Zero Degree Extraction using an Electrostatic Separator



Similar documents
BEPC UPGRADES AND TAU-CHARM FACTORY DESIGN

Damping Wigglers in PETRA III

LHC MACHINE PROTECTION

HIGH-ENERGY COLLIDER PARAMETERS: e + e Colliders (I)

Simulation of Neutron Backgrounds from the ILC Extraction Line Beam Dump. Siva Darbha. Office of Science, SULI Program. University of Toronto

Status of Radiation Safety System at

PHYS 222 Spring 2012 Final Exam. Closed books, notes, etc. No electronic device except a calculator.

Cathode Ray Tube. Introduction. Functional principle

Shielding and Radiation Measurements at ESRF

FCC JGU WBS_v0034.xlsm

Status of IP FB system design

90 degrees Bremsstrahlung Source Term Produced in Thick Targets by 50 MeV to 10 GeV Electrons

Running in Luminosity. Mike Lamont Verena Kain

Information about the T9 beam line and experimental facilities

Relativistic kinematics basic energy, mass and momentum units, Lorents force, track bending, sagitta. First accelerator: cathode ray tube

Projects and R&D activities

Results: Low current ( ) Worst case: 800 MHz, GeV, 4 turns Energy oscillation amplitude 154 MeV, where

SIMULATIONS OF ELECTRON CLOUD BUILD-UP AND SATURATION IN THE APS *

& Tunnel Cross Section

Frequency Map Experiments at the Advanced Light Source. David Robin Advanced Light Source

The half cell of the storage ring SESAME looks like: Magnetic length =

Lecture VI Magnetic Design

A new extraction system for the upgraded AIC-144 cyclotron

Development of Radiation Resistant Quadrupoles Based on High Temperature Superconductors for the Fragment Separator

Digital vs. Analogue Control Systems

World-first Proton Pencil Beam Scanning System with FDA Clearance

Reliability and Availability Aspects of. the IPHI Project

Calorimetry in particle physics experiments

Development of on line monitor detectors used for clinical routine in proton and ion therapy

Slice Emittance Measurements at the SLAC Gun Test Facility*

Machine Protection and Interlock Systems for Circular Machines Example for LHC

Tom Wilson Product Marketing Manager Delivery Systems Varian Medical Systems International AG. CERN Accelerator School, May 2015

LHC optics measurement & correction procedures. M. Aiba, R. Calaga, A. Morita, R. Tomás & G. Vanbavinckhove

HIGH CURRENT OPERATION OF THE ACSI TR30 CYCLOTRON

The accurate calibration of all detectors is crucial for the subsequent data

Production of X-rays. Radiation Safety Training for Analytical X-Ray Devices Module 9

Cross section, Flux, Luminosity, Scattering Rates

Mark Jaski. Multi-Bend-Achromat (MBA) Magnets

Undulators and wigglers for the new generation of synchrotron sources

Development of Virtual Accelerator Environment for Beam Diagnostics *

Brookhaven Magnet Division - Nuclear Physics Program Support Activities

SOLEIL Current Performances. And. Futur Developments

High Power Neutral Beam Injection in LHD

New Machine Layout in IR3 and IR7

AUTOMATION OF OPERATIONS ON THE VEPP-4 CONTROL SYSTEM

Study of electron cloud at MI and slip stacking process simulation

A Quick primer on synchrotron radiation: How would an MBA source change my x-ray beam. Jonathan Lang Advanced Photon Source

10 Project Costs and Schedule

Chapter 3 SYSTEM SCANNING HARDWARE OVERVIEW

TOF FUNDAMENTALS TUTORIAL

LHCC TOTEM STATUS REPORT

Status of the Free Electron Laser

The APS Machine Protection System (MPS) *

OVERVIEW OF PROTON DRIVERS FOR NEUTRINO SUPER BEAMS AND NEUTRINO FACTORIES*

Physics 2A, Sec B00: Mechanics -- Winter 2011 Instructor: B. Grinstein Final Exam

SpectraTec II. Polarized Multi-Laser Source BLUE SKY RESEARCH WAVELENGTHS. The SpectraTec II

Figure 1: Lattice drawing for the APS storage ring.

Institute of Accelerator Technologies of Ankara University and TARLA Facility

POSSIBL-E EXPERIMENTS ON THE 200-GeV ACCELERATOR. A. D. Krisch University of Michigan. R. Serber Columbia University.

Proton tracking for medical imaging and dosimetry

How To Analyze Plasma With An Inductively Coupled Plasma Mass Spectrometer

The TOTEM experiment at the LHC: results and perspective

Beam Instrumentation Group, CERN ACAS, Australian Collaboration for Accelerator Science 3. School of Physics, University of Melbourne 4

Study the Quality Assurance of Conventional X-ray Machines Using Non Invasive KV meter

X-ray Production. Target Interactions. Principles of Imaging Science I (RAD119) X-ray Production & Emission

Status of the SOLEIL project Commissioning from Linac to beamlines

Lab 8: Ballistic Pendulum

6) How wide must a narrow slit be if the first diffraction minimum occurs at ±12 with laser light of 633 nm?

Large Hadron Collider am CERN

Towards large dynamic range beam diagnostics and beam dynamics studies. Pavel Evtushenko

Status of High Current Ion Sources. Daniela Leitner Lawrence Berkeley National Laboratory

Scan Time Reduction and X-ray Scatter Rejection in Dual Modality Breast Tomosynthesis. Tushita Patel 4/2/13

Copyright. Ryoichi Miyamoto

Large Systems Commissioning

Grazing incidence wavefront sensing and verification of X-ray optics performance

Digital Energy ITI. Instrument Transformer Basic Technical Information and Application

Status of the Diamond Storage Ring RF Systems. Morten Jensen on behalf of Diamond Storage Ring RF Group

Wir schaffen Wissen heute für morgen

Meeting the Grand Challenge of Protecting an Astronaut s Health: Electrostatic Active Space Radiation Shielding for Deep Space Missions

Tune and Chromaticity Tracking in the Tevatron. C.Y. Tan 09 May 2006

ESRF Upgrade Phase II: le nuove opportunitá per le linee da magnete curvante

P R E A M B L E. Facilitated workshop problems for class discussion (1.5 hours)

LBS-300 Beam Sampler for C-mount Cameras. YAG Focal Spot Analysis Adapter. User Notes

CHAPTER D1 ION OPTICS OF MAGNETIC/ELECTRIC SECTOR MS

Robot Perception Continued

STUDY OF THE TRANSVERSE BEAM EMITTANCE OF THE BERN MEDICAL CYCLOTRON

RF data receiver super-reactive ASK modulation, low cost and low consumption ideal for Microchip HCS KEELOQ decoder/encoder family. 0.

Industrial Involvement in the Construction of Synchrotron Light Sources

Introduction. Magnet Coordinate System

The OPERA Emulsions. Jan Lenkeit. Hamburg Student Seminar, 12 June Institut für Experimentalphysik Forschungsgruppe Neutrinophysik

Transcription:

Zero Degree Extraction using an Electrostatic Separator L. Keller Aug. 2005 Take another look at using an electrostatic separator and a weak dipole to allow a zero degree crossing angle a la the TESLA TDR. See also: O. Napoli, et.al, Interaction Region Layout, Feedback and Background Issues for TESLA. Problems with the TDR: 1. Dipole, thin copper septum absorbed several kw of beamstrahlung radiation under some steering conditions. Proposed solution: Extract in the horizontal plane to get the dipole septum completely outside the beamstrahlung cone. 2. Too much beam loss on a synchrotron radiation mask between the separators. Proposed solution: Move the mask closer to the IP and the separator further from the IP, add another mask inboard from the separator for the outgoing synchrotron radiation. 3. Large electric field ( 100 kv/cm) needed for 1 TeV CM probably not realistic. Proposed solution: Reduce the maximum electric field to 50 kv/cm at 1 TeV CM (31 kv/cm @ 500 GeV CM).

Plan View of Zero Degree Extraction from IP to Charged Beam Dump

Plan View of Zero Degree Extraction Showing Beamstrahlung Collimation sep B1 B2 B2 B2 γ dump sep QF3 septum PC 5 mr dipole septum QD2A QD2B

Elevation View of Zero Degree Extraction Showing Beamstrahlung Collimation FD sep PC B1 B2 B2 B2 Beamstr. Dump QF3 QD2B sep QD2A

Cross Section of the PEPII/BaBar IR Septum Quad QF3 modeled after this design Incoming beam B 0 Outgoing beam, core is 4 cm from the septum (units cm)

LEP and SPS Electrostatic Separator Experience* 1. At an operating field of 30 kv/cm the breakdown rate was <0.01/hr for 3 ma, 100 GeV beams. With no beam, the breakdown rate at 50 kv/cm was ~0.2/hr. In SPS, the breakdown rate was 10/hr at 110 kv/cm. 2. The separators operated successfully in a high flux of synchrotron radiation which drew several hundred µamp from the high voltage power supply. Estimated 10 17 /sec unmasked synchrotron photons w/ critical energy 70 KeV hit the plates. 3. LEP operated for many years with 40, four meter long separator modules. 4. The required pressure is less than 10-9 mbar, LEP had 10-10 mbar or better. 5. CERN has experience supporting the separator plates in the orientation required for bending in the horizontal plane. * CERN SL-Note-2000-002 MS and private communication with Brennan Goddard, CERN

Separator Issues a) Need a 10 cm gap between plates to keep dispersed beam from hitting the plates on the low energy side. Offset the separator toward the low energy side. b) Need pressure 1 nt in the separator, ideally 0.1 nt. c) Does scattered synchrotron radiation from the upbeam mask cause breakdown? d) Do radiative bhabha s hitting the plates cause breakdown? e) At 1 TEV CM, to keep the electric field and maximum voltage within the bounds of CERN experience, the total separator length must increase from 20 to 25 m; and a collimator must be inserted approximately halfway through the separator module chain to keep low energy disrupted beam tail from hitting the plates directly. What is the effect of this collimator?

End View of a LEP 4 m Electrostatic Separator Tank

Analysis Steps Given: existing 20 mrad FF optics, look at possible modifications later. Charged Beam: 1. Use GUINEA-PIG disrupted beam rays for head-on and worst-case vertical offset for two CM energies and two parameter sets including radiative bhabha s. 2. Input the rays to TURTLE and track the beam to the charged dump. 3. Record hits on collimators. Beamstrahlung: Use the GUINEA-PIG photon trajectories for the same conditions as above and track each photon until it hits an aperture in the system or reaches the beamstrahlung dump.

Collimators in the Zero Degree Extraction Line Collimator Location Name (from IP) Function MASK 1 13 m Shield IP beam pipe from incoming soft bend synch. rad. Shield elect. sep. plates from extracted beam synch. rad. 86 163 Disrupted beam low energy tail, 185 Disrupted beam horizontal tails

Magnets 500 GeV CM Distance Radius/ Poletip from IP Length 1/2 gap field Name (m) (m) (cm) (T) Notes QD0 3.51 2.2 2.0 2.83 SD0 5.86 0.6 2.0 1.32 QF1 7.81 2.0 2.0 1.60 SF1 9.96 0.3 2.0 1.24 B1 90.1 73.5 6.0 0.0025 C-magnet QD2A 163.9 2.0 13.0 1.22 B2 166.2 139.6 10.0 0.0070 C-magnet QF3 190.8 2.0 7.0 0.75 Septum (BaBar Q2) B_EXT1 203 5.0 6.0 0.84 "Thick" septum QD2B 217.7 2.0 10.5 0.18 B_EXT2 509 6.0 6.0 1.00 = incoming and outgoing beams = incoming beam only = outgoing beam only

Power Lost on Beam Line Elements in Zero Degree Extraction Line* (Units Kilowatts) 500 GeV CM, Nominal Parameter Set* Worst Case Radiative Head On Vertical Offset Bhabha's Beam- Beam- Loss Point Charged strahlung Charged strahlung Charged QD0/SD0 0 0 0 0 0.000022 QF1/SF1 0 0 0 0 0.000024 Synch. Mask 0 0 0 0 0.00045 Separator Plates 0 0 0 0 0.0001 0.0013 0 13 3.3 0.00007 16 0 9 0 0.0064 1.7 0.4 0.06 11 0.0006 Beamstrahlung dump 264 361 Charged dump 11,280 11,280 *Twenty meter long separator chain begins 15 m from the IP

Changes for 1 TeV CM 1. Longer final doublet separator moves 2 m further from the IP. 2. Longer separator to keep the same gap (10 cm) and stay within reasonable maximum voltage (250 kv) leads to an intermediate collimator halfway along the separator chain.

Power Lost on Beam Line Elements in Zero Degree Extraction Line (Units Kilowatts) 1 TeV CM, Nominal Parameter Set* Worst Case Radiative Head On Vertical Offset Bhabha's Beam- Beam- Loss Point Charged strahlung Charged strahlung Charged QD0/SD0 0.00023 0 0 0 0.00013 QF1/SF1 0.1 0 0.1 0 0.0002 Synch. Mask 0 0 0 0 0.00045 Separator Collimator 0.2 0 0.16 0 0.0013 Separator Plates 0 0 0.02 0 0.0002 0.03 0 92 0.002 0.00066 110 0 95 0 0.021 2.5 0 0.3 0.7 0.00024 Beamstrahlung dump 1,087 1,696 Charged dump 18,000 17,900 *Twenty-five meter long separator chain begins 17 m from the IP

Machine Protection, Fault Examples Separator breakdown during the bunch train: (dipole remains on) Outgoing bunches: 0.5 mrad bend becomes 0.25 mrad bend. Bunches hit QF3 low-z septum collimator. Incoming bunches: 0 mrad bend becomes 0.25 mrad bend. Bunches pass cleanly through the IP region and hit AB7, 450 m from the IP. The low-z protection collimators which intercept these errant bunches have to survive 30 bunches before the machine protection system takes the beam to the linac dump.

Next Steps if this is to Become a Viable Alternative to the 2 mrad Baseline Configuration Need more collaborators to: 1. Design higher order optics to limit beam losses beyond the 5 mrad dipole. 2. Design optics for the energy spectrometer and Compton polarimeter (can the spot be made small enough at the laser IP)? 3. Modify the FF optics to create space within the dipole string for protection collimators at QD2A and QF3 at 500 GeV and 1TeV CM. 4. Look at the optimum position of QD2A to minimize the separator bend angle (brief look by Andrei showed the bend can be reduced by more than 20%, i.e. 50 kv/cm @ 1 TeV CM => 40 kv/cm). 5. Design the septum quadrupole QF3 and the 5 mrad septum dipole. 6. Simulate radiative bhabha s hitting the separator plates. Preliminary indications are that these contribute less than one microamp of separator current at 500 GeV CM. 7. Simulate the scattered synchrotron radiation from the mask which protects the separator and estimate the photon flux hitting the separator plates. 8. Continue beam loss simulations with all parameter sets.

Conclusions: To show that head-on collisions are a viable option, a level of effort comparable to that expended on the 2 mrad crossing angle must be started soon if this option could be considered as part of the baseline configuration by the end of 2005. At 500 GeV CM, nominal parameter set: The separator requirements are well within the LEP experience. The charged beam and beamstrahlung losses appear tolerable, pending design of the full extraction line Required pressure less than 10-9 mbar, LEP had 10-10 mbar or better. Simulations of scattered synchrotron radiation and radiative bhabha s hitting the separator plates need to be finished. It has yet to be shown that energy and polarization measurements in the extraction line are possible. Parasitic bunch crossing at 50 m => separation is 1.25 cm => Is this enough? (Deepa, et.al.)

Conclusions (cont.) : At 500 GeV CM, high lum parameter set: (show stopper)? Have to open the separator gap to 20 cm to avoid intolerable losses on the plates. In principle this is OK, but there are also several hundred kw of disrupted beam lost on the energy slit at QD2A. At 1 TeV CM, nominal parameter set: The charged beam and beamstrahlung losses appear tolerable, pending design of the full extraction line. The LEP group has tested separators at the required field of 50 kv/cm, but has little experience with long term operation in the accelerator environment. The separator needs to be lengthened from 20 to 25 m, and a new collimator introduced. The effect of this collimator on the breakdown rate must be understood. Is 150 ns bunch spacing required? (Parasitic bunch crossing at 25 m is only 650 separation).

Backup

RF Kicker Machine Protection, Fault Examples 1) Reduced kick of out-going bunch, => undisrupted bunches (380 x 32 ) hit protection collimator, => 50 C/bunch temp. rise in solid aluminum. May be OK in an aluminum plate/water collimator. 2) No kick, undisrupted bunches go backward through incoming line. If this happened in SLC, the incoming arc had an energy taper, so the backward bunch was lost in the arc and may have caused an ion chamber trip. 3) Kicker at wrong phase so the incoming bunch gets a kick (A. Seryi) => severe damage potential - see next slide. 4) Incoming dark current bunches see non-zero kicker field and hit elements in the IR (A. Seryi) => MPS trips and/or large backgrounds in the detector.

Kicker out-of-phase for incoming main bunches or dark current bunches