PROJECT DESIGN DELIVERABLES SEQUENCE (PDD)



Similar documents
Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+)

Provide Outsourcing services In the areas of Engineering Design & Project Management Consultancy Services

Mechanical Engineer. Process Engineer. Civil Engineer. PFD Inlet works and screening PFD Membrane Bioreactor 34.

Plant Design for Oil & Gas Industry Client

ENGINEERING & CONSULTANCY

Master Class. Electrical and Instrumentation (E &I) Engineering for Oil and Gas Facilities

TABLE OF CONTENT

APEC CAPABILITIES PROJECT MANAGEMENT / SUPPORT

JUBILEE TECHNICAL TRAINING CENTRE TAKORADI POLYTECHNIC 2015 TRAINING PROGRAMMES

Liquefied Natural Gas (LNG)

TABLE OF CONTENT

Alain Nifenecker - General Electric Manager Controls Engineering

Engineering Procurement Construction Quality Plan

HANDOVER OF DISTRIBUTION NETWORK ASSETS (ELECTRICITY & WATER)

FIRE ALARM SYSTEM. A. Shop drawings shall be submitted as follows: 1. Manufacturer's published literature. for aspproval.

Safety Integrity Level (SIL) Assessment as key element within the plant design

Recently Completed Projects - Storage Projects

HAZARDOUS MATERIALS MANAGEMENT ISSUE 2

ENGINEERING SPECIFICATION. Engineering Specification SAPPHIRE 42 Bar

H.V.A.C. Design Plumbing Design

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

Electrical Engineering

TABLE OF CONTENT

SLC Standards Leadership Council

TRANSNET PIPELINES. TPL 25 Tarlton Commissioning Plan

IAG EFFECTIVE SCOPE MANAGEMENT THROUGH MULTI-LEVEL CLIENT ENGAGEMENT

Backup Fuel Oil System Decommissioning & Restoration Plan

SPECIFICATION MICROMIST FIRE SUPPRESSION SYSTEM WITH CHEETAH Xi CONTROL PANEL

ENGINEERING SPECIFICATIONS

2012 BIM Guidelines and Standards (Rev. 00) University at Albany

Electrical. This section applies to the design and installation of building power distribution systems.

University of Houston Master Construction Specifications Insert Project Name

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS

SECTION ( ) FIRE DETECTION AND ALARM SYSTEM

TANKLESS WATER HEATER INSTALLATION DIAGRAMS

A. The Commissioning Authority (CxA) has been contracted or will be contracted directly with the Owner for this project.

Liquefied Petroleum Gas Volume 1 : Large Bulk Pressure Storage & Refrigerated LPG

Engineering Capability Presentation 02-Feb-2015

Owner-User Pressure Equipment Integrity Management Requirements

Transformer Deluge Systems

B-1 Buildings & Service Maintenance

Automation. Main Automation Contractor (MAC) solutions Helping the process industries to reduce risks and project delays

Addendum #2 Contract UK-11-13

KUWAIT OIL COMPANY (K.S.C.) RFP: INSTALLATION OF TELEMETRY SYSTEM FOR MONITORING AND CONTROL OF CONSUMERS NETWORK SYSTEM APPENDIX F

Asset Lifecycle Information Management solutions for Oil & Gas industry. Marcin Stecki, Bentley Systems Inc.

CAD/CAE systems and cost engineering

DET NORSKE VERITAS TM

North Street, Stoke-on-Trent, ST4 7SA. Tel: Fax: Web:

CONSULTATION PAPER FOR PROPOSED MODIFICATIONS TO THE TRANSMISSION CODE

Exceptional... Everytime!

Aerni consulting services

COMMISSIONING OF HVAC SYSTEMS

Tracking project deliverables through a standard definition of Project WBSs. Franco Concari Technip & VP IPMA Italy Luciano De Gaetano Technip Italy

ENGINEERING COMPETENCY CLAIMS

Safety Integrity Level (SIL) Studies Germanischer Lloyd Service/Product Description

Tennessee Gas Association

BANGLADESH POWER DEVELOPMENT BOARD. Consulting Services for Ghorasal 365 MW Combined Cycle Power Plant Construction Project

Arkansas Natural Gas Severance Marketing Costs

Drawings for Pipe Installation

THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION

The commissioning of the LHC: first the technical systems, then the commissioning with beam

Combined Cycle Control Overview

Chapter 9 Computer Scheduling Projects should be scheduled one byte at a time

TABLE OF CONTENT

Spec. Standard: 11/27/ Revision: 11/27/06

PIPING DRAWINGS BASICS N.P.TODKAR

WHITE PAPERS. Process Safety Management

Training for Operations and Maintenance

CHUGACH ELECTRIC ASSOCIATION, INC. Anchorage, Alaska. February 10, 2014

Tank Terminals Proven Solutions for Liquid Bulk Storage and Distribution Terminals

Gas turbine power plants

Company Name: City, State, Zip Code: Annual Report Summary

Building Services Engineering Technician

Mechanical &Electrical Services Modernisation. Presentation to The Commons & Lords Management Boards 26 th November 2008

ACKNOWLEDGEMENTS. I like to say Thank You from the bottom of my heart to the following individuals for my

Agile Project Execution

Interfacing electrification and system reliability. Earthing of AC and DC railways 4,10,13

Gas Standards and Safety. Guidance Note GAS INSTALLATIONS SUPPLIED FROM BIOGAS FACILITIES - ACCEPTANCE REQUIREMENTS GAS ACT 2000

Importance of Project Schedules. matter what happens on a project. projects, especially during the second half of projects

Installation Guidance: CNG Refueling Stations

COMPANY NAME: STREET ADDRESS: CITY: STATE: ZIP: COUNTRY: Have you previously been a supplier member? Yes No If yes, most recent year:

Directory. Maintenance Engineering

The Piping System Model a New Life Cycle Document. Elements of the Piping System Model

SECTION FIRE ALARM AND DETECTION SYSTEMS

WHO NEEDS TO KNOW YOUR DATA CENTRE DESIGN?

E-Version SECTION CHLORINATION SYSTEM PART 1 - GENERAL PART 2 - PRODUCT

Practical Guidelines for Electrical Area Classification in Combustion Turbine-Generator Power Plants

MEM10019 Select circuit protection devices by type and rating, fit to switchboards and install earthing

SECTION FIRE AND SMOKE ALARM SYSTEM. City of San Diego, CWP Guidelines

Safety Requirements Specification Guideline

TABLE OF CONTENT

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

Designer Quality Control Plan Guidelines

Program No Section Heading

Cathodic Protection Use On Tank Bottoms & Underground Piping In Power Generation Plants

..OR How To Protect your 3-Phase Equipment Investment with 3-Phase Monitors from Time Mark...

Asset Management Conformity Assessment Fitness for Service QHSE. Oil & Gas Services and Tools. For the benefit of business and people

Intelligent Terminal Automation System

Marco Colombi Account Manager

Transcription:

PROJECT DESIGN DELIVERABLES SEQUENCE (PDD)

INTRODUCTION There are several reasons which lead to delay in project completion, out of all, one main reason is delay in deliverable processing i.e., submission & review documents. Most of the project cycles start with a list of deliverables but without a sequence of submission of the same, means without a direction to move, leading to overlapping of activities and more interdependences. Submittals are documents that must accompany items being sent, such as sample materials, plans, drawings, documents etc. Submittals typically require a response from the recipient, so it is necessary to organize and track when, and whether a response has been received. Hence Project Design Deliverables (PDD) is developed as a solution to Organize Transmittals (Documents/Drawings) received from contractors/consultants during different phases of an EPC (Engineering, Procurement & Construction) projects, which gives proper direction to the stakeholders from the beginning, to reduce inter discipline dependency, avoid overlapping of activities, provide a list of deliverables, sequence of activities etc... PDD attempts to provide a list and sequencing of the engineering documents/ drawings required during different phases of a Project which will benefit both client and Contractor in performing planned activities through timely submission & review of deliverables. This helps in ensuring improved quality and completion of Project in time. The successful implementation begins with a detailed understanding the specific challenges and requirements of the project.

INTRODUCTION The PDD will cover the contractor transmittal submission sequence for the following types of project Pipeline projects, Tankage projects, Building projects, Substation projects, Pressure Vessels (Separators, Heaters) projects, Fire and Gas System projects, DCS & ESD Modification Works projects, CCTV Projects, Fencing projects, Fire water System projects, Flare Projects, Air Compressor system projects

AIM This document attempts to provide a list and sequencing the engineering documents/ drawings required during different phases of a Project. This document can benefit both the Company and the Contractor in performing planned EPC activities through timely submission & review of deliverables in order to ensure improved quality and completion of Project in time.

AIM Following are some of the benefits of this document:- Implementation of this list & sequence of submission, as applicable, during Contract stage to Post-award stage up to Project Program of Schedule Stage, as minimum requirements. Submission of deliverables during detailed engineering, Procurement and Construction phases in proper sequence will enable the Company for a proper review resulting in saving time. Monitoring the timely submission & review of the deliverables from the early stages of Project. Responsibility and Accountability (Company & Contractor). Training of new Engineers about the significance of Engineering, Procurement & Construction deliverables in a Project and their proper sequence of preparation.

EXAMPLE Project Design Deliverable Check List Tankage Projects Process S. No PROJECT DESIGN DELIVERABLES: Doc/Dwg Dependency 1-P Process Flow Diagram Doc Independent 2-P Process Design Basis Doc Independent 3-P Piping/ Instrumentation Diagram Dwg. Independent 4-P Line Sizing 5-P Line List 6-P Tie-in List 7-P Cause & Effect Diagram 8-P Operation & Control Philosophy 9-P Tie-in Procedure Doc 7-MP/23-MP 10-P 11-P Commissioning Procedure Operating Manual Doc Doc 10-P

EXAMPLE Project Design Deliverable Check List Tankage Projects Mechanical S. No PROJECT DESIGN DELIVERABLES: Doc/Dwg Dependency 1-MP 2-MP 3-MP 4-MP 5-MP 6-MP 7-MP 8-MP 9-MP 10-MP 11-MP 12-MP 13-MP 14-MP 15-MP 16-MP Equipment Datasheet for Tank Equipment Specification for Tank General Arrangement Drawing for Tank Piping Material Specification Valve Datasheet Pipe thickness calculation MOV datasheets Valve specification Piping Plan Drawings Valve Pit, Drain Pit - GA & Sectional drawing Existing UG Facilities drawing, Protection and re-routing Datasheet for Corrosion Monitoring System Piping bill of materials Fire fighting equipment datasheet, drawings Piping Isometric drawings, tie-in details Hot tapping calculation Doc 1-MP Dwg. 1-MP/ 2-MP Doc 3-MP Doc 5-MP Dwg 3-P Dwg. 9-MP Dwg 9-MP, 9-MP Doc/Dwg. 3-P Dwg. Doc. 3-P, 9-MP 9-MP

EXAMPLE Project Design Deliverable Check List Tankage Projects Instrument S. No PROJECT DESIGN DELIVERABLES: Doc/Dwg Dependency 1-IN Instrument Index Doc Independent 2-IN Specification for DCS/ESD Doc Independent 3-IN Specification for Ultrasonic Radar Transmitter Doc Independent 4-IN Datasheets for Instrument cable Doc Independent 5-IN Datasheets for Flame and Gas Detectors Doc Independent 6-IN Datasheet pressure safety valve & vacuum relief Doc Independent 7-IN valve Datasheet for emergency shutdown valves, 1-IN 8-IN Datasheet for control valves, 1-IN 9-IN Instrument layout drawings Dwg 3-P, 1-IN, 6-C 10-IN F&G detector layout drawing Dwg 3-P, 1-IN, 6-C 11-IN H2S detector layout drawings Dwg 3-P, 1-IN, 6-C 12-IN Instrument cable block diagrams Dwg. 1-IN, 9-IN 13-IN Junction box layout drawings Dwg 3-P, 1-IN, 6-C 14-IN Instrument cable layout drawings Dwg 3-P, 1-IN, 6-C 15-IN Instrument cable schedule Doc 1-IN, 9-IN 16-IN Instrument loop diagrams Dwg. 1-IN, 15-IN,20-IN,22-IN,23-IN 17-IN Instrument datasheettransmitters/gauges/switches/, 1-IN 18-IN junction box ESD/F&G/H2S cause & effect diagrams Dwg 3-P, 1-IN 19-IN Instrument hook up drawings Dwg 3-P, 1-IN 20-IN Input/ Output List for DCS/ESD/ F&G/H2S, 1-IN, 2-IN 21-IN DCS/F&G/H2S graphics Dwg 9-IN,10-IN, 11-IN 22-IN DCS/ESD marshalling cabinet Dwg 1-IN, 2-IN 23-IN Junction box termination diagram Dwg 1-IN, 13-IN,15-IN 24-IN Instrument power distribution Dwg 2-IN, 25-IN FAT & SAT procedures for DCS & ESD systems Doc 2-IN 26-IN Operation & maintenance manual, 1-IN 27-IN As-built instrumentation manual Doc/Dwg 25-IN, 26-IN 28-IN Level coordination sketches Doc/Dwg 3-P, 3-MP

EXAMPLE Project Design Deliverable Check List Tankage Projects EIA/HSE deliverables check list S. No PROJECT DESIGN DELIVERABLES: Doc/Dwg Dependency 1-S EIA Study Report Doc. 3-C, 4-C, 9-MP 2-S HAZID Report Doc. 3-P, 3-MP, 9-MP 3-S HAZOP Report Doc. 3-P 4-S QRA Study Report Doc. 3-S 5-S PHSER-III Report Doc. 4-S 6-S PHSER-IV Report Doc. 5-S 7-S PHSER-V Report Doc. 6-S

S. No PROJECT DESIGN DELIVERABLES: Doc/Dwg Dependency EXAMPLE Project Design Deliverable Check List Tankage Projects Electrical 1-E List of Deliverables Doc. Independent 2-E Elec. Design Basis Doc. Independent 3-E Site Survey Drawings/Document Doc/Dwg Independent 4-E Drawings for Protection of Under Ground Facilities Dwg. Independent 5-E Area Classification Drawing Dwg. Independent 6-E Identifation of reserved Electrical Feeders for the Project Doc. Independent 7-E Design Datasheet for LT Power Cable, Control Cable & Earthing Doc. Independent Cables 8-E Design Datasheet for MICS Cable Doc. Independent 9-E Design Datasheet for 440V LV Switchboard Doc. Independent 10-E Design Datasheet for Induction Motors Doc. Independent 11-E Design Datasheet for MOV Actuator Doc. Independent 12-E Design Datasheet for MOV Isolators Doc. Independent 13-E Design Datasheet for Flame Proof DB/Junction Box Doc. Independent 14-E Design Datasheet for Local Control Stations Doc. Independent 15-E Load List Doc. 3-MP/ 7-MP 16-E Illumination Calculation Doc. 2-MP/ 14-E 17-E Single Line & Schematic Diagram of 440 volt Network Dwg. 14-E 18-E Single Line Diagram for lighting Distribution Board Dwg. 14-E 19-E Single Line Diagram for Power Distribution Board Dwg. 14-E 20-E List-Cable Sizing calculation Doc. 15-E,16-E, 17-E,18-E, 19-E 21-E List-LV & Control Cable Schedule Doc. 15-E,16-E, 17-E,18-E, 19-E 22-E Earthing Calculation Doc. 15-E,16-E, 17-E,18-E, 19-E 23-E Lightning Calculation Dwg. 9-E,10-E, 11-E, 12-E,13-E,14-E 24-E LCS Wiring Dwg. 7-MP 25-E Overall Lighting Layout Dwg. 15-E 26-E Overall Cable Layout Dwg. 20-E 27-E Overall Plot Plan-Earthing Layout Dwg. 22-E 28-E Lightning Protection Layout Dwg. 23-E 29-E Vendor Datasheet, Drawing s for LV Switchgear Doc/Dwg 9-E,17-E 30-E Vendor Datasheet, Drawing s for Lighting DB Doc/Dwg 18-E 31-E Vendor Datasheet, Drawing s for Power DB Doc/Dwg 19-E 32-E Vendor Datasheet, for Cables Doc/Dwg 19-E,20-E 33-E Vendor Datasheet, Drawing s for Earthing & Lightning Materials Doc/Dwg 22-E.23-E 34-E Vendor Datasheet, Drawing s for CP system Doc/Dwg 3MP/9MP

IMPLEMENTATION During the Sequencing process we identify the document relationship among the different discipline documents. These documents are wellarranged based on their logical relationships. Most of them are linked to at least one predecessor and one successor. SEQUENCING FUNDAMENTALS WE ASSUME FOR PREPARATION. Sequencing can be stuck-up by P&ID, Layouts, load details etc. Necessary Vendor Dependencies Optional Dependencies External Dependencies

IMPLEMENTATION DOCUMENT SEQUENCING TECHNIQUES During the implementation we illustrate in details the dependent relationships among all project documents and, consequently, the order is being generated in our software for the predecessor and the successor document. Physical appearance of the of the Software Page Contains: Sl. No Type of Projects like pipeline, Tankage etc. Discipline Selections like Electrical, Civil, and Process etc. Independent /Depended Documents Selection Drawings / Documents are displayed with the sequence of their submission. An indication from one document to another means that the successor document cannot start until the predecessor document is complete. If the document has more than one predecessor, it cannot start until all predecessors are complete. If the predecessor document is completed, the page will automatically direct to the successor document.

SUMMARY In our experience, we have found that the implementation of Project Design Deliverable checklist helps to monitor the submissions of Project documents and their accomplishment in a timely manner without causing any intersections and delays. Document sequencing process guides to identify the documenting relationship among the Project documents. Submission of Project documents shall always base on their logical relationships. For the successful completion of a project, Contractor must be well aware of all the document submission activities and their sequence of

THANKS