1 Our ref T E bill.higgins@mottmac.com.au Holcim (Australia) Pty Ltd 7 9 Irvine Place Baulkham Hills NSW th May 2014 Attention: Mr Alan Massoud Dear Alan, Lynwood Quarry Lighting Design Peer Review Mott MacDonald provides the following commentary on the potential for light spillage and obtrusive lighting impact on the local community following construction of infrastructure for a new quarry located at Marulan. The completed facility will enable the processing, storage and handling of quarry products. The works includes a series of access roads for the safe movement of vehicular and pedestrian traffic around the facility and includes for necessary lighting to enable safe operations. Holcim has commissioned this peer review in order to review the potential impact of lighting, which has been installed in accordance with the design engineer s lighting design drawings, on the local community. In response, Mott MacDonald has used industry standard software and technology to; a. Review the design in accordance with the requirements of AS1158 and AS4282, and b. Review the design in accordance with criteria considered relevant to optimal performance, and c. Identify any opportunities to; Reduce / eliminate any potential light spillage, and/or Reduce / eliminate any potential obtrusive lighting, and/or Remove any lighting that may be deemed superfluous and/or redundant with regard to Operations and Safety. In summary, the outcome of the peer review approach followed to date is as follows; 1. The lighting design complies with AS1158 which allows safe movement and operations on site. 2. There is an isolated instance at the site boundary where the lighting design has difficulty achieving compliance with some uniformity metrics within AS1158 as well as the obtrusive light restrictions within AS4282. This has no impact on surrounding residences and is remedied by implementing some of the recommendations listed later in this report. L3, 90 Phillip Street, Parramatta NSW 2150, Australia T +61 (0) F +61 (0) W Mott MacDonald Australia Pty Limited is a subsidiary of Mott MacDonald International Limited. Registered in Australia, ABN
2 Approach Reference documentation sourced for the purposes of this review included; Drawing files in CAD format for the Lynwood Quarry lighting design. Survey drawing in CAD format illustrating topology of the site and the surrounding area. IES photometry files for specified luminaires from the relevant lighting suppliers. Based on clarification from the lighting design engineer, the lumen option for the Pierlite Tarmac luminaire was used. Modelling for the purposes of review was undertaken using the Australian Standards approved lighting simulation package AGI32 Lighting Calculation Software based on the abovementioned reference documentation. It should be noted that theoretical (ie. calculated) values may differ to actual measurements recorded on site due to minor inconsistencies inherent with all simulation packages, atmospheric and environmental conditions, calibration of measurement equipment and the like. The AGI32 model was configured using the following luminaires; Type F Pierlite Maxi Master GMRS400MH. 1 x 400W Metal Halide, lumens, LLF=0.7, pole mounted at 12.5m, 0 uptilt. Type F1 Pierlite Tarmac APR-2x400MH. 2 x 400W Metal Halide, lumens, LLF=0.7, pole mounted at 15m, 0 uptilt Type R Sylvania Lighting Urban Eco Series JA x 42W CFL, 3200 lumens, LLF=0.7, pole mounted at 7.5m, 5 uptilt. The abovementioned were positioned in the model as per the lighting design drawings in order to; Review car parks for compliance with AS categories P11c and P12 (person with disability car spaces). Review internal roadways against AS category P4. Review the relevant site boundaries against AS4282. In addition, five (5) nominated residential properties that, due to their location and elevation, may be affected by the lighting design were considered as follows. Refer Appendix 2 for locality plan. House-1(SW). Located 2.95km South-West from nearest site boundary. House located 50m above nearest site boundary. Land topography between these two points suggests minimal direct line of sight between house and nearest point on site. House-2(S). Located 1.5km South from nearest site boundary. House located ~51m above worst case (highest) point on nearest site boundary. Land topography between these two points suggests direct line of sight between house and nearest point on site. House-3(E). Located 2.4km East from nearest site boundary. House located ~20m above nearest site boundary. Land topography between these two points suggests minimal direct line of sight between house and nearest point on site. House-4(N). Located 2.86km North from nearest site boundary. House located ~9m above nearest site boundary. Land topography between these two points suggests no direct line of sight between house and nearest point on site. House-5(NW). Located 9.5km North-West from nearest site boundary. House located ~58m above nearest site boundary. Land topography between these two points suggests direct line of sight between house and nearest point on site.
3 House-6(NW). Located 9km North-West from nearest site boundary. House located ~2m below nearest site boundary. Land topography between these two points suggests no direct line of sight between house and nearest point on site. Relevant Codes and Modelling Results The results of the modelling approach are as follows; 1. AS , Category P11c Technical Parameters 2. AS , Category P12 Technical Parameters Car parks 1, 2 and 3 comply with all Category P11c and P12 criteria aside from the uniformity of car parks 1 and 2 which can be achieved by implementing lower wattage lamps as mentioned in recommendations section later in the report. None of the car park lighting designs have any impact on AS4282 (obtrusive light) with respect to the assessed residential properties. Due to car park 1 s location on site, the current design has a very slight impact on AS4282 requirements at the site boundary however with the implementation of one of the few recommendations listed later in this report, compliance is achievable. 3. AS/NZS , Category P4 Technical Parameters: The site roadways comply with Category P4 criteria. 4. AS , Curfew Hours Technical Parameters for site boundary: The majority of the western boundary easily complies with AS4282 requirements, with only 2 short sections not meeting compliance. Remedial measures are outlined in the recommendations section of this report. All other site boundaries comply with AS4282 requirements. 5. AS , Curfew Hours Technical Parameters for nearby residential buildings: The overall site lighting design complies with AS4282 when assessing against all five of the houses listed at the beginning of this report. Summary of the Modelling Results The modelling results suggest excessive lighting in the car parks which has the following impact: a. Non-compliance with uniformity requirements of AS1158 b. Non-compliance with obtrusive light requirements of AS4282 over a distance of approximately 10m on the western property boundary. The lighting design in the south west corner of the site (main entrance) complies with AS1158 but can be optimised. The lighting design in this area also slightly impacts on site compliance with AS4282, once again only over short distance. The overall site lighting design complies when reviewing nearby residential properties against AS4282.
4
5 Appendix 1 Site Overview Diagram
6 Appendix 2 Assessed Residences in Relation to Site
Lynwood Quarry Community Investment Fund Plan 2015 to 2019
Strength. Performance. Passion. Community Investment Fund Plan 2015 to 2019 Holcim (Australia) Pty Ltd PO Box 76 Marulan 2579, NSW Australia ABN 87 099 732 297 Phone 1300 657 051 www.holcim.com.au Community
More informationAusgrid s Policy on Public Lighting - Contestable Projects. AUSPL CONPOL01 September 2012
Ausgrid s Policy on Public Lighting - Contestable Projects AUSPL CONPOL01 September 2012 Ausgrid s Policy on Public Lighting - Contestable Projects September 2012 Contents 1 OBJECTIVE... 3 2 SCOPE AND
More informationDepartment of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure
Department of State Development, Infrastructure and Planning State Planning Policy state interest guideline State transport infrastructure July 2014 Great state. Great opportunity. Preface Using this state
More informationSTREET LIGHTING CONSTRUCTION DESIGN CRITERIA
STREET LIGHTING CONSTRUCTION DESIGN CRITERIA DC9-001 GENERAL. Proposed street lighting construction in the city of Olathe shall in all respects conform to the technical criteria for analysis and design
More informationAPPLYING CFD TO ENVIRONMENTAL FLOWS
APPLYING CFD TO ENVIRONMENTAL FLOWS Eric N Jal Connell Wagner Pty Ltd 60 Albert Road South Melbourne Victoria AUSTRALIA E-mail: JalE@conwag.com Date: December 2003 Computer: Intel Pentium IV 1.7GHz Operating
More informationCompliance Noise Monitoring
Monitoring Byron Centre The Manse Road Myocum HEALTH SCIENCE ENVIROMENTAL EDUCATION ENVIRONMENTAL AUDITOR Monitoring Byron Centre The Manse Road Myocum Prepared for: Byron Shire Council Version 1.0 Date:
More informationAttended Noise Monitoring - Quarter Ending December 2013
Big Island Mining Pty Ltd Majors Creek Road Majors Creek Version: Page 2 PREPARED BY: ABN 29 001 584 612 Units 7-8, 26-28 Napier Close Deakin ACT 2600 Australia (PO Box 9344 Deakin ACT 2600 Australia)
More information1 Welcome. The exhibition comprises a series of boards which provide some background information to show you our initial ideas for the site.
1 Welcome Thank you for taking the time to attend this public exhibition of our proposals for residential development on Land at Daws Farm, Back Road, Writtle (site shown opposite). The exhibition comprises
More informationMount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement. November 2013. with
Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement November 2013 with Tibbalds Planning & Urban Design 19 Maltings Place 169 Tower Bridge Road London SE1 3JB Telephone 020
More informationSTEMCELL UNITED LIMITED ACN 009 104 330 Level 2, 350 Kent Street, Sydney NSW 2000, Australia
STEMCELL UNITED LIMITED ACN 009 104 330 Level 2, 350 Kent Street, Sydney NSW 2000, Australia 10 November 2015 Mr John Johansson Adviser, Listings Compliance (Melbourne) ASX Compliance Pty Ltd Dear Sir,
More informationCree Edge and LEDway by Cree Compared to Induction Lamp Luminaires
Cree Edge and LEDway by Cree Compared to Induction Lamp Luminaires Executive Summary There are many excellent reasons to select a Cree lighting system over one based upon induction technology, even though
More informationAppendix 14 Traffic Management Plan
Appendix 14 Traffic Management Plan Toms Gully Underground Project Table of Contents 1 Purpose... 3 2 Location & Production Overview... 3 3 Operations History... 3 4 Current Traffic Management & Traffic
More informationLED High bays. Peter Grumont 11/16/2012
LED High bays Peter Grumont Company and product overview. Product and component manufacture, Australian quality and certification, Australian Parent Investor advantage. High bay definition. Energy Savings.
More informationSUITE 6/63 STUD ROAD, BAYSWATER VIC 3153
Noise Consulting & Management Pty Ltd Suite 211, 500 Centre Road Bentleigh Vic 3204 Ph 03 9557 3799 Fax 03 9557 3766 ABN 74 105 601 321 noise@noises.com.au NOISE MANAGEMENT PLAN FOR HARVEST FESTIVAL ON
More informationBest Practice Guide for Managing Litter and Illegal Dumping at Clothing Bins
Best Practice Guide for Managing Litter and Illegal Dumping at Clothing Bins 2013 Acknowledgements: The research for this guide was completed by Equilibrium OMG Pty Ltd (trading as Equilibrium) for Sustainability
More informationSite Traffic Management Plan
Pathhead Primary School Cairns Street West Kirkcaldy Fife KY1 2JA Telephone: 01592 583450 Email: pathheadps.enquiries@fife.gov.uk Headteacher Julie M Anderson Site Traffic Management Plan December 2012
More informationFILE NO.: Z-6915-C. Gamble Road Short-form PCD and Land Alteration Variance Request
FILE NO.: Z-6915-C NAME: Gamble Road Short-form PCD and Land Alteration Variance Request LOCATION: Located on the Northwest corner of Chenal Parkway and Gamble Road DEVELOPER: Davis Properties P.O. Box
More informationSite Traffic Management Plan
Masterton Primary School Aberdour Road Dunfermline Fife KY11 8HY Telephone: 01383 602455 Email: masterton.enquiries@fife.gov.uk Head Teacher: Mr Stephen Humphries Site Traffic Management Plan Date December
More informationPrepared for Local Government Association of SA
Level 1/89 King William Street, Kent Town SA 5067 Phone: (08) 8364 6155 Fax: (08) 8364 6199 www.lucidconsulting.com.au 16 Hutt Street GPO Box 2693 Adelaide SA 5001 Phone: (08) 8224 2000 Fax: (08) 8232
More informationBLOCK 400 PLANNED COMMUNITY DISTRICT
BLOCK 400 PLANNED COMMUNITY DISTRICT Newport Center December 1983 Newport Beach, California Ordinance 88-119 Adopted December 12, 1988 Amendment No. 672 Resolution No. 95-115 Adopted October 9, 1995 Amendment
More informationPRELIMINARY FINAL REPORT YEAR ENDED 30 JUNE 2015
28 August 2015 PRELIMINARY FINAL REPORT YEAR ENDED 30 JUNE 2015 Underlying EBITDA $4.3 million, ahead of guidance Cash flow from operating activities $11.6 million Cash at bank $10.2 million Strong earnings
More informationAmex Site Residential Development, Tarneit
Amex Site Residential Development, Tarneit Local Area Traffic Management Report Client: Amex Corporation Project No. 114430 Draft Report 13/12/13 Suite 1, 1 st Floor 132 Upper Heidelberg Road Ivanhoe Vic
More informationTechnical Solution Sheet 5.03 5: Cold Water Plumbing
5: Cold Water Plumbing Drawings of Typical Water and Fire Services, Pipe Materials and Private Service AIM The aim of this technical solution is to inform practitioners on the typical requirements for
More informationPUBLIC LIGHTING CODE April 2005
PUBLIC LIGHTING CODE April 2005 2nd Floor, 35 Spring Street, Melbourne Telephone: (+613) 9651 0222 Facsimile: (+613) 9651 3688 Email address: reception@esc.vic.gov.au Website: http//www.esc.vic.gov.au
More informationMAC-ENC-PRO-057 AIR QUALITY MONITORING PROGRAM
MAC-ENC-PRO-057 AIR QUALITY MONITORING Document Owner Donna McLaughlin, Environment Superintendent Document Approver Rob Hayes, Manager Environment Revision History Version No. Date Published Details 1.2
More informationMulti-Modal Corridor Degree of Complexity: High Cost/Benefit: High
Multi-Modal Corridor Degree of Complexity: Cost/Benefit: Maintain the same level of service for Ensures continuous flow through the Might impact other transportation Consider road diet and/or different
More informationLONDON ROAD SEVENOAKS
WELCOME TO THE BERKELEY HOMES EXHIBITION Train Station Gr anv i ll e Dar tford Road Lo ad Ro nd on ad Ro Eard SITE Th ed riv e ley R oad on R oad A 224 Gord Pem b rok e Roa d Site Location Since the submission
More informationSuite 21 Ph (02) 9686 3122 35 Old Northern Road Fax (02) 9686 3177 Baulkham Hills NSW 2153 Mobile: 0408 231 220 RESIDENTIAL VALUATION REPORT
Independent Property Valuations Pty Ltd REGISTERED VALUERS & PROPERTY CONSULTANTS ABN 61 100 282 488 Suite 21 Ph (02) 9686 3122 35 Old Northern Road Fax (02) 9686 3177 Baulkham Hills NSW 2153 Mobile: 0408
More informationACCREDITATION PROCESS FOR ROADWORKS TRAFFIC MANAGERS MAIN ROADS WESTERN AUSTRALIA
ACCREDITATION PROCESS FOR ROADWORKS TRAFFIC MANAGERS MAIN ROADS WESTERN AUSTRALIA 1. INTRODUCTION The Main Roads Western Australia Traffic Management for Works on Roads Code of Practice (the code) requires
More informationUNDERGROUND OPERATION INTEGRA COAL UNDERGROUND NOISE MANAGEMENT PROGRAM (NMP) EMS 002-3. Incorporating a Noise Monitoring Protocol
UNDERGROUND OPERATION INTEGRA COAL UNDERGROUND NOISE MANAGEMENT PROGRAM (NMP) EMS 002-3 Incorporating a ise Monitoring Protocol 1: March 2007 TABLE OF CONTENTS Page 1 INTRODUCTION... 1 1.1 Background...
More informationPOSITIVELY+ LOCATED. Everglade Campus 82 Waterloo Road, Macquarie Park, NSW
POSITIVELY+ LOCATED 82 Waterloo Road, Macquarie Park, NSW 02 opportunity+ is a high profile, four level office building featuring a blend of native landscaping and unique building design. Located in the
More informationSection 6 Traffic Analysis
Section 6 Traffic Analysis Traffic Operations of the Preferred Network Alternative After the Preferred Network was identified and confirmed by local policy makers and area residents, detailed traffic analysis
More informationCity of Wichita, Kansas Americans with Disabilities Act Transition Plan Main Library Address
City of Wichita, Kansas Americans with Disabilities Act Transition Plan Main Library Address July 005 Prepared by DMCG Disability Management Consulting Group L.L.C. 801 Jonquil Place Columbia, MO 650 In
More informationCALDER PARK PROJECT STAGE 1. EPBC Act Approval Compliance Report (EPBC 2012/6439)
CALDER PARK PROJECT STAGE 1 EPBC Act Approval Compliance Report (EPBC 2012/6439) Prepared for: METRO TRAINS MELBOURNE Level 28, 80 Collins Street, Melbourne, VIC 3000 Prepared by: Kellogg Brown & Root
More information4 Alternatives and Design Evolution
4 Introduction 4.1 This Chapter describes the considerations and constraints influencing the siting, layout and massing of the Development. It also describes the main alternatives to the Development that
More informationSite No 17 Former Weston Vinyls Site, Frome Location
Location Former Weston Vinyls site is situated on the A362 Vallis Road in the Western Part of Frome. The surrounding uses are primarily residential with residential to the North East and West. The Vallis
More informationRelease: 1. RIIOHS302A Implement traffic management plan
Release: 1 RIIOHS302A Implement traffic management plan RIIOHS302A Implement traffic management plan Modification History Not applicable. Unit Descriptor This unit covers the competency required to implement
More informationDiploma of Practice Management
of Health & Wellbeing HLT52012 Diploma of Practice Management Learn to love your career Ivy Institute Pty Ltd trading as Ivy College ABN 84 138 115 278 (RTO Code 40718), delivering on behalf of Study Group
More informationErection of replacement warehouse building and erection of two buildings in connection with builder s merchants
Plan: O 02/00708/FUL Thames Ward (A) Address: Development: Applicant: London Works, Ripple Road, Barking Erection of replacement warehouse building and erection of two buildings in connection with builder
More informationUrban Vehicle Crossing Application To be completed and fees paid for prior to approval
Urban Vehicle Crossing Application To be completed and fees paid for prior to approval Applicant Details Name: Postal Address: Telephone Home: Work: Signed: Date: Proposed Contractor: Proposed Start Date:
More informationContractors and Suppliers Code of Conduct. June 2013
Contractors and Suppliers Code of Conduct June 2013 Owner: Facilities, Maintenance and Property Manager Page 1 of 8 Table of Contents 1. Purpose of this Document... 3 1.1. Non Compliance with Code... 3
More informationTRAFFIC MANAGEMENT PLAN
TRAFFIC MANAGEMENT PLAN For: The construction and operation of a Photovoltaic (PV) Facility in Dabenoris, South Africa Prepared for: Alternative Energy Solutions (Pty) Ltd PO Box 4939 Tygervalley, South
More informationPlanning requirements for heliports and helicopter landing sites
Practice Note 75 December 2012 Planning requirements for heliports and helicopter landing sites The purpose of this practice note is to: 1. Explain how helicopter activity is regulated by the planning
More informationAIR CONDITIONING SYSTEMS
Installation Manual for DRED Interface (DRC-101A) About DRED Interface The DRED interface (DRC-101A) allows the air-conditioner to go in to Demand Response Mode in response to signals sent from the Electric
More informationPhilips remote monitoring and control systems
Philips remote monitoring and control systems Intelligent management of your road and street lighting Energy cost savings Maintenance efficiencies Reduced CO 2 emissions Improved safety Minimized light
More informationCharlton Christian College, Fassifern Master Plan Acoustic Assessment for the Proposed Facilities Upgrade
Master Plan Acoustic Assessment for the Proposed Facilities Upgrade Report No. 20C-12-0116-TRP-266092-3 2 nd April 2013 Acoustics Vibration Air Quality Mechanical & Structural Systems Fluid Mechanics Sustainability
More informationMercer Self-Managed Super Service Application form
Mercer Self-Managed Super Service Application form Please print in black or blue pen, in uppercase, one character per box. A Important information regarding completion of this form Establishing a self-managed
More informationPLANNING POLICY 3.3.5
PLANNING POLICY 3.3.5 CHILD CARE PREMISES 1. Introduction A Child Care Premises is used to provide a child care service within the meaning of the Child Care Services Act 2007, but does not include a Family
More informationGosnells Dust Study. Ambient Air Quality Monitoring. Final Report. Delivering sustainable solutions in a more competitive world
Gosnells Dust Study Ambient Air Quality Monitoring Final Report For Department for Planning and Infrastructure Government of Western Australia July 2006 0042183 www.erm.com Delivering sustainable solutions
More informationFoulford Primary School Site Traffic Management Plan. December 2012 (Review date October 2013)
Foulford Primary School Leuchatsbeath Drive Cowdenbeath Fife KY4 9SN Foulford Primary School Site Traffic Management Plan December 2012 (Review date October 2013) Site Traffic Management Plan Foulford
More informationApplication No : 13/00389/FULL2 Ward: Bromley Town. Applicant : Bromley Conservative Club Objections : NO
SECTION 2 Applications meriting special consideration Application No : 13/00389/FULL2 Ward: Bromley Town Address : Lancaster House 7 Elmfield Road Bromley BR1 1LT OS Grid Ref: E: 540487 N: 169009 Applicant
More informationShannon Corner Service Centre, 208-212 Burlington Road, New Malden, KT3 4NP
Shannon Corner Service Centre, 08-1 Burlington Road, New Malden, KT NP S1 Total site area (ha) 0.05ha Current MOT Car Repair Undeveloped land (ha) 0 Number of units 1 Grid reference TQ 680 Sequential status
More informationLawson Outline Plan External Traffic Analysis Working Paper
Total Lawson Development ACTPLA 16 January 2009 Document No.: Prepared for ACTPLA Prepared by Maunsell Australia Pty Ltd Level 2, 60 Marcus Clarke Street, Canberra ACT 2600, Australia T +61 2 6201 3000
More informationlighting against crime Reduction Professionals
lighting against crime A Guide for Crime Reduction Professionals 1 contents INTRODUCTION GOOD LIGHTING How much light Exterior Domestic Lighting Commercial Lighting Industrial Lighting Public Spaces Road
More informationRETAIL ELECTRIC SERVICE TARIFF P.S.C. Md. No. 3 R Sheet 61
R Sheet 61 SCHEDULE R RESIDENTIAL SERVICE AVAILABILITY Available throughout the area served by the Cooperative to individual residences and individually metered dwelling units in multiple-occupancy buildings
More informationFULL APPLICATION FOR ERECTION OF GARAGE MAINTENANCE UNIT AND PORTABLE OFFICE CABIN
6 February 2015 Delivered by post and planning portal Planning and Building Control Nuneaton and Bedworth Borough Council Town Hall Coton Road Nuneaton Warwickshire CV11 5AA Dear Sirs, FULL APPLICATION
More informationMEMORANDUM. Further discussion regarding the Community s solid waste facility is described further in this memorandum.
MEMORANDUM File: Sanikiluaq Improvement of the Existing Wastewater Treatment Facility To: Government of Nunavut Department of Community and Government Services Attention: Mr. Grigor Hope,, Project Officer
More informationElectricity supply to rural areas
This document has been developed to inform people wishing to purchase rural properties or those people who currently own a rural property about the issues that need to be considered in connecting the property
More informationWelcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site.
Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site. Background & Planning Context The Site The site is an area
More informationDEPARTMENT OF TRANSPORT CYCLING STRATEGY 29 February 2008
DEPARTMENT OF TRANSPORT CYCLING STRATEGY 29 February 2008 INTRODUCTION The Department of Transport s Business Plan for the 2007/08 financial year stated the following: Government Aim: Quality Environment
More informationDevelopment Management Report
Committee and Date Central Planning Committee 5 th April 2012 Item 13 Public Development Management Report Responsible Officer: Stuart Thomas email: stuart.thomas@shropshire.gov.uk Tel: 01743 252665 Fax:
More informationALCYONE REPORTS JORC SILVER RESOURCES
ASX ANNOUNCEMENT & MEDIA RELEASE 29 March 2010 ALCYONE REPORTS JORC SILVER RESOURCES +15Moz RESOURCE INVENTORY UNDERPINS PROGRAM TARGETING RESUMPTION OF SILVER PRODUCTION AT TEXAS PROJECT LATER THIS YEAR
More informationANZ Auto Assist Product Information Terms and Conditions Policy Wording May 2005
ANZ Auto Assist Product Information Terms and Conditions Policy Wording May 2005 ANZ Auto Assist Product Information ANZ Auto Assist will keep you moving By joining the exclusive ANZ Auto Assist program
More informationManaging Public Use of Freeway Emergency Access Gates and Median Crossovers
Managing Public Use of Freeway Emergency Access Gates and Median Crossovers Operational Instruction Transport Services Division TRAFFIC MANAGEMENT Operational Instructions Managing Public Use of Freeway
More informationAlternatives and Design Evolution: Planning Application 1 - RBKC
3 Alternatives and Design Evolution: Planning Application 1 - RBKC Design Freeze Draft One (January 2011) Figure 3-19 3.82 The design freeze draft one was a point in time in the evolution of the Masterplan
More informationAPPLICATION PACKAGE FOR LISTING AS A WATER AND/OR WASTEWATER INFRASTRUCTURE PROVIDER FOR DESIGNERS, CONSTRUCTORS
APPLICATION PACKAGE FOR LISTING AS A WATER AND/OR WASTEWATER INFRASTRUCTURE PROVIDER FOR DESIGNERS, CONSTRUCTORS (Major & minor works) TO THE MANAGING NEW DEVELOPMENTS PROCESS For information regarding
More informationAPPENDIX 4. Risk Tables
APPENDIX 4 Tables Preliminary Qualitative Criteria The qualitative risk assessment criteria have been developed to identify key risks to the environment, society, heritage and business reputation. The
More informationReference: 05/00928/FUL Officer: Mr David Jeanes
DEVELOPMENT CONTROL BOARD 5 January 2006 Reference: 05/00928/FUL Officer: Mr David Jeanes Location: Proposal: Applicant: Whiffens Farm Clement Street Sutton-At-Hone Kent BR8 7PQ Retrospective application
More informationMadras College Site Traffic Management Plan (South Street) August 2015
Madras College Site Traffic Management Plan (South Street) August 2015 South Street, St. Andrews, KY16 9EJ Kilrymont Road, St. Andrews, KY16 8DE Telephone (01334) 659402 Telephone (01334) 659401 Email
More informationDELIVERY & SERVICING PLAN. REDWOOD PARTNERSHIP Consulting Engineers Transportation Planners
Redwood Partnership Transportation Limited Maritime House Basin Road North Portslade Brighton BN41 1WR T: 01273 414515 F: 01273 376824 E: consult@redwoodpartnership.co.uk www.redwoodpartnership.co.uk REDWOOD
More informationOptimizing Tensile Membrane Design utilizing CFD. Trevor Scott. Light Weight Structures Advisory Service
Optimizing Tensile Membrane Design utilizing CFD Trevor Scott Light Weight Structures Advisory Service Abstract CFD is a process that assists designers in optimizing the design configuration of a Tensile
More informationElectrical safety of grid-connected solar installations in Western Australia December 2011
Electrical safety of grid-connected solar installations in Western Australia December 2011 Level 1, 303 Sevenoaks Street (cnr Grose Avenue) Cannington, Western Australia 6107 PO Box 135 Cannington WA 6987
More informationMEASUREMENT AND ANALYSIS OF RF EME LEVELS FROM MOBILE TELEPHONE BASE STATIONS LOCATED AT LEICHHARDT, NSW
AUSTRALIAN RADIATION PROTECTION AND NUCLEAR SAFETY AGENCY A R P N S A Lower Plenty Road YALLAMBIE VIC 3085 Phone 61 3 9433 2211 Fax 61 3 9432 1835 E-mail: arpansa@health.gov.au Web: www.arpansa.gov.au
More informationMemorandum. Summary of Review. Government. Enquiries David Wainwright Queensland. Telephone
Memorandum Enquiries David Wainwright Queensland Government Telephone Phone Number Your reference Our reference Friday, 20 February 2015 Department of Science, nformation Technology, nnovation and the
More informationDesign & Access Statement : Proposed Internal Devlopment & External Plant to Data Centre Facility, 35 Imperial Way, Croydon.
Design & Access Statement : Proposed Internal Devlopment & External Plant to Data Centre Facility, ARC-RP-A-002 Prepared by ARCMC Ltd July 2012: Issue A Contents 1. Introduction 2. Application Proposal
More informationHOME INDEMNITY INSURANCE - WESTERN AUSTRALIA POLICY WORDING
POLICY WORDING HOME INDEMNITY INSURANCE - WESTERN AUSTRALIA GLA RBUA HII WA 1115 Effective Date 01 November 2015 Welcome to the financial security provided by RBUA Home Indemnity Insurance - Western Australia
More informationIFRIC DRAFT INTERPRETATION DI/2010/1 STRIPPING COSTS IN THE PRODUCTION PHASE OF A SURFACE MINE
Mr Kevin Stevenson Chairman Australian Accounting Standards Board PO Box 204, Collins Street WEST VICTORIA 8007 By Email: standard@aasb.gov.au 8 November 2010 Dear Kevin Grant Thornton Australia Limited
More informationHow To Comply With The Telecommunications Consumer Protection Code
Applied VoIP Pty Ltd Telecommunications Consumer Version 1.0 October 1, 2012 Telecommunications Consumer Part 1 General Terms and Objectives Objectives of this Policy This plan sets out the general principles
More informationAPPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE
APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE DESIGN AND ACCESS STATEMENT Report Reference: AU/KC/SPH/1449/01/D&A/FIN Baddesley
More informationSECTION 7 LIGHTING AND POWER DISTRIBUTION SYSTEMS
SECTION 7 LIGHTING AND POWER DISTRIBUTION SYSTEMS Table of Contents Page No 7.1 GENERAL... 1 7.1.1 INTRODUCTION... 1 7.1.2 CODES AND STANDARDS... 2 7.1.3 ALTERNATE EQUIPMENT AND MODIFICATION OF DESIGN
More informationAppendix G. Security management plan
Appendix G Security management plan Security Management Plan Prepared by: Kann Finch Group Project Energy Australia Belmore Park Zone 1- Sub-station component General Design Requirements The perimeter
More informationItem D3 Wind Swanley Technology ogy College, St Mary s Road, Swanley SE/09/
Wind turbine with 15m mast and solar photovoltaic panels Swanley Technology ogy College, St Mary s Road, Swanley SE/09/ /09/889 A report by Head of Planning Applications Group to Planning Applications
More informationCouncil Policy for New Telecommunication Facilities
Council Policy for New Telecommunication Facilities 1. Purpose To establish policies and procedures for the installation of new telecommunication antennas, towers and related structures which emphasize
More informationMajor Development Plan. (Sydney Airport Corporation Limited) Conditions of Ministerial Approval
Major Development Plan Runway End Safety Area (RESA), Sydney Airport (Sydney Airport Corporation Limited) Conditions of Ministerial Approval DEFINITIONS In this document, unless the contrary intention
More informationPROFESSIONAL SERVICES SPECIFICATION
R64 - PAVEMENT MARKING August 1996 PROFESSIONAL SERVICES SPECIFICATION PM2 PROJECT MANAGEMENT PLAN Date JUNE 2012 Department 1 DOT Spec R64 of Infrastructure, Energy and Resources Index DEPARTMENT of INFRASTRUCTURE,
More informationNOW THEREFORE, BE IT ENACTED by the Municipality of East Hants as follows:
Municipality of East Hants By-law Number 163 Civic Addressing By-Law A By-law Respecting the Civic Numbering of Buildings and the Naming/Renaming of Streets in the Municipality of East Hants. WHEREAS the
More informationCITY OF SUN PRAIRIE NEIGHBORHOOD TRAFFIC MANAGEMENT PROGRAM
CITY OF SUN PRAIRIE NEIGHBORHOOD TRAFFIC MANAGEMENT PROGRAM Adopted: June 2011 City of Sun Prairie Neighborhood Traffic Management Program The objective of the Neighborhood Traffic Management Program (NTMP)
More informationAPPLICATION KIT AND GUIDELINES FOR ORGANISATIONS SEEKING TO UNDERTAKE WORKS WITHIN ROAD RESERVE LOW COMPLEXITY WORKS.
Document No: 16-02-12A Issue Date: 09 December 2014 APPLICATION KIT AND GUIDELINES FOR ORGANISATIONS SEEKING TO UNDERTAKE WORKS WITHIN ROAD RESERVE LOW COMPLEXITY WORKS (An approved Traffic Management
More informationAn airport for Western Sydney. Building Western Sydney s future
Building Western Sydney s future Western Sydney is already Australia's third largest economy and, in its own right, would be our fourth largest city. The fourth largest city in Australia should have its
More informationLED ROADWAY LIGHTING VOLUME 2: FIELD EVALUATIONS AND SOFTWARE COMPARISONS
CIVIL ENGINEERING STUDIES Illinois Center for Transportation Series No. 12-013 UILU-ENG-2012-2018 ISSN: 0197-9191 LED ROADWAY LIGHTING VOLUME 2: FIELD EVALUATIONS AND SOFTWARE COMPARISONS Prepared By Kıvanç
More informationSTANDARD SPECIFICATIONS FOR SIGNAGE, STRIPING, AND LIGHTING TOWNSHIP OF STANFORD
STANDARD SPECIFICATIONS FOR SIGNAGE, STRIPING, AND LIGHTING TOWNSHIP OF STANFORD TABLE OF CONTENTS 1.00 2.00 3.00 4.00 GENERAL REQUIREMENTS MATERIALS DESIGN LAYOUT STANDARD PLATES Page No. 1 1 3 5 STANDARD
More informationThe site is Lot 1 DP 837271. Survey of this lot and Willarong Road and Koonya Circuit is given in Figure 2.
Our Ref : NA49913151-019-L02:BCP/bcp Contact: Dr Brett C. Phillips 8 th May 2015 Cardno (NSW/ACT) Pty Ltd ABN 95 001 145 035 The Manager Bunnings Group Limited, c/- C&M Consulting Engineers 1/142 James
More informationApplication by National Grid Gas plc for the River Humber Gas Pipeline replacement (the application)
Application by National Grid Gas plc for the River Humber Gas Pipeline replacement (the application) Examining Authority s (ExA) Record of Unaccompanied Inspection of Sites to Which the Application or
More informationSCHEDULE 16 TO THE SPECIAL USE ZONE. Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT. Purpose
SCHEDULE 16 TO THE SPECIAL USE ZONE Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT Purpose To facilitate the revitalisation of the Ballarat Station Precinct in accordance
More informationAccident Analysis of Sheridan Road between Isabella Street and South Boulevard
Accident Analysis of Sheridan Road between Isabella Street and South Boulevard Prepared for TranSystems Corporation for the City of Evanston Submitted by Regina Webster & Associates, Inc. Date: 08/15/2008
More informationHOW TO SET UP A CHILD CARE CENTRE IN MOSMAN
HOW TO SET UP A CHILD CARE CENTRE IN MOSMAN Mosman Municipal Council CONTENTS WHAT IS A CHILD CARE CENTRE?...3 WHERE ARE CHILD CARE CENTRES PERMISSIBLE?...3 Site Selection... 3 Size... 3 Impact on Neighbours...
More informationTermination of Employment:
Termination of Employment: Australian Business Lawyers & Advisors 2 nd Edition UpdatEd FEbrUary 2011 rrp $45.00 a new legal framework The Fair Work Act took effect on 1 July 2009. As with the previous
More informationPublic Worksessions - A Summary of the New York City Zoning and Planning Study
APPENDIX F Third Public Work Session Notice Presentation July 27, 2004 For Immediate Release July 12, 2004 Town of Rotterdam Notice of Public Meeting The Town of Rotterdam Public Works Department will
More informationGUIDELINES. for oversize and overmass vehicles and loads MAY 2006. Government of South Australia. Department for Transport, Energy and Infrastructure
ESCORTING GUIDELINES ESCORTING GUIDELINES SCORTING GUIDELINES ESCORTING GUIDELINES ESCORTING ESCORTING GUIDELINES for oversize and overmass vehicles and loads Government of South Australia Department for
More informationdata centre construction
data centres 2 reliable a data centre construction asset maintenance & management availability management reliability engineering 3 nd secure We are generating more and more data every day. It is estimated