Marine Insurance Associates Amsterdam

Similar documents
Installation, future demands for recruitment and competencies. Speaker: Hans Schneider Date: 4 April 2013

The installation and servicing

Profile. Offshore Wind Projects. Sustainable EPC and Marine Contractors

EXPERIENCE WITH DP-SYSTEMS ON BOARD

London Array. Operations and Maintenance

Supply Chain Opportunities and Management of Risk. Ian McCarlie

INSTALLATION and LOGISTICS of OFFSHORE WIND FARMS

UK content analysis of Robin Rigg Offshore Wind Farm operations and maintenance

Essex... A great location for offshore wind

Wind Service Offshore. We can t conquer the elements But we can outthink them

Safeguarding Investments and Risk Exposure

VISION MISSION ABOUT A2SEA. Stay ahead in taking wind power offshore and the future of energy in a sustainable direction.

Offshore Wind OPERATIONS & MAINTENANCE. A National Renewables Infrastructure Plan Stage 2 Information Paper

HIGH LEVEL REVIEW HELIDECK AND ACCOMMODATION Helideck and accommodation facilities on offshore platforms for wind farms. TenneT.

Danish Society for Naval Architecture and Marine Engineering, Danish Maritime Society, The Transport Innovation Network & Danish Wind Energy Group

OFFSHORE WIND Peter Robert

OWPST & Titan 200 & UK Offshore

Abstract. Introduction

Contents. 1. PROFILE p2. 2. SERVICES 2.1 Offshore Support Services p 4 Offshore support p 6 ROV operations p 8

Our recent customers Siemens / Statoil and Bard Offshore have experienced this. References on request.

G9 Offshore wind health and safety association

OFFSHORE WIND PROCUREMENT

Design of Offshore Wind Farms Prepared by Flemming Jakobsen & Andrass Ziska Davidsen LICENGINEERING A/S

DEPARTMENT OF MARINE SERVICES AND MERCHANT SHIPPING (ADOMS) Boatmaster s Licenses

Training and Certification Requirements for the Crew of Fishing Vessels and their Applicability to Small Commercial Vessels and Large Yachts

Concepts for Transfer of Personnel in Offshore Wind

> Capital Markets Day 2011

Our mission is to be a solid and flexible partner by delivering unique and challenging projects. We are present in OFFSHORE WIND

Vessels reporting duties on the NSR

Nautischer Verein zu Bremerhaven Bremerhaven, Nautischer Verein

Overturning Stability of Offshore Wind Power Substructure with Bucket Foundation

Monobuckets and the competitiveness versus monopiles and jacket structures.

MAXIMISING YOUR. Offshore wind assets ASSET OPERATION & MAINTENANCE SERVICES

A Guide to UK Offshore Wind Operations and Maintenance

Introduction BAM and Van Oord GBF - Concrete Centre Conference, December 2012

OFFSHORE WIND TECHNOLOGY OVERVIEW NYSERDA PON 995, Task Order No. 2, Agreement No. 9998

Recovery of Persons from the Water

GOLIATH DPIII OFFSHORE SUPPORT VESSEL. Vessel Specification - December 2011

For the PNTL Fleet, which are all purpose built vessels, certified to INF3 classification [3] such prevention measure include the following:

How To Reduce Energy Efficiency On Ships

COMPOSITE VESSELS DANISH YACHTS A/S

Cost Benefit Methodology for Optimal Design of Offshore Transmission Systems

Employment in OWE in NL, 2010

Port of Farsund. The exotic choice. Your first and foremost port in Norway

E.ON Offshore Wind Energy Factbook

Fassmer Offshore Solutions

ArcticStore. product guide environmentally friendly storage solutions

Fjord Line AS a company running on LNG. Presentation, Thursday March 5th 2015

Fleet Performance Management and Benchmarking Against Peers

Part 0 - Classification and Surveys Classification and Surveys I

2016 MAY. The brochure.

NOWITECH models for O&M and fleet optimization

FOGA ApS. Arctic Hunter Multipurpose/support vessel

The Market for Installation Vessels

A Guide to UK Offshore Wind Operations and Maintenance

RENEWABLE ENERGY IN FIFE Skills and Supply Chain

Marine Guide for Ship Masters Contents

13. FPSO Operational Problems Don Smith, OGP

E.ON Offshore Wind Energy Factbook

LNG as Ship Fuel. Effects on Ship Design, Operations and Supporting Infrastructure

Dutch wind energy strength

Hellesylt. PORT Contact on arrival (detail name): VHF channel: 13/16 PFSO on duty Telephone: Notice required:

Nordkapp og Porsanger Havn IKS. Nordkapp og Porsanger Havn The port of North Cape. Price List- Cruise Vessels. Rev..

DONG Energy offshore wind experience

INCREASE UPTIME THROUGH SAFE ACCESS

Operational analysis & Optimisation

Offshore Work Packages

Lisbeth Holberg. Contact details Tel.: Address: Agnetevej 32, DK-8680 Ry, Denmark.

RESUME for Dr. Walter L. Kuehnlein

Project ms Groenland. Henk Grunstra / Richard de Vries Damen Shipyards / Rederij Doeksen

Helicopter Flight Operations to Offshore Windfarms

COOLING SOLUTIONS WIND

2015 CT Offshore A/S Diving Assistance Sub Station Debris Clearance WODS Wind Farm

Trevilling Quay Wadebridge Cornwall PL27 6HF

Performance Monitoring and Analysis for Operational Improvements

Power output of offshore wind farms in relation to atmospheric stability Laurens Alblas BSc

Winddag 2015: Innovation need and necessity. Bob Meijer 20 juni 2015

Australian Maritime Safety Authority

Offshore Wind Project Management

Integrated management systems Ship operating companies

HSE DIRECTIVE 10 HELICOPTER OPERATIONS

PT. ANDIKA BUANA LINES BATAM - BROCHURE

The WindFloat Project

Notice to all operators and masters of passenger ships and non-passenger vessels on inland waterways and on limited coastal operations.

Operations in the Arctic areas? New challenges: Exploration Development Production

Dansk Offshore Netværk, Lindø Industripark, 21. April 2015 The Road to Below 10 ct /kwh

Experiences Drilling in the North. OMV Norge AS

Offshore Wind Operations. Fife, at the heart of renewable energy development in Scotland

Offshore Renewable Energy Services and solutions

World Fuel Services Corporation Overview

installation, operations & maintenance

Marine Training Courses available from B & M Marine Services

Integrated Risk Management Solutions

Transcription:

Marine Insurance Associates Amsterdam 22 maart 2010

WindCat Workboats

History 2000 Neil M. Clarkson Robbert M. van Rijk Renewable energy Intermediar Consultant Fisheries Need of Vessels

Offshore access systems Existing offshore access systems in the oil/gas industry EU: Heli, Supply vessel, crewbasket, Frog. US/Gulf: same, plus crewboats. New challenges due to the development of offshore windfarms No design criteria for vessel, stable platform, high speed. Purpose: Transporting maintenance engineers and components, safe and efficiently HSE requirement, wave heights. How many vessels a) construction period b) maintenance period How many turbines per vessel How many technicians per vessel / day

How it all started Started in 2000 development of vessels trial and error

WindCat Unique points Safe transfer in excess 2 meter swell Proven safe transfer method over 130.000 in the last 3 years Comfortable relaxing accommodation for technicians Highly experienced skipper / crew and shore side backup Efficient speedy transfers Economical operation of vessel

Proven stable platform

WindCat Workboats

Present fleet WindCat Mk 1 WindCat Mk 2 WindCat Mk 3 WindCat 1-4 WindCat 5-8 WindCat 9-16 operating Windcat 17 25 being build EVOLUTION

Windcat 15 Beatrice field United Kingdom WindCat 1 Q7, WndCat 12 OWEZ WindCat 3 & 4 Robin Rigg United Kingdom WindCat 7, 14, 16, 17 & 18 Horns Rev2, Denmark WindCat 2 Arklow Windfarm Ireland WindCat 5 Burbo Bank United Kingdom WindCat 11 Thorton Bank, Belgium WindSpeed 3 Gunfleet Sands United Kingdom WindCat 8 & 7 Greater Gabbard United Kingdom WindCat 9 & WindCat 10 Lynn Inner Dowsing United Kingdom WindCat 20 Greater Gabbard United Kingdom

Safety of operations Safety = first and highest priority QHSE manual Clean safety record over full fleet after 130.000 of transfers Proven step over system Highly experienced crews Training program for new crews Regular drills including clients technicians when possible ISO 9001 in progress External QHSE auditor 2010 WindCat QHSE manager to be employed

Experience gained Up to today over more than 130.000 safe transfers without incidents Accessibility is key for any satisfactory offshore operation Position of boatlanding in current/tide direction Height of boatlanding Type of boatlanding / ladder / stairs Strength of boatlanding Future ladders / inclined ladders / Labour Law Mooring berths, for fuelling up safe 24hrs access in port Vessel and people tracking

Presently under construction WindCat 21 and 23, MK 3, short wheelhouse, MTU main engines, Hamilton WaterJet WIndCat 24,25,26, MK 3, long wheelhouse, MTU main engines, Servogear VP WindCat 101, MK 4, fully classed DNV, 50 pax, 4 x MTU, Servogear VP Presently under design WindCat MK 3,5 fully classed DNV, 24 pax, MTU main engines, Servogear VP, German waters WIndCat MK 3,5, MCA classed < 24 mtrs, MTU main engines, Servogear VP. Typical bad weather vessel UK WindPower, small catamaran scatter vessel, one point hoisting point.

Presently under construction WindCat 23

Other offshore systems Ampelman Self stabilizing platform Based on proven technology of flight simulator Movement input from vessel Ampelman Modular, stand alone, plug and play system Vessel to be used as mother vessel if necessary

Other offshore systems O-as Offshore Solutions

Other offshore systems Swath Abeking & Rasmussen

Future Offshore Access Solutions Near shore - Far offshore Round ½ - Round 3 Upto 25 mile - 25 to 100 miles Fast crew vessel - platform crew accommodation Workable wave heights & windspeeds

Future Offshore Solutions Accommodation platforms Windsolution, C-Bed EON substation. KS Energy, Titan 2 Dong Energy substation.

New design WindCat MK 4 Round 3 demonstrator vessel DNV Classed Pax notation 40 50 passengers 30 knots cruising 32 knots max speed 8 ton cargo capacity

New design WindCat MK 4 Round 3 demonstrator vessel

New design WindCat MK 4 Round 3 demonstrator vessel

Complementary to existing offshore systems Increase in swh expected 2 mtr + guaranteed Complementary to helicopters Complimentary to Suppliers Quick emergency response Quick oil response Quick oil recovery Survey and dive support vessel

New design WindCat MK 3,5 Increase comfort at sea with seastates over swh 2 mtr Increase and guarantee access over swh 2 mtr Classed version 24 pax MCA version 12 pax

New design WindCat MK 3,5

New design WindCat MK 3,5

New design WindCat MK 3,5

Type of preferred boatlanding Jacket spiral access staircase

Vessel mooring recommendations Safe berthing in all weather conditions, no lost of time due to tide Multi point for fast bunkering Pontoon with 16 amp shore supply Refuse collection point and waste water

Thank you for your interest in WindCat Workboats