Straub Construction, Inc. 202 West College, Fallbrook, CA (760)

Size: px
Start display at page:

Download "Straub Construction, Inc. 202 West College, Fallbrook, CA 92028 (760) 414-9000 www.straubinc.com"

Transcription

1 Straub Construction, Inc. 202 West College, Fallbrook, CA (760)

2 Straub Construction, Inc. An Accredited Quality Contractor West College Street Fallbrook, CA Phone: (760) Fax: (760) DUNS: CAGE: 0TWN5 TIN: Contractor License Numbers California: Arizona: Nevada: New Mexico: Services Preconstruction General Contracting Design-Build Turnkey Capabilities Bonding and Insurance 20+ years relationship with Surety Underwriters and Agents. No specific bonding limits Personnel: 53 Executives: 6 Project Managers: 4 Design-Build: 2 Marketing: 2 Operations: 33 Estimating: 4 Superintendents: 10 Quality Control: 9 Safety Officers: 4 Administration: 11 Company Profile Outstanding Reputation for Three Decades Straub Construction has steadily grown into one of the most experienced and respected providers of construction services in the southwestern United States. Straub is a privately held corporation which has experienced steady and stable growth to its present position with annual contract revenues of more than $115 million. Building for Excellence Straub s unyielding commitment to Building for Excellence is the key to our continued success for over 30 years. Straub s reputation has become one of our most important assets. This outstanding reputation was and continues to be founded on the integrity of our employees, solid values, financial stability, and innovation. Collaborative Approach to Effective Solutions The company specializes in public facility construction for educational, commercial, health care, and residential housing clients. We approach each project with a collaborative mindset, working with clients, architects, and subcontractors toward the common goal meeting or exceeding our client s expectations. The key to every successful project is matching appropriate resources and expertise to the needs of the client and its users. Through technical skill and quality focused construction practices we anticipate project challenges, develop solutions that meet client s objectives, and deliver award winning projects. Management s Vision: Exceed Client Expectations The vision of Straub s management is to incorporate the best management practices to provide an environment that supports and nurtures the core values of Quality, Integrity and Outstanding Customer Satisfaction. We are committed to building and maintaining long-lasting relationships with owners, subcontractors, and employees. As a general contractor, we continue to exceed client s expectations with our versatility, responsiveness, talented associates, and progressive attitude. 1

3 Straub Construction, Inc. Project Types Design oriented contractor who uses the design phase to plan accurately and cost effectively Educational Outstanding Preconstruction services with comprehensive knowledge of building costs Administration Versatile portfolio of project experience Proven track record of commitment to safety Housing Experienced in large, complex projects within and around occupied spaces Healthcare Professional Quality Control staff with excellent communication and relationship building skills Recreation Bonding capacity of $300 million for projects in excess of $100 million Infrastructure 2

4 Management Personnel Richard Straub, CPA CEO/President For over 37 years, Mr. Straub has built a reputation for Building for Excellence by providing outstanding facilities for public and private educational, commercial, medical, and residential housing clients throughout the southwestern United States. As the owner, He is responsible for strategic, long-range planning, overall direction and attends to day-to-day business. Mr. Straub has steadily grown the company into one of the most respected and award winning general contractors specializing in DoD facilities and public projects. Mr. Straub has a BA in Business Administration and is a Certified Public Accountant. He holds memberships with the Associated General Contractors, Associated Builders and Contractors, Vistage - The World s Leading Chief Executive Organization, and Management Action Planning. Robert Mhyre V.P. of Preconstruction Mr. Mhyre joined Straub Construction in 1998 and has been instrumental in growing the company both in size and profitability. With over 25 years experience in construction management and business development, his overall responsibilities include developing preconstruction and teaming strategies, proposal development, and directing all preconstruction services; including design-build, estimating, procurement, and small business. Mr. Mhyre has a BA in Arch: Urban Planning from the University of Washington and holds active memberships with American Society of Professional Estimators, Society of Military Engineers, Design Build Institute of America, and is a member of the Associated General Contractors of America Naval Facilities Engineering Command Liaison Committee and U.S. Army Corps of Engineers Liaison Committee. 3

5 Management Personnel Kyle Campbell, Esq. Risk Manager / General Council Mr. Campbell has over 15 years of experience providing corporate legal council, with five years at Straub Construction. He is responsible for overseeing and managing all legal aspects for Straub Construction, including: negotiating joint ventures responsible for $300M+ in federal construction work; negotiating various contracts, teaming agreements, and non-disclosure agreements in excess of $200M; and establishing multiple internal company policies and procedures to ensure best practices and compliance with applicable regulations. Mr. Campbell earned his Juris Doctor from Pepperdine University School of Law, as well as a Certificate in Dispute Resolution from the Straus Institute. He holds memberships with the American Bar Association, California Bar Association, and the Association of Corporate Counsel. Mr. Campbell was nominated in 2010, and selected as a 2011 Finalist for San Diego Daily Transcript Power of Attorneys, which honors San Diego s top corporate counsel. Clifford McCarthy, CMA Director of Finance Mr. McCarthy is a Certified Management Accountant. He brings nearly 20 years of corporate finance experience to Straub Construction. As Director of Finance, he is responsible for developing and managing all financial strategies and accounting functions, as well as contract administration, insurance, and management of capital expenditures. Mr. McCarthy holds several degrees from San Diego State University including an MBA in Finance, BS in Computer Science, and a BS in Finance. He holds memberships with the Institute of Management Accountants and the Construction Financial Management Association. 4

6 Management Personnel Matthew Ferguson, DBIA Director of Operations Mr. Ferguson possesses more than 18 years of experience in construction management and has extensive experience in military construction. He has received Outstanding Performance ratings on almost every project he has managed He has the proven track record and first-hand knowledge to successfully work with NAVFAC & USACE, clients and users to deliver efficient, maintainable and reliable facilities. Prior to joining Straub Construction in 2007, He served in various management positions including Project Manager for over 20 contracts including military facilities, higher education facilities, and design-build procurement. Mr. Ferguson is a designated Design-Build Professional with a BS in Construction Management from California State University- Chico. He holds a membership with the Design Build Institute of America. Richard Smith, PE Senior Project Executive Mr. Smith possesses more than 30 years experience in engineering and construction including extensive experience in military construction. He has successfully managed the Operations and Preconstruction Divisions of several MILCON Contractors with supervisory responsibility for multiple project managers, project superintendents, design/build estimating teams, and home office personnel. Prior to joining Straub Construction in 2004, Mr. Smith has held various management positions including Project Manager for Soltek Pacific, Vice President of Valenzuela Engineering, and Engineer/Project Administrator for the USACE. Mr. Smith is a registered civil engineer with a BS in Civil Engineering from Arizona State University. 5

7 Services Straub offers a full complement of construction services to meet clients needs: preconstruction, general contracting, design-build, and turnkey capabilities. We perform under multiple contract types and delivery methods depending on our clients requirements and preferences, including lump sum, guaranteed maximum price or negotiated procurement. Straub exceeds client s expectations with versatility, responsiveness, talented associates and a progressive attitude. We staff each project with teams of personnel with the experience and know-how to get the job done right. Technical staff members are supported by in-house specialists in estimating, purchasing, scheduling, cost engineering, risk management, and safety. With the right team on the job, clients can be sure that technical and administrative issues on projects are quickly addressed. Our experienced teams address potential challenges with solutions and timely performance. Preconstruction Addressing critical details during preconstruction frequently results in fewer construction-phase changes, reduced construction time, and cost savings. It also ensures that the finished product meets a client s needs. For the best results, Straub works closely with our clients and design teams. We develop and maintain accurate construction cost estimates as well as analyze scheduling, materials, building systems, and construction methods. The involvement of Straub s construction professionals during this planning stage ensures continuity between preconstruction and construction, so that decisions made during project planning are accurately implemented in the field. 6

8 Services Design-Build Straub s value-based approach to design-build assures our clients that we will deliver a project that meets their expectations and requirements. We focus on understanding, capturing, and implementing the client s definition of project value. We focus on helping each client balance their program, budget, schedule, and design in a manner that sets up their project for success. Straub takes pride in our award-winning history. Our awards are testimony to the quality and integrity of our work. Straub s Design-Build Division has developed efficient, proactive and proven processes and procedures. Each design-build team is dedicated to developing win-win solutions that incorporate the best balance of cost, function, efficiency and maintainability to meet the client s project requirements. Straub implements a seamless transition from design to construction involving a complete integration of designers, on-site construction team and subcontractors from project inception to project closeout. We refer to this approach as Total Team involvement. For each project, Straub dedicates resources with expertise in cost, systems options and comparison analysis, sustainable materials and methods, design coordination and building means/ methods constructability. Straub s design-build processes reduce inherent risks, flush out coordination issues, and maintain the project budget and schedule. We provide a thorough risk analysis vetting trade contractor s qualifications and capabilities, local regulations, contract conditions, establishing zero tolerance safety standards. To deliver best value, Straub teams conduct a detailed value analysis of each system and material after gaining an understanding of our clients goals and objectives and leverage our experience to identify ways to reduce cost or enhance the scope. Our ultimate goal is to present our client s with every practical cost savings and scope enhancement opportunity. 7

9 Services Construction Services Straub has been providing construction services for more than 30 years. Our reputation for delivering the highest level of service in the industry is a critical element in our success. All of Straub s construction professionals strive to improve our performance, quality and services by building on the lessons learned from previous projects. We incorporate lessons learned including technical solutions, sustainable building practices, integrating Building Information Modeling (BIM), best practices for implementing project delivery options and constructability ideas. We manage our projects with onsite resources that provide the following core services: Quality and innovative solutions make certain that Straub projects continue to perform and stand the test of time. Building Expertise Cost Management Schedule Management Quality Control Onsite Safety Training, Supervision and Coordination Building Information Modeling (BIM) Project Closeout and Post Construction Support Owner Move-in Coordination The majority of Straub s work uses the collaborative delivery methods such as Construction Management At-Risk and Design- Build. The Straub team knows how to add value to a project and accelerate the delivery process even for the most complex projects. Our clients rely on us because we are responsive, provide outstanding service, and staff each project with a dedicated team that works in concert with owners, architects, subcontractors, and engineers. Our employees are highly skilled and use proven management systems and procedures to monitor project progress and ensure that project goals are met every step of the way. 8

10 Safety Safety is a core value at Straub and it must never be compromised. We incorporate safety into every aspect of every project from the earliest phases of preconstruction to project commissioning and closeout. We firmly believe that a safe work place is the key to operational excellence and eliminates injuries and property damage with the additional benefit of reducing operating costs. To Straub, nothing is more important than ensuring the safety of our employees, subcontractors, and the public. Straub s safety culture begins with commitment from the top down and creates a culture that not only controls costs, but also creates an environment to protect our workers from injury. We are proud to say we maintain one of the finest safety records in the industry and continually surpass local and national safety standards. Straub provides an incentive program that is based on both the project team and each individual s performance. Our safety program empowers our employees and all employees are trained to ensure safe performance and compliance with company procedures and OSHA regulations. Excellence in safety is not a goal, it is an expectation. EMR, LWDIR and RIR Description EMR OSHA LWDIR OSHA RIR Straub has an outstanding safety program and record. We have zero lost work days for 10 consecutive years 9

11 Industry Awards National Excellence in Construction Eagle Award - Mega-Projects, Best Project in the Nation 2012 Associated Builders & Contractors BEQs and Parking Structure, MCAGCC Twentynine Palms, CA Greener Tomorrow Award 2012 Associated Builders & Contractors Green BEQs and Parking Structure, MCAGCC Twentynine Palms, CA Excellence in Construction - Top Project by a General Contractor 2012 Associated Builders & Contractors, San Diego Chapter BEQs and Parking Structure, MCAGCC Twentynine Palms, CA BEQs and Parking Structure MCAGCC Twentynine Palms, CA Photovoltaic Project of Distinction Award 2012 PV America / SEIA / SEPA BEQs and Parking Structure, MCAGCC Twentynine Palms, CA National Excellence in Construction Pyramid Award 2011 Associated Builders & Contractors MCAS Miramar Human Resource Services Center, San Diego, CA Concrete Masonry Design Grand Award - Public/Civic Design 2011 Concrete Masonry Associate of CA & NV Red Rock Canyon Educational Visitor Center, Las Vegas, NV Human Resources Service Center San Diego, CA Concrete Masonry Design Grand Award - Sustainable Design 2011 Concrete Masonry Associate of CA & NV Red Rock Canyon Educational Visitor Center, Las Vegas, NV Excellence in Construction - Top Project by a General Contractor 2011 Associated Builders & Contractors, San Diego Chapter MCAS Miramar Human Resource Services Center, San Diego, CA Build San Diego Award 2011 Association of General Contractors, San Diego Chapter MCAS Miramar Human Resources Services Center San Diego, CA National Excellence in Construction Pyramid Award 2010 Associated Builders & Contractors Red Rock Canyon Educational Visitor Center, Las Vegas, NV Red Rock Canyon Educational Visitor Center Las Vegas, NV Excellence in Construction - Top Project by a General Contractor 2010 Associated Builders & Contractors, San Diego Chapter Red Rock Canyon Educational Visitor Center, Las Vegas, NV Best Green Building 2010 Southwest Contractors Best of Nevada Red Rock Canyon Visitor Center, Las Vegas, NV 10

12 Industry Awards Excellence in Construction Award 2009 Associated Builders & Contractors, San Diego Chapter Permanent Resident Dormitory, Luke AFB, AZ Excellence in Construction Award 2008 Associated Builders & Contractors, San Diego Chapter Santa Maria Public Library, Santa Maria, CA Excellence in Construction Award 2008 Associated Builders & Contractors, San Diego Chapter Allan Hancock College Science/Health Occupational Complex, Santa Maria, CA Permanent Resident Dormitory Glendale, Arizona Excellence in Construction Award 2006 Associated Builders & Contractors, San Diego Chapter Original Student Center Expansion, Phase I, UC San Diego, CA National Excellence in Construction Eagle Award, Best Project in the Nation 2006 Associated Builders & Contractors Original Student Center Expansion, UC San Diego, CA National Excellence in Construction Certificate of Commendation 2006 Associated Builders & Contractors Multi-Level Temporary Housing, Nellis AFB, NV Science and Health Occupation Complex Allen Hancock College, Santa Maria, CA Excellence in Construction Merit Award 2006 Associated Builders & Contractors, San Diego Chapter Multi-level Temporary Housing Quarters, Nellis AFB, NV Air Force Regional Design Award 2004 Air Force Design Award Program Design-Build Fitness Center, Los Angeles AFB, CA SARA Honor Award 2004 CA Council of Society of American Registered Architects Design-Build Fitness Center, Los Angeles AFB, CA Concrete Engineering for Bridge Award 2003 American Concrete Institute, San Diego International Chapter Design-Build Missile Transport Bridge, Vandenberg AFB, CA Fitness Center Los Angeles, California Excellence in Construction Merit Award 2003 Associated Builders & Contractors, San Diego Chapter Design-Build Fitness Center, Los Angeles AFB, CA Excellence in Construction Honor Award 2002 Associated Builders & Contractors, San Diego Chapter INS SD Sector Support/Air Operations Complex, San Diego, CA 11

13 Safety Awards 2012 Construction Safety Excellence - Finalist - Building Division, 100, ,000 Work Hours Associated General Contractors 2012 STEP Gold Award Associated Builders & Contractors st Place Construction Safety Excellence Federal & Heavy Division, 100, ,000 Work Hours Associated General Contractors, San Diego Chapter Santa Maria Library Santa Maria, CA 2011 NAVFAC STAR Safety Award MCB Camp Pendleton Comm/Electric Maintenance Complex 2011 STEP Diamond Award Associated Builders & Contractors 2011 Safety Excellence Finalist Construction Management Under 500,000 Work Hours Associated General Contractors 2011 Safe Site Award Associated General Contractors Twentynine Palms Multi-level Dormitory & Parking Structure, Pkg st Place Construction Safety Excellence Award AGC - San Diego Chapter Cal Poly College of Architecture and Environmental Design, San Luis Obispo, CA 2010 NAVFAC STAR Safety Award MCB Camp Pendleton Force Intelligence Operations Complex 2010 NAVFAC STAR Safety Award MCB Camp Pendleton Infantry Training Center nd Place Construction Safety Excellence Award Associated General Contractors, San Diego Chapter 2009 National Excellence in Safety, Merit Award Associated Builders and Contractors 2009 STEP Platinum Award Associated Builders and Contractors Multi-level Temporary Housing Las Vegas, NV 2008 Merit Winner, National Safety Excellence Award Associated Builders & Contractors 12

14 Safety Awards 2008 STEP Platinum Award Associated Builders & Contractors 2008 Award of Excellence Fidelity Safety & Training Fort Hunter Liggett U.S Army Reserve Training Center 2007 STEP Platinum Award Associated Builders & Contractors 2011 Safety Excellence Finalist Associated General Contractors 2006 STEP Platinum Award Associated Builders & Contractors 2006 Safe Site Award Associated General Contractors Nellis AFB FA/22 Weapons School Facility 2005 National Safety Award National Excellence in Safety, SIC 15 Associated Builders & Contractors 2005 Safe Site Award Associated General Contractors Nellis AFB Multi-level Temporary Housing 2010 Construction Safety Excellence Award Associated General Contractors 2005 Safe Site Award Associated General Contractors Nellis AFB Administration Buildings 2005 STEP Platinum Award Associated Builders & Contractors 2004 STEP Platinum Award Associated Builders & Contractors 2004 Safe Site Award Associated General Contractors Nellis AFB Commissary 2009 Associated Builders and Contractors Safety Award 2003 STEP Platinum Award Associated Builders & Contractors 2002 STEP Gold Award Associated Builders & Contractors 13

15 Multi-level Dormitories & Parking Structure Twentynine Palms, CA Design-Build Straub-Martin Harris, A Joint Venture Architect: Value: NAVFAC Southwest PGAL Architects $118 Million Completed: 2011 Residential Dormitory 384 Living Units 292,300 Total Square Feet 550+ car packing structure USGBC LEED Gold Certification Outstanding Interim Owner Evaluation ABC San Diego Award - Top Project by a General Contractor ABC National Eagle Award - Top Project, Mega-Projects Category PV America Project of Distinction Award The work of this project includes the design, engineering, and construction of three new dormitory buildings, new off-site chiller, and a new 550+ car parking structure at Twentynine Palms, CA. This project is a LEED Gold certified sustainable project. The campus design concept the Straub/Martin-Harris/PGAL Team developed for this project blends the U.S. Marines bachelor quarters design standard with features that are inherent to college campuses and hospitality design throughout the country. All three buildings are virtually identical four-story units (each building has 192 living units which house 384 enlisted personnel) compatible in size, style and color with the existing adjacent buildings. Each dormitory has community and service core facilities including multipurpose rooms, internet café and laundry facilities. The site plan is also compatible with the existing development pattern and character of the area and has the appropriate vehicular and pedestrian connections to the existing development. The interior of this facility was designed so that residents have a more apartment-like environment, and do not have an institutional character.

16 Multi-level Dormitory & Dining Facilities Twentynine Palms, CA Design-Build Straub-Martin Harris, A Joint Venture Architect: Value: NAVFAC Southwest PGAL Architects $125 Million Completed: 2013 Residential Dormitory Dining Facility 384 Living Units 348,915 Total Square Feet 500 Seat Open-Air Amphitheater 1,000+ Car Parking Structure USGBC LEED Gold Design This Design-Build project focuses on improving the quality of life for single Marines at Twentynine Palms with a campus approach, similar to college campus design. The work of this project includes the design, engineering, and construction of three dormitory buildings, a dining facility, parking structure and 500-seat open-air amphitheater complex prominently located in the middle of the campus. The dormitory buildings and the dining facility are both contemporary in design and use the base vernacular materials to provide unity and continuity. An artistic use of CMU block, horizontal banding, precast concrete elements, and architectural details creates a new building concept that promotes the contemporary overall campus approach. LEED Gold sustainability and energy efficiency are key elements of the campus design. The campus design concept the Straub/Martin-Harris/PGAL Team developed for this project blends the standard enlisted personnel dormitory with features that are inherent to college campuses and hospitality design throughout the country. The campus is organized in distinct functional zones: living areas, community areas, dining facility, active and passive recreational and parking areas. Many of the site design elements serve dual purposes where practical. Each building has 22,945 SF of PV panels installed on adjacent covered parking to the dormitory building with 50% use of shade structure space.

17 Multi-level Hospitality Center Las Vegas,NV Design-Build Architect: Value: US Army Corps of Engineers Lee & Sakahara Architects $31 Million Completed: 2005 Temporary Housing Facility 188,000 Total Square Feet 349 Guest Rooms Sustainable Design Features Included AGC Safe Award, 2004 ABC Excellence in Construction Merit Award, 2006 ABC Certificate of Commendation, 2006 Nevada Best of 2005, Masonry Project Above Average Owner Evaluation The project involved design and construction of a 188,000 s.f., fourstory temporary housing quarters with 349 guest rooms, retail sales area, coffee bar, interior and exterior storage and multiple common areas including a lobby, corridors and vendors areas. In addition, the facility houses offices and numerous administrative areas including administration support, lodging support, management offices, accounting, reservations and a registration desk. The facility provides a surge capacity for as many as 698 guests in order to support temporary lodging needs on a year-round basis. Straub was responsible for design and construction of all site utilities including water, wastewater, storm water, electrical and communications in addition to the building design. Site improvements included entry/exit drives with covered loading/unloading areas, parking areas, landscaping and exterior gathering areas. The building has reinforced concrete foundations, structural steel frame with reinforced masonry walls and standing seam metal roof. Straub was also responsible for preparation of a Comprehensive Interior Design (CID) package requiring submission of a construction prototype mockup demonstrating construction materials, details and finishes. Building systems include mechanical, electrical, communications, fire protection and security.

18 Permanent Resident Dormitory Glendale, AZ Design-Build Architect: Value: US Army Corps of Engineers KMA Architects $17 Million Completed: 2009 Residential Dormitory 108 Living Units 36,000 Total Square Feet Completed On-Schedule Designed to USGBC LEED Certified 2009 Excellence in Construction Award Certificate of Special Congressional Recognition Above Average Owner Evaluation Straub served as the design-build contractor on this new replacement dormitory; built to replace the existing deteriorating facility and improve the quality of life for military personnel. The Straub design-build team approach to quality of life is reflected in creating a sense of community and incorporating the Air Force s new high quality design criteria. The three-story dormitory is arranged in a U shape for efficiency and centered around the Day Room in the open courtyard area. The Day Room/lounge provides an additional socializing opportunity for the residents; outfitted with pool tables, big screen television and other amenities to encourage camaraderie and community. Each living unit consists of four bedrooms with bathrooms around a shared living area and kitchen. Each unit has a laundry facility with washer and dryer. The larger shared social space enhances the quality of life for the residents by providing an apartment type setting, encouraging interaction and relaxation. The interior design layouts avoided the traditional governmental look. Interior design packages included a wider selection of contemporary colors, materials and quality wood furnishings. Bulk storage is provided in separate storage lockers in locations common to all living unit modules. The facilities exterior features split-faced masonry with smooth masonry bands at the elevated floor levels and a standing seam metal roof which reduces maintenance and total ownership costs. The building placement is oriented to the existing dormitory buildings on the base; allowing room for expansion within the dormitory district to complete a four dormitory quadrangle. Circulation patterns encourage social interaction, as well as provide seamless navigation to commonly used areas, including parking.

19 Family Housing Replacement Yuma Proving Grounds, AZ Design-Build Architect: US Army Corps of Engineers Sixty First Place Architects Value: $13,334,265 Award: 29 June 2005 Completion: 25 January 2007 Military Housing Facility, Revitalization 55 Family Housing Units Completed Ahead of Schedule Sustainable Design Features Included LEED Gold SPiRiT Level Certification Self-Performed 18% of Scope Outstanding Owner Evaluation This project involved the revitalization of an entire neighborhood with 55 family housing units which replaced 74 units that were demolished. Demolition included asbestos and lead-based paint removal/abatement. and reutilizing portions of existing infrastructure. Supporting facility improvements include new electrical and communications service connections, new water and sewer laterals, replacement of rolled curbs with curb and gutters and refinishing existing roadways, sidewalk additions, and revitalization of existing recreation amenities. Design and construction consisted of variously configured one and two-story buildings which are factory built/manufactured and/or conventionally on-site constructed houses. Each new housing unit has a one car attached garage, individual central heating systems, central air conditioning and equipment and appliances including a range and oven, range exhaust hood with fire extinguishing system, refrigerator, garbage disposal, dishwasher, water heater, carbon monoxide detectors, ceiling fans, whole house fan, and smoke detectors. The site was designed with neighborhood connectivity, pedestrian circulation and safety as the primary focus. Pedestrian circulation is designed along desired paths of travel for walking between gathering areas and facilities. The topography and landscaping is designed to reinforce a sense of movement within the neighborhoods. The design focused on Quality of Life for military families and optimization of materials and construction to achieve a new standard of durability and reduced life cycle costs. The design maximized USGBC Leadership in Energy & Environmental Design (LEED ) and SPiRiT scoring. In addition, all designs were prepared in accordance with the EPA Energy Star Home program.

20 Human Resources Service Center San Diego, CA Design-Build Architect: Value: NAVFAC Southwest RJC Architects $22 Million Completed: 2011 Class A Office Building 56,100 Total Square Feet Wetland area used as focal point to create amenities and visual interest USGBC LEED Platinum Certification Exceed Title 24- Optimized Energy Performance Savings by Design AGC San Diego Build America Award ABC San Diego Award - Top Project by a General Contractor ABC National Pyramid Award The new home of the Human Resources Service Center (HRSC) ties its styling and material makeup to the physics of aerodynamics creating a new building type while upholding the principles of the Base Exterior Architectural Plan. The natural landscape setting combined with the use of CMU, glass, and sleek metals design elements uplift the building to a commanding presence on the base. The HRSC is a true representation of elegance, function and place. The HRSC represents the beauty of flight with its long, crisp lines, dynamic composition of airfoil forms, high articulation of both traditional and modern materials, and construction detailing (aluminum blade-type sun-control fins) so that the building appears to take flight. The connection to the exterior views enhances the comfortable work environment where natural daylighting extends to the core of the building. Punched windows are dual-glazed, laminated (PPG Solarban) with horizontal and vertical mullions. Two corners of the building have a full height glass curtain wall, supported at the slab, second floor and roof structure.

21 Reserve Training Center Fort Hunter Liggett, CA Design-Build Architect: US Army Corps of Engineers KMA Architects Value: $12,058,761 Award: 13 June 2007 Completion: 30 March 2009 Military Training Facility 42,765 Total Square Feet Overall Cost Savings to the Owner Sustainable Design Features Included SPiRiT Silver Level Certification Self-Performed 19% of Scope Above Average Owner Evaluation Located on approximately seven acres, the Reserve Training Center consisted of a new 200 member 45,500 SF Army Reserve Center and a 915 SF unheated storage facility. The two-story steel framed facility is primarily used for training of personnel with administrative, storage and other miscellaneous support areas. The center is constructed of concrete tilt-up wall panels with an elastomeric coating to match the installation criteria of an off-white finish stucco appearance. This economical system also provides a more durable exterior finish than traditional stucco used in the Fort Hunter Liggett environment. The facility includes slab on grade first floor, structural steel beam and joist second floor framing with metal deck and concrete fill, and a low-slope modified bituminous roof with a parapet and interior roof drains and overflow scuppers. The storage facility is a pre-engineered metal building. The building utilizes low maintenance, quality materials, which provide durability as well as a high level of reliability suitable to the functionality of the facility. The facility meets all ADA requirements and was designed to meet the SPiRiT Silver level of certification.

22 Allan Hancock College Science and Health Occupations Complex Santa Maria, CA Design-Bid-Build Value: Allan Hancock College $16 Million Completed: 2007 Educational Facility 44,302 Total Square Feet Value Engineering Features Included Overall Cost Savings to the Owner Excellent Owner Evaluation The new Science / Health Occupations Complex provides science and health occupations instructional facilities including classrooms, faculty offices and facilities for the health occupations program as well as state of the art science laboratories and math and engineering computer laboratories. The scope of this project included facilities for the health occupations programs that were housed in various offcampus buildings. A greenhouse, hardscape and landscaping were included as well as the modernization of several existing buildings within the complex. Construction was completed in two phases. Phase I involved construction of the two-story structural steel-framed building with metal stud interior walls. The exterior façade was constructed of plaster with split face block accents and a flat roof with single-ply roofing is included and provides standing metal seam accents. The adjacent building (M-100) had to remain operational throughout construction. After completion of the new building, occupants from M-100 and other locations both on and off campus were relocated to their new location requiring a sixty-day period. Phase II involved demolition of 10,562 s.f of existing laboratories and conversion of 3,779 SF of instructional space to storage. Science laboratories included those for organic chemistry, general chemistry, physics, geology and engineering, materials and physical science. The biological sciences section provides laboratories for microbiology/general biology, marine and introductory biology, anatomy/physiology, zoology and natural history. Support spaces for the science laboratories include physical science prep areas, secured chemical storage, anatomy cold storage space, an aquarium, an isolated microbiology prep area and greenhouse. Math and engineering laboratories provide study stations with a multidisciplinary computer lab equipped with thirty-eight computer stations.

23 Cal Poly College of Architecture & Environmental Design Renovations & Replacement California Polytechnic State University - San Luis Obispo, CA Design-Bid-Build Value: Cal Poly San Luis Obispo $23 Million Completed: 2008 Educational Facility & Renovation 56,332 Square Feet of New Construction 26,000 Square Feet of Renovations Sustainable Design Features Included OBA Award of Recognition, 2009 The Cal Poly Phase 11B project is the final phase of collaboration between the College of Engineering and the College of Architecture and Environmental Design. This phase of the project involved the construction of new laboratory space and faculty office space for the College of Architecture and Environmental Design, and space for interdisciplinary lecture. The project consists of four structures; one one-story building and three three-story buildings, connected by exterior walkways. The buildings have drilled pier slabs on grade foundations, with a steel brace frame structure. The exterior of the buildings include glass curtain walls, ribbed metal, pre-cast panels and one common elevator. Renovation portion of contract involved three existing instructional buildings and one new exterior elevator. The project contains many sustainable features including operable window and single loaded corridor that allow cross ventilation of the laboratory and lecture spaces. The building also includes appropriate shading devices on the south side to reduce solar head gain. Landscaping includes the use of drought tolerant plantings, and provide additional shading in the summer months with the use of deciduous trees along the southern exposure.

24 Santa Maria Library Santa Maria, CA Design-Bid-Build Value: City of Santa Maria $19 Million Completed: 2008 Educational Facility 59,850 Total Square Feet Sustainable Design Features Included Excellence in Construction Award, 2008 DPW Letter of Commendation, 2008 Excellent Owner Evaluation The Santa Maria Library project involved the construction of a new 59,850 SF multi-story facility within the City s central office campus. The placement of the new library next to City Hall forms a central plaza for activities and events which features two fountains and nostalgic lighting standards identical to those outside the adjoining City Hall and existing library buildings. The new library includes an administration area, 123 computers, multipurpose room which seats 300, a new Literacy Center, Adult Education Center, Career Center, study group rooms, community meeting rooms, and a café which overlooks the plaza. The Friends of the Library have their own shop inside the building and the Donor Tree is prominently displayed in the lobby. Particular effort has been placed on community features such as the children s section which creates a family destination. Dubbed the Enchanted Forest, the children s library features interesting shapes in the ceiling, a large artificial tree of knowledge just inside the entrance, and bumble bee and butterfly motif is incorporated in the mosaic carpeting and furniture. The space also includes a Young Adult-teen zone, Homework center for more collaboration with local schools, and a Children s theater that opens into a secured courtyard. Construction elements of the library include a steel-framed structure with a concrete slab on grade foundation, a plaster exterior, and concrete over steel joist and metal roof deck panels with clay roofing tile accents. Other project features include state-of-the-art communication/computer systems, two elevators, a package air conditioning/ heat pump system, landscaping, irrigation systems, ADA access, fire alarms and fire sprinklers throughout.

25 UCSD Student Center Expansions La Jolla, CA Design-Bid-Build University of California San Diego Value: $5,315,546 Completed: 2006 Educational Facility 13,593 Total Square Feet Completed On-Schedule Sustainable Design Features Included Outstanding Owner References ABC National Excellence in Construction Eagle Award, Best Project in the Nation - Institutional, 2006 The project scope involved construction of two new two-story buildings totaling 13,593 square feet at the original Student Center. The buildings were designed to house student resource centers, a new café/lounge terrace/dining area in the form of a living room with a bank of lounge chairs, a multi-media conference room, a 3,000 book library, kitchen and counseling room as well as offices and conference space. The project also included space for a Women s Center, which is a 24-hour student study lounge and the David Bohnett Wireless CyberCenter. The center is a space in which students, faculty, staff and the community work collaboratively to foster the educational, professional and personal development of diverse groups of women. The Center affords education and support to all members of UCSD and provides space for programs ranging from Legal Clinics, to Women in Science and Engineering panels, a dedicated lactation room for fursing mothers, a counseling room, a holistic center and a speakers bureau. Construction was performed on this busy campus at the Student Center on an urban site with very limited access and parking. This created challenges in establishing construction staging areas since the site stood on the main pedestrian route between various colleges of study and the University Center, which houses the Geisel Library, Price Student Center and the University Book Store. With no direct access roads to the site, equipment and material deliveries required the use of pedestrian walkways and ramps, which were still in use by the college community. Straub provided safety flaggers for public safety and scheduled deliveries and many other construction activities at times when student pedestrian traffic was the lowest.

26 Spanagel Hall & Root Hall Repairs and Renovations Post Graduate School, Monterey, CA Design-Build Architect: Value: NAVFAC Southwest RJC Architects $24 Million Completed: 2010 Post Graduate School Renovation Projected completed ahead of schedule LEED Sustainable Design Features Outstanding Owner Evaluation This project modernizes Spanagel Hall and Root Hall at the Naval Post Graduate School in Monterey. Both buildings provide an applied instruction and combined research laboratory, to accommodate modern teaching and research equipment. The Graduate School of Engineering and Applied sciences, considered to be the largest and most important department is housed within Spanagel Hall. Both buildings are within a quad composed of 1950 s era architecture and are considered to be of historical significance. The scope of work consisted of repairs to the first floor, second floor, and roof in Root Hall to comply with current safety and building codes. In addition, repairs from the basement to the fifth floor of Spanagel Hall were required to comply with current critical safety and building codes. The following Mechanical and Life Safety Upgrades were provided: Repaired the buildings to comply with current building codes Removed hazardous materials: asbestos and lead paint Upgraded finishes in public areas: replaced ceiling tiles, carpet, and painted walls Removed and replaced HVAC systems Provided upgrades to the electrical systems Replaced the existing fire protection systems Integrated sustainable strategies in the design Provided 7 temporary buildings for users within classroom and office buildings during construction

27 New Fitness Center Los Angeles, CA Design-Build Architect: Value: NAVFAC Southwest DCSW Architects $5.9 Million Award: 30 March 2001 Completion: 25 November 2002 Fitness Center 34,054 Total Square Feet Completed On-Schedule Overall Cost Savings to the Owner Value Engineering Features Included Sustainable Design Features Included ABC Excellence in Construction Merit Award, 2003 Outstanding Owner Evaluation The Design-Build Fitness Center is a 34,054 SF gymnasium complete with two glass wall racquetball courts, sauna, aerobics, weight room, exercise room, locker/shower rooms, sauna, and laundry. The facility also includes a Health & Wellness Center with classroom, kitchen, and offices. The plan was designed to accommodate a future exterior pool. Pre-existing buildings totaling 1,850 sf required demolition. The project is located on the site of a 1940 s and 1950 s era aircraft production facility complex. The site contained unidentified abandoned underground utilities, scattered hazardous materials, and a documented need for methane gas control. Straub worked closely with the Navy and Los Angeles Air Force Base personnel in addressing these issues, while coordinating with an adjacent Medical-Dental Clinic construction project without disturbance to the users. Construction included a complex combination of insulated metal wall panels over open web bow trusses with curved standing seam metal roofing at the office and exercise areas along with pre-engineered building elements at the gymnasium. This project received the Associated Builders and Contractor s San Diego Chapter 2003 Excellence in Construction Merit Award. Straub received an outstanding project Final Performance Evaluation (DD Form 2626). Design awards include: Air Force Regional Design Award and Honor Award - California Council of Society of American Registered Architects (SARA).

28 Campus Retail Center Las Vegas, NV Design-Bid-Build Value: US Army Corps of Engineers $14 Million Completed: 2004 Retail Facility / Addition / Alterations 21,430 Square Feet of Addition 94,345 Square Feet of Alterations Completed Ahead of Schedule Sustainable Design Features Included AGC Safe Site Award, 2003 Above Average Owner Evaluation This phased occupancy facility project included construction of approximately 21,430 SF of addition and 94,345 SF of alterations consisting of Sales, Nonperishable and Refrigerated Food Storage, Food Processing and Administrative Areas. A high-volume store with $1.2 M in sales per week, it was critical to protect the commissary shoppers, staff personnel, and product. Straub worked with the commissary staff in resequencing the phasing and scheduling of work to minimize impacts on both commissary operations and the commissary shoppers. Sales volume during construction actually increased. The 8.33 acre site included 240,000 SF of asphalt paving and 31,700 SF of landscape and surface storm drainage. Straub supplemented the project safety program with regular independent safety audits and was awarded the Associated General Contractors Safe Jobsite Award.

29 Red Rock Canyon Educational Visitor Center Las Vegas, NV Design-Bid-Build Value: US Dept. of Interior Bureau of Land Management $17 Million Completed: 2009 Educational Facility 17,850 Total Square Feet Completed On-Schedule Designed to USGBC Gold LEED Rating AGC Safe Site Award, 2009 ABC San Diego Award - Top Project by a General Contractor ABC National Pyramid Award Southwest Contractors Best Green Building, 2010 Scope of work also includes landscaping and amenities, shade structures, exhibits, support structures and retaining walls, general site work, roads, as well as renovations and new construction of parking. Construction elements include reinforced concrete foundation and floor slab, masonry, wall panels, structural steel frame, poly foam roof, fire detection/protection, special security enhancements, specialized heating and air conditioning with temperature and humidity limitations, site improvements, utilities, and communication systems. Construction was adjacent to occupied buildings as the Rock Canyon National Conservation Area is fully operational with daily visitors. Therefore the Straub field team and subcontractors worked together to ensure all roads were open to the public at all times. This sustainable project has numerous features including: Transpired Solar Wall, Solar Hot Water System, and Rainwater Harvesting System. This project was designed by the government to achieve USGBC LEED Silver certification. Straub construction provided LEED action plans, LEED progress reports, and documentation submittals necessary for certification. The Visitor Center not only consists of Sustainable buildings but serves as an educational facility to teach sustainable practices.

30 Force Intelligence Operations Center (FIOC), Phase III MCB Camp Pendleton, CA Design-Build Architect: NAVFAC Southwest RJC Architects Value: $46,876,449 Award: 29 September 2008 Completion: 23 July 2010 Military Complex 147,000 Total Square Feet Complex includes: 9th Communications Headquarters Building and Training Facility 9th Communications CEM Facility and Support Company Facility 9th Communications Alpha Bravo Facility Radio Rappelling Tower Intel Company Headquarters Building Intel Academic Instruction Facility Intel Armory Facility and Radio Addition Overall Cost Savings to the Owner USGBC LEED Gold Certification - All Buildings, Except Armory USGBC LEED Certified - Armory Self-Performed 20% of Scope Outstanding Final CCASS Evaluation NAVFAC STAR Safety Award First Building on MCB Camp Pendleton to Receive LEED Gold Straub Construction is responsible for Phase III design and construction of six structures, as well as all related site amenities; set on nearly 14 acres within the HQ Area of Camp Pendleton. This project is one of the highest profile projects at MCB Camp Pendleton. The mission of the Force Intelligence Operations Center (FIOC) is collocating Radio Battalion, Intelligence Battalion and 9th Communication Battalion. The collocated facilities consolidate shared activities and operations to support the mission goals of the Radio, Intelligence, and 9th Communications Battalions. For all six projects the related amenities and site work included earthwork, grading, landscaping, demolition of existing paving and buildings, drainage, storm water management, parking lot and paved roadway, fencing, sidewalks, site excavation and fill, sanitary sewer system extensions, domestic water extensions, a natural gas distribution system, fire pumps and hydrants, electrical utilities, telecommunication utilities, security systems, Mass Notification Systems (MNS), Local Area Network (LAN), and emergency/standby power systems.

31 Marine Corps Training Center Oceanside, CA Design-Build Architect: Value: NAVFAC Southwest KMA Architects $10 Million Completed: 2010 Training Facility 24,962 Total Square Feet USGBC LEED Gold Certification - ITC USGBC LEED Certified - GMB Designed for Future Flexibility Project will be Delivered Ahead of Schedule Overall Cost Savings to the Owner Outstanding Owner Evaluation NAVFAC STAR Safety Award This project involves design and construction of two buildings in two different locations. The first building is a multi-story Training Center with Administrative and Support Areas. The second building is a Grounds Maintenance Building (GMB) with a Vehicle Holding Shed. The project total area is 24,962 SF. The Training Center is a two story office building, housing three separate entities. Functional spaces include the general purpose and computer classrooms, lecture space, and staff office areas. Support spaces includes a media development room, viewing/tv-vcr room, media/equipment and supply storage areas, instructor computer prep rooms, administrative and support spaces for the various headquarters sections, and a Navy Marine Corps Intranet (NMCI) utility room for mechanical, electrical, fire protection and communications. The building is 35 feet in height at the peak of the roof and consists of a combination of split face and precision CMU exterior walls. Straub worked with the client and the users to move them from dilapidated quonset huts into the new facilities while completing the finish work. With creative scheduling, we were able to complete the project on time while the users utilized the new facilities. Ground Maintenance Building- A 3,027 SF CMU building that provides storage for ground maintenance equipment and supplies. The structure has 14-foot ceilings and includes storage, a single main office and ADA Unisex compliant toilet room. Concrete floors support the use of forklifts within the building.

32 Consolidated Communications/Electronics Maintenance Shop MCB Camp Pendleton, CA Design-Build Architect: NAVFAC Southwest GMH Architects Value: $9,516,605 Award: 30 June 2009 Completion: 18 March 2011 Military Maintenance Facility 23,935 Total Square Feet Currently Ahead of Schedule Designed to USGBC Silver LEED Rating Exceeded CA Engergy Performance Standard Title 24 by 30% Self-Performed 20% of Scope STAR Safety Award The 23,935 square foot single-story, High Bay Communication/ Electronics Maintenance Shop is currently under construction and is on schedule and within budget. The CMU building has conventional reinforced concrete footing and slab-on-grade, factory-finished standing seam metal roofing over structural steel framing, steel doors and frames, finished gypsum board over metal stud interior partitions, and suspended acoustical ceiling systems. Functional spaces for the ECMS include maintenance areas for the Communications/Electronics shop, computer classroom, and telecommunication room. Built-in equipment includes vehicle exhaust system. The Comm/Elect building provides space for maintenance of communication/electronic equipment for four subordinate element of the 1st Marines Regiment: Headquarter, 1st Battalion (1/1), 2nd Battalion (2/1), 3rd Battalion (3/1) and 4th Battalion (4/1). The facility includes spaces for equipment repair (both hand-held and vehicle mounted) storage, tool room, and administrative offices for all battalions. The program consists of three main department areas. These areas include: Regiment spaces, Battalion spaces and support areas (mechanical, electrical, telecommunication, fire protection, clean room, etc). Regimental areas will include common or shared spaces that will also be used by battalion personnel. Shared areas include: break room, training classrooms, conference room, men s and women s heads and lockers, toilet and shower facilities.

33 Border Patrol Station Boulevard, CA Design-Build Architect: US Army Corps of Engineers RJC Architects Value: $29,667,291 Award: 31 August 2010 Completion: 19 January 2013 Border Patrol Complex 74,284 Total Square Feet Designed to USGBC LEED Silver Sustainable Design Features Included Two-Story Main Station (46,140 SF) Vehicle Service & Maintenance (13,918 SF) Firing Range (8,874 SF) Kennel Facility (3,372 SF) Equestrian Office (1,980 SF) Straub served as the design-build contractor for this new Border Patrol Station. This design-build complex builds a 74,284 SF facility including a two-story Main Station, a vehicle service and maintenance building, firing range, an equestrian office, and a kennel facility. The Main Station includes both private and open offices, a conference/ training room, assembly rooms, locker rooms, report writing room, file storage, equipment storage, break room, interview rooms, exercise room, holding cells, evidence room, processing areas, and monitoring/ control rooms. The facility also includes a helicopter pad. The Station is constructed of masonry walls, interior steel columns, and a standing seam metal, while the accessory buildings are preengineered metal buildings. All facilities incorporate energy efficient design and construction and include sustainable design features that will allow the building to achieve LEED Silver certification.

34 Flight Simulator Nellis AFB, NV Design-Bid-Build US Army Corps of Engineers Value: $8,240,773 Award: 27 June 2007 Completion: 12 August 2008 Military Operations Facility 15,931 Total Square Feet Completed Ahead of Schedule Value Engineering Features Included Self-Performed 20% of Scope AGC Site Safe Award Outstanding Owner Evaluation The new 15,931 SF permanent four-cockpit flight simulator facility supports the BRAC directed beddown of F-15C/D and F16 aircraft at Nellis AFB. Although this was a D/B/B fixed price contract, Straub was responsible for the design of the pre-engineered metal building and foundation. Construction elements included reinforced concrete foundation and floor slab, structural steel frame with pre-engineered metal building system over concrete masonry block walls, standing seam metal roof, fire detection/protection, special security enhancements, specialized heating and air conditioning with temperature and humidity limitations, site improvements, utilities, landscaping, roads/parking, communications support and all other necessary work as required. Force protection includes reinforced exterior walls and laminated windows. While construction materials and methods for the Flight Simulator are fairly standard in MILCON construction, particular project concerns were: (1) minimizing impacts of site electrical distribution system connection work to the existing Nellis Terrace switch at Swaab Boulevard approximately 4,500 LF from the project site; (2) safety and traffic control in the local area; (3) insuring effective communication/ coordination with the Base and users; and (4) interface with other contract work on base, particularly the other four BRAC projects scheduled concurrently for construction with the BRAC Flight Simulator Facility.

35 AFSOC Headquarters Nellis AFB, NV Design-Build Architect: US Army Corps of Engineers Lee & Sakahara Architects Value: $2,272,542 Award: 31 August 2004 Completion: 15 September 2005 Complex includes: AFSOC Headquarter Facility MXS Facility 7,926 Total Square Feet Completed Ahead of Schedule Overall Cost Savings to the Owner Sustainable Design Features Included Designed to LEED SPiRiT Gold Level of Certification Self-Performed 15% of Scope AGC Safe Site Award, 2005 Letters of Recognition, 2005 Outstanding Owner Evaluation This Design-Build project consisted of a combined HQ AFSOC 563 Operation Location A Facility and 763 MXS HQ Facility. The AFSOC 563 HQ Facility is a 4,238 s.f. administrative support facility housing a permanent staff of approximately nineteen personnel, and conference room space for up to thirty personnel. The 763 MXS Facility project consists of a 3,688 s.f. administrative support facility housing a permanent staff of approximately seventeen personnel, and conference room space for up to thirty personnel. In addition to design and construction, Straub was responsible for site preparation including clearing, excavation and shaping. Site utilities included water, wastewater, storm water, electrical, as well as voice and data communications. Site improvements included access, parking areas, sidewalks and landscaping; utilizing drought tolerant plants native to the local area.

36 JIEDDO Battle Course MCAGCC Twentynine Palms, CA Design-Build Architect: NAVFAC Southwest GMH Architects Value: $9,929,368 Award: 24 September 2008 Completion: 19 February 2010 Military Training Facility 3 Training Sites, Totaling 86 Buildings AAR Range Support Facility, Totaling 2,691 Square Feet Completed Ahead of Schedule Overall Cost Savings to the Owner LEED Sustainable Design Features Included Met the Requirements for California Energy Performance Standard Title 24 Self-Performed 20% of Scope Outstanding Owner Evaluation NAVFAC STAR Safety Award The JIEDDO battle course project is designed to train Marines to identify and defeat Improvised Explosive Devices. The project consisted of three training sites; extensive roadway improvements, a Range Support Facility; as well as Communication Lines and Fiber Optic Cable connection to Camp Wilson. The three sites were developed to simulate foreign villages with a two-lane roadway into each site. A total of 86 building sites were graded and the CMU courtyard walls were built to support combat exercises and bodily impacts during training exercises. Additional features included a mock traffic signal, 60 Photovoltaic street lights, a generator, tunnels, and a mock pedestrian overpass. The 2,691 SF After Action Reporting (AAR) Range Support Facility consists of a large classroom that offered the flexibility and capability to divide into three smaller classrooms for review of filmed training and debriefing; an instructors production room; a communications room; material storage space; an electronic equipment systems control room and LAN room. A concrete patio space creates an outdoor classroom; complete with portable heating and cooling, as well as bleachers protected by an expansive sunshade.

37 Ear, Nose, & Throat (ENT) & Speech Pathology Clinic Loma Linda, CA Design-Build Teehee-Straub, A Joint Venture Architect: Value: USACE KMA Architecture $5 Million Completed: 2012 Medical Facility Outstanding Interim Owner Evaluation 8,005 SF Audiology Clinic Sustainable Design Features Constrained Site Safety Precautions for Parking and Pedestrians Good Neighbor Accommodations during Construction Teehee-Straub Joint Venture, was responsible for the design and construction of the 8,005 SF audiology clinic, located at the Jerry L. Pettis Memorial VA Medical Center Campus. The one-story building is situated northeast of the existing hospital building and was constructed with a steel frame and stucco exterior, a glazed curtain wall storefront, and a concrete slab roof. The facility was built on a poured caisson foundation with slab on grade concrete. The facility has been designed and constructed to accommodate a second floor future addition with six feet of interstitial space above the first floor to house future hospital equipment and utility systems. The new building entrance provides a recognizable, formal entry, which makes efficient use of existing patient circulation and the new architecture blends with the pre-existing hospital campus. Spaces within the clinic included administration areas, private offices, exam rooms, and audiology exam suites with both an exam room and adjacent control room, hearing aid fitting lab, break room, public restrooms, and open lobby with upgraded finishes. Site work included the demolition and filling of duck ponds, along with reconfiguration of berms, swales and sidewalks, and parking within the new building area. The project site was treated as environmentally sensitive due to the wildlife that previously resided in the duck ponds which were filled for this project. The new audiology clinic was designed and built with several sustainable design features, including: efficient mechanical split VAV systems, walk-off entry mats, energy saving glazing, efficient lighting systems, window shades on sun-exposed sides of building, and additional windows for increased daylighting. Additionally, water savings features were included, such as efficient fixtures, low flow toilets and sinks, and water efficient landscaping.

38 Upgrade Research Lab Facilities Long Beach, CA Design-Build Architect: Value: USACE DGA $4 Million Completed: 2013 Medical Facility Sustainable Design Features Constrained Site Infection Control Measures Safety Precautions for Parking and Pedestrians Good Neighbor Accommodations during Construction Straub was responsible for the design and construction for the Long Beach Veteran s Administration s Research Laboratory upgrades. This $4 million contract provided tenant improvements throughout several areas of the facility. This contract included design, general construction tasks, and some unique tasks to renovate laboratory space for this project. Straub managed all of the disciplines including Architectural, Mechanical, Plumbing, Electrical and HVAC. Trades included demolition, carpentry, painting, plumbing, rigging, pipe fitting, mechanical, electrical and low voltage security. Additionally, the contract included installation of a new security surveillance system with a fiber optic routing plan, condensing unit, and an 80-ton chiller. The work was completed within an active and functioning VA Research Lab; therefore the contract included a high level of infection control measures and protection of all existing building systems and services.

39 C-130 Hangar & Administration Unit Davis-Monthan AFB, AZ Design-Bid-Build US Army Corps of Engineers Value: $10,169,213 Award: 02 May 2008 Completion: 25 September 2009 Military Hangar/Maintenance Facility 42,765 Total Square Feet Completed Ahead of Schedule Overall Cost Savings to the Owner Sustainable Design Features Included Self-Performed 20% of Scope Outstanding Owner Evaluation As the primary contractor, Straub Construction was charged with constructing a 29,009 SF pre-engineered metal Maintenance Hangar, a 13,756 SF Aircraft Maintenance unit, as well as a large administrative area which surrounds two sides of the hangar and ties into the existing taxiway. The hangar/aircraft maintenance unit was built to prepare, service and maintain C-130 aircraft; supporting the beddown of the Combat Search and Rescue (CSAR) mission at Davis Monthan AFB and the activation of a C-130 squadron with 10 aircraft. The new facility improves readiness efforts and enables the CSAR squadron to be fully functional; filling a 28 year need. Construction elements for the hangar include site improvements, utilities, landscaping and irrigation, roads, parking, split faced block, reinforced concrete foundation and floor slab, pre-engineered metal building components, standing seam metal roof, fire detection/ protection, special security enhancements, specialized heating and air conditioning with temperature and humidity limitations, and communications support.

40 Aircraft Operations - AMU/Hangar & Squadron Operations Nellis AFB, NV Design-Bid-Build US Army Corps of Engineers Value: $24,966,024 Award: 23 July 2007 Completion: 07 December 2009 Military Hangar & Operations Facilities 54,992 Total Square Feet Completed On-Schedule Sustainable Design Features Included Self-Performed 20% of Scope Outstanding Owner Evaluation This contract scopes of work consisted of both a new 13,748 SF Squadron Operations Facility and a 41,244 SF Aircraft Maintenance Unit (AMXU) Facility with 4-bay high hangar to support the BRAC directed beddown of F-15C/D and F-16 aircraft. The Squadron Operations/ AMXU facilities supports mission planning, flight operations, direct flightline maintenance functions, mission briefs and debriefs, and squadron administrative support functions. The high bay hangar supports the direct maintenance of the F-15C aircraft. The project site required the removal/cleanup of contaminated soil associated with truck refueling operations. Construction consisted of reinforced concrete foundation and floor slab, structural steel frame, standing seam metal roof, fire detection/ protection, contaminated soil remediation/removal, utilities, landscaping, roads/ parking, hangar apron access pavements/ lighting/ markings, demolition, communication support and all necessary work as required. Force protection includes reinforced exterior walls/ laminated windows. The Squadron Operations facility is a masonry building with standing seams, glazing, storefront system, interior partitions and dedicated parking lot. The interior of the building is mainly office spaces with some open spaces that can be used for training and classroom set up or cubicle areas. This building was completed with in 9 months and the users took occupancy will Straub finished construction on the hangar portion of the contract. In addition, the project site required the removal/cleanup of contaminated soil associated with truck refueling operations.

41 Aircraft Maintenance Complex Fuel Cell Nellis AFB, NV Design-Bid-Build US Army Corps of Engineers Value: $11,639,305 Award: 23 July 2007 Completion: 16 March 2009 Military Maintenance Facility 18,202 Total Square Feet Completed On-Schedule Value Engineering Features Included Self-Performed 20% of Scope Above Average Owner Evaluation The scope of work consists of construction of an approximately 18,202 sf fuel cell maintenance hangar with reinforced concrete foundation and floor slab, structural steel frame, standing seam metal roof, fire detection/protection including high expansion foam system, utilities, site improvements, and access road, hangar apron access pavements/ lighting, markings, and communication support. Bid options include masonry wainscot for the building exterior; thin film flooring in aircraft maintenance area; aircraft pad west of the aircraft apron/access; and parking lot and associated entry drive, pavement marking and walks east across access drive east of the hangar/ maintenance facility. While construction means and methods for the Aircraft Maintenance Complex are similar to numerous recent Straub Construction projects and fairly standard in MILCON construction, particular care will be taken with the demolition/ removal of existing electrical primary power lines; relocation of the existing transformer; and safety especially during elevated work including structural steel erection, placement of masonry wall/ metal wall panels, roof installation, and installation of hanger doors.

42 Vehicle Maintenance Complex Nellis AFB, NV Design-Build Architect: US Army Corps of Engineers KMA Architects Value: $11,142,778 Award: 29 July 2004 Completion: 17 May 2006 Military Maintenance Facility 63,203 Total Square Feet Completed On-Schedule Sustainable Design Features Included Achieved Bronze SPiRiT Level Self-Performed 23% of Scope AGC Safe Site Award ABC San Diego Chapter Merit Award Outstanding Owner Evaluation Straub was selected as the prime contractor for this project that involved design and construction of a Vehicle Maintenance Complex at Nellis AFB, Nevada. The complex consists of four buildings: a new 33,068 square foot maintenance facility designed for the repair and maintenance of a variety of wheeled vehicles; renovation and repair of an existing 25,858 square foot vehicle maintenance facility; alteration of an existing 4,133 square maintenance including a 144 square foot addition; and, alteration of an existing distinguished visitor operations building consisting of 1,930 square feet. Also included in the scope was construction of a drive-through vehicle wash rack accommodating pickup trucks and HMMV s and a new 2,000 square foot loading dock. The facilities are designed to provide working space for seventy-five military personnel and maintenance space for approximately thirty-eight vehicles. Elements of work include a combination of load bearing CMU walls with a split face concrete masonry exterior, steel framed maintenance bays with CMU in-fill panels and a standing seam metal roof. Interiors include metal studs with gypsum wall board, CMU walls and acoustical ceilings. Special features include a 5-ton bridge crane, overhead vehicle exhaust system, P.O.L. fluids system, compressed air system, vehicle wash system and double walled waste vent tanks.

43 557 Maintenance Complex Fort Irwin, CA Design-Bid-Build US Army Corps of Engineers Value: $15,395,098 Award: 4 September 2002 Completion: 16 May 2004 Military Maintenance Facility 59,000 Total Square Feet 1,400,000 Square Feet of Parking Completed On-Schedule Sustainable Design Features Included Self-Performed 23% of Scope Above Average Owner Evaluation The 557th Direct Support (DS) Vehicle Maintenance Facility consists of a Maintenance Shop Building, Unit Deployment Storage Building, Break Shelter Building, Guardhouse, a two-bay Wash Rack Facility, and approximately 1,400,000 SF of hardstand parking area. The main building is approximately 59,000 SF, consisting of 15 maintenance bays, three mechanical areas, a warehouse, and administration areas. The Maintenance Shop combined a contractor provided design/build pre-engineered metal structure with foundation in the maintenance and warehouse areas. A reinforced CMU masonry and steel roof system structure housed the mechanical and administration areas, designed by the Sacramento District, U. S. Army Corps of Engineers. Site work included perimeter security fencing and a POV parking lot with Guard Shack at a pedestrian entry. Included in the mechanical areas are two 35-ton overhead bridge cranes that travel through the maintenance bays. The facility also has two 5-ton, five 3-ton, and one ½-ton jib cranes.

44 Pavement and Runway Lighting Replacement March Air Reserve Base, Riverside, CA Design-Build U.S. Army Corps of Engineers Value: $15,449,521 Award: 17- March, 2011 Completion: October 2013 Large Airfield Demolition of Existing Pavement Repair over 10,000 sf of Runway Energy Saving Lighting Features The scope of work included the design and construction for the repair of the entire Runway 32/14 Asphaltic Concrete and replacement of airfield lighting at March ARB, CA. The work includes milling and over laying of existing asphaltic concrete pavement, repairing the access road to south-east shack and providing new pavement markings in three phases. Straub constructed the new airfield, repaired the airfield lighting system and installed a new lighting vault. The project also included a new rotating beacon light and new helipad perimeter lights and guidance signs. Straub provided all site preparation, erect safety barricades, construction, restoration, repair, enhancement, maintenance, demolition, site clean-up, and demobilization of facilities and sites as required. Straub also integrated the latest Anti-Terrorism/Force Protection (AT/FP) standards. Other features included energy conservation, pollution prevention, and waste reduction to the maximum extent practicable.

45 INS Sector Support/Air Operations Facility San Diego, CA Design-Bid-Build Architect: US Army Corps of Engineers KMA Architects Value: $22,154,300 Award: 20 September 2000 Completion: 12 January 2004 Military Operations Facility 93,000 Total Square Feet 115,000 Square Feet of Helipad 265,000 Square Feet of Pavement Sustainable Design Features Included Value Engineering Features Included Self-Performed 20% of Scope AGC Excellence in Construction Honor Award ABC San Diego Chapter Merit Award Outstanding Owner Evaluation The scope of this project involved construction of four masonry and steel buildings for the U.S. Immigration and Naturalization Service in San Diego, California. Buildings included a facilities maintenance shop, vehicle maintenance garage, electronics shop and air operations facility with single-story and two-story sections totaling 93,000 s.f. The work also involved construction of an 115,000 s.f. concrete helipad and 265,000 of concrete paving for storage and staging of vehicles. A major portion of work involved processing more than 31,261 tons of lead-contaminated soil and treatment and disposal of additional 38,137 tons. Straub and its remediation subcontractor developed an alternate treatment plan that involved the encapsulation of low lead-bearing processed soils, processing and removal of high lead-bearing soils and protection of clean soils located outside the construction area. Straub Construction served as the Prime Contractor for this project being responsible for all contract activities including partial design. The company self-performed: project management including preparation and control of the construction schedule; quality control and safety management including development and implementation of project specific plans, performance of inspections, directing of rework activities and providing regular safety training; preparation of submittals, as-built drawings, regular status reports and O&M manuals; and, contract administration. Straub also performed approximately 14% of the construction including: demolition; rough and finish carpentry; caulking and sealants; and, punch list items.

46 Debris Basin Emergency Cleanup San Bernardino County, CA Design-Bid-Build US Army Corps of Engineers Value: $1,317,273 Award: 16 January 2004 Completion: 20 February 2004 Federal Contract - Debris Cleanup Rapid Emergency Response Project of Water Mainlines Over 178,529 Cubic Yards of Material Removed. Completed Ahead of Schedule Outstanding Owner Evaluation The Emergency Debris Basin Cleanup project consisted of the removal and disposal of all classes of material within six designated debris basins in San Bernardino County, California. The basins cleaned to their original as-built dimensions were Patton Basin, East Badger Basin, North Badger Basin and Devil Basins (3), with over 178,529 cubic yards of material removed. This emergency contract was competitively bid through contractors certified under the U.S. Army Corps of Engineers South Pacific Division s MATOC (Multiple Award Task Order Contrast); a select group prequalified to bid on projects throughout eleven western states. Additionally, Project consisted of design and construction for 20,034 lf of new 18-inch water mainline and 1,258 lf of 8-inch service laterals. The flood-control basins are a series of lagoons spaced at regular intervals along the base of the San Gabriel mountain range. The Christmas Day mudslides and resulting loss of life have shown that a much larger effort beyond local and state resources is needed, Linda Adams, director of the state Dept. of Water Resources, wrote to U.S. Army Corps of Engineers District Commander COL Richard G. Thompson on Dec. 28, To prevent widespread flooding and loss of life and property, it is critical to clear the San Bernardino County debris basins Therefore, I am requesting the technical and direct assistance of the U.S. Army Corps of Engineers. Emergency Federal funds were authorized on January 5, A site visit was conducted on January 14; bids were due at 1:00 PM January 15; award of contract followed in one day on Friday, January 16. Full production hauling on-site started the next day, Saturday, January 17. We include this project as a demonstration of the Straub management team s ability to deliver a MACC Task Order contract under an emergency procurement with high project visibility and extremely short duration.

47 Missile Transport Bridge Vandenberg AFB, CA Design-Build Architect: US Army Corps of Engineers Simon Wong Engineering Value: $12,915,490 Award: 17 September 2002 Completion: 1 December 2003 Federal Contract - Military Bridge 2,098 Lineal Foot Bridge Completed Ahead of Schedule Overall Cost Savings to the Owner Sustainable Design Features Included Outstanding Owner Evaluation USACE SPD Construction Contractor of the Year DBIA Partnership Award for Efficiency in Design Build, 2004 ABC National Eagle Award for Excellence in Construction, Best Project in the Nation - Infrastructure and Heavy Division The Missile Transport Bridge consisted of the design and construction of a 2,098 lineal foot bridge on El Rancho Road over San Antonio Creek. The bridge includes 19 spans with 7-foot dia. CIDH piles of up to 130 ft deep, pile caps, piers, precast girders to support the bridge deck, and 1,329 lf of approach roadway. Related work included new approach pavement, demolition of the existing bridge deck, relocation of existing electrical and communication lines and other utilities, and revegetation and habitat restoration with a one-year habitat monitoring and maintenance period. The project site runs through an environmentally sensitive wetland with significant endangered species such as the California Red-legged frog, the unarmored three spinned stickleback fish, as well as many archaeological and Native American artifact sites. Environmental permit requirements stipulated construction activity could not take place in the riparian corridor between December 1 and April 15. All construction site personnel were required to receive site-specific training by qualified biologists prior to participating in project activities. Both environmental and cultural resource professionals monitored construction activities. Quality control was provided by Straub using a blend of the USACE Resident Management System (RMS) for Quality Control adapted to a CalTrans bridge construction methodology. Through careful coordination between the project team, issues were identified early and adjustments made to provide the proper oversight and review, resulting in no quality control issues.

48 DV-3 Vehicle Barrier Fence Tohono O Odham National Indian Reservation, Pima County, AZ Design-Bid-Build US Army Corps of Engineers Value: $26,652,000 Award: 28 September 2008 Completion: 16 January 2009 Federal Contract - Border Patrol Fence Miles of Fencing Completed Ahead of Schedule Value Engineering Features Included Self-Performed 23% of Scope Outstanding Owner Evaluation The Border Fence project DV-3 is located within the Area of Operation of the Office of Border Patrol s Tucson Sector, Ajo and Casa Grande Stations and traverses approximately miles along the International Boundary between the United States and Mexico, in Pima County, Arizona. The project consists of installing miles of VF-1 fence (post-onrail) and approximately 0.43 miles of VF-2 fence (normandy) and all components necessary to complete the construction, including clearing and grubbing, labor and equipment. Because the project was on the Tohono O odham Indian Reservation (TON), tribal monitors were required for all earth moving operations along with coordination and collaboration with landowners.

49 Waterline SLC-3, Phase 3 Vandenberg AFB, CA Design-Build Architect: US Army Corps of Engineers Penfield & Smith Engineering Value: $4,955,000 Award: 29 September 2006 Completion: 1 October 2007 Federal Contract - Waterline 3 Miles of Underground Waterline Completed Ahead of Schedule Overall Cost Savings to the Owner Valuable Engineering Features Included Self-Performed 20% of Scope Superior Letter of Recommendation Outstanding Owner Evaluation The scope of work consisted of furnishing all labor, materials, and equipment in connection with the design and construction of approximately 3 miles of underground waterline from South Gate SLC 3, Station to Bear Creek Road along Arguello Boulevard and from Station to Station along Bear Creek, and furnishing all labor, materials, and equipment in connection with replacing the pressure reducing valves and all components at Station on Arguello Boulevard and at the corner of Monroe Road and Sweeny Road. Additionally, Straub provided all labor material and equipment required to slurry seal and re-stripe Aguello Boulevard from Station to Bear Creek Road along Arguello Boulevard and from Station to Station along Bear Creek Road.

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM Shepherd University Board of Governors June 9, 2005 Agenda Item No. 9 SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM In 1994 construction began on the Byrd Science and

More information

Angelo State University Construction Report

Angelo State University Construction Report May 12, 2009 Angelo State University Construction Report Modular buildings will temporarily house ASU staff during the Hardeman renovation starting this fall. Prepared for: John Russell, Director of Planning

More information

DISCOVERY HALL, UNIVERSITY OF WASHINGTON BOTHELL Bothell, Washington 78,200 sf

DISCOVERY HALL, UNIVERSITY OF WASHINGTON BOTHELL Bothell, Washington 78,200 sf DISCOVERY HALL, UNIVERSITY OF WASHINGTON BOTHELL Bothell, Washington 78,200 sf Discovery Hall reflects its dynamic program and dramatic site, as well as the collaborative and student-centered spirit of

More information

Architectural Design Standards Example Guide DESIGN STANDARDS EXAMPLE GUIDE

Architectural Design Standards Example Guide DESIGN STANDARDS EXAMPLE GUIDE Architectural Design Standards Example Guide DESIGN STANDARDS EXAMPLE GUIDE Commercial, Professional Office, and Public Facility Developments Purpose This Guide offers examples to clarify and explain the

More information

john jay college of criminal justice

john jay college of criminal justice AIA NEW YORK CHAPTER 2013 DESIGN AWARDS ARCHITECTURE john jay college of criminal justice NEW YORK, NEW YORK FULL PROJECT NARRATIVE John Jay College of Criminal Justice s new building provides all the

More information

Occupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School

Occupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School Introduction Background The Duke School of Nursing building offers a new three-story state of the art facility that has helped strengthen the quality and integrity of the School of Nursing at Duke. The

More information

MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010

MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010 MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010 To better prepare San Jose City College/ Evergreen Valley

More information

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development

More information

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT 1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.3 Cabinets, Equipment 1.1.4 Portables 1.2 Fire / Life Safety 1.2.1 Corridor, Separation

More information

NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES

NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES All searches and notifications on Bid4Michigan are based on National Institute of Government Purchasing (NIGP) codes. It

More information

Capital Projects Town Hall Meeting

Capital Projects Town Hall Meeting Capital Projects Town Hall Meeting Planning, Architectural & Engineering Services September 15, 2014 Agenda Project Updates Recently Completed and in Construction Projects in Design Projects in Planning

More information

Riverside Community College District / Renaissance Block

Riverside Community College District / Renaissance Block Riverside Community College District / Renaissance Block Site Location Parking Structure Four levels 224 parking spaces Access Street Coil School of the Arts Two levels 36,420 sf Plaza of the Arts Culinary

More information

Building Permits: When are they required?

Building Permits: When are they required? Building Permits: When are they required? Generally, you need to obtain a building permit from the City whenever you construct, enlarge, alter, repair, move, remove, improve, convert, or demolish a building

More information

New Jersey City University Gilligan Student Union Center

New Jersey City University Gilligan Student Union Center New Jersey City University Gilligan Student Union Center The RBA Group worked with New Jersey City University in a major renovation of their Gilligan Student Union building. We were contracted to reassess,

More information

Exhibit B. Property Acquisition and Disposition Division Residential Design & Performance Standards

Exhibit B. Property Acquisition and Disposition Division Residential Design & Performance Standards Exhibit B Property Acquisition and Disposition Division Residential Design & Performance Standards I. Introduction The Property Acquisition and Disposition Division ( PADD ) has developed design standards

More information

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal. 2.02 DESIGN DEVELOPMENT PHASE GENERAL The Architect shall prepare the Design Development Documents from the approved Schematic Design. The Design Development Documents shall consist of drawings and other

More information

Development Services Guidelines

Development Services Guidelines Dear Customer/Developer: Balcones Heights 3300 Hillcrest San Antonio, Texas 78201 210-735-9148 ext 246 Fax: 210-735-9409 Development Services Guidelines Welcome to the City of Balcones Heights, we look

More information

C-2 Construction, Inc. - NAICS Codes

C-2 Construction, Inc. - NAICS Codes C-2 Construction, Inc. - NAICS Codes 212313 - Crushed and Broken Granite Mining and Quarrying This U.S. industry comprises: (1) establishments primarily engaged in developing the mine site, and/or mining

More information

C I T Y O F P E A R S A L L

C I T Y O F P E A R S A L L The Largest City Between San Antonio and Laredo COMMUNITY DEVELOPMENT C I T Y O F P E A R S A L L A Business-Friendly, Family-Oriented Community Building Department Application Information (Please read

More information

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage Property Address: Company Name: Contractor Name: Contractor Address: City: State: Zip: License Number: Phone Number

More information

Building Condition Assessment Report

Building Condition Assessment Report C2 - Nurses Resident (aka Administration) Building Condition Assessment Report Asset Address Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Inspection Date C2 - Nurses

More information

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY Cost Code # Description Cost Code # Description 01 00 00.001 General Requirements 02 00 00.001 Existing Conditions 01 31 19.13.001 Preconstruction Meetings 02 21 00.001 Surveys 01 32 33.001 Photographic

More information

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are: When is a Permit Required? The most common types of projects that require permits are: -New Houses or buildings -Room Additions or Expansions -Structural repairs, remodeling and alterations -Accessory

More information

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE BUILDING SERVICES DEPARTMENT 789 Broadway Street, Box 3000 Wyoming, ON N0N 1T0 Telephone: 519 845-0801 Toll-free: 1-866-324-6912 Fax: 519

More information

BUILDING SAFETY UNIT

BUILDING SAFETY UNIT POLICY Page 1 of 5 SUBMITTAL REQUIREMENTS FOR ONE AND TWO FAMILY DWELLINGS, ADDITIONS AND RENOVATIONS All submittals shall be site specific and designed to the provisions of the 2012 International Residential

More information

Hartsfield-Jackson Atlanta International Airport s

Hartsfield-Jackson Atlanta International Airport s Hartsfield-Jackson Atlanta International Airport s 2008-09 Closed Projects (Posted 1/6/2009) FC-3007000038C: MISCELLANEOUS BUILT-UP ROOF AND SINGLE PLY ROOF REPAIRS AT H-JAIA Furnish all labor, equipment,

More information

Each icon on this map represents the physical location of a station.

Each icon on this map represents the physical location of a station. ABBOTSFORD SCHOOL DISTRICT: GREEN TOUR TOMORROW S SUSTAINABLE SOLUTIONS TODAY Welcome to the Abbotsford School District: Green Tour. Our goal is to create an interactive learning experience for visitors

More information

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT 1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.2 Water damage in many classrooms. Replace tiles. 1.1.3 Cabinets, Equipment 1.1.4 Portables

More information

Saint Cloud Business Center

Saint Cloud Business Center Saint Cloud Business Center 14 7th Avenue North Saint Cloud, MN 56303 For Sale Located on 7th Avenue in the heart of downtown across from the Court House Square. A large professional reception area with

More information

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS Los Angeles, CA Project Manual and Specification DIVISION 1 GENERAL CONDITIONS 01 01 10 STATEMENT OF WORK 01 11 00 SUMMARY OF THE WORK 01 14 05 METRO (OWNER) - DIRECTED STOPPAGES 01 20 00 PRICE AND PAYMENT

More information

SECTION 3 ONM & J STRUCTURAL ANALYSIS

SECTION 3 ONM & J STRUCTURAL ANALYSIS Historic Boynton Beach High School Existing Building Assessment City of Boynton Beach February 10, 2011 SECTION 3 ONM & J STRUCTURAL ANALYSIS STRUCTURAL ENGINEERS SPECIAL INSPECTORS STRUCTURAL CONDITION

More information

Schedule B to By-law 33-2009

Schedule B to By-law 33-2009 Amended by By-law 8-2016 Note: This consolidation is prepared for convenience only. For accurate reference the original by-laws should be reviewed. Floor Area Calculation Floor area shall: Schedule B to

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information

Design Development Quality Management Phase Checklist Project Phase Checklist Series

Design Development Quality Management Phase Checklist Project Phase Checklist Series Best Practices Design Checklist Project Phase Checklist Series Contributed by Micheal J. Lough, AIA, Principal, Integral Consulting The AIA collects and disseminates Best Practices as a service to AIA

More information

Construction Technologies Career Field Pathways and Course Structure

Construction Technologies Career Field Pathways and Course Structure Courses in Structural Systems (DD) Construction Technologies Career Field Pathways and Course Structure PATHWAY COURSES SUBJECT CODE Construction Technology-Core and Sustainable Construction 1 178000 Carpentry

More information

Does Wall Township require an inspection by the building department on resale of a home?

Does Wall Township require an inspection by the building department on resale of a home? Selling your home Does Wall Township require an inspection by the building department on resale of a home? No. We do not require a Certificate of Continued Occupancy on the resale of home. A Smoke Detector,

More information

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

D Sample Notices to Property Owners, Sample Affidavits, and Other Material D Sample Notices to Property Owners, Sample Affidavits, and Other Material These samples are offered to illustrate specific points in the Desk Reference. States and communities should examine them carefully

More information

STATE OF SOUTH CAROLINA RESIDENTIAL PROPERTY CONDITION DISCLOSURE STATEMENT

STATE OF SOUTH CAROLINA RESIDENTIAL PROPERTY CONDITION DISCLOSURE STATEMENT STATE OF SOUTH CAROLINA RESIDENTIAL PROPERTY CONDITION DISCLOSURE STATEMENT The South Carolina Code of Laws (Title 27, Chapter 50, Article 1) requires that an owner of residential real property (single

More information

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT SAMPLE SCHEDULE OF S 1.00 General Conditions 1.01 Project Management 1.02 General Superintendent 1.03 Superintendents 1.04 Safety Engineer 1.05 Scheduling 1.06 Field Engineering 1.07 Bonds 1.08 Trailer

More information

Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015

Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015 Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015 Town Hall Complete building restoration (state historic preservation award) High efficiency

More information

ESSENTIAL CURRICULUM ARCHITECTURAL DESIGN ACADEMY

ESSENTIAL CURRICULUM ARCHITECTURAL DESIGN ACADEMY ESSENTIAL CURRICULUM ARCHITECTURAL DESIGN ACADEMY HOWARD COUNTY MARYLAND ARCHITECTURAL DESIGN ACADEMY Architectural Design 1 Introduction / Overview of Course This course will introduce the basic principles

More information

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER NOTICE TO PROPERTY OWNER Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule. If your home or business is below

More information

CASE STUDY: The EVERGREEN

CASE STUDY: The EVERGREEN CASE STUDY: The EVERGREEN 1691 Palm Ave Summary Information Type: Residential Occupancy: Single Family Residence Size: 3,075 square feet Completed: 2009 Owner: Rob and Denise Smith Developer: E2 Homes,

More information

Civil Engineering and Architecture (CEA) Detailed Outline

Civil Engineering and Architecture (CEA) Detailed Outline Civil Engineering and Architecture (CEA) Detailed Outline Unit 1: Overview of Civil Engineering and Architecture (23 days) Lesson 1.1: History of Civil Engineering and Architecture 1. Many features of

More information

STANDARD FEATURES & PROCESS- NEW HOME CONSTRUCTION. Now offered for a limited period of time, free solar with each home!

STANDARD FEATURES & PROCESS- NEW HOME CONSTRUCTION. Now offered for a limited period of time, free solar with each home! STANDARD FEATURES & PROCESS- NEW HOME CONSTRUCTION Now offered for a limited period of time, free solar with each home! ENERGY EFFICIENT ITEMS BUILD IN YOUR HOME 50 Gal Energy Star Hot Water Heaters with

More information

DESIGN REVIEW CHECKLIST Chapter 6 Special Consideration Design Guidelines

DESIGN REVIEW CHECKLIST Chapter 6 Special Consideration Design Guidelines DESIGN REVIEW CHECKLIST Chapter 6 Special Consideration Design Guidelines A. Offices a. Office buildings should be built to the minimum required setback. b. Surface parking should be located towards the

More information

GREEN SCHOOLS CASE STUDY. West Wing Elementary

GREEN SCHOOLS CASE STUDY. West Wing Elementary GREEN SCHOOLS CASE STUDY School School name: School Deer Valley Union School District Address: 26716 N. High Desert Drive, Peoria, Arizona Contact: Jerry Cipriano Phone number: 602-467-5131 General location:

More information

Think Of Us First! When It s Time to Distribute Your Plans

Think Of Us First! When It s Time to Distribute Your Plans Think Of Us First! When It s Time to Distribute Your Plans CONSTRUCTION NOTEBOOK WILL LIST YOUR PLANS AND SPECS FREE CALL TODAY FOR DETAILS 702-876-8660 Why use Experience We have over 60 years of experience

More information

Development Services Guidelines

Development Services Guidelines Dear Customer/Developer: Balcones Heights 3300 Hillcrest San Antonio, Texas 78201 210-735-9148 ext 246 Fax: 210-735-9409 Development Services Guidelines Welcome to the City of Balcones Heights, we look

More information

Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study

Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study Robert C. Burns, AIA, LEED AP Principal Director of Historic Architecture 804. 648. 5040, ext. 1107

More information

Columbia Theological Seminary to Celebrate Ground-blessing for New, Green Residence Hall

Columbia Theological Seminary to Celebrate Ground-blessing for New, Green Residence Hall FOR IMMEDIATE RELEASE News Release Contact: Anne Taylor Lord, Aeck & Sargent 404-253-6710 [email protected] or Ann Kohut Kohut Communications Consulting 770-913-9747 [email protected] Columbia

More information

MICHIGAN STATE HOUSING DEVELOPMENT AUTHORITY LOW INCOME HOUSING TAX CREDIT PROGRAM COST CERTIFICATION GUIDELINES TABLE OF CONTENTS

MICHIGAN STATE HOUSING DEVELOPMENT AUTHORITY LOW INCOME HOUSING TAX CREDIT PROGRAM COST CERTIFICATION GUIDELINES TABLE OF CONTENTS MICHIGAN STATE HOUSING DEVELOPMENT AUTHORITY LOW INCOME HOUSING TAX CREDIT PROGRAM COST CERTIFICATION GUIDELINES TABLE OF CONTENTS 1. Cost Certification Guidelines PAGE I General 1 II Identity of Interest

More information

Los Angeles Community College District

Los Angeles Community College District Los Angeles Community College District BLUE AND GREEN TOGETHER Developing Sustainable Integrated Approaches to Green Technologies and Water Usage Green California Schools and Community Colleges October

More information

SYSTEMS INTEGRATION SYSTEMS INTEGRATION. Air handler uses heat recovery on exhaust air to temper incoming ventilation air Oxbow skylight

SYSTEMS INTEGRATION SYSTEMS INTEGRATION. Air handler uses heat recovery on exhaust air to temper incoming ventilation air Oxbow skylight 100% outside air intake Air handler uses heat recovery on exhaust air to temper incoming ventilation air Oxbow skylight Smoke evacuation Natural convection exhaust Atrium skylight Phase change material

More information

The City of Basehor, Kansas

The City of Basehor, Kansas The City of Basehor, Kansas Residential and Miscellaneous Permits This list provides general information regarding permit requirements for various residential construction and maintenance activities. The

More information

Students were surveyed by Brailsford & Dunlavey in the fall of 2000 to determine their priorities for Commons program spaces.

Students were surveyed by Brailsford & Dunlavey in the fall of 2000 to determine their priorities for Commons program spaces. I-1 2.0 INTRODUCTION 2.1 BACKGROUND Located in the rapidly growing Inland Empire area of Southern California (Riverside and San Bernardino Counties), the University of California, Riverside is well positioned

More information

Design of a Concrete Masonry House: NCMA Foundation Partners with NC State University School of Architecture

Design of a Concrete Masonry House: NCMA Foundation Partners with NC State University School of Architecture Design of a Concrete Masonry House: NCMA Foundation Partners with NC State University School of Architecture Thanks to the generous support of the NCMA Foundation, a team of architecture students from

More information

For Historically Designated Homes & Buildings

For Historically Designated Homes & Buildings Ninth Street Historic Park Acknowledgements This project was paid for in part by a State Historical Fund grant from the Colorado Historical Society. The contents contained herein do not necessarily reflect

More information

SELECTED SPECIAL EVENTS PROJECTS

SELECTED SPECIAL EVENTS PROJECTS 1 5 SELECTED SPECIAL EVENTS PROJECTS 3 1 DONNA AND MARVIN SCHWATZ CENTER FOR PERFORMING ARTS, ATLANTA, GEORGIA, USA. COBB ENERGY PERFORMING ARTS CENTRE, COBB COUNTY, GEORGIA, USA. 3 OLYMPIC AQUATIC CENTER,

More information

LEED PRESENTATION OUTLINE

LEED PRESENTATION OUTLINE 16902 BOLSA CHICA STREET, SUITE 101 HUNTINGTON BEACH, CA 92649 TELEPHONE (714) 840-8230 FACSIMILE (714) 840-2490 LEED PRESENTATION OUTLINE I. Overview of Green Building and Risks Involved with Sustainability

More information

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES A Residential Owner s Guide to PERMITS CITY OF Elgin PLANNING & NEIGHBORHOOD SERVICES CITY OF Elgin A Residential Owner s Guide Welcome! This booklet has been prepared to provide residential property owners

More information

Los Angeles Mission College Facilities Master Plan Draft Program Environmental Impact Report 3.5 ENERGY CONSERVATION AND SUSTAINABILITY.

Los Angeles Mission College Facilities Master Plan Draft Program Environmental Impact Report 3.5 ENERGY CONSERVATION AND SUSTAINABILITY. 3.5 ENERGY CONSERVATION AND SUSTAINABILITY As a result of the analysis undertaken in the Initial Study 1 for the Los Angeles Mission College Facilities Master Plan, the LACCD determined that the proposed

More information

How To Plan A Building

How To Plan A Building State of Nevada Department of Administration Purchasing Division Las Vegas Purchasing Warehouse Facility Condition Analysis LAS VEGAS PURCHASING WAREHOUSE 1054 South Commerce Street Las Vegas, Nevada Site

More information

MANAGEMENT PLAN STONE BAY RIFLE RANGE HISTORIC DISTRICT MCB CAMP LEJEUNE

MANAGEMENT PLAN STONE BAY RIFLE RANGE HISTORIC DISTRICT MCB CAMP LEJEUNE MANAGEMENT PLAN STONE BAY RIFLE RANGE HISTORIC DISTRICT MCB CAMP LEJEUNE This management plan is to be used in association with procedures outlined in Chapter of the Historic Buildings Management Handbook.

More information

Carbon Monoxide Detection in Commercial Buildings (

Carbon Monoxide Detection in Commercial Buildings ( 1 Technical Guideline for School Districts and BOCES to comply with regulations for Carbon Monoxide Detection in Commercial Buildings (Section 1228.4 of Part 1228 of Title 19 NYCRR). General: This document

More information

NOTICE TO CONTRACTORS

NOTICE TO CONTRACTORS NOTICE TO CONTRACTORS Notice is hereby given that San Luis Obispo County Community College District, ( District ) is accepting sealed Informal Bidding Prequalification Applications and Formal Bidding Prequalification

More information

DRAPER ELEMENTARY SCHOOL

DRAPER ELEMENTARY SCHOOL INITIAL YEAR BUILT 1953 BUILDING AREA 54,000 SF CURRENT PROGRAM CAPACITY 250 ENROLLMENT 2008 84 WARD 8 PROPOSED PROGRAM CAPACITY 325 Site Plan DRAPER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

BUILDING PERMIT SPECIFICATIONS

BUILDING PERMIT SPECIFICATIONS BUILDING PERMIT SPECIFICATIONS The below noted requirements are based upon La Plata County Building Code. These specifications are not intended as a complete set of requirements, but are intended to provide

More information

Exhibit C: Scope of Work and Schedule of Deliverables

Exhibit C: Scope of Work and Schedule of Deliverables Exhibit C: Scope of Work and Schedule of Deliverables Project Scope of Work Phases: A City Hall Envelope Renovations B City Hall Skylight Replacement C City Hall Chiller Replacement D City Hall Annex Plaza

More information

Facilities Operations Customer Service Standards WORK ORDER PRIORITIES

Facilities Operations Customer Service Standards WORK ORDER PRIORITIES Facilities Operations Customer Service Standards WORK ORDER PRIORITIES In order to provide fair and consistent maintenance service to all University faculty, staff and students, a work priority system

More information

MARQUETTE UNIVERSITY: McCabe Hall

MARQUETTE UNIVERSITY: McCabe Hall MARQUETTE UNIVERSITY: McCabe Hall THE SITE Newly acquired by Marquette, the vintage 1920 s building is located on the northeast corner of Wisconsin and 17th Streets. The urban setting offers immediate

More information

PROPERTY EVALUATION AND RESERVE FUND STUDY

PROPERTY EVALUATION AND RESERVE FUND STUDY PROPERTY EVALUATION AND RESERVE FUND STUDY COMPLEX NORTH & WEST AVENUES LAS VEGAS, NV Prepared for: HOMEOWNER S ASSOCIATION Prepared by: CRITERIUM ENGINEERS 22 Monument Square Portland, ME 04101 CONTENTS

More information

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table

More information

Structural Assessment Report

Structural Assessment Report Report Dallas Township Elementary School Dallas, Pennsylvania (JBCI Project No. 144911) 1655 Suburban Station Building 1617 John F. Kennedy Boulevard Philadelphia PA 19103 215 665 0497 5 Sandwood Drive

More information

Los Angeles Union Station, CA Sustainable Neighborhood Assessment. April 22-23, 2014

Los Angeles Union Station, CA Sustainable Neighborhood Assessment. April 22-23, 2014 Los Angeles Union Station, CA Sustainable Neighborhood Assessment April 22-23, 2014 Sustainable Neighborhood Assessment Through the Sustainable Neighborhood Assessment Tool developed by Global future development

More information

Foundation Evaluation Report for PROPERTY ADDRESS Houston, Texas 77089. August 30, 2012. Prepared for:

Foundation Evaluation Report for PROPERTY ADDRESS Houston, Texas 77089. August 30, 2012. Prepared for: A Full Service Real Estate Inspection & Engineering Firm for Houston, Texas 77089 August 30, 2012 Prepared for: CLIENT S NAME MAILING ADDRESS Houston, Texas 77089 Prepared by: Charles J. Jenkins, P.E.

More information

Innovation in Affordable Housing Incorporating GREEN in Development

Innovation in Affordable Housing Incorporating GREEN in Development Innovation in Affordable Housing Incorporating GREEN in Development 2014 Housing Innovation Marketplace Conference INTRODUCTION A small idea can grow into something that really bears fruit and, if good

More information

Estimating Database Checklist

Estimating Database Checklist Estimating Database Checklist If you are creating a new estimating database for projects, the following list offers a thorough listing of Main and Sub Categories. You can also use it as a checklist to

More information

Slavic Village Building Condition Review

Slavic Village Building Condition Review Slavic Village Building Condition Review Slavic Village Development May 8, 2015 Page 1 EXECUTIVE SUMMARY City Architecture was commissioned by Slavic Village Development to review five existing facilities

More information

17,280 square feet Overview:

17,280 square feet Overview: CENTRAL OFFICE Located at 167 Boston Post Road, East Lyme, Connecticut, the Central Office was built in 1916 as the original Flanders Elementary School and remains connected to the current school. The

More information

TD AMERITRADE Park Omaha

TD AMERITRADE Park Omaha TD AMERITRADE Park Omaha November 19, 2009 Report No. 6 MONTHLY CONSTRUCTION PROGRESS REPORT METROPOLITAN ENTERTAINMENT & CONVENTION AUTHORITY MONTHLY CONSTRUCTION PROGRESS REPORT Metropolitan Entertainment

More information

A Homeowner s Guide to Building Permits

A Homeowner s Guide to Building Permits A Homeowner s Guide to Building Permits Building Division City of London 300 Dufferin Ave. P.O. Box 5035 London, ON N6A 4L9 Table of Contents What is a Building?... 3 Planning Your Project... 3 When is

More information

MSHDA Affordable Green Enterprise Green Communities USGBC LEED

MSHDA Affordable Green Enterprise Green Communities USGBC LEED TAB M The ("QAP") is designed to further the Authority's mission by providing a process to allocate Low Income Housing Tax Credits ("LIHTC") to developments promoting safe, decent, affordable housing.

More information

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 SECTION B1: PREPARATION GUIDE B1.1 INTRODUCTION... B1-1

More information

Luxury Coach Homes. by bateman & martin developments

Luxury Coach Homes. by bateman & martin developments Luxury Coach Homes Luxury Coach Homes Neighborhood Site map about the builder Bateman & Martin Developments, Southwest Florida's leading coach home builder, has created award-winning coach homes of unparalleled

More information

BPC Green Builders. Green building for new and existing homes. Health Comfort Energy

BPC Green Builders. Green building for new and existing homes. Health Comfort Energy BPC Green Builders Green building for new and existing homes Health Comfort Energy Mechanical Systems Installed HVAC Systems Primary energy source large, roof mounted, solar thermal array (AET flat plate)

More information

9770 CULVER BOULEVARD CULVER CITY, CA 90232-0507 www.culvercity.org. Incidental improvements: improvements that do not qualify as minor or

9770 CULVER BOULEVARD CULVER CITY, CA 90232-0507 www.culvercity.org. Incidental improvements: improvements that do not qualify as minor or 9770 CULVER BOULEVARD CULVER CITY, CA 90232-0507 www.culvercity.org Construction Permitting Guidelines for Businesses Moving into Existing Buildings in Culver City If your business is moving into an existing

More information

NAHB 1-00-0000 PRODUCT DEFINITION

NAHB 1-00-0000 PRODUCT DEFINITION NAHB Standard Homebuilder Cost Codes Cost Code Description 1-00-0000 PRODUCT DEFINITION 1-01-0000 PREAQUISITION COSTS 1-01-0110 Feasibility Study 1-01-0120 Environmental Impact Study 1-01-0130 Option Fees

More information

Maryland. American Recovery and Reinvestment Act. 158 DoD Projects ($ 65.8M) Completed or Under Way by August 31, 2009

Maryland. American Recovery and Reinvestment Act. 158 DoD Projects ($ 65.8M) Completed or Under Way by August 31, 2009 Maryland American Recovery and Reinvestment Act 158 DoD Projects ($ 65.8M) Completed or Under Way by August 31, 2009 Project Title Component Installation Repair Building 316 Electrical, HVAC, Plumbing,

More information

Seattle Public Schools Building Excellence IV Projects Under Construction

Seattle Public Schools Building Excellence IV Projects Under Construction Seattle Public Schools Building Excellence IV Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 13 Genesee

More information

LOS ANGELES AFB, EL SEGUNDO, CA:

LOS ANGELES AFB, EL SEGUNDO, CA: LOS ANGELES AFB, EL SEGUNDO, CA: Contract #: FA2816-11-D-0001 / DO #001 Title: Building 284 Repair Lighting Location: Los Angeles AFB, El Segundo, CA Amount: $61,062.00 Start date: 4/13/12 Completion:

More information