool Proof Part Supplier Responsibility, no action by HM Dunn Aerospace Production Part If the supplier is not able to replace the material in time to meet the contract delivery requirements due to lead time or economic reasons, the supplier shall contact the HM Dunn Aerospace Supplier Liaison and supply the following; Submit a Supplier Generated Non-Conformance Report detailing the Root Cause and Corrective Action along with a supporting RCCA 5 Why Analysis Contact the HM Dunn Aerospace Supplier Liaison for a copy of a RCCA 5 Why form if none are available at the supplier HM Dunn Aerospace shall evaluate the impact to our Customer, and shall notify the supplier if we will accept the non-conforming part in accordance with the next slide

Product Quality Requirements Acceptance of Non-Conforming Product From Suppliers HM Dunn Aerospace is not responsible for supplier generated nonconforming product HM Dunn Aerospace shall evaluate each non-conformance report submitted by a Supplier for consideration of submittal to our Customer for concessions If HM Dunn Aerospace refuses to submit the non-conforming part, it shall be the Suppliers responsibility to replace the non-conforming part If HM Dunn Aerospace agrees to submit the non-conforming part to our Customer for concessions and there are fees associated with the submittal, the supplier shall be responsible for the fees Supplier shall be notified in writing of the fees prior to submittal All Customer Submittals shall be approved by the HM Dunn Aerospace CEO prior to submittal

Product Quality Requirements Supplier Non-Conforming Product found during receiving Inspection The Supplier shall receive a non-conformance report from the HM Dunn Aerospace s Non-Conformance Report NCR System caweb4 software The Supplier shall perform RCCA and document the results in the caweb4 in accordance with the following instructions within 10 working days

caweb4 Instructions The caweb4 software is HM Dunn Aerospace s Non- Conformance Report NCR System Supplier that receive an email notification from the HM Dunn Aerospace caweb4 shall follow the instructions on the following pages If you have any issues or questions, please contact the caweb4 Administrator at the following link caweb4admin@hmdunn.com

caweb4 Email Notification When a suppler receives a caweb4 notification email, the supplier should click on the hyperlink within the body of the email

caweb4 Login Screen

caweb4 NCR Screen

caweb4 NCR Edit

caweb4 Root Cause

caweb4 Cause Code

caweb4 Corrective Action

caweb4 Corrective Action Code

caweb4 Save NCR Note: The esign setup is a one time requirement

caweb4 Password Setup The following 6 slides are a one time setup for passwords The user will need to modify the temporary password they were issued with a permanent password, only the user will know the new password The user shall also need to add the esign password, which should be the same as the new password the just created

caweb4 Home Page Note: The esign setup is a one time requirement

caweb4 Modify Login Password Note: The Login Password setup is a one time requirement

caweb4 Modify Login Password Note: The Login Password setup is a one time requirement

caweb4 Modify esign Password Note: The esign setup is a one time requirement

caweb4 Modify esign Password Note: The esign setup is a one time requirement

caweb4 Return to NRC for ESign Note: The esign setup is a one time requirement

caweb4 Return to NRC for esign

caweb4 ESign

caweb4 Change NCR Responsibility

caweb4 Change NCR Responsibility

caweb4 Change NCR Responsibility

caweb4 Change NCR Responsibility

caweb4 Save

caweb4 Return Email to HM Dunn

Supplier Non-Conformance Disclosure Disclosure Supplier generated Non-Conforming Product discovered to be non-conforming after shipment from the Supplier When a Supplier discovers part that have already shipped to HM Dunn Aerospace are non-conforming, they must notify HM Dunn Aerospace via email within 24 hours of the discovery The notification must include the part number and a clear description of the nonconformance Send email to the Supplier Liaison The Supplier is the responsible to supply HM Dunn Aerospace the following within 72 hours of discovering the shipped non-conformance Formal Letter of Disclosure Supplier Internal Non-Conformance Report with RCCA Supplier RCCA 5 Why Analysis Detailed spread sheet of details of product shipped Part Number, Quantity, Shipped Date, Shipper Number

Program Review When flowed down in the contact, Supplier shall perform a Program Review with HM Dunn Aerospace, annually as a minimum Depending on performance to contract, HM Dunn Aerospace may request a Program Review

FACC Quality Requirements FQS 05 008 02 Supplier performing work and/or processing on FACC product are required to comply with the FACC Quality Requirements FQS 05 008 02 A copy the FACC Quality Requirements FQS 05 008 02 can be obtained on the HM Dunn website Supplier Portal