misconceptions about arc-flash hazard assessments



Similar documents
Arc Flash Hazards. Electrical Hazards. Dan Neeser Field Application Engineer Electrical Hazards 2/18/2015. Shock.

Understanding Arc Flash

ARC FLASH CALCULATIONS & LABELING REQUIREMENTS

2013WWOA Conference Technical Conference Program

NFPA 70E 2012 Rolls Out New Electrical Safety Requirements Affecting Data Centers

BRANDON AND CLARK INC. // SCOTT W. CLARK, P.E. ELECTRICAL CONTINUING EDUCATION ARC FLASH - NFPA 70E

NFPA 70E Updates Affect Your Most Valuable Assets

What s up with Arc Flash?

A Guide to Performing An Arc Flash Hazard Assessment Using Power Analysis Software

ARC FLASH HAZARD OVERVIEW. Presented August 13, 2015 WWOA Lake Michigan District by Mead & Hunt, Inc.

Part 1 System Modeling & Studies for Existing Systems

Choosing the Best Solution for Reducing Arc Energy

Safety By Design. Strategies for Electrical Contractors

Integrating SPDs in Switchgear & Switchboards Causes More Problems than it Solves

Introduction to Arc Flash

2012 NFPA 70E. Ten Most Important Changes. John A. DeDad

What Are the Qualifications to Conduct Arc Flash Studies? Where Do You Begin?

INTRODUCTION ARC FLASH PROTECTION AND SAFETY MEASURES. September 2010

Roadmap to Compliance with NFPA 70E Arc Flash Requirements

! WARNING Arc Flash and Shock Hazard Appropriate PPE Required

Analyzing Electrical Hazards in the Workplace

Mission Critical Data Center Systems

Technical Guide. SKM Arc Flash Line Side vs. Load Side

Arc Flash Mitigation. Remote Racking and Switching for Arc Flash danger mitigation in distribution class switchgear.

Arc Flash Avoidance and its Application to Overhead Traveling Cranes

The Other Hazard of Electricity. Larren Elliott Ph.D. Lindsay Polic, CSP, REHS

How to reduce exposure to arc flash hazards

Short Circuit Current Calculations

SALISBURY ASSESSMENT SOLUTIONS

Electrical Wiring Methods, Components and Equipment for General Use. Approved for Public Release; Further Dissemination Unlimited

Understanding 2015 Changes to NFPA 70E Safety-related work practices and maintenance requirements mandate more robust electrical safety programs for

IMPLEMENTING THE NEW ELECTRICAL SAFETY REQUIREMENTS

Proper Application of 415V Systems in North American Data Centers. A White Paper from the Experts in Business-Critical Continuity

Understanding 2015 Changes to NFPA 70E Safety-related work practices and maintenance requirements mandate more robust electrical safety programs for

90.2(A) Covered & 90.2(B) Not Covered 6/23/2015. Learning Objectives. 90.2(A) Covered & 90.2(B) Not Covered. Change Summary

Management Systems 10 Electrical Safety Audit 14 PPE 20 Arc Mitigation 22 Hazard Assessment 26

OSHA Published First-Ever Arc Flash Protection Requirements for the Electric Power Industry Significant changes and unprecedented compliance

Arc Flash Mitigation & Selective Co-ordination

Requirements for Electrical Installations

Written Program ELECTRICAL SAFETY. Based on OSHA Subpart S and NFPA 70E Standards

A USERS GUIDE TO ARC RESISTANT LOW VOLTAGE SWITCHGEAR & MOTOR CONTROL ANALYTICAL COMPARISON VS ARC FLASH TEST RESULTS

Common Electrical Hazards in the Workplace Including Arc Flash. Presented by Ken Cohen, PhD, PE & CIH (Ret.)

RISK MITIGATION for ELECTRICAL WORK. Feb 2013 San Diego CA

Electrical Safety Program

Arc Flash Energy Mitigation Techniques

HAZARDS, INCLUDING SHOCK, ARC FLASH AND FIRE

PRESENTED AT THE 2011 IEEE IAS PULP & PAPER INDUSTRY TECHNICAL CONFERENCE, NASHVILLE, TN: IEEE PERSONAL USE OF THIS MATERIAL IS PERMITTED.

SAFE ELECTRICAL WORK PRACTICES & 2015 NFPA 70E

CIRCUIT BREAKER INTERRUPTING CAPACITY AND SHORT-TIME CURRENT RATINGS

THE reliability, cost, and safety of electricity and industrial

Midwest Healthcare Engineering Conference and Trade Show 2012 Indianapolis, Indiana

2008 Eaton Corporation. All rights reserved.

Arc Flash Mitigation. Executive summary. by Antony Parsons, Ph.D., P.E.

Engineering Series Ratings: Is It Practical?

Understanding the Standards Surrounding Arc Flash Hazards and Arc Resistant Equipment

OSHA and NFPA 70 Understanding NFPA 70 and its Implications in Electrical Inspections 2010

ELECTRICAL SAFETY HAZARDS HANDBOOK

Vilter motor starter solutions The NEW industry standard in motor starter packages

Dielectric Withstand Testing in a Production Environment

Who sets the rules for electrical testing and safety?

Implementation of arc flash mitigating solutions at industrial manufacturing facilities

Guidelines on the Short Circuit Current Rating for Industrial Control Panels

Fault Characteristics in Electrical Equipment

Progress in Impacting Policy in Workplace Electrical Safety

Concerned about arc-flash and electric shock?

Top Commercial / Residential Electrical Requirements *

ARC FLASH HAZARD MITIGATION. Industrial Tests, Inc. [indtests.com]

A Survey of Arc Flash Computation Methods and Mitigation Strategies By Dr. Carl J. Spezia

Low Voltage Circuit Breakers. Arc flash hazards

UL Validated Testing of Arc-Resistant Motor Control Centers

How to Build a Safe and Effective Electrical Maintenance Program

SALISBURY ASSESSMENT SOLUTIONS

Electrical Safety in the Workplace

Reducing Liability through Safety Labeling - Industrial Automation. Todd Fries

Secondary Unit Substations

Demystifying arc flash hazard management

PLANT OPERATIONS ELECTRICAL SAFETY PROGRAM

MODULE 1 INTRODUCTION TO ELECTRICAL SAFETY

Electrical Grounding. Appendix C

Procedure Number Arc Flash Hazard Calculation and Required Protection Revision 5. TVA Safety Procedure Page 1 of

Low Voltage Switchgear

STANDARDS AND RATINGS FOR THE APPLICATION OF MOLDED CASE, INSULATED CASE, AND POWER CIRCUIT BREAKERS

Massachusetts FACE Occupational Fatality Report

CONDUCTOR SHORT-CIRCUIT PROTECTION

100% Rule Alternate Method Arc Blast Arc Flash Approved Approved Equipment Authority Having Jurisdiction (AHJ) Authorized Work Bare Hand Work

2004 TRANSMISSION SYSTEMS SEMINAR MEDIUM VOLTAGE, METAL-CLAD ARC RESISTANT SWITCHGEAR: ENHANCING WORKPLACE SAFETY

ELECTRICAL SAFETY PROGRAM

ELECTRICAL SAFETY RISK ASSESSMENT

ELECTRICAL & ARC FLASH SAFETY PROGRAM

Reverse-feed applications for circuit breakers

We will produce a colored custom Arc Flash Label that will list the following items:

ETAP Arc Flash Analysis

Short-circuit current rating (SCCR) of. industrial control panels. NEC Article 409 and UL 508A

Fusible Disconnect Switch

Safety, Health, and Environmental Standard

Worldwide Thermography Headquarters

The Costs and Risks Associated with Improper Service and Maintenance of Electrical Systems

The Three A s of Arc Flash

Transcription:

misconceptions about arc-flash hazard assessments

There are some common misconceptions about Arc-Flash Hazard Assessments which reduce the effectiveness of the Assessments and can increase electrical hazards. These misconceptions exist because of the confusion about the laws and standards that apply regarding Arc-Flash Hazard Assessments. It is important to note that OSHA (Occupational Safety and Health Administration) may rely on numerous consensus standards to enforce their regulations, and this may vary by state. Further confusion is caused by the various methods used to calculate and quantify Arc-Flash hazards. When deciding to do an Arc-Flash assessment, it is vital to determine what is being offered by a service company and what is required to be OSHA compliant. The goal of this paper is to discuss some of the common misconceptions regarding Arc-Flash Hazard Assessments and clarify what OSHA and NFPA, the National Fire Protection Association, actually require. An Arc-Flash Hazard Assessment is part of a complete electrical hazard assessment required by OSHA and NFPA 70E. An Arc-Flash Hazard Assessment determines the degree to which a worker may be exposed to potential Arc-Flash Hazards and what kind of Personal Protective Equipment (PPE) is required to protect workers from the heat, light, and blast associated with an Arc-Flash accident. Misconcep t ion 1: OSHA does not enforce NFPA 70E for Arc-Flash and electrical safety compliance. OSHA has adopted Electrical Safety-related work practices in OSHA 1910 Subpart S (1910.301 to 1910.399). OSHA is using the latest edition of NFPA 70E as a guideline for enforcing OSHA electrical safety rules. The Occupational Safety and Health Act of 1970 requires employers to provide their employees with a workplace that is free from recognized hazards that may cause death or serious injury to their employees. NFPA 70E, Standard for Electrical Safety in the Workplace, was developed by the NFPA to help employers meet OSHA regulations. OSHA compliance officers look to NFPA 70E for guidance on how to evaluate Arc-Flash Hazards and minimize or prevent Arc-Flash accidents. OSHA 1910.132(d) and OSHA 1910.335(a)(1)(i) requires employers to assess the workplace and identify electrical and other hazards, select and provide PPE for their employees, inform their employees about the hazards that are present, and train qualified employees on how to use protective equipment. In addition to safety-related work practices, OSHA 1910 Subpart S specifically requires employers to establish an electrical safety program including safe electrical design, safe electrical maintenance requirements, and safe work procedures for special electrical equipment. OSHA 1910.332 requires employers to train and qualify their employees in safe work practices and standard operating procedures to reduce the hazards and increase worker safety. OSHA regulations are written in general terms and do not give detailed information about how to meet the regulations. NFPA 70E addresses how to implement an electrical safety program, how to establish safety-related work practices, how to establish methods and use mathematical formulas to evaluate electrical shock and Arc-Flash Hazards, and how to select and use electrical shock and Arc-Flash PPE. NFPA 70E defines what type of safety training is necessary and how to qualify workers. OSHA refers to NFPA 70E as an acceptable national consensus standard that can be used to meet OSHA regulations. OSHA is considered the Shall and NFPA 70E is the How of electrical safety. In order to be OSHA compliant you must follow a consensus standard such as NFPA 70E. Misconcep t ion 2 : When equipment is determined to be a Hazard Risk Category 0, it is assumed that all other equipment, fed downstream, is also a Hazard Risk Category 0. Some companies assume that equipment supplied from a panel assessed as Hazard Risk Category 0 must also be Hazard Risk Category 0. They stop assessing any panels or equipment supplied from a Hazard Risk Category 0. This practice, if followed, will result in violation of OSHA and NFPA 70E regulations and greatly compromise worker safety. OSHA and NFPA 70E requires employers to assess all equipment operating at 50 volts and higher for shock and Arc-Flash Hazards. In addition to the shock hazards, incident energy and Hazard Risk Categories can increase the further into your electrical distribution system and farther away you are from the power source. The severity of a potential Arc-Flash depends on the available fault current where the Arc- Flash occurs and the opening time of the upstream overcurrent protective devices. Because of the impedance of cables or bus ducts, etc., the maximum available fault current decreases the farther away you are from the power source. The lower the fault current, the longer the fuse or circuit breaker will take to open. In some cases, a slightly lower fault current can double or triple the opening time of the upstream fuse or circuit breaker. This can easily escalate the incident energy possible and increase the Hazard Risk w w w. l i t t e l f u s e. c o m 2007 Littelfuse POWR-GARD Products

Categories at panels and equipment downstream of the protective device. If there are long cable runs, transformers, or other overcurrent protective devices downstream of a Hazard Risk Category 0, the incident energy and Hazard Risk Categories will often increase. Never assume Hazard Risk Categories. Always confirm the possible incident energy at all equipment supplied from panels assessed at Hazard Risk Category 0. Figure 1 is a partial one-line drawing of a facility supplied by a 1500 kva Utility transformer with a bolted pressure switch on the secondary with 2000 Ampere Class L fuses supplying the main switchgear bus. MCC-1 is supplied from the switchgear by LLSRK 0 Amp UL Class RK1 fuses. MCC-2 is supplied from the switchgear by a 0 Amp TB4 frame circuit breaker. And MCC-3 is supplied by LLSRK 0 Amp UL Class RK1 fuses. Each MCC is 220 ft. away from the switchgear supplied by 3 -#500MCM copper cables. The Arc-Flash Incident Energy available at the switchgear bus is over cal/cm² and is considered DANGEROUS. Figure 2 shows Hazard Risk PPE Category 0 at the MCC-2 bus, based on the available fault current of 13.6 ka and the clearing time of the 0 Amp TB4 frame circuit breaker at the switchgear. If the assessment process ceased at this point and did not proceed further down to Disconnect Motor #4, workers would be exposed to Hazard Risk PPE Category 3 at motor disconnect switch #4 because of the reduction in available fault current (3.1 ka) due to the impedance of 250 ft. of cables and the clearing time of the 100 Ampere FA frame circuit breaker at MCC-2. Figure 3 shows Hazard Risk PPE Category 0 at the MCC-1 bus, based on the available fault current of 13.6 ka and the clearing time of the 0 Ampere LLSRK UL Class RK1 fuses at the switchgear. If the assessment ceased and did not proceed further to Disconnect Motor switch #2, workers would be exposed to Hazard Risk PPE Category 1 due to the reduction in available fault current (3.1 ka) and the opening time of the 100 Ampere FLSR UL Class RK5 fuses at MCC-1. Figure 1 UTILITY (5 Sets) 3 - #500 30 ft P S Utility Transformer 1500.0 kva Section 1 MAIN KLPC 2000A MAIN MAIN SWITCHGEAR Section 2 S.C. 29.5 KA I.E. 135.80 (cal/cm2) PPE CATEGORY: DANGEROUS 200.0 kaic MCC-1 LLSRK RK1 0A MCC-2 Frame / Model TB4 0 A MCC-3 LLSRK RK1 0A 3 - #500 220 ft 3 - #500 220 ft 3 - #500 220 ft TO MCC-1 TO MCC- 2 TO MCC- 3 2007 Littelfuse POWR-GARD Products w w w. l i t t e l f u s e. c o m

Upgrading fusible power distribution systems to the most current-limiting fuses throughout the electrical distribution system will decrease Arc-Flash incident energy and Hazard Risk Categories. For example, if UL Class RK5 fuses are used downstream of a UL Class RK1 fuse, Hazard Risk Categories can increase and possible nuisance opening of the upstream fuse may occur. See Figure 3. If the 100 Ampere RK5 fuse at MCC-1 for Motor 2 in Figure 3 were upgraded to a 100 Ampere RK1 fuse, selective coordination would be assured and the Hazard Risk Category at Disconnect #2 would be reduced to Hazard Risk Category 0. In Figure 4, we see the effect that upgrading from UL Class RK5 fuses to RK1 fuses can have on incident energy and Hazard Risk Categories. Motor Disconnect switch #6 is the same distance from MCC-3 as Motor Disconnect switch #2 is from MCC-1, yet simply replacing RK5 fuses with LLSRK UL Class RK1 fuses reduces the Hazard Risk to PPE Category 0 at Motor Disconnect switch #6. For optimum safety, performance and reliability, always use the most current-limiting UL Class RK1, J or L fuses throughout your electrical distribution system. In addition to recognizing the effect of reduced fault currents due to circuit impedance, other factors such as large motor loads, alternate power sources during emergency service, or auxiliary generators can affect the available fault currents and opening times of overcurrent protective devices. It is essential to consider all possible power sources and available fault currents from the power utility, on-site power generators, or UPS systems when performing an Arc-Flash Hazard Assessment. Utilize both IEEE 1584 and NFPA 70E methods to calculate worst case Figure 2 FROM: MAIN DISTRIBUTION MCC-2 S.C. 13.6 KA I.E. 0.88 (cal/cm 2 ) 18.0 kaic Frame / Model FA 100 A 18.0 kaic Frame / Model FA 100 A 1 ft 250 ft Disconnect Motor 3 S.C. 4.8 KA I.E. 0.21 (cal/cm 2 ) Disconnect Motor 4 S.C. 3.1 KA I.E. 9.50 (cal/cm 2 ) PPE CATEGORY: 3 MOTOR 3 MOTOR 4 w w w. l i t t e l f u s e. c o m 2007 Littelfuse POWR-GARD Products

FROM: MAIN DISTRIBUTION MCC-1 S.C. 13.6 KA I.E. 1.03 (cal/cm 2 ) FLSR RK5 100A FLSR RK5 100A 1 ft 250 ft Disconnect Motor 1 Disconnect Motor 2 S.C. 4.8 KA I.E. 0.42 (cal/cm 2 ) S.C. 3.1 KA I.E. 2.09 (cal/cm 2 ) PPE CATEGORY: 1 MOTOR 1 MOTOR 2 Figure 3 incident energy scenarios before establishing Hazard Risk Categories and selecting PPE. Misconcep t ion 3 : Per IEEE 1584 Guide for Performing Arc-Flash Hazard Calculations, there is no need to assess equipment under 2 volts from a transformer rated less than 125 kva. All equipment operating at 50 volts and higher must be assessed for electrical shock and potential Arc- Flash hazards per OSHA regulations and NFPA 70E standards. IEEE 1584, published by the Institute of Electrical and Electronic Engineers (IEEE), provides a method of calculating the amount of Arc-Flash incident energy possible at certain working distances from exposed live conductors. IEEE 1584 helps to determine the Hazard Risk Category and PPE requirements of NFPA 70E. NFPA 70E references the IEEE 1584 calculation methods in NFPA 70E Annex D. IEEE 1584 states, Equipment below 2 V need not be considered unless it involves at least one 125 kva or larger low-impedance transformer in its immediate power supply. This statement refers to the incident energy exposure possible under these conditions as observed during testing. The IEEE statement means that it is not necessary to calculate incident energy on equipment under 2V fed from a transformer less than 125 kva, because the available fault current is not high enough to sustain an Arc-Flash and release significant energy. It is important to remember that this statement only refers to incident energy calculations, and does not release employers from the responsibility to assess all equipment operating at 50 volts and higher in the workplace for other electrical hazards, such as shock and overload conditions which may lead to electrocutions, fires, or other hazards. 2007 Littelfuse POWR-GARD Products w w w. l i t t e l f u s e. c o m

As stated in OSHA 1910.303(g)(2), OSHA 1910.333, and NFPA 70E Article 110.8(B), all equipment operating at 50 volts and higher must be assessed for electrical shock (establishing protection boundaries and PPE) and potential Arc-Flash hazards (incident energy levels, Hazard Risk Categories, PPE and flash protection boundaries). In addition to OSHA and NFPA 70E requirements, Article 110.16 of the National Electrical Code (NEC ) 1 requires all equipment that may be worked on while energized to be identified and marked with an Arc-Flash warning label. See Figure 5. Misconcep t ion 4 : There is no need to assess equipment for Arc- Flash Hazards beyond the Motor Control Center. There is a misconception that since a Motor Control Center (MCC) is the final access point of power for National Electrical Code and NEC are registered trademarks of the National Fire Protection Association, Quincy, MA. motor loads, there is then no need to assess any other loads which are fed from the MCC. This perception can potentially create a very serious and hazardous situation. It is not uncommon for a MCC to feed a 277/480 volt power panel or a 480/120-2 volt transformer that feeds an additional panel. Because of examples such as these and OSHA and NFPA regulations and standards, every panel, switchboard, or industrial control panel that is fed from a Motor Control Center must be assessed for Arc-Flash and shock hazards. This is particularly important because of the contribution to the available fault current that motor loads can produce at the MCC if a fault were to occur. In addition to potential Arc-Flash hazards, both OSHA 1910.303(g)(2) and NFPA 70E Article 110.8(B) require an electrical shock hazard evaluation for all energized parts operating at 50 volts and higher. As stated in NEC Article 110.16 and NFPA 70E Articles 0.11 and 130.7(E)(1), all switchboards, panelboards, industrial control panels, meter socket enclosures, motor control centers, and disconnect switches or circuit breakers that may be examined, Figure 4 FROM: MAIN DISTRIBUTION S.C. 13.6 KA I.E. 1.03 (cal/cm 2 ) MCC-3 LLSRK RK1 100A LLSRK RK1 100A 1 ft 250 ft Disconnect Motor 5 Disconnect Motor 6 S.C. 4.8 KA I.E. 0.15 (cal/cm 2 ) S.C. 3.1 KA I.E. 0.84 (cal/cm 2 ) MOTOR 5 MOTOR 6 w w w. l i t t e l f u s e. c o m 2007 Littelfuse POWR-GARD Products

adjusted, serviced, or maintained while energized, must be identified and marked prominently to warn qualified workers of potential electric shock and Arc-Flash Hazards. WARNING Arc-Flash and Shock Hazard Appropriate PPE Required ARC-FLASH HAZARD BOUNDARY AND REQUIRED PPE Flash Hazard Boundary 8 inches 0.37 cal/cm 2 Incident Energy at 18"(cal/cm 2 ) Required PPE SHOCK HAZARD APPROACH BOUNDARIES Shick Hazard 42 inches 12 inches 1 inch Limited Restricted Prohibited Equipment ID: 277 VAC Hazard Risk Category Glove Class FR Underwear + FR Shirt & Pants Panel L-10 Assessment Date: 7-11-06 0 00 Ref erences OSHA Regulations 29 CFR 1910.300-399, Subpart S, Electrical Washington, DC: Occupational Safety and Health Administration, US Department of Labor NFPA 70E, Standard for Electrical Safety in the Workplace, Quincy, MA: National Fire Protection Association, 2004. IEEE 1584, IEEE Guide for Performing Arc-Flash Hazard Calculations, IEEE Industry Applications Society, The Institute of Electrical and Electronics Engineers, Inc. New York, NY. September 2002 800-TEC-FUSE www.littelfuse.com Figure 5: Example of NEC 110.16 Warning Label. Summ a ry It is important to remember that performing an Arc-Flash Hazard Assessment is not an option. Arc-Flash Hazard Assessments are required by OSHA and NFPA 70E as a part of an Electrical Hazard Assessment. Arc-Flash Assessments are a serious life safety issue and essential part of a safe and comprehensive electrical safety program. OSHA and NFPA require employers to identify all potential electrical hazards in the workplace such as shock and Arc-Flash Hazards, reduce or eliminate the hazards, train and qualify their employees, and provide them with PPE that will protect them from all hazards. Knowing what OSHA requires and how NFPA 70E can help meet the requirements will not only keep workers safe, but will also increase productivity and profitability for employers. Littelfuse, Inc. offers products and services that can reduce Arc-Flash Hazards and help companies meet OSHA regulations and NFPA standards. For more information about electrical safety, Arc-Flash Hazards and Littelfuse POWR-GARD Engineering Services, please contact Technical Support at 800-TEC-FUSE, or visit us at www.littelfuse.com 2007 Littelfuse POWR-GARD Products w w w. l i t t e l f u s e. c o m

800 E. Northwest Highway Des Plaines, IL 60016 USA 800-TEC-FUSE www.littelfuse.com FORM NO. PF993 January 2007, Littelfuse Inc. Specifications descriptions and illustrative material in this literature are as accurate as known at the time of publication, but are subject to changes without notice. Visit www.littelfuse.com for the most up-to-date technical information.