Purchase Order Clauses and Conditions
|
|
|
- Barbara Rosanna Kennedy
- 9 years ago
- Views:
Transcription
1 Purchase Order Clauses and Conditions All purchase orders for materials, special processes, machining and fabrication services and end items are subject to the following requirements: General Requirements: 1. The terms Item(s), (including item(s) with lower case i ), PO, and Buyer as used herein, have the same meaning as terms Work, Contract, Supplier, and Cyclone Manufacturing, respectively. 2. Cyclone Manufacturing Inc. will be reference to herein as Buyer or Cyclone. 3. The recipient of the purchase order will be referenced to herein as the Supplier. 4. The Supplier may not subcontract the work or any portion of the work without prior written consent of the Buyer. 5. This Purchase Order is subject to cancellation by the Buyer if the supplies / services are not delivered in accordance with the schedule specified on the purchase order. 6. Cyclone reserves the right to extend the ship date and (or) cancel or change any item in its entirety, with no penalty or cancellation charges, by giving written notice at least six (6) calendar weeks prior to ship date. 7. Language - Unless otherwise authorized by Buyer in writing, all records, reports, specifications, drawings and other documentation shall be in English. 8. Supplier is responsible to ensure that all material used in the manufacture or processing of the purchase order are obtained from end customer approved sources and have proper certification. 9. Supplier shall establish controls to ensure that material subject to age control, shelf life, or environmental controls are properly identified, monitored and maintained. 10. Supplier must control drawings, specifications and supplemental instructions and changes thereto to the extent necessary to ensure that only documents of the revisions specified in the PO are utilized. 11. Supplier shall maintain a system to ensure removal of obsolete documentation from the manufacturing, inspection and test areas. 12. In order to receive any Boeing electronic data, the Supplier must be DPD approved. 13. Notification Supplier shall notify Buyer when: a. Supplier or Supplier s sub-tiers are found to be non-compliant to Buyer specifications, b. Supplier s sub-tier is disapproved by Supplier c. Supplier or Supplier s sub-tier are disapproved by a Government Agency, d. Government/Industry Data Exchange Program ( GIDEP ) Alert is required or received affecting Buyer items. 14. Access to Facilities The buyer, its customers and regulatory authorities reserves the right of access to the applicable areas of the Supplier s facilities, and its sub-tiers, involved in the order to review the progress of work, review applicable supporting records and perform required audits as per AS9100 standard. 15. The Supplier is responsible to flow down the requirements outlined in this document to its applicable sub-tiers. 16. The Supplier shall not violate any basic working conditions and human rights Form CYC QP 6-F06 1 of 6 Rev 7 (Dec )
2 Quality Requirements 1. The Supplier shall maintain an accredited and documented Quality Management System, such as ISO 9001, AS9100, or TS16949, that is subject to review, audit or approval by Cyclone Manufacturing Inc. or Cyclone s customers. 2. Buyer s Quality Assurance or Buyer s customer or regulatory agencies may perform inprocess inspection and quality systems surveillance at Supplier s facilities. Work to be performed which is related to Buyer s end items and/or spares is subject to Buyer s periodic audit of Supplier s conformance with their internal procedures and other applicable documentation, including prior to identification by Supplier of such end items and/or spares to the Buyer s program. 3. Article to be delivered under the purchase order shall be subject to inspection as follows: a. Buyer s Quality Assurance or Buyer s customer or regulatory agencies will inspect, at Supplier s plants, all items which are to be delivered to the Buyer if a source inspection requirement is specifically called out on the PO. This includes witnessing of the Acceptance Tests. b. Buyer s Quality Assurance will inspect, at Supplier s plants, supplies to be delivered from Supplier to another Buyer s subcontractor if a source inspection requirement is called out on the PO. c. Supplier shall prepare and present to the Buyer s quality Assurance Representative the Acceptance Documentation and Records package required by the Purchase Order for each deliverable end item. This includes the Certificate of Conformance. d. Verification by the customer (buyer or buyer s customer) does not absolve the supplier of the responsibility to provide acceptable product and not preclude subsequent rejection by the customers. 4. The following documents must accompany the shipment: a. Manufacturer Certificate of Conformance and Material Test Report b. Distributor Certificate of Conformance c. NAFTA Certificate of Origin 5. Manufacture and process completely to the requirements of the drawing, all specifications referenced therein, and all P.O. requirements, including such items as part marking, identification, inspection, stamps, certification, inspection records, etc. All special processes that are called out on the PO, engineering drawings or specifications must be carried out by OEM approved sources as follows: a. For all Boeing products the Supplier must utilize approved sources per D b. For all Lockheed Martin Aeronautics products the Supplier must utilize approved sources per QCS-001. c. For all Bombardier Aerospace products that Supplier must utilize approved sources per QD Manufacturing and Inspection Control is required on this order. The Supplier s documented quality system shall provide for the review of the PO, Manufacturing and Inspection plans, to ensure that quality requirements are incorporated into the manufacturing planning, and inspection and test instructions, as applicable, to assure compliance with the PO. Supplier shall retain evidence of such review. Supplier shall utilize only written instruction plans for all manufacturing, processing and inspection operations. Buyer will provide to Supplier all required customer specification once requested. Form CYC QP 6-F06 2 of 6 Rev 7 (Dec )
3 7. The sell/supplier who produces the parts shall not allow to perform any operation of welding restoration and correction unless the Supplier/supplier receives a written agreement from buyer, except those the relevant specifications or drawings incorporated in the contract specified otherwise. 8. The supplier shall submit a First Article Inspection (FAI) report for each deliverable item on this order. This report may be in any format suitable to the supplier's system but must contain variable data for 100% of all drawings characteristics and account for 100% of all other features such as drawing notes and processes and must be representative of production processes actually used. The FAI report shall be consistent with the requirements of AS9102 (latest revision), Aerospace First Article Inspection Requirement. All FAI submissions and supporting documentation must be forwarded electronically to your specific purchasing agent and Quality Manager at Cyclone prior to the delivery of the first production lot. The Supplier shall retain one copy of the AS9102 FAI Report as evidence of FAI approval. Products already accepted by FAI shall repeat FAI or delta FAI under the following conditions: a. A change affecting fit, form or function of the part. b. A change in manufacturing source(s), process(es), inspection method(s), location of manufacture, tooling or materials, that can potentially affect fit, form or function. c. A change in numerical control program or translation to another media that can potentially affect fit, form or function. d. A natural or man-made event, which may adversely affect the manufacturing process. e. A lapse in production of two years. 9. In the event that the Supplier is supplying parts including the material the Supplier shall deliver with each shipment a copy of the original Mill/Manufacturer s Certificate of conformance (CofC) indicating that the material/articles supplied on this Purchase order meet all Purchase order requirements and that objective evidence is on file for Buyer s review to substantiate such certification. If Supplier is not the material manufacturer, then a Supplier s Certificate of conformance is required in addition to the material manufacturer s Certificate of Conformance. Supplier shall mark the name of Mill/Manufacturer, Manufacturing Lot/Batch number or Heat Treatment number on each package and CofC document of supplies. Supplier must acknowledge and confirm that all sources of Supply and Manufacturer of materials(s) to be purchase under this purchase order are approved by the respective OEM that the end item is designated for and are also approved by the OEM for the relevant specification to which they are being purchased and that in the event Supplier reaches this requirements, Supplier shall assume sole and exclusive risk, liability and expense whatsoever without limitation in the removal, re-supply and/or replacement of such materials form approved sources for the item(s) in question. Further, in the event of such breach, Buyer expressly reserves all rights and remedies if any, provided by this purchase order, in equity or at law. 10. The Certificate of Compliance from the Supplier must be signed by a responsible member of the supplier s Quality Organization and stating "the parts conform in all respect to the Purchase Order/Contract, drawings and applicable specifications" and contain the following information: a. Supplier's company name b. Drawing and/or specification number(s) and revision(s) c. Applicable process specification and revision status, d. Serial number(s)/date code/lot number(s) as applicable e. Waivers or deviations approved by Cyclone. f. Cyclone Purchase Order number Work Order number (Lot number) g. Quantity shipped Form CYC QP 6-F06 3 of 6 Rev 7 (Dec )
4 h. Part number and revision level as described on the Cyclone Purchase order i. Material size and specifications as described on the Cyclone Purchase Order j. Statement of trace-ability k. All special customer requirements that may be defined in customer special process specifications or customer clauses l. The final Customer approval identity (e.g. Airbus, Boeing, etc) The certificate of compliance, must accompany the shipment. Almen strips must be supplied for shot peening operations. Examples of these (but not limited to) are: special processes including thermal, metal conditioning and working, welding, brazing, soldering, surface conditioning and coating, non-destructive testing and other miscellaneous processes. 11. Batch Traceability: All items on this order must be traceable to the raw material batch/cyclone lot #/heat batch # and source from which they were produced. 12. Absolute Traceability: The Batch traceability and identification (i.e. Serial numbers) of all items on this order must be ensured and maintained at all times. All items must be traceable to all processes to which they have been subjected. 13. The supplier shall furnish a functional test report for each item shipped. The test report shall contain the actual results of all functional tests required by the Purchase Order/Contract, drawing, specifications or acceptance test procedure (ATP). 14. The Purchaser or his representative shall be afforded the right to verify at source or upon receipt that the purchased product conforms to specified requirements. All records relating to the requirements on this P.O. shall be kept on file for a minimum of 10 years from the shipment date and made available for review by a Cyclone Representative upon request. Any records related to this P.O. shall not be discarded or destroyed without the consent and approval of Cyclone. 15. Non-conforming material shall be identified and reports submitted to Cyclone for disposition. No non-conforming material may be shipped without written authorization from Cyclone. A copy of the dispensation must accompany the shipment. Any non-conforming material shipped under license of Cyclone shall be conspicuously marked and traceable to the reports submitted. 16. Non-conformances affecting fit, form, function, interchangeability and/or safety shall be identified and reports submitted to Cyclone for disposition. No such non-conforming material may be shipped without written authorization from Cyclone. Records of all other nonconformances shall be retained by the supplier and may be requested for submission to Cyclone on a periodic basis. If any product delivered to Cyclone is determined to be non-conforming, the Seller shall provide Cyclone with written notification within 24 hours. Notification shall contain a description of the non-conformance including all affected part numbers, quantities, purchase orders and delivery dates. 17. "Limited Life" material supplied on this order must be accompanied by a Certificate of Conformance signed by a responsible member of the supplier's Quality organization stating the date of manufacture and the manufacturer's lot number and the expiration/cure dates. 18. Tooling manufactured for this order must be physically identified with a Cyclone serial number, contract number and project identification as a minimum. Such data will be provided, upon request, prior to shipment to Cyclone. 19. The goods covered by this Purchase Order shall be packed by the Vendor for shipment to Cyclone at destination in a manner that protects the part(s) from damage during transit and, Form CYC QP 6-F06 4 of 6 Rev 7 (Dec )
5 unless otherwise specifically provided for on the face of this Purchase Order, the price or prices of the goods therein specified include all costs of packaging. 20. All goods covered by this Purchase Order will be subject to later recount and inspection. If any of the goods are found at any time to be defective in material or workmanship, or are otherwise not in conformity with the requirements of the order, Cyclone, in addition to any other rights which it may have under warranties or otherwise, shall have the right to reject, return and recover costs at the Vendor's expense, with such goods not being replaced without written authorization from Cyclone. 21. All goods are to be shipped in accordance with the terms of the Purchase Order. On collect shipments, goods must be shipped on a regular standard service unless otherwise authorized by Cyclone. 22. This order may be DPAS rated for National Defense use. When a DPAS rating is entered on Cyclone PO this order will take priority over any other work as per the Defense Priorities and Allocation Systems Regulation (15 CFR 700). This requirement must be flowed down to all subcontractors of the Supplier. 23. In the case of Lockheed-Martin product P.O s the requirements of the LM quality clause Q4R foreign object debris/damage (FOD) prevention shall be followed. 24. The supplier providing product and/or services shall notify Cyclone of changes in product and/or process, changes of supplier, changes of manufacturing facility location and, where required, obtain approval prior to implementation. 25. For Lockheed Martin product P.O s, the Counterfeit Parts Prevention requirement of Appendix QX shall be followed: a) For purposes of this clause, Work consists of those parts delivered under this Contract that are the lowest level of separately identifiable items (e.g., articles, components, goods, and assemblies). "Counterfeit Work" means Work that is or contains items misrepresented as having been designed and/or produced under an approved system or other acceptable method. The term also includes approved Work that has reached a design life limit or has been damaged beyond possible repair, but is altered and misrepresented as acceptable. b) SELLER agrees and shall ensure that Counterfeit Work is not delivered to LOCKHEED MARTIN. c) SELLER shall only purchase products to be delivered or incorporated as Work to LOCKHEED MARTIN directly from the Original Component Manufacturer (OCM)/Original Equipment Manufacturer (OEM), or through an OCM/OEM authorized distributor chain. Work shall not be acquired from independent distributors or brokers unless approved in advance in writing by LOCKHEED MARTIN. d) SELLER shall immediately notify LOCKHEED MARTIN with the pertinent facts if SELLER becomes aware or suspects that it has furnished Counterfeit Work. When requested by LOCKHEED MARTIN, SELLER shall provide OCM/OEM documentation that authenticates traceability of the affected items to the applicable OCM/OEM. 26. Any supplier processing parts for Cyclone Manufacturing (Supplier Code ) to Lockheed Martin QCS-001 controlled specifications shall comply with the following requirement. Processing to be accomplished in performance of this purchase order is directly related to a Lockheed Martin Aeronautics Company purchase order and must be accomplished in accordance with process specification(s) on this purchase order and the revision in effect as of the date of this PO of Lockheed Martin Aeronautics Company Appendix QJ. All requirements of such Appendix QJ paragraph 12. a. - f. shall be accomplished. Appendix QJ is located at Form CYC QP 6-F06 5 of 6 Rev 7 (Dec )
6 27. The Supplier must stipulate if the delivered goods (hardware, software or technology) are subject to Export Control Legislation (ITAR/CGP) 28. For all materials categorized as dangerous goods the Supplier is committed to notify in writing any changes to the item using a material data sheet Form CYC QP 6-F06 6 of 6 Rev 7 (Dec )
Supplier Quality Requirements F16 Program
ISRAEL AEROSPACE INDUSTRIES LTD. MILITARY AIRCRAFT GROUP, LAHAV DIVISION DOCUMENT IDENTIFIER : WF16Z/150901 Supplier Quality Requirements F16 Program RESTRICTION ON USE, DUPLICATION, OR DISCLOSURE OF PROPRIETARY
Supplier Quality Assurance Requirements Manual
12716 EAST PINE STREET TULSA, OK 74116 Supplier Quality Assurance Requirements Manual Approved: Mike Collins Quality Assurance Manager Precise Machining & Manufacturing 1 Record of Revisions Revision D
Helical Products Co., Inc.
Q01 GENERAL REQUIREMENTS 1. Supplier Responsibilities 1.1. Delivery Certification By delivering products or services on the Contract, the Supplier certifies that such products or services are in compliance
GLOBAL AEROSPACE PROCEDURE
1 of 13 1. PURPOSE: This procedure establishes the minimum PPG Aerospace requirements for a Supplier's Quality Plan. These requirements pertain to the documentation and inspection/testing necessary to
Bogue Machine Company, Inc. Business Instruction
Bogue Machine Company, Inc. Business Instruction Document Title: Supplier Quality Control Requirements Document Number: Revision: Document Owner: Mark Bogue Backup Owner: Craig Bogue Parent Document: PURP-004,
Supplier Quality. Assurance Provisions. Manual. SQAP-001 Rev. E
9060 WINNETKA AVENUE NORTHRIDGE, CA 91324 USA Supplier Quality Assurance Provisions Manual SQAP-001 Revision E Page 1 of 14 Table of Contents 1 General Requirements... 4 1.1 Supplier Control... 4 1.2 Supplier
Supplier Quality Requirements and Clauses
Supplier Quality Requirements and Clauses Supplier Quality Requirements General The following Quality Notes (QN01 through QN19) apply to and form a part of all Purchase Orders issued by Advanced Conversion
Chandler-Arrow Division Arrow Supplier Quality Requirements
AQR-1 QUALITY SYSTEM Supplier must maintain a quality system that meets, as a minimum, the requirements of ISO9001-2008, unless otherwise directed by Chandler-Arrow Division QA organization. Immediate
Cessna - Interiors Manufacturing Facility (IMF) Supplier Quality System Requirements
Cessna - Interiors Manufacturing Facility (IMF) Supplier Quality System Requirements Wichita KS Effective: 3-11-15 Rev. IR Page 1 of 6 1.0 Introduction This document establishes Cessna Interiors Manufacturing
Q2A First Article Inspection (FAI) AS9102 * Revised ** Added
Page 1 of 5 Q2A First Article Inspection (FAI) AS9102 * Revised ** Added NOTE: A hard copy of this document may not be the document currently in effect. The current version is always the version on the
IEC Electronics Terms and Conditions
IEC Electronics Terms and Conditions 1. General: This Purchase Order is placed subject to these terms and conditions including those within the Purchase Order. The terms of any proposal referred to in
Supplier Quality Assurance Requirements Manual
1701 West Tacoma Broken Arrow, Ok. 74012 Supplier Quality Assurance Requirements Manual Approved: Bryan Sanderlin President/COO/CEO OSECO, Inc. Darrel Bilke Quality Assurance Manager OSECO, Inc. 1 Record
QCI 012.4 Counterfeit Avoidance and Mitigation Procedure
Page 1 of 6 Dept.: Quality Number: Counterfeit Avoidance and Mitigation Procedure Date Issued: 5/13/14 Supersedes Issue Dated: 2/13/14 Issued By: Lorenzo Belluccia, Quality Engineer Issuing Dept. Approval:
Appendix QX. Supplier Quality Requirements
Appendix Q Appendix Q Supplier Quality Requirements The latest issue to this document is the version that is available on the Lockheed Martin Aero website: http://www.lockheedmartin.com/us/aeronautics/materialmanagement.html
PURCHASE ORDER APPENDIX QP 7.0-09 PROCUREMENT QUALITY CLAUSES
PURCHASE ORDER APPENDIX QP 7.0-09 PROCUREMENT QUALITY CLAUSES Buyer" = PCA Aerostructures Company "Seller" = Vendor, Supplier, Subcontractor, and/or Agents/Representatives 1.0 PURPOSE This document establishes
Appendix QX. Supplier Quality Requirements
Supplier Quality Requirements The latest issue to this document is the version that is available on the Lockheed Martin Aero website: http://www.lockheedmartin.com/us/aeronautics/materialmanagement.html
Product Order Quality Requirements Meggitt (Orange County), Inc.
Product Order Quality Requirements Meggitt (Orange County), Inc. Reference QP8-051, Purchase Order Quality Requirements QP8-055, Review/Control Supplier Documentation PP-401, Quality Assurance Codes 50-2-351,
INTRODUCTION: PURPOSE:
UMBRA CUSCINETTI, INC. 2916 100 th Street SW Everett, WA 98204-1340 USA 425-743-2577 FAX: 425-347-0682 Printed versions may not be the latest. Suppliers shall utilize the latest version which can be found
PPI/TZ Standard Quality Requirements for Suppliers -SQRS-
PPI/TZ Standard Quality Requirements for Suppliers -SQRS- AS9100, ISO 13485 and ISO 9001 Revision: November 16, 2015 For questions concerning Standard Quality Requirements for Supplier (SQRS), please contact
KOLLMORGEN. Title: Standard Operating Procedure Counterfeit Parts
Approved By: Elliott Major Date: 11-19-09 Page 1 of 9 Rev ECO Date Approve Rev ECO Date Approve A R01_13541 07-23-10 DWL B R01_14787 12-15-11 DWL C R01_14910 03-07-12 DWL D R01_14964 04-16-12 DWL 1.0 Purpose
L-3 Communications Corporation AMI Purchase Order Supplement No. 3 Quality Assurance
Q10 QUALITY SYSTEM REQUIREMENTS Q10A Q10B ISO 9001:2008 Seller s quality system shall be in compliance with the requirements of ISO 9001, Model for in Design, Development, Production, Installation and
ATTACHMENT "Q" PURCHASE ORDER QUALITY CLAUSES
1 of 8 Q0. Instructions: Review your Purchase Order for any Q clauses listed below. Specific clauses other than Q0 apply only when listed on the PO. All certifications provided to CAI are to be complete,
Gulfstream Production Certificate Operations
SUPPLIER QUALITY ASSURANCE SYSTEM REQUIREMENTS SQAR 0001 REV D Supplier s Quality System David H. Trucksis Donald A. Strickland R. Christiansen PREPARED BY: REVIEWED BY: APPROVED BY: Robert W. Mullen Jr.
SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE
Company Name Street Address City, State, Zip code Phone Number Fax Company Website Email Address ORGANIZATION NAME PHONE NUMBER EMAIL ADDRESS President/CEO General Manager Engineering Manager Production
PPG AEROSPACE SUPPLIER QUALITY CONTROL REQUIREMENTS
PPG AEROSPACE SUPPLIER QUALITY CONTROL REQUIREMENTS Approved By Claude Rigsby Sourcing Manager Approved By Doug Nixon Manager,Quality Assurance PPG Industries, Inc. - PPG Aerospace Transparencies 1719
Quality Assurance Provisions
Page 1 of 5 1. Purpose and Scope. The purpose of this document is to define the Quality Assurance Provisions FLIR Systems Inc. requires for inventory material received from Suppliers. This document applies
Quality Assurance Requirements. For. Pratt & Whitney/Space Propulsion, Chemical Systems Division
Quality Assurance Requirements For Pratt & Whitney/Space Propulsion, FORM 06.13.02.02 (REV. 6) Page 1 of 14 Table of Contents SECTION I QUALITY SYSTEMS REQUIREMENTS... 5 1. QUALITY ASSURANCE PROGRAM...
RTP s NUCLEAR QUALITY ASSURANCE PROGRAM
RTP s NUCLEAR QUALITY ASSURANCE PROGRAM RTP operates under one quality program, whether you purchase products that are commercial grade, nuclear safety-related or industrial safety compliant (IEC 61508).
GARDNER AEROSPACE SUPPLIER QUALITY REQUIREMENTS MANUAL
GARDNER AEROSPACE SUPPLIER QUALITY REQUIREMENTS MANUAL Issue Number: 1 Issue Date: 12/9/14 1 of 19 Contents Revision Summary... 4 1.0 Introduction... 5 2.0 Supplier Quality System Requirements... 6 3.0
How To Ensure Quality Assurance
1001 Robb Hill Road Oakdale, PA 15071-3200 412/923-2670 PROCUREMENT SPECIFICATION: SUPPLIER QUALITY MANAGEMENT SYSTEM REQUIREMENTS Specification Number: ATI-QA-703, Rev 4 Date: 11/12/13 Page: 1 of 7 Written
QUALITY MANUAL REVISION RECORD
Page 2 of 31 REVISION RECORD Date Rev Description Jun 18, 2007 N/C Original Issue Sep 16, 2009 A Update to ISO 9001:2008 Standard. Feb 04, 2010 B Revised exclusions, removed (Except 7.3.7 from the exclusion
Q2A First Article Inspection (FAI) AS9102
Page 1 of 7 Q2A First Article Inspection (FAI) AS9102 A hard copy of this document may not be the document currently in effect. The current version is always the version on the Lockheed Martin network.
New Program Quality Requirements for Suppliers (NPQR) For Limited Manufacturing of Components and/or Processes for Engineering Certification
New Program Quality Requirements for Suppliers (NPQR) For Limited Manufacturing of Components and/or Processes for Engineering Certification Revision A New Program Quality Requirements for Suppliers Rev.
Turbo Resources International Quality Procedure
TURBO RESOURCES INTERNATIONAL QUALITY MANAGEMENT SYSTEM MANUAL APPROVALS: Revision : 46 Page : 1 of 53 TABLE OF CONTENTS INTRODUCTION 3 1. SCOPE 4 1.1 GENERAL 4 1.2 APPLICATION 5 2. NORMATIVE REFERENCE
UNCONTROLLED COPY FOR REFERENCE ONLY
CLOVER MACHINE AND MFG. 800 MATHEW ST. #101 SANTA CLARA, CA 95050 727-3380 727-7015 fax REVISION: DATE: PAGE 1 OF 45 QUALITY POLICY MANUAL DISTRIBUTION LIST: President Purchasing Manager Vice President
Quality Requirements for Suppliers
ESC9100 Rev D Quality Requirements for Suppliers This document is the property of The United Technologies Aerospace Corporation and is loaned with the understanding that neither this document, nor any
2.1.1. Distributors In addition to the requirements noted herein, Distributors shall have a Quality System
1. Purpose This document defines requirements for suppliers providing aerospace and defense materials, products and services to Electromech Technologies. Supplier acceptance of a purchase order from Electromech
Self-Audit Checklist
Page 1 Company Name: Date of audit: Date of last audit performed: Name of person performing self-audit: Signature: Name of person responsible for quality system: Signature: Number of non-compliances: Page
Unincorporated changes to Revision J of the SPOC Manual UPDATED November 22, 2011
Aerospace Unincorporated changes to Revision J of the SPOC Manual UPDATED November 22, 2011 The SPOC Manual is controlled in Electronic format as presented on the Supplier Portal and Honeywell Intranet.
AS9100 Quality Manual
Origination Date: August 14, 2009 Document Identifier: Quality Manual Revision Date: 8/5/2015 Revision Level: Q AS 9100 UNCONTROLLED IF PRINTED Page 1 of 17 1 Scope Advanced Companies (Advanced) has established
ONTIC UK SUPPLIER QUALITY SURVEY
MAIL-IN / ONSITE This report is intended to furnish data relative to the Suppliers capability to control the quality of supplies and services furnished to Ontic UK. Please complete this Survey and return
Quality Supplier Requirements for Beckwith Electric Co., Inc.
Quality Supplier Requirements for Beckwith Electric Co., Inc. This Page Left Intentionally Blank To Our Valued Suppliers: One of the primary goals of Beckwith Electric is to provide the highest Quality
Flexible Circuits Inc. Purchase Order Standard Terms and Conditions
Flexible Circuits Inc. Purchase Order Standard Terms and Conditions 1. Acceptance- This writing, together with any attachments incorporated herein, constitutes the final, complete, and exclusive contract
Sargent Controls & Aerospace 5675 West Burlingame Rd. Tucson AZ 85743 PHONE: (520) 744-1000 FAX: (520) 744-8054
Sargent Controls & Aerospace 5675 West Burlingame Rd. Tucson AZ 85743 PHONE: (520) 744-1000 FAX: (520) 744-8054 SUPPLIER EVALUATION CHECKLIST Date: Vendor: Address: City, State, Zip: Web Site: Prepared
Purchase Order Attachment 1600 Revision 02 June-2006. Raytheon Aircraft Company Supplier Quality Requirements Document
Purchase Order Attachment 1600 Revision 02 June-2006 Raytheon Aircraft Company Supplier Quality Requirements Document Issued by: Raytheon Aircraft Company Supply Chain Management Quality Assurance 101
Surgi Manufacturing Quality Manual
Surgi Manufacturing Page 1 of 18 Approvals: QA: Eng. Mgt. : A Date: 18Aug98 1. Introduction... 4 1.1 Scope... 4 1.2 Purpose... 4 1.3 Authority... 4 1.4 Issue of the Manual... 4 1.5 Amendments... 4 1.6
Table of Contents 1. SCOPE... 3 2. APPLICABLE DOCUMENTS... 4 3. TERMS AND DEFINITIONS... 4 4. QUALITY MANAGEMENT SYSTEM...4-8
Table of Contents 1. SCOPE... 3 2. APPLICABLE DOCUMENTS... 4 3. TERMS AND DEFINITIONS... 4 4. QUALITY MANAGEMENT SYSTEM...4-8 5. MANAGEMENT RESPONSIBILITY...8-9 6. RESOURCE MANAGEMENT... 10 7. PRODUCT
Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature
Far West Technology, Inc. ISO 9001 Quality Manual Document No.: QM Revision: 0 Issue Date: 27 August 1997 Approval Signatures President/CEO Executive Vice President Vice President/CFO Change Record Rev
ALL PRODUCTS MFG & SUPPLY
ALL PRODUCTS MFG & SUPPLY 618 ANDERSON DRIVE ROMEOVILLE, IL 60446 PHONE: 877-255-8700 FAX: 877-255-8701 WWW. APGASKET.COM QUALITY MANAGEMENT SYSTEM MANUAL DATE: 11/20/12 REVISION 9.1 UNCONTROLLED COPY
Supplier Requirements Manual M M 0 3
Supplier Requirements Manual M M 0 3 Conformance to this manual is a requirement for all of Merrill Technologies Group and Ranger s suppliers & subcontractors, unless otherwise specified on purchase orders.
SUPPLIER Form #: 007 AUDIT QUESTIONNAIRE
1.0 BACKGROUND INFORMATION Company Name: Company Address: Phone Number: Fax Number: Number of years in business: Number of employees: Annual Sales in Dollars: Size of Facility in Square Feet: Name of Senior
QUALITY POLICY MANUAL Document: 01-090000 Revision: E Effective Date: January 15, 2010
Section i INTRODUCTION QUALITY POLICY STATEMENT: The purpose of our business is to provide continuity of electrical power to keep businesses in business. We do this by helping clients solve their power
Century Fasteners & Machine Co., INC. /CFMC PURCHASE ORDER
Century Fasteners & Machine Co., INC. /CFMC PURCHASE ORDER CONDITIONS AND INSTRUCTIONS A HARDCOPY OF THIS DOCUMENT MAY NOT BE THE DOCUMENT IN EFFECT. SEE CFMC DOCUMENT LIBRARY FOR CURRENT REVISION. 1.
Supplier Quality Assurance
Supplier Quality Assurance Preface We strive to continually improve our process performance by meeting quality objectives. It is imperative that our suppliers operate under the zero defects and 100% on
PERFORMANCE EXCELLENCE Procurement Standards
PERFORMANCE EXCELLENCE Procurement Standards AEROSPACE PRODUCTS Agile Revision: D Sparton Quality Policy: It is the goal of Sparton Corporation and it subsidiaries ( Sparton ) to deliver value through
GE Power Electronics Business Total Quality Management for Suppliers
GE Power Electronics Business Total Quality Author: Reviewers: Contributors: Alessandro A. Cervone Technical Manager Component & Reliability Engineering Alicia Scott Title Erika Nannis Title Robert Roessler
QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC.
QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC. Hattiesburg, MS Revision E 01/19/11 Revised to ISO 9001:2008 on July 9, 2009 JPM OF MISSISSIPPI, INC. MANAGEMENT QUALITY POLICY It is the goal of JPM of
QUALITY ASSURANCE PROVISIONS OF PURCHASE ORDER
QUALITY ASSURANCE PROVISIONS OF PURCHASE ORDER Lockheed Martin and LMC hereinafter shall mean Lockheed Martin Maritime Systems & Sensors, Maritime Security & Ship Systems (MS&SS), a Lockheed Martin Company.
How To Manage A Plant
MALAT 9100 QUALITY REQUIREMENTS For Suppliers of Category 12, 13 This Document is located in the Internet site http://www.iai.co.il/sip_storage/files/2/35782.pdf Date: March 2012 Prepared by : S. Migdal
SUPPLIER FIRST ARTICLE INSPECTION INSTRUCTIONS AND FORMS
SUPPLIER FIRST ARTICLE INSPECTION INSTRUCTIONS AND FORMS 1-4.10-FM-35, Rev. A Page 1 of 5 Page 2 of 5 SUPPLIER FIRST ARTICLE INSPECTION INSTRUCTIONS AND FORMS Document Name: Supplier First Article Inspection
Pacific Gas and Electric Company
Pacific Gas and Electric Company Supplier Quality Assurance Mission Statement Our mission is to assure that PG&E has a robust quality program that quantitatively measures supplier performance and drives
Aviation Suppliers Association Quality System Standard. ASA-100 Revision 4.0
Page 1 Aviation Suppliers Association Quality System Standard ASA-100 Revision 4.0 Original Issue: March 1994 Revision 4.0 Release Date: August 1, 2015 Effective Date: August 24, 2015 Copyright 1994-2015
DEC STD 017-2 - ISO 9002 - Quality Systems - Model for Quality Assurance in Production and Installation
Digital Internal Use Only DEC STD 017-2 - ISO 9002 - Quality Systems - Model for Quality Assurance in Production and Installation DOCUMENT IDENTIFIER: A-DS-EL00017-02-0000 Rev A, ABSTRACT: This standard
Quality Management System Manual
Quality Management System Manual Assurance ISO / AS Manual Quality Management System EXCEEDING ALL EXPECTATIONS Since our inception in 1965, Swiss-Tech has supplied the medical, aerospace, hydraulic, electronic
1) CERTIFICATE OF COMPLIANCE/CONFORMANCE
Standard Supplier Quality Requirements This document defines restrictions and quality system requirements applicable when goods and services are procured to SMART ELECTRONICS part numbers or Military,
MEGGITT GLOBAL STANDARD PURCHASING CONDITIONS
MEGGITT GLOBAL STANDARD PURCHASING CONDITIONS 1. Definitions In these conditions Buyer means the Meggitt company that places the order (acting where relevant through a business division). Seller means
New Program Quality Requirements for Suppliers (NPQR) For Limited Manufacturing of Components and/or Processes for Engineering Certification
New Program Quality Requirements for Suppliers (NPQR) For Limited Manufacturing of Components and/or Processes for Engineering Certification Revision - New Program Quality Requirements for Suppliers Rev.
074-8432-552 Page 1 of 7 Effective Date: 12/18/03 Software Supplier Process Requirements
Page 1 of 7 Software Supplier Process Requirements 1.0 QUALITY SYSTEM FRAMEWORK 1.1 QUALITY POLICY The Seller shall document and implement a quality program in the form of Quality manual or detailed Quality
NORTH AMERICA OPERATIONS. (Fairmont and Montreal Facilities) QUALITY MANUAL. Prepared to comply with the requirements of ISO 9001:2008
WEIGH-TRONIX CANADA ULC NORTH AMERICA OPERATIONS (Fairmont and Montreal Facilities) QUALITY MANUAL Prepared to comply with the requirements of ISO 9001:2008 Meets or exceeds the requirements for design,
Aviation Suppliers Association Quality System Standard. ASA-100 Revision 3.5
Page 1 Aviation Suppliers Association Quality System Standard ASA-100 Revision 3.5 Original Issue: March 1994 Revision 3.5 Release Date: September 1, 2008 Effective Date: November 1, 2008 Copyright 1994-2008
Cartel Electronics. AS 9100 Quality Systems Manual
Cartel Electronics AS 9100 Quality Systems Manual 1900 C Petra Lane Placentia, California 92870 Introduction Cartel Electronics, as a global supplier to the aviation, space, and space industries, has developed
VENDOR QUALIFICATION APPROVAL FORM
COMPANY INFORMATION: Company Name: Jet Aviation St. Louis, Inc. Address (Street, City, State) Other Property Locations: Website: Repair Station Certificate No. With Class Rating: Date of Last FAA Audit:
DOCUMENT. General Purchase Conditions
1. Scope 1.1 These general purchase conditions (hereinafter the GPC ) shall apply to all kinds of materials, articles, products and services related to them, (hereinafter Products ), offered, sold or supplied
Wesco Aircraft Europe Ltd. Purchase Order Terms and Conditions
1. PURCHASE ORDER ACCEPTANCE. These together with the Order Form to which these Terms and Conditions are attached (collectively, the Order ) constitute an offer by Wesco Aircraft Europe Ltd ( Buyer ).
MEDFORD FABRICATION CSC, INC. Quality System Manual. Date of issue: 03/25/2010 Revision : F
MEDFORD FABRICATION CSC, INC Quality System Manual Date of issue: 03/25/2010 Revision : F Table of Contents System Description 1.0 Introduction 2.0 Company Quality Policy 3.0 Organization Charts 4.0 Quality
TERMS AND CONDITIONS OF SALE. Quotations, Purchase Orders, Acknowledgements, Packing Lists/Slips, Invoices & Credits
Quotations, Purchase Orders, Acknowledgements, Packing Lists/Slips, Invoices & Credits All quotations of Seller ( Quotations ) and purchase orders of Buyer ( Purchase Orders ) shall be subject to these
SUPPLIER QUALITY ASSURANCE REQUIREMENTS
SUPPLIER QUALITY ASSURANCE REQUIREMENTS The following supplier quality assurance requirements, referenced by number on the Purchase Order, are an integral part of each order placed by Continental Disc
CORPORATE QUALITY MANUAL
Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance
AVNET Logistics & EM Americas. Quality Manual
AVNET Logistics & EM Americas Quality Manual Avnet is committed to ensuring customer satisfaction while meeting all customer and applicable legal, statutory and regulatory requirements. This is accomplished
QP-740. Supplier Management Handbook
QP-740 Supplier Management Handbook Revision H Revision Date Reason Signature - 2/02/08 Initial Release Avis Rosenfield A 12/10/10 Complete update Ritchie Lacson B 4/14/11 Add sections: 6.4, 6.5, 9.9,
Karas Engineering AS9100 QUALITY MANAGEMENT SYSTEM MANUAL
Karas Engineering AS9100 QUALITY MANAGEMENT SYSTEM MANUAL Revision D October 27, 2015 Statement of Commitment and Authority Commitment This Quality Management System Manual (QMSM) delineates the processes,
SUPPLIER QUALITY MANAGEMENT SPECIFICATION MANUAL
SUPPLIER QUALITY MANAGEMENT SPECIFICATION MANUAL 1. PURPOSE SCM 502 Issued: 02/20/06 Revision: 20 Page: 1 of 12 DISTRIBUTOR QUALITY MANAGEMENT SYSTEM REQUIREMENTS 1.1 This specification stipulates the
Anti-Counterfeit Policy Mouser has adopted this Anti-Counterfeit Policy to eliminate the impact of counterfeit products on Mouser and its customers.
QS-PR-024 Anti-Counterfeit Control Plan Approved by: Chuck Amsden Approved 1/19/15 This procedure is current and approved when viewed on-line. The procedure becomes uncontrolled when printed. Uncontrolled
Counterfeit Parts Prevention
Counterfeit Parts Prevention 1 Introduction / Objectives Counterfeiting is an age-old issue, but is growing in exponential proportions with respect to the types of: Products being counterfeited Industries
Plan QAQ-82-001 Supplier Quality Requirements (Rev 10)
1.0 Purpose To outline Insitu s quality management system requirements for suppliers. 2.0 Scope This document applies to suppliers and subcontractors that provide products and/or services that affect the
AMETEK Airtechnology Group Ltd
Page 1 of 16 AMETEK Airtechnology Group Ltd Locations: Airscrew Muirhead Aerospace Traxsys Input Products 111 Windmill Road, Sunbury on Thames, Middlesex, TW16 7EF Oakfield Road, Penge London SE20 8EW
QT-2 QUALITY MANUAL Written to the requirements of ASME NQA-1-2008 & 09a and 10 CFR Part 21. Revision: 14
QT-2 QUALITY MANUAL Written to the requirements of ASME NQA-1-2008 & 09a and 10 CFR Part 21 Revision: 14 SPRINGS FABRICATION, INC. ADVANCED TECHNOLOGY GROUP 2685 Industrial Lane Broomfield, CO 80020 Controlled
STEEL fabrication quality SySTEmS guideline
STEEL fabrication quality systems guideline Copyright 2002 by Canadian Institute of Steel Construction All rights reserved. This book or any part therof must not be reproduced in any form without written
Supplier Handbook Terms and Conditions
* 2 / 7 TABLE OF CONTENTS 1. Section 1 Introduction 1.1. Objective 1.2. Scope 1.3 Contact Information 2. Section 2 Quality Expectations 2.0 Application of This Section 2.1 Change Notification 2.2 Quality
Generic CMMS Quality Assurance Plan
Generic CMMS Quality Assurance Plan Scope In accordance with the Quality Policy, the Quality System of CMMS is based upon the requirements and structure of ISO (the International Organization for Standardization)
VEHICULAR EQUIPMENT PURCHASE EXHIBIT. This Exhibit modifies the Terms and Conditions for Materials and Related Services:
VEHICULAR EQUIPMENT PURCHASE EXHIBIT This Exhibit modifies the Terms and Conditions for Materials and Related Services: The following definitions are added to DEFINITIONS of the Terms and Conditions. Contract:
Supplier Quality Requirements Manual SQRM
Supplier Quality Requirements Manual SQRM Approval: Signature on File: 5/25/2016 Beverly Green Director of Corporate Quality Signature on File: 5/25/2016 Brian McCarthy Executive Director of Material Page
GENERAL WELDING & FABRICATING, INC. 991 Maple Road Elma, New York 14059
QUALITY MANUAL GENERAL WELDING & FABRICATING, INC. 991 Maple Road Elma, New York 14059 Distribution: Position Location Copy # President / CEO Office 1 Operations Manager Office 2 Quality Assurance Office
Quality System Manual
Chalmers & Kubeck, Inc. Quality System Manual ISO 9001:2008 Control #:00 Rev. 4 (02-01-11) Chalmers & Kubeck, Inc. Quality System Manual Scope Chalmers & Kubeck Inc. is a job shop that performs new manufacturing
Purchase Order Terms and Conditions Beloit College
Purchase Order Terms and Conditions Beloit College Accounting Office 608-363-2205 (Tim Miles Controller) 608-363-2206 (Deb Sperry Accounts Payable) 608-363-2897 (fax) The purpose of these terms and conditions
Independent Distributor / Broker - Requirement Specification / Questionneire Version 3. exceet electronics
exceet electronics Independent Distributor / Broker - Requirement Specification / Questionnaire This document details the responsibilities for Independent Distributors / Brokers to assure the use of authentic
TT electronics IMS Supplement to Purchase Order Quality Clauses TT electronics Purchase Order
Q01 Quality System Requirements The supplier shall establish and maintain a quality system that conforms to the requirements of ISO 9001:2008 or AS9100 Rev. C Q02 Supplier s Quality Plan The supplier shall
Quality Management System Manual Revision L
This Page 1 of 35 of the Quality Management System Manual If issued as a controlled copy, the serial number of this copy is Quality Management System Manual Certified to AS9100 Revision C Printed copies
