Construction of the Eads Bridge



Similar documents
Safe & Sound Bridge Terminology

Historic Bridges of Frederick County. Frederick County, Maryland Division of Public Works Department of Highways and Transportation (301)

Bridges to Math. Students will collect bridge statistics to use for measurement calculations and comparisons.

Public Information & Public Scoping Meeting

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

Chaudière Crossing Bridge Rehabilitation

J. David Rogers Natural Hazards Mitigation Center University of Missouri-Rolla

REHABILITATION PACKAGE 1-a

CSXT Emergency Response for May 2010 Flood Repairs

CITY OF TRAIL MEMORANDUM

Informational Workshop Public Meeting Kanawha Falls Bridge Project

GEORGE J. CAMBOURAKIS, P.E., C. ENG. PRESIDENT & CHIEF STRUCTURAL ENGINEER

US 51 Ohio River Bridge Engineering and Environmental Study

CONCEPTUAL REHABILITATION ALTERNATIVE

3 Tappan Zee Bridge Rehabilitation Options

3.1 Historical Considerations

Incredible Inventor. Beginner Biographies

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM

ENGINEERING SERVICES FOR CONTRACTORS

The Rehabilitation Alternative Huey P. Long Bridge Case Study. Bruce E. Peterson, P.E. Project Manager Modjeski and Masters, Inc.

Open House Public Meeting for the Thurmond Bridge Rehabilitation Project State Project: State Project S310-25/ Federal Project: BR-0252(001)D

MEMORANDUM West Swann Avenue, Suite 225 Tampa, Florida Phone (813) Fax (813)

Design of Bridges. Introduction. 3 rd to 4 th July Lecture for SPIN Training at the University of Dar es Salaam

Project Information. New Hope - Lambertville Toll Bridge - Pavement Rehabilitation & Approach Bridges Repairs -

My name is Big MOE. I was built in the year I can pick up balls and put them in a basket.

Stone Arch Bridges of Washington County, MD

The Mersey Gateway Project

CHAPTER 4 LEGAL DESCRIPTION OF LAND DESCRIBING LAND METHODS OF DESCRIBING REAL ESTATE

A Career In CIVIL ENGINEERING: Improving the Quality of Life

COLUMN-FREE OFFICE SPACE RISES IN CHICAGO S LOOP

BRIDGES ARE relatively expensive but often are

Contractor of the Year

Managing Water in the West. Arrowrock Dam: A Century of Service

THE STRUCTURAL ENGINEER

Concept Design Synopsis

ISSUING AGENCY: New Mexico Public Regulation Commission, Insurance Division. [7-1-97; NMAC Rn & A, 13 NMAC 17.6.

Construction Industry Safety History CSTM 102

Rehabilitation of Locks on the Kentucky River

BRIDGE RESTORATION AND LANDSLIDE CORRECTION USING STRUCTURAL PIER AND GRADE BEAM

CAPPELEN MEMORIAL BRIDGE REHABILITATION

MILWAUKEE CITY HALL FOUNDATION RESTORATION. Project Update November 12, 2014

Electric Service Conversion Overhead-to-Underground. Minnesota

Bridge Facts. Can you name the longest bridge in the world? The Akashi-Kaikyo Bridge

Michigan Air-Line Railroad Company

Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir. Presented By: Doug Stachler, P.E.

2001 WAG Postprints Dallas, Texas

Port Corpus Christi Awarded $10M from USDOT 2012 TIGER Grant Grant Will Help Fund the Port s New Main Interchange Rail Yard

Analysis of the Interstate 10 Twin Bridge s Collapse During Hurricane Katrina

REPAIR AND STRENGTHENING OF HISTORICAL CONCRETE BRIDGE OVER VENTA RIVER IN LATVIA

Lockport Pool Chicago Sanitary & Ship Canal Illinois Waterway

HEAVY MOVABLE STRUCTURES, INC. 12 TH BIENNIAL SYMPOSIUM NW 17 TH AVENUE BRIDGE REHABILITATION OVER THE MIAMI RIVER MIAMI-DADE COUNTY

~iffiui ~ Bridge Condition Survey. Inspection Date: 21 May 2003 District: San Angelo County: Tom Green Highway:

STRUCTURAL ASSESSMENT. Full Metal Jacket Building 0 Prince Street, Alexandria, VA

National Archives and Record Administration

How To Check For Scour At A Bridge

RENOVATION AND RESTORATION OF OLD BUILDINGS IN SRI LANKA

WSDOT Bridge Elements

Introduction to Architecture. Lesson 13: Hoover Dam

PHOTOGRAPHS WRITTEN HISTORICAL AND DESCRIPTIVE DATA

THE MINERAL INDUSTRY OF NEBRASKA

IH-635 MANAGED LANES PROJECT, SEG. 3.2

Red Wing Bridge Project. PAC #5/TAC #8 Meeting July 18, 2013

Full recovery. The current state of American infrastructure. As economy improves, I-74 span to handle the masses CITY STREETS

FEBRUARY 2014 LRFD BRIDGE DESIGN 4-1

How to Design and Build a Fence/G traverse Bridge or Graffiti Project

1,045 m length of the Deh Cho Bridge

BLACK & WHITE PHOTOGRAPHS WRITTEN HISTORICAL & DESCRIPTIVE DATA

National Council of Examiners for Engineering and Surveying. Principles and Practice of Engineering Structural Examination

Piers, Wharves & Docks

KOSCIUSZKO BRIDGE PROJECT BRIDGE PRIMER

Ross River Suspension Bridge Ross River, Yukon. Life Cycle Cost Analysis

Overhang Bracket Loading. Deck Issues: Design Perspective

302 E. Millsap Fayetteville, AR mwyusa.com

Aging sewer pipes buried in the Bow River bed, from the foot of Muskrat Street to Glen Avenue must be replaced A raised crossing pipes crossing over

Analysis of the Response Under Live Loads of Two New Cable Stayed Bridges Built in Mexico

Uptown Station - A Model For the Coming Train Feeding Craze

C O N S U L T A N T S RESUME

Founder s Foresight Key to Courtlandt Place Preservation. By Sallie Gordon

Nepean River Bridge. The NSW Government is building a new pedestrian and cyclist bridge over the Nepean River to connect Penrith and Emu Plains.

Truss. are both simple and A Matsuo Example continuous trusses. The

Hunter College school of Social Work Thesis Proposal

Displayed with permission The American Surveyor Vol. 9 No. 9 Copyright 2012 Cheves Media

SECTION POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

Source: Port Mann Bridge Plans Unveiled Today, CBC News, February 4, 2009.

Title: Document by which land was conveyed from the public domain into private ownership. Titles were issued by the governments of Spain and Mexico.

14. ENGINEERING AND CONSTRUCTION SCHEDULES Preparation of Schedules ALASKA ENERGY AUTHORITY AEA ENGINEERING FEASIBILITY REPORT


Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. Fig some of the trusses that are used in steel bridges

Managing Our Water Retention Systems

Statement of Matt Woodruff. on behalf of. Kirby Corporation. before the. Committee on Environment and Public Works. United States Senate.

April 17, 2015 SUMMARY OF SUBJECT MATTER

GUIDELINES FOR REHABILITATION OF TRADITIONAL COMMERCIAL BUILDINGS DESIGN GUIDELINES

Evaluating. A Case Study

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

FY14 LRD Lock Maintenance Meeting February Rehabilitation of the Bird Island Pier Black Rock Lock, Buffalo, NY

Steve Jobs, Bill Gates, and the PC and Course Review

What kinds of engineers build bridges?

PORTLAND BES ADVANCES IN SEWER MAINTENANCE AND REPAIRS BY OPERATING MULTIPLE CIPP CREWS.

Engineering for Rehabilitation of Historic Metal Truss Bridges

The Manitoba Water Services Board SECTION Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

Transcription:

Construction of the Eads Bridge Margaret L. McGunegle 23 March 2004 Science can do anything, however tremendous, if it has enough money." - James B. Eads

Purpose To provide the class with an overview of the Eads Bridge to include its history, design, and construction.

References Dorsey, Florence. Road to the Sea. Rinehart & Company: New York, 1947. Kirby, Richard S., et al. Engineering in History. McGraw-Hill: New York, 1956. Miller, Howard S. and Quinta Scott. The Eads Bridge. Missouri Historical Society: Saint Louis, 1999. Moser, Diane K. and Ray Spangeburg. The Story of America s Bridges. Fact on File: New York, 1991. Williams, J. W., Jr. James B. Eads and his St. Louis Bridge. Civil Engineering Oct., 1977: 102-106. www.builtstlouis.net www.4dw.net/rainman2000/flood/flood.html www.loc.gov www.pbs.org/wgbh/amex/eads/index.html www.quintascott.com/eadsbridge.html www.slfp.com/fairstl2003.htm

Outline Bridge Information Engineering Innovations James B. Eads The Problem The Solution Bridge Design Bridge Supports Building the Piers Caissons Superstructure Problems with Iron and Steel Erecting the Superstructure Completion and Opening History of Use

Bridge Information Engineered and constructed by James B. Eads Built from 1867 to 1874 at a cost of $6 million ($12 million including land, tunnels, debt, and approaches) Oldest standing bridge across the Mississippi and one of the first Spans: 502, 520, and 502 feet Materials: Steel: 2,390 tons Wrought Iron: 3,156 tons Timber Decking: 806 tons Stone Masonry (limestone): 97,571 cubic yards

Engineering Innovations Largest bridge constructed at the time First major use of structural steel Use of cantilever support for superstructure First significant underwater use of compressed air in the United States Largest and deepest caissons used to date A variety of new mechanical inventions including the sand pump

James B. Eads Born on 23 May 1820 in Indiana Family moved to St. Louis in 1833 In 1844, Eads began his own Mississippi River salvage business He taught himself engineering and designed his own salvage ships and diving bell Built ironclads for the Union during the Civil War Suffered from ill health, probably from his diving excursions, and took convalescent trips to Europe Engineered jetties for the Mississippi River Delta Proposed a huge ship-railway system across the Isthmus of Tehauntepec, Mexico Married twice with one daughter and three stepdaughters Died 08 March 1889 in the Bahamas

The Problem (1 of 2) Saint Louis - 1859 Railroads began to overtake rivers and canals as the preferred transportation of commerce Rapid expansion of Illinois and Chicago railroad lines

The Problem (2 of 2) Chicago railroads bridged the Mississippi at Rock Island with plans to bridge at Dubuque, Burlington, and Quincy Chicago rail moved deep into Saint Louis Trade Region Chicago s population soared while Saint Louis stalemated 1870 Railroad Map

The Solution (1 of 2) By 1866, civic and financial leaders of Saint Louis demanded a bridge to connect the five eastern and three western railroads near the city The St. Louis and Illinois Bridge Company secured state and federal authorization to bridge the river Early designs included: A suspension-arch from John Roebling A tunnel from the Mississippi Submerged Tubular Bridge Company A lattice-girder truss with six piers from the Illinois and St. Louis Bridge Company The Illinois and St. Louis Bridge Company, led by Chicago capitalist Lucius Boomer, received the exclusive rights to build from Illinois side

The Solution (2 of 2) Railroad financiers did not share the city s enthusiasm because many were from Chicago Steamboat men objected because it would cut into their commerce and add an obstruction to the river Political opponents passed a Congressional Bill in 1865 which would require the bridge to have 500 ft spans and have a clearance of 50 ft above the City Directrix, the local survey base line James B. Eads originally was not interested, but did not want the bridge s control to fall into Chicago s hands Eads teamed up with the St. Louis and Illinois Bridge Company Eads began circulating designs and became the company s director by May 1867

Bridge Design (1 of 2) Eads was inspired by the Koblenz Bridge in Germany Eads design called for 3 steel arches supported by masonry abutments and piers Supports extend to bedrock for stability

Bridge Design (2 of 2) Original design placed rail deck below the arches and included architectural accents.

Bridge Supports (1 of 2) Constructed of limestone masonry The original plan called for the use of coffer dams to place all the supports Coffer dam for west abutment started in August 1867; cornerstone laid on 25 February 1868 Masonry from bedrock: 113ft

Bridge Supports (1 of 2) Air Lock In 1869, Eads discovered the plenum pneumatic method, excavating in caissons, while convalescing in Europe He brought it to Saint Louis to use on the remaining abutment and piers

Building the Piers * (1 of 6) * Taken from PBS American Experience, Secrets of a Master Builder

Building the Piers (2 of 6)

Building the Piers (3 of 6)

Building the Piers (4 of 6)

Building the Piers (5 of 6)

Building the Piers (6 of 6)

Caissons (1 of 2) Derricks and Pontoons for the East Pier Construction of east pier began on 17 October 1869; reached bedrock on 28 February 1870; masonry to bedrock: 193 ft Plan View of Derricks and Pontoons Construction of west pier began in early 1870; Reached bedrock 01 April 1870; masonry to bedrock: 172 ft

Caissons (2 of 2) Eads caissons became a popular tourist attraction for Saint Louis society By this time, the competing bridge companies had settled their differences and merged Construction of east abutment began on 3 November 1871; reached bedrock in April 1871; masonry to bedrock: 197 ft The east abutment included an elevator and a floating hospital to treat workers with Caisson Disease

Problems with Iron and Steel (1 of 2) Metal manufacturing lacked any standards in the 1870s Keystone Bridge Company received contract to build superstructure Butcher Steel Company awarded contract for steel parts and Kloman Carnegie received contract for iron parts Butcher s carbon steel failed all of Eads test so Eads used chrome steel instead In reality, amounts of chrome varied greatly in the steel pieces The improvement in quality is probably more linked to experience and acceptance of Eads exacting standards

Problems with Iron and Steel (2 of 2) Eads inspectors rejected iron sample braces from Kloman Carnegie A compromise was made when Eads lowered the tensile requirements and Kloman Carnegie improved quality control Keystone could not produce steel couplings without bubbles or internal flaws Eads had to resort to wrought iron couplings Metallurgical problems delayed bridge construction for at least two years Eads Bridge ended up being more than half wrought iron

Superstructure (1 of 4) Superstructure Connection to Masonry Cross-Section of Pier

Superstructure (2 of 4) Assembled Ribs Details of Steel Ribs A thin steel envelope bound the six steel staves together into a twelve foot rib Each end of the ribs was cut at a slight angle to make an arch

Superstructure (3 of 4) Detail of Rib Joint with Coupling and Braces Assembled Ribs Showing Couplings and Braces Up Close of Joint

Superstructure (4 of 4) West Abutment Train Tunnel Road Deck Support

Erecting the Superstructure (1 of 3) Henry Flad, assistant engineer, devised a method of using cantilevers to construct the superstructure to keep the river clear of falseworks Boatmen tried to stop construction of the arches in conjunction with Secretary of War Belknap and General A. A. Humphreys, Chief of the Corps of Engineers Eads appealed to his friend, President Grant, who ordered Belknap to drop the case

Erecting the Superstructure (2 of 3) Closing the East Span September 1873 Closing the East and Center Spans December 1873 Eads developed double threaded coupling to close the west span Flad attempted to close arches by packing them in ice, but had to resort to Eads coupling

Erecting the Superstructure (3 of 3) Building the Road and Rail Decks Spring 1874

Completion and Opening Decks finished on 15 April 1874, but Keystone refused to open bridge before it received a payment bonus On 24 May, the city opened the sidewalks to pedestrians On 03 June, the road deck was opened to vehicles Grand-opening ceremony was a part of the 4 th of July festivities

History of Use (1 of 7) Saint Louis -1874 Bridge never lived up to its expectations Coordination was never made to connect major rail lines to bridge Bridge went bankrupt within a year and was sold in December 1878 for $2 million

History of Use (2 of 7) Rail traffic ceased on the bridge in 1974 Vehicular traffic stopped in 1991 Illinois side removed approach Saint Louis -1890 Eads Bridge 1993 (note approach on east bank)

History of Use (3 of 7) Saint Louis light rail system began to use rail deck and attached tunnels in 1993.

History of Use (4 of 7) The bridge survived numerous floods. Saint Louis - 1993 Saint Louis - 1994

History of Use (5 of 7) The bridge continued to fall into disrepair and neglect. Deterioration of Abutment Masonry Rusting Toll Booth

History of Use (6 of 7) Reopening Celebration Saint Louis lobbied for support and the bridge is now a protected National Landmark $25 million dollar restoration project began in late 1990s Bridge reopened during the 2003 4 th of July festivities to pedestrian and vehicle traffic

History of Use (7 of 7) Bridges of Downtown Saint Louis Future Bridge in Saint Louis: estimated cost - $1billion, estimated completion - 2010

Summary The events leading up to the construction of the Eads bridge The design and construction of the bridge s supports and superstructure Obstacles and delays during construction The history of the bridge since its completion

Questions?

Conclusion Must we admit that because a thing never has been done, it never can be? - James B. Eads