BUILDINGS AND GROUNDS
|
|
|
- Mervin Robertson
- 10 years ago
- Views:
Transcription
1 BUILDINGS AND GROUNDS INTRODUCTION The SUNY Farmingdale campus comprises 380 acres and 69 buildings, three of which are LIEOC off-campus extensions leased by the campus in Hempstead (1977), East Brentwood (1962), and Riverhead. The newest campus building is the Broad Hollow Bioscience Park, completed in 2000 but currently inactive and currently undergoing a stage two office and laboratory addition and refurbishing. Together, the equipment in the 69 campus buildings is valued at $10,838,000, and the buildings themselves, with a gross area of 1,518,994 square feet, have a total replacement value (without land) of $246,960,000. Farmingdale, without land, is a quarter of a billion dollar state asset. And the value it generates in present tax revenue and graduates contributions to future state revenue has not been estimated. The campus of Farmingdale is indeed economically worth our attention and concern. In the description below, information about the buildings are drawn from the Building Characteristics Inventory Space Management List (SUNY Office for Capital Facilities, Oct, 10, 2001). This SUNY System Administration report uses abbreviations and numbers to explain details of all buildings owned or leased by SUNY Farmingdale including location, function, occupation and construction dates, details of building size and type, and costs of construction, replacement, and equipment. Other cited reports include the Capital Project Summary Report and an informal local list of campus buildings and general plans. DESCRIPTION OLDEST BUILDINGS The oldest building on campus is the Herdsman Residence, built in The table below describes the first six buildings on the SUNY Farmingdale campus which remain standing:
2 FARMINGDALE S SIX OLDEST BUILDINGS BUILDING CONSTRUCTION DATE CONSTRUCTION COST REPLACEMENT COST HERDSMAN 1912 $ 5,000 $ 126,000 WARD 1914 $12,000 $2,413,000 CUTLER 1914 $ 9,000 $1,906,000 HICKS 1914 $ 9,000 $1,985,000 COTTAGE 1914 $ 9,000 $413,000 CONKLIN 1914 $13,000 $2,734,000 Only Ward Hall and Conklin Hall among these oldest buildings are being used. Although members of the staff acknowledge the value of rehabilitating Cutler and Hicks because of their history, utility, and charm, no proposals for such projects exist in the Capital Project Summary (January 1, 2002). Such work, however, could be cost effective because of the 2002 replacement cost (excluding land) of each building. The local plan (not the Capital Project Summary) calls for the demolition of the Herdsman Residence, which has a comparatively small present asset value. LARGEST BUILDINGS The following list describes the seven largest buildings on campus: LARGEST BUILDINGS: SUNY FARMINGDALE BUILDING OCCUPATION GROSS AREA REPLACEMENT COST LUPTON HALL ,575 $27,968,000 GLEESON HALL ,869 $22,967,000 NOLD HALL ,236 $14,550,000 NATHAN HALE HALL ,225 $12,037,000 WHITMAN HALL ,871 $13,215,000 GREENLEY LIBRARY ,233 $12,503,000 ROOSEVELT HALL ,661 $7,759,000 Plans and Construction Among the eighteen ongoing campus building projects being funded by the capital improvements budget, seven are taking place in these buildings: I. A planned $10,000,000 two-phase rehabilitation and expansion of Roosevelt Hall is presently on hold. 2 Central air conditioning will be installed by December 2004 at Nathan Hale Hall (estimated cost: $571,000). 3 Two separate projects in Lupton Hall include the rehabilitation of corridors, chemistry labs, and Construction Technology classrooms (Rooms 260, 261, 263, 266, and 269) by December, 2004 (estimated total cost: $7,240,000)
3 4 The installation of forensics labs in Gleeson Hall was to be completed by February 2002 (actual cost: $427,531). 5 Smart Classrooms were installed throughout the campus by October 2001 (actual cost: $500,000). 6 Bathrooms will be rehabilitated in Thompson Hall (a medium-sized building) and Hale Hall by July 15, 2003(estimated cost: $1,223,000). MEDIUM-SIZED BUILDINGS The Farmingdale campus has seventeen medium-sized buildings, those with gross areas between 20,000 and 50,000 square feet. The BroadHollow BioScience Park is the largest at 50,000 square feet, making it the eighth largest building on campus: Administration/Laffin Hall (1967) Aero/Flightline (1996) Sinclair Dining Hall (1970) Dewey Hall (1970) Greenhouse (1980) Hempstead EOC (1977) Horton Hall (1953) Hughes Hall (1970) Knapp Hall (1936) Lehman Hall (1970) Nassau Hall (inactive, 1958) Service Building (1968) Smith Dorm (1970) Suffolk Dorm (inactive, 1958) Thompson Hall (1935) Steam Tunnel (1950) Allard Field House BroadHollow Bioscience Park (inactive, 2000) (47 square feet shy of 20,000 square feet, 1962). Plans and Construction According to local plans dated February 2002, three of these fifteen buildings will be demolished soon, along with the smaller Herdsman Residence: the Allard Field House, Nassau Dorm, and Suffolk Dorm. Future demolition is planned for four others: Dewey Hall, Hughes Hall, Lehman Hall, and Smith Dorm, along with the smaller Police Building. According to the Capital Project Summary, however, only Suffolk Hall has been identified for undated demolition at an estimated cost of $529,000. The Capital Project Summary includes four plans for rehabilitation of medium-sized buildings:
4 1 The Laffin Student Services Building is being totally rehabilitated at a cost of $5,270,000, nearly $2,000,000 over the original estimate. 2 Spill remediation at the Greenhouse is nearly complete at a cost of $502, A planned rehabilitation of the entry of Knapp Hall with no date is estimated to cost $858,000 and will include ADA entrances and complete rehabilitation of the patio and the handicap ramp. 4 A planned exterior rehabilitation of Thompson Hall with no date is estimated to cost $713,000. In addition to these improvements, which are funded through the SUNY capital improvements budget, the campus plan includes new dormitories, which will be funded through the State Dormitory Authority. At the present time, $20,000,000 has been bonded for this project, and the design stage has begun. SMALLER BUILDINGS The 44 remaining campus buildings are smaller and range from Conklin Hall (with an area of 17,935 square feet and a replacement cost of $2,734,000), the Cow Barn (1972,16,347 square feet and a replacement cost of $3,993,000), and Hooper Hall (1920, 15,934 square feet and a replacement cost of $2,660,000), down to two of four transportation sheds, built in 1963 and1991, with areas of 56 square feet and 48 square feet and replacement costs of $6,000 and $5,000. The most valuable of the 44 smaller buildings, as one might expect, is the Heating Plant, 14,806 square feet and a replacement cost of $13,480,000. OTHER CAMPUS-WIDE CAPITAL IMPROVEMENTS The remaining eight ongoing improvements in the Capital Project Summary include a Master Plan Update ($250,000), and several upgrades to the campus infrastructure: a reconfiguration of stacks and breaching (estimated cost: $600,000), a rehabilitation of Boiler #3 completed in 2001 ($1,275,000), and high voltage distribution which is 93% complete ($4,781,000). More visibly, the rehabilitation of the Veterinary Science Building is planned to house a new campus police office at a estimated cost of $1,094,000; and Phase 2 of the BioScience Park will add an office addition of 10,000 square feet and lab renovations of 30,000 square feet to the building at a cost of $7,600,000. The original contractor defaulted in December 2001 and the new contractor has a scheduled completion date of Spring The BioScience facility is not funded through the Farmingdale capital budget, however, but rather through separate funding specific to this biotechnology project which has been approved by the New York State legislature. Lump Sum Funding Projects
5 Since 1996, other smaller construction projects on campus have been funded from a lump sum amount included annually in the capital budget. In , such funding totaled $352,872 and paid for what are often unobservable projects, since many are repairs or upgrades of the infrastructure. Samples of the nineteen varied projects paid for in include elevator upgrades ($40,000), catwalks on the west side of Nold Hall ($37,500), the installation of steam lines to the Greenhouse ($30,000), clearing and pruning for campus safety ($19,800), repair of the oil storage alarm system ($15,000), an upgrade of the heat in the MiniMall ($12,000), and repairs to the wrestling room in Nold Hall ($4,000). In , the rehabilitation of the Fireside Lounge ($45,000) is being funded from this account, as is campus-wide sitework improvement ($110,000). Alternately Funded Projects System Administration made available alternate state-wide funding to improve SUNY campuses beginning in 1998 through a plan in which the state matches funds when an individual campus successfully raises capital from external sources. If a local campus raises 15% of the cost of a capital improvement in this way, then the state provides the remaining 85%. The $485,000 synthetic floor resurfacing in Nold Hall was funded with such matching funds in , although an additional $10,000 from the lump sum distribution was spent to complete the project in Currently, SUNY Farmingdale is funding a $1,300,000 landscaping and road project using this plan, based on external funding from Mothers Against Drunk Driving (MADD), which is installing a sculpture garden near Hale Hall. State revenues will fund landscaping and a new entrance roadway into the center of the campus
6 Completed Projects Thirteen capital budget projects are listed in the Project Summary (January 1, 2002) as having been completed since 1998: BUILDING COST NOTES LUPTON CHEMISTRY REHAB $2,999,343 MOVED AND RECONSTRUCTED IN AN- OTHER AREA IN LUPTON (DUE TO ASBESTOS) GREENLEY HALL HVAC REHAB $885,000 REPLACED AIR CONDITIONING AND REHAB/REPLACE BOILERS 1 & 2 $1,051,364 LOCATED IN CENTRAL HEATING CONSTRUCT SALT/STORAGE FACILITY $171,200 A NEW CODE COMPLIANT FACILITY CONSTRUCTED AT FARM COMPLEX ENERGY CONSERVATION $1,100,000 INCLUDES LIGHTING OCCUPANCY SENSORS AND HIGH EFFICIENCY MOTORS ASBESTOS ABATEMENT $122,165 COMPLETED AT VARIOUS GLEESON ROOF REPLACEMENT/MASONRY REPAIR $267,000 NEW ROOF AND REPAIR OF CRACKING MASONRY IN WALLS REHAB CAMPUS ROADS $1,696,000 NEW EAST AND WEST PERIMETER ROADS AND CURBS, CURB CUTS REHAB WHITMAN PHYSICS LAB $208,457 WHITMAN HALL, ROOMS 248, 253, REHABILITATED CAMPUS-WIDE SURVEY $76,076 SURVEY UPDATE BIO SCIENCE PARK* (funded through $12,600,000 50,000 SQUARE FOOT NEW FACILITY separate, non-campus legislation) NOLD GYM FLOOR REPLACEMENT $485,000 [MATCHING FUNDS], REPLACEMENT OF SYNTHETIC GYM FLOOR GREENHOUSE BOILER REPLACEMENT $78,000 EMERGENCY REPLACEMENT TOTAL $21,739,605 Some of these major projects are unnoticeable, and many staff members and students, who, for example, may not study physics or visit Nold Hall, do not enjoy even their unseen benefits. Yet none of the problems which these projects solve could have been ignored. Many address health and safety concerns, while others arrest future damage or respond to threats of non-operational systems. It is apparent that state funding has been limited, even for this necessary maintenance, not to speak of attractive improvements to the campus. Health and Safety Regulations The health and safety on the campus grounds and in the buildings are evaluated each spring by the State Office of Fire Prevention and Control. While much of the campus is considered safe, an existing problem in the dormitory buildings (planned for demolition) is their lack of sprinklers. Other buildings throughout the campus are not ADA
7 compliant. The renovation of Laffin Hall, however, includes ADA compliant door openers, which one faculty member suggests be installed throughout the campus. STAFFING FOR BUILDINGS AND GROUNDS The following table compares the salary ranges, gender, and total number of service and maintenance staff members and skilled crafts staff members in Fall 1995, Fall 2001, and Fall 1989: Service, Maintenance, and Skilled Craft Workers: 1995 and 2001 By Salary Range and Gender SERV/MAINTENANCE SERV/MAINTENANCE MEN WOMEN ALL MEN WOMEN ALL Below 12, Below 20, ,000-15, ,000-29, ,000-19, ,000-39, ,000-24, ,000-49, ,000-29, ,000 and above ,000 and above 9 0 TOTAL TOTAL SKILLED CRAFTS SKILLED CRAFTS MEN WOMEN ALL MEN WOMEN ALL Below 16, Below 20, ,000-19, ,000-29, ,000-24, ,000-39, ,000-29, ,000-49, ,000-34, ,000 and above ,000 and above 4 0 TOTAL TOTAL Data presented below for the academic year do not include salary ranges: 1989 MEN WOMEN TOTAL SERV/MAINTENANCE SKILLED CRAFTS In the campus had only 54.9% of the maintenance staff it had IN 1989 doing virtually the same amount of work. In , skilled craft workers had been cut to 60.4% of the 1989 staff
8 It might be argued that such a significant decline in skilled craft and maintenance staff reflects the decrease in the total student headcount during this period: Year Student headcount , But such an explanation is flawed because the campus size has remained constant, and the number of active buildings among the 68 on campus has decreased by only two (Cutler and Hicks). Slightly more than half of the staff maintains nearly the same size facility in With such a diminished staff, maintenance tasks must be completed in priority order, so that health and safety problems are solved first. We may assume, then, that the presence of unkempt, unattractive, or unclean areas on campus are the sacrifice we make to maintain health and safety standards, given reduced state funding for staff
9 OPINIONS ON BUILDINGS AND GROUNDS Because the appearance of the campus is its most easily evaluated quality to students, staff, and visitors, it is frequently discussed and frequently criticized. Campus buildings and grounds affect student and staff pride in the campus, contribute strikingly to potential students first impressions of the College, and influence individuals and groups who can offer Farmingdale various kinds of support. The comments presented below summarize and illustrate internal opinion: STAFF OPINION Although many students and staff on campus regularly speak with disappointment of the condition of Farmingdale s buildings and grounds, few staff members include comments about the condition of the campus in their survey comments (SWOT forms). Perhaps they assumed their SWOT forms should contain comments on strengths and weaknesses only in the area of their professional responsibility. Staff SWOT Survey Form Comments + Laffin Hall now has push button door openers for individuals with mobility impairments (those who use wheel chairs, braces, walkers, or crutches) Faculty member - Lupton Hall is a very poor facility/learning environment Faculty member - The Machine Tool Laboratory in Lupton Hall, Rooms 180 and 181, contains equipment from the Second World War. Faculty member - Bathrooms smell, which our current cleaning agents seem helpless to control. Maybe we could change disinfectants. This is, sadly, not a joke. -- Faculty member - At least eleven other frequently used buildings on campus are inaccessible to individuals with mobility impairments. Faculty member - The physics labs and the nursing labs are poorly cleaned and maintained. Two faculty members
10 COLLEGE COUNCIL OPINION On the other hand, members of the College Council identify many problems concerning the grounds and buildings on campus that must be solved. They offer several observations: + Farmingdale enjoys an excellent location among high tech parks. + The campus has many beautiful mature plantings. - Refurbishing, remodeling, and furniture are essential in dormitories. - The grounds need cleaning, replanting, and maintenance. - Teaching and activity areas need repair, remodeling, maintenance, equipment, and furniture. - During the 1990s, funding for maintenance was reallocated and lost. STUDENT OPINION Students are even more vocal. In the survey of students conducted by the Retention Task Force in Fall 2001, students responded to nine questions about campus support services and were provided space for individual comments about the campus. In 27% of these handwritten responses, (78 of a total of 296 optional handwritten comments received on the 538 printed survey forms), students criticize the campus grounds and buildings. This is perhaps the most consistently faulted aspect of the campus. Students offer variations on the themes of cleanliness, safety, attractiveness, and convenience. Sample suggestions are paraphrased below:
11 SAMPLE STUDENT COMMENTS ON CAMPUS GROUNDS AND BUILDINGS CLEANLINESS ATTRACTIVENESS Bathrooms are dirty. More benches would be pleasant. Soap is missing. Maintenance is needed for lawns. Thompson is filled with dust. Leaves need raking. Tickets are needed for littering. Flowers need to be planted. Maintenance is needed in Lupton. The library needs renovation. Improvement is needed in the cleaning staff. Brighter colors are needed for cheerfulness. Dorms are dirty everywhere. Garbage pails are needed. CONVENIENCE Thompson has broken lockers. Bulletin boards are not updated. Dorm closet doors are needed. SAFETY Dorm kitchens are needed. Laundry facilities are needed. Self-locking doors are needed on dorm rooms. Water fountains need replacement. ID controlled locks are needed on dorm rooms. Heat control is needed in Thompson. Broken desks are unsafe. Parking needs improvement. Classrooms and ceilings need repair. A commuter student lounge is needed. A commuter student recreation area is needed. Clocks are needed everywhere on campus. (Report of the Retention Task Force, Fall 2001)
12 CONCLUSION Everyone at Farmingdale wants an up-to-date, safe, beautiful campus. The potential exists Farmingdale has a convenient location, spacious grounds, and often valuable buildings. But potential alone, unfortunately, is insufficient. Funding to upgrade and maintain the campus buildings and grounds so far has been meager and inadequate and often is obtained only after passage through a labyrinthine bureaucracy. Currently a new five-year capital improvement master plan is being finalized for the period beginning in Funded through System Administration, an architectural firm is completing an analysis to identify and approve projects throughout the state. Such projects are divided into two categories: necessary maintenance and appropriations for improvements. So far, Farmingdale is requesting $40,000,000 for necessary maintenance alone, which experts consider a conservative estimate. This five-year plan does not include dormitory construction, which is funded separately. The value of Farmingdale, a public four-year college in a region populated by over 25% of New York State residents, cannot be overestimated. But the infrastructure, grounds, and buildings on the campus need full and continuous financial support to realize the potential of the College. The state, private individuals, and interested non-profit groups and businesses must be persuaded to participate
Facilities Operations Customer Service Standards WORK ORDER PRIORITIES
Facilities Operations Customer Service Standards WORK ORDER PRIORITIES In order to provide fair and consistent maintenance service to all University faculty, staff and students, a work priority system
SECTION XI OPINION OF PROBABLE COST
SECTION XI OPINION OF PROBABLE COST OPINION OF PROPABLE COSTS HARBOR ISLAND THE PAVILION 1) Provide a sprinkler system for the entire building. 8000 SF X $15/SF $120,000 2) Remove and replace existing
Angelo State University Construction Report
May 12, 2009 Angelo State University Construction Report Modular buildings will temporarily house ASU staff during the Hardeman renovation starting this fall. Prepared for: John Russell, Director of Planning
Number Northern Arizona University Facility Services Section Page. Effective April 1, 2011
Facility Services Section Page Recharge Services, Maintenance and Construction PURPOSE 1 of 6 The purpose of this policy is to set forth standards for chargeable services for maintenance and construction
Frequently Asked Questions
Byron Area Schools Frequently Asked Questions Bond Proposal How did this come about? For several years the Byron Area Schools Board of Education has included upgrading facilities as one of the district
Five-Year Capital Plan Request FY 2015-16 through FY 2019-20
Section Contents Five-Year Capital Plan Request FY 2015-16 through FY 2019-20 Project Funding Type Total ($ 000s) Critical Maintenance for Community Colleges bonded $417,500 Health and Safety bonded $91,088
HOUSTON ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1962 BUILDING AREA 59,900 SF CURRENT PROGRAM CAPACITY 507 ENROLLMENT 2008 291 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan HOUSTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
DRAPER ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1953 BUILDING AREA 54,000 SF CURRENT PROGRAM CAPACITY 250 ENROLLMENT 2008 84 WARD 8 PROPOSED PROGRAM CAPACITY 325 Site Plan DRAPER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT
1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.3 Cabinets, Equipment 1.1.4 Portables 1.2 Fire / Life Safety 1.2.1 Corridor, Separation
MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010
MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010 To better prepare San Jose City College/ Evergreen Valley
Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals
Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals Les Butler Associate Commissioner for Business and Regional
HAMILTON SCHOOL. 1401 Brentwood Parkway, N.E., Washington, DC INITIAL YEAR BUILT 1968 BUILDING AREA
INITIAL YEAR BUILT 1968 BUILDING AREA 187,700 SF CURRENT PROGRAM CAPACITY N/A ENROLLMENT 2008 129 WARD 5 PROPOSED PROGRAM CAPACITY N/A Site Plan HAMILTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
Bond Priorities. Repairs and Maintenance. School Safety. Capacity
Replace old windows, boilers, heating and air conditioning system. Improve accessibility for disabled persons. Keyless entry lock systems, redesign of school entrance, and wireless access throughout building.
PLUMMER ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
Description of Project Statewide Student Data Warehouse
Description of Project Statewide Student Data Warehouse The Department of Education (DE) uses Rebuild Iowa Infrastructure Fund funding to support critical components of Iowa s Statewide Longitudinal Data
Chicago Public Schools
Ames Middle School 1920 N Hamlin Ave 1997 Completed The scope of this project is to construct a new school $16,913,379 2014 Construction The intent of this project is to expand existing Ames middle school
17,280 square feet Overview:
CENTRAL OFFICE Located at 167 Boston Post Road, East Lyme, Connecticut, the Central Office was built in 1916 as the original Flanders Elementary School and remains connected to the current school. The
2015 CAMPUS STATEMENT
STATE UNIVERSITY OF NEW YORK UNIVERSITY AT STONY BROOK 2015 CAMPUS STATEMENT The University at Stony Brook got its start in 1957 at a temporary location on the Planting Fields estate in Oyster Bay, Long
STATE UNIVERSITY OF NEW YORK UNIVERSITY AT BUFFALO 2015 CAMPUS STATEMENT
STATE UNIVERSITY OF NEW YORK UNIVERSITY AT BUFFALO 2015 CAMPUS STATEMENT The University at Buffalo Medical School was established in downtown Buffalo, New York in 1846. Later additional schools were added
SUMMARY OF ASBESTOS CONTAINING MATERIAL IN BUILDINGS AND BULK SAMPLE ANALYSIS
ASBESTOS SURVEY SUMMARY PACIFIC UNION COLLEGE ANGWIN, CALIFORNIA SUMMARY OF ASBESTOS CONTAINING MATERIAL IN BUILDINGS AND BULK SAMPLE ANALYSIS Definition of terms: Friable: Material that can be crumbled
ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT
1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.2 Water damage in many classrooms. Replace tiles. 1.1.3 Cabinets, Equipment 1.1.4 Portables
The work has continued on final Phase 4 and is nearing completion.
Updates-January 22, 2013 29369-Rehab Plaza Deck/Drainage Budget: $18,000,000, constr. Start 8/2009 The work has continued on final Phase 4 and is nearing completion. The main plaza area of phase 4 is now
BUNKER HILL ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1970 BUILDING AREA 98,200 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 387 WARD 5 PROPOSED PROGRAM CAPACITY 750 Site Plan BUNKER HILL - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
MURCH ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1929 BUILDING AREA 47,700 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 491 WARD 3 PROPOSED PROGRAM CAPACITY 500 Site Plan MURCH - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
HOWARD UNIVERSITY. I. Policy Statement. II. Rationale. III. Entities Affected by the Policy. IV. Definitions. Policy Number: 300-004
HOWARD UNIVERSITY Policy Number: 300-004 Policy Title: ASSET CAPITALIZATION Responsible Officer: Chief Financial Officer Responsible Offices: Office of the Controller, Departments of Strategic Sourcing
New Jersey City University Gilligan Student Union Center
New Jersey City University Gilligan Student Union Center The RBA Group worked with New Jersey City University in a major renovation of their Gilligan Student Union building. We were contracted to reassess,
PARKVILLE HIGH SCHOOL LIMITED RENOVATION
PARKVILLE HIGH SCHOOL LIMITED RENOVATION DESIGN BRIEFING For Dr. Joe A. Hairston BALTIMORE COUNTY PUBLIC SCHOOLS August 11, 2009 Smolen 3 Emr + Associates Architects 1355 Piccard Drive, Suite 200 Rockville,
Montana Law Enforcement Academy
Montana Law Enforcement Academy State-Owned Heritage Properties Biennial Report 2012 2013 Report Prepared by: Beth Strandberg Administrative Officer Montana Law Enforcement Academy TABLE OF CONTENTS Executive
College of Agriculture and Life Sciences Space Management Guidelines. College Space Assignments
College of Agriculture and Life Sciences Space Management Guidelines REVISION: September 29, 2009 College Space Assignments Space is a resource serving university programs. It is owned by the university
Higher Education Projects University of Illinois at Urbana-Champaign Gorski Reifsteck
Laboratories Bevier Hall Food Labs Renovation College of ACES Everitt Lab 4th Floor Remodel - Phase I Renovation College of Engineering MATSE Kiln House Renovation Phase I College of Engineering MATSE
Arizona Health Care Association DISASTER PLANNING AND EMERGENCY MANAGEMENT GUIDE POST INCIDENT DAMAGE ASSESSMENT CHECKLIST
It is essential to perform a Basic Damage Assessment (BDA) following an adverse event to help ensure the safety of building occupants as well as prevent additional losses from occurring. This checklist
Accounting and Administrative Manual Section 100: Accounting and Finance
No.: A-25 Page: 1 of 8 General: This policy establishes guidelines for determining when certain expenditures should be capitalized as capital assets and specifies the university s depreciation policy.
FIRE EXTINGUISHER DORM #1 SYMPHONY
FIRE EXTINGUISHER DORM #1 SYMPHONY 101 ABC (Dry Chem) Basement (Downbeat Café Pool Tables) 102 ABC (Dry Chem) Hall Men s room (Downbeat Café) 103 ABC (Dry Chem) Hallway across chiller (Downbeat Café) 104
Capital Budget Testimony to the Maryland General Assembly. Presented by Dr. Robert L. Caret
Capital Budget Testimony to the Maryland General Assembly Presented by Dr. Robert L. Caret President, Towson University March 2009 Capital Budget Testimony to the Maryland General Assembly Presented by
Building Description Project Description Estimated Cost Notes Total Deferred
Building Description Project Description Estimated Cost Notes Total Deferred Athletic Fields & Grounds Baseball dugouts 125,000 Surface level/inground? Relamp Baseball field 16,000 Relamp Softball field
Capital Budget Summary
ZA00JKL Maryland Independent College and University Association Miscellaneous Grant Programs Capital Budget Summary Grant and Loan Capital Improvement Program Program 2014 Approp. 2015 Approp. MICUA $10.500
Maryland. American Recovery and Reinvestment Act. 158 DoD Projects ($ 65.8M) Completed or Under Way by August 31, 2009
Maryland American Recovery and Reinvestment Act 158 DoD Projects ($ 65.8M) Completed or Under Way by August 31, 2009 Project Title Component Installation Repair Building 316 Electrical, HVAC, Plumbing,
A Self-Audit of Your Current Campus Security Systems
A Self-Audit of Your Current Campus Security Systems Security Solutions for Education, Business & Public Safety Free Consultations on ID Card Systems, Access Control, Call Recording, Video Surveillance,
Capital Outlay. Capital Outlay Funding ($ in millions)
Capital Outlay Capital Outlay Funding ($ in millions) Fund Type Chapter 3 2012-14 General Fund $20.3 VPBA/VCBA Tax-Supported Bonds 217.8 9(c) Revenue Bonds 125.6 9(d) NGF Revenue Bonds 665.1 Virginia Port
DAVIESS COUNTY SCHOOLS DISTRICT FACILITIES PLAN
DISTRICT "SHELL" SUBMISSION DATE: 11/13/12 questions 11/26/12 (delete following Hearing) KDE "SHELL" RESUBMISSION DATE: 11/19/12 revised 11/26/12 (delete following Hearing) KBE APPROVAL DATE: FEBRUARY
E X I S T I N G F A C I L I T I E S
Los Angeles Unified School District Facilities Services Division E X I S T I N G F A C I L I T I E S 68 TH STREET ELEMENTARY SCHOOL FOOD FACILITIES BUILDING Monthly Program Status Report August 2011 Prepared
STATE UNIVERSITY OF NEW YORK COLLEGE AT NEW PALTZ 2015 CAMPUS STATEMENT
STATE UNIVERSITY OF NEW YORK COLLEGE AT NEW PALTZ 2015 CAMPUS STATEMENT The State University of New York at New Paltz traces its beginnings to 1828, when a group of leading citizens founded the New Paltz
Schematic Design Presentation S. Dallas Dance, Superintendent October 22, 2013 OVERLEA HIGH SCHOOL
Schematic Design Presentation S. Dallas Dance, Superintendent October 22, 2013 0 Overlea High School - Facility Summary Facility Opened: Auditorium Addition: Activity Room Addition: School Rated Capacity
Schedule B to By-law 33-2009
Amended by By-law 8-2016 Note: This consolidation is prepared for convenience only. For accurate reference the original by-laws should be reviewed. Floor Area Calculation Floor area shall: Schedule B to
Building Condition Assessment Report
C2 - Nurses Resident (aka Administration) Building Condition Assessment Report Asset Address Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Inspection Date C2 - Nurses
Caretaker Handbook. S:\5 Handbooks\Caretaker Handbook 151231.doc Page 1 of 9
Caretaker Handbook S:\5 Handbooks\Caretaker Handbook 151231.doc Page 1 of 9 Table of Contents Introduction... 2 Maintenance Coordinator Areas... 3 Management Structure... 4 School-based Administrator s
PATTERSON ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1945 BUILDING AREA 78,300 SF CURRENT PROGRAM CAPACITY 368 ENROLLMENT 2008 463 WARD 8 PROPOSED PROGRAM CAPACITY 500 Site Plan PATTERSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
Bond Referendum Presentation. Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014
Bond Referendum Presentation Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014 Mr. David Fowler President Floral Park- Bellerose Mr. David Del Santo Vice-President New Hyde Park Garden City Park
MEMORANDUM. DATE: January 6, 2015. Campus Community. Tim Ridley, CSP, ARM-P Director, Safety and Risk Management. SUBJECT: Asbestos Notification 2015
MEMORANDUM DATE: January 6, 2015 TO: FROM: Campus Community Tim Ridley, CSP, ARM-P Director, Safety and Risk Management SUBJECT: Asbestos Notification 2015 California Health and Safety Code, 25915 (Asbestos
RESOLUTION NO. 2003-04-13
RESOLUTION NO. 2003-04-13 RESOLUTION OF THE BOARD OF TRUSTEES OF THE CITRUS COMMUNITY COLLEGE DISTRICT ORDERING AN ELECTION, AND ESTABLISHING SPECIFICATIONS OF THE ELECTION ORDER WHEREAS, the Board of
CONSTRUCTION UPDATE. Thank you for your continued support! Noemi Avila-Zamudio Coordinator, Facilities Planning & Construction SEPTEMBER 2012
CONSTRUCTION UPDATE WWW.SVUSD.ORG SEPTEMBER 2012 The 2012-2013 school year is proving to be another year filled with exciting, much needed Measure B building projects. Facilities Planning & Construction
Schedule B to By-law 33-2009 Part A Fees Payable for Permits
Floor Area Calculation Floor area shall: Part A Fees Payable for Permits (Effective January 1, 2015) a) be calculated by measuring to the outer face of exterior walls and to the centre of party walls or
Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule
Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Homestead HS Sept.'15 Oct'15 Nov'15 Dec'15 Jan'16 Feb'16 Repair Asphalt @ Main Garage Replace Exterior Hollow Metal
FACILITIES PLANT OPERATIONS SERVICES
FACILITIES PLANT OPERATIONS SERVICES Plant Operations consists of five areas of responsibility: Grounds, Utilities, Building Services, Trades and Automotive each managed by an Assistant Director, except
REQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS. ATTACHMENTS: 1. Construction Management Update
REQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS MEETING DATE: March 16, 2011 SUBJECT: PRESENTER: ATTACHMENTS: Construction Management Update David Berry Yes 1. Construction Management
Capital Projects Town Hall Meeting
Capital Projects Town Hall Meeting Planning, Architectural & Engineering Services September 15, 2014 Agenda Project Updates Recently Completed and in Construction Projects in Design Projects in Planning
INTRODUCTION COST AND FEASIBILITY OF RENOVATING OR REPLACING AN OLD SCHOOL BUILDING
INTRODUCTION COST AND FEASIBILITY OF RENOVATING OR REPLACING AN OLD SCHOOL BUILDING GS 521C-521 requires a local school board to submit its long-range plan for meeting school facility needs to the State
The Master Building Program Budget Plan. The Los Angeles Community College District. The Colleges
The Master Building Program Budget Plan The Master Building Program Budget Plan represents the amounts established to accomplish the District s 329 new building, renovation, and campus wide infrastructure
SECTION D CAPITAL PROGRAM CAPITAL PROGRAM 1999 2013 D 1 FEDERAL TAX LAW D 2 STATUTORY DEBT LIMIT D 2 FINANCING SUMMARY D 3 AGENCY DETAIL D 4
SECTION D CAPITAL PROGRAM CAPITAL PROGRAM 1999 2013 D 1 FEDERAL TAX LAW D 2 STATUTORY DEBT LIMIT D 2 FINANCING SUMMARY D 3 AGENCY DETAIL D 4 Capital Budget CAPITAL BUDGET 1999 2013 RECOMMENDED EXECUTIVE
Somerville Commons. Financial Analysis for Acquisition of a Multifamily Rental Project from a Bank s Real Estate Owned (REO) Portfolio
Somerville Commons Gerry Frank, a self-employed 44-year old registered architect in Boston, hit the Powerball lottery for an after tax payout of ten million dollars on April 1, 2011. The timing was fortuitous
HOLLAND HALL DESIGN UPDATE. Design Team 11.11.15
DESIGN UPDATE Design Team.. AGENDA Design Team Presentation Vision + Design Drivers Review Offices - s/labs - Common Spaces Floor Plan Review VISION STATEMENT The reimagined Holland Hall will be a light-filled,
CENTRAL OHIO NORTHEAST OHIO
CENTRAL OHIO Military Defense Supply Center Columbus Warehouse upgrades Columbus 1,000,000 Military Defense Supply Center Columbus Fire protection Columbus 500,000 Military Defense Supply Center Columbus
Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components
Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development
The University of Akron Main Campus Biennium 1 July 2016- June 2018. Priority Project Budget Description 1 Electrical Infrastructure Loop
The University of Akron Main Campus Biennium 1 July 2016- June 2018 1 Electrical Infrastructure Loop $2,400,000 Scope: Replace center campus deteriorated 4,160 volt cable and duct bank with 23,000 volt
Asbestos Procedures. Asbestos Products
Asbestos Procedures Asbestos Products Where is asbestos known to be located on The Evergreen State College? Please see Appendix A for a list of known asbestos containing materials located on the Olympia
Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015
Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015 Town Hall Complete building restoration (state historic preservation award) High efficiency
Services outsourced in 2013 to a third-party firm (not including parts, equipment purchased). Type of Service
Outsourcing Services outsourced in 2013 to a third-party firm (not including parts, equipment purchased). Type of Service Abandoned Vehicle Auction Auctioneer Accounts Payable Services Actuarial Services
University of Northern Iowa Facilities Services
University of Northern Iowa Facilities Services February 2013 Page 1 Table of Contents: 3 General Service Information 3 Maintenance Services 4 Non-Maintenance Services 5 Area Maintenance Program 6 Carpentry
A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES
A Residential Owner s Guide to PERMITS CITY OF Elgin PLANNING & NEIGHBORHOOD SERVICES CITY OF Elgin A Residential Owner s Guide Welcome! This booklet has been prepared to provide residential property owners
SITE OVERALL CONDITION COMMENTS
PROPERTY INSPECTION A complete property inspection should be done at the beginning of the academic year, during the holiday break, and at the end of the academic year. Work to prioritize the list of needed
Vanderbilt University
Vanderbilt University Plant Operations Guide to Services Published: 2013 Table of Contents Page Section I. General Information 3 Section II. Service and Information Systems (SIS) 3 Section III. Building
Columbus State Community College MASTER PLANNING
Columbus State Community College MASTER PLANNING Current State Facilities and Utilities Assessment November 2011 Columbus State Community College MASTER PLANNING EXISTING UTILITIES AND FACILITIES ASSESSMENT
Program: Facilities and Construction Management. Program Based Budget 2016-2018. Facilities and Construction Management. Page 81
Program: Program Based Budget 2016-2018 Page 81 Program: Vision: To develop and maintain town buildings which are safe, comfortable and welcoming to all. Mission Statement: To provide technical expertise
DISTRICTWIDE FACILITIES MASTER PLAN. February 18, 2015 PLANNERS / ARCHITECTS / ENGINEERS
DISTRICTWIDE FACILITIES MASTER PLAN February 18, 2015 PLANNERS / ARCHITECTS / ENGINEERS Table of Contents Executive Summary. 2 Section 1: Bridgewater Elementary School. 4 Background Deferred Maintenance