A59 A29 A16 A17 A58 Roosendaal

Similar documents
MEGAHUB LOGISTICS CENTER Center of Consumers. Hämeenlinna Lahti Turku Tampere

the location warehouse Port of moerdijk

Antwerp East Port Logistic Campus

LogisticsCentre IV Distribution Center

LogisticsCentre IV Distribution Center

Executive Flight Office & Hangar

100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

SPECIFICATIONS FOR VASWANI BRENTWOOD PROJECT. RCC Framed Structure confirming with zone II seismic detailing. Reinforced Cement Concrete

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year

Data Center Due Diligence List

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

LOGISTIC INVESTMENT OPPORTUNITY MOERDIJK ORIONWEG 6

50 St Mary Axe London EC3

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

Saint Cloud Business Center

Conclusions. How to optimize your. Medtec Supply Chain in Europe

164,491 SF Food Production Facility Situated on 10 Acres Available in

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

How To Plan A Building

NAHB PRODUCT DEFINITION

LITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE -

AT&T Internet Data Center Site Specification - Phoenix Area (Mesa, AZ)

The UPLANDS at ORO VALLEY Sterling Features

START OFF AT The MOST STRATEGIC LOCATION

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

Product description NCC Data Center

Current as of 11/10/08 1 of 1

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3

SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME)

Location. Central Business District. Ataturk Airport IFC. Sabiha Gökçen Airport

Previder Datacenters it starts here

Cleaning and painting work. Electrical work. Pipe-fitting work. Mechanical work. Others. Steelwork

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

483/503 GARRETTS GREEN LANE GARRETTS GREEN BIRMINGHAM B33 0TL

AT&T Internet Data Center Site Specification New York III (Secaucus, NJ)

Appendix B Florida Building Code Building Section Public Shelter Design Criteria

How To Visit An Internet Data Center

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)

Fire Safety In High Rise Building

New Ontario Building Code Requirements for Mid-rise Wood Frame Buildings

Please use a separate sheet for each location Date Notes taken / / By. Name of Company: Tel No: Mobile: Contact at Company: E mail Fax:

SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY

COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS

Proposed A&A work at E-Commerce Air-Hub at SATS Airfreight Terminal 1 (AFT1)

South Carolina Home Inspector Standards of Practice

AT&T Internet Data Center Site Specification Chicago Area (Lisle, IL)

9770 CULVER BOULEVARD CULVER CITY, CA Incidental improvements: improvements that do not qualify as minor or

Company presentation

PLEASE REFER TO YOUR INDIVIDUAL QUOTE

you haven t seen sawgrass until you ve seen old landing & coronado drive, rehoboth beach, de

Passenger Terminal Amsterdam

FOR RENT PRODUCTION AND COMMERCIAL FACILITIES ALONG WITH A SOCIAL AND OFFICE SURFACE MARR BUSINESS PARK 10 NAD DRWINĄ STREET IN KRAKÓW

EXCLUSIVE MANDATE INFORMATION MEMORANDUM. Teichweg 3, Giessen

Clear Creek Business Center 187,865 Sq. Ft. OFFICE/FLEX/INDUSTRIAL

AT&T Internet Data Center Site Specification San Diego Koll (San Diego, CA)

2. What building projects are exempted? (permit not required)

Protection of unoccupied or void properties

CHARLOTTE COUNTY Community Development Department

ADDENDUM NO. 1. DATE: February 10, 2015 INVITATION FOR BID: IFB K Commerce Road Renovations Project DATED: February 9, 2015

October 5, 2015 Dear Client,

Home Inspection Report

Estimator: Miami Estimates Business: (305) Date Entered: 04/30/2008

BUILDING DESIGN FOR HOMELAND SECURITY. Unit IV Vulnerability Assessment

INVESTMENT OFFERING QUALITY MULTI-TENANT FLEX BUILDING N. CORRINGTON AVENUE KANSAS CITY, MO 38,954 TOTAL SF ASKING PRICE: $2,700,000

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

INDUSTRIAL FACILITY FOR SALE SUBLEASE 400 INDUSTRIAL DRIVE BIRMINGHAM, AL

ITB2 Datacenters Informationbrochure 2015 Page: 2

Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015

BROWACOM PRODUCTS. Our web-pages can be found from:

KIEWIT CM/GC Enabling/Utilities

Elva Business Centre Elva Way Bexhill on Sea East Sussex TN39 5BF DEVELOPMENT OF LIGHT INDUSTRIAL WORKSHOPS & OFFICE SPACE

WHERE INFRASTRUCTURE DELIVERS OPPORTUNITY 41 AVENUE SW & EWING TRAIL, EDMONTON, AB

FOR SALE - BANK OWNED REO 6671 SCHUSTER STREET, LAS VEGAS, NV 89118

Occupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School

ridgway office ParK progress WAy, denton, manchester, m34 2gp

MIAMI BLUFFS COMMUNITY ASSOCIATION LINE ITEM BUDGET (9058)

The Peaks Features List

May 5, Client Client Address. Re: Inspection Address, Chicago, Illinois. Dear Mr. Client,

Disabled Access Guide

Our data centres have been awarded with ISO 27001:2005 standard for security management and ISO 9001:2008 standard for business quality management.

AT&T Internet Data Center Site Specification Washington-DC Area (Ashburn, VA)

HOWARD UNIVERSITY. I. Policy Statement. II. Rationale. III. Entities Affected by the Policy. IV. Definitions. Policy Number:

BUILDING PERMIT SPECIFICATIONS

Commercial Building Valuation Report

MURPHY SHIPPING & COMMERCIAL SERVICES AZERBAIJAN

5200, 5250, 5300 AUTO CLUB DRIVE A PREMIER OFFICE/RESEARCH & DEVELOPMENT CAMPUS

Appendix G. Security management plan

Aurora Mall. Aurora (Denver), Colorado

LOGISTICS FACILITY UNITS AVAILABLE FROM 17,500 TO 130,000 SQ FT NEW BUILD PLANNING APPROVED

The White House 15 Whirlow Park Road, Sheffield. Park Estates

Datacentre Studley. Dedicated managed environment for mission critical services. Six Degrees Group

GUIDE TO LOGISTICS. The Netherlands A Cushman & Wakefield Research Publication 2012

Residential SALES. 71 Oxhey Lane, Hatch End, Pinner, Greater London, HA5 4AY. pulvercarr.co pulvercarr.co.

APEC CAPABILITIES PROJECT MANAGEMENT / SUPPORT

Transcription:

www.prologis.com THE NETHERLANDS

PROLOGIS PARk MOERDIjk Prologis Park Moerdijk, is a modern logistics platform located in the Tradepark of Port of Moerdijk and consists of three state-of-the-art distribution facilities, including office and mezzanine floors with a total space of approximately 56,000 m². Moerdijk DC1 consists of four units which can be leased individually, with a total warehouse area of 21,000 m² with mezzanine and office space. Moerdijk DC2 is one large distribution facility of 14,400 m2 with mezzanine and two main offices. Moerdijk DC3 is also one large distribution facility of 14,600 m2 with mezzanine and office space. All the warehouses have a clear height of approximately 10 meters and offer loading docks with electrically operated doors and levelers and are in compliance with all modern standards. Many international operating companies have chosen Moerdijk as the center for their European and regional distribution operations and include companies such as DSV, Kühne & Nagel, Wincanton, Rucanor, DHL, Panalpina, Bridgestone and Ewals Cargo Care. Port of Moerdijk the Port of Moerdijk and its industrial complex is strategically located on the Hollandsch Diep between the international ports of Rotterdam and Antwerp, in the Rhine Scheldt Delta. Goods from all over the world arrive and also depart from here to many further destinations. Located the furthest inland in the netherlands, the Port of Moerdijk is a seaport which can be reached by inland vessels via a widely branching inland waterway network, among others, the Rhine, the Meuse, the Scheldt, the Volkerak, the Haringvliet, Markiezaatsmeer and various canals. Moerdijk is part of the trans- European network of waterways and therefore suits ideally as an operational base. With more than 400 companies, the Port of Moerdijk is a B2B platform for business contacts and relations. the established companies provide an added value for most businesses that are situated at the Port of Moerdijk.

BIRD S - EyE VIEW Prologis Park Moerdijk The Netherlands Dc 3 Dc 2 Dc 1 A16 A17 A59 A16 A17 A59 Antwerp AntWERP 65 km 65 km Rotterdam ROttERDAM 40 km 40 km AMS 100 km AMS 100 km BRU 120 km BRU 120 km RTM 50 kmrtm 50km Rail terminal Rail terminal 1 km 1 km Barge terminal 1 km 1 km

PROLOGIS PARK Moerdijk Distribution Center 1 Unit A Unit B Unit C Leased Unit D Leased Mezzanine 563 m² Mezzanine 587 m² Loading Pit Loading Pit Loading Pit Overhead Door Overhead Door Truck Parking DC 1 DC 2 DC 3 Unit A Unit B Unit c Unit D TOTAL (m²) Warehouse 5,200 m 2 5,266 m 2 5,176 m 2 5,261 m 2 20,903 m 2 in warehouse 63 m 2 --- 90 m 2 153 m 2 ground floor 111 m² 111 m 2 111 m 2 111 m 2 444 m 2 first floor 107 m² 107 m 2 393 m² 393 m² 1,000 m² Mezzanine 563 m² 587 m² 295 m² 539 m² 1,984 m² Total m 2 6,044 m 2 6,071 m 2 5,975 m 2 6,394 m 2 24,484 m 2 LEAsed LEAsed

THE NETHERLANDS Distribution Center 1 OutLIne SpeCIfICAtIOns DC1-Units A+B Warehouse 10.8 m (34.75-foot) clear height, steel frame Column grid 20.0 m x 14.2 m 3,000 kg/m² floor loading capacity 6 electric dock doors (6 dock doors per unit of 2.6 m x 3.0 m) with bumpers, electric levellers, seals, and dock numbers per unit 1 electric overhead door (4.0 m x 4.5 m) per unit Smoke detection and fire-alarm system Insulation value (Rc) of 2.5 Central gas heating to 15 ºC (outside temp. of 7 ºC) Average lighting on the floor of 200 lux before the installation of racks, type HQL high pressure lamps. Mezzanine floor (depth of 9 m) above the loading area for offices or storage; provided with windows; mezzanine floor load 400 kg/m² in 2 levels Top cooling to maintain 5 ºC less than outside temperature Central gas heating to 21 ºC with outside temperature of 7 ºC and wind velocity of 8 m/sec Lighting to 400 lux with fully recessed fluorescent fixtures with low brightness louvers Power at perimeter and in wall ducts, with vacant provision for phone and data cabling Male and female toilet facilities on each floor with concealed cisterns, hand basins fixed into vanity units, mirrors, full height ceramic tiles Ceramic floor tiles in reception area Site/ Exterior (shared) Truck court for manoeuvering (shared with Moerdijk DC 2) Concrete wheel guides to protect loading docks 2.0 m fence with manual sliding gates Landscaping as required Paving with heavy-duty 100 mm concrete pavers in truck zone, 80 mm concrete pavers in passenger vehicle areas Bicycle shed at unit B Flagpoles Ample car and truck parking on site No warranties or representations, expressed or implied, are made as to the accuracy or completeness of the information contained herein. All sizes are approximate. Prologis makes no commitment to update the information contained herein, and may make changes to these materials at any time without notice.

PROLOGIS PARK Moerdijk Distribution Center 3 Trade Boulevard 133 m Mezzanine Mark S. Clarkelaan DC 1 100 m DC 2 DC 3 TOTAL (m²) Warehouse Total m 2 13,300 m 2 1,300 m 2 14,600 m 2 April 2013

THE NETHERLANDS Distribution Center 3 OutLIne SpeCIfICAtIOns DC3 Warehouse 10.6 meter clear height, steel frame Depth of 100 meters Column grid 20.0 m x 14.2 m 3,000 kg/m2 floor loading capacity Floor flatness Zeile 4 15 electric dock doors (3.0 m x 3.0 m) with bumpers, electric levellers, seals, and dock numbers 1 electric overhead door 1 (4.0 m x 4.0 m) Smoke detection and fire-alarm system Fire extinguisher cabinets in compliance with fire protection requirements Evacation alarm system in compliance with fire protection requirements Sprinkler system K14 EFSR according to fm global standards Insulation value (Rc) of 2.5 Central gas heating to 18 ºC with outside temp. of 10 ºC Minimum lighting level 150 LUX, average lighting level 200 LUX measured on 1 meter above floor, type HQL mercury high pressure lamps before the installation of racks Concrete wheel guides to protect loading docks 30 cm concrete curb around interior perimeter of building Mezzanine floor (depth of 9 meters) above the loading area, for offices or storage Mezzanine floor load 500 kg/m² Mezzanine provided with windows in 2 levels Top cooling to maintain 5 ºC less than outside temperature Central gas heating to 21 ºC with outside temperature of 10 ºC and wind velocity of 7 m/sec Minimum lighting to 400 LUX on 1 meter with fully recessed fluore scent fixtures with low brightness louvers Power at perimeter and in wall ducts, with vacant provision for phone and data cabling Male and female toilet facilities on each floor with concealed cisterns, hand basins fixed into vanity units, mirrors, full height ceramic tile Ceramic floor tile in reception area Site/ Exterior 2.4 m fence with 2 manual sliding gates Lawn according to the requirements of the zoning plan 35m truck court for manoeuvring Paving with heavy-duty 100 mm concrete pavers in truck zone, 80 mm concrete pavers in passenger vehicle areas Bicycle storage Flagpoles and advertisement sign at the entrance No warranties or representations, expressed or implied, are made as to the accuracy or completeness of the information contained herein. All sizes are approximate. Prologis makes no commitment to update the information contained herein, and may make changes to these materials at any time without notice.

Design: RUHRGOLD/ Stilgrad/03.2012 LOCATION Prologis Park Moerdijk is situated 30 kilometres south of Rotterdam, between the ports of Rotterdam and Antwerp and the airports of Schiphol and Zaventem. It is located alongside the A17 motorway to Antwerp and can be reached via rail, sea, inland waterways and pipeline connections. PROLOGIS PARK BERGEN OP ZOOM A4 A29 PROLOGIS PARK MOERDIJK A59 A17 A58 Roosendaal PROLOGIS PARK ETTEN/LEUR No warranties or representations, expressed or implied, are made as to the accuracy or completeness of the information contained herein. All sizes are approximate. Prologis makes no commitment to update the information contained herein, and may make changes to these materials at any time without notice. A16 CONTACT: BRAM VERHOEVEN Vice President Market r Benelux Tel. +31 (0) 20 655 66 71 GSM +31 (0) 62 073 86 20 Email bverhoeven@prologis.com GINA HELMOLD Leasing r The Netherlands Tel. +31 (0) 20 655 19 16 GSM +31 (0) 65 236 05 27 Email ghelmold@prologis.com Prologis Management B.V. Symphony s Gustav Mahlerplein 17-21 1082 MS Amsterdam The Netherlands Tel. +31 (0)20 655 66 66 Fax +31 (0)20 655 66 00 Email jpapachristou@prologis.com 09 2013 50 Design: RUHRGOLD/ Stilgrad www.prologis.com