Water Leakage Through Building Facades



Similar documents
Water Problems in Building Exterior Walls: Evaluation, Prevention, and Repair

Systems (EIFS): Materials,

Evaluating the Field Performance of Windows and Curtain Walls of Large Buildings

Bioremediation of Pollutants in Soil and Water

Pesticide Formulations and Application Systems: Global Pest Control Formulations for the Next Millennium: Nineteenth Volume

FIELD TESTING SERVICES

WATER LEAKAGE IN GLAZED CURTAIN WALL SYSTEMS:

Water Damage & Repair

Pesticide Formulations and Delivery Systems: The Continued Evolution of Agrochemicals, 24 th Volume

Architectural Testing

RDH Building Sciences Inc.

JOSEPH P. SOLINSKI. Membership affiliations and committee board standings are maintained with the following industry organizations:

Assessing Curtain Walls

Williamson and Associates, Inc. Report of Building Exterior Condition Evaluation, dated January 2 nd, (68 pages)

MOCK-UP TEST REPORT. Rendered to: TUBELITE, INC. PROJECT: 200 Series Curtain Wall Mock-Up

10DBMC International Conference On Durability of Building Materials and Components LYON [France] April 2005

Influence of rain water leakage on the hygrothermal performance of exterior insulation systems

Field Water Testing - Lessons Learned

Black Box Data. from Accident Vehicles. William Rosenbluth. Methods of Retrieval, Translation, and Interpretation

Figure 1A. Typical brick veneer installation over wood frame construction.

Vertebrate Pest Control and Management Materials: 5th Volume

Maintenance Matters. Window and Door Replacement

September 3, Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901

BTC. Building Technology Consultants, PC 1845 E. Rand Road, Suite L-100 Arlington Heights, Illinois Main: (847) , Fax: (847)

Rainwater Intrusion in Light-Frame Building Walls

Mario D. Gonçalves, Patenaude-Trempe 1 Pierre Gendron, Patenaude-Trempe 2 Tony Colantonio, PWGSC 3. Abstract

The Science of Rough Opening Preparation and Window Installation to Minimize Air Leakage

WJE Announces Senior Staff Promotions

BEST 2 WB 3 4 SIX WAYS FOR CONDENSATION IN BUILDINGS. Wagdy Anis, FAIA, LEED ap*

COPYRIGHT. Dincel Construction System Pty Ltd

Weather Resistive Barriers: Building Science Makes a Case for Two Layers by Dave Olson Technical Services Manager, Fortifiber Building Systems Group

BECx& Building Airtightness. Presented by: Eric Amhaus Principal

Stucco and Windows on Wood Frame Construction. Maintaining the Water-shedding Barrier

Quality Assurance and Diagnostic Water Leakage Field Check of Installed Storefronts, Curtain Walls and Sloped Glazing Systems

Avoiding Air Barrier Pitfalls

TEST REPORT. Rendered to: TFC A DIVISION OF CENTURION INDUSTRIES, INC. Garrett, Indiana

bout your HOUSE before you start Repairing And Replacing Materials Exterior Walls

Business area System/product family System/product Exterior restore group. Sto restore Advanced Restoration for Building Façades

7 INNOVATIONS IN SECONDARY DRAINAGE SYSTEMS

How To Control Water Penetration In A Window

Analysis II Façade Redesign: Architectural Precast Panels

Moisture Control. System Solutions to Prevent Mold

WET/DAMP BASEMENTS ANSWER: BASEMENT WALLS AND FLOORS CAN BECOME WET BY A LEAK, CAPILLARY SUCTION OR CONDENSATION.

PERFORMANCE TEST REPORT. Rendered to: UNITED STATES ALUMINUM CORPORATION. SERIES/MODEL: 450 Center Glaze PRODUCT TYPE: Aluminum Curtain Wall

foot skylight) is enough to knock a worker off their feet. A 10 mph wind gust on a 5 x 6 skylight develops a wind force of 270 lbs.

Window Sill Details for Effective Drainage of Water

JANUARY, 2016 TR-7100 Windows (Fixed) 1 EC ALUMINUM WINDOWS Guide Specs

Consumer Guide to window and Door Replacement

What you need to know about concrete block basement construction.

When dealing with a potential moisture problem, time is of the essence. Taking a proactive approach will save you money and headaches down the road.

A GUIDE TO WINDOW AND DOOR SELECTION

continuing professional education. As such, it construed to be an approval or endorsement by

etter buildings Lessons learned: Restoring the Quayside Village leaky condo CASE STUDY NUMBER 50 Introduction

WUFI-ORNL/IBP A North American Hygrothermal Model

research highlight Water Penetration Resistance of Windows - Study of Codes, Standards,Testing, and Certification

STEPS TO CONSTRUCTING A MOISTURE-RESISTANT FOUNDATION SOURCES OF MOISTURE IN NEW CONSTRUCTION. Natural ground slope

I S S U E 1/2013 VOLUME 30 NUMBER 1. Water Testing: Richard P. Kadlubowski, AIA and Courtenay Bauer

TEST REPORT. Report No.: A Rendered to: BAMCO INC. Middlesex, New Jersey. PRODUCT TYPE: Wall Cladding System SERIES/MODEL: Dry Concept

WATER TESTING MISCONCEPTIONS: F ENESTRATION PRODUCT CERTIFICATION AND FORENSIC INVESTIGATION OF BUILDING LEAKAGE

Testing Water Penetration Resistance of Window Systems Exposed to Realistic Dynamic Air Pressures

DuPont Tyvek Commercial Air Barrier Assemblies Exceed Air Barrier Association of America, ASHRAE 90.1

AAMA/WDMA/CSA 101/I.S.2/A TEST REPORT. Rendered to: EAGLE WINDOW & DOOR COMPANY

Dow Corning PROPRIETARY. Dow Corning. A Thermal Modelling Comparison of Typical Curtain Wall Systems

Dow Corning AllGuard Silicone Elastomeric Coating. Application and Maintenance Guide

Wall Moisture Problems in Seattle

ENGINEERING SERVICES FOR CONTRACTORS

k eeping walls dry Part 1 of 2 November 2004 by Dale Kerr, P. Eng ABSTRACT

Property Adjuster and Claims Examiner Training Programs

Subject Index. MNL18-EB/Oct. 2009

What Causes Foundation Leaking?

Exterior Repair Project. By: Kami Farahmandpour, PE, RRC, RWC, CCS, CCCA Alex Szatanek. Building Technology Consultants, PC BTC

Managing Moisture in Low-Rise Building Enclosures A Prescriptive Guide for Building Professionals on Proper Moisture Management Solutions.

Natatorium Building Enclosure Deterioration Due to Moisture Migration

Figure 1 The GENERAL CONTRACTOR blames the applicator (if available) for improper installation and

Exterior Elevated Elements Inspection Guidelines

Section 4: Architectural Design

How To Prevent Water Damage To A Home

Sealing & Bonding Sika solutions for Window Installation

MOISTURE MANAGEMENT DURING THE CONSTRUCTION PROCESS

SG Series 65mm Frame Windows (Fixed Lite Window Illustrated)

Stucco Failures and Remediation

Waterproofing and interior insulation for basements takes new twist in technology.

Uncovering Myths and Opportunities of Advanced Building Envelope Technologies: BIPV, Roofing and Windows

Basements are Changing. Basements Part of the Enclosure. Basements. Energy Efficient, Durable, Healthy. Below grade enclosure

Total Building Commissioning: Case Study of the U.S. District Courthouse in Salt Lake City, Utah, USA

The Prefab Package. Modular EIFS construction offers benefits to today s busy jobsites. Building Envelope. Roland Serino, P.E., of Dryvit Systems Inc.

Repair of Spalling and Leaking Clay Brick Building Walls

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

Built to Last. Built for Beauty. Good. Solid. Logix. TM

Dryvit Finish System For Exterior Soffits

Standard Method for Sampling and Analysis of. of Chlorine Containing Bleaches. Soap Products

Transcription:

STP 1314 Water Leakage Through Building Facades Robert J. Kudder and Jeffrey L. Erdly, editors" ASTM Stock #: STP1314 ASTM 100 Barr Harbor Drive West Conshohocken, PA 19428-2959 Printed in the U.S.A.

Library of Congress Cataloging-in-Publication Data Water leakage through building facades / Robert J. Kudder and Jeffrey L. Erdly, editors. p. cm.--(stp : 1314) The symposium on Water Leakage Through Building Facades was held 17 March 1996 in Orlando, Florida"--Frwd. "ASTM stock #: STP1314." ISBN 0-8031-2042-7 1. Dampness in buildings--congresses. 2. Facades-- Congresses. I. Kudder, Robert J., 1945- I1. Erdly, Jeffrey L., 1951- III. Symposium on Water Leakage Through Building Facades (1966 : Orlando, Fla.) IV. Series: ASTM special technical publication : 1314. TH9031.W374 1998 693.8'9--dc21 97-52152 CIP Copyright 9 1998 AMERICAN SOCIETY FOR TESTING AND MATERIALS, West Conshohocken, PA. All rights reserved. This material may not be reproduced or copied, in whole or in part, in any printed, mechanical, electronic, film, or other distribution and storage media, without the written consent of the publisher. Photocopy Rights Authorization to photocopy items for internal, personal, or educational classroom use, or the internal, personal, or educational classroom use of specific clients, is granted by the American Society for Testing and Materials (ASTM) provided that the appropriate fee is paid to the Copyright Clearance Center, 222 Rosewood Drive, Danvers, MA 01923; Tel: (508) 750-8400; online: http://www.copyright.com/. Peer Review Policy Each paper published in this volume was evaluated by two peer reviewers and at least one editor. The authors addressed all of the reviewers' comments to the satisfaction of both the technical editor(s) and the ASTM Committee on Publications. To make technical information available as quickly as possible, the peer-reviewed papers in this publication were prepared "camera-ready" as submitted by the authors. The quality of the papers in this publication reflects not only the obvious efforts of the authors and the technical editor(s), but also the work of these peer reviewers. The ASTM Committee on Publications acknowledges with appreciation their dedication and contribution of time and effort on behalf of ASTM. Printed in Ann Arbor, MI February 1998

Foreword The Symposium on Water Leakage Through Building Facades was held 17 March 1996 in Orlando, Florida. ASTM Committee E6 on Performance of Buildings sponsored the symposium. Robert J. Kudder, Raths, Raths & Johnson, Inc., and Jeffrey L. Erdly, Masonry Preservation Services, Inc., presided as symposium cochairmen and are editors of this publication.

Contents Overview vii DESIGN Criteria for Water Penetration TestingdE. c. c. CnOl 3 The Application of Local Weather Data to the Simulation of Wind-Driven Rain--c. L. GALITZ AND A. g. WHITLOCK 17 Window Detailing Considerations for Leakage Prevention--K. M. LIES AND B. A. FAITH 33 A Review of Pressure Equalization and Compartmentalization Studies of Exterior Walls for Rain Penetration Control--R. L. QUIROUETTE AND J. ROUSSEAU 47 Rainscreen Computer Program--J. ROUSSEAU AND R. L. QUIROUETTE 57 Driving Rain and Masonry Veneer--J. F. STRAUBE AND E. F. P. BURNETT 73 REPAIR Solution to Moisture and Mildew Problems in a Central Florida Hotel-- R. L. DELANEY AND C. B. GOLDSMITH 91 Repair Methods for Common Water Leaks at Operable Windows and Sliding Glass Doors--e. E. BEERS AND W. D. SMITH 105 Remedial Repair Leak Prevention in Porous Stone Faced Precast Panels-A Case Study Option--R. S. FLOOD 115 CASE STUDIES Lessons Learned from Investigation of Water Leakage Through Precast and Cast-In-Place Concrete Facadesml. R. CHIN AND E. A. 6ERNS 129 Leakage at Interface Between Multiple Facade Components--G. L. ZWAYER, D. F. COOK. AND J. P. CROWE 142 Performance of Stucco-Clad Wood-Frame Buildings in a Temperature Rain Forest--M. J. DELL AND S. B. L1AW 155 Ivestigation and Repair of Leakage Problems in Recently Constructed Curtain Walls--o. A. RUTILA 168

Water Leakage Through Sloped Glazing and Skylights: Case Studies-- M. J. SCHEFFLER AND C. J. SASS 187 TESTING AND QUALITY CONTROL The Facts About Hose Testing--K. R. HOIGARD AND R. J. KUDDER 207 Critical Review of Curtain Wall Mockup Testing for Water Penetration-- B. S. KASKEL, M. J. SCHEFFLER, AND I. R. CHIN 218 Quality Control Procedures to Prevent Water Leakage Through Windows-- P. E. BEERS AND W. D. SMITH 232 Evaluation of Water Resistance Testing Problems for Installed Facade Systems--w. O. SMITH AND P. E. BEERS 236 Building Exterior Wall Water Infiltration Control Using Quality Assurance Programs--P. G. JOHNSON 244 Using Modified ASTM E 1105 to Identify Leakage Sources in Building Wall Systems--N. v. KROGSTAD, D. K. JOHNSON, AND R. A. WEBER 267 An Overview of Water Leakage Problems in Single-Family Residences Clad with Exterior Insulation and Finish Systems (EIFS)--M. F. WILLIAMS AND B. L. WILLIAMS 277 In Situ Assessment of Moisture Levels in Exterior Walls of Single-Family Residences Clad with Exterior Insulation and Finish Systems (EIFS)-- M. S. WILLIAMS, B. L. WILLIAMS, AND L. J. HAM1LTON 288 The Influence of Waterproof Coating on the Hygrothermal Performance of a Brick Facade Wall System--M. H. SALONVAARA AND A. N. KARAGIOZIS 295 Author Index 313 Subject Index 315

Overview The sponsoring Subcommittee for this Symposium is ASTM E06.55 on Exterior Wall Systems. The Subcommittee was started in 1985 by Alan Yorkdale to establish a "systems" approach to wall performance, and to depart from the prescriptive, material specific, and procedural approaches to wall performance evaluation and testing. In October 1990, the first Symposium on wall leakage was held in Dearborn, Michigan, chaired by Thomas Schwartz. Tom retold the advice from an architect in the 1930s about common errors, omissions, and wrong thinking which would guarantee a leaky building.the irony was that if so many buildings leaked, that must be what people wanted. The remarks were as timely in 1990 as they were in the 1930s, and it appeared that little progress has been made in the intervening sixty years. We believe that progress is being made to reduce the frequency of wall leakage problems, at least in buldings involving informed design and construction professionals working with owners who commit sufficient resources to construct workable designs. The papers in the 1990 Symposium presented examples of the mistakes which caused walls to leak, and diagnostic and testing methods to determine the causes of leakage. In contrast, many of the papers in today's Symposium discuss design and quality assurance topics intended to prevent leakage, refined techniques for diagnostic and quality assurance procedures, and a broadened perspective to include durability issues. We like to think that this shift in Symposium topics reflects an evolution in how we think about and deal with wall leakage. With better dissemination of information which these ASTM Symposia represent, better attention to details and quality control, and a clearer understanding of pertbrmance requirements, we should expect a progressive reduction in wall leakage problems. While a reduction in building leakage is acknowledged, portions of our industry continue to build structures with walls that leak. As the pressure to build lower cost structures continues, the resulting design requires the utilization of thinner, lighter building envelopes, less capable of withstanding the damage caused by even minimal water leakage. When reviewing the papers contained in this publication, we encourage the user to be aware of how everyone from the architect to the technician who installs the final linear toot of joint sealant, has a critical role in the success or failure of these building walls. Evaluating and repairing wall leaks remains an art. Many of the papers, particularly the case studies, present authors' varying approaches to diagnosing and repairing leaks. As an art, there is much room for the creative application of proven techniques, but there is usually no one "right" way to address a leakage problem. It is hoped that this Symposium will illustrate how many skilled technical professionals have attempted to prevent, diagnose, and correct wall leakage. vii

viii OVERVIEW Robert J. Kudder, Raths, Raths & Johnson, Inc., 835 Midway Drive, Willow Brook, IL 60521; symposium cochairman and editor. Jeffrey L. Erdly Masonry Preservation Services, Inc., PO Box 324, Berwick, PA 18603; symposium cochairman and editor.