6 GSA Automation of Early Concept Design Chuck Eastman, Yeon-Suk Jeong, Jae min Lee, Jin Kook Lee, Sherif Abdelmohsen, Hugo Sheward, Paola Sanguinetti GEORGIA TECH
7 Early Concept Design Review - Project Purpose Late concept design review identifies some errors that are systemic and cannot be easily corrected after the concept has been selected. Could you carry out Circulation assessment at early Concept Deign, so it would inform us in the selection of a concept?
8 Integrated Review in Early Concept Design for US Courts Preliminary Spatial Validation 8.14 Verify BIM Measurements Circulation/ Security Check 8.21 Verify BIM Measurements 8.8 Create Three or More Preliminary Concepts 8.13 Refine Three Concepts 8.20 Develop Best Concepts Preliminary Concept Design is a crucial early step for GSA project review Final Concept Design is the last step for project review before DD
9 Early Concept Design Review - Project Purpose The PBS-100 Guide lays out the process clearly. An Early Design Concept begins with a simpler set of given requirements: -a space program of the occupancy, number and type of occupant spaces -the site and general site plan -major circulation and building zoning -a budget or expected cost figure -major fire code considerations -exterior zoning -and recently, preliminary energy analysis
10 Context - Concept Design Energy Review provide automated feedback on early stage concept designs for energy implications, catching energy issues early, speeding and standardizing GSA reviews
11 System Architecture Spatial Validation Circulation/Security Energy Analysis Cost Estimation Pre-checker Pre-checker Pre-checker Pre-checker Spatial Validation Circulation/Security Energy Analysis Cost Estimation Checking Checking Interactive Review Report Interactive Review Report Interactive Review Report Interactive Review Report Extensible to other checking capabilities
12 Jefferson City PCD Model Concept 8-A
13 Toledo OH PCD Model United States Courts Toledo, Ohio Concept Design Model Development & Automated Review Process Lateral Design Development 2 Court 3 Court 4 Court 4 Court 6 Court Vertical Design Development May 2008 Aug 2008 Nov June, 2008 Early CD Review 1 Departments only Oct, 2008 Early CD Review 2 Mixed Mode Dec Early CD Review 3 Mixed Mode Updated 6Court Late CD Review Final Concept: Detailed spaces with departments, doors
14 GSA BIM Guide for Early Concept Design Review
15 GSA BIM Guide for Early Concept Design Review Building defined as a set of floor slabs, at the appropriate height/spacing (above and below grade External walls, with thickness, percent glazing All slab covered by space objects, with department space name (and base space name if defined) Elevators/stair spaces defined by space names One wall object covers one level One wall object covers three levels
16 16 GSA Review Example 07/26/07 - manual calculation
17 Automated Early Space Program Review
18 Automated Early Space Program Review
19 An Example: Actual Department Names in the Model This should be Building Support Facilities department. This could be handled by the fact that its space name mechanical room is always under the Building Support Facilities. But most cases require correct Department-Space name set. Well-named Department example. Computer recognizes it. Insufficient Meaning. For which Judge s Chamber? (Magistrate / District / Senior District / Bankruptcy Judge) Blank Name Standard Name defined in the Design Guide is USMS. But U.S. Marshal is also a correct name. Synonym DB needs to handle this. Misspelled Name Secured is non-standard name, but it is recognizable by our name mapping algorithm using secure key word mapping.
20 Space Naming for GSA and U.S. Courts Preliminary thru Final Spatial Validation Cost Estimation Space Classes Space Names Departments and Base spaces Circulation Space Classes Energy Internal Load Classes Department Names Base Space Names Application-based Space Names
21 Our BIM Program embedded these circulation rules into BIM-analysis software Court design guide U.S. Courts Design guides Selected circulation issues Define standard syntax and structure for rule families and procedures Normalized circulation issues Show where design fails IFC Court house Data Testing a court house model on Rule Checking SW Reference back to Design Guide description Generate rule set Rule Sets
22 Automatic circulation rule checking Circulation rule checking by using start, target and transit space conditions Circulation rule checking based on graph representation of space (paths shown in green)
23 3D circulation rules are implemented as a route graph that defines all paths within the building going through space that can be used for through circulation Conditions regarding the distances traversed, the types and security of spaces in the traversal path, and other conditions can be used to define allowable and illegal circulation paths. On a 6- story courthouse, approximately 27,000 routes were tested using 312 circulation rules in approximately 15 seconds.
24 Understanding an occupant s path traversals User-based occupant rules on path traversals ensure that a path between a judge s chamber and attorney s office can be made within restricted spaces (Figure 1). These rules also check multi-floor paths (Figure 2). Figure 1 Figure 2
25 Preliminary Design Energy Analysis In selecting a concept many energy-impacting decisions are being made, even though many have not been made and there is uncertainty in final energy costs. The purpose of energy analysis at this state is to understand the relative energy costs of each alternative and the energy impacts of the design features Major decisions and feedback available form this stage: building massing: number of storeys, footprint Orientation, self-shading, impact of applied shading Areas where building envelope receive major gains Impacts of courtyards and atriums
26 Preliminary Design Energy Analysis Input values from IFC Building geometry Construction types (associated to wall thickness) Heat gains by occupant density (associated to space name) Input values from Solibri Interface Location (City & State) Building North Orientation (0 = North up in plan) % fenestration pre façade External wall class Default values Solar Distribution Idealized HVAC system
27 MODELING /DEBUGGING EFFORTS Thermal zone generation Aggregate spaces by occupancy type Create perimeter zone (15 perimeter) Assign internal heat gains (revised to match new P 100) Zone surface subdivision Departmental spaces Secondary space boundary definition Thermal model with aggregated spaces by occupancy types, with added perimeter zones, and subdivision of zone surfaces Open to below condition (atrium) Internal walls (level of detail) zone inside a zone Next: surface overhangs + = Level 1: Level 2 Horizontal surface subdivision
28 ENERGY INTERFACE DEVELOPMENT Automated generation of thermal model Open IFC file Build: generate/visualize thermal zone Simulate: save IDF & call Energy Plus Aggregate results: view output report build Option to edit input values Revise building orientation Modify envelope construction type Change % window Add external shading simulate results
29 REPORTING FUNCTIONALITY Monthly heating/cooling report Visualization of thermal zones by occupancy based on department classification Grouping of zones by monthly output to provide quantitative results Graph to evaluate overall performance by building level
30 REPORTING FUNCTIONALITY Hourly heat transmission report Visualization of envelope thermal performance based on surface average heat transmission Grouping of surfaces by orientation and hourly output to provide quantitative results Results color coded for overall performance evaluation (3D & numerical) Result s
31 REPORTING FUNCTIONALITY Hourly heat transmission report Grouping and visualization of selected zones per selected hour Results aggregated and displayed
32 WORK-IN-PROGRESS LOCAL OPTIMIZATION Storage of report data Simulation output saved in conjunction with input model Data can retrieved and used for comparative analysis Min/Max scale values associated to color coding support visual comparison 50% windows w/vertical shade_12 pm_january 50% windows w/vertical shade_12 pm_august 50% windows w/vertical shade_4 pm_january 50% windows w/vertical shade_4 pm_august
33 Cost Estimation Module - Architecture INPUT DAT SET Project Name City Facility Name Footprint State Model Name Perimeter Country Floors Above Exterior wall area Zip code Floors Below Roof area Gross Area Floor to floor height Number of stairs Window area Number of elevators
34 Summary of PACES Functionality REVIEW OF ECD COST ESTIMATION MODULE
35 Output Format & Reporting (review of p 120) Requirements for cost estimating at different design phases REVIEW OF ECD COST ESTIMATION MODULE
36 The Method Being Followed: Requiring specially configured BIM models during design destroys the design effectiveness uning BIM Robust post-processing of widely varied assessment tools is the only reliable means to gain effective use All the interfaces developed here are made compatible with their analysis interfaces through significant post-processing Concept design Design development Contract model Construction
37 Thank you, The Georgia Tech Team
GSA. Circulation and Security Validation. GSA BIM Guide Series 006. www.gsa.gov/bim
GSA Circulation and Security Validation GSA BIM Guide Series 006 COPYRIGHT 2007 BY General Services Administration If you would like to contact the authors, please write to: The National 3D-4D-BIM Program
Building Information Modelling (BIM); How it Improves Building Performance. R.P. Kumanayake Lecturer, Department of Civil Engineering
Building Information Modelling (BIM); How it Improves Building Performance R.P. Kumanayake Lecturer, Department of Civil Engineering R.M.P.S. Bandara Lecturer, Department of Mechanical Engineering Faculty
Total Building Commissioning: Case Study of the U.S. District Courthouse in Salt Lake City, Utah, USA
Total Building Commissioning: Case Study of the U.S. District Courthouse in Salt Lake City, Utah, USA Boggarm S. Setty, P.E., Fellow ASHRAE Setty & Associates, Ltd. 3040 Williams Drive, Suite 600, Fairfax,
3-D Modeller Rendered Visualisations
Recognised energy Dynamic Simulation Modelling (DSM) software DesignBuilder is a user interface to the EnergyPlus DSM. EnergyPlus builds on the most popular features and capabilities of BLAST and DOE-2
Energy Efficiency in Buildings
Energy Efficiency in Buildings Supplemental Guide to SANS 10400-XA & SANS 204 V. 3.0 Registered to: The Drawing Studio Image: digitalart / FreeDigitalPhotos.net Report Date: 26 August 2014 Practice Name:
ANSI/ASHRAE Standard 140-2004 Building Thermal Envelope and Fabric Load Tests
ANSI/ASHRAE Standard 140-2004 Building Thermal Envelope and Fabric Load Tests DesignBuilder Version 1.2.0 (incorporating EnergyPlus version 1.3.0) - June 2006 1.0 Purpose The ANSI/ASHRAE Standard 140-2004
Diego Ibarra Christoph Reinhart Harvard Graduate School of Design
Building Performance Simulation for Designers - Energy DesignBuilder // EnergyPlus Tutorial #3 Construction Assemblies, Load Reduction & Shading GEOMETRY LOADS RESULTS Diego Ibarra Christoph Reinhart Harvard
28.0 Development Permit Area #2 (Neighbourhood District)
28.0 Development Permit Area #2 (Neighbourhood District) Goals and Objectives To provide a guide for infill and new development in the Neighbourhood District. To outline the nature, form and character
Conceptual Design and Analysis in Autodesk Revit Architecture 2011
AUTODESK REVIT ARCHITECTURE 2011 Conceptual Design and Analysis in Autodesk Revit Architecture 2011 In this white paper, CASE Design, a design technology consultancy based in New York City, describes how
Saint Cloud Business Center
Saint Cloud Business Center 14 7th Avenue North Saint Cloud, MN 56303 For Sale Located on 7th Avenue in the heart of downtown across from the Court House Square. A large professional reception area with
Design Development Quality Management Phase Checklist Project Phase Checklist Series
Best Practices Design Checklist Project Phase Checklist Series Contributed by Micheal J. Lough, AIA, Principal, Integral Consulting The AIA collects and disseminates Best Practices as a service to AIA
City of Colleyville Community Development Department. Site/Landscape Plan Application Packet
City of Colleyville Community Development Department Site/Landscape Plan Application Packet Development Application Fees City of Colleyville 100 Main Street Colleyville TX 76034 817.503.1050 Zoning Zoning
Ontology-Based Semantic Modeling of Safety Management Knowledge
2254 Ontology-Based Semantic Modeling of Safety Management Knowledge Sijie Zhang 1, Frank Boukamp 2 and Jochen Teizer 3 1 Ph.D. Candidate, School of Civil and Environmental Engineering, Georgia Institute
TARRANT COUNTY FAMILY LAW CENTER Fort Worth, Texas
Fort Worth, Texas RELEVANT FEATURES Courthouse design relies on contemporary and traditional influences to create a building appropriate to its urban setting. Courtrooms and lobby areas receive direct,
BIM to Sim. Drury B. Crawley, Ph.D. FASHRAE, BEMP, FIBPSA, AIA Bentley Systems, Inc.
BIM to Sim (How do I get that rich data into my simulations without re-entering?) Drury B. Crawley, Ph.D. FASHRAE, BEMP, FIBPSA, AIA Bentley Systems, Inc. Building Energy Simulation Forum 18 December 2013
Building Performance Evaluation Guide Version 1.7
Building Performance Evaluation Guide Version 1.7 Prepared by Center for Energy and Environment January 2014 Minnesota Sustainable Building 2030: Building Performance Evaluation Guide p 1 1. Schematic
Climate and Energy Responsive Housing in Continental Climates. The Suitability of Passive Houses for Iran's Dry and Cold Climate. Farshad Nasrollahi
Climate and Energy Responsive Housing in Continental Climates The Suitability of Passive Houses for Iran's Dry and Cold Climate Farshad Nasrollahi Table of Contents Abstract German Abstract Introduction
Autodesk Revit LEARNING PATH BUILDING DESIGN SUITE
Autodesk Revit LEARNING PATH FUNDAMENTALS Duration: 3 days Cost: R5 500 (excl VAT) Revit MEP Duration: 3 days Cost: R5 500 (excl VAT) Revit Structure Duration: 3 days Cost: R5 500 (excl VAT) REVIT ADVANCED
Title 24 2013 Compliance Software: CBECC-Com
Title 24 2013 Compliance Software: CBECC-Com California Building Energy Code Compliance for Commercial Buildings Creating Model Geometry using the Detailed Geometry Approach 1 Detailed Geometry Approach:
Subtropical Cities September 2006. Design for Energy Efficiency in Commercial Buildings in Queensland
Subtropical Cities September 2006 Design for Energy Efficiency in Commercial Buildings in Queensland Contents Typical Building Constraints & Requirements Understanding Energy Consumption in Buildings HVAC
This policy is the guiding document for all development within that area of Cable Beach pertaining to the Cable Beach Development Plan.
;, r it CABLE BEACH -ARCHITECTURAL DESIGN GUIDE'LINES This policy is the guiding document for all development within that area of Cable Beach pertaining to the Cable Beach Development Plan Where proposed
Improving comfort and energy efficiency in a nursery school design process S. Ferrari, G. Masera, D. Dell Oro
Improving comfort and energy efficiency in a nursery school design process S. Ferrari, G. Masera, D. Dell Oro Dept. Building Environment Science &Technologies Politecnico di Milano Italy Research funded
Opening the Bonnet. Prof Darren Woolf WYSINWYG 1
Opening the Bonnet Prof Darren Woolf WYSINWYG 1 WYSINWYG What You See Is NOT What You Get: Looking inside the Pandora s Box Prof Darren Woolf WYSINWYG 2 WYSIWYG implies a user interface that allows the
June 7, 2010 Page 1 of 5
Page 1 of 5 Functional Programming [Prepared by Justin Saly, MRAIC; Edited by Alberta Association of Architects] The following information is supplemental to the information provided in section 2.3.4 in
IES <Virtual Environment> training. Trainee notes. ASHRAE 90.1 Appendix G - PRM Navigator. Version 6.4.0.7
IES training Trainee notes ASHRAE 90.1 Appendix G - PRM Navigator Version 6.4.0.7 Introduction These training notes are to be used in conjunction with your ASHRAE 90.1 Appendix G
84 part video tutorial training course. The course is 100% free with no catches or exclusions. You don
Please Note: If you're new to Revit, you may be interested in my " Beginner's Guide to Revit Architecture " 84 part video tutorial training course. The course is 100% free with no catches or exclusions.
THE NATIONAL BUILDING REGULATIONS PART XA: ENERGY EFFICIENCY. Presentation by Peter Henshall-Howard: HEAD: BUILDING DEVELOPMENT MANAGEMENT.
THE NATIONAL BUILDING REGULATIONS PART XA: ENERGY EFFICIENCY. Presentation by Peter Henshall-Howard: HEAD: BUILDING DEVELOPMENT MANAGEMENT. A Diagrammatic representation of the relationship between the
BIM: FOR PROJECT MANAGERS. 2011 CSI Southwest Region Conference Program 1B 8:45am 11:00am
BIM: FOR PROJECT MANAGERS ANA BAKER BRANDON GARRETT 2011 CSI Southwest Region Conference Program 1B 8:45am 11:00am 1 2 3 4 BIM Overview BIM Level of Development Evolution of the Drawing Process BIM Workflow
Automatic Reconstruction of Parametric Building Models from Indoor Point Clouds. CAD/Graphics 2015
Automatic Reconstruction of Parametric Building Models from Indoor Point Clouds Sebastian Ochmann Richard Vock Raoul Wessel Reinhard Klein University of Bonn, Germany CAD/Graphics 2015 Motivation Digital
Building Energy Modelling. prescriptive
Building Energy Modelling prescriptive An alternative to Design for SANS 10400-XA Contents Complying with the new building energy standard - SANS 10400-XA 3 Compliance options Two rational design routes
Decision-making Methodology & Selection Tools for High-performance Window Systems in U.S. Climates Kerry L. Haglund 1
ABSTRACT Decision-making Methodology & Selection Tools for High-performance Window Systems in U.S. Climates Kerry L. Haglund 1 Selecting a glazing system requires an understanding of a series of variables
Eco Pelmet Modelling and Assessment. CFD Based Study. Report Number 610.14351-R1D1. 13 January 2015
EcoPelmet Pty Ltd c/- Geoff Hesford Engineering 45 Market Street FREMANTLE WA 6160 Version: Page 2 PREPARED BY: ABN 29 001 584 612 2 Lincoln Street Lane Cove NSW 2066 Australia (PO Box 176 Lane Cove NSW
Tall Building Form Generation by Parametric Design Process
ctbuh.org/papers Title: Authors: Subject: Keywords: Tall Building Form Generation by Parametric Design Process Mahjoub Elnimeiri, Professor, Illinois Institute of Technology Sang Min Park, PhD Candidate,
Residential Plan Review Emergency Vehicle Access and Water Supply Permit Information Packet
Residential Plan Review Emergency Vehicle Access and Water Supply Permit Information Packet 1. Definitions a. AHJ Authority Having Jurisdiction. The Fire Chief or Fire Marshal of a given Fire District
Case Study 13 Schools of Architecture and Design, Wellington tertiary education institute, New Zealand
Case Study Schools of Architecture and Design, Wellington tertiary education institute, New Zealand Winter Summer daylight intermediate, intermediate, climate temperate, oceanic altitude m heating degree
Schematic Design: Quality Management Phase Checklist Project Phase Checklist Series
Best Practices : Project Phase Series Contributed by Micheal J. Lough, AIA, Principal, Integral Consulting The AIA collects and disseminates Best Practices as a service to AIA members without endorsement
Industrial Suburban District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations
16.20.110 - Industrial Suburban District ( IS ) Figure REFERENCE Typical Buildings in the IS District Figure REFERENCE Site Plan of a typical development in the IS District Sections: 16.20.110.1 Composition
Protocol for the Certification of Energy Simulation Software: Second edition, September 2011
Copyright Agrément South Africa, September 2011 The master copy of this document appears on the website: http://www.agrement.co.za SANS 10400: The application of the National Building Regulations: Protocol
Improving thermal insulation of concrete sandwich panel buildings
Improving thermal insulation of concrete sandwich panel buildings Jørgen Munch-Andersen Danish Building Research Institute, Aalborg University LCUBE conference, Vienna 17-18 April 2007 Outline A general
BIM Test At ASHRAE HQ
This article was published in ASHRAE Journal, April 2011. Copyright 2011 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. Posted at www.ashrae.org. This article may not be
Evaluating the Field Performance of Windows and Curtain Walls of Large Buildings
Best2 Airtightness of Buildings Session WB6-2 Evaluating the Field Performance of Windows and Curtain Walls of Large Buildings Mario D. Gonçalves, Patenaude-Trempe and Robert Jutras, Air-Ins Introduction
2012 Ontario Building Code Requirements for New Construction. Bradford West Gwillimbury Building Division March 5, 2012
2012 Ontario Building Code Requirements for New Construction Bradford West Gwillimbury Building Division March 5, 2012 1 Ontario Building Code changes Applicable to permits applied for after December 31,
Building Energy Codes 101 October 23, 2013. Matthew Giudice Building Policy Associate Midwest Energy Efficiency Alliance
Building Energy Codes 101 October 23, 2013 Matthew Giudice Building Policy Associate Midwest Energy Efficiency Alliance OVERVIEW 1. Introduction 2. Energy Code Development 3. Adoption Process 4. Elements
What can we learn from the commercial sector and building modelling
What can we learn from the commercial sector and building modelling Chris Twinn FRSA HonFRIBA FCIBSE MEI CEng BSc(Hons) Founder & CEO of Buildings that do not cost the Earth 2 This is how energy efficient
IECC Compliance Guide for Homes in Virginia
IECC Compliance Guide for Homes in Virginia Amended Version of 2012 International Energy Conservation Code July 14, 2014 Climate Zone Since the entire state of Virginia falls in the IECC Climate Zone 4,
Diego Ibarra Christoph Reinhart Harvard Graduate School of Design
Building Performance Simulation for Designers - Energy DesignBuilder // EnergyPlus Tutorial #2 Load Schedules GEOMETRY LOADS RESULTS Diego Ibarra Christoph Reinhart Harvard Graduate School of Design OVERVIEW
Certificate of Compliance ENV-1-C and Envelope Component Method ENV-2-C
Certificate of Compliance ENV-1-C and Envelope Component Method ENV-2-C Forms Quality You Can Trust Since 1886... From North America s Largest Roofing Manufacturer CERTIFICATE OF COMPLIANCE (Part 1 of
HOW TO CONDUCT ENERGY SAVINGS ANALYSIS IN A FACILITY VALUE ENGINEERING STUDY
HOW TO CONDUCT ENERGY SAVINGS ANALYSIS IN A FACILITY VALUE ENGINEERING STUDY Benson Kwong, CVS, PE, CEM, LEED AP, CCE envergie consulting, LLC Biography Benson Kwong is an independent consultant providing
Current as of 11/10/08 1 of 1
BEST PRACTICES STANDARDS FOR SCHOOLS UNDER CONSTRUCTION OR BEING PLANNED FOR CONSTRUCTION I. Site Layout A. School buildings shall be provided with a securable perimeter. A securable perimeter means that
2009 Seattle Energy Code Impacts: See below for a recap of Changes in Envelope performance from 2006 to 2009
2009 Seattle Energy Code Impacts: Building Envelope Impacts: Below is a Summary of Changes that impact building envelope construction planned for 624 Yale. There are several modifications are required
Adaptive strategies for office spaces in the UK climate
International Conference Passive and Low Energy Cooling 631 Adaptive strategies for office spaces in the UK climate I. Gallou Environment & Energy Studies Programme, Architectural Association Graduate
Commercial Building Valuation Report
INSURED University of Houston - Victoria Effective Date: Expiration Date: Cost as of: 09/2010 BUILDING 1 217 - University Center 77901 Location Adjustments Climatic Region: High Wind Region: Seismic Zone:
2012 BIM Guidelines and Standards (Rev. 00) University at Albany
A. Building Information Modeling (BIM) Guidelines: The Office of AECM will require the submission of BIM modeling files as part of an electronic file submission to the AECM project manager as requested
Glossop Design & Place Making Strategy
Supplementary Planning Document to the High Peak Local Plan June 2011 Design Brief for the Town Hall Complex GILLESPIES I GERALD EVE Reproduced from the Ordnance Survey map with the permission of Ordnance
The Integrated Design Process
The Integrated Design Process The Integrated Design Process (IDP) has been developed on the basis of experience gained from a small Canadian demonstration program for high-performance buildings, the C2000
Overview of Hotel Fire Safety Requirements
Overview of Hotel Fire Safety Requirements in the Fire Code Susan Clarke, P.Eng. Office of the Fire Marshal - January 10, 2012 1 Agenda Regulation History - Hotels Fire Code Overview (Parts 1 to 8) Defined
HEATING-COOLING WALL PANELS SYSTEM IN SLOVENE ETHNOGRAPHIC MUSEUM
01-147 The 2005 World Sustainable Building Conference, HEATING-COOLING WALL PANELS SYSTEM IN SLOVENE ETHNOGRAPHIC MUSEUM Aleš KRAINER Prof. Dr. 1 Rudi Perdan 2 Gal Krainer 3 1 2 Faculty of Civil Engineering,
Heating Load Calculation
Heating Load Calculation ME 425 Air Conditioning System Design Keith E. Elder, P.E. Heating Load Calculation The heating load calculation begins with the determination of heat loss through a variety of
Residential HVAC Load Sizing Training October 14, 2015. David Kaiser Green Code Plan Reviewer
Residential HVAC Load Sizing Training October 14, 2015 David Kaiser Green Code Plan Reviewer DCRA - Green Building Division Regulations of green codes including: Green Building Act Green Construction Code
REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N
PLAN REVIEW FOR: PROJECT NAME: OWNER: ARCH/DESIGNER: ADDRESS: Ph/Fx: Plans Dated: E-mail: Sealed By: Estimated Project Cost - $ REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N
2009 IECC Update. Scope. Content. International Energy Conservation Code
2009 IECC Update International Energy Conservation Code Scope The code applies to both residential and commercial buildings. In the code, the United States is divided into eight climate zones which are
THERMAL LOSSES Thermal Losses Calculations
Calculations -1- THERMAL LOSSES Thermal Losses Calculations Employer : 4M SA Project Location : ASHRAE Office Room : Example from ASHRAE 2013 Handbook - Fundamentals : Chapter 18, Single Room Example Peak
BPC Green Builders. Green building for new and existing homes. Health Comfort Energy
BPC Green Builders Green building for new and existing homes Health Comfort Energy Mechanical Systems Installed HVAC Systems Primary energy source large, roof mounted, solar thermal array (AET flat plate)
Using BIM In HVAC Design
This article was published in ASHRAE Journal, June 2010. Copyright 2010 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. Posted at www.ashrae.org. This article may not be
Concepts. Products. Service. 30 Crown Place, London EC2
Concepts Products Service 30 Crown Place, London EC2 1 Project Report 30 Crown Place, London EC2. Bold design makes this a striking addition to the London skyline. Occupying an important site close to
BUILDING SAFETY UNIT
POLICY Page 1 of 5 SUBMITTAL REQUIREMENTS FOR ONE AND TWO FAMILY DWELLINGS, ADDITIONS AND RENOVATIONS All submittals shall be site specific and designed to the provisions of the 2012 International Residential
HOURLY ANALYSIS PROGRAM QUICK REFERENCE GUIDE
HOURLY ANALYSIS PROGRAM QUICK REFERENCE GUIDE COPYRIGHT 1998-2015 CARRIER CORPORATION [This page has been left blank intentionally] HAP Quick Reference Guide Software Systems Network Carrier Corporation
city of edmonds development information
#B17 city of edmonds development information Commercial Kitchen Hood & Hood Fire Suppression System Permit Submittal Requirements PERMIT REQUIRED: CODES: FEES: A Commercial Kitchen Hood Mechanical Permit
Exterior Elevated Elements Inspection Guidelines
Exterior Elevated Elements Inspection Guidelines Planning and Development 1. Guideline Purpose These guidelines are intended to assist practicing professionals in complying with Berkeley Municipal Code
Unbeatable energy efficient glass curtain wall system
Unbeatable energy efficient glass curtain wall system CONTENT Introduction 1 System 2 World Class Engineering 4 Unit Selection 5 Energy Efficiency & Comfort 10 Maximised Installation Efficiency 12 Aesthetics
A WORKFLOW ANALYSIS FOR BIM SOFTWARE: ARCHITECTURAL AND MECHANICAL ENGINEERING DEPARTMENT OF ARUP TURKEY
ISTANBUL TECHNICAL UNIVERSITY FACULTY OF ARCHITECTURE DEPARTMENT OF DESIGN COMPUTING BIM 2037 / BUILDING INFORMATION MODELS INSTRUCTOR: Salih OFLUOĞLU A WORKFLOW ANALYSIS FOR BIM SOFTWARE: ARCHITECTURAL
EFA PSBP. Natural Ventilation Strategy. Introduction. 1.1 Relevant legislation. 1.1.1 The Building Regulations 2010
EFA PSBP Natural Ventilation Strategy Introduction The Baseline Designs Project will provide scheme design details for a number of Primary and Secondary School Exemplars. For the purposes of setting a
ENERGY STAR Data Verification Checklist
ENERGY STAR Data Verification Checklist 86 ENERGY STAR Score 1 Sample Property Primary Function: Office Gross Floor Area (ft²): 200,000 Built: 1980 For Year Ending: 04/30/2013 Date Generated: 06/28/2013
Estimated Cost of Repair
1 Applicant: Property: Home: Business: Assessor: Applicant Number: Type of Loss: Hurricane Date Contacted: 1/18/2014 Date of Loss: 10/29/2012 Date Received: 1/14/2014 Date Inspected: 2/4/2014 Date Entered:
Site Development Information Worksheet for single family residential development
Site Development Information Worksheet for single family residential development Project description: Address: Owner Name: Phone No. Date Signature & phone number of Individual who Completed this Worksheet
Piotr Tofiło a,*, Marek Konecki b, Jerzy Gałaj c, Waldemar Jaskółowski d, Norbert Tuśnio e, Marcin Cisek f
Available online at www.sciencedirect.com Procedia Engineering 57 (2013 ) 1156 1165 11th International Conference on Modern Building Materials, Structures and Techniques, MBMST 2013 Expert System for Building
ResearcH JournaL 2009 / VOL 01.01. www.perkinswill.com
ResearcH JournaL 2009 / VOL 01.01 www.perkinswill.com PERKINS+WILL RESEARCH JOURNAL / VOL 01.01 05. CONTEXT BASED DESIGN OF DOUBLE SKIN FACADES Climatic Considerations During the Design Process Ajla Aksamija,
AUTOMATED CONSTRUCTION PLANNING FOR MULTI-STORY BUILDINGS
AUTOMATED CONSTRUCTION PLANNING FOR MULTI-STORY BUILDINGS Tang-Hung Nguyen 1 ABSTRACT This paper outlines a computer-based framework that can assist construction planners and schedulers in automatically
equest Introductory Tutorial equest Introductory Tutorial, version 3.64
equest Introductory Tutorial equest Introductory Tutorial, version 3.64 JAMES J. HIRSCH & ASSOCIATES December 2010 James J. Hirsch & Associates 12185 Presilla Road. Camarillo, CA 93012-9243 Phone 805.553.9000
Challenging the possibilities
Passivhus Norden 2013 Challenging the possibilities Olav Langenkamp, Architect ETH-MAA, Langenkamp.dk Architects, Tigervej 26 8400 Ebeltoft Denmark, [email protected] Martin Wikkelsø Brandt, Cand. Polyt.
HERNANDO COUNTY FIRE ALARM GUIDELINES
HERNANDO COUNTY FIRE ALARM GUIDELINES To be used for all commercial building fire alarm system plan review. The procedures set forth in this document are the minimum requirements necessary to ensure a
Green BIM/ Early BIM/
Green BIM/ Early BIM/ Agenda/ Introduction to Sustainability Process Environmental Analysis Tools Environmental Analysis Relation to LOD Conclusion Disclaimer/ This seminar is looking at Building Performance
Commercial Building Valuation Report
INSURED State Office of Risk Management Effective Date: 300 W 15th Street Expiration Date: Austin, TX 78701 Cost as of: 12/2013 BUILDING 1 Athletics/PCI - 206 3302 N. Ben Wilson Victoria, TX 77901 Location
AiM User Guide Property Module
AiM User Guide 2010 AssetWorks Inc. 1777 NE Loop 410, Suite 1250 San Antonio, Texas 78217 (800) 268-0325 Table of Contents AiM User Guide INTRODUCTION... 4 CHAPTER 1: PROPERTY PROFILE SCREEN... 5 CHAPTER
Using the Autodesk Revit GSA Spatial Template
Autodesk Revit Template for the U.S. General Services Administration Using the Autodesk Revit GSA Spatial Template This document helps you to get started in using the GSA Spatial Template Revit file in
AIR DISTRIBUTION FOR COMFORT AND IAQ
AIR DISTRIBUTION FOR COMFORT AND IAQ Heating Piping and Air Conditioning March 1998 Dan Int-Hout Chief Engineer KRUEGER EXCELLENCE IN AIR DISTRIBUTION Modern environmentally controlled spaces consume significant
The Industry s Most Advanced Sun-Sensing, Adaptive-Tinting Technology For Dynamic Windows
by The Industry s Most Advanced Sun-Sensing, Adaptive-Tinting Technology For Dynamic Windows In Alliance with OCCUPANT COMFORT All of the windows above have the same exterior tint of glass. Why such a
Efficient use of energy simulation in the early design phase
The higher offices are not sufficiently cooled the first level offices are correctly cooled 600 W/m2 at 11h00 SOUTH facade Architectural and climatic control systems choices Efficient use of energy simulation
Innovative capture and modeling of existing building conditions using 3D laser scanning. Entry B Submission
Innovative capture and modeling of existing building conditions using 3D laser scanning Entry B Submission Executive Summary As a large owner organization, understanding and developing new technologies
Assignment 4 CPSC 217 L02 Purpose. Important Note. Data visualization
Assignment 4 CPSC 217 L02 Purpose You will be writing a Python program to read data from a file and visualize this data using an external drawing tool. You will structure your program using modules and
SECTION XI OPINION OF PROBABLE COST
SECTION XI OPINION OF PROBABLE COST OPINION OF PROPABLE COSTS HARBOR ISLAND THE PAVILION 1) Provide a sprinkler system for the entire building. 8000 SF X $15/SF $120,000 2) Remove and replace existing
Federation of European Heating, Ventilation and Air-conditioning Associations
Federation of European Heating, Ventilation and Air-conditioning Associations Address: Rue Washington 40 1050 Brussels Belgium www.rehva.eu [email protected] Tel: +32 2 514 11 71 Fax: +32 2 512 90 62 REHVA
Vestibule Case Study. Vestibule Requirement Intent [2003 IECC, 2006 IECC, 2003 IBC, 2006 IBC, 90.1-2001, 90.1-2004]
Vestibule Case Study [2003 IECC, 2006 IECC, 2003 IBC, 2006 IBC, 90.1-2001, 90.1-2004] Vestibule Requirement Intent Page 1 of 14 The primary intent behind the requirement for a vestibule is to reduce infiltration
Energy-Plus Primary School, Hohen Neuendorf, Germany
Energy-Plus Primary School, Hohen Neuendorf, Germany Ingo LÜTKEMEYER, Prof. Dipl.-Ing. Architekt BDA 1 Jens KRAUSE, Dipl. Ing. 2 Günter LÖHNERT, Dr. Ing. 3 Holger KÖNIG, Dipl.-Ing. 4 Detlef HENNINGS, Dr.
Program Advisory Committee (PAC) Agenda. December 14, 2011 9:00am 3:00pm PST. Agenda Items:
BOULDER NASHVILLE SAN FRANCISCO KANSAS CITY SPRINGFIELD, MO FAIRFAX, VA 2540 Frontier Avenue, Suite 100 Boulder, Colorado 80301 303.444.4149 SUBJECT: Date: Program Advisory Committee (PAC) Agenda December