GENERAL RUBBER LINING PRINCIPLES

Similar documents
Rubber Lining Application Manual Revision Date: September 1, Section 10: Pipe Lining Procedures Page: 10-1

PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta

SEAMS SEAMING USING SEAM TAPE

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 16 BRIDGE DECK WATERPROOFING General Materials Equipment...

SECTION CEMENT-MORTAR LINED AND COATED STEEL PIPE

NEW ELECTRICAL SUBSTATION Building 300 SECTION ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK

CertainTeed. Self-Adhering Roof Systems for Low Slope Residential Roofs

3M Scotchcast Mine and Portable Cable Splice Kit

DRAINAGE MATS For Vertical: Flow 15-P For Horizontal: Flow 18-H

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12

Peel & Seal Self-Stick Roofing Solutions

VC 104+ Rigid Grade / Rigid Grade Imagine VC 104 Rigid Grade Commercial Customised

BRIDGE & SUPPLY COMPANY. Installation Guide. Ultra Includes:

COATING & WRAPPING OF UNDERGROUND PIPING

THIRD PARTY INSPECTION GUIDELINES FOR OWNERS AND GENERAL CONTRACTORS/CONSTRUCTION MANAGERS DS150

Rubber Lining for Projects

Computer Lane Monitor HOW TO MAKE A TAPE AND HOW TO READ A TAPE

4 Installation Requirements

General Allowances for Insulation & Cladding

DIVISION 23 HEATING, COOLING, AIR CONDITIONING AND VENTILATION

Application Instructions for Avery Dennison Films SF S LTR EZ RS, Conform Chrome

Pipe and Equipment Insulations. Zeston. PVC Insulated Fitting Covers Installation Instructions for Hot, Cold and USDA Piping Systems

PAAM COMMERCIAL PRIVATE LIMITED

POLYURETHANE LINING AND COATING ON PIPE RAW WATER

Table of Contents. Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide. Notes to Designer /Installers..

Sikaflex Sealant Installation. Sika Corporation

Distributed by: BEST MATERIALS LLC, Phoenix AZ Ph: , Fx:

Herringbone Pattern Flooring

ITEM THERMOPLASTIC MEMBRANE ROOFING

SECTION STORM DRAINAGE SYSTEM

Arctic King Fuel Tanks meet the Environment Canada TECHNICAL REQUIREMENTS FOR COLLAPSIBLE FABRIC STORAGE TANKS (BLADDERS) - December 17, 2009

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN Fax: Re-Roofing: Asphalt Shingles

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION CONCRETE BONDING COMPOUND.

DASH KIT INSTALLATION

1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system.

3 Installation. 9 Roof Edges... p Wall Terminations... p Membrane Repair... p Miscellaneous... p

MODULAR EPDM ROOFING SYSTEMS

WATERPROOFING FOR CONCRETE STRUCTURES

Read and understand all installation instructions and precautions before installing. GENERAL APPLICATION INSTRUCTIONS

Guidelines for Earthquake Bracing of Residential Water Heaters

Sun Windows General Information Sun New Construction Window Installation Instructions

WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING

Section 5: Machine Overview

peel adhesion 2 breaking load 4 rolling ball 6 shear adhesion 7 carton test 9 summary test methods 11

A. The top cover quality is not adequate for the system/material being conveyed. Upgrade to a heavier top cover. Upgrade to a better cover compound.

Although we do a fair amount of residential roofing, my family s breadand-butter. Installing a. Sealants aren t universal

Wall Mount Installation and Use

Formwork Direct International Ltd Phone No +44 (0151) Fax no +44 (0151)

Stormproof Your Roof. I ve done enough roof repairs to know that storm water that gets past the shingles

Important Information

GreenGuard Housewrap Installation Guide

Please refer to the pack Design Tutorial for direction on how to embroider the blocks and sew them together.

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C Date of issue , Updated July 1, 2011

Installation Instructions For Slider Casement Air Conditioners

Oil and Gas Pipeline Design, Maintenance and Repair

LIFE SCIENCE. Hoop House Construction for New Mexico: 12-ft. x 40-ft. Hoop House BRINGING TO YOUR HOME ECONOMICS COLLEGE OF AGRICULTURE AND

HfHMD uses LP SmartSide siding and trim.

Fosroc Proofex Engage

MASONRY RESTORATION Lime Putty Mortar Repointing Guide

3 Installation. 3. Installation. EPDM Installation

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS

Cosmetics Case with Vinyl Interior Skill Level: Intermediate

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association

A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents.

Drexel Metals Inc. DMC 100SS 16oz min. Copper Mechanical Seam Metal Roof System over Plywood

Epdm Flat Roofing Systems

WIRE, TERMINAL AND CONNECTOR REPAIR CONDUCTORS

Rooflight INSTALLATION INSTRUCTIONS

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing

Barewood Octagon and Elongated Windows Installation Instructions

CHAPTER 6 ASPHALT ROLL ROOFING

Surface Decoration. Design techniques used to put on the surface of the pottery. Slip Oxides Glaze Embossed Incised Wax on wet Altered from the wheel

Quality You Can Trust Since From North America s Largest Roofing Manufacturer

SECTION HVAC INSULATION. A. All work specified in this Section is subject to the provisions of Section

Chapter 9: INSTALLING ROOFING

Selection, Use, and Care of Brushes

How to Install Hardwood Flooring Over a Sub Floor

James M. Pleasants Company

Shower Walls and Tub Surrounds

Memtec Single Ply PVC Membrane Roofing and Waterproofing Technology. Modern Efficient Performance Cost Effective Flat Roofing Systems

UNIT 4: SHEATHING AND SHINGLING THE ROOF

NAPCA BULLETIN APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE

Section SEWER PIPE INSTALLATION AND TESTING

SC2000 CEMENT BONDING PROCEDURES

SERIES ASM NEOPRENE/EPMD FLANGED SINGLE SPHERE CONNECTOR CONNECTORS. Pressures to 225 PSIG (15.51 barg) Temperatures to 230ºF (110ºC)

2. The mold is closed up and held under hydraulic pressure while the rubber material or compound cures.

Installation Manual for STANDING SEAM ROOFING

Guidelines for Earthquake Bracing Residential Water Heaters

FREEBIRD THE ORIGINAL D.I.Y. ORNITHOPTER! Tools and Glue. Required Materials

Table of Contents. Western States RustWall Wall and Soffit Panels Installation, Flashings & Shop Drawing Detail Guide

Pipe Protection Tape System

DIY Poly Digester. What is Supplied in the Kit. Sketch of Arrangement

Wastewater Capital Projects Management Standard Construction Specification

EPDM System Repair and Cleaning

Kemlite Transportation Products

Ecoflex Wall Penetration Systems: An efficient, sustainable solution for penetrating concrete or block walls

Residential Roofing Guide

Transcription:

GENERAL RUBBER LINING PRINCIPLES I. METAL PREREQUISITES Metal to be lined should meet the requirements as stated in section 8 Metal Fabrication and section 12 Blasting and Cementing Procedures. The surface of the metal needs to be free of pits and crevices. Pits and crevices will trap air which will expand during the cure, causing the lining to form a blister known as a blow. The primer and any intermediate can be applied ahead of time. The tack cement should be applied ahead of the application of the lining sheets so that, 1) the cement is dry and tacky, and 2) the cement is applied just far enough so that the last sheet of rubber is applied at the end of the shift. In this way, the tack cement won t become so dry that the rubber won t stick when ready. The temperature of the equipment to be lined must be higher than 60ºF (15ºC). Any colder and the rubber applicators will have difficulty applying the rubber and the adhesives may not dry in a timely manner. The rubber linings are easier to apply when they are warmed to approximately 120ºF (49ºC) on a warming table just prior to use. II. PRIMER AND CEMENT APPLICATION The primer and any intermediate can be applied ahead of the lining application see the appropriate data sheets for maximum tack or layover times. The tack cement should be applied the same day as the sheet application. Be certain the cement is solvent free but still tacky. Any areas that have been cemented but not lined in one day should be re- cemented the next day to ensure good adhesion. III. LINING GUIDELINES Sheets of rubber should be unrolled and then cut to the desired size and shape on a clean table. We recommend using a heating table whenever possible. Care needs to be taken so that the tie gum side of the lining, if present, is facing out for cementing. The edges should be cut with a minimum skive of 45 to aid in forming the seam. For best results the plastic side of the lining, once removed, should be cemented and applied to the substrate. When preshrinking is required, unroll the lining on the table, remove the plastic and allow the lining to shrink before cutting it to size. After the cement is applied and allowed to dry, a fabric liner such as nylon should be put on the rubber sheet and then positioned on the cemented metal and partially tacked down as the liner is pulled out. The lining can be rolled down using steady, firm and overlapping strokes with roller of 2 1/2 maximum width. When rolling, always start in the center of the panel and work toward the edges forcing all the air out from behind the lining. The craftsman can mark the portion of the panel that has been rolled to assure complete contact between rubber and metal. Air blisters found should be punctured, vented and overlaid with a 4 patch. 5020 Panther Parkway Seville, Ohio 44273 Ph. 800-321-5583 Fx. 330-769-9334 www.blairrubber.com

There are 2 styles of seams: skive butt joint, with or without cap strips, and overlap (open or closed skive). The Specification should be referred to in order to ensure the proper seam style is used. The skive butt joint with cap strips is shown below with the cap strips having an open skive. The overlap method is also shown with a closed skive. Open skives are used when the rubber is a one construction lining. A closed skive is used on a multiple construction lining to protect the underlying plies, such as a Tri-bond or tie gum lining construction. CLOSED SKIVE OVERLAP BUTT JOINT WITH CAP STRIP The most common seam construction uses a 2 overlap with a closed skive. The panels are skived with a minimum 45 up skive on the bottom, and the top has a 45 down skive on the exposed edge. In corners where triple lining thickness appear, you can cut out a piece of lining on the second layer of stock approximately 2 square. In abrasion service or high flow areas, care should be taken to ensure that seams are in the direction of flow to prevent lifting of the seams. BUTT SEAM CORNER SEAM CLOSED SKIVE Where skive butt joints are required the sheets of lining are skived at a minimum 45 angle and mated together. If a cap strip is required, it should be at least 4 wide with the seam in the middle. Care should be taken to ensure the lining is not stretched or applied in tension. Care needs to be taken in corners where the lining can be folded in, or joined and seamed. A V strip fillet can be used on sharp inside corners to give them sufficient radius. BLAIR RUBBER COMPANY SECTION 13: RUBBER LINING GENERAL RUBBER LINING PRINCIPLES 2

The sheets of lining should be applied so that there is a minimum amount of wasted stock. The panels can be laid vertically or horizontally on the sides and cross-wise in the bottom. In cylindrical tanks it is typically easier to apply vertical panels. The seams should always be staggered to avoid four (4) layers of rubber. Neatness and uniformity will ensure the job looks professional. NO YES SEAMS ALIGNED SEAMS OFFSET When lining tanks outside the shop, the tanks must be warmed to 60 degrees. In cold weather the tank should be covered and heating equipment brought in. Insulation is strongly recommended. Tanks should be treated as a confined Space and will require that special safety procedures be followed. RUBBER LINING PIPE I. METAL SPECIFICATION Pipe should be fabricated in accordance with the requirements stated in ARPM IP-4-2. Any other requirements specified by the engineering company, or end user, shall be agreed upon by all parties prior to pipe fabrication. II. METAL PREPARATION All surfaces to be lined shall be blasted to a white metal blast per SSPC-SP5 or NACE #1. The surface should be free from all oil, grease, dirt, mill scale, rust or other foreign matter. See Section 12 - Blasting and Cementing Procedures. III. CEMENTING Apply primer immediately after blasting. Apply additional coats of primers and cements as specified by Blair Rubber Company. Primers and cements are normally applied on the inside of pipe with a swab, spray or roller. Allow sufficient drying time between cement coats. More information is available in Sections 5 and 12. BLAIR RUBBER COMPANY SECTION 13: RUBBER LINING GENERAL RUBBER LINING PRINCIPLES 3

IV. LINING PROCEDURE FOR STANDARD FLANGED PIPE A. Form a tube with lining stock using longitudinal skived seams. This can be accomplished by wrapping the lining stock around a mandrel, using a liner inside the tube, or any other method to facilitate the making of a tube. The spliced tube s outside circumference should be slightly less than the inside circumference of the pipe and the tube length should be longer than the pipe s length. B. Apply twisted multifilament cotton string lengthwise to permit proper air venting between the pipe and the lining. Do not use string made from synthetic yarns. Stringing should be done after cementing and the individual strings should be spaced equally around the circumference. Normally, four strings are used on pipe with diameters up to and including six inches. Larger size pipe normally uses additional strings. String is optional for some methods of lining. C. Enclose the tube in a liner and attach a towrope. Pull tube into pipe with a slow constant pull. D. Remove liner and expand tube against pipe wall by using air pressure. A mechanical extension and flange arrangement may be used for the pipe ends so a minimum of 10psi internal pressure can be maintained in the expanded tube for at least five minutes. E. Remove extension and flare excess stock over flange face and trim flush with the flange face. F. Apply a covering to the full face of the flange. Skive ID of flange stock to slightly less than ID of lining and stitch firmly to tube stock. When using hard rubber lining on flanges, it is important that customer understand that soft rubber gaskets are required on the flanges. G. On pipe sizes larger than 6, the flange face stock may be lapped onto the lining inside the pipe instead of the skive used on smaller sizes. This lapping technique makes a stronger joint and is the preferred method. Some customers may prefer not to have laps inside the pipe at flanges because of abrasion considerations or requirements on full line capacity. (See various flange covering sketches for alternate procedures, Sketches 301 and 302). H. See Sketch 304 and 305 for suggested lining styles of lateral nozzles and side outlets. V. LINING PROCEDURE FOR VICTAULIC PIPE A. Line inside of pipe in accordance with procedures used for standard flanged pipe. B. When using 1/8 through 1/4 linings, the tube lining should be extended over the end of the pipe and bent back into the recess on the outside of the pipe. Apply a round of friction tape over the OD of outside rubber. After cure, remove tape and buff OD flush with OD of metal (see Sketch 303). BLAIR RUBBER COMPANY SECTION 13: RUBBER LINING GENERAL RUBBER LINING PRINCIPLES 4

VI. GUIDELINES FOR NUMBER OF LAPS IN PIPE AND FITTINGS PIPE SIZE NO. OF MAX. LONGITUDINAL SEAMS NO. OF CIRCUMFERENTIAL SEAMS 3-6 1 1 in 14 to 10 sections 8-16 2 (180 apart) 2 in 20 sections 0 in 8 and under sections PIPE SIZE * STRAIGHT LENGTH 2-3 14 4-8 24 8-42 40 * For maximum lengths check with your Applicator. BLAIR RUBBER COMPANY SECTION 13: RUBBER LINING GENERAL RUBBER LINING PRINCIPLES 5

FLANGE LINING METHODS SKETCH 301 Flange Stock Skived to tube lining Rubber SKETCH 301 Skived Joint Rubber BLAIR RUBBER COMPANY SECTION 13: RUBBER LINING GENERAL RUBBER LINING PRINCIPLES 6

RUBBER LINING FOR DOUBLE GROOVED VICTAULIC PIPE SKETCH 303 Steel Pipe Rubber 90 NOZZLE LINING SKETCH 304 Main Run of Pipe Pipe BLAIR RUBBER COMPANY SECTION 13: RUBBER LINING GENERAL RUBBER LINING PRINCIPLES 7

LATERAL NOZZLE DETAILS SKETCH 305 Main Run of Pipe BLAIR RUBBER COMPANY SECTION 13: RUBBER LINING GENERAL RUBBER LINING PRINCIPLES 8

FLANGE CONSTRUCTION USING PRECURED RUBBER SKETCH F-1 CU-76-BC Cured Chlorobutyl Uncured Internal Flange BLAIR RUBBER COMPANY SECTION 13: RUBBER LINING GENERAL RUBBER LINING PRINCIPLES 9