1 Los Angeles County Metropolitan Transportation Authority Integrating State of Good Repair with PPP s NCPPP Conference San Diego, California, July 7-8, 2009 Denise L. Longley Deputy Executive Officer, Facilities-Operations, Metro
2 Presentation State of Good Repair Examples of SGR Case Study of integrated SGR and PPP 2
3 Los Angeles County Metropolitan Transportation Authority (Metro) Is unique compared to other transit agencies because it is the... regional transportation planner; regional builder;. for Los Angeles County. and the regional transit operator 3
4 Los Angeles County Metropolitan Transportation Authority (Metro) Facts at a Glance 73 Miles of Metro Rail 63 Rail Stations 225 Rail Cars 447 Miles of HOV Lanes 1.4M+ ave bus & rail weekday boardings 8,076 represented empl 1,230 non-rep 4
5 11 Bus Operating Divisions Total 2520 CNG buses-all needing maintenance, fueling, cleaning, vaulting, parking and operators. Total 188 acres and 1,371,655 sq ft of buildings to maintain. 5
6 Metro State of Good Repair Definition Adapted by Metro An asset or system is in a state of good repair when no backlog of capital needs exists-hence all asset life cycle investment needs (e.g., preventative maintenance and rehabilitation) have been addressed and no capital asset exceeds its useful life. 6
7 State of Good Repair Discussions Current Conditions Preventative Maintenance Measuring State of Good Repair Transit Asset Management Core Capacity Research Needs Alternate Approaches to Financing F TA S GR Title pg.lnk t.gov 7
8 State of Good Repair-Building Replacement Division 9 Transportation Building El Monte, CA 8
9 State of Good Repair-Building Replacement Division 9 Transportation Building El Monte, CA 9
10 State of Good Repair-Bus Facilities Improvements Completed Facility Projects San Gabriel Valley Transportation Building & Sector Office Building completed under budget and formally opened in January 2008 Obtained LEED Gold certification Division 8, 15, 18 Solar Generation Projects Metro s first three solar projects, 430kWh, or 1600 individual solar panels per division Division 1 Shop Expansion $3.3 million addition to shop building for maintenance of articulated buses 10
11 SGR - Facilities Improvements More examples of SGR Division 3 Master Plan Improvements $19 million project to improve 30 year old facility in Cypress Park Division-Wide Hoist Replacements $15M 120 hoists in total will be replaced, last phase to be completed 7/10 Divisions 5, 10, and 18 Improvements $18 million improvement project for all 3 divisions, Divisions 1, 3, 8, 9, and 15 Improvements $13.7 million improvement project for all 5 divisions, MSSC Solar and Energy Efficiency Project Public/private partnership to install one megawatt of solar panels and perform green retrofit of facility 11
12 Facilities Improvements In Planning and Design Bauchet St. Warehouse & Facilities Shop Award contract July 2009, scheduled completion December 2010 Union Division Maintenance Facility 200 bus operations base in Downtown, engineering in progress LAX Maintenance Facility 300 bus operations base near LAX, NEPA/CEQA underway 12
13 State of Good Repair-Vertical Transportation 124 Escalators 129 Elevators Service Contract $35 million/5 yr APTA heavy duty transit standards must be incorporated into specs for safety and state of good repair of transit s vertical transportation. As CA budget 13
14 Financial Challenge While population and mobility needs continue to increase Federal and state operating funds have declined Transportation capital needs and operating costs have increased American Recovery and Reinvestment Act (ARRA) is source of some funding 14
15 SGR-ARRA funded projects at Metro Bus procurements (153 buses) 84M Bus Midlife Program (400 buses) 47M MRL 7 th 2M St Egress Widening MBL Traction Power Substation 56M MRL/MBL/MGL Fiber Optic 2.5M 15
16 Facilities Public/Private Partnership Case Study Partners 16.4M Photovoltaic Solar and Energy Upgrade project Client Builder/Ope rator Financi ng 16
17 The P3 Site (Metro Support Services Center) 20 acres Adjacent to USG HQ 25-year old heavy maintenance facility with $1,100,000/year energy bills Opportunities for energy efficiency upgrades 17
18 The Site (Metro Support Services Center) Central Maintenance-Bus Bus Rebuild Machining Central Stores & Instruction Paint Shop Administration Stops and Zones Facilities Maintenance 18
19 Solar PPP = State of Good Repair Installation of 1 Megawatt (6720) Photovoltaic Solar Panels on roof 19
20 MSSC Solar and Energy Efficiency Project Project was to green the entire facility by retrofitting HVAC, compression, and lighting equipment, and installing 1 megawatt of solar panels on the roofs Total of $6.5 million in incentives from Gas Co, LADWP, and AQMD Project was constructed using a Performance Contracting approach (design/build/finance/guarantee). Largest solar installation by a transit property to date in the nation, and largest in the city of Los Angeles. 20
21 Solar PPP = State of Good Repair HVAC Replacement of 3 Units (75T, 20T, 20T) 21
22 Solar PPP = State of Good Repair Pit Light Replacement 22
23 Solar PPP = State of Good Repair Shop Light Replacement total Exterior Light Replacement 23
24 Solar PPP = State of Good Repair New Air Tanks Compressor and Dryer Replacement - running in 24
25 MSSC Solar and Energy Efficiency Project Project ProForma Project Cost: $16.4 million Rebate at end of construction: ($6.5 million) Financed Cost: $9.9 million at 4% (10 years) 10 Year Monthly Cost: $110,000 Savings per month: $50,000 For ten years, project will cost us $60,000 per month At end of 10 years, Metro enjoys all electricity savings Project produces a net present value 25
26 MSSC Solar and Energy Efficiency Project Public/Private partnership between financing entity (BofA), installer (Chevron) and owner (Metro) Contractor responsible for all facets including financing, design, permits, construction, and energy guarantees Metro pays the finance costs on an amortized basis, but deducts the savings generated Metro owns the system and maintains per Contractor program, Contractor guarantees savings over ten years RFP issued for bidders May 2007, deal negotiated September 2007, Board approved project January Construction started May 2008 and is complete. 26
27 MSSC Solar and Energy Efficiency Project End Results of Project Immediate savings of $50,000 per month Reduces electricity bills by 50%, from $1.1 million to $550,000 On a net present value basis, project is cash positive and realizes a $1.5 million ROI over life of equipment Over the Life of Equipment, the project reduces our CO2 Emissions by 120,000 metric tons 27
28 Public Private Partnerships (P3) How Do We Increase Financial Capability? Activate potential new private sources Maximize leverage provided Maximize use of flexible and fungible revenue Minimize annual debt service payments Phase spending to reflect revenue 28
29 PPP Program Objectives Accelerating delivery to improve service Reducing costs through contracting and construction methods Develop projects integrated with existing transit/highway infrastructure Allocating risk 29
30 How Do We Begin? Metro retained program management and an advisory consulting team InfraConsult LLC KPMG LLP Nossaman LLP Halcrow Inc. Sharon Greene + Associates Englander & Associates Initial activities underway Primary screening criteria - LRTP and Measure R Preliminary screening of all projects Development of financial assumptions Readiness assessment Risk analysis Technical and operational 30
31 Project Approach Projects with greatest likelihood of success: Clearly defined (i.e., draft EIR/EIS), high-priority, noncontroversial project with demonstrated public sector commitment Fair risk allocation Transparent, well-defined procurement process, experienced public sector 31
32 Financing Transit PPP s Financing questions? 8:00 am session on Financing Transit PPP s Roger Moliere, Chief Real Property Management & Development for LA Metro 32
33 Thank You 33
State Planning Agency, Tribal Utilities & Renewable Energy Regime in California
California and Clean Energy/Tech Permit Streamlining & Business Development Governor s Office of Planning and Research Scott Morgan National Governor s Association Workshop December 9, 2011 Office of Planning
Southern California Edison s
Welcome to Southern California Edison s Energy Efficiency Programs 1 Energy Efficiency #1 Resource The California Energy Action Plan of 2005 establishes energy efficiency as the state s top priority procurement
o SEP grant: $10,000,000.00 o Leveraged funds anticipated
Federal Stimulus Allocation Plan State Energy Program (SEP) Funds State of Florida Allotment: $126,089,000.00 Total Jobs Created/Retained from SEP Funds: 1,832 Renewable Energy Programs Allocation for
Local Solar. bikeriderlondon / Shutterstock.com. Local Solar Power
bikeriderlondon / Shutterstock.com Local Solar Power Production of electricity from fossil fuels creates pollution, including smog and green house gas emissions. Combining the abundance of sunshine our
Los Angeles Metro Rapid
Los Angeles Metro Rapid Why BRT In Los Angeles Public dissatisfied with slow bus service Average bus speeds had declined by 10% since late- 1980s LADOT found that 50% of the time a bus is in service it
Business Transformation and Green Fleet Achievements. City of Sacramento
Business Transformation and Green Fleet Achievements City of Sacramento The Problem - Bridge the Budget Gap The City faced a projected $35 to $40 million deficit beginning next fiscal year. The projected
CLEAN LA SOLAR PROGRAM. Mary Leslie, Los Angeles Business Council
CLEAN LA SOLAR PROGRAM LADWP FEED-IN TA R I F F Mary Leslie, Los Angeles Business Council Agenda 1. The Context: Clean energy and policy landscape in California 2. Review of LADWP Feed-in Tariff Program
An Airport Sustainable Energy Strategy
An Airport Sustainable Energy Strategy Addressing the Ecology, Equity & Economics of Airport s Energy Usage March 2015 Paul Manasjan - Director, Environmental Affairs San Diego County Regional Airport
Owner s Procurement Forum
Washington Metropolitan Area Transit Authority Construction Management Association of America National Capitol Chapter Owner s Committee Owner s Procurement Forum February 24, 2015 OVERVIEW of WMATA INFRASTRUCTURE:
Nationwide Fixed Guideway
1. CONCEPT SUMMARY Solar Transportation Technologies is developing a completely new mass transit system, utilizing privately owned electric cars on an elevated fixed guideway, called Freedom Transit (FT).
PV Farms Solar Electric Power for Wholesale Distribution
PV Farms Solar Electric Power for Wholesale Distribution UC ENERGY WEEK 2010 California Solar Energy Workshop UC Davis Energy Institute Davis, California Larry Asera Chairman/CEO Asera Group, Inc. May
Financing Options for Commercial Solar Projects
2010 Financing Options for Commercial Solar Projects EXECUTIVE SUMMARY Thanks to a range of innovative financing options, transitioning to solar energy has never been more affordable for businesses and
Clean State Energy Actions 2011 Update. nevada
Energy Efficiency Appliance/Equipment Efficiency Standards Building Energy Codes Utility Demand-Side-Management Utility Rate Realignment Energy Savings Targets/Energy Efficiency Resource Standards Requires
When is BRT the Best Option? 1:30 2:40 p.m.
TRB/APTA 2004 Bus Rapid Transit Conference When is BRT the Best Option? 1:30 2:40 p.m. Paul Larrousse Director, National Transit Institute (NTI) (Moderator) TRB/APTA 2004 Bus Rapid Transit Conference Session
Notice of Public Hearing Washington Metropolitan Area Transit Authority Docket B13-01
Notice of Public Hearing Docket B13-01 PROGRAM OF PROJECTS FOR FEDERAL FISCAL YEAR 2013 FUNDS AUTHORIZED UNDER THE MOVING AHEAD FOR PROGRESS IN THE 21 ST CENTURY ACT (MAP-21) AND THE PASSENGER RAIL INVESTMENT
Q1 2011 Utility Rebate Report. Fort Worth, TX
Q1 2011 Utility Rebate Report A service of the Sustainable Corporate Real Estate Roundtable Fort Worth, TX April 7, 2011 (Captures regulations through March 31, 2011) This Report is one of a series of
Financing Energy-Saving Improvements. Through The Florida Green Energy Works PACE Financing Program
Financing Energy-Saving Improvements Through The Florida Green Energy Works PACE Financing Program Who we are - Towns: - Lantana & Mangonia Park - Chambers: - Greater Boynton Beach Chamber of Commerce
ON-SITE SOLAR GENERATION AT METRO OPPORTUNITIES & IMPLEMENTATION
ON-SITE SOLAR GENERATION AT METRO OPPORTUNITIES & IMPLEMENTATION CONTENTS Introduction...3 Why go solar?...4 What type of solar is best?...6 Where should solar be developed?...8 Implementation...10 Disclaimer:
Quon Kwan. Safety Considerations Related to Commercial Vehicles Using Natural Gas. Natural Gas Vehicle Technology Forum San Diego, CA October 17, 2012
Safety Considerations Related to Commercial Vehicles Using Natural Gas Quon Kwan Natural Gas Vehicle Technology Forum San Diego, CA October 17, 2012 Outline Purpose Partners Federal Motor Carrier Safety
SUSTAINABLE ENERGY ACTION PLAN AND SOLAR PILOT PROJECTS
T&E AGENDA: 03 05 07 ITEM: 6 TO: TRANSPORTATION & ENVIRONMENT COMMITTEE FROM: John Stufflebean Peter Jensen SUBJECT: SEE BELOW DATE: 02 20 07 Approved Date SUBJECT: SUSTAINABLE ENERGY ACTION PLAN AND SOLAR
Los Angeles County One Gateway Plaza Metropolitan Transportation Authority Los Angeles, CA g0012-2g52 AWARD CONTRACT FOR AC/AIR COMPRESSORS
52 Los Angeles County One Gateway Plaza Metropolitan Transportation Authority Los Angeles, CA g0012-2g52 Metro OPERATIONS COMMI'ITEE JUNE 18,2009 SUBJECT: ACTION: AIR CONDITIONING (AC) AND AIR COMPRESSORS
SUSTAINABLE RETURN ON INVESTMENT SROI
SUSTAINABLE RETURN ON INVESTMENT U.S. Army Corps of Engineers New Orleans, LA; Hurricane Storm Damage Risk Reduction System Sustainable Return on Investment () Can Help Get Projects Funded This is a time
Distributed PV the road California is already on. Public Interest Environmental Law Conference Bill Powers, P.E., Powers Engineering March 5, 2011
Distributed PV the road California is already on Public Interest Environmental Law Conference Bill Powers, P.E., Powers Engineering March 5, 2011 1 John Geesman, Energy Commissioner, 2007 source: California
Jan McFarland Executive Director CA Alternative Energy and Advanced Transportation Financing Authority
Jan McFarland Executive Director CA Alternative Energy and Advanced Transportation Financing Authority Tim Seufert Managing Director NBS Solar Energy An idea whose time has [finally] come? Hurricane Katrina
Greenfield Innovation Park
Greenfield Innovation Park Site Available for Interconnection and Data Center Greenfield, Massachusetts Welcome to Western Massachusetts! 50 MILE RADIUS Western Massachusetts - two hours from Boston and
Photovoltaic Industry Technologies, Markets & Trends
Photovoltaic Industry Technologies, Markets & Trends AIAA Los Angeles Enterprise Chapter Joel Davidson Solutions in Solar Electricity Presentation Outline The Big Picture Brief History of PV Solar Array
Overview. PG&E and Energy Efficiency. CA Energy Efficiency Regulatory & Policy Roadmap. Financing Options for Efficiency & Demand Response
Overcoming Financial Barriers to Energy Efficiency April 6, 2010 Overview PG&E and Energy Efficiency CA Energy Efficiency Regulatory & Policy Roadmap Financing Options for Efficiency & Demand Response
CCC/IOU Energy Efficiency Partnership and Campus Budget Challenges
and Campus Budget Challenges Dan Estrada Chancellor s Office Robert Brunn Southern California Edison Lisa Hannaman Southern California Edison California Community Colleges Systemwide Detail 72 districts
Los Angeles Community College District
Los Angeles Community College District BLUE AND GREEN TOGETHER Developing Sustainable Integrated Approaches to Green Technologies and Water Usage Green California Schools and Community Colleges October
Intelligent Transport for Smart Cities Conference. Bruce McCuaig, President and CEO, Metrolinx
Intelligent Transport for Smart Cities Conference Bruce McCuaig, President and CEO, Metrolinx 2 Transportation Trends 2013 2031 82 minutes spent commuting 109 6.6 9 million residents in the GTHA 3 The
Budget Used Balance Obligation Based Budget: Infrastructure Renewal Program $290.1 $251.2 $38.9
FY 05 Metro Matters Summary End of Fiscal Year Status Dollars in Million Budget Used Balance Obligation Based Budget: Infrastructure Renewal Program $290.1 $251.2 $38.9 Expenditure Based Budget: Rail Car
CNG Station Considerations Trillium USA
CNG Station Considerations Trillium USA Presented by Bill Zobel May 25, 2010 Trillium s Profile Formed in 1994 Design, build, and operate CNG stations Customer base includes Transit Agencies, Municipalities,
Incentives for Plug-in Electric Vehicle Users or Consumers
National Programs VEHICLES Qualified Plug-In Electric Drive Motor Vehicle Tax Credit - Internal Revenue Service Tax credits range from $2,500 to $7,500 For qualified electric drive vehicles acquired after
MISSION DRIVEN FINANCING OPTIONS
MISSION DRIVEN FINANCING OPTIONS WHO IS HAWAII COMMUNITY REINVESTMENT CORPORATION Hawaii Community Reinvestment Corporation (HCRC) is a community based non profit 501(c)3 organization founded in July 1990.
Public-Private Partnerships Forum PPP Law, Structures and Contracting
Public-Private Partnerships Forum PPP Law, Structures and Contracting AGC California Fall Conference 2010 Hyatt Grand Champions, Indian Wells November 4, 2010 MAKING IT HAPPEN. Overview California PPP
Michael I. Schneider Senior Vice President and Managing Director HDR / InfraConsult
Senior Vice President and Managing Director HDR / InfraConsult Michael Schneider is co-founder and Managing Partner of InfraConsult LLC, a program management and strategic advisory firm with primary focus
2012 Civic Natural Gas Retail & Fleet Markets. NGV Bridge Fleet Framework Summit March 26, 2013
2012 Civic Natural Gas Retail & Fleet Markets NGV Bridge Fleet Framework Summit March 26, 2013 Elizabeth Munger Alternative Fuel Vehicle Sales Consultant Civic Natural Gas Sales and Marketing 512-694-1004
Agenda. Part I: Introduction to OptimumHVAC. Part II: Initial Energy Savings Analysis for MCO Main Terminal. Part III: Case Studies & Conclusion
OptimumHVAC Prepared for the: GOAA Energy Conservation & Environmental Initiatives Forum April 27, 2010 Jamie Wiecks Enterprise Account Manager Optimum Energy Mike Dillard Vice President, Business Development
Fuel-Efficient and Alternative-Fuel Vehicles Community Stories and Snapshots
CALIFORNIA CLIMATE ACTION NETWORK Fuel-Efficient and Alternative-Fuel Vehicles Community Stories and Snapshots These community stories and snapshots were compiled in May and June 2010. They were prepared
MANAGEMENT PLAN. Fiscal Year 2015-2016
MANAGEMENT PLAN Fiscal Year 2015-2016 May 6, 2015 Table of Contents I. Executive Summary... 2 Omnitrans Vision... 5 Omnitrans Mission Statement... 5 II. Strategic Initiatives... 5 Implementation... 6 Strategic
CITY OF EL PASO: SUN METRO Legislative Update Briefing
CITY OF EL PASO: SUN METRO Legislative Update Briefing Updated March 2014 OUR VISION The mission of Sun Metro is to provide a first-class public transportation service to all El Pasoans and visitors so
California Energy Commission 2015 Accomplishments
California Energy Commission 2015 Accomplishments Responding to California s Drought Responded to the state's historic drought and Governor Edmund G. Brown Jr. s Executive Order B-29-15 by approving new
A One Stop Shop for Small and Micro Business. Roberto E. Barragan President, VEDC, Inc. Presentation to the Federal Reserve www.vedc.
A One Stop Shop for Small and Micro Business Roberto E. Barragan President, VEDC, Inc. Presentation to the Federal Reserve www.vedc.org 1 Valley Economic Development Center Multi-ethnic CDC serving LA,
Solar Project Financing Commercial Power Purchase Agreements (PPAs) & PPA Market Rates for SCE Territory
Solar Energy in Inland Southern California: The Future is Now The University of California, Riverside Solar Project Financing Commercial Power Purchase Agreements (PPAs) & PPA Market Rates for SCE Territory
Plan it. Build it. Service it.
Plan it. Build it. Service it. Plan it. Build it. Service it. Energy efficiency and reduction in operational costs is becoming critical in the energy driven industry. Our clients are benefiting from Aireko
Clean State Energy Actions 2011 Update. colorado
Energy Efficiency Building Energy Codes Utility Demand-Side-Management Energy Savings Targets/Energy Efficiency Resource Standards Residential: 2003 IECC, required in jurisdictions with a building code
PENNSYLVANIA GREEN ENERGY LOAN FUND
PENNSYLVANIA GREEN ENERGY LOAN FUND Procedures Manual for Quantifying Energy Savings A. Introduction A building project applying for a GELF energy loan must demonstrate that it will result in a 25% reduction
Experts in Rail Maintenance and Infrastructure
Experts in Rail Maintenance and Infrastructure It is with great people and pride, rooted in a culture of safety, D that Transdev delivers systems, technologies, and business processes to strengthen rail
Tysons Sustainability Summit Evidence Based Urban Design. Roger E. Frechette III, PE, LEED-AP
Tysons Sustainability Summit Evidence Based Urban Design 2013 Autodesk Roger E. Frechette III, PE, LEED-AP Live in Harmony with Nature Transit Community Energy Waste Air Quality Water Yujiapu Financial
Enterprise Asset Management
Enterprise Asset Management Asset Management Strategy April 29, 2014 Craig Stewart, Senior Director Capital Program Metropolitan Transportation Authority Providing public transit is asset-intensive 5/15/2014
EXPRESS PERMITS (No Plan Check Required)
EXPRESS PERMITS (No Plan Check Required) Following are the lists of different types of construction for which an express permit can be issued. Express permits can be issued where work does not require
SDG&E s - Sustainable Communities Program
SDG&E s - Sustainable Communities Program February 21, 2014 Pete Pavao 2013 San Diego Gas & Electric Company. All copyright and trademark rights reserved. Overview SDG&E Sustainable Communities Program
MCAS Miramar Construction. Christopher Manis Deputy S-4, MCAS Miramar
MCAS Miramar Construction Christopher Manis Deputy S-4, MCAS Miramar PV streetlights ongoing, and they save ~750 KW-hr per year each 342,000 KW-hrs per year from this carport enough to power a 35Ksf bldg
Commercial Property Assessed Clean Energy (PACE) Primer
Commercial Property Assessed Clean Energy (PACE) Primer Overview Commercial PACE Commercial PACE programs may be used by local governments to finance energy efficiency and renewable energy improvements.
Pet Coke Consulting, LLC. Phil Fisher Argus Conference, Houston September 19-21, 2012
Pet Coke Consulting, LLC Phil Fisher Argus Conference, Houston September 19-21, 2012 Will Pet Coke continue to be made over next 25 years? To answer, we need to know: What drives pet coke production? How
Clean Energy Jobs Plan
Clean Energy Jobs Plan Introduction When I was governor, California was the world leader in renewable energy and it led the nation in efficiency standards. Our programs saved California consumers billions
WHY NOW? GAS? The Design. Nopetro
Nopetro The Energy Solution About Us Founded in 2008 Design, finance, build, operate, maintain and supply Compressed Natural Gas (CNG) and Liquefied Natural Gas (LNG) Fueling Stations Focus on Medium and
AASHTO RR101 Webinar Equipment
Presentation to AASHTO RR101 Webinar Equipment M. Bergeron Chief Mechanical Officer April 9, 2013 Agenda Amtrak Mechanical Department Maintenance Plan & Production Capabilities Amtrak Train 5 Bull Gulch,
LA: THE DREAM STARTS HERE BUILDING LOS ANGELES INTO A GLOBAL CAPITAL OF CLEAN TECHNOLOGY
LA: THE DREAM STARTS HERE BUILDING LOS ANGELES INTO A GLOBAL CAPITAL OF CLEAN TECHNOLOGY Mayor s Office of Economic Development Mayor s Office of Energy & Environment Office of Mayor Antonio R. Villaraigosa
3.36 kw Solar PV Kit Pricing
3.36 kw Solar PV Kit Pricing Standard 3.36 kw Solar PV System Pricing $ 13,440 MI Solar Works Pricing $ 11,760 Less Federal Tax Incentives (30% of System Cost) - 3,528 Final 3.36 kw Solar PV System Cost
Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014)
Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014) Summary Description Proposed Project: Light Rail Transit 10.9 Miles, 9 Stations Total
Appendix F. DRECP Energy Development Assumptions and the BLM LUPA
Appendix F DRECP Energy Development Assumptions and the BLM LUPA F DRECP Proposed LUPA and Final EIS DRECP ENERGY DEVELOPMENT ASSUMPTIONS AND THE BLM LUPA F.1 Introduction This appendix briefly summarizes
J. Craig Venter Institute, La Jolla Transportation Demand Management Plan
J. Craig Venter Institute, La Jolla Transportation Demand Management Plan Project Overview The J. Craig Venter Institute (JCVI) is a private, not-for-profit research institute dedicated to the advancement
Chicago Climate Action Plan Update
Chicago Climate Action Plan First Two Years ACCO Climate Change Leadership Summit November 9, 2010 City of Chicago Richard M. Daley, Mayor Chicago Climate Action Plan Update FIVE STRATEGIES Recognition
How to Earn the LEED Green Power Credit
3D EG REES WH ITE PAPER How to Earn the LEED Green Power Credit Using on-site and off-site renewable energy to mitigate the impact of greenhouse gas emissions associated with a LEED project s energy use
Risk Management in the Development of a Penta-P Project
Risk Management in the Development of a Penta-P Project Bill Van Meter Regional Transportation District Denver, CO Julie Skeen Jacobs Engineering Denver, CO Damian Carey Jacobs Engineering Denver, CO Don