1 Quality Control Procedures QCP 5.4 Page 1 of PURPOSE 2.0 SCOPE SOURCE INSPECTION To establish a system for Source Inspection of material supplied to Eaton Corporation, FSD, Euclid. This procedure applies to all parts and assemblies whenever source inspection is specified on the Purchase Order/or as required. 3.0 APPLICABLE DOCUMENTS QCP 2.4 QCP 3.0 QCP 5.3 QCP 5.8 ARG-2367 ARG ARG SOP Visual Acuity Requirements for Visual Evaluation Document Control Receiving Inspection Procedure Quality Requirements for the Supplier Base Request for Source Inspection Source Inspection Tag Source Inspection Plan Drop Shipped Parts and Foreign Receivals SOP SOP SOP Source Inspection Plan Preparation First Article Inspection Requirements for Aircraft Accessories Purchased Parts (Excluding Forgings and Castings) Non Conforming Material at Suppliers 4.0 QUALITY ELEMENTS 4.1 General Source Inspection Product may be selected for Source Inspection when: Compliance to contract requirements cannot be verified due to available equipment and/or the item s specialized nature. The items are assemblies whose component parts cannot be verified except in the unassembled condition. Date of Issue Revisions 3/6/87 - AA 02/14/13 Prepared by Approved signature on file M.A. Patrizi signature on file G.Lallathin
2 Quality Control Procedures QCP 5.4 Page 2 of 5 The items are of such complexity that inspections are lengthy, and significant gage and/or test equipment correlation problems exist. The economic benefit and improved scheduling of parts can be realized. Required portion of a Supplier Quality Audit. Castings are in development stage and not yet released for production. Or as deemed necessary by Supplier Quality Assurance Manager 4.2 Purchasing The Purchasing Department is responsible for: Selecting items for source inspection in accordance with the above criteria Informing suppliers of items to be source inspected and the requirements of this procedure Notify the Supplier Quality Manager or designee of source inspection needs. Notification will be made on Form ARG-2367, "Request for Source Inspection". 4.3 Supplier Quality The Supplier Quality Manager or designee will forward the request for source inspection to the Source Inspector with the current revision of the inspection SIP (finished parts) or SOP (Castings). 4.4 Supplier The supplier must complete their final inspection and document results in conformance with QCP 3.0 Document Control and QCP 5.8 prior to the arrival of the source inspector Discrepant parts found during supplier inspection shall be submitted and dispositioned in accordance with SOP prior to Source Inspection The contractual documents, (PO, VQR, updates, etc.) as well as inspection and test documentation shall be presented to the Source Inspector. 4.5 Finished Part Source Inspection The Source Inspector shall perform the following tasks for finished parts and assemblies: The Source Inspector will review the Purchase Order for any requirements (e.g., First Article Inspection, etc). The Source Inspector shall review the First Article Inspection Report (FAIR) in Accordance with SOP when required and shall indicate
3 Quality Control Procedures QCP 5.4 Page 3 of 5 acceptance on the Source Inspection Plan and Source Inspection Tag. The source inspector shall also check for current FAI approval for part or component revision Review complete certification package (e.g., material, heat treat, nondestructive testing, nitride, Materials Lab approval, etc.) per contract requirements and affix inspector stamp on the documents reviewed. If Lab Testing is required, list Lab Certification number on the Source Inspection Tag Review the supplier s inspection data sheets for completeness and accuracy Perform an audit of selected characteristics to ensure the accuracy of the supplier s inspection. This audit shall be documented on a Source Inspection Plan (SIP) - Form ARG 21005, prepared in accordance with SOP Visually inspect for workmanship and part marking (selected quantity or the entire lot when practical). These parts will be inspected using the tin soldier method where parts are arranged so that differences from part to part are easily detected Witness functional test on a sample from the lot (as applicable) Review serial numbers in the lot (if applicable) to ensure serial numbers match those listed on certifications (may be done using a sample). Document serial numbers on the Source Inspection Tag - Form ARG Serial numbers may be continued on reverse side of card if not enough space exists on the front Review MRBA characteristics to ensure discrepancies are as stated on the MRBA and note MRBA s in remark section of Source Inspection Card If an inspected characteristic does not meet the specified requirements the entire lot must be screened for the characteristic. 4.6 Casting and Forging Source Inspection The term "forging" shall replace the term "casting" in this procedure (as applicable) The Casting Source Inspector will determine the extent of inspection to be performed for each lot (this could vary from a small sample to each part inspected - depending on the complexity of the part and the quality history of the supplier) Normal inspection will be performed per the part number Standard Operating Procedure (SOP). The inspection may include additional visual, dimensional, radiographic or penetrant inspection (if a discrepancy is discovered) Certifications shall be reviewed by the Source Inspector at the supplier A Radiographic Film Audit may be performed when deemed appropriate.
4 Quality Control Procedures QCP 5.4 Page 4 of Source Inspection Documentation Ø Source Inspection Tag Form ARG will be completed by the Source Inspector for all accepted material. The split circle shall be filled in per sections and The Inspector Stamp area is for the Source Inspector s personal stamp application. Vendor name, P.O. No., Part No., part LCL, and Part Name shall be filled in to match what is ordered on the Purchase Order. No. Pcs. is the number of parts presented for inspection. Date (MM/DD/YY) is the date of source inspection. Source Inspector is the WRITTEN, PRINTED, LEGIBLE name of the Source Inspector. Remarks may contain any applicable information (MRBA numbers, lab test certificate numbers, parts are OK to Eaton, First Article status, etc., as applicable). Serial Nos. are where the applicable serial numbers are recorded. This may be used for Lot Numbers and any remarks may be continued in this area if not used for Serial Nos. CERTIFICATIONS REVIEWED BY ARGO-TECH SOURCE INSPECTOR AT VENDOR S FACILITY shall have Yes or No circled, as applicable. Inspector s Signature shall be signed in that area and shall correspond to the Source Inspector s name PRINTED in that field near the upper right of the Tag The SIP is to be completed in accordance with SOP A copy of the Source Inspection Tag (at a minimum), SIP and complete certification package shall accompany each shipment All Source Inspection documentation shall conform to the QCP 3.0 Document Control Euclid facility test materials, certifications, and source inspection tag are to be shipped in accordance with SOP in cases when source inspected parts are Drop- Shipped to a destination other than Eaton. 4.8 Receiving Inspection Source inspected lots will be processed by Eaton Receiving Inspection in accordance with QCP 5.3 Receiving Inspection Procedure. 4.9 Nonconforming Material Every effort should be made to correct any known issues while a Source Inspector is at a supplier s site. (e.g., minor discrepancies noted in workmanship, part marking or supplier certification issues, etc) The Source Inspector will instruct the supplier to submit non-conforming material for Material Board review in accordance with SOP in the event that nonconformances cannot be corrected The casting source inspector will document results of inspection on the Source Inspection Tag, Form ARG The finished parts Source Inspector will document the results of inspection on a SIP.
5 Quality Control Procedures QCP 5.4 Page 5 of The split circle at the top of the Source Inspection Cards is used to identify when nonconformances are discovered by the Source Inspector. Both the top and bottom of the spit circle will show the total number of parts if no nonconformances are found Nonconformances discovered during source inspection will be noted on the Source Inspection tag as a zero ( O ) appearing on the top half of the split circle. The bottom number indicates the total number of parts presented. (Note: There may be a difference between the number of parts presented verses the number of parts accepted) Waiver of Source Inspection Source Inspection may be "waived" only with the approval of the Supplier Quality Manager or designee. The "Request for Source Inspection" Form, ARG-2367 is annotated with the verbiage indicating that source inspection has been waived. The document is signed, dated and returned to Purchasing Third party inspection, where an approved third party is assigned to perform receiving Inspection may be required when deemed necessary by the Quality Management Team The third party inspection source must be listed on the SPL and all applicable requirements flowed down to the source in accordance with QCP Source Inspector and Third Party Inspector Training Source Inspectors and Third Party Inspectors must complete training provided by Supplier Quality. Candidates must demonstrate proficiency by passing an examination after the training. An eighty percent minimum score is required Source Inspectors and Third Party Inspectors must meet visual acuity requirements in accordance with QCP 2.4.
Quality Control Procedures QCP 5.5 Page 1 of 5
Quality Control Procedures QCP 5.5 Page 1 of 5 1.0 PURPOSE CERTIFIED SUPPLIER PROGRAM To establish quality requirements for the selection, implementation and maintenance of the Certified Supplier Program.
Quality Control Procedures QCP 13.0 Page 1 of 6
Quality Control Procedures QCP 13.0 Page 1 of 6 1.0 PURPOSE CONTROL OF QUALITY RECORDS To define the method for the identification, collection, indexing, filing, access, storage, maintenance and disposition
Supplier Quality Assurance Requirements Manual
12716 EAST PINE STREET TULSA, OK 74116 Supplier Quality Assurance Requirements Manual Approved: Mike Collins Quality Assurance Manager Precise Machining & Manufacturing 1 Record of Revisions Revision D
Copies of this document shall be classified either as Controlled or Uncontrolled, and shall be identified as such on the cover sheet.
INTRODUCTION This document describes an inspection system broken down into four separate levels. When Inspection Level IV is invoked, this system meets the requirements of former MIL-I-45208A. The primary
Standard Operating Practice S.O.P. No. 52-10-005.0-00-001
Page 1 of 12 1.0 PURPOSE SAMPLE CASTING APPROVAL This specification documents the procedure and the requirements for the procurement of casting fixtures, gages and pattern equipment, approval of sample
UNCONTROLLED COPY FOR REFERENCE ONLY
CLOVER MACHINE AND MFG. 800 MATHEW ST. #101 SANTA CLARA, CA 95050 727-3380 727-7015 fax REVISION: DATE: PAGE 1 OF 45 QUALITY POLICY MANUAL DISTRIBUTION LIST: President Purchasing Manager Vice President
QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC.
QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC. Hattiesburg, MS Revision E 01/19/11 Revised to ISO 9001:2008 on July 9, 2009 JPM OF MISSISSIPPI, INC. MANAGEMENT QUALITY POLICY It is the goal of JPM of
Supplier Quality Requirements and Clauses
Supplier Quality Requirements and Clauses Supplier Quality Requirements General The following Quality Notes (QN01 through QN19) apply to and form a part of all Purchase Orders issued by Advanced Conversion
Cessna - Interiors Manufacturing Facility (IMF) Supplier Quality System Requirements
Cessna - Interiors Manufacturing Facility (IMF) Supplier Quality System Requirements Wichita KS Effective: 3-11-15 Rev. IR Page 1 of 6 1.0 Introduction This document establishes Cessna Interiors Manufacturing
INTRODUCTION: PURPOSE:
UMBRA CUSCINETTI, INC. 2916 100 th Street SW Everett, WA 98204-1340 USA 425-743-2577 FAX: 425-347-0682 Printed versions may not be the latest. Suppliers shall utilize the latest version which can be found
Supplier Quality Assurance Requirements Manual
1701 West Tacoma Broken Arrow, Ok. 74012 Supplier Quality Assurance Requirements Manual Approved: Bryan Sanderlin President/COO/CEO OSECO, Inc. Darrel Bilke Quality Assurance Manager OSECO, Inc. 1 Record
4.0 Receiving Process
4.0 Receiving Process Delivery of requested products or services marks a transition in the Purchase-to-Pay process from a purchasing activity to a payables activity. All purchases must be received to release
Self-Audit Checklist
Page 1 Company Name: Date of audit: Date of last audit performed: Name of person performing self-audit: Signature: Name of person responsible for quality system: Signature: Number of non-compliances: Page
Supplier Quality. Assurance Provisions. Manual. SQAP-001 Rev. E
9060 WINNETKA AVENUE NORTHRIDGE, CA 91324 USA Supplier Quality Assurance Provisions Manual SQAP-001 Revision E Page 1 of 14 Table of Contents 1 General Requirements... 4 1.1 Supplier Control... 4 1.2 Supplier
Quality Assurance Requirements. For. Pratt & Whitney/Space Propulsion, Chemical Systems Division
Quality Assurance Requirements For Pratt & Whitney/Space Propulsion, FORM 06.13.02.02 (REV. 6) Page 1 of 14 Table of Contents SECTION I QUALITY SYSTEMS REQUIREMENTS... 5 1. QUALITY ASSURANCE PROGRAM...
Supplier Requirements Manual M M 0 3
Supplier Requirements Manual M M 0 3 Conformance to this manual is a requirement for all of Merrill Technologies Group and Ranger s suppliers & subcontractors, unless otherwise specified on purchase orders.
AS9100 Quality Manual
Origination Date: August 14, 2009 Document Identifier: Quality Manual Revision Date: 8/5/2015 Revision Level: Q AS 9100 UNCONTROLLED IF PRINTED Page 1 of 17 1 Scope Advanced Companies (Advanced) has established
GARDNER AEROSPACE SUPPLIER QUALITY REQUIREMENTS MANUAL
GARDNER AEROSPACE SUPPLIER QUALITY REQUIREMENTS MANUAL Issue Number: 1 Issue Date: 12/9/14 1 of 19 Contents Revision Summary... 4 1.0 Introduction... 5 2.0 Supplier Quality System Requirements... 6 3.0
ONTIC UK SUPPLIER QUALITY SURVEY
MAIL-IN / ONSITE This report is intended to furnish data relative to the Suppliers capability to control the quality of supplies and services furnished to Ontic UK. Please complete this Survey and return
Purchase Order Clauses and Conditions
Purchase Order Clauses and Conditions All purchase orders for materials, special processes, machining and fabrication services and end items are subject to the following requirements: General Requirements:
QUALITY CONTROL MANUAL
QUALITY CONTROL MANUAL TABLE OF CONTENTS PREFACE I II III IV Title Page Table of Contents Information Page Revision Log SECTION DESCRIPTION 1.0 Introduction 2.0 Organization 3.0 Organization Chart 4.0
PERFORMANCE EXCELLENCE Procurement Standards
PERFORMANCE EXCELLENCE Procurement Standards AEROSPACE PRODUCTS Agile Revision: D Sparton Quality Policy: It is the goal of Sparton Corporation and it subsidiaries ( Sparton ) to deliver value through
Product Order Quality Requirements Meggitt (Orange County), Inc.
Product Order Quality Requirements Meggitt (Orange County), Inc. Reference QP8-051, Purchase Order Quality Requirements QP8-055, Review/Control Supplier Documentation PP-401, Quality Assurance Codes 50-2-351,
Bogue Machine Company, Inc. Business Instruction
Bogue Machine Company, Inc. Business Instruction Document Title: Supplier Quality Control Requirements Document Number: Revision: Document Owner: Mark Bogue Backup Owner: Craig Bogue Parent Document: PURP-004,
Gulfstream Production Certificate Operations
SUPPLIER QUALITY ASSURANCE SYSTEM REQUIREMENTS SQAR 0001 REV D Supplier s Quality System David H. Trucksis Donald A. Strickland R. Christiansen PREPARED BY: REVIEWED BY: APPROVED BY: Robert W. Mullen Jr.
L-3 Communications Corporation AMI Purchase Order Supplement No. 3 Quality Assurance
Q10 QUALITY SYSTEM REQUIREMENTS Q10A Q10B ISO 9001:2008 Seller s quality system shall be in compliance with the requirements of ISO 9001, Model for in Design, Development, Production, Installation and
Helical Products Co., Inc.
Q01 GENERAL REQUIREMENTS 1. Supplier Responsibilities 1.1. Delivery Certification By delivering products or services on the Contract, the Supplier certifies that such products or services are in compliance
MEDFORD FABRICATION CSC, INC. Quality System Manual. Date of issue: 03/25/2010 Revision : F
MEDFORD FABRICATION CSC, INC Quality System Manual Date of issue: 03/25/2010 Revision : F Table of Contents System Description 1.0 Introduction 2.0 Company Quality Policy 3.0 Organization Charts 4.0 Quality
ATTACHMENT "Q" PURCHASE ORDER QUALITY CLAUSES
1 of 8 Q0. Instructions: Review your Purchase Order for any Q clauses listed below. Specific clauses other than Q0 apply only when listed on the PO. All certifications provided to CAI are to be complete,
GLOBAL AEROSPACE PROCEDURE
1 of 13 1. PURPOSE: This procedure establishes the minimum PPG Aerospace requirements for a Supplier's Quality Plan. These requirements pertain to the documentation and inspection/testing necessary to
Standard Practice for Quality Control Systems for Nondestructive Testing Agencies 1
Designation: E 1212 99 AMERICAN SOCIETY FOR TESTING AND MATERIALS 100 Barr Harbor Dr., West Conshohocken, PA 19428 Reprinted from the Annual Book of ASTM Standards. Copyright ASTM Standard Practice for
VEHICULAR EQUIPMENT PURCHASE EXHIBIT. This Exhibit modifies the Terms and Conditions for Materials and Related Services:
VEHICULAR EQUIPMENT PURCHASE EXHIBIT This Exhibit modifies the Terms and Conditions for Materials and Related Services: The following definitions are added to DEFINITIONS of the Terms and Conditions. Contract:
EVALUATION AND ACCREDITATION OF SUPPLIER TEST FACILITIES GP 10
EVALUATION AND ACCREDITATION OF SUPPLIER TEST FACILITIES GP 10 EVALUATION AND ACCREDITATION OF TESTING FACILITIES USED BY SUPPLIER OF MATERIALS TO GENERAL MOTORS PREFACE TO GP-10 General Motors expects
VENDOR QUALIFICATION APPROVAL FORM
COMPANY INFORMATION: Company Name: Jet Aviation St. Louis, Inc. Address (Street, City, State) Other Property Locations: Website: Repair Station Certificate No. With Class Rating: Date of Last FAA Audit:
Quality Management System Manual Revision L
This Page 1 of 35 of the Quality Management System Manual If issued as a controlled copy, the serial number of this copy is Quality Management System Manual Certified to AS9100 Revision C Printed copies
New Program Quality Requirements for Suppliers (NPQR) For Limited Manufacturing of Components and/or Processes for Engineering Certification
New Program Quality Requirements for Suppliers (NPQR) For Limited Manufacturing of Components and/or Processes for Engineering Certification Revision A New Program Quality Requirements for Suppliers Rev.
QUALITY ASSURANCE PROVISIONS OF PURCHASE ORDER
QUALITY ASSURANCE PROVISIONS OF PURCHASE ORDER Lockheed Martin and LMC hereinafter shall mean Lockheed Martin Maritime Systems & Sensors, Maritime Security & Ship Systems (MS&SS), a Lockheed Martin Company.
Surgi Manufacturing Quality Manual
Surgi Manufacturing Page 1 of 18 Approvals: QA: Eng. Mgt. : A Date: 18Aug98 1. Introduction... 4 1.1 Scope... 4 1.2 Purpose... 4 1.3 Authority... 4 1.4 Issue of the Manual... 4 1.5 Amendments... 4 1.6
Sargent Controls & Aerospace 5675 West Burlingame Rd. Tucson AZ 85743 PHONE: (520) 744-1000 FAX: (520) 744-8054
Sargent Controls & Aerospace 5675 West Burlingame Rd. Tucson AZ 85743 PHONE: (520) 744-1000 FAX: (520) 744-8054 SUPPLIER EVALUATION CHECKLIST Date: Vendor: Address: City, State, Zip: Web Site: Prepared
SUPPLIER QUALITY ASSURANCE REQUIREMENTS
SUPPLIER QUALITY ASSURANCE REQUIREMENTS The following supplier quality assurance requirements, referenced by number on the Purchase Order, are an integral part of each order placed by Continental Disc
Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature
Far West Technology, Inc. ISO 9001 Quality Manual Document No.: QM Revision: 0 Issue Date: 27 August 1997 Approval Signatures President/CEO Executive Vice President Vice President/CFO Change Record Rev
Quality Management System General
Audit Date: Quality Management System General Requirement: 4.1 and 4.2.2-QMS General Verify Scope Comments/Evidence/Findings: Verify the Exclusions is applicable and justified How are the processes in
www.itilhelp.com ISO 9000 Quality Standard Background Information Quality Systems Implementation
ISO 9000 Quality Standard Background Information www.itilhelp.com There is a worldwide trend towards more stringent customer expectations with regard to quality. Accompanying this trend has been a growing
GENERAL WELDING & FABRICATING, INC. 991 Maple Road Elma, New York 14059
QUALITY MANUAL GENERAL WELDING & FABRICATING, INC. 991 Maple Road Elma, New York 14059 Distribution: Position Location Copy # President / CEO Office 1 Operations Manager Office 2 Quality Assurance Office
2.1.1. Distributors In addition to the requirements noted herein, Distributors shall have a Quality System
1. Purpose This document defines requirements for suppliers providing aerospace and defense materials, products and services to Electromech Technologies. Supplier acceptance of a purchase order from Electromech
Quality Management System Manual
Quality Management System Manual This manual has been reviewed and approved for use by: Jack Zazulak President, Aurora Machine Limited March 07, 2011 Date - Copyright Notice - This document is the exclusive
Quality Systems Manual
Hardy Machine & Design, Inc. Quality Systems Manual Meeting ISO9001:2008 Requirements Ankur Goel August 21, 2015 Quality Systems Manual Hardy Machine & Design Rev. 015 Page 2 AS 9100 Quality Management
Doc Edition Section Question Answer Q1 9th 3.1.6 / 5.6.1.1
Doc Edition Section Question Answer Q1 9th 3.1.6 / 5.6.1.1 In a recent API Q1 audit, my auditor interpreted API Spec Q1, Section 3.1.6 to mean that the distributor supplying plastic shrink wrap material
PRO-SUPPLIER PERFORMANCE MANUAL PROCEDURE Supplier Performance Manual REVISION L December 7, 2015
APPROVAL Procedure Section Process Owner Approval 1.0 Letter of Introduction 2.0 Global Competitiveness 3.0 Supply Chain Contact List 4.0 Quality Policy Statement 5.0 Quality Systems Qualifications 6.0
Camar Aircraft Parts Co. Procedures Manual
QUALITY ASSURANCE PROCEDURES INDEX Procedure Number Approval Procedure Title 4.2.3 R.F. Control of Documents 4.2.4 R.F. Control of Records 6.2.2 R.F. Competence, Training and Awareness 6.4 R.F. Foreign
SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE
Company Name Street Address City, State, Zip code Phone Number Fax Company Website Email Address ORGANIZATION NAME PHONE NUMBER EMAIL ADDRESS President/CEO General Manager Engineering Manager Production
RTP s NUCLEAR QUALITY ASSURANCE PROGRAM
RTP s NUCLEAR QUALITY ASSURANCE PROGRAM RTP operates under one quality program, whether you purchase products that are commercial grade, nuclear safety-related or industrial safety compliant (IEC 61508).
SUPPLIER Form #: 007 AUDIT QUESTIONNAIRE
1.0 BACKGROUND INFORMATION Company Name: Company Address: Phone Number: Fax Number: Number of years in business: Number of employees: Annual Sales in Dollars: Size of Facility in Square Feet: Name of Senior
PPI/TZ Standard Quality Requirements for Suppliers -SQRS-
PPI/TZ Standard Quality Requirements for Suppliers -SQRS- AS9100, ISO 13485 and ISO 9001 Revision: November 16, 2015 For questions concerning Standard Quality Requirements for Supplier (SQRS), please contact
Quality Supplier Requirements for Beckwith Electric Co., Inc.
Quality Supplier Requirements for Beckwith Electric Co., Inc. This Page Left Intentionally Blank To Our Valued Suppliers: One of the primary goals of Beckwith Electric is to provide the highest Quality
GE Power Electronics Business Total Quality Management for Suppliers
GE Power Electronics Business Total Quality Author: Reviewers: Contributors: Alessandro A. Cervone Technical Manager Component & Reliability Engineering Alicia Scott Title Erika Nannis Title Robert Roessler
Quality Assurance Provisions
Page 1 of 5 1. Purpose and Scope. The purpose of this document is to define the Quality Assurance Provisions FLIR Systems Inc. requires for inventory material received from Suppliers. This document applies
This Business Management System Manual is based on ISO 9001:2008 requirements
Page 1 of 19 (Formerly: Quality Management System Manual) When the ISO 9001:2008 standard is identifying the Quality Manual or Quality Management System, Turbonetics is representing this requirement with
Aviation Suppliers Association Quality System Standard. ASA-100 Revision 4.0
Page 1 Aviation Suppliers Association Quality System Standard ASA-100 Revision 4.0 Original Issue: March 1994 Revision 4.0 Release Date: August 1, 2015 Effective Date: August 24, 2015 Copyright 1994-2015
How To Manage A Plant
MALAT 9100 QUALITY REQUIREMENTS For Suppliers of Category 12, 13 This Document is located in the Internet site http://www.iai.co.il/sip_storage/files/2/35782.pdf Date: March 2012 Prepared by : S. Migdal
Generic CMMS Quality Assurance Plan
Generic CMMS Quality Assurance Plan Scope In accordance with the Quality Policy, the Quality System of CMMS is based upon the requirements and structure of ISO (the International Organization for Standardization)
Ege Fren Ege Fren San. ve Tic. A.Ş.
Page : 1 / 8 1. Purpose: This manual is formed in order to create a business environment based on a partnership understanding with our suppliers, determine and develop our relationships in this context
Supplier Handbook Terms and Conditions
* 2 / 7 TABLE OF CONTENTS 1. Section 1 Introduction 1.1. Objective 1.2. Scope 1.3 Contact Information 2. Section 2 Quality Expectations 2.0 Application of This Section 2.1 Change Notification 2.2 Quality
New Program Quality Requirements for Suppliers (NPQR) For Limited Manufacturing of Components and/or Processes for Engineering Certification
New Program Quality Requirements for Suppliers (NPQR) For Limited Manufacturing of Components and/or Processes for Engineering Certification Revision - New Program Quality Requirements for Suppliers Rev.
Installation and Operational Qualification Protocol (Reference: SOP )
Project Name Equipment Process Line/Location Project Number Serial Number Model Number Protocol number WRITTEN BY: REVIEWED BY: Position APPROVAL TO EXECUTE: Position: PROTOCOL COMPLETION APPROVAL: Position:
Overview. Responsibility
Overview Property management is an important function at the University. Prudent inventory practices help protect the University s multi-million dollar investment in equipment, provide documentation needed
TERMS AND CONDITIONS OF SALE. Quotations, Purchase Orders, Acknowledgements, Packing Lists/Slips, Invoices & Credits
Quotations, Purchase Orders, Acknowledgements, Packing Lists/Slips, Invoices & Credits All quotations of Seller ( Quotations ) and purchase orders of Buyer ( Purchase Orders ) shall be subject to these
Unincorporated changes to Revision J of the SPOC Manual UPDATED November 22, 2011
Aerospace Unincorporated changes to Revision J of the SPOC Manual UPDATED November 22, 2011 The SPOC Manual is controlled in Electronic format as presented on the Supplier Portal and Honeywell Intranet.
Quality Assurance Manual. QAM-2013-Rev2
QAM-2013-Rev2 President s Policy and Authorization of Quality Control The management system for the Steel Structural Fabrication of Pinnacle Industrial Services entrusted through furnishing high quality
1. Scope This SOP covers requirements for PHARMCO-AAPER s Quality Management System
Page 1 of 8 1. Scope This SOP covers requirements for PHARMCO-AAPER s Quality Management System 2. Application This Standard Operating Procedure applied to the entire Quality Management System as it relevant
Section 8.1 Volume I QUALITY ASSURANCE PROGRAM OF PRECAST PRESTRESSED CONCRETE PRODUCTS
Section 8.1 Volume I QUALITY ASSURANCE PROGRAM OF PRECAST PRESTRESSED CONCRETE PRODUCTS 8.1.1 PURPOSE This procedure provides guidelines related to the implementation of quality control and quality assurance
Accounts Payable and Inventory Management
Accounts Payable and Inventory Management 2013 SedonaOffice Users Conference Presented by: Lisa Gambatese & Laurie Goodrich Table of Contents Accounts Payable G/L Account Defaults (AP) 4 A/P Setup Processing
Cartel Electronics. AS 9100 Quality Systems Manual
Cartel Electronics AS 9100 Quality Systems Manual 1900 C Petra Lane Placentia, California 92870 Introduction Cartel Electronics, as a global supplier to the aviation, space, and space industries, has developed
Quality Assurance Manual ISO 9001:2000. Uncontrolled copy
ISO 9001:2000 Uncontrolled copy Approved by: Hugue Meloche, Eng. Page 1 of 24 Intellectual Property This document, prepared by Meloche Group Inc. for its company in the Valleyfield region, remains the
Aviation Suppliers Association Quality System Standard. ASA-100 Revision 3.5
Page 1 Aviation Suppliers Association Quality System Standard ASA-100 Revision 3.5 Original Issue: March 1994 Revision 3.5 Release Date: September 1, 2008 Effective Date: November 1, 2008 Copyright 1994-2008
GLB QM 02. Supplier Quality Manual 03. 7/11/12 Supplier Quality 1 of 18. Revision Level. Issue Date Issuing Department Page
7/11/12 Supplier Quality 1 of 18 7/11/12 Supplier Quality 2 of 18 Table of Contents 1.0 Introduction 3 2.0 Manual 4 2.1 Application 4 2.2 Quality Management System of the Supplier 4 2.3 Quality Management
7dmX^ Jafaes D. Seipel Manager ^Production and Airworthiness Division, AIR-200
U.S. DEPARTMENT OF TRANSPORTATION ORDER FEDERAL AVIATION ADMINISTRATION National Policy 8130.21H SUBJ: Procedures for Completion and Use of the Authorized Release Certificate, FAA Form 8130-3, Airworthiness
FIXED ASSETS PROCEDURES
SECTION XI - INVENTORY / FIXED ASSETS FIXED ASSETS PROCEDURES WHO IS RESPONSIBLE? A. Building principals and department managers are accountable for assets/equipment within their immediate area of responsibility.
SUPPLIER FIRST ARTICLE INSPECTION INSTRUCTIONS AND FORMS
SUPPLIER FIRST ARTICLE INSPECTION INSTRUCTIONS AND FORMS 1-4.10-FM-35, Rev. A Page 1 of 5 Page 2 of 5 SUPPLIER FIRST ARTICLE INSPECTION INSTRUCTIONS AND FORMS Document Name: Supplier First Article Inspection
First Article Inspection (FAI) Training
First Article Inspection (FAI) Training What is the purpose an FAI? The purpose of the First Article Inspection is to provide objective evidence that all engineering design and specification requirements
QUALITY MANAGEMENT SYSTEM
2507 WEST GENEVA DRIVE TEMPE, ARIZONA 85282 TEL: 602.231.8616 FAX: 602.273.9135 QUALITY MANAGEMENT SYSTEM TABLE OF CONTENTS TABLE OF CONTENTS... 2 Phoenix Logistics Vision Statement... 3 1.0 SCOPE... 4
Table of Contents 1. SCOPE... 3 2. APPLICABLE DOCUMENTS... 4 3. TERMS AND DEFINITIONS... 4 4. QUALITY MANAGEMENT SYSTEM...4-8
Table of Contents 1. SCOPE... 3 2. APPLICABLE DOCUMENTS... 4 3. TERMS AND DEFINITIONS... 4 4. QUALITY MANAGEMENT SYSTEM...4-8 5. MANAGEMENT RESPONSIBILITY...8-9 6. RESOURCE MANAGEMENT... 10 7. PRODUCT
ARKANSAS TECH UNIVERSITY
ARKANSAS TECH UNIVERSITY INVENTORY CONTROL MANUAL SEPTEMBER 2005 PROPERTY MANAGEMENT OFFICE 204 BRYAN EXT. 6087 FAX 968-0227 INTRODUCTION The purpose of this Inventory Manual is to present a uniform method
Acceptance Codes APPENDIX - A. Acceptance Criteria
1111 Receipt of a satisfactory Test Report from WSDOT Materials Laboratory is required indicating the lot (or lots) or batch of material meets the requirement of the specifications under which it is listed.
CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES
1.0 SCOPE CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES This document establishes the minimum quality program requirements for a contractor providing equipment, material, and construction
FAR 15.408 Table 15-2 -- Instructions for Submitting Cost/Price Proposals When Cost or Pricing Data Are Required
FAR 15.408 Table 15-2 -- Instructions for Submitting Cost/Price Proposals When Cost or Pricing Data Are Required This document provides instructions for preparing a contract pricing proposal when cost
Chapter 10 Receiving, Inspection, Acceptance Testing and Acceptance or Rejection
Chapter 10 Receiving, Inspection, Acceptance Testing and Acceptance or Rejection Table of Contents Receiving, Inspection, Acceptance Testing and Acceptance or Rejection...1 Chapter 10...3 Receiving, Inspection,
14620 Henry Road Houston, Texas 77060 PH: 281-447-3980 FX: 281-447-3988. WEB: www.texasinternational.com QUALITY MANUAL
14620 Henry Road Houston, Texas 77060 PH: 281-447-3980 FX: 281-447-3988 WEB: www.texasinternational.com QUALITY MANUAL ISO 9001:2008 API Spec Q1, 9th Edition API Spec 8C 5 Th Edition MANUAL NUMBER: Electronic
QT-2 QUALITY MANUAL Written to the requirements of ASME NQA-1-2008 & 09a and 10 CFR Part 21. Revision: 14
QT-2 QUALITY MANUAL Written to the requirements of ASME NQA-1-2008 & 09a and 10 CFR Part 21 Revision: 14 SPRINGS FABRICATION, INC. ADVANCED TECHNOLOGY GROUP 2685 Industrial Lane Broomfield, CO 80020 Controlled
QUALITY MANUAL REVISION RECORD
Page 2 of 31 REVISION RECORD Date Rev Description Jun 18, 2007 N/C Original Issue Sep 16, 2009 A Update to ISO 9001:2008 Standard. Feb 04, 2010 B Revised exclusions, removed (Except 7.3.7 from the exclusion
Section 700 Fixed Assets
Section 700 Fixed Assets Section 701 Definition Fixed Assets Section 702 Responsibility for Fixed Assets Section 703 Inventory of Fixed Assets Section 705 Inventory Shortage Procedures Section 706 Inventory
Specialties Manufacturing. Talladega Castings & Machine Co., Inc. ISO 9001:2008. Quality Manual
Specialties Manufacturing Talladega Castings & Machine Co., Inc. ISO 9001:2008 This document is the property of TMS and may not be reproduced, wholly, or in part, without the express consent of TMS. Rev.
SUBJECT: WAREHOUSE FACILITIES ORDERING, RECEIVING, SECURING, STORING, AND DISPENSING MATERIALS.
MIAMI-DADE AVIATION DEPARTMENT STANDARD OPERATING PROCEDURES PROCUREMENT AND COMMODITIES DIVISION SOP No. 03-01 Effective: July 25, 2003 SUBJECT: WAREHOUSE FACILITIES ORDERING, RECEIVING, SECURING, STORING,
Q2A First Article Inspection (FAI) AS9102 * Revised ** Added
Page 1 of 5 Q2A First Article Inspection (FAI) AS9102 * Revised ** Added NOTE: A hard copy of this document may not be the document currently in effect. The current version is always the version on the
4 FAH-2 H-210 CHECK STOCK, SIGNATURE DIE, INTERNAL CONTROLS AND FILE MANAGEMENTS
4 FAH-2 H-200 CHECK STOCK, SIGNATURE DIE, INTERNAL CONTROLS AND FILE MANAGEMENTS 4 FAH-2 H-210 REQUISITIONING, RECEIVING, AND CONTROLLING CHECK STOCK, AND SIGNATURE DIE (Office of Origin: CGFS/FPRA/FP)