Indiana Safe Routes to School Assessment

Size: px
Start display at page:

Download "Indiana Safe Routes to School Assessment"

Transcription

1 Iniana Sa Routs to School Assssmnt Prpar by th Iniana Stat Dpartmnt o Halth, Division o Nutrition an Physical Activity 2013 Walk to School Day Harrison Parkway Elmntary School

2 Iniana Sa Routs to School Assssmnt 2/1/2014 Tabl o Contnts INTRODUCTION AND BACKGROUND OF THE INDIANA SAFE ROUTES TO SCHOOL PROGRAM... 3 PURPOSE OF THIS ASSESSMENT... 3 OVERVIEW OF THE INDIANA SRTS PROGRAM... 3 EXECUTIVE SUMMARY OF ASSESSMENT FINDINGS... 4 ANALYSIS OF THE TYPES OF PROJECTS, AMOUNTS OF FUNDING, AND LOCATIONS AWARDED FUNDING WITHIN INDIANA... 5 STATUS OF SRTS PROJECT FUNDING UNDER SAFETEA-LU... 6 LOCATION OF AWARDED FUNDS... 7 SURVEY RESULTS FROM THE AWARDEE SURVEY... 8 UPDATE ON INDIANA SRTS FUNDING ORGANIZATIONAL CHANGES TO THE SRTS PROGRAM AT INDOT ANALYSIS OF THE STUDENT AND PARENT SURVEYS THAT ARE PART OF INDIANA S SRTS FUNDING APPLICATIONS AND ARE HOUSED AT THE NATIONAL CENTER FOR SAFE ROUTES TO SCHOOL TRAVEL TALLY REPORT: STUDENT TRAVEL PATTERNS AT 80 SCHOOLS IN INDIANA BETWEEN 2 DATA COLLECTION PERIODS PLEASE SEE APPENDIX F FOR THE DOCUMENT) PARENT SURVEY REPORT: SURVEY PATTERNS AT 69 SCHOOLS IN INDIANA BETWEEN 2 DATA COLLECTION PERIODS PLEASE SEE APPENDIX G FOR THE DOCUMENT) PARENT SURVEY REPORT: TRAVEL PATTERNS AND PARENTAL PERCEPTIONS AT 222 SCHOOLS IN INDIANA SOME OF THESE WERE NOT FUNDED) PLEASE SEE APPENDIX H FOR THE DOCUMENT) TRAVEL TALLY REPORT: YEAR-BY-YEAR STUDENT TRAVEL MODES IN INDIANA PLEASE SEE APPENDIX I FOR THE DOCUMENT) TRAVEL TALLY REPORT: BASELINE STUDENT TRAVEL PATTERNS AT 200 SCHOOLS IN INDIANA SOME OF THESE WERE NOT FUNDED) PLEASE SEE APPENDIX J FOR THE DOCUMENT) ANALYSIS OF A SURVEY OF EXISTING AND POTENTIAL SRTS STAKEHOLDERS STAKEHOLDER SURVEY SUMMARY OF ASSESSMENT FINDINGS SUMMARY NARRATIVE: POSSIBLE STEPS TO ADDRESS THE ASSESSMENT FINDINGS RESOURCES APPENDICES APPENDIX A: MAP OF FUNDED AWARDS FROM , UPDATED JANUARY APPENDIX B: MAP OF SRTS AWARDS AND STATEWIDE HEALTH DISPARITIES... APPENDIX C: AWARDEE SURVEY SURVEY MONKEY)... APPENDIX D: TRAVEL TALLY FORM... APPENDIX E: PARENT/GUARDIAN SURVEY FORM... 1

3 Iniana Sa Routs to School Assssmnt 2/1/2014 APPENDIX F: TRAVEL TALLY REPORT: STUDENT TRAVEL PATTERNS AT 80 SCHOOLS IN INDIANA BETWEEN 2 DATA COLLECTION PERIODS... APPENDIX G: PARENT/GUARDIAN SURVEY REPORT: SURVEY PATTERNS AT 69 SCHOOLS IN INDIANA BETWEEN 2 DATA COLLECTION PERIODS... APPENDIX H: PARENT/GUARDIAN SURVEY REPORT: TRAVEL PATTERNS AND PARENTAL PERCEPTIONS AT 222 SCHOOLS IN INDIANA SOME OF THESE WERE NOT FUNDED... APPENDIX I: TRAVEL TALLY REPORT: YEAR BY YEAR STUDENT TRAVEL MODES IN INDIANA... APPENDIX J: TRAVEL TALLY REPORT: BASELINE STUDENT TRAVEL PATTERNS AT 200 SCHOOLS IN INDIANA SOME OF THESE WERE NOT FUNDED... APPENDIX K: STAKEHOLDER SURVEY SURVEYMONKEY)... Contact Inormation: Linsy Bouza, Wllnss an Physical Activity Coorinator Division o Nutrition an Physical Activity Iniana Stat Dpartmnt o Halth 2 North Mriian Strt Inianapolis, IN [email protected] Pt Fritz, Halthy Communitis Plannr Division o Nutrition an Physical Activity Iniana Stat Dpartmnt o Halth 2 North Mriian Strt Inianapolis, IN [email protected] 2

4 Iniana Sa Routs to School Assssmnt 2/1/2014 Iniana Sa Routs to School Assssmnt Prpar by th Iniana Stat Dpartmnt o Halth, Division o Nutrition an Physical Activity Introuction an Backroun o th Iniana Sa Routs to School Proram Purpos o this Assssmnt In 2013, th Iniana Stat Dpartmnt o Halth ISDH) ntr into an armnt with th Iniana Dpartmnt o Transportation INDOT) to assss an promot th non-inrastructur lmnt o th Sa Routs to School SRTS) proram in Iniana. As part o th Mmoranum o Armnt MOA) btwn th two ancis, ISDH prpar this assssmnt o th ovrall SRTS proram. Th purpos o th assssmnt was partly to analyz th projct typs, locations, an unin amounts o projcts throuhout Iniana. Th purpos was also to valuat how ctiv th proram has bn or incrasin walkin an bicyclin to school an raisin th proil o activ transportation or school travl in Iniana. Th rsponss rom stunt an parnt survys prviously assmbl as part o th SRTS proram hav bn analyz alon with aitional survy ata athr spciically or this assssmnt. This rport prsnts th rsults o th analysis alon with a summary o th inins o th assssmnt an nral rcommnations to arss ths inins. Ovrviw o th Iniana SRTS Proram Th Iniana SRTS proram has bn bas on th ral proram sin to mak walkin an bicyclin to school sa an routin. Walkin an bicyclin ar viabl transportation altrnativs or travl to an rom school with siniicant potntial bnits, amon thm ructions in motor vhicl traic, ruc ul consumption or school trips, improv air quality, an incras physical activity lvls. Whn SAFETEA-LU, th prvious ral hihway bill, was sin into law in 2005, th vinc was clar that isturbin wiht ains amon Amrican chilrn an a rowin nationwi obsity pimic thratn our halth. Bicyclin an walkin to school hlps stablish a halthy, activ listyl rom an arly a. Gnrally, incras physical activity amon school-a chilrn contributs to thir improv prsonal halth. In aition, towns with stablish SRTS prorams rport a stronr sns o community intity an incras social skills amon schoola chilrn, as stat on th National Cntr or Sa Routs to School s Wbsit. INDOT has bn rsponsibl or aministrin th Iniana SRTS proram that maks ral unin availabl or liibl activitis an improvmnts. INDOT crat an application procss, rom 2006 to 2012, to valuat projct unin applications. A SRTS Avisory Committ has rviw applications an ma rcommnations to un inrastructur projcts an non-inrastructur activitis. Unr th nw transportation lislation that wnt into ct in Octobr 2012, call MAP-21, SRTS is now part o th Transportation Altrnativs Proram an no lonr has its own icat unin. Unr MAP-21, th SRTS proram is rstructur ollowin numrous chans oun in th currnt transportation lislation. How th nw lislation acts Iniana's proram is still bin trmin. 3

5 Iniana Sa Routs to School Assssmnt 2/1/2014 Excutiv Summary o Assssmnt Finins Projct typs liibl or unin ar sparat into th two broa catoris o inrastructur projcts an noninrastructur projcts. Inrastructur projcts ocus mostly on construction activitis, whil non-inrastructur projcts typically involv plannin, ucation, an ncouramnt activitis. Inrastructur projcts outnumbr noninrastructur projcts in Iniana by a actor o almost inrastructur to 48 non-inrastructur). This assssmnt has oun that schools n assistanc in ralizin th importanc o non-inrastructur projcts, both as it rlats to plannin or inrastructur work an to th prorammin activitis, such as ncouramnt, ucation, an norcmnt. Ths lmnts n to o han in han with inrastructur projcts. Th unin th SRTS applicants hav rciv is wll istribut throuhout Iniana. With input rom partnrs, th ISDH vlop an awar survy to assss th status o SRTS unin in Iniana rom th prspctiv o th awar school prsonnl, city lars, tc.). Th ISDH rciv 40 rsponss out o 128 awars) to th survy. Th oal o th survy was to assss th proram as a whol prior to th chans in th ral hihway bill unr th nwly aopt MAP-21 lislation. Conclusions inclu barrirs an succsss. Without ral unin which coul b th utur o th SRTS proram), many lt that thy coul still implmnt ncouramnt activitis to promot awarnss, buil support, rly on communication btwn th school an th community, an ucat parnts an stunts. Othr, mor spciic inins ar inclu on pa 8. On o th many utis o th National Cntr or Sa Routs to School is to collct ata rom schools throuhout th nation on numbrs o chilrn walkin an bicyclin to school, as wll as parnt/uarian attitus an bhaviors. As part o th application procss or th SRTS proram in Iniana unr SAFETEA-LU, Iniana schools complt both stunt transportation mo tallis an parnt/uarian survys an submitt thm to th National Cntr. This assssmnt rport inclus analysis o ths survys an tallis. Many schools also complt post-awar tallis an survys, but not all hav on so at this tim. Som o th inins rom all o ths rports can b oun startin on pa 12. Th ISDH also vlop a survy, with input rom a w partnrs, to ask qustions o SRTS stakholrs in Iniana. Stakholrs inclu community partnrs intrst in SRTS, avocats, intrst parnts/uarians, school lars, tc. Th ISDH rciv 64 rsponss to th survy. Th oal o th survy was to assss th satisaction o th IN SRTS Partnrship o Halth by Dsin th SRTS Partnrship) an ovrall namnt in walkin an bicyclin to school in Iniana. Halth by Dsin is a coalition workin to brin tothr avocats o community sin, transportation, an halth to support halthy an activ livin. Eorts o th coalition inclu stablishin a committ that ocuss on walkin an bicyclin to school. That committ is now th SRTS Partnrship From , SRTS was a rally un proram aministr by INDOT. Iniana ha a rlativly hih amount o ovrall unin availabl compar to othr stats. As o Jun 2013, Iniana ha obliat a littl ovr hal o th total awar amount. Th ral SRTS proram in th SAFTEA-LU lislation th prvious ral hihway bill) rquir that uns b ma availabl or both inrastructur projcts an non-inrastructur activitis, spciyin non-inrastructur btwn 10% an 30%. Iniana mt that rquirmnt with 13.5%. Th unin SRTS applicants hav rciv is wll istribut throuhout Iniana. Crtainly smallr rural an suburban communitis hav bnitt rom th SRTS unin in Iniana. It appars that schools in mor ns, urban aras outsi o Marion County hav not bn un as otn bas upon th unin istribution pattrn illustrat in th SRTS Proram Awars Map in Appnix A. It also appars that many school istricts monstratin low socioconomic status in Iniana hav not takn avanta o th SRTS unin. At th tim o this rport, almost thr ourths o th istricts xhibitin low socioconomic status i not contain a SRTS projct as illustrat in Appnix B. 4

6 Iniana Sa Routs to School Assssmnt 2/1/2014 Analysis o th Typs o Projcts, Amounts o Funin, an Locations Awar Funin within Iniana Eliibl Projct Typs Sinc 2006, th Iniana SRTS proram has un projcts or proram activitis non-inrastructur) an construction activitis inrastructur). Th SRTS proram ncouras applicants to utiliz th non-inrastructur unin or plannin activitis that hlp to trmin th n an xtnt o utur inrastructur projcts. Many rcipints wr awar unin or both non-inrastructur an inrastructur projcts. Th ral SRTS proram in th SAFETEA-LU lislation ha st a tart o at last 10% an no mor than 30% o th uns to b utiliz or non-inrastructur projcts. Th nw ral hihway lislation, MAP-21, no lonr manats amounts to b spnt or ithr inrastructur or non-inrastructur SRTS projcts. Unr this nw lislation, SRTS is no lonr a stan-alon proram but is an liibl projct activity unr th Transportation Altrnativs Proram TAP). Eliibl SRTS activitis unr SAFETEA-LU ar still liibl unr MAP-21, althouh th proram now rquirs a manatory 20% local match o th total unin amount. Inrastructur projcts typically involv construction or installation an may inclu riht-o-way acquisition. Th ollowin projct typs ar typically un: Construction or installation or rplacmnt o siwalks Construction or installation o crosswalks Pstrian countown sinal installation Curb ramp installation Construction or stripin o on-strt bicycl lans Construction o o-strt shar-us paths, incluin roa crossins Purchas an installation o scur bicycl parkin acilitis an racks Installation o traic calmin an sp ruction improvmnts nar schools Installation o traic ivrtrs nar schools to rirct motor vhicl traic Purchas an installation o school zon an Sa Routs sina to alrt motorists to schools an to ui bicycl an pstrian traic Application or installation o pavmnt markins to improv rconition o walkin an bicyclin acilitis irctly srvin schools Purchas an prmannt installation o school zon lashin bacons, Rapi Rctanular Flashin Bacons, or spcial crosswalk lashin bacons to hlp control vhicl traic an nhanc pstrian an bicycl traic n rout to schools Prmannt sp back sin purchas an installation Eliibl non-inrastructur projcts inclu proram activitis or improvin an incrasin bicycl an pstrian travl to an rom schools. Encouramnt, ucation, an norcmnt or bicycl an pstrian plannin or spciic schools ar consir non-inrastructur activitis an may inclu th ollowin projct typs: Walkin an bikin to school ncouramnt activitis.., "bicycl trains," "walkin school buss," mila clubs, walk or bik to school vnts, bikin or walkin contsts, sination o rmot rop-o sits or stunts livin mor than two mils rom school) Prparation o a comprhnsiv SRTS plan or a school travl plan sinl school, multipl schools, school istrict, community-wi or urban ara) Pstrian skills trainin sssions or bicycl saty skills trainin or roos Prparation an istribution o walkin or bikin saty litratur Purchas o crossin uar clothin an quipmnt 5

7 Iniana Sa Routs to School Assssmnt 2/1/2014 Walkin an bikin incntiv purchass.., rlctiv backpack or zippr tas; hih visibility wristbans, sholacs, sho stickrs, or pant cu bans; SRTS bookmarks, pncils, or pns; bicycl lihts, hlmts, blls, or locks; watr bottls; SRTS T-shirts; halthy snacks) Various norcmnt actions to nhanc walkin an bikin Prossional saty valuations o xistin or propos sinat walkin or bikin routs to trmin suitabl improvmnts to incras sa walkin an bicyclin to school Purchas an ploymnt o mobil SRTS quipmnt, limit by contract or us only at spciic schools or arrival an partur tims or at SRTS vnts.., mobil sp trailrs or lashin bacons, portabl bik racks, movabl barrirs or controllin vhicular movmnts, portabl pstrian crossin Stop or Yil sins, portabl bik-pstrian countrs) Projct Typs Fun in Iniana Iniana awar $21,672,203 rom th 2006 throuh th 2012 cycl an, o this, $2,925,833 was awar or noninrastructur activitis. Th non-inrastructur unin awar qual 13.5% o th total unin availabl. Th rquirmnt was that at last 10% an no mor than 30% o th uns wr to b obliat or non-inrastructur; thror, Iniana mt th rquirmnt. A numbr o un projcts inclu both inrastructur an noninrastructur lmnts within th sam awar projct amount. Whn ths aitional non-inrastructur lmnts ar a to th non-inrastructur activity awars, th total amount o unin or non-inrastructur activitis total clos to 15% o th unin availabl. In Iniana, rom 2006 to 2012, 48 non-inrastructur projcts wr awar an 80 inrastructur projcts wr awar. It is not unusual or inrastructur projcts to wily outnumbr non-inrastructur projcts or th SRTS proram, as som communitis choos not to apply or a non-inrastructur projct prior to an inrastructur projct. Som communitis also ar awar on non-inrastructur projct an thn ollow up with multipl constructionrlat projct awars. A total o 128 communitis/schools wr awar unin or projcts in Iniana out o a total o 318 unin applications. Status o SRTS Projct Funin unr SAFETEA-LU Th procss o awarin unin unr th SRTS proram ollows a spcii path rom th awar notic to projct implmntation an projct clos out. Atr th initial awar o th uns, th applicant prpars ncssary ocumntation accorin to th ruls o th Fral Hihway Aministration FHWA) an INDOT to rciv th unin. Atr rviw, th applicant which is ithr a school, a school istrict, or a community in partnrship with a school or roup o schools) rcivs approval rom INDOT to bin accruin costs an submits rqusts or rimbursmnt o liibl activitis. Th awar projct unin is sinat as obliat by INDOT at th point that th applicant is authoriz to accru costs or th projct. Followin th announcmnt o awars, thr is typically a prio bor uns ar obliat an approv or rimbursmnt. Durin this tim, coorination bins an various rviws an approvals occur bor th authorization to proc is ivn. This is common to most local projcts that us ral transportation uns, althouh schools an school corporations ar not typically amiliar with ths procurs. Th Iniana SRTS proram currntly has obliat a littl ovr 50% as o Jun 2013) o all its awar uns sinc th proram ban in Nationally, th SRTS obliation rat is 62%. Thirty-six stats hav obliat a hihr prcnta than Iniana; som ar in th 90% ran. Th 50% obliation rat constantly improvs ach month. Th obliation rat is hihr or thos initial yars o th proram, as th awars hav ha nouh tim to brin thir projct throuh th approval procss an to compltion. A brakown o th awar an currnt obliation amounts or ach yar o th Iniana SRTS proram ollows in Tabl 1. 6

8 Iniana Sa Routs to School Assssmnt 2/1/2014 Tabl 1 Jun 2013 ata) Yar Amount Awar Amount Obliat Prcnta Obliat 2006 $1,721,532 $1,571, % 2007 $2,139,050 $1,707, % 2008 $2,615,126 $1,518, % 2009 $3,149,480 $1,983, % 2010 $3,368,991 $2,059, % 2011 $5,272,251 $1,672, % 2012 $3,405,771 $357, % TOTAL $21,672,201 $10,870, % Th total amount o SRTS unin awar sinc th proram ban in Iniana compars avorably with othr stats in th US. Iniana has 93% prcnt o uns announc bas on uns availabl. That prcnta maks it 10 th amon all stats in rars to prcnta o unin awar. Thr ar som uns rmainin rom th SRTS proram authoriz unr SAFETEA-LU. Ths uns ar nrally rom cancll projcts an projcts that hav com in unr but an ar bin us to covr unanticipat costs on othr SRTS projcts awar unr SAFETEA-LU. It is unknown how much unin is lt rom SAFETEA-LU. Plas s Appnix A or Map o awars rom Location o Awar Funs Th unin SRTS applicants hav rciv is wll istribut throuhout Iniana. Th map o awar communitis an schools in Appnix A illustrats th istribution o unin in Iniana. Crtainly, smallr rural an suburban communitis hav bnitt rom th SRTS unin in Iniana. It appars that schools in mor ns, urban aras outsi o Marion County hav not bn un as otn bas upon th unin istribution pattrn illustrat in this map. Th locations o un projcts point to anothr trn whn compar with thos school corporations xhibitin halth isparitis in Iniana s Appnix B). A school corporation is sn by public halth prossionals as monstratin low socioconomic status a major contributor to halth isparity) whn ovr 50% o th stunts ar liibl to rciv r or ruc lunch subsiis rom th ral ovrnmnt. Clos to 27% 27 out o 101) o th school corporations that mt this masurmnt o povrty hav at last 1 SRTS projct within thir bounary. Typically, thos aras monstratin low socioconomic status in Iniana ar also thos that hav th ratst n or incras opportunitis or physical activity or chilrn Lvin, 2011) 1. Thr ar lar oraphic aras in wstcntral Iniana, southast Iniana, an north-cntral Iniana with school istricts xhibitin povrty that hav not ha a SRTS projct un in thir istricts. This coul b u to a varity o rasons: lack o knowl about th proram, prciv lack o support or capacity, lack o havin a halth quity lns, tc. Rarlss o th rason, Iniana coul o a bttr job o rachin out to thos aras with lowr-incom populations. Plas s Appnix B or th Map o Fun Awars an School Districts Exhibitin Povrty 7 1 Lvin, Jams A. 2011). Povrty an Obsity in th U.S. Diabts 6011),

9 Iniana Sa Routs to School Assssmnt 2/1/2014 Survy Rsults rom th Awar Survy With input rom partnrs, th ISDH vlop a survy to assss th status o SRTS unin in Iniana rom th prspctiv o th awar school prsonnl, city lars, tc.). Survys wr snt to th mail arsss list on th application orms rom Each application inclu mor than on somtims thr or our) contacts. Out o 243 mail arsss, 39 wr unlivrabl, ivin us a total o 204 possibl rsponss. W rciv 40 rsponss to th survy. This is a limitation to th rspons prcnta u to city an school sta chanin rols an losin contact inormation. Also, mor rsponss wr rom awars in th latr yars o unin, showin that contact inormation has not bn maintain wll or thos awars in th binnin yars o th proram. Th survy ask various qustions about th plannin procss, popl involv, catory an yar o awar unin, any barrirs or succsss urin th procss, othr unin us, lnth o tim to rciv unin, outcoms as a rsult o havin rciv unin, an any trainin ns movin orwar. Th oal o th survy was to assss th proram as a whol prior to th chan in th ral hihway bill unr SAFETEA-LU. Conclusions o not inclu: In what rion o Iniana o you consir yoursl? This qustion prsnt a oraphic istribution o th awars. O thos who rspon, th istribution was spra quit wll, althouh covra was prtty liht on th southast an ast cntral parts o Iniana. Which bst scribs your rol in your community s SRTS projct? 37% rspon with city/county community srvics sta, ollow by 32% as a school coorinator, an 26% as city/county ninr or public works. A w othrs rspon with othr, stat/local law norcmnt, an projct valuator. Is/Was your projct inrastructur/non-inrastructur, or both? 40% o rsponrs ha rciv unin or inrastructur projcts, 32% or both, 21% or non-inrastructur, an 11% or mostly inrastructur with a small amount or non-inrastructur. This conirms our knowl that th ovrwhlmin majority apply or inrastructur. Part o th rason or this assssmnt is to brin mor attntion an promotion to non-inrastructur projcts. This is vn mor important now that MAP-21 has com into plac, u to th 20% match puttin a potntial burn on school an communitis. I on thin coul b chan in th application procss, what woul it b? A stp-by-stp scription o th procss, w ha a wait tim atrwars Paprwork is too xtnsiv an th rquir mtin was not rlvant to SRTS Bttr xplanation o how INDOT uns/procss works N ar lss MPO Mtropolitan Plannin Oranization) involvmnt A hihr wiht shoul b ivn to thos who o a plan an thn not only ollow th plan but who also supplmnt th plan by usin local uns to o non-srts projcts that connct to an/or othrwis support th SRTS plan implmntation What wr your barrirs, i any, atr bin un or SRTS? 45% sai not nouh mony to complt th work or actual costs xcin stimat costs. 26% sai thy i not hav any barrirs, 24% sai thy ha insuicint inormation on how to proc or who to communicat with at INDOT, an 24% also sai thr was a lack o oranization urin th procss or that thy ha a lack o unrstanin o th procss. What wr your succsss atr bin un or SRTS? 66% stat that thy wr abl to t bttr inrastructur or walkin or bicyclin, 63% stat incras community or school support or walkin an bicyclin, 34% stat succssul walk or bik to school activitis, an 32% stat incras amounts o walkin or bicyclin to school. 8

10 Iniana Sa Routs to School Assssmnt 2/1/2014 What i you in you coul accomplish without ral unin or SRTS? This qustion is ssntially askin how thy woul b abl to work on walkin an bicyclin without havin ral rant mony by just usin limit local uns or unin rom lswhr. This will b spcially important to know movin orwar, as Iniana s unin or SRTS is qustionabl an will rquir a 20% match. Simpl ias to promot itnss an walkin or bicyclin to school Bikin saty an crosswalk uar proram Goo communication btwn city an schools That w can o our own siwalks astr an with lss xpns Mor ovrall awarnss o wllnss in th community Gttin important inormation out to kis about th saty concrns surrounin th ivrs communitis in our istrict Compltin survys an builin support or improvin school zon saty an walkin to school Encourain schools to promot connctivity to surrounin nihborhoos to incras sa walkin an bikin to school W coul not hav ottn it on W oun w coul rais public awarnss o th proram an th n or pstrian inrastructur, an w also oun voluntrs to hlp us aministr bik saty ay Chans that hav happn as a rsult o th projct: Only 18% hav ha a school or local policy chan, such as siwalk spciications 32% hav not notic a chan in transportation split, 11% hav, an 58% o not know Only 8% hav conuct stunt counts in aition to th rquir counts or th application) Only 37% hav continu to conuct oraniz walkin an bicyclin vnts atr SRTS-un activitis) Only 5% hav notic incras lvls o saty, 34% hav not, an 61% o not know 44% hav not notic any cras in traic constion, an 56% o not know many o thm anticipat that thy will) Do you hav any trainin ns movin orwar? A sssion an hlp or inrastructur rants will b hlpul Rcruitin parnt an school voluntrs an participation No. Havin xprinc with th ral procss bor oin throuh th Sa Routs Proram is a must Sinc this proram has apparntly bn ol into a larr roup o prorams at last in Iniana), w n som aitional ucation on how that acts SRTS rant applications Is thr anythin you lik to know mor about SRTS? I possibl, w woul lik mor notic o at o applications sinc w hav to o throuh rional plannin Plas t start It woul b nic i thr was a raily availabl ocumnt which provis xampls o bnicial thins othr communitis hav on as part o thir SRTS projcts. W ar also concrn that th SRTS proram uns may bcom lss availabl sinc, in th stat o Iniana, it has bn ol into a larr projct roup which inclus trail an othr transportation prorams Not at this tim 9

11 Iniana Sa Routs to School Assssmnt 2/1/2014 Othr nral conclusions rom th survy rsponss inclu: Most communitis ban th application procss at last six months aha o th application u at All ha a varity o popl involv in thir applications, althouh not many ha th businss community or public halth involv 40% o awars hav bn un mor than onc A littl ovr 50% o rsponnts stat that this application was not any harr or asir than othr rant applications 82% i not rciv any othr local, privat, ral, or stat unin Evn thouh som communitis start on thir projct immiatly atr bin awar, most i not start until at last six months latr 79% o rsponnts hav not yt complt thir projcts, which crtainly act som o th answrs Plas s Appnix C: Awar Survy Upat on Iniana SRTS Funin Th SRTS proram has bn rstructur ollowin numrous chans brouht on by th currnt transportation lislation, MAP-21. Th SRTS proram is now combin with th ormr Transportation Enhancmnt TE) Proram to orm th nw TAP. INDOT issu a call or applications binnin Novmbr 1, 2013, that inclus proposals in a numbr o local projct catoris, incluin SRTS. Thr chans unr th nw TAP ar most notworthy: All TAP projcts an activitis now rquir a 20% local match incluin all SRTS projcts). Funs must now b us within a limit tim ram. Comptition or limit uns now inclus most o th ormr Transportation Enhancmnt projct typs. Th ollowin ar liibl activitis unr TAP: 1. Facilitis or pstrians, bicyclists, an othr non-motoriz orms o transportation, incluin siwalks, bicycl lans, trails an shar-us paths, pstrian an bicycl sinals, traic calmin tratmnts, lihtin, an improvmnts to mt ADA rquirmnts. 2. Construction, plannin, an sin o inrastructur-rlat projcts an systms to provi sa routs or non-rivrs, incluin chilrn, olr aults, an iniviuals with isabilitis. 3. Convrsion an us o abanon railroa corriors or trails or pstrians, bicyclists, or othr non-motoriz transportation usrs. 4. Construction o turnouts, ovrlooks, an viwin aras. 5. Invntory, control, or rmoval o outoor avrtisin. 6. Historic prsrvation an rhabilitation o historic transportation acilitis. 7. Vtation manamnt practics within transportation rihts-o-way to improv roaway saty, prvnt or control invasiv spcis, an provi rosion control. 10

12 Iniana Sa Routs to School Assssmnt 2/1/ Archaoloical activitis rlatin to impacts rom implmntation o transportation projcts liibl unr this titl. 9. Any nvironmntal mitiation activity, incluin pollution prvntion an abatmnt, mitiation or storm watr manamnt or control, an watr pollution abatmnt rlat to hihway construction or hihway runo. Also inclus masurs to ruc vhicl-caus willi mortality or to rstor an maintain habitat connctivity. 10. Any inrastructur projcts an non-inrastructur activitis liibl unr th Sa Routs to School Proram crat unr SAFETEA-LU. 11. Th plannin, sinin, or construction o boulvars an othr roaways within th riht-o-way o ormr Intrstat Systm routs or othr ivi hihways. Projcts in urban aras ovr 50,000 in population will rquir norsmnt an prorammin by th rsponsibl Mtropolitan Plannin Oranization MPO). It is important to not that schools an communitis in thos aras may rciv unin or TAP throuh thir local MPO i an whn thy choos. Th authorization ircts th MPOs to st up a comptitiv slction procss to un liibl projcts. Communitis unr 50,000 in population will hav a sparat statwi call or projcts throuh INDOT. Small communitis can compt or a pot o ral uns st asi within TAP or communitis with populations o 5,000 an unr. Ths uns can b us or any o th projcts list as liibl unr TAP. Th ull ran o SRTS activitis that wr liibl unr SAFETEA-LU inrastructur an non-inrastructur) will rmain liibl unr th nw TAP. SRTS activitis an projcts must b proramm in th statwi transportation improvmnt proram to rciv ral uns. Oranizational Chans to th SRTS Proram at INDOT Du to th chans unr MAP-21, INDOT no lonr has an oicial Sa Routs to School Coorinator. Thr is no lonr any icat unin spciically or SRTS at this tim, xcpt or th uns icat to th activitis an projcts slct unr th SRTS proram btwn 2006 an Funin or projcts that woul b consir SRTS projcts woul now com rom TAP, an that proram is currntly aministr by th Local Prorams sction at INDOT. Unr SAFETEA-LU, th Iniana SRTS Avisory Committ was crat to rviw an mak rcommnations or applications to b un or SRTS projcts. That avisory committ still xists but its rol has not yt bn trmin. All TAP projcts may b rviw by a sinl committ. 11

13 Iniana Sa Routs to School Assssmnt 2/1/2014 Analysis o th Stunt an Parnt Survys that Ar Part o Iniana s SRTS Funin Applications an Ar Hous at th National Cntr or Sa Routs to School On o th many utis o th National Cntr or Sa Routs to School is to collct ata rom schools throuhout th nation on numbrs o chilrn walkin an bicyclin to school, as wll as parnt/uarian attitus an bhaviors. As part o th application procss or SRTS in Iniana unr SAFETEA-LU, Iniana schools complt both stunt transportation mo tallis an parnt/uarian survys an submitt thm to th National Cntr. Many schools 80) also complt post-awar tallis an survys, but not all hav on so at this tim. Som o th nral inins rom all o ths rports inclu: Walkin tn to incras in th atrnoon. This coul b u to a varity o rasons on o thm bin that parnts/uarians miht not b abl to pick up thir chilrn atr school bcaus o job rsponsibilitis. Schools that rciv awars wr statistically mor likly to ncoura bikin/walkin to/rom school parnt/uarian survy rport or 69 schools). Distanc was a main rason why amilis i not allow thir chilrn to walk/bik to/rom school. A lar majority o parnts/uarians sai thir chilrn s schools nithr ncoura nor iscoura walkin/bikin to/rom school. This coul b u to politics o a school/school istrict/school boar or can point to a larr issu o lack o awarnss o SRTS work. Major barrirs or allowin chilrn to walk an bicycl to school cras atr th schools rciv unin or Sa Routs to School. Ths barrirs inclu istanc, traic, sp o traic, saty o intrsctions, an wathr. Travl Tally Rport: Stunt travl pattrns at 80 schools in Iniana btwn 2 ata collction prios Plas s Appnix F or th ocumnt) This rport is on that compars stunt travl pattrns in th 80 schools that complt th tallis both prior to rcivin unin an atr rcivin unin. As mntion arlir, not all schools hav complt pr- an postassssmnts. Important to not is that th tim btwn pr- an post- was not th sam or ach school, as som schools complt it two yars atr th irst tim, som thr yars atr, tc. In th inins, Tim 1 prtains to th tallis prior to th unin, an Tim 2 prtains to th tallis atr th unin. Som o th siniicant inins rom this rport inclu: School Mornin Arrival Travl Mo Thr was a small, yt statistically siniicant, cras in th prcnta o stunts who arriv at school by bik btwn Tim 1 an Tim 2 s Pa 2 o Appnix F) Siniicantly mor stunts arriv at school by amily vhicl or carpool btwn Tim 1 an Tim 2 s Pa 2 o Appnix F) Siniicantly wr stunts arriv at school by school bus or transit btwn Tim 1 an Tim 2 s Pa 2 o Appnix F) School Atrnoon Dpartur Travl Mo Thr was no statistically siniicant irnc in th prcnta o stunts who lt school walkin or bikin btwn Tim 1 an Tim 2 s Pa 3 o Appnix F) 12

14 Iniana Sa Routs to School Assssmnt 2/1/2014 Siniicantly mor stunts lt school by car btwn Tim 1 an Tim 2 s Pa 3 o Appnix F) Siniicantly wr stunts lt school by school bus an transit btwn Tim 1 an Tim 2 s Pa 3 o Appnix F) Chart 1 blow hihlihts th Mornin Arrival Travl Mo Comparison btwn th tallis on bor th uns wr awar an th tallis atr th uns wr awar. Chart 1: School Mornin Arrival Travl Mo Comparison # o trips Walk Bik School Family Carpool Transit Bus Vhicl Tim 1 74,605 8% 2% 49% 36% 4% 0.5% Tim 2 88,322 8% 2% 44% 41% 4% 0.5% Walk Thr was no statistically siniicant irnc in th prcnta o stunts who arriv at school by walkin btwn Tim 1 an Tim 2. Evn thouh th prcnta i not chan, th numbr o walkrs incras sizably. At Tim 1, 5,968 chilrn walk to school; an at Tim 2, 7,065 chilrn walk to school. That is an incras in 1,097 chilrn walkin to school in th mornin. Bik Thr was a small, yt statistically siniicant, cras in th prcnta o stunts who arriv at school by bik btwn Tim 1 an Tim 2. Du to rounin to 2%, it appars thr was no irnc; howvr, thr was a small irnc. Accorin to th prcntas, 1,492 bik urin Tim 1, an 1,766 bik urin Tim 2. That is an incras o 274 chilrn bikin or mornin arrival. Th rason thr was a small cras in th prcnta but an actual incras in numbrs is bcaus th total numbr o trips was siniicantly larr at Tim 2. To urthr clariy, 7.8% o 88,322 is a larr numbr than 8.2% o 74,605, vn thouh th prcnta is smallr. Family Vhicl/Carpool Siniicantly mor stunts arriv at school by amily vhicl or carpool btwn Tim 1 an Tim 2. School Bus/Transit Siniicantly wr stunts arriv at school by school bus or transit btwn Tim 1 an Tim 2. Chart 2 blow hihlihts th Atrnoon Dpartur Travl Mo Comparison btwn th tallis on bor th uns wr awar an th tallis atr th uns wr awar. Chart 2: School Atrnoon Dpartur Travl Mo Comparison # o trips Walk Bik School Family Carpool Transit Bus Vhicl Tim 1 72,267 11% 2% 52% 29% 4% 0.6% Tim 2 85,881 12% 2% 48% 34% 4% 0.4% Walk Thr was no statistically siniicant irnc in th prcnta o stunts who lt school by walkin btwn Tim 1 an Tim 2. Evn thouh th prcnta i not chan much, th numbr o walkrs incras sizably. At Tim 1, 13

15 Iniana Sa Routs to School Assssmnt 2/1/2014 7,949 chilrn walk hom rom school; an at Tim 2, 10,306 chilrn walk hom rom school. That is an incras in 2,357 chilrn walkin hom rom school in th atrnoon. Bik Thr was no statistically siniicant irnc in th prcnta o stunts who lt school by bik btwn Tim 1 an Tim 2. Du to rounin to 2%, it appars thr was no irnc; howvr, thr was a small irnc. Accorin to th prcntas, 1,445 bik urin Tim 1, an 1,718 bik urin Tim 2. That is an incras o 273 chilrn bikin hom in th atrnoon. Family Vhicl/Carpool Siniicantly mor stunts lt school by car btwn Tim 1 an Tim 2. School Bus/Transit Siniicantly wr stunts lt school by school bus or transit btwn Tim 1 an Tim 2. Mthos us in this rport - Plas s Appnix F to ra about th mthos us in this rport. Limitations o this rport Thr ar svral points to consir whn intrprtin chans, or lack o chan, in walkin/bikin. I a rport shows no chan, or vn a cras in walkin/bikin, this is not ncssarily ba nws. Whn travl tally ata ar collct at irnt points in tim, thr ar svral actors that ar not part o SRTS prorams that coul iv th apparanc o no chan or a clin that is not ral, but rathr u to whn ata wr collct. For xampl: 1) Schools may hav collct travl tally ata urin a spcial vnt lik Walk to School Day at on tim prio but not urin th othr tim prio; 2) Schools may hav collct tally ata urin avrs wathr at on tim prio but not urin th othr tim prio; an 3) Evnts that occurr in communitis may hav inlunc popl s prcptions about walkin/bikin at on tim but not urin anothr tim. Similarly, i th rport shows an incras in walkin an/or bikin, it is important to consir whthr on or mor o th points mntion abov may hav prouc an apparanc o succss that is not irctly u to your SRTS proram. Parnt Survy Rport: Survy pattrns at 69 schools in Iniana btwn 2 ata collction prios Plas s Appnix G or th ocumnt) This rport is on that compars parnt/uarian survys in th 69 schools that complt th survys both prior to rcivin unin an atr rcivin unin. As mntion arlir, not all schools hav complt pr- an postassssmnts. Important to not is that th tim btwn pr- an post- was not th sam or ach school, as som schools complt it two yars atr th irst tim, som thr yars atr, tc. In th inins, Tim 1 prtains to th tallis prior to th unin, an Tim 2 prtains to th tallis atr th unin. This survy inclu askin parnts/uarians: thir stimat o istanc rom chil s hom to school th typical mo o arrival at school typical mo o partur rom school whthr or not chilrn hav ask or prmission to walk or bik to an rom school 14

16 Iniana Sa Routs to School Assssmnt 2/1/2014 issus rport to act th cision o whthr or not to allow a chil to walk or bik to school opinions about how much thir chil s school ncouras or iscouras walkin or bikin to school opinions on how much un it is or thir chil to walk or bik to school opinions about how halthy walkin or bikin to an rom school is or thir chil Som o th siniicant inins rom this rport inclu: Thr was no statistically siniicant irnc in how stunts arriv at school btwn Tim 1 an Tim 2 s Pa 3 o Appnix G) Thr was no statistically siniicant irnc in how stunts part rom school btwn Tim 1 an Tim 2 s Pa 4 o Appnix G) Thr was no statistically siniicant irnc in th prcnta o stunts who ask or prmission to walk or bik to/rom school btwn Tim 1 an Tim 2 s Pa 5 o Appnix G); howvr, th rsults show that thos who liv closr to school ask mor otn or prmission to walk or bik. Thr was a statistically siniicant incras in th prcnta o parnts/uarians who stat that thir school ncouras walkin an bikin to/rom school btwn Tim 1 an Tim 2 s Pa 7) o On possibl conclusion to raw rom this point is that a school is positivly usin mony to promot/ncoura walkin/bikin to/rom school btwn applyin or nw mony. As or th issus rport to allow or not allow a chil to walk to school, vn thouh statistical tsts ar not appropriat in this cas u to such lar numbr o issus rport), on can s by th bar raph that many o th barrirs or issus cras rom Tim 1 to Tim 2. Thos barrirs that cras by 10% inclu istanc, amount o traic, sp o traic, saty at intrsctions, an wathr. Violnc/Crim an siwalks an pathways both also ha a cras in th prcnta o thos who cit barrirs. S Chart 1 blow. Chart 1 Issus rport to act th cision to NOT allow a chil to walk or bik to/rom school Mthos us in this rport - Plas s Appnix G to ra about th mthos us in this rport. 15

17 Iniana Sa Routs to School Assssmnt 2/1/2014 Parnt Survy Rport: Travl pattrns an parntal prcptions at 222 Schools in Iniana som o ths wr not un) Plas s Appnix H or th ocumnt) This parnt/uarian survy rport was complt by 222 schools whn applyin or SRTS unin throuh SAFETEA-LU. Som o ths schools wr not un. For this rport, all o th inins ar bas on obsrvation o th ata, as oppos to statistical siniicanc. Whn comparin mornin an atrnoon travl bas upon parnt/uarian rsponss, thr was a 2% incras in walkin rom th mornin to th atrnoon 6% to 8%, rspctivly); thr was no incras in bikin rom mornin to atrnoon 1%); school bus rirship incras rom 54% in th mornin to 60% in th atrnoon; amily vhicl cras rom 35% in th mornin to 27% in th atrnoon; carpool rmain constant at 3%. Typical mo o school arrival an partur by istanc chil livs rom school School arrival School Numbr Arrival within Distanc Distanc Lss than ¼ mil ¼ mil up to ½ mil ½ mil up to 1 mil 1 mil up to 2 mils Mor than 2 mils Walk Bik School Bus Family Vhicl Carpool Transit Othr 2,829 28% 2% 26% 41% 3% 0.2% 0.0% 2,283 9% 2% 43% 42% 4% 0.4% 0.1% 3,219 4% 1% 51% 41% 4% 0.3% 0.1% 4,020 1% 0.3% 60% 35% 3% 0.2% 0.1% 8, % 0.3% 64% 32% 3% 0.2% 0.0% Don t know or No Rspons: 326, Prcntas may not total 100% u to rounin School partur School Numbr Arrival within Distanc Distanc Lss than ¼ mil ¼ mil up to ½ mil ½ mil up to 1 mil 1 mil up to 2 mils Mor than 2 mils Walk Bik School Bus Family Vhicl Carpool Transit Othr 2,775 35% 2% 29% 30% 4% 0.4% 0.1% 2,231 14% 2% 49% 31% 4% 0.5% 0.2% 3,158 6% 1% 59% 30% 3% 0.3% 0.3% 3,946 2% 0.3% 68% 27% 3% 0.2% 0.2% 8, % 0.2% 69% 26% 4% 0.3% 0.1% Don t know or No Rspons: 520, Prcntas may not total 100% u to rounin 16

18 Iniana Sa Routs to School Assssmnt 2/1/2014 As mntion bor, walkin has incras in th atrnoon/school partur tim ram, as has school bus rirship. Family vhicl has cras, which may inicat that parnts/uarians ar unabl to lav work to pick up thir chilrn. For thos stunts that liv th closst to school lss than ¼ mil), mor than a thir walk hom whn thy lav school. Stunts who liv up to ½ mil away ask to walk/bik to/rom school mor than thos who i not 63% or lss than ¼ mil, 51% or ¼ up to ½ mil). Th major inin rom th pi charts in Appnix H is that 75% o parnts/uarians sai thir chilrn s school os not ncoura or iscoura walkin an bikin to/rom school. Movin orwar, this miht b a rat plac to start, unlss th politics o th school/school istrict on t want to nors anythin u to liability concrns. Travl Tally Rport: Yar-by-Yar stunt travl mos in Iniana Plas s Appnix I or th ocumnt) This Travl Tally Rport: Yar-by-Yar Stunt Travl Mos Rport was complt 396 tims. That is not to b conus with th numbr o schools submittin tallis. Som o th schools submitt tallis mor than onc ovr th yars atr thy rciv unin. Also, som o ths schools wr not un at all an only i tallis onc. For this rport, all o th inins ar bas on obsrvation o th ata, as oppos to statistical siniicanc. Yar Numbr o Tally-Submittin Schools I w look at only 2007 an 2013 hav much lss schools rsponin to th survy), walkin was hihr in th atrnoon btwn 2-3%; bikin was th sam at both tims o ay; school bus rirship consistntly incras rom mornin to atrnoon btwn 2-4%; amily vhicl consistntly cras rom mornin to atrnoon btwn 6-8%. o On coul inr that parnts/uarians rov thir chilrn to school in th mornin but wr unabl to pick up thir chilrn in th atrnoon, which is why w s an incras in both school bus rirship an walkin in th atrnoon. 17

19 Iniana Sa Routs to School Assssmnt 2/1/2014 Travl Tally Rport: Baslin stunt travl pattrns at 200 schools in Iniana som o ths wr not un) Plas s Appnix J or th ocumnt) This Travl Tally rport was complt by 200 schools whn applyin or SRTS unin throuh SAFETEA-LU. Som o ths schools wr not un. For this rport, all o th inins ar bas on obsrvation o th ata, as oppos to statistical siniicanc. Whn comparin mornin an atrnoon travl, thr was a 2% incras in walkin rom th mornin to th atrnoon 6% to 8%, rspctivly); thr was no incras in bikin rom mornin to atrnoon both wr 1%); school bus rirship incras rom 56% in th mornin to 59% in th atrnoon; amily vhicl cras rom 34% in th mornin to 28% in th atrnoon; carpool rmain constant at 3%. Accorin to th National Cntr or Sa Routs to School, travl pattrns captur on Monays an Friays wr systmatically irnt rom pattrns in th mil o th wk. Thror, comparin th ata on Tusay, Wnsay, an Thursay only capturs mor typical school travl pattrns. Analysis o a Survy o Existin an Potntial SRTS Stakholrs Stakholr Survy Th ISDH vlop a survy, with input rom a w partnrs, to ask qustions o SRTS stakholrs in Iniana. Survys wr snt to th mail arsss on th listsrv or th Iniana Sa Routs to School Partnrship. Thos on this list inclu community partnrs intrst in SRTS, avocats, intrst parnts/uarians, school lars, tc. ISDH rciv 64 rsponss to th survy. Th survy ask various qustions such as county o mploymnt, il o work, involvmnt in SRTS applications, lnth o intrst in walkin an bicyclin to school, bnits an barrirs to walkin an bicyclin to school, trainin topics, prrr mtho or rcivin trainin, mtin attnanc, satisaction with th Partnrship, utur ias or th rol o th Partnrship, an any nral thouhts about SRTS in Iniana. Th oal was to assss th satisaction o th Partnrship an ovrall namnt in walkin an bicyclin to school in Iniana. Conclusions o not inclu: Rsponnts rom all aras o Iniana complt th survy an, surprisinly, not a hih concntration in th cntral part o th stat. A lar prcnta work in ithr K-8 or 9-12 ucation, or both, ollow by transportation, plannin, ninrin, an, lastly, halth. 42% o rsponnts ha bn involv in a SRTS application. On optional commnt inclu, I oun th application to b laborious with vry littl back on why w wr not un spit a vry stron application in our ys. Anothr stat, Our school is in a rural ara, whr kis cannot walk or ri thir biks. A majority ha bn intrst in walkin an bicyclin to school or many yars 47% woul rat thir currnt knowl o walkin an bicyclin to school as Binnr, 38% as Intrmiat, an 14% as Avanc. Th top bnit chosn or walkin an bicyclin to school was improv halth, ollow by cras busin an ul xpnss, incras sns o community an inpnnc/rsponsibility in stunts, an ruc traic constion. 18

20 Iniana Sa Routs to School Assssmnt 2/1/2014 Th top barrir cit by stakholrs that hamprs walkin an bicyclin to school is poor/missin inrastructur ollow by prcptions o anr, lack o parntal support/involvmnt, istanc btwn hom an school, an wathr/arknss. This is slihtly irnt compar to parnts/uarians. Top trainin topics inclu applyin or ral SRTS unin, compltin a walkin an bicyclin assssmnt, an vlopin parnt/uarian/school aministrator support, althouh all choics or trainin rciv a air amount o rspons. A w commnts inclu,wantin statistical vinc that walkin/riin to school rucs stunt injuris or ath urin th commut to/rom school an how to crat a proram in a rural community. 50% o rsponnts stat thy woul lik to rciv inormation rom a wbinar, ollow by mailins, a sminar, an a listsrv upat. 59% sai thy ha nvr bn to a SRTS Partnrship mtin; 30% sai thy ha bn to a w, with only 5% statin som, but not most; an 5% statin most. 59% ha no opinion on th prormanc o th SRTS Partnrship, with 23% satisi, an 11% Vry Satisi. Rsponnts chos th promotion o unin opportunitis as th prim rol or th SRTS Partnrship in th utur, ollow by promotin local orts, avocatin or walkin an bicyclin to school policis an unin, an proviin trainin. Rsponnts woul lik to participat in this orr) by stablishin local prorams, rcivin inormation rom th Partnrship, rlayin inormation back to local partnrs an cision-makrs, attnin mtins an trainins, an avocatin or local policis. A w nral commnts inclu: o I woul lik to s mor critrion-bas application procsss in plac or smallr istricts that o n SRTS unin an support. o Whil I o ar with th principl o walkin/riin biks to school, traic is havily const urin th mornin rop-o hours. It os pos a hazar to lmntary stunts. o Schools that ar not locat within town or city limits an with rural mmbrship hav many obstacls to ovrcom. Plas s Appnix K or Stakholr survy 19

21 Iniana Sa Routs to School Assssmnt 2/1/2014 Summary o Assssmnt Finins Summary narrativ: SRTS inrastructur projcts wily outnumbr non-inrastructur projcts in Iniana, Schools coul us som assistanc in ralizin th importanc o non-inrastructur projcts, both as it rlats to plannin or inrastructur an to th prorammin activitis such as ncouramnt, ucation, an norcmnt. Ths lmnts n to o han in han with construction projcts. Inrastructur projcts ar mor xpnsiv than non-inrastructur, which woul hlp xplain th $18,746,370 or inrastructur, compar with $2,925,833 or non-inrastructur. Iniana has 93% prcnt o uns announc bas on uns availabl. That prcnta maks it 10 th amon all stats in rars to prcnta o unin awar. Howvr, it is rank 37 th or th amount o unin obliat at only 50%. Th 50% is as o Jun 2013, an that numbr improvs monthly. Th unin that SRTS applicants hav rciv is wll istribut throuhout Iniana. Public halth avocats otn look to aras o halth isparity to tart community initiativs, such as SRTS projcts, to provi incras opportunitis or chilrn to b activ an sa. On inicator o halth isparity in school corporations is th prcnta o chilrn livin in povrty. Many aras monstratin low socioconomic status in th stat ar also thos that hav th ratst n or opportunitis or physical activity. Accorin to th analysis conuct or this rport, only about a thir o th un SRTS projcts ar locat in school corporations with ovr 50% o th stunts rom lowr-incom amilis. Th ISDH rciv 40 rsponss to th survy that was vlop or SRTS awars. Th oal o th survy was to assss th proram as a whol, prior to th chan in th ral hihway bill unr SAFETEA-LU. Barrirs or awars, atr bin un, inclu not havin nouh mony to complt th projct u to inaquat stimats o projct costs, havin insuicint inormation on how to proc or who to communicat with at INDOT, an a lack o unrstanin o th procss. Succsss inclu bin abl to t bttr inrastructur or walkin or bicyclin, havin incras community or school support or walkin an bicyclin, havin succssul walk or bik to school activitis, an havin incras amounts o walkin or bicyclin to school. School prsonnl also cit lays in approvals as a barrir. SRTS procurs ar similar to othr rally un transportation projcts in rars to rviws an approvals, but school corporation prsonnl ar not typically amiliar with ths procurs an ar rustrat by th lays. As part o th application procss or SRTS in Iniana unr SAFETEA-LU, Iniana schools complt both stunt transportation mo tallis an parnt survys an submitt thm to th National Cntr. Many schools also complt post-awar tallis an survys, but not all hav on so at this tim. Som o th nral inins rom all o ths rports inclu: Walkin tn to incras in th atrnoon. Schools that rciv awars wr statistically mor likly to ncoura bikin/walkin to/rom school. Th numbr o chilrn walkin sizably incras atr rcivin unin as compar to bor. Th numbr o chilrn bikin also incras atr rcivin unin as compar to bor. Distanc was th most cit rason why parnts/uarians i not allow thir kis to walk/bik to/rom school, ollow by traic volum an traic sp. Major barrirs or allowin chilrn to walk an bicycl to school, such as istanc, traic, sp o traic, saty o intrsctions, an wathr, cras atr th schools rciv unin or Sa Routs to School. Th ISDH also vlop a survy, with input rom a w partnrs, to ask qustions o SRTS stakholrs in Iniana. Thos on this list inclu community partnrs intrst in SRTS, avocats, intrst amilis, school lars, tc. Th ISDH rciv 64 rsponss to th survy. Th oal o th survy was to assss th satisaction o th Partnrship 20

22 Iniana Sa Routs to School Assssmnt 2/1/2014 an ovrall namnt in walkin an bicyclin to school in Iniana. Som o th nral inins rom this survy inclu: Th top bnit chosn or walkin an bicyclin to school was improv halth, ollow by cras busin an ul xpnss, incras sns o community an inpnnc/rsponsibility in stunts, an ruc traic constion. Th top barrir that hamprs walkin an bicyclin to school cit by stakholrs is poor/missin inrastructur, ollow by prcptions o anr, lack o parntal support/involvmnt, istanc btwn hom an school, an wathr/arknss. This is slihtly irnt rom parnt/uarian viws. Top trainin topics inclu applyin or ral SRTS unin, compltin a walkin an bicyclin assssmnt, an vlopin parnt/uarian/school aministrator support, althouh all choics or trainin rciv a air amount o rspons. A w commnts inclu wantin statistical vinc that walkin/riin to school rucs stunt injuris or ath urin th commut to/rom school an how to crat a proram in a rural community. Ovr th cours o 7 rouns o unin, 128 projcts an activitis wr un, totalin $21,672,203. About hal o that was obliat as o Jun Thouh Iniana has a lowr obliation rat than avra, Iniana also ha a rlativly hih allocation o SRTS unin compar to othr stats. Eliibl SRTS activitis unr SAFETEA-LU ar still liibl unr MAP-21, althouh th proram now rquirs a 20% local match o th total unin amount. Ltovr SAFETEA-LU uns will b us to covr cost ovrruns on othr SRTS projcts awar unr SAFETEA-LU. Oicially, thr is no lonr an SRTS Coorinator position at INDOT; howvr, th ormr coorinator still vots th majority o his tim an nry to SRTS projcts an activitis an walkin an bicyclin to school in som mannr. Funin or projcts that woul b consir SRTS will now com rom TAP, an that proram is currntly aministr by th Local Prorams sction at INDOT, whr th ormr SRTS Coorinator is now workin. All TAP projcts will likly b rviw by a sinl committ. Th unin that th SRTS applicants hav rciv is wll istribut throuhout Iniana. Crtainly, smallr rural an suburban communitis hav bnitt rom SRTS unin in Iniana. It appars that schools in mor ns, urban aras outsi o Marion County hav not bn un as otn bas upon th unin istribution pattrn illustrat in this map Appnix A). 21

23 Iniana Sa Routs to School Assssmnt 2/1/2014 Rcommnations to arss th assssmnt inins Throuh this initial assssmnt rport, th ISDH ha vlop som nxt stps to arss som o th inins. 1. Arssivly promot obliation o uns to incras th unin obliation rat. It is o som concrn that Iniana has only obliat 50.16% o its awar unin, althouh it is rconiz that this numbr improvs monthly. It is o concrn bcaus this mans that only hal o th uns hav bn st asi or rsrv spciically or th plann projct or activitis. Th schools, citis, an towns n to b accountabl or th unin. This unin cannot b rirct or us or othr typs o projcts. MPOs an INDOT istrict oics coul also athr a mor upat contact list o all th awars in thir rspctiv aras to trmin status. Evn thouh projct sponsors ar rquir to submit rular prorss rports, this rquirmnt ns to b norc i it s not alray), th prorss rports shoul b collct in a cntraliz location an, aitionally, b ma availabl to th public. Accountability typically hlps projcts continu movin orwar, thus hlpin th allocat unin to b spnt, an, in th n, achiv our oals o incrasin walkin an bicyclin to school mor timly. 2. Promot th non-inrastructur prorams statwi to incras th prcnta o non-inrastructur projcts. It has bn apparnt in Iniana that non-inrastructur projcts ar not as popular to apply or as inrastructur projcts. Whil construction is xtrmly important, plannin, ncouramnt, ucation, norcmnt, an valuation all n to occur to act chan in a community. Iniana coul bnit rom mor than 13.5% o its unin oin towars non-inrastructur-spciic projcts. Schools an communitis n to b bttr inorm on th bnits o non-inrastructur. This rport is part o th non-inrastructur ucation that th ISDH is vlopin. Nxt stps inclu vlopmnt o a uibook an toolkit, rional trainins, an pilot non-inrastructur projcts. Espcially with th currnt unin o MAP-21, non-inrastructur is mor important than vr. 3. Tart th rmainin SAFETEA-LU Sa Routs unin appropriatly. It is important that any SRTS unin rmainin rom SAFETEA-LU b us or illin in aps that may mr or prviously awar SRTS projcts or or closly rlat spciic orts to improv sa walkin an bicyclin to school. 4. Continu to hav on point prson rsponsibl or SRTS proram qustions an applications. INDOT no lonr has a prson with th titl o SRTS Coorinator, oicially. Howvr, th ormr SRTS Coorinator vots a lar portion o his tim an nry to th SRTS proram in som mannr. It will b important to continu to hav on prson who ovrss ths projcts movin orwar with nw MAP-21 unin an any utur chans to th ral hihway bill. 5. Clarly in th rol o th xistin SRTS Avisory Committ unr MAP-21. Ensur that th SRTS Avisory Committ will still rviw projcts m to b SRTS-typ projcts unr th TAP rviw procss. Othr TAP projcts woul b rviw by othrs. Potntially th Avisory Committ coul provi tchnical rviw or uianc to communitis who miht st up thir own SRTS rant unin proram to schools in thir jurisictions sparat rom th ral TAP unin). 6. Promot SRTS projcts in school istricts xhibitin povrty that hav not yt ha a projct in thir istrict. Sinc it has bn trmin that only 27% o school corporations xhibitin povrty hav ha a SRTS projct within thir bounary, much work coul b on to chan that. On straty woul inclu intiyin iniviual schools with rlativly hih stunt povrty rats as potntial caniats or SRTS projcts an prorams. For th last thr yars o unin unr SAFETEA-LU, r/ruc lunch prcnta was inclu in critria or unin. A rcommnation woul b that, in th utur, unr TAP, it not only b a critrion, but ivn an aitional wiht on th application or unin. Anothr straty woul b to provi tchnical assistanc intrvntions in ths schools to promot th proram. Thirly, ths schools coul b tart or pilot non-inrastructur projcts as part o th ISDH non-inrastructur SRTS work. 22

24 Iniana Sa Routs to School Assssmnt 2/1/2014 Rsourcs Appnics Appnix A: Map o un awars rom , upat January 2013 Appnix B: Map o SRTS awars an statwi halth isparitis Appnix C: Awar survy Survy Monky) Appnix D: Travl Tally orm Appnix E: Parnt/Guarian Survy orm Appnix F: Travl Tally Rport: Stunt travl pattrns at 80 schools in Iniana btwn two ata collction prios Appnix G: Parnt/Guarian Survy Rport: Survy pattrns at 69 schools in Iniana btwn two ata collction prios Appnix H: Parnt/Guarian Survy Rport: Travl pattrns an parntal prcptions at 222 Schools in Iniana -som o ths wr not un Appnix I: Travl Tally Rport: Yar by Yar Stunt Travl Mos in Iniana Appnix J: Travl Tally Rport: Baslin stunt travl pattrns at 200 schools in Iniana -som o ths wr not un Appnix K: Stakholr survy SurvyMonky) 23

25 INDIANA SAFE ROUTES TO SCHOOL PROGRAM AWARDS Granr Gary Dyr # Lak County 35 Laport County Portr County Crown Point 6 Valparaiso St. Josph County 80 Mishawaka # Elkhart County North Librty # # # 35 DKalb County Nobl County # Culvr # St. Jo Winona Lak Kosciusko County Butlr Auburn Garrtt Bourbon Stark County Watrloo 33 Milor Marshall County # # Dmott Laran County Anola Goshn 6 Car Lak Stubn County # Whitly County Winamac Jaspr County # Pulaski County Nwton County 27 Alln County Ft. Wayn Fulton County Ossian Huntinton # Wabash County 24 Monticllo Whit County Loansport Cass County # Huntinton County 33 Miami County Aams County Wlls County Brn Walton # 52 Carroll County Dlphi Bnton County # Ottrbin # Convrs Galvston W. Laaytt # Tippcano County Pnnvill Grant County Hartor City Rossvill # Laaytt # Blackor County Howar County Portlan # Jay County Warrn County Attica µ Frankort Clinton County Elwoo Tipton County # # Alxanria # Dlawar County Munci # 35 Maison County Ranolph County Winchstr Fountain County Craworsvill Montomry County Boon County # Hamilton County Lbanon Wstil # Pnlton Carml 31 # # Hnry County Knnar Inianapolis Vrmillion County 36 Park County Putnam County Bainbri Brownsbur Hnricks County # Faytt County Union County Rush County 40 Cntr Grov Cambri City 40 Hancock County Wayn County Marion County 40 Grncastl Danvill # # # # # # # Johnson County Moran County 40 Shlby County Franklin County Vio County Clay County 31 Own County 421 Hop Spncr # Dcatur County Columbus Ellttsvill # # # # # Bloominton Monro County Sunman # # Brown County Bartholomw County Osoo # Riply County Sullivan County Linton Grn County Darborn County Vrsaills Jnnins County Ohio County Oolitic Jackson County Switzrlan County Lawrnc County Bicknll Jrson County Mitchll Daviss County Washinton # Knox County Martin County Scott County Washinton County Salm Oran County Ptrsbur Pik County Ln Clark County 231 Dubois County 41 Floy County Gibson County Crawor County Fort Branch Harrison County Posyvill Vanrburh County Posy County Mt. Vrnon Evansvill Warrick County Prry County Chanlr # Nwburh Spncr County Tll City # Cannlton January 2013 # # # # # # # 2012_Non_Inrastructur 2012_Inrastructur 2011_Non_Inrastructur 2011_Inrastructur 2010_Non_Inrastructur 2010_Inrastructur 2009_Non_Inrastructur 2009_Inrastructur 2008_Non_Inrastructur 2008_Inrastructur 2007_Non_Inrastructur 2007_Inrastructur 2006_Non_Inrastructur 2006_Inrastructur

26 Iniana Sa Routs to School Projct Locations School Districts Exhibitin Povrty that hav SRTS Projcts Map Author: Nutrition an Physical Activity Iniana Stat Dpartmnt o Halth Proram Data: IDOE, INDOT an ISDH Sptmbr 2013 Sa Routs to School SRTS) Projcts School Corps. with >50% Fr an Ruc Lunchs > 50% Fr an Ruc Lunch with SRTS Projcts o Mils School Corporation Bounaris Incorporat Aras

27 Sa Routs To School Assssmnt Introuction ThInianaStatDpartmntoHalthISDH)ispartnrinwiththInianaDpartmntoTransportationINDOT)topromotSaRoutsto Schoolnon inrastructurproramsthrouhoutthstat.thinormationathrbythissurvywillbustoassssthstatwiproraman tobttrinormisdhanindotaboutthtraininanassistancnsorthoswhorcivsaroutstoschoolunin. Thissurvyisircttoprsonswhohavworkonthplannin,application,implmntation,an/orvaluationoralSaRoutsto SchoolrantsaministrthrouhINDOTrom ThoalothisistoathrinormationaboutSaRoutstoSchoolproramsthat havprviouslybnunbythralsaroutstoschoolprorambythinianadpartmntotransportationindot).iyouar rcivinthis,youhavbnunithrorinrastructurornon inrastructurbyindotbtwn Thankyou,inavanc,ortakinthissurvy.Itwillonlytakbtwn10 15minuts.Inormationathrwillbranomizanwillnot connctwithyournamoryourprojctnam.youwillnotbintiiiniviuallyinanyrport.youwillhavthoptionoproviinyour contactinormationatthnothsurvy.thiswoulalloworollow uponyourrsponssanpotntiallyoryoursittobincluinabst practicsui.

28 Sa Routs To School Assssmnt 1. In what rion o Iniana o you consir yoursl? j Northast k l m n j Northwst k l m n j EastCntral k l m n j Cntral k l m n j WstCntral k l m n j Southast k l m n j Southwst k l m n 2. Which bst scribs your rol in your community's Sa Routs to School Projct? may choos mor than on, i applicabl) c city/countyninrorpublicworkssta c city/countycommunitysrvicssta c stat/locallawnorcmnt c countypublichalth c schoolcoorinator c projctvaluator c non proitsubcontractor c othrcommunityroup c parntlar Othrplasspciy) 3. How lon bor th application was u, i th plannin procss bin? j 1yarormor k l m n j 6 11months k l m n j 2 5months k l m n j 1month k l m n j Donotknow k l m n

29 Sa Routs To School Assssmnt 4. Who was involv in your Sa Routs to School initiativ? chck all that apply) c c c c c c c c City lars appoint, lct, or city sta) School prsonnl principal, tachrs, sta) Consultants) Community lars Businss community Public Halth Parnts Stunts Plas list any othr partnrs What rsourcs wr rquir or a succssul plannin phas? Chck all that apply) c c c c In hous stain hours Sta with knowl o INDOT applications Built upon knowl ain in prior rant plannin & implmntation Community oranizations with unin or plannin Othr plas spciy) Is/was your projct inrastructur, non inrastructur, or both? c c c c Inrastructur Non inrastructur Both havin rciv mor than on awar) Mostly inrastructur with small amount o non inrastructur 7. Hav you bn un mor than onc? nmlkj nmlkj Ys No

30 Sa Routs To School Assssmnt 8. Unr which application cycl yar) wr you awar unin? chck all that apply) c c c c c c c In which yar i you start to rciv unin? nmlkj nmlkj nmlkj nmlkj nmlkj nmlkj nmlkj Othr plas spciy) 10. Compar to othr rant applications, how iicult was it to complt th SRTS application? nmlkj nmlkj nmlkj nmlkj nmlkj nmlkj Much Easir Somwhat Easir About th sam Mor Diicult Much mor Diicult Not applicabl 11. Woul it hav bn hlpul to hav irnt typs o applications or inrastructur an non inrastructur rants? nmlkj nmlkj nmlkj Ys No No opinion

31 Sa Routs To School Assssmnt 12. I on thin coul b chan in th application procss, what woul that b? 13. What wr your barrirs, i any, atr bin un or Sa Routs to School? Plas chck all that apply an iv xampls in th commnt box) 5 6 c c c c c c c Not nouh mony to complt th work or actual costs xcin stimat costs Insuicint inormation on how to proc or who to communicat with at INDOT Timly procss o rcivin rimbursmnt atr ilin claims Lack o community or school top lvl support or chan in lvl or support Lack o oranization urin th procss or lack o unrstanin o th procss Lack o parntal involvmnt or ncouramnt Non Othr plas xplain) What wr your succsss atr bin un or Sa Routs to School? Plas chck all that apply an iv xampls in th commnt box) 6 c c c c c c Bttr inrastructur or walkin or bicyclin or both) Incras community or school support or walkin an bicyclin to school Ability to spn all or most o th un amount an to complt work within th but Succssul Walk or Bicycl To School ay activitis Incras amounts o walkin or bicyclin to school Tachr's ancotal storis o stunts havin bttr bhavior or hihr tst scors Othr plas xplain) 5 6

32 Sa Routs To School Assssmnt 15. Di you rciv any othr unin.. local, privat, ral, or stat) as a rsult o your Sa Routs to School Awar? nmlkj nmlkj Ys No I ys, plas xplain What i you in you coul accomplish without uns throuh larnin about th SRTS proram? 17. How lon was it, atr your community rciv notiication that you wr awar th Sa Routs to School rant, that th projct ot unrway? nmlkj nmlkj nmlkj nmlkj nmlkj nmlkj nmlkj 1 3 months 3 6 months 6 9 months 9 12 months months months Hav not yt start I you hav not yt start, what is th rason? Hav you complt your un projct? incluin compltin post projct survys an rportin rsults) 6 nmlkj nmlkj Ys No Optional commnt box 5 6

33 Sa Routs To School Assssmnt 19. What kins o valuation ata will you or hav you bn collctin? Plas chck all that apply) c c c c c c c c W hav not bn collctin valuation ata Rportin proram activitis trainins, workshops, vnts) Numbrs o participants in vnts Frquncy o stunts walkin or bikin Chans in stunt walkin or bikin habits Car sps by school Traic collision ata I hav no knowl about th proram valuation Othr plas spciy) Hav any local or school policy chans com about sinc rcivin your Sa Routs to School Awar? 6 nmlkj nmlkj Ys No I ys, plas xplain Hav you notic or rcor a chan in transportation split amon stunts as a rsult o your Sa Routs to School Awar? car, bus, walk, bicycl) 6 nmlkj nmlkj nmlkj Ys No Unknown I ys, plas xplain 5 6

34 Sa Routs To School Assssmnt 22. Hav you conuct counts o stunts walkin or bikin to school othr than thos rquir by INDOT as part o your application)? nmlkj nmlkj Ys No I ys, plas a mor inormation Di you continu to conuct oraniz walkin an bikin to school vnts atr th SRTS un activitis wr complt such as Walkin Wnsays, Walk & Roll Friays, tc.)? 6 nmlkj nmlkj Ys No I ys, plas a mor inormation Hav you notic or masur incras lvls o saty or a cras in accints an injuris rlat to travlin to school) as a rsult o your projct? 6 nmlkj nmlkj nmlkj Ys No Unknown I ys, plas xplain Hav you notic or masur cras traic constion or wr school buss sinc your projct ban? 6 nmlkj nmlkj nmlkj Ys No Unknown I ys, plas xplain 5 6

35 Sa Routs To School Assssmnt 26. Do you hav any trainin ns movin orwar in rars to Sa Routs to School? Is thr anythin mor you' lik to know mor about SRTS? 5 6

36 Sa Routs To School Assssmnt Follow Up This survy is bin aministr by th Iniana Stat Dpartmnt o Halth. Th inormation will b rport in th arat an to b us by ISDH to prioritiz thir tchnical assistanc stratis. W will not shar any inormation that intiis your proram without irst skin an ainin your prmission. W may contact som sits to inclu in our bst practics trainin matrials. 28. Shoul w hav any qustions, may ISDH contact you? Nam Ancy City/Town Arss Phon numbr

37

38

39

40 Travl Tally Rport: Stunt travl pattrns at 80 schools in Iniana btwn two ata collction prios Stunt travl ata rom Tim 2 hav bn stanariz bas on ra lvl ran o stunts in Tim 1. This was on to nsur that th stunts survy in Tim 2 rsmbl th stunts survy in Tim 1 in trms o thir ra lvl. S th Appnix A or mor inormation on stanarization, th statistical tst us an how th travl mo catoris wr combin prior to analysis. Thr ar svral points to consir whn intrprtin chans, or lack o chan, in walkin/bikin. I your rport shows no chan, or vn a cras in walkin/bikin, this is not ncssarily ba nws. Whn travl tally ata ar collct at irnt points in tim, thr ar svral actors that ar not part o SRTS prorams that coul iv th apparanc o no chan or a clin that is not ral, but rathr u to whn ata wr collct. For xampl: 1) Schools may hav collct travl tally ata urin a spcial vnt lik Walk to School Day at on tim prio, but not urin th othr tim prio; 2) Schools may hav collct tally ata urin avrs wathr at on tim prio, but not th othr tim prio; an 3) Evnts that occurr in communitis may hav inlunc popl s prcptions about walkin/bikin at on tim, but not urin anothr tim. By th sam tokn, i your rport shows an incras in walkin/bikin, it is important to consir whthr on or mor o th points mntion abov may hav prouc an apparanc o succss that is not irctly u to your SRTS proram. S Appnix B: Schools an tim prios inclu in rport

41 Prcnt o Trips School Mornin Arrival Travl Mo Comparison 60% Tim 1 Mornin Tim 2 mornin 50% 40% 30% 20% 10% 0% Walk Bik School Bus Family Vhicl Carpool Transit School Mornin Arrival Travl Mo Comparison Numbr o Family Walk Bik School Bus Trips Vhicl Carpool Transit Tim 1 74,605 8% 2% 49% 36% 4% 0.5% Tim 2 88,322 8% 2% 44% 41% 4% 0.5% Othr catory not inclu. Prcntas may not total 100% u to rounin. Walk/Bik Thr was a small, yt statistically siniicant cras in th prcnta o stunts who arriv at school by bik btwn Tim 1 an Tim 2. Family Vhicl/Carpool Siniicantly mor stunts arriv at school by amily vhicl or carpool btwn Tim 1 an Tim 2. School Bus/Transit Siniicantly wr stunts arriv at school by school bus or transit btwn Tim 1 an Tim 2. Pa 2 o 6

42 Prcnt o Trips School Atrnoon Dpartur Travl Mo Comparison 60% Tim 1 atrnoon Tim 2 atrnoon 50% 40% 30% 20% 10% 0% Walk Bik School Bus Family Vhicl Carpool Transit School Atrnoon Dpartur Travl Mo Comparison Numbr o Family Walk Bik School Bus Trips Vhicl Carpool Transit Tim 1 72,267 11% 2% 52% 29% 4% 0.6% Tim 2 85,881 12% 2% 48% 34% 4% 0.4% Othr catory not inclu. Prcntas may not total 100% u to rounin. Walk/Bik Thr was no statistically siniicant irnc in th prcnta o stunts who lt school by walkin or bikin btwn Tim 1 an Tim 2. Family Vhicl/Carpool Siniicantly mor stunts lt school by car btwn Tim 1 an Tim 2. School Bus/Transit Siniicantly wr stunts lt school by school bus or transit btwn Tim 1 an Tim 2. Pa 3 o 6

43 Appnix A: Mthos us in rport Stanarization Whn comparin travl mo prcntas rom Tim 1 to Tim 2 bor stanarization, somtims th ra lvls rprsnt in th two roups ir. Stanarization is us to control or ths ra irncs so that whn th Tim 1 an Tim 2 roups ar compar, ra lvl os not account or any chan in travl mo. Stanarizin travl mo by stunts' ra is on by takin th ran o ras that stunts wr in an th numbr o stunts within ach ra) urin Tim 1, an makin th ran o ras that stunts wr in an th numbr o stunts within ach ra) urin Tim 2, th sam. For instanc, i at Tim 1, 20 prcnt o th trips wr ma by stunts in scon ra, atr stanarization, travl ata woul b ajust so that 20 prcnt o th trips at Tim 2 woul also hav bn ma by stunts in scon ra. Stanarizin stunt travl ata by stunts' ra is ncssary bcaus chilrn's abilitis continu to vlop as thy a. Thror, thr is a n to account or th ra lvl irncs that may xist whn comparin a Tim 1 roup to a Tim 2 roup. Groupin o travl mos Bor runnin th statistical tsts comparin th chan in travl mo rom Tim 1 to Tim 2, th svn travl mos wr combin as ollows: Walk an Bicycl mos wr combin into a "walk/bik" catory. Th Family vhicl an Carpool wr combin into a "car" catory. Th School bus an Transit wr combin into school "bus/transit" catory. Th "Othr" mo choic was xclu rom statistical analysis bcaus: thr wr rlativly small numbrs in this catory; an th manin o "Othr" is otn unin. Thror, it was not possibl to appropriatly an consistntly classiy this rspons option into on o th abov catoris. Pairin Walk an Bicycl trips, Family vhicl an Carpool trips, an School bus an Transit trips, an combinin ach pair into on o thr catoris was on or th ollowin rasons: Usually, th numbr o trips ma by crtain mos such as bicyclin, transit an carpool is too low or th liklihoo ratio chi-squar tsts us in this rport to tct travl mo irncs btwn Tim 1 an Tim 2. In orr or th liklihoo ratio chi-squar tst to run proprly, thr shoul b at last 5 trips within ach o th mo catoris i.., walk/bik, bus/transit, an car) in both th mornin an atrnoon. I th rports sparat "School Bus" trips rom "Transit" trips or instanc, it is likly that th Transit mo alon woul not mt th "5 or mor" thrshol. That is, in most cass wr than 5 stunts ri th city bus "Transit") to/rom school. Combinin ths travl mos with similar travl mos nhancs th tsts' ability to tct travl mo irncs btwn Tim 1 an Tim 2. Th majority o Sa Routs prorams sk a nral shit away rom th amily vhicl an towar non-motoriz travl mos, rathr than a spciic shit btwn th othr mos walkin, bicyclin, transit riin, or carpoolin). Th National Cntr souht to vlop a stanariz rport that woul b usul to th ratst numbr o usrs collctin Travl Tally ata. Statistical tsts To trmin i stunts' travl mos chan siniicantly rom Tim 1 to Tim 2, liklihoo ratio chi-squar tsts wr prorm sparatly or th mornin arrival an atrnoon partur travl ata. Th irst liklihoo ratio chi-squar tst, with two rs o rom, trmins whthr thr was a siniicant shit in stunts' travl mo btwn Tim 1 an Tim 2, but os not intiy which travl mos) shit th most. I this irst tst i not tct a statistically siniicant chan in stunts' travl mos rom Tim 1 to Tim 2, thn th scon an thir liklihoo ratio chi-squar tsts wr not calculat. Howvr, i th irst liklihoo ratio chi-squar tst tct a siniicant chan in stunts' travl mos rom Tim 1 to Tim 2, thn scon an thir liklihoo ratio chi-squar tsts wr prorm. Th scon an thir liklihoo ratio chi-squar tsts, with on r o rom ach, trmin which travl mo roups shit th most rom Tim 1 to Tim 2. For xampl, th scon liklihoo ratio chi-squar tst compar Walk/Bik to th othr mos i.., Bus/Transit + Family Vhicl/Carpool mo roups) to assss whthr stunts shit towar or away rom walkin/bikin btwn Tim 1 an Tim 2. Th thir liklihoo ratio chi-squar tst compar Bus/Transit to Family Vhicl/Carpool to assss whthr stunts shit towar or away rom usin th bus or transit btwn Tim 1 an Tim 2. Th scon an thir liklihoo ratio chi-squar tsts also trmin whthr stunts shit towar or away rom th Family Vhicl/Carpool rom Tim 1 an Tim 2. Pa 4 o 6

44 Appnix B: Schools an tim prios inclu in rport School Nam City Tim 1 Tim 2 Alxanria Hih School Alxanria Octobr 2009 May 2012 Alxanria Intrmiat School Alxanria Octobr 2009 May 2012 Alxanria Monro Elmntary School Alxanria Octobr 2009 May 2012 Anola Mil School Anola Octobr 2008 May 2010 Carlin Park Elmntary School Anola Octobr 2008 May 2010 Hnry Park Elmntary School Anola Octobr 2008 May 2010 Ryan Park Elmntary School Anola Octobr 2008 May 2010 Jr Watson Elmntary School Auburn Sptmbr 2008 May 2012 McKnny-Harrison Elmntary School Auburn Sptmbr 2008 January 2009 Batchlor Mil School Bloominton Sptmbr 2008 May 2010 Chils Elmntary School Bloominton May 2008 May 2010 Ewoo Intrmiat School Bloominton Sptmbr 2008 Octobr 2009 Ewoo Primary School Bloominton Sptmbr 2008 Octobr 2009 Summit Elmntary School Bloominton May 2008 Octobr 2009 Tmplton Bloominton Sptmbr 2008 April 2010 Univrsity Bloominton May 2008 May 2010 Triton Elmntary School Bourbon May 2009 May 2012 Cannlton Elmntary School Cannlton April 2011 March 2012 MacArthur Elmntary School Car Lak May 2008 May 2009 Fora Elmntary School Columbus May 2009 May 2010 Northsi Mil School Columbus May 2009 May 2010 Parksi Elmntary School Columbus May 2009 April 2011 Schmitt Elmntary School Columbus May 2009 April 2011 Smith Elmntary School Columbus May 2009 April 2011 Culvr Elmntary School Culvr Sptmbr 2009 May 2012 Culvr Mil School Culvr Sptmbr 2009 May 2012 Davi Turnham Dal April 2008 May 2009 Dlphi Community Elmntary School Dlphi April 2008 May 2010 Dlphi Community Mil School Dlphi April 2008 May 2010 Stinsvill Elmntary School Ellttsvill Sptmbr 2008 Octobr 2009 Elwoo Elmntary School Elwoo Octobr 2008 May 2012 Elwoo Mil School Elwoo Octobr 2008 May 2012 Garrtt Mil School Garrtt May 2010 May 2012 J.E. Obr Elmntary School Garrtt May 2010 May 2012 St Josph School Garrtt May 2010 May 2012 Chambrlain Elmntary School Goshn May 2007 May 2008 Chanlr Elmntary School Goshn May 2007 May 2008 Goshn Mil School Goshn May 2007 April 2010 Mol Elmntary School Goshn May 2007 May 2008 Parksi Elmntary School Goshn May 2007 May 2010 Prairi Viw Elmntary School Goshn May 2007 May 2008 Wst Goshn Elmntary School Goshn May 2007 May 2008 Pa 5 o 6

45 School Nam City Tim 1 Tim 2 Mary Frank Elmntary School Granr May 2008 Sptmbr 2009 Cntr Grov Elmntary School Grnwoo May 2008 April 2010 Cntr Grov Mil School Cntral Grnwoo May 2008 May 2010 Blackor Junior Hih School Hartor City April 2011 May 2012 Northsi Elmntary School Hartor City April 2011 May 2012 Huntinbur Elmntary School Huntinbur Auust 2011 April 2012 Southri Mil School Huntinbur Auust 2011 April 2012 Amy Bvrlan Elmntary School Inianapolis May 2010 May 2012 Cntr or Inquiry at IPS 84 Inianapolis Novmbr 2008 April 2012 Immaculat Hart o Mary Inianapolis Novmbr 2008 April 2012 St Joan o Arc Inianapolis April 2008 April 2011 Th Projct School - Inianapolis Inianapolis April 2009 May 2011 Hanly Elmntary School LaPort April 2009 May 2012 Linton-Stockton Elmntary School Linton Auust 2007 May 2011 Battll Elmntary School Mishawaka April 2008 April 2011 Bir Elmntary School Mishawaka April 2008 April 2011 Emmons Elmntary School Mishawaka May 2009 May 2012 Fr J Hums Elmntary School Mishawaka April 2008 April 2011 John J Youn Mil School Mishawaka April 2008 Octobr 2009 La Sall Elmntary School Mishawaka May 2008 April 2011 Librty Elmntary School Mishawaka May 2008 April 2011 Twin Branch Elmntary School Mishawaka April 2008 April 2011 Nobl Crossin Noblsvill Octobr 2008 May 2009 Whit Rivr Elmntary School Noblsvill May 2009 April 2010 Dollns Elmntary School Oolitic May 2008 May 2012 Oolitic Junior Hih School Oolitic May 2008 May 2012 Ottrbin Elmntary School Ottrbin May 2009 May 2011 Ptrsbur Elmntary School Ptrsbur April 2010 April 2011 North Elmntary School Posyvill May 2008 May 2011 Taylorsvill Elmntary School Taylorsvill March 2009 April 2011 Hln Griith Washinton Novmbr 2008 April 2011 Lna Dunn Elmntary School Washinton April 2008 April 2011 Watrloo Elmntary School Watrloo April 2009 April 2011 Happy Hollow School Wst Laaytt May 2008 May 2011 EP Elmntary School Winamac April 2010 April 2012 WC Mil School Winamac April 2010 April 2012 Jrson Elmntary School Winona Lak May 2008 April 2010 Laklan Christian Acamy Winona Lak May 2008 April 2010 Pa 6 o 6

46 Prcnt o Chilrn Parnt Survy Rport: Survy pattrns at 69 schools in Iniana btwn two ata collction prios Survy ata rom Tim 2 hav bn stanariz bas on stunts ra lvl an istanc rom school in Tim 1. This was on to nsur that th stunts survy in Tim 2 rsmbl th stunts survy in Tim 1 in trms o thir ra lvl an istanc rom school. S th Appnix A or mor inormation on stanarization, th statistical tst us an how th travl mo catoris wr combin prior to analysis. 16% Gra lvls o chilrn rprsnt in survys 14% 12% Tim 1 Tim 2 10% 8% 6% 4% 2% 0% K Gra lvls o chilrn rprsnt in survys Gra in School Tim 1 Tim 1 Tim 2 Tim 2 Numbr Prcnt Numbr Prcnt K 1,171 13% % 1 1,262 14% % 2 1,294 14% % 3 1,318 14% % 4 1,300 14% % 5 1,262 14% % % % % 425 5% % 319 4% Parnt stimat o istanc rom chil s hom to school S Appnix B: Schools an tim prios inclu in rport

47 Prcnt o Chilrn 40% 35% 30% Tim 1 Tim 2 25% 20% 15% 10% 5% 0% < 1/4 mil 1/4 to 1/2 mil 1/2 to 1 mil 1 to 2 mils > 2 mils Parnt stimat o istanc rom chil s hom to school Distanc btwn hom Tim 1 Tim 1 Tim 2 Tim 2 an school Numbr Prcnt Numbr Prcnt Lss than 1/4 mils 1,605 18% % 1/4 mil up to 1/2 mil 1,171 13% % 1/2 mil up to 1 mil 1,469 16% % 1 mil up to 2 mils 1,651 18% % Mor than 2 mils 3,092 34% % Pa 2 o 10

48 Prcnt o Chilrn Typical mo o arrival at school 60% Tim 1 Mornin Tim 2 Mornin 50% 40% 30% 20% 10% 0% Walk Bik School Bus Family Vhicl Carpool Transit Typical mo o arrival at school Numbr o Family Walk Bik School Bus Trips Vhicl Carpool Transit Tim 1 8,981 10% 2% 46% 38% 4% 0.2% Tim 2 9,027 9% 2% 48% 37% 4% 0.1% Othr catory not inclu. Prcntas may not total 100% u to rounin. Rsults Thr was no statistically siniicant irnc in how stunts arriv at school btwn Tim 1 an Tim 2. Pa 3 o 10

49 Prcnt o Chilrn Typical mo o partur rom school 60% Tim 1 Mornin Tim 2 Mornin 50% 40% 30% 20% 10% 0% Walk Bik School Bus Family Vhicl Carpool Transit Typical mo o partur rom school Numbr o Family Walk Bik School Bus Trips Vhicl Carpool Transit Tim 1 8,946 13% 2% 53% 29% 3% 0.4% Tim 2 8,740 13% 2% 52% 29% 3% 0.2% Othr catory not inclu. Prcntas may not total 100% u to rounin. Rsults Thr was no statistically siniicant irnc in how stunts part rom school btwn Tim 1 an Tim 2. Pa 4 o 10

50 Prcnt o Chilrn Prcnt o chilrn who hav ask or prmission to walk or bik to/rom school by istanc thy liv rom school 80% Tim 1 Tim 2 70% 60% 50% 40% 30% 20% 10% 0% < 1/4 mil 1/4 to 1/2 mil 1/2 to 1 mil 1 to 2 mils > 2 mils Prcnt o chilrn who hav ask or prmission to walk or bik to/rom school by istanc thy liv rom school Tim 1 Ask Prmission? Numbr o Chilrn Lss than 1/4 mil 1/4 mil to 1/2 mil 1/2 mil to 1 mil 1 mil to 2 mils Mor than 2 mils Ys 3,366 68% 57% 49% 31% 10% No 5,655 30% 40% 50% 67% 88% Tim 2 Ask Prmission? Numbr o Chilrn Lss than 1/4 mil 1/4 mil to 1/2 mil 1/2 mil to 1 mil 1 mil to 2 mils Mor than 2 mils Ys 3,317 68% 57% 48% 28% 12% No 5,600 30% 41% 49% 70% 87% Rsults Thr was no statistically siniicant irnc in th prcnta o stunts who ask or prmission to walk or bik to/rom school btwn Tim 1 an Tim 2. Pa 5 o 10

51 Issus rport to act th cision to not allow a chil to walk or bik to/rom school by parnts o chilrn who o not walk or bik to/rom school Distanc Amount o Traic Alon Rout Sp o Traic Alon Rout Saty o Intrsctions an Crossins Wathr or Climat Violnc or Crim Siwalks or Pathways Tim Crossin Guars Aults to Bik/Walk With Chil's Participation in Atr School Convninc o Drivin Tim 2 Tim 1 0% 10% 20% 30% 40% 50% 60% 70% Issus rport to act th cision to allow a chil to walk or bik to/rom school by parnts o chilrn who alray walk or bik to/rom school Distanc Amount o Traic Alon Rout Sp o Traic Alon Rout Saty o Intrsctions an Crossins Wathr or Climat Violnc or Crim Siwalks or Pathways Tim Crossin Guars Aults to Bik/Walk With Chil's Participation in Atr School Convninc o Drivin Tim 2 Tim 1 0% 10% 20% 30% 40% 50% 60% 70% Rsults Givn th lar total numbr o parnt-rport issus i.. > 30,000), statistical tsts wr inappropriat in this cas. Pa 6 o 10

52 Parnts' opinions about how much thir chil's school ncouras or iscouras walkin an bikin to/rom school 80% 70% 60% 50% 40% 30% 20% 10% 0% Stronly Discouras Tim 1 Tim 2 Discouras Nithr Encouras Stronly Encouras Parnts' opinions about how much un walkin an bikin to/rom school is or thir chil 80% 60% Tim 1 Tim 2 40% 20% 0% Parnts' opinions about how halthy walkin an bikin to/rom school is or thir chil 80% 70% 60% 50% 40% 30% 20% 10% 0% Vry Borin Borin Nutral Fun Vry Fun Vry Unhalthy Tim 1 Tim 2 Unhalthy Nutral Halthy Vry Halthy Rsults Thr was a statistically siniicant incras in th prcnta o parnts who stat that thir school ncouras walkin an bikin to/rom school btwn Tim 1 an Tim 2. Pa 7 o 10

53 Appnix A: Mthos us in rport Stanarization Whn comparin travl mo prcntas rom Tim 1 to Tim 2 bor stanarization, somtims th ra lvls an istancs rom school rprsnt in th two roups ir. Stanarization is us to control or ths irncs so that whn th Tim 1 an Tim 2 roups ar compar, ra an istanc o not account or any chan in travl mo. Stanarizin stunt travl ata by stunts' ra is ncssary bcaus chilrn's abilitis continu to vlop as thy a. Furthr, istanc rom school is th stronst prictor o whthr stunts walk or bik. Groupin o travl mos Bor runnin th statistical tsts comparin th chan in travl mo rom Tim 1 to Tim 2, th svn travl mos wr combin as ollows: Walk an Bicycl mos wr combin into a "walk/bik" catory. Th Family vhicl an Carpool wr combin into a "car" catory. Th School bus an Transit wr combin into school "bus/transit" catory. Th "Othr" mo choic was xclu rom statistical analysis bcaus: thr wr rlativly small numbrs in this catory; an th manin o "Othr" is otn unin. Thror, it was not possibl to appropriatly an consistntly classiy this rspons option into on o th abov catoris. Pairin Walk an Bicycl trips, Family vhicl an Carpool trips, an School bus an Transit trips, an combinin ach pair into on o thr catoris was on or th ollowin rasons: Usually, th numbr o trips ma by crtain mos such as bicyclin, transit an carpool is too low or th liklihoo ratio chi-squar tsts us in this rport to tct travl mo irncs btwn Tim 1 an Tim 2. In orr or th liklihoo ratio chi-squar tst to run proprly, thr shoul b at last 5 trips within ach o th mo catoris i.., walk/bik, bus/transit, an car) in both th mornin an atrnoon. I th rports sparat "School Bus" trips rom "Transit" trips or instanc, it is likly that th Transit mo alon woul not mt th "5 or mor" thrshol. That is, in most cass wr than 5 stunts ri th city bus "Transit") to/rom school. Combinin ths travl mos with similar travl mos nhancs th tsts' ability to tct travl mo irncs btwn Tim 1 an Tim 2. Th majority o Sa Routs prorams sk a nral shit away rom th amily vhicl an towar non-motoriz travl mos, rathr than a spciic shit btwn th othr mos walkin, bicyclin, transit riin, or carpoolin). Th National Cntr souht to vlop a stanariz rport that woul b usul to th ratst numbr o usrs collctin Travl Tally ata. Statistical tsts To trmin i stunts' travl mos an parnts prcptions about walkin an bikin to/rom school chan siniicantly rom Tim 1 to Tim 2, liklihoo ratio chi-squar tsts wr prorm sparatly or th mornin arrival an atrnoon partur travl ata, as wll as th parntal prcption qustions. Th irst liklihoo ratio chi-squar tst, with two rs o rom, trmins whthr thr was a siniicant shit in stunts' travl mo or parnts prcption btwn Tim 1 an Tim 2, but os not intiy which mo or prcption catory shit th most. I this irst tst i not tct a statistically siniicant chan in travl mo or prcption rom Tim 1 to Tim 2, thn th scon an thir liklihoo ratio chi-squar tsts wr not calculat. Howvr, i th irst liklihoo ratio chi-squar tst tct a siniicant chan in stunts' travl mos or prcption rom Tim 1 to Tim 2, thn scon an thir liklihoo ratio chi-squar tsts wr prorm. Th scon an thir liklihoo ratio chi-squar tsts, with on r o rom ach, trmin which travl mo an prcption roups shit th most rom Tim 1 to Tim 2. For xampl, th scon liklihoo ratio chisquar tst compar Walk/Bik to th othr mos i.., Bus/Transit + Family Vhicl/Carpool mo roups) to assss whthr stunts shit towar or away rom walkin/bikin btwn Tim 1 an Tim 2. Th thir liklihoo ratio chisquar tst compar Bus/Transit to Family Vhicl/Carpool to assss whthr stunts shit towar or away rom usin th bus or transit btwn Tim 1 an Tim 2. Th scon an thir liklihoo ratio chi-squar tsts also trmin whthr stunts shit towar or away rom th Family Vhicl/Carpool rom Tim 1 an Tim 2. Pa 8 o 10

54 Appnix: Schools an tim prios inclu in rport School Nam City Tim 1 Tim 2 Alxanria Hih School Alxanria Alxanria Monro Elmntary School Alxanria Alxanria Monro Intrmiat School Alxanria Anola Mil School Anola Carlin Park Elmntary School Anola Hnry Park Elmntary School Anola Ryan Park Elmntary School Anola Jr Watson Elmntary School Auburn McKnny-Harrison Elmntary School Auburn Arlinton Bloominton Batchlor Mil School Bloominton Chils Elmntary School Bloominton Lakviw Elmntary School Bloominton Summit Elmntary School Bloominton Tmplton Bloominton Univrsity Bloominton Triton Elmntary School Bourbon Cannlton Elmntary School Cannlton MacArthur Elmntary School Car Lak Fora Elmntary School Columbus Northsi Mil School Columbus Parksi Elmntary School Columbus Schmitt Elmntary School Columbus Smith Elmntary School Columbus Culvr Elmntary School Culvr Culvr Mil School Culvr Davi Turnham Dal Dlphi Community Elmntary School Dlphi Dlphi Community Mil School Dlphi Elwoo Elmntary School Elwoo Elwoo Mil School Elwoo Blu Ri Primary School Frankort Grn Maows Intrmiat School Frankort Suncrst Elmntary School Frankort Garrtt Mil School Garrtt J.E. Obr Elmntary School Garrtt Chambrlain Elmntary School Goshn Chanlr Elmntary School Goshn Goshn Mil School Goshn Mol Elmntary School Goshn Parksi Elmntary School Goshn Prairi Viw Elmntary School Goshn Pa 9 o 10

55 School Nam City Tim 1 Tim 2 Wst Goshn Elmntary School Goshn Mary Frank Elmntary School Granr Cntr Grov Elmntary School Grnwoo Cntr Grov Mil School Cntral Grnwoo Amy Bvrlan Elmntary School Inianapolis Cntr or Inquiry at IPS 84 Inianapolis Immaculat Hart o Mary Inianapolis St Joan o Arc Inianapolis Hanly Elmntary School LaPort Battll Elmntary School Mishawaka Bir Elmntary School Mishawaka Emmons Elmntary School Mishawaka Twin Branch Elmntary School Mishawaka Dollns Elmntary School Oolitic Oolitic Junior Hih School Oolitic Ottrbin Elmntary School Ottrbin Ptrsbur Elmntary School Ptrsbur North Elmntary School Posyvill Taylorsvill Elmntary School Taylorsvill Hln Griith Washinton Lna Dunn Elmntary School Washinton Watrloo Elmntary School Watrloo Cumbrlan Elmntary School Wst Laaytt Happy Hollow School Wst Laaytt EP Elmntary School Winamac WC Mil School Winamac Jrson Elmntary School Winona Lak Pa 10 o 10

56 Parnt Survy Rport: Travl Pattrns an Parntal Prcptions at 222 Schools in Iniana Typical mo o arrival at an partur rom school 70% Mornin Atrnoon 60% 50% 40% 30% 20% 10% 0% Walk Bik School Bus Family Vhicl Carpool Transit Othr Typical mo o arrival at an partur rom school Tim o Trip Numbr o Trips Walk Bik School Bus Family Vhicl Carpool Transit Othr Mornin 22,458 6% 1% 54% 35% 3% 0.3% 0.1% Atrnoon 21,854 8% 1% 60% 27% 3% 0.3% 0.2% No Rspons Mornin: 569 No Rspons Atrnoon: 1,173 Prcntas may not total 100% u to rounin. S Appnix: Schools inclu in rport

57 Prcnt o Trips - > 2 mils Prcnt o Trips - 1/2 to 1 mil Prcnt o Trips - 1 to 2 mils Prcnt o Trips - < 1/4 mil Prcnt o Trips - 1/4 to 1/2 mil Typical mo o school arrival an partur by istanc chil livs rom school 100% 90% 80% Arrival Dpartur 100% 90% 80% Arrival Dpartur 70% 70% 60% 60% 50% 40% 30% 20% 10% 0% Walk Bik School Bus Family Carpool Transit Othr Vhicl 50% 40% 30% 20% 10% 0% Walk Bik School Bus Family Carpool Transit Vhicl Othr 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% Walk Bik School Bus Arrival Dpartur Family Carpool Transit Vhicl Othr 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% Walk Bik School Bus Arrival Dpartur Family Carpool Transit Vhicl Othr 100% Arrival Dpartur 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% Walk Bik School Bus Family Carpool Transit Vhicl Othr Pa 2 o 13

58 Typical mo o school arrival an partur by istanc chil livs rom school School Arrival Distanc Lss than 1/4 mil 1/4 mil up to 1/2 mil 1/2 mil up to 1 mil 1 mil up to 2 mils Mor than 2 mils Don t know or No Rspons: 326 Prcntas may not total 100% u to rounin. School Dpartur Distanc Lss than 1/4 mil 1/4 mil up to 1/2 mil 1/2 mil up to 1 mil 1 mil up to 2 mils Mor than 2 mils Don t know or No Rspons: 520 Prcntas may not total 100% u to rounin. Numbr within School Family Walk Bik Carpool Transit Othr Distanc Bus Vhicl 2,829 28% 2% 26% 41% 3% 0.2% 0.0% 2,283 9% 2% 43% 42% 4% 0.4% 0.1% 3,219 4% 1% 51% 41% 4% 0.3% 0.1% 4,020 1% 0.3% 60% 35% 3% 0.2% 0.1% 8, % 0.3% 64% 32% 3% 0.2% 0.0% Numbr within School Family Walk Bik Carpool Transit Othr Distanc Bus Vhicl 2,775 35% 2% 29% 30% 4% 0.4% 0.1% 2,231 14% 2% 49% 31% 4% 0.5% 0.2% 3,158 6% 1% 59% 30% 3% 0.3% 0.3% 3,946 2% 0.3% 68% 27% 3% 0.2% 0.2% 8, % 0.2% 69% 26% 4% 0.3% 0.1% Pa 3 o 13

59 Prcnt o chilrn who hav ask or prmission to walk to bik to/rom school by istanc thy liv rom school 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% < 1/4 mil 1/4 mil to 1/2 mil 1/2 mil to 1 mil 1 to 2 mils > 2 mils Distanc btwn Hom an School Prcnt o chilrn who hav ask or prmission to walk to bik to/rom school by istanc thy liv rom school Ask Prmission? Numbr o Chilrn Ys 6,335 No 15,984 Don't know or No Rspons: 17 Prcntas may not total 100% u to rounin. Lss than 1/4 1/4 mil to 1/2 1/2 mil to 1 1 mil to 2 Mor than 2 mil mil mil mils mils 63% 51% 39% 24% 10% 37% 49% 61% 76% 90% Pa 4 o 13

60 Issus rport to act th cision to not allow a chil to walk or bik to/rom school by parnts o chilrn who o not walk or bik to/rom school Wathr or Climat Violnc or Crim Crossin Guars Saty o Intrsctions an Crossins Siwalks or Pathways Aults to Bik/Walk With Amount o Traic Alon Rout Sp o Traic Alon Rout Chil's Participation in Atr School Prorams Tim Convninc o Drivin Distanc 0% 10% 20% 30% 40% 50% 60% 70% Prcnt o Rsponss Issus rport to act th cision to allow a chil to walk or bik to/rom school by parnts o chilrn who alray walk or bik to/rom school Wathr or Climat Violnc or Crim Crossin Guars Saty o Intrsctions an Crossins Siwalks or Pathways Aults to Bik/Walk With Amount o Traic Alon Rout Sp o Traic Alon Rout Chil's Participation in Atr School Prorams Tim Convninc o Drivin Distanc 0% 10% 20% 30% 40% 50% 60% 70% Prcnt o Rsponss Pa 5 o 13

61 Issu Chil os not walk/bik to Chil walks/biks to school school Distanc 60% 43% Convninc o Drivin 10% 7% Tim 26% 20% Chil's Participation in Atr School Prorams 13% 13% Sp o Traic Alon Rout 55% 27% Amount o Traic Alon Rout 55% 26% Aults to Bik/Walk With 16% 10% Siwalks or Pathways 39% 34% Saty o Intrsctions an Crossins 47% 33% Crossin Guars 18% 24% Violnc or Crim 34% 22% Wathr or Climat 44% 38% Numbr o Rsponnts pr Catory 19,722 2,084 No rspons: 351 Not: --Each column may sum to > 100% bcaus rsponnt coul slct mor than issu --Th calculation us to trmin th prcnta or ach issu is bas on th 'Numbr o Rsponnts pr Catory' within th rspctiv columns Chil os not walk/bik to school an Chil walks/biks to school.) I comparin prcntas btwn th two columns, plas pay particular attntion to ach column's numbr o rsponnts bcaus th two numbrs can ir ramatically. Pa 6 o 13

62 Parnts' opinions about how much thir chil's school ncouras or iscouras walkin an bikin to/rom school Stronly Encouras, 3% Stronly Discouras, 6% Discouras, 6% Encouras, 10% Nithr, 75% Parnts' opinions about how much un walkin an bikin to/rom school is or thir chil Vry Fun, 11% Vry Borin, Borin, 4% 4% Fun, 26% Nutral, 56% Parnts' opinions about how halthy walkin an bikin to/rom school is or thir chil Vry Unhalthy, 2% Vry Halthy, 39% Unhalthy, 1% Nutral, 21% Halthy, 37% Pa 7 o 13

63 Appnix: Schools inclu in rport School Nam City Tim Prio Anrws Anrws May 2009 Anola Mil School Anola Apr 2012 Carlin Park Elmntary School Anola Apr 2012 Hnry Park Elmntary School Anola Apr 2012 Hamilton Hihts Mil School Arcaia May 2009 Bainbri Elmntary School Bainbri May 2011 Batsvill Community School Corp Batsvill May 2012 St. Louis Batsvill Apr 2012 South Aams Elmntary School Brn May 2008 South Aams Elmntary/Mil School Brn Mar 2011 South Aams Junior/Snior Hih School Brn May 2008 North Knox Cntral Elmntary School Bicknll Sp 2010 Arlinton Elmntary School Bloominton May 2012 Binor Elmntary School Bloominton May 2012 Chils Elmntary School Bloominton May 2012 Ewoo Primary School Bloominton Oct 2008 Fairviw Elmntary School Bloominton May 2012 Hihlan Park Elmntary School Bloominton May 2012 Rors Elmntary School Bloominton May 2012 Tmplton Elmntary School Bloominton May 2012 Tri-North Mil School Bloominton May 2012 Univrsity Elmntary School Bloominton May 2012 Triton Junior/Snior Hih School Bourbon May 2009 Forst Park Elmntary School Brazil Apr 2008 Franklin County Community School District Brookvill May 2012 Brown Elmntary School Brownsbur May 2010 Eal Elmntary School Brownsbur May 2010 Eastsi Junior Hih School Butlr May 2012 Eastsi Junior Hih School Butlr Apr 2012 Wstrn Wayn Elmntary School Cambri City Oct 2007 Cannlton Junior/Snior Hih School Cannlton Apr 2011 Cannlton Mil/Snior Hih School School Cannlton May 2009 Myrs Gra School Cannlton May 2009 WM Bnntt Larnin Cannlton May 2009 Carlisl Elmntary Mil School Carlisl May 2009 Carml Elmntary School Carml May 2009 Coll Woo Elmntary School Carml May 2009 Crksi Mil School Carml May 2009 Prairi Trac Elmntary School Carml May 2009 Wst Clay Carml May 2009 Pa 8 o 13

64 School Nam City Tim Prio Hanovr Cntral Mil School Car Lak Jan 2008 Jan Ball Elmntary School Car Lak Jan 2008 Chanlr Elmntary School Chanlr May 2008 Cntral Elmntary School Clinton Apr 2012 CSA-Lincoln Columbus May 2009 Cntral Mil School Columbus May 2009 Clity Crk Columbus May 2008 Fora Columbus May 2008 Lincoln Elmntary School Columbus May 2008 Parksi Elmntary School Columbus May 2008 Richars Elmntary School Columbus May 2009 Richars Elmntary School Columbus May 2008 Schmitt Elmntary School Columbus May 2008 Smith Columbus May 2008 Southsi Elmntary School Columbus May 2008 Taylorsvill Columbus May 2008 Hoovr Elmntary School Craworsvill May 2010 Tuttl Mil School Craworsvill Dc 2012 Timothy Ball Elmntary School Crown Point May 2010 Mil School Danvill Oct 2011 South Elmntary School Danvill Oct 2011 Bllmont Mil School Dcatur Oct 2010 Bibich Elmntary School Dyr May 2009 N Knox E Elmntary Junior Hih School Ewarsport May 2008 Hawthorn Elmntary School Elkhart Oct 2009 Elwoo Oaklan Elmntary School Elwoo Oct 2008 Stockwll Elmntary School Evansvill Apr 2012 Tkoppl Elmntary School Evansvill Oct 2010 Fort Branch Community School Fort Branch May 2009 South Gibson Elmntary School Fort Branch Jan 2008 Blackhawk Christian Schools Fort Wayn May 2007 Blackhawk Mil School Fort Wayn May 2007 Haly Elmntary School Fort Wayn Apr 2007 Hoalan Elmntary School Fort Wayn May 2007 St. Charls Borromo School Fort Wayn May 2009 St. Ptrs Luthran Fort Wayn May 2007 Fortvill Elmntary School Fortvill Oct 2011 Mount Vrnon 8th Gra Acamy Fortvill Oct 2011 Mount Vrnon Mil School Fortvill Oct 2011 Aspir Chartr School Gary Sp 2012 Bailly Elmntary School Gary Oct 2012 Bannkr Achivmnt Cntr Gary Apr 2011 Brunswick Elmntary School Gary Oct 2012 Pa 9 o 13

65 School Nam City Tim Prio Chartr School o th Duns Gary Oct 2012 Danil Wbstr Elmntary School Gary Oct 2012 Gary Lihthous Chartr School Gary Sp 2012 Gln Park Acamy Gary Oct 2012 Jrson Elmntary School Gary Jan 2013 La Coll Prp Gary Oct 2012 Marqutt Gary Apr 2011 Marqutt Elmntary School Gary May 2013 Tha Bowman Gary Sp 2012 Watson Elmntary School Gary Oct 2012 Wst Gary Lihthous Gary Sp 2012 South Aams Mil School Gnva May 2008 Ray Elmntary School Griith May 2009 Harstown Elmntary School Harstown Apr 2013 Harstown Elmntary School Harstown Oct 2010 Harstown Junior/Snior Hih School Harstown Apr 2013 Hamilton Community Schools Hamilton Sp 2009 Blackor Junior Hih School Hartor City Apr 2011 Montplir School Hartor City Apr 2011 Northsi Elmntary School Hartor City Apr 2011 Southsi Elmntary School Hartor City May 2011 Cross Cli-Hop Intrmiat School Hop May 2011 Hausr Junior Hih School Hop Apr 2013 Hausr Junior Snior Hih School Hop Apr 2011 Hop Elmntary School Hop Apr 2013 Huntinbur Elmntary School Huntinbur May 2012 Southri Mil School Huntinbur May 2012 Crstviw Huntinton May 2009 Flint May s Huntinton May 2009 Horac Mann Huntinton May 2009 Huntinton Catholic 1 Huntinton May 2009 Huntinton Catholic 2 Huntinton May 2009 Lancastr Huntinton May 2009 Lincoln Huntinton May 2009 Northwst Huntinton May 2009 Rivrviw Huntinton May 2009 Blzr Mil School Inianapolis May 2010 Cntr or Inquiry at IPS 27 Inianapolis Apr 2012 Crstviw Elmntary School Inianapolis May 2012 Harrison Hill Elmntary School Inianapolis May 2010 Hatti B. Stoks Elmntary School Inianapolis May 2008 Sunnysi Elmntary School Inianapolis May 2010 Thomas D. Gr School 15 Inianapolis May 2010 Pa 10 o 13

66 School Nam City Tim Prio knnar Elmntary School Knnar May 2009 Mapl Crst Elmntary School Kokomo May 2009 Mapl Crst Mil School Kokomo May 2009 Hailmann Elmntary School LaPort May 2009 Lansvill Junior/Snior Hih School Lansvill May 2007 Librty Elmntary School Librty May 2008 Union County Mil School Librty May 2008 Linton-Stockton Junior Hih School Linton May 2011 Fairviw Loansport Oct 2011 Franklin Elmntary School Loansport Oct 2008 Lansvill Community School Corporation Loooot May 2007 Marno Elmntary School Marno May 2008 Eastbrook Junior Hih School Marion Apr 2011 Burris Elmntary School Mitchll May 2008 Hatil Elmntary School Mitchll May 2008 Mitchll Junior Hih School Mitchll May 2008 Maowlawn Elmntary School Monticllo Sp 2010 Oaklawn Elmntary School Monticllo Sp 2010 Roosvlt Mil School Monticllo Sp 2010 Woolawn Elmntary School Monticllo Sp 2010 Wst Elmntary School Mount Vrnon May 2008 Lonllow Elmntary School Munci Apr 2012 Northsi Mil School Munci Apr 2012 Storr Elmntary School Munci Apr 2012 Sutton Elmntary School Munci Apr 2012 Wst Viw Elmntary School Munci Apr 2012 Cntral Luthran School Nw Havn May 2012 Hihlan Trrac School Nw Havn May 2012 Maowbrook Nw Havn May 2012 Saint John Th Baptist School Nw Havn May 2012 Saint John th Baptist Nw Havn May 2012 Sharon Elmntary School Nwburh May 2010 Nobl Crossin Noblsvill Oct 2008 Whit Rivr Elmntary School Noblsvill May 2010 North Librty Elmntary School North Librty Apr 2011 N Vrnon Elmntary School North Vrnon Oct 2007 Ossian Elmntary School Ossian May 2011 Pnlton Mil School Pnlton Nov 2010 Pnnvill Elmntary School Pnnvill May 2008 Pnnvill Elmntary School Pnnvill May 2012 Jrson Elmntary School Plymouth Apr 2012 Rivrsi Intrmiat School Plymouth Apr 2012 East Elmntary School Portlan May 2012 Pa 11 o 13

67 School Nam City Tim Prio East Jay Mil School Portlan May 2012 Gnral Shanks Elmntary School Portlan May 2012 Ju Hayns Elmntary School Portlan May 2012 Rky Elmntary School Rky Oct 2011 Monntt Elmntary School Rnsslar May 2012 Dnnis Mil School Richmon Apr 2008 Roanok Roanok May 2009 Rossvill Elmntary School Rossvill May 2012 Rossvill Mil School Rossvill May 2011 Clark Mil School Saint John May 2009 Brai Shrum Lowr Elmntary School Salm May 2008 Brai Shrum Uppr Elmntary School Salm May 2008 Salm Mil School Salm May 2008 Slma Elmntary School Slma Sp 2012 Hnricks Elmntary School Shlbyvill May 2012 Northpoint Elmntary School South Bn Oct 2009 Fishr Elmntary School Spway May 2008 Spway Junior Hih School Spway May 2008 Spncr Elmntary School Spncr May 2010 Rivral Elmntary School St. Jo May 2011 Rivral Elmntary School St. Jo May 2011 Sunman Elmntary School Sunman Apr 2011 William Tll Elmntary School Tll City Oct 2008 D Vany Elmntary School Trr Haut May 2009 Suar Grov Elmntary School Trr Haut May 2009 Cooks Cornr Valparaiso May 2009 South Riply Vrsaills Apr 2012 Clark Mil School Vincnns Oct 2011 Francis Vio Elmntary School Vincnns Oct 2011 O.J. Nihbours Elmntary School Wabash Oct 2012 W.C. Mills Elmntary School Wabash Oct 2012 Wabash Mil School Wabash Oct 2012 Salamoni Warrn May 2009 North Elmntary School Washinton Oct 2008 Watrloo Elmntary SRTS Watrloo May 2012 Cary Ri Elmntary School Wstil May 2010 Mapl Gln Elmntary School Wstil May 2010 Monon Trail Gln Elmntary School Wstil May 2010 Oak Trac Elmntary School Wstil Apr 2012 Oak Trac Elmntary School Wstil May 2010 Shamrock May s Wstil May 2010 Washinton Woos Elmntary School Wstil May 2010 Wstil Intrmiat School Wstil May 2010 Pa 12 o 13

68 School Nam City Tim Prio Wstvill Elmntary School Wstvill May 2012 Prry-Worth Elmntary School Whitstown Apr 2012 Whitin Hih School Whitin May 2012 Whitin Mil School Whitin May 2012 WC Hih School Winamac May 2010 Bakr Elmntary School Winchstr May 2010 Willar Elmntary School Winchstr May 2010 Laklan Christian Acamy Winona Lak May 2010 Wooburn Elmntary School Wooburn May 2010 Wooburn Luthran Elmntary School Wooburn May 2010 Pa 13 o 13

69 Prcnt o Trips Prcnt o Trips Prcnt o Trips Prcnt o Trips Travl Tally Rport: Yar by Yar Stunt Travl Mos in Iniana Yar Numbr o Tally-submittin Schools Mornin an Atrnoon Travl Mos ovr Tim 60% Mornin Atrnoon 60% Mornin Atrnoon 50% 50% 40% 40% 30% 30% 20% 20% 10% 10% 0% Walk Bik School Bus Family Carpool Transit Vhicl Othr 0% Walk Bik School Bus Family Carpool Transit Vhicl Othr 60% Mornin Atrnoon 60% Mornin Atrnoon 50% 50% 40% 40% 30% 30% 20% 20% 10% 10% 0% Walk Bik School Bus Family Carpool Transit Vhicl Othr 0% Walk Bik School Bus Family Carpool Transit Vhicl Othr S Appnix: Schools an tim prios inclu in rport

70 Prcnt o Trips Prcnt o Trips Prcnt o Trips % Mornin Atrnoon 60% Mornin Atrnoon 50% 50% 40% 40% 30% 30% 20% 20% 10% 10% 0% Walk Bik School Bus Family Carpool Transit Vhicl Othr 0% Walk Bik School Bus Family Carpool Transit Vhicl Othr 60% 50% Mornin Atrnoon 40% 30% 20% 10% 0% Walk Bik School Bus Family Carpool Transit Vhicl Othr Pa 2 o 13

71 Mornin an Atrnoon Travl Mos ovr Tim 2007 Numbr o Trips Walk Bik School Bus Family Vhicl Carpool Transit Othr Mornin 24,798 10% 2% 47% 37% 5% 0.0% 0% Atrnoon 24,412 12% 2% 52% 29% 5% 0.1% 0% 2008 Numbr o Trips Walk Bik School Bus Family Vhicl Carpool Transit Othr Mornin 82,438 7% 2% 50% 36% 4% 0.5% 0% Atrnoon 79,920 10% 2% 54% 29% 4% 0.6% 0% 2009 Numbr o Trips Walk Bik School Bus Family Vhicl Carpool Transit Othr Mornin 76,211 6% 1% 53% 35% 4% 0.5% 0% Atrnoon 73,528 9% 1% 57% 29% 4% 0.5% 0% 2010 Numbr o Trips Walk Bik School Bus Family Vhicl Carpool Transit Othr Mornin 51,276 7% 1% 54% 35% 3% 0.2% 0% Atrnoon 50,222 10% 1% 58% 27% 3% 0.2% 0% 2011 Numbr o Trips Walk Bik School Bus Family Vhicl Carpool Transit Othr Mornin 56,055 6% 1% 52% 37% 4% 0.4% 0% Atrnoon 54,284 9% 1% 54% 31% 4% 0.5% 0% 2012 Numbr o Trips Walk Bik School Bus Family Vhicl Carpool Transit Othr Mornin 74,231 8% 1% 50% 38% 3% 0.1% 0% Atrnoon 70,371 10% 1% 53% 32% 3% 0.2% 0% 2013 Numbr o Trips Walk Bik School Bus Family Vhicl Carpool Transit Othr Mornin 369 7% 0% 38% 52% 3% 0.3% 0% Atrnoon 373 9% 1% 52% 36% 2% 0.3% 0% Prcntas may not total 100% u to rounin. Pa 3 o 13

72 Appnix: Schools an tim prios inclu in rport 2007 School Nam City Month Wstrn Wayn Elmntary School Cambri City Nov Coll Woo Elmntary School Carml May Mohawk Trails Elmntary School Carml May Orchar Park Elmntary School Carml May Blackhawk Christian Schools Fort Wayn May Blackhawk Mil School Fort Wayn May Haly Elmntary School Fort Wayn May Hoalan Elmntary School Fort Wayn May Chambrlain Elmntary School Goshn May Chanlr Elmntary School Goshn May Goshn Mil School Goshn May Mol Elmntary School Goshn May Parksi Elmntary School Goshn May Prairi Viw Elmntary School Goshn May Wst Goshn Elmntary School Goshn May Lansvill Junior/Snior Hih School Lansvill May Linton-Stockton Elmntary School Linton Au Lansvill Community School Corporation Loooot May 2008 School Nam City Month Anola Mil School Anola Oct Carlin Park Elmntary School Anola Oct Hnry Park Elmntary School Anola Oct Ryan Park Elmntary School Anola Oct Jr Watson Elmntary School Auburn Sp McKnny-Harrison Elmntary School Auburn Sp South Aams Elmntary School Brn Apr South Aams Junior/Snior Hih School Brn Apr Arlinton Bloominton May Batchlor Mil School Bloominton Sp Chils Elmntary School Bloominton May Chils Elmntary School Bloominton Sp Ewoo Intrmiat School Bloominton Sp Ewoo Primary School Bloominton Sp Summit Elmntary School Bloominton May Tmplton Bloominton Sp Univrsity Bloominton Sp Univrsity Bloominton May Forst Park Elmntary School Brazil May Pa 4 o 13

73 2008 School Nam City Month Hanovr Cntral Mil School Car Lak Apr Jan Ball Elmntary School Car Lak May MacArthur Elmntary School Car Lak May Chanlr Elmntary School Chanlr Apr Clity Crk Columbus Apr Fora Columbus Apr Parksi Elmntary School Columbus Apr Richars Elmntary School Columbus Apr Smith Columbus Apr Southsi Elmntary School Columbus Apr Taylorsvill Columbus Apr Culvr Elmntary School Culvr Jan Davi Turnham Dal Apr Dlphi Community Elmntary School Dlphi Apr Dlphi Community Mil School Dlphi Apr N Knox E Elmntary Junior Hih School Ewarsport May Stinsvill Elmntary School Ellttsvill Sp Elwoo Elmntary School Elwoo Oct Elwoo Mil School Elwoo Oct Elwoo Oaklan Elmntary School Elwoo Oct South Aams Mil School Gnva Apr Chambrlain Elmntary School Goshn May Chanlr Elmntary School Goshn May Mol Elmntary School Goshn May Parksi Elmntary School Goshn May Prairi Viw Elmntary School Goshn May Wst Goshn Elmntary School Goshn May Mary Frank Elmntary School Granr May Cntr Grov Elmntary School Grnwoo May Cntr Grov Mil School Cntral Grnwoo May Southwstrn Jrson County School Corp. Hanovr Apr Cntr or Inquiry at IPS 84 Inianapolis Nov Hatti B. Stoks Elmntary School Inianapolis May Immaculat Hart o Mary Inianapolis Nov St Joan o Arc Inianapolis Apr Dlphi Community Mil School Laaytt Apr Librty Elmntary School Librty Apr Union County Mil School Librty Apr Franklin Elmntary School Loansport Oct Marno Elmntary School Marno May Battll Elmntary School Mishawaka Apr Bir Elmntary School Mishawaka Apr Emmons Elmntary School Mishawaka Apr Pa 5 o 13

74 2008 School Nam City Month Fr J Hums Elmntary School Mishawaka Apr John J Youn Mil School Mishawaka Apr La Sall Elmntary School Mishawaka May Librty Elmntary School Mishawaka May Twin Branch Elmntary School Mishawaka Apr Burris Elmntary School Mitchll May Hatil Elmntary School Mitchll May Mitchll Junior Hih School Mitchll Apr Wst Elmntary School Mount Vrnon Apr Nobl Crossin Noblsvill Oct Dollns Elmntary School Oolitic May Oolitic Junior Hih School Oolitic May Pnnvill Elmntary School Pnnvill May North Elmntary School Posyvill May Dnnis Mil School Richmon May Brai Shrum Lowr Elmntary School Salm May Salm Mil School Salm May Fishr Elmntary School Spway May Spway Junior Hih School Spway May William Tll Elmntary School Tll City Oct Hln Griith Washinton Nov Lna Dunn Elmntary School Washinton Apr North Elmntary School Washinton Nov Cumbrlan Elmntary School Wst Laaytt May Happy Hollow School Wst Laaytt May Jrson Elmntary School Winona Lak May Laklan Christian Acamy Winona Lak May 2009 School Nam City Month Alxanria Hih School Alxanria Oct Alxanria Monro Elmntary School Alxanria Oct Alxanria Monro Intrmiat School Alxanria Oct Anrws Anrws Apr Hamilton Hihts Mil School Arcaia May Jr Watson Elmntary School Auburn Jan McKnny-Harrison Elmntary School Auburn Jan Batchlor Mil School Bloominton May Chils Elmntary School Bloominton May Ewoo Intrmiat School Bloominton Oct Ewoo Intrmiat School Bloominton May Ewoo Primary School Bloominton Oct Summit Elmntary School Bloominton Oct Univrsity Bloominton Nov Pa 6 o 13

75 2009 School Nam City Month Triton Elmntary School Bourbon May Triton Junior/Snior Hih School Bourbon May Cannlton Mil/Snior Hih School School Cannlton Mar Myrs Gra School Cannlton Mar WM Bnntt Larnin Cannlton Mar Carlisl Elmntary Mil School Carlisl May Carml Elmntary School Carml May Coll Woo Elmntary School Carml May Crksi Mil School Carml May Prairi Trac Elmntary School Carml May Wst Clay Carml May MacArthur Elmntary School Car Lak May CSA-Lincoln Columbus May Cntral Mil School Columbus May Fora Elmntary School Columbus May Northsi Mil School Columbus May Parksi Elmntary School Columbus May Richars Elmntary School Columbus May Schmitt Elmntary School Columbus May Smith Elmntary School Columbus May Southsi Elmntary School Columbus May Culvr Elmntary School Culvr Sp Culvr Mil School Culvr Sp Davi Turnham Dal May Bibich Elmntary School Dyr Apr Hawthorn Elmntary School Elkhart Nov Stinsvill Elmntary School Ellttsvill May Stinsvill Elmntary School Ellttsvill Oct Fort Branch Community School Fort Branch Mar St. Charls Borromo School Fort Wayn May Galvston Elmntary School Galvston Nov Mary Frank Elmntary School Granr Sp Ray Elmntary School Griith May Hamilton Community Schools Hamilton Sp Crstviw Huntinton Apr Flint Sprins Huntinton Apr Horac Mann Huntinton Apr Huntinton Catholic 1 Huntinton May Huntinton Catholic 2 Huntinton May Lancastr Huntinton Apr Lincoln Huntinton May Northwst Huntinton Apr Rivrviw Huntinton Apr Pa 7 o 13

76 2009 School Nam City Month Th Projct School - Inianapolis Inianapolis Apr Knnar Elmntary School Knnar May Mapl Crst Elmntary School Kokomo May Mapl Crst Mil School Kokomo May Hailmann Elmntary School LaPort Apr Hanly Elmntary School LaPort Apr Battll Elmntary School Mishawaka Oct Bir Elmntary School Mishawaka Sp Emmons Elmntary School Mishawaka May Emmons Elmntary School Mishawaka Oct Fr J Hums Elmntary School Mishawaka Oct John J Youn Mil School Mishawaka Oct La Sall Elmntary School Mishawaka May La Sall Elmntary School Mishawaka Oct Librty Elmntary School Mishawaka Oct Twin Branch Elmntary School Mishawaka Oct Forst Hill Elmntary School Noblsvill May Hazl Dll Elmntary School Noblsvill May Hinkl Crk Elmntary School Noblsvill May Nobl Crossin Noblsvill May North Elmntary School Noblsvill May Stony Crk Elmntary School Noblsvill May Whit Rivr Elmntary School Noblsvill May Ottrbin Elmntary School Ottrbin May North Elmntary School Posyvill May Roanok Roanok Apr Clark Mil School Saint John Apr Kahlr Mil School Saint John Apr Northpoint Elmntary School South Bn Oct Taylorsvill Elmntary School Taylorsvill Mar D Vany Elmntary School Trr Haut May Suar Grov Elmntary School Trr Haut May Cooks Cornr Valparaiso May South Havn Elmntary School Valparaiso May Salamoni Warrn Apr Watrloo Elmntary School Watrloo Apr Anola Mil School Anola May Carlin Park Elmntary School Anola May Hnry Park Elmntary School Anola May Ryan Park Elmntary School Anola May North Knox Cntral Elmntary School Bicknll Sp Batchlor Mil School Bloominton May Chils Elmntary School Bloominton May Pa 8 o 13

77 2010 School Nam City Month Lakviw Elmntary School Bloominton May Tmplton Bloominton Apr Univrsity Bloominton May Brown Elmntary School Brownsbur May Eal Elmntary School Brownsbur May Fora Elmntary School Columbus May Northsi Mil School Columbus May Parksi Elmntary School Columbus May Schmitt Elmntary School Columbus May Smith Elmntary School Columbus May Hoovr Elmntary School Craworsvill May Timothy Ball Elmntary School Crown Point May Bllmont Mil School Dcatur Oct Dlphi Community Elmntary School Dlphi May Dlphi Community Mil School Dlphi May Tkoppl Elmntary School Evansvill Oct Garrtt Mil School Garrtt May J.E. Obr Elmntary School Garrtt May St Josph School Garrtt May Goshn Mil School Goshn Apr Parksi Elmntary School Goshn May Cntr Grov Elmntary School Grnwoo Apr Cntr Grov Mil School Cntral Grnwoo May Harstown Elmntary School Harstown Oct Amy Bvrlan Elmntary School Inianapolis May Blzr Mil School Inianapolis May Cntr or Inquiry at IPS 84 Inianapolis May Harrison Hill Elmntary School Inianapolis May Immaculat Hart o Mary Inianapolis Apr Sunnysi Elmntary School Inianapolis May Thomas D. Gr School 15 Inianapolis Sp Maowlawn Elmntary School Monticllo Oct Oaklawn Elmntary School Monticllo Oct Roosvlt Mil School Monticllo Oct Woolawn Elmntary School Monticllo Oct Sharon Elmntary School Nwburh May Whit Rivr Elmntary School Noblsvill Apr Pnlton Mil School Pnlton Nov Ptrsbur Elmntary School Ptrsbur Apr Spncr Elmntary School Spncr May Taylorsvill Elmntary School Taylorsvill May EP Elmntary School Winamac Apr WC Hih School Winamac Apr Pa 9 o 13

78 2010 School Nam City Month WC Mil School Winamac Apr Bakr Elmntary School Winchstr May Willar Elmntary School Winchstr May Jrson Elmntary School Winona Lak Apr Laklan Christian Acamy Winona Lak Apr Wooburn Elmntary School Wooburn May Wooburn Luthran Elmntary School Wooburn May 2011 School Nam City Month Bainbri Elmntary School Bainbri Apr South Aams Elmntary/Mil School Brn Apr Franklin County Community School District Brookvill Oct Cannlton Elmntary School Cannlton Apr Cannlton Junior/Snior Hih School Cannlton Apr Parksi Elmntary School Columbus Apr Schmitt Elmntary School Columbus Apr Smith Elmntary School Columbus Apr Mil School Danvill Oct South Elmntary School Danvill Oct Kahlr Mil School Dyr May Elwoo Elmntary School Elwoo May Elwoo Mil School Elwoo May Fortvill Elmntary School Fortvill Oct Mount Vrnon 8th Gra Acamy Fortvill Oct Mount Vrnon Mil School Fortvill Oct Bannkr Achivmnt Cntr Gary May Marqutt Gary May Blackor Junior Hih School Hartor City Apr Montplir School Hartor City Apr Northsi Elmntary School Hartor City Apr Cross Cli-Hop Intrmiat School Hop Apr Hausr Junior Snior Hih School Hop Apr Huntinbur Elmntary School Huntinbur Au Southri Mil School Huntinbur Au St Joan o Arc Inianapolis Apr St Joan o Arc Inianapolis Apr Th Projct School - Inianapolis Inianapolis May Linton-Stockton Elmntary School Linton May Linton-Stockton Junior Hih School Linton May Fairviw Loansport Oct Eastbrook Junior Hih School Marion Apr Battll Elmntary School Mishawaka Apr Bir Elmntary School Mishawaka Apr Pa 10 o 13

79 2011 School Nam City Month Emmons Elmntary School Mishawaka Apr Fr J Hums Elmntary School Mishawaka Apr La Sall Elmntary School Mishawaka Apr Librty Elmntary School Mishawaka Apr Twin Branch Elmntary School Mishawaka Apr North Librty Elmntary School North Librty Apr Ossian Elmntary School Ossian May Ottrbin Elmntary School Ottrbin May Ptrsbur Elmntary School Ptrsbur Apr East Elmntary School Portlan May East Jay Mil School Portlan May Gnral Shanks Elmntary School Portlan May Ju Hayns Elmntary School Portlan May North Elmntary School Posyvill May Rky Elmntary School Rky Oct Rivral Elmntary School St. Jo May Sunman Elmntary School Sunman Apr Taylorsvill Elmntary School Taylorsvill Apr Eastbrook South Elmntary School Uplan Apr Eastbrook South Elmntary School Uplan Apr Clark Mil School Vincnns Oct Hln Griith Washinton Apr Lna Dunn Elmntary School Washinton Apr Watrloo Elmntary School Watrloo Apr Happy Hollow School Wst Laaytt May 2012 School Nam City Month Alxanria Hih School Alxanria May Alxanria Monro Elmntary School Alxanria May Alxanria Monro Intrmiat School Alxanria May Anola Mil School Anola Apr Carlin Park Elmntary School Anola Apr Hnry Park Elmntary School Anola Apr Jr Watson Elmntary School Auburn May Batsvill Community School Corp Batsvill May Triton Elmntary School Bourbon May Franklin County Community School District Brookvill May Butlr Elmntary School Butlr May Eastsi Junior Hih School Butlr May Cannlton Elmntary School Cannlton Mar Smith-Grn Community Schools Churubusco Apr Cntral Elmntary School Clinton Apr Tuttl Mil School Craworsvill Dc Pa 11 o 13

80 2012 School Nam City Month Culvr Elmntary School Culvr May Culvr Mil School Culvr May Elwoo Elmntary School Elwoo May Elwoo Mil School Elwoo May Stockwll Elmntary School Evansvill May Garrtt Mil School Garrtt May J.E. Obr Elmntary School Garrtt May St Josph School Garrtt May Aspir Chartr School Gary Oct Bailly Elmntary School Gary Oct Brunswick Elmntary School Gary Oct Danil Hal Williams Gary Oct Gary Lihthous Chartr School Gary Oct Gln Park Acamy Gary Oct La Coll Prp Gary Oct Tha Bowman Gary Sp Watson Elmntary School Gary Oct Wst Gary Lihthous Gary Sp Blackor Junior Hih School Hartor City May Montplir School Hartor City May Northsi Elmntary School Hartor City May Southsi Elmntary School Hartor City May Huntinbur Elmntary School Huntinbur Apr Southri Mil School Huntinbur Apr Amy Bvrlan Elmntary School Inianapolis May Cntr or Inquiry at IPS 27 Inianapolis Apr Cntr or Inquiry at IPS 84 Inianapolis Apr Crstviw Elmntary School Inianapolis Apr Immaculat Hart o Mary Inianapolis Apr Skils Tst Elmntary School Inianapolis Apr Hanly Elmntary School LaPort May Emmons Elmntary School Mishawaka May South Viw Elmntary School Munci Apr Sutton Elmntary School Munci Apr Wst Viw Elmntary School Munci Apr Cntral Luthran School Nw Havn Apr Hihlan Trrac School Nw Havn Apr Hihlan Trrac School Nw Havn Apr Maowbrook Nw Havn Apr Saint John Th Baptist School Nw Havn Apr Dollns Elmntary School Oolitic May Oolitic Junior Hih School Oolitic May Pnnvill Elmntary School Pnnvill May Pa 12 o 13

81 School Nam City Month Jrson Elmntary School Plymouth Apr Rivrsi Intrmiat School Plymouth Apr Monntt Elmntary School Rnsslar May Rossvill Elmntary School Rossvill May Rossvill Mil School Rossvill May Slma Elmntary School Slma Sp Hnricks Elmntary School Shlbyvill Apr Shlbyvill Mil School Shlbyvill Apr South Riply Vrsaills Apr Francis Vio Elmntary School Vincnns Mar O.J. Nihbours Elmntary School Wabash Sp W.C. Mills Elmntary School Wabash Sp Wabash Mil School Wabash Sp Watrloo Elmntary SRTS Watrloo May Oak Trac Elmntary School Wstil Apr Wstvill Elmntary School Wstvill May Prry-Worth Elmntary School Whitstown Apr Nathan Hal Elmntary School Whitin May Whitin Hih School Whitin May Whitin Mil School Whitin May EP Elmntary School Winamac Apr WC Mil School Winamac Apr 2013 School Nam City Month Alxanria Hih School Alxanria May Alxanria Monro Elmntary School Alxanria May Jrson Elmntary School Gary Jan Marqutt Elmntary School Gary May Harstown Elmntary School Harstown Apr Harstown Junior/Snior Hih School Harstown Apr 2012 Pa 13 o 13

82 Prcnt o Trips Travl Tally Rport: Baslin stunt travl pattrns at 200 schools in Iniana 70% Mornin an Atrnoon Travl Mo Comparison 60% Mornin Atrnoon 50% 40% 30% 20% 10% 0% Walk Bik School Bus Family Vhicl Carpool Transit Othr Mornin an Atrnoon Travl Mo Comparison Numbr o School Family Walk Bik Trips Bus Vhicl Carpool Transit Othr Mornin 187,881 6% 1% 56% 34% 3% 0.2% 0.1% Atrnoon 180,786 8% 1% 59% 28% 3% 0.3% 0.3% Prcntas may not total 100% u to rounin. S Appnix: Schools an tim prios inclu in rport

83 Friay Prcnt o Trips Wnsay Prcnt o Trips Thursay Prcnt o Trips Monay Prcnt o Trips Tusay Prcnt o Trips Mornin an Atrnoon Travl Mo Comparison by Day 70% Mornin Atrnoon 70% Mornin Atrnoon 60% 60% 50% 50% 40% 40% 30% 30% 20% 20% 10% 10% 0% Walk Bik School Bus Family Carpool Transit Othr Vhicl 0% Walk Bik School Bus Family Carpool Transit Othr Vhicl 70% Mornin Atrnoon 70% Mornin Atrnoon 60% 60% 50% 50% 40% 40% 30% 30% 20% 20% 10% 10% 0% Walk Bik School Bus Family Carpool Transit Othr Vhicl 0% Walk Bik School Bus Family Carpool Transit Vhicl Othr 70% 60% Mornin Atrnoon 50% 40% 30% 20% 10% 0% Walk Bik School Bus Family Carpool Transit Othr Vhicl Pa 2 o 8

84 Mornin an Atrnoon Travl Mo Comparison by Day Numbr Family Walk Bik School Bus o Trips Vhicl Carpool Transit Othr Monay AM 5,858 4% 1% 51% 40% 3% 0% 0.1% Monay PM 5,914 8% 1% 56% 30% 5% 0.1% 0.2% Tusay AM 60,547 6% 1% 56% 34% 3% 0.2% 0.1% Tusay PM 58,844 8% 1% 60% 27% 3% 0.3% 0.3% Wnsay AM 67,719 6% 1% 57% 33% 3% 0.2% 0.2% Wnsay PM 64,794 8% 1% 59% 28% 3% 0.3% 0.3% Thursay AM 48,124 6% 1% 56% 34% 3% 0.1% 0.1% Thursay PM 45,897 8% 1% 60% 28% 3% 0.2% 0.3% Friay AM 5,633 5% 2% 52% 37% 4% 0% 0% Friay PM % 2% 57% 31% 3% 0.1% 0% Prcntas may not total 100% u to rounin. Pa 3 o 8

85 Appnix: Schools an tim prios inclu in rport School Nam City Tim Prio Anrws Anrws Apr 2009 Anola Mil School Anola Apr 2012 Carlin Park Elmntary School Anola Apr 2012 Hnry Park Elmntary School Anola Apr 2012 Hamilton Hihts Mil School Arcaia May 2009 Bainbri Elmntary School Bainbri Apr 2011 Batsvill Community School Corp Batsvill May 2012 South Aams Elmntary School Brn Apr 2008 South Aams Elmntary/Mil School Brn Apr 2011 South Aams Junior/Snior Hih School Brn Apr 2008 North Knox Cntral Elmntary School Bicknll Sp 2010 Arlinton Bloominton May 2008 Lakviw Elmntary School Bloominton May 2010 Triton Junior/Snior Hih School Bourbon May 2009 Forst Park Elmntary School Brazil May 2008 Brown Elmntary School Brownsbur May 2010 Eal Elmntary School Brownsbur May 2010 Butlr Elmntary School Butlr May 2012 Eastsi Junior Hih School Butlr May 2012 Wstrn Wayn Elmntary School Cambri City Nov 2007 Cannlton Junior/Snior Hih School Cannlton Apr 2011 Cannlton Mil/Snior Hih School School Cannlton Mar 2009 Myrs Gra School Cannlton Mar 2009 WM Bnntt Larnin Cannlton Mar 2009 Carlisl Elmntary Mil School Carlisl May 2009 Carml Elmntary School Carml May 2009 Coll Woo Elmntary School Carml May 2007 Coll Woo Elmntary School Carml May 2009 Crksi Mil School Carml May 2009 Mohawk Trails Elmntary School Carml May 2007 Orchar Park Elmntary School Carml May 2007 Prairi Trac Elmntary School Carml May 2009 Wst Clay Carml May 2009 Hanovr Cntral Mil School Car Lak Apr 2008 Jan Ball Elmntary School Car Lak May 2008 Chanlr Elmntary School Chanlr Apr 2008 Smith-Grn Community Schools Churubusco Apr 2012 Cntral Elmntary School Clinton Apr 2012 CSA-Lincoln Columbus May 2009 Cntral Mil School Columbus May 2009 Clity Crk Columbus Apr 2008 Fora Columbus Apr 2008 Pa 4 o 8

86 School Nam City Tim Prio Parksi Elmntary School Columbus Apr 2008 Richars Elmntary School Columbus Apr 2008 Richars Elmntary School Columbus May 2009 Smith Columbus Apr 2008 Southsi Elmntary School Columbus May 2009 Southsi Elmntary School Columbus Apr 2008 Taylorsvill Columbus Apr 2008 Hoovr Elmntary School Craworsvill May 2010 Tuttl Mil School Craworsvill Dc 2012 Timothy Ball Elmntary School Crown Point May 2010 Mil School Danvill Oct 2011 South Elmntary School Danvill Oct 2011 Bllmont Mil School Dcatur Oct 2010 Dlphi Community Elmntary School Dlphi Apr 2008 Bibich Elmntary School Dyr Apr 2009 Kahlr Mil School Dyr May 2011 N Knox E Elmntary Junior Hih School Ewarsport May 2008 Hawthorn Elmntary School Elkhart Nov 2009 Elwoo Oaklan Elmntary School Elwoo Oct 2008 Stockwll Elmntary School Evansvill May 2012 Tkoppl Elmntary School Evansvill Oct 2010 Fort Branch Community School Fort Branch Mar 2009 Blackhawk Christian Schools Fort Wayn May 2007 Blackhawk Mil School Fort Wayn May 2007 Haly Elmntary School Fort Wayn May 2007 Hoalan Elmntary School Fort Wayn May 2007 St. Charls Borromo School Fort Wayn May 2009 Fortvill Elmntary School Fortvill Oct 2011 Mount Vrnon 8th Gra Acamy Fortvill Oct 2011 Mount Vrnon Mil School Fortvill Oct 2011 Galvston Elmntary School Galvston Nov 2009 Aspir Chartr School Gary Oct 2012 Bailly Elmntary School Gary Oct 2012 Bannkr Achivmnt Cntr Gary May 2011 Brunswick Elmntary School Gary Oct 2012 Danil Hal Williams Gary Oct 2012 Gary Lihthous Chartr School Gary Oct 2012 Gln Park Acamy Gary Oct 2012 Jrson Elmntary School Gary Jan 2013 La Coll Prp Gary Oct 2012 Marqutt Gary May 2011 Marqutt Elmntary School Gary May 2013 Tha Bowman Gary Sp 2012 Watson Elmntary School Gary Oct 2012 Pa 5 o 8

87 School Nam City Tim Prio Wst Gary Lihthous Gary Sp 2012 South Aams Mil School Gnva Apr 2008 Ray Elmntary School Griith May 2009 Harstown Elmntary School Harstown Apr 2013 Harstown Elmntary School Harstown Oct 2010 Harstown Junior/Snior Hih School Harstown Apr 2013 Hamilton Community Schools Hamilton Sp 2009 Southwstrn Jrson County School Corp. Hanovr Apr 2008 Southsi Elmntary School Hartor City May 2012 Cross Cli-Hop Intrmiat School Hop Apr 2011 Hausr Junior Snior Hih School Hop Apr 2011 Crstviw Huntinton Apr 2009 Flint Sprins Huntinton Apr 2009 Horac Mann Huntinton Apr 2009 Huntinton Catholic 1 Huntinton May 2009 Huntinton Catholic 2 Huntinton May 2009 Lancastr Huntinton Apr 2009 Lincoln Huntinton May 2009 Northwst Huntinton Apr 2009 Rivrviw Huntinton Apr 2009 Blzr Mil School Inianapolis May 2010 Cntr or Inquiry at IPS 27 Inianapolis Apr 2012 Crstviw Elmntary School Inianapolis Apr 2012 Harrison Hill Elmntary School Inianapolis May 2010 Hatti B. Stoks Elmntary School Inianapolis May 2008 Skils Tst Elmntary School Inianapolis Apr 2012 Sunnysi Elmntary School Inianapolis May 2010 Thomas D. Gr School 15 Inianapolis Sp 2010 knnar Elmntary School Knnar May 2009 Mapl Crst Elmntary School Kokomo May 2009 Mapl Crst Mil School Kokomo May 2009 Hailmann Elmntary School LaPort Apr 2009 Dlphi Community Mil School Laaytt Apr 2008 Lansvill Junior/Snior Hih School Lansvill May 2007 Librty Elmntary School Librty Apr 2008 Union County Mil School Librty Apr 2008 Franklin Elmntary School Loansport Oct 2008 Lansvill Community School Corporation Loooot May 2007 Marno Elmntary School Marno May 2008 Eastbrook Junior Hih School Marion Apr 2011 Burris Elmntary School Mitchll May 2008 Hatil Elmntary School Mitchll May 2008 Mitchll Junior Hih School Mitchll Apr 2008 Maowlawn Elmntary School Monticllo Oct 2010 Pa 6 o 8

88 School Nam City Tim Prio Oaklawn Elmntary School Monticllo Oct 2010 Roosvlt Mil School Monticllo Oct 2010 Woolawn Elmntary School Monticllo Oct 2010 Wst Elmntary School Mount Vrnon Apr 2008 South Viw Elmntary School Munci Apr 2012 Sutton Elmntary School Munci Apr 2012 Wst Viw Elmntary School Munci Apr 2012 Cntral Luthran School Nw Havn Apr 2012 Maowbrook Nw Havn Apr 2012 Saint John Th Baptist School Nw Havn Apr 2012 Sharon Elmntary School Nwburh May 2010 Forst Hill Elmntary School Noblsvill May 2009 Hazl Dll Elmntary School Noblsvill May 2009 Hinkl Crk Elmntary School Noblsvill May 2009 North Elmntary School Noblsvill May 2009 Stony Crk Elmntary School Noblsvill May 2009 North Librty Elmntary School North Librty Apr 2011 Ossian Elmntary School Ossian May 2011 Pnlton Mil School Pnlton Nov 2010 Pnnvill Elmntary School Pnnvill May 2008 Pnnvill Elmntary School Pnnvill May 2012 Rivrsi Intrmiat School Plymouth Apr 2012 East Elmntary School Portlan May 2011 East Jay Mil School Portlan May 2011 Gnral Shanks Elmntary School Portlan May 2011 Ju Hayns Elmntary School Portlan May 2011 Rky Elmntary School Rky Oct 2011 Monntt Elmntary School Rnsslar May 2012 Dnnis Mil School Richmon May 2008 Roanok Roanok Apr 2009 Rossvill Elmntary School Rossvill May 2012 Rossvill Mil School Rossvill May 2012 Clark Mil School Saint John Apr 2009 Kahlr Mil School Saint John Apr 2009 Brai Shrum Lowr Elmntary School Salm May 2008 Brai Shrum Uppr Elmntary School Salm May 2008 Salm Mil School Salm May 2008 Slma Elmntary School Slma Sp 2012 Hnricks Elmntary School Shlbyvill Apr 2012 Shlbyvill Mil School Shlbyvill Apr 2012 Northpoint Elmntary School South Bn Oct 2009 Fishr Elmntary School Spway May 2008 Spway Junior Hih School Spway May 2008 Spncr Elmntary School Spncr May 2010 Pa 7 o 8

89 School Nam City Tim Prio Rivral Elmntary School St. Jo May 2011 Sunman Elmntary School Sunman Apr 2011 William Tll Elmntary School Tll City Oct 2008 D Vany Elmntary School Trr Haut May 2009 Suar Grov Elmntary School Trr Haut May 2009 Cooks Cornr Valparaiso May 2009 South Havn Elmntary School Valparaiso May 2009 South Riply Vrsaills Apr 2012 Clark Mil School Vincnns Oct 2011 Francis Vio Elmntary School Vincnns Mar 2012 O.J. Nihbours Elmntary School Wabash Sp 2012 W.C. Mills Elmntary School Wabash Sp 2012 Wabash Mil School Wabash Sp 2012 Salamoni Warrn Apr 2009 North Elmntary School Washinton Nov 2008 Watrloo Elmntary SRTS Watrloo May 2012 Cumbrlan Elmntary School Wst Laaytt May 2008 Oak Trac Elmntary School Wstil Apr 2012 Wstvill Elmntary School Wstvill May 2012 Prry-Worth Elmntary School Whitstown Apr 2012 Whitin Mil School Whitin May 2012 WC Hih School Winamac Apr 2010 Bakr Elmntary School Winchstr May 2010 Willar Elmntary School Winchstr May 2010 Wooburn Elmntary School Wooburn May 2010 Wooburn Luthran Elmntary School Wooburn May 2010 Pa 8 o 8

90 Sa Routs to School Partnrship Survy - Stakholrs 1.Introuction Walkinanbicyclintoschoolisanimportantcaus.ThlarsothInianaSaRoutstoSchoolPartnrship, convnvbyhalthbydsin,arintrstinyouriasonthopportunitisanobstaclsorwalkinanbicyclin toschoolininiana.whopyouranswrswillalsohlpwithuturactivitisothinianasaroutstoschool Partnrship.Allrsponsswillbanonymousunlssyouchoostoproviyourcontactinormation. ThInianaStatDpartmntoHalthISDH)ispartnrinwiththInianaDpartmntoTransportationINDOT)to promotsaroutstoschoolnon inrastructurproramsthrouhoutthstat.somothinormationathrby thissurvywillbustoassssthstatwiproramantobttrinormisdhanindotaboutyourxprinc withsaroutstoschool.thrsultsothissurvywillbcompilinarportputtothrbyisdh. Thissurvyshoultaklssthan10minutstocomplt. Thankyouoryourparticipation

91 Sa Routs to School Partnrship Survy - Stakholrs 2.Backroun Inormation 1. County o Employmnt 2. Fil o Work chck all that apply) c Eucation K 8 c Eucation 9 12 c Halth nral c Transportation c Eucation hihrucation c Halth physicalactivity&obsityprvntion c Halth injuryprvntion c Othrplasspciy) c Plannin c Eninrin c Lawnorcmnt 3. Hav you bn involv in any Sa Routs to School applications? j Ys k l m n j No k l m n Optionalcommntbox How lon hav you bn intrst in walkin an bicyclin to school? j Lssthan6months k l m n j 6monthsto1yar k l m n j 1to2yars k l m n j 2to5yars k l m n j Morthan5yars k l m n 5. How woul you rat your currnt knowl o walkin an bicyclin to school an Sa Routs to School prorams? j Binnr k l m n j Intrmiat k l m n j Avanc k l m n j Exprt k l m n

92 Sa Routs to School Partnrship Survy - Stakholrs 3.Opportunitis an Obstacls or Walkin an Bicyclin to School 1. In your opinion, what ar th top 3 strnths that support walkin an bicyclin to school in Iniana? c Supportivschoolpolicis c Lawnorcmntinvolvmnt c Aquatinrastructur..,siwalks,crosswalks,tc.) c Parntalsupportaninvolvmnt c Supportivschoolaministration c Othrplasspciy) c Sanihborhoos c Schoolslocatwithinnihborhoos c Commonblithatchilrnshoulwalkorbicycltoschool 2. In your opinion, what ar th top 3 bnits to walkin an bicyclin to school? c Improvhalth c Incrassnsocommunity c Improvairquality/Dcraspollution c Dcrasbusinanulxpnss c Chilrnarrivatschoolprpartolarn c Ructraicanconstion c Incrasinpnncanrsponsibilityinstunts c Ruccrim c Incrasqualitytimbtwnparnts/uariansanchilrn c Othrplasspciy) 3. In your opinion, what ar th top 5 barrirs that hampr walkin an bicyclin to school? c Rstrictivschoolpolicis c Lackoinormationorskillsrarinbicyclanpstrian c Poor/Missininrastructur.,siwalks,crosswalks,tc.) c Lackoparntalsupportaninvolvmnt c Lackoschoolaministrationsupport c Wathr c Distancbtwnhomanschool c Poorcommunitysin c Incrastimaninconvnincorparnts/uariansan chilrn.,wakinarlir,lavinarlir) c Lackostuntmotivationtowalkorbicycltoschool c Lackounin saty c Lackolawnorcmntinvolvmnt c Prcptionsoanr c Schoolmatrials..,backpacks,banquipmnt,tc.)artoo havy c Ovrpnnconautomotivtransportation c Tooarkinthmornins c Nocrossinuars c Othrplasspciy)

93 Sa Routs to School Partnrship Survy - Stakholrs 4. What topics woul you lik to rciv trainin on to hlp you promot walkin an bicyclin to school? chck all that apply) c Compltinawalkinanbicyclinassssmnt c Proviininnovativncouramntactivitis c ApplyinorralSaRoutstoSchoolunin c Partnrinwithparnts/uarians c Promotinwalkinanbicyclintoschoolthrouhlocalmia c Dvlopinparnt/uariananschoolaministratorsupport c Establishinwalkinschoolbussorbicycltrains c Proviinctivpstriananbicyclsatyucation c Cratinpolicisthatsupportwalkinanbicyclintoschool c Dvlopinawalkinanbicyclintoschooltransportationplan prorams c Othrplasspciy) 5. How o you prr to rciv inormation on walkin an bicyclin to school? chck all that apply) c Annualconrnc c Sminar c Listsrvupat c Conrnccall c Wbinar c Rularlyschulac to acmtins c Socialmia..,Facbook,blo,tc.) c Mailins

94 Sa Routs to School Partnrship Survy - Stakholrs 4.Futur Dirction o Walkin an Bicyclin to School Workroup 1. How many Sa Routs to School Partnrship mtins hav you attn? j All k l m n j Most k l m n j Som,butnotmost k l m n j Aw k l m n j Non k l m n 2. Ovrall, how satisi ar you with th prormanc o th Sa Routs to School Partnrship? j Vrysatisi k l m n j Satisi k l m n j Unsatisi k l m n j Vryunsatisi k l m n j Noopinion k l m n 3. What woul o you nvision as th utur rol o th Sa Routs to School Partnrship? chck your top 3 rols) c Avocatorwalkinanbicyclintoschoolpolicisan unin c Promotlocalorts c Provitchnicalassistanc c Promotstatwiorts c Oranizntworkinopportunitis c Promotuninopportunitis c Othrplasspciy) c Provitrainin

95 Sa Routs to School Partnrship Survy - Stakholrs 4. How woul you lik to participat in walkin an bicyclin to school orts? chck all that apply) c Establishinlocalprorams c AttninWorkroupcalls,mtins,antrainins c Participatinonastatwistrincommitt c Plannintrainins c RcivininormationromthWorkroup c Avocatinorpolicissupportinwalkinanbicyclinto c Prsntinatworkshops school c Oranizinntworkinopportunitis c Intiyinanpromotinunin c Othrplasspciy) c Rlayininormationtolocalpartnrsancision makrs c Ionotwishtoparticipat 5. Do you hav any nral thouhts or input at this tim? I you woul lik to rciv mor inormation about how to participat in th spciic activitis you slct, plas provi your nam an mail arss. Your nam an mail will only b link to your rspons or th prvious qustion I you woul lik to srv in an incras larship rol within th Partnrship, plas provi us with your nam an mail arss. Your nam an mail will not b link to any othr rspons. 5 6

96 Sa Routs to School Partnrship Survy - Stakholrs 5. Thank You Thank you or your tim. W ratly apprciat your input. For mor inormation on walkin an bicyclin to school in Iniana, plas visit: Th Iniana Halthy Wiht Initiativ Halth by Dsin Th Iniana Sa Routs to School Proram Contact inormation or th la ancy or th survy: Iniana Stat Dpartmnt o Halth 2 North Mriian Strt Inianapolis, IN Phon: 317) [email protected]

B-285141. April 21, 2000. The Honorable Charles B. Rangel Ranking Minority Member Committee on Ways and Means House of Representatives

B-285141. April 21, 2000. The Honorable Charles B. Rangel Ranking Minority Member Committee on Ways and Means House of Representatives Unit Stats Gnral Accounting Offic Washington, DC 20548 Halth, Eucation, an Human Srvics Division B-285141 April 21, 2000 Th Honorabl Charls B. Rangl Ranking Minority Mmbr Committ on Ways an Mans Hous of

More information

Category 7: Employee Commuting

Category 7: Employee Commuting 7 Catgory 7: Employ Commuting Catgory dscription This catgory includs missions from th transportation of mploys 4 btwn thir homs and thir worksits. Emissions from mploy commuting may aris from: Automobil

More information

Adverse Selection and Moral Hazard in a Model With 2 States of the World

Adverse Selection and Moral Hazard in a Model With 2 States of the World Advrs Slction and Moral Hazard in a Modl With 2 Stats of th World A modl of a risky situation with two discrt stats of th world has th advantag that it can b natly rprsntd using indiffrnc curv diagrams,

More information

STATEMENT OF INSOLVENCY PRACTICE 3.2

STATEMENT OF INSOLVENCY PRACTICE 3.2 STATEMENT OF INSOLVENCY PRACTICE 3.2 COMPANY VOLUNTARY ARRANGEMENTS INTRODUCTION 1 A Company Voluntary Arrangmnt (CVA) is a statutory contract twn a company and its crditors undr which an insolvncy practitionr

More information

FACULTY SALARIES FALL 2004. NKU CUPA Data Compared To Published National Data

FACULTY SALARIES FALL 2004. NKU CUPA Data Compared To Published National Data FACULTY SALARIES FALL 2004 NKU CUPA Data Compard To Publishd National Data May 2005 Fall 2004 NKU Faculty Salaris Compard To Fall 2004 Publishd CUPA Data In th fall 2004 Northrn Kntucky Univrsity was among

More information

WORKERS' COMPENSATION ANALYST, 1774 SENIOR WORKERS' COMPENSATION ANALYST, 1769

WORKERS' COMPENSATION ANALYST, 1774 SENIOR WORKERS' COMPENSATION ANALYST, 1769 08-16-85 WORKERS' COMPENSATION ANALYST, 1774 SENIOR WORKERS' COMPENSATION ANALYST, 1769 Summary of Dutis : Dtrmins City accptanc of workrs' compnsation cass for injurd mploys; authorizs appropriat tratmnt

More information

E X C H A N G E R U L E S A N D C L E A R I N G R U L E S O F N A S D A Q O M X D E R I V A T I V E S M A R K E T S

E X C H A N G E R U L E S A N D C L E A R I N G R U L E S O F N A S D A Q O M X D E R I V A T I V E S M A R K E T S E X C H A N G E R U L E S A N D C L E A R I N G R U L E S O F N A S D A Q O M X D E R I V A T I V E S M A R K E T S Fair Valu 1 Valuation Variabls Tabl 1 blow shows th variabls us in th rspctiv valuation

More information

Rural and Remote Broadband Access: Issues and Solutions in Australia

Rural and Remote Broadband Access: Issues and Solutions in Australia Rural and Rmot Broadband Accss: Issus and Solutions in Australia Dr Tony Warrn Group Managr Rgulatory Stratgy Tlstra Corp Pag 1 Tlstra in confidnc Ovrviw Australia s gographical siz and population dnsity

More information

QUANTITATIVE METHODS CLASSES WEEK SEVEN

QUANTITATIVE METHODS CLASSES WEEK SEVEN QUANTITATIVE METHODS CLASSES WEEK SEVEN Th rgrssion modls studid in prvious classs assum that th rspons variabl is quantitativ. Oftn, howvr, w wish to study social procsss that lad to two diffrnt outcoms.

More information

A Project Management framework for Software Implementation Planning and Management

A Project Management framework for Software Implementation Planning and Management PPM02 A Projct Managmnt framwork for Softwar Implmntation Planning and Managmnt Kith Lancastr Lancastr Stratgis [email protected] Th goal of introducing nw tchnologis into your company

More information

The example is taken from Sect. 1.2 of Vol. 1 of the CPN book.

The example is taken from Sect. 1.2 of Vol. 1 of the CPN book. Rsourc Allocation Abstract This is a small toy xampl which is wll-suitd as a first introduction to Cnts. Th CN modl is dscribd in grat dtail, xplaining th basic concpts of C-nts. Hnc, it can b rad by popl

More information

YouthWorks Youth Works (yüth- w rkz), n.

YouthWorks Youth Works (yüth- w rkz), n. YouthWorks Youth Works(yüth- w rkz),n. 1. Baltimor City s summr jobs program. 2. Crats carr pathways for Baltimor City youth. 3. Givs Baltimor mployrs opportunitis to train thir futur workforc. Opportunity

More information

5 2 index. e e. Prime numbers. Prime factors and factor trees. Powers. worked example 10. base. power

5 2 index. e e. Prime numbers. Prime factors and factor trees. Powers. worked example 10. base. power Prim numbrs W giv spcial nams to numbrs dpnding on how many factors thy hav. A prim numbr has xactly two factors: itslf and 1. A composit numbr has mor than two factors. 1 is a spcial numbr nithr prim

More information

IBM Healthcare Home Care Monitoring

IBM Healthcare Home Care Monitoring IBM Halthcar Hom Car Monitoring Sptmbr 30th, 2015 by Sal P. Causi, P. Eng. IBM Halthcar Businss Dvlopmnt Excutiv [email protected] IBM Canada Cloud Computing Tigr Tam Homcar by dfinition 1. With a gnsis

More information

Econ 371: Answer Key for Problem Set 1 (Chapter 12-13)

Econ 371: Answer Key for Problem Set 1 (Chapter 12-13) con 37: Answr Ky for Problm St (Chaptr 2-3) Instructor: Kanda Naknoi Sptmbr 4, 2005. (2 points) Is it possibl for a country to hav a currnt account dficit at th sam tim and has a surplus in its balanc

More information

Chapter 2: Privatization, Diffusion of Share Ownership, and Politics

Chapter 2: Privatization, Diffusion of Share Ownership, and Politics Chiara ratton-lavoi Chaptr Chaptr : rivatization Diusion o har wnrship an olitics. Introuction inc th 980s many national govrnmnts hav pursu privatization programs. Although th wor "privatization" ncompasss

More information

AP Calculus AB 2008 Scoring Guidelines

AP Calculus AB 2008 Scoring Guidelines AP Calculus AB 8 Scoring Guidlins Th Collg Board: Conncting Studnts to Collg Succss Th Collg Board is a not-for-profit mmbrship association whos mission is to connct studnts to collg succss and opportunity.

More information

Free ACA SOLUTION (IRS 1094&1095 Reporting)

Free ACA SOLUTION (IRS 1094&1095 Reporting) Fr ACA SOLUTION (IRS 1094&1095 Rporting) Th Insuranc Exchang (301) 279-1062 ACA Srvics Transmit IRS Form 1094 -C for mployrs Print & mail IRS Form 1095-C to mploys HR Assist 360 will gnrat th 1095 s for

More information

Remember you can apply online. It s quick and easy. Go to www.gov.uk/advancedlearningloans. Title. Forename(s) Surname. Sex. Male Date of birth D

Remember you can apply online. It s quick and easy. Go to www.gov.uk/advancedlearningloans. Title. Forename(s) Surname. Sex. Male Date of birth D 24+ Advancd Larning Loan Application form Rmmbr you can apply onlin. It s quick and asy. Go to www.gov.uk/advancdlarningloans About this form Complt this form if: you r studying an ligibl cours at an approvd

More information

5.4 Exponential Functions: Differentiation and Integration TOOTLIFTST:

5.4 Exponential Functions: Differentiation and Integration TOOTLIFTST: .4 Eponntial Functions: Diffrntiation an Intgration TOOTLIFTST: Eponntial functions ar of th form f ( ) Ab. W will, in this sction, look at a spcific typ of ponntial function whr th bas, b, is.78.... This

More information

CDP. Module: Introduction. Page: W0. Introduction. CDP 2014 Water 2014 Information Request W0.1. Introduction

CDP. Module: Introduction. Page: W0. Introduction. CDP 2014 Water 2014 Information Request W0.1. Introduction CDP CDP 2014 Watr 2014 Information Rqust Barloworl Moul: Introuction Pag: W0. Introuction W0.1 Introuction Plas giv a gnral scription an introuction to our organization. BARLOWORLD (BAW) is a istributor

More information

REPORT' Meeting Date: April 19,201 2 Audit Committee

REPORT' Meeting Date: April 19,201 2 Audit Committee REPORT' Mting Dat: April 19,201 2 Audit Committ For Information DATE: March 21,2012 REPORT TITLE: FROM: Paul Wallis, CMA, CIA, CISA, Dirctor, Intrnal Audit OBJECTIVE To inform Audit Committ of th rsults

More information

union scholars program APPLICATION DEADLINE: FEBRUARY 28 YOU CAN CHANGE THE WORLD... AND EARN MONEY FOR COLLEGE AT THE SAME TIME!

union scholars program APPLICATION DEADLINE: FEBRUARY 28 YOU CAN CHANGE THE WORLD... AND EARN MONEY FOR COLLEGE AT THE SAME TIME! union scholars YOU CAN CHANGE THE WORLD... program AND EARN MONEY FOR COLLEGE AT THE SAME TIME! AFSCME Unitd Ngro Collg Fund Harvard Univrsity Labor and Worklif Program APPLICATION DEADLINE: FEBRUARY 28

More information

CARE QUALITY COMMISSION ESSENTIAL STANDARDS OF QUALITY AND SAFETY. Outcome 10 Regulation 11 Safety and Suitability of Premises

CARE QUALITY COMMISSION ESSENTIAL STANDARDS OF QUALITY AND SAFETY. Outcome 10 Regulation 11 Safety and Suitability of Premises CARE QUALITY COMMISSION ESSENTIAL STANDARDS OF QUALITY AND SAFETY Outcom 10 Rgulation 11 Safty and Suitability of Prmiss CQC Rf 10A 10A(1) Lad Dirctor / Lad Officr Rspons Impact Liklihood Lvl of Concrn

More information

C H A P T E R 1 Writing Reports with SAS

C H A P T E R 1 Writing Reports with SAS C H A P T E R 1 Writing Rports with SAS Prsnting information in a way that s undrstood by th audinc is fundamntally important to anyon s job. Onc you collct your data and undrstand its structur, you nd

More information

TIME MANAGEMENT. 1 The Process for Effective Time Management 2 Barriers to Time Management 3 SMART Goals 4 The POWER Model e. Section 1.

TIME MANAGEMENT. 1 The Process for Effective Time Management 2 Barriers to Time Management 3 SMART Goals 4 The POWER Model e. Section 1. Prsonal Dvlopmnt Track Sction 1 TIME MANAGEMENT Ky Points 1 Th Procss for Effctiv Tim Managmnt 2 Barrirs to Tim Managmnt 3 SMART Goals 4 Th POWER Modl In th Army, w spak of rsourcs in trms of th thr M

More information

Architecture of the proposed standard

Architecture of the proposed standard Architctur of th proposd standard Introduction Th goal of th nw standardisation projct is th dvlopmnt of a standard dscribing building srvics (.g.hvac) product catalogus basd on th xprincs mad with th

More information

Logo Design/Development 1-on-1

Logo Design/Development 1-on-1 Logo Dsign/Dvlopmnt 1-on-1 If your company is looking to mak an imprssion and grow in th marktplac, you ll nd a logo. Fortunatly, a good graphic dsignr can crat on for you. Whil th pric tags for thos famous

More information

by John Donald, Lecturer, School of Accounting, Economics and Finance, Deakin University, Australia

by John Donald, Lecturer, School of Accounting, Economics and Finance, Deakin University, Australia Studnt Nots Cost Volum Profit Analysis by John Donald, Lcturr, School of Accounting, Economics and Financ, Dakin Univrsity, Australia As mntiond in th last st of Studnt Nots, th ability to catgoris costs

More information

Sci.Int.(Lahore),26(1),131-138,2014 ISSN 1013-5316; CODEN: SINTE 8 131

Sci.Int.(Lahore),26(1),131-138,2014 ISSN 1013-5316; CODEN: SINTE 8 131 Sci.Int.(Lahor),26(1),131-138,214 ISSN 113-5316; CODEN: SINTE 8 131 REQUIREMENT CHANGE MANAGEMENT IN AGILE OFFSHORE DEVELOPMENT (RCMAOD) 1 Suhail Kazi, 2 Muhammad Salman Bashir, 3 Muhammad Munwar Iqbal,

More information

Continuity Cloud Virtual Firewall Guide

Continuity Cloud Virtual Firewall Guide Cloud Virtual Firwall Guid uh6 Vrsion 1.0 Octobr 2015 Foldr BDR Guid for Vam Pag 1 of 36 Cloud Virtual Firwall Guid CONTENTS INTRODUCTION... 3 ACCESSING THE VIRTUAL FIREWALL... 4 HYPER-V/VIRTUALBOX CONTINUITY

More information

Entry Voice Mail for HiPath Systems. User Manual for Your Telephone

Entry Voice Mail for HiPath Systems. User Manual for Your Telephone Entry Voic Mail for HiPath Systms Usr Manual for Your Tlphon About This Usr Manual About This Usr Manual This usr manual is intndd for Entry Voic Mail usrs and traind oprators who ar rsponsibl for confiurin

More information

Traffic Flow Analysis (2)

Traffic Flow Analysis (2) Traffic Flow Analysis () Statistical Proprtis. Flow rat distributions. Hadway distributions. Spd distributions by Dr. Gang-Ln Chang, Profssor Dirctor of Traffic safty and Oprations Lab. Univrsity of Maryland,

More information

Non-Emergency Health Transport

Non-Emergency Health Transport Ovr 14 i n v r y 1 0 0 p o p l in N SW l iv NCOSS Background Papr Non-Emrgncy Halth Transport b l o w t h p o v r ty li n... Council of Social Srvic of NSW Fbruary 2014 What is transport disadvantag? Transport

More information

Section A This ONE question is compulsory and MUST be attempted

Section A This ONE question is compulsory and MUST be attempted Profssional Lvl Options Moul Avanc Financial Managmnt Tusay 3 Dcmbr 2013 Tim allow Raing an planning: Writing: 15 minuts 3 hours This papr is ivi into two sctions: Sction A This ONE qustion is compulsory

More information

GOAL SETTING AND PERSONAL MISSION STATEMENT

GOAL SETTING AND PERSONAL MISSION STATEMENT Prsonal Dvlopmnt Track Sction 4 GOAL SETTING AND PERSONAL MISSION STATEMENT Ky Points 1 Dfining a Vision 2 Writing a Prsonal Mission Statmnt 3 Writing SMART Goals to Support a Vision and Mission If you

More information

Product Overview. Version 1-12/14

Product Overview. Version 1-12/14 Product Ovrviw Vrsion 1-12/14 W ar Grosvnor Tchnology Accss Control Solutions W dvlop, manufactur and provid accss control and workforc managmnt solutions th world ovr. Our product offring ompasss hardwar,

More information

Maintain Your F5 Solution with Fast, Reliable Support

Maintain Your F5 Solution with Fast, Reliable Support F5 SERVICES TECHNICAL SUPPORT SERVICES DATASHEET Maintain Your F5 Solution with Fast, Rliabl Support In a world whr chang is th only constant, you rly on your F5 tchnology to dlivr no mattr what turns

More information

Long run: Law of one price Purchasing Power Parity. Short run: Market for foreign exchange Factors affecting the market for foreign exchange

Long run: Law of one price Purchasing Power Parity. Short run: Market for foreign exchange Factors affecting the market for foreign exchange Lctur 6: Th Forign xchang Markt xchang Rats in th long run CON 34 Mony and Banking Profssor Yamin Ahmad xchang Rats in th Short Run Intrst Parity Big Concpts Long run: Law of on pric Purchasing Powr Parity

More information

Intermediate Macroeconomic Theory / Macroeconomic Analysis (ECON 3560/5040) Final Exam (Answers)

Intermediate Macroeconomic Theory / Macroeconomic Analysis (ECON 3560/5040) Final Exam (Answers) Intrmdiat Macroconomic Thory / Macroconomic Analysis (ECON 3560/5040) Final Exam (Answrs) Part A (5 points) Stat whthr you think ach of th following qustions is tru (T), fals (F), or uncrtain (U) and brifly

More information

School Improvement Plan. Community Ed. Resource Center

School Improvement Plan. Community Ed. Resource Center Lak Orion Community Schools Mrs. Kristin Sliwinski 455 EAST SCRIPPS RD LAKE ORION, MI 48360-2249 Documnt Gnratd On Sptmbr 11, 2015 TABLE OF CONTENTS Introduction 1 Excutiv Summary Introduction 3 Dscription

More information

Natural Gas & Electricity Prices

Natural Gas & Electricity Prices Click to dit Mastr titl styl Click to dit Mastr txt styls Scond lvl Third lvl Natural Gas & Elctricity Prics Fourth lvl» Fifth lvl Glnn S. Pool Manufacturing Support Mgr. Enrgy April 4, 2013 Click Vrso

More information

Usability Test of UCRS e-learning DVD

Usability Test of UCRS e-learning DVD Usability Tst of UCRS -Larning DVD Dcmbr 2006 Writtn by Thrsa Wilkinson Excutiv Summary Usability Tst of th UCRS -Larning DVD, Dcmbr 2006 This rport documnts th findings of a usability tst of th UCRS -Larning

More information

Lecture 3: Diffusion: Fick s first law

Lecture 3: Diffusion: Fick s first law Lctur 3: Diffusion: Fick s first law Today s topics What is diffusion? What drivs diffusion to occur? Undrstand why diffusion can surprisingly occur against th concntration gradint? Larn how to dduc th

More information

A copy of the Consultation Paper is in the Members Library and further details are available at www.scotland~qov.umpublications/2012/12/5980

A copy of the Consultation Paper is in the Members Library and further details are available at www.scotland~qov.umpublications/2012/12/5980 To: CORPORATE SERVICES COMMITTEE NORTH LANARKSHIRE COUNCIL REPORT Subjct: CONSULTATION: CIVIL LAW OF DAMAGES - ISSUES IN PERSONAL INJURY From: HEAD OF LEGAL SERVICES Dat: 30 JANUARY 2013 Rf: AL LE CSN

More information

Keywords Cloud Computing, Service level agreement, cloud provider, business level policies, performance objectives.

Keywords Cloud Computing, Service level agreement, cloud provider, business level policies, performance objectives. Volum 3, Issu 6, Jun 2013 ISSN: 2277 128X Intrnational Journal of Advancd Rsarch in Computr Scinc and Softwar Enginring Rsarch Papr Availabl onlin at: wwwijarcsscom Dynamic Ranking and Slction of Cloud

More information

Fleet vehicles opportunities for carbon management

Fleet vehicles opportunities for carbon management Flt vhicls opportunitis for carbon managmnt Authors: Kith Robrtson 1 Dr. Kristian Stl 2 Dr. Christoph Hamlmann 3 Alksandra Krukar 4 Tdla Mzmir 5 1 Snior Sustainability Consultant & Lad Analyst, Arup 2

More information

Cookie Policy- May 5, 2014

Cookie Policy- May 5, 2014 Cooki Policy- May 5, 2014 Us of Cookis on Sizmk Wbsits This Cooki Disclosur applis only to us of cookis on corporat wbsits (www.sizmk.com and rlatd rgional wbsits) publishd by Sizmk Inc. and its affiliats

More information

Teaching Computer Networking with the Help of Personal Computer Networks

Teaching Computer Networking with the Help of Personal Computer Networks Taching Computr Ntworking with th Hlp of Prsonal Computr Ntworks Rocky K. C. Chang Dpartmnt of Computing Th Hong Kong Polytchnic Univrsity Hung Hom, Kowloon, Hong Kong [email protected] ABSTRACT

More information

ITIL & Service Predictability/Modeling. 2006 Plexent

ITIL & Service Predictability/Modeling. 2006 Plexent ITIL & Srvic Prdictability/Modling 1 2 Plxnt Th Company 2001 Foundd Plxnt basd on an Expandd ITIL Architctur, CMMI, ISO, and BS15000 - itdna 2003 Launchd itdna Srvic Offring 2003 John Groom, past Dirctor

More information

Change Your History How Can Soccer Knowledge Improve Your Business Processes?

Change Your History How Can Soccer Knowledge Improve Your Business Processes? Symposium Inuurl Lctur o Hjo Rijrs, VU, 26-6-2015 Chn Your History How Cn Soccr Knowl Improv Your Businss Procsss? Wil vn r Alst TU/ n DSC/ 1970 born Oostrbk 1988-1992 CS TU/ 1992-1994 TS TU/ 1994-1996

More information

This page is left blank intentionally.

This page is left blank intentionally. This pag is lft blank intntionally. Offic of th Mdicar Ombudsman 2012 Rport to Congrss Contnts LIST OF ACRONYMS... ii MESSAGE FROM THE MEDICARE BENEFICIARY OMBUDSMAN... iv MISSION, VISION, AND ORGANIZATION...

More information

Asset set Liability Management for

Asset set Liability Management for KSD -larning and rfrnc products for th global financ profssional Highlights Library of 29 Courss Availabl Products Upcoming Products Rply Form Asst st Liability Managmnt for Insuranc Companis A comprhnsiv

More information

Category 1: Purchased Goods and Services

Category 1: Purchased Goods and Services 1 Catgory 1: Purchasd Goods and Srvics Catgory dscription T his catgory includs all upstram (i.., cradl-to-gat) missions from th production of products purchasd or acquird by th rporting company in th

More information

Moving Securely Around Space: The Case of ESA

Moving Securely Around Space: The Case of ESA Moving Scurly Around Spac: Th Cas of ESA Prpard By: Andra Baldi, Jos Frnandz Balsiro, Marco Incollingo Tommaso Parrinllo, Cristiano Silvagni, Stfano Zatti Europan Spac Agncy [email protected] ESA Scnario

More information

Department of Natural Resources

Department of Natural Resources Dpartt o Natura Rsourcs DIVISION OF AGRICULTURE Northr Rio Oic 1648 S. Cusha St. #201 Fairbas, Aasa 99701-6206 Mai: 907.328.190 Far to Schoo Cha Ectroic Appicatio Istructios 1. Pas i out th ctroic survy

More information

Probabilistic maintenance and asset management on moveable storm surge barriers

Probabilistic maintenance and asset management on moveable storm surge barriers Probabilistic maintnanc an asst managmnt on movabl storm surg barrirs Patrick Wbbrs Ministry of Transport, Public Works an Watr Managmnt Civil Enginring Division A n a l y s O n r h o u F a a l k a n s

More information

est with berkeley / uc berkeley exte xtension / be your best with berkel

est with berkeley / uc berkeley exte xtension / be your best with berkel c rkley xtnsion yor st rkly c rkley xtnsion st with rkly c rkley xt Post-Baccalarat yor st Program with for rkly c rk xtnsion yor st with rkl c rkley xtnsion yor st rkly Consling c rkley and xtnsion st

More information

YOU HAVE A MISSION WE HAVE TECHNOLOGY SAVING TIME TO BUILD YOUR CAMP S BOTTOM LINE

YOU HAVE A MISSION WE HAVE TECHNOLOGY SAVING TIME TO BUILD YOUR CAMP S BOTTOM LINE YOU HAVE A MISSION WE HAVE TECHNOLOGY SAVING TIME TO BUILD YOUR CAMP S BOTTOM LINE TABLE OF CONTENTS Camp Markting Ar You Invsting Your Markting Budgt Wisly? Choosing A Softwar Partnr 8 Ky Faturs Spotlight

More information

ESA Support to ESTB Users

ESA Support to ESTB Users ESA Support to ESTB Usrs Dr. Javir Vntura-Travst Europan Spac Agncy 3 rd ESTB Workshop Nic 12 Novmbr 2002 OUTLINE! ESA ESTB wbsit support! Th ESTB/EGNOS Hlpdsk! Th ESTB Nwslttr! Th ESA SISNET tchnology!

More information

Version 1.0. General Certificate of Education (A-level) January 2012. Mathematics MPC3. (Specification 6360) Pure Core 3. Final.

Version 1.0. General Certificate of Education (A-level) January 2012. Mathematics MPC3. (Specification 6360) Pure Core 3. Final. Vrsion.0 Gnral Crtificat of Education (A-lvl) January 0 Mathmatics MPC (Spcification 660) Pur Cor Final Mark Schm Mark schms ar prpard by th Principal Eaminr and considrd, togthr with th rlvant qustions,

More information

Who uses our services? We have a growing customer base. with institutions all around the globe.

Who uses our services? We have a growing customer base. with institutions all around the globe. not taking xpr Srvic Guid 2013 / 2014 NTE i an affordabl option for audio to txt convrion. Our rvic includ not or dirct trancription rvic from prviouly rcordd audio fil. Our rvic appal pcially to tudnt

More information

Thursday, March 18, 2010-4:07 PM Page 1 of 16

Thursday, March 18, 2010-4:07 PM Page 1 of 16 Exhibit 300: Capital Asst Plan Businss Cas Summary Part I: Summary And Justification (All Capital Assts) Sction A: Ovrviw (All Capital Assts) 1. Dat of Submission: 2/1/2010 2. Agncy: Dpartmnt of Justic

More information

Fetch. Decode. Execute. Memory. PC update

Fetch. Decode. Execute. Memory. PC update nwpc PC Nw PC valm Mmory Mm. control rad writ Data mmory data out rmmovl ra, D(rB) Excut Bch CC ALU A vale ALU Addr ALU B Data vala ALU fun. valb dste dstm srca srcb dste dstm srca srcb Ftch Dcod Excut

More information

SCHOOLS' PPP : PROJECT MANAGEMENT

SCHOOLS' PPP : PROJECT MANAGEMENT Rport Schools' PPP Sub Committ 22 April 2004 2 SCHOOLS' PPP : PROJECT MANAGEMENT 1 Rason for Rport To provid Mmbrs with information on th structur of th Schools' PPP Projct Tam 2 Background 21 Dumfris

More information

June 2012. Enprise Rent. Enprise 1.1.6. Author: Document Version: Product: Product Version: SAP Version: 8.81.100 8.8

June 2012. Enprise Rent. Enprise 1.1.6. Author: Document Version: Product: Product Version: SAP Version: 8.81.100 8.8 Jun 22 Enpris Rnt Author: Documnt Vrsion: Product: Product Vrsion: SAP Vrsion: Enpris Enpris Rnt 88 88 Enpris Rnt 22 Enpris Solutions All rights rsrvd No parts of this work may b rproducd in any form or

More information

Outside Cut 1 of fabric Cut 1 of interfacing

Outside Cut 1 of fabric Cut 1 of interfacing a a Outsi Cut o abric Cut o intracing a a b b Outsi Cut o abric Cut o intracing Placmnt lin or Mony Pockts Dix Not: F. Cut Fol b. Pin t /8 in 5. Nx bottom pics sw th 6. For t Prss, 7. Lay togth on th 8.

More information

Question 3: How do you find the relative extrema of a function?

Question 3: How do you find the relative extrema of a function? ustion 3: How do you find th rlativ trma of a function? Th stratgy for tracking th sign of th drivativ is usful for mor than dtrmining whr a function is incrasing or dcrasing. It is also usful for locating

More information

SPECIAL VOWEL SOUNDS

SPECIAL VOWEL SOUNDS SPECIAL VOWEL SOUNDS Plas consult th appropriat supplmnt for th corrsponding computr softwar lsson. Rfr to th 42 Sounds Postr for ach of th Spcial Vowl Sounds. TEACHER INFORMATION: Spcial Vowl Sounds (SVS)

More information

EFFECT OF GEOMETRICAL PARAMETERS ON HEAT TRANSFER PERFORMACE OF RECTANGULAR CIRCUMFERENTIAL FINS

EFFECT OF GEOMETRICAL PARAMETERS ON HEAT TRANSFER PERFORMACE OF RECTANGULAR CIRCUMFERENTIAL FINS 25 Vol. 3 () January-March, pp.37-5/tripathi EFFECT OF GEOMETRICAL PARAMETERS ON HEAT TRANSFER PERFORMACE OF RECTANGULAR CIRCUMFERENTIAL FINS *Shilpa Tripathi Dpartmnt of Chmical Enginring, Indor Institut

More information

Important Information Call Through... 8 Internet Telephony... 6 two PBX systems... 10 Internet Calls... 3 Internet Telephony... 2

Important Information Call Through... 8 Internet Telephony... 6 two PBX systems... 10 Internet Calls... 3 Internet Telephony... 2 Installation and Opration Intrnt Tlphony Adaptr Aurswald Box Indx C I R 884264 03 02/05 Call Duration, maximum...10 Call Through...7 Call Transportation...7 Calls Call Through...7 Intrnt Tlphony...3 two

More information

Family Health and Literacy

Family Health and Literacy Family Halth and Litracy A Guid to Easy-to-Rad Halth Education Matrials and Wb Sits for Familis Juli McKinny & Sabrina Kurtz-Rossi Dvlopd by World Education in collaboration with th National Institut for

More information

Small Business Grant Applications: Annotated SF424 (R&R) Form Set

Small Business Grant Applications: Annotated SF424 (R&R) Form Set Sall usinss rant pplications nnotat SF RR For St FRMS Sris Tabl o ontnts Pag For Sapl rant pplication Packag Managnt Scrn SF RR ovr ProctProranc Sit Locations RR tr Proct noration RR Snior Prson Proil

More information

OPINION NO. 90-17 December 28, 1990

OPINION NO. 90-17 December 28, 1990 OPINION NO. 90-17 Dcmbr 28, 1990 FACTS: Th inquiring law firm has bn rtaind by a workrs compnsation carrir~ primarily to proscut third-party lawsuits that injurd mploys hav lctd not to pursu. Th carrir

More information

5.3.2 APPROACH TO PERFORMANCE MANAGEMENT

5.3.2 APPROACH TO PERFORMANCE MANAGEMENT Chaptr 5: Prformanc Managmnt Systm 5. APPROACH TO PERFORMANCE MANAGEMENT Th Municipal Systms Act () rquirs municipalitis to dvlop a prformanc managmnt systm suitabl for thir own circumstancs. According

More information

Dr David Dexter The Parkinson s UK Brain Bank

Dr David Dexter The Parkinson s UK Brain Bank Dr David Dxtr Th Parkinon UK Brain Bank In aociation with Vrion 1/2011 introducing th brain bank Contnt Uing my tiu 4 Collcting my tiu 6 Storing my tiu 8 Uing my pronal information 10 W r th UK largt brain

More information

FEASIBILITY STUDY OF JUST IN TIME INVENTORY MANAGEMENT ON CONSTRUCTION PROJECT

FEASIBILITY STUDY OF JUST IN TIME INVENTORY MANAGEMENT ON CONSTRUCTION PROJECT FEASIBILITY STUDY OF JUST IN TIME INVENTORY MANAGEMENT ON CONSTRUCTION PROJECT Patil Yogndra R. 1, Patil Dhananjay S. 2 1P.G.Scholar, Dpartmnt of Civil Enginring, Rajarambapu Institut of Tchnology, Islampur,

More information

Planning and Managing Copper Cable Maintenance through Cost- Benefit Modeling

Planning and Managing Copper Cable Maintenance through Cost- Benefit Modeling Planning and Managing Coppr Cabl Maintnanc through Cost- Bnfit Modling Jason W. Rup U S WEST Advancd Tchnologis Bouldr Ky Words: Maintnanc, Managmnt Stratgy, Rhabilitation, Cost-bnfit Analysis, Rliability

More information

Incomplete 2-Port Vector Network Analyzer Calibration Methods

Incomplete 2-Port Vector Network Analyzer Calibration Methods Incomplt -Port Vctor Ntwork nalyzr Calibration Mthods. Hnz, N. Tmpon, G. Monastrios, H. ilva 4 RF Mtrology Laboratory Instituto Nacional d Tcnología Industrial (INTI) Bunos irs, rgntina [email protected]

More information

Stag and Capital Bids in Indian Scenario

Stag and Capital Bids in Indian Scenario SNH/01/4/Info2 CAPITAL INVESTMENT STRATEGY 2001-02 Summary 1. `This information papr provids an ovrviw of th critria and prioritis usd by Managmnt Tam in dtrmining SNH s annual capital programm, as rqustd

More information

k e e n - n o t e s Annual Meeting, Saturday 7/13/2013 roxana fire Station 10: 00 am February 2013 Keen-Wik Association www.keen-wikonthebay.

k e e n - n o t e s Annual Meeting, Saturday 7/13/2013 roxana fire Station 10: 00 am February 2013 Keen-Wik Association www.keen-wikonthebay. Fbruary 2013 Kn-Wik Association www.kn-wikonthbay.org Annual Mting, Saturday 7/13/2013 roxana fir Station 10: 00 am Prsidnt s Lttr Fbruary 2013 k n - n o t s So far this yar, it has bn a prtty quit wintr

More information

Job Description. Programme Leader & Subject Matter Expert

Job Description. Programme Leader & Subject Matter Expert Job titl: Programm Ladr & Subjct Mattr xprt Arbitration Pathways, ducation and Training Dpartmnt Salary band: 47,500 to 56,500 (dpndnt upon xprinc) Hours: 35 hours a wk Trm: Full Tim, Prmannt Accountabl

More information

Electric power can be transmitted or dis

Electric power can be transmitted or dis 64 64 Principls of Powr Systm CHAPTER CHAPTER Unrgroun Cabls. Unrgroun Cabls. Construction of Cabls.3 Insulating Matrials for Cabls.4 Classification of Cabls.5 Cabls for 3-Phas Srvic.6 Laying of Unrgroun

More information

Gold versus stock investment: An econometric analysis

Gold versus stock investment: An econometric analysis Intrnational Journal of Dvlopmnt and Sustainability Onlin ISSN: 268-8662 www.isdsnt.com/ijds Volum Numbr, Jun 202, Pag -7 ISDS Articl ID: IJDS20300 Gold vrsus stock invstmnt: An conomtric analysis Martin

More information

An Broad outline of Redundant Array of Inexpensive Disks Shaifali Shrivastava 1 Department of Computer Science and Engineering AITR, Indore

An Broad outline of Redundant Array of Inexpensive Disks Shaifali Shrivastava 1 Department of Computer Science and Engineering AITR, Indore Intrnational Journal of mrging Tchnology and dvancd nginring Wbsit: www.ijta.com (ISSN 2250-2459, Volum 2, Issu 4, pril 2012) n road outlin of Rdundant rray of Inxpnsiv isks Shaifali Shrivastava 1 partmnt

More information

Electronic Commerce. and. Competitive First-Degree Price Discrimination

Electronic Commerce. and. Competitive First-Degree Price Discrimination Elctronic Commrc and Comptitiv First-Dgr Pric Discrimination David Ulph* and Nir Vulkan ** Fbruary 000 * ESRC Cntr for Economic arning and Social Evolution (ESE), Dpartmnt of Economics, Univrsity Collg

More information

Magic Message Maker Amaze your customers with this Gift of Caring communication piece

Magic Message Maker Amaze your customers with this Gift of Caring communication piece Magic Mssag Makr maz your customrs with this Gift of aring communication pic Girls larn th powr and impact of crativ markting with this attntion grabbing communication pic that will hlp thm o a World of

More information

A Path Tracking Algorithm Using Future Prediction Control with Spike Detection for an Autonomous Vehicle Robot

A Path Tracking Algorithm Using Future Prediction Control with Spike Detection for an Autonomous Vehicle Robot Intrnational Journal o Avanc Robotic Systms ARTICLE A Path Tracking Algorithm Using Futur Priction Control with Spik Dtction or an Autonomous Vhicl Robot Rgular Papr Muhamma Aizzat Zakaria, Hairi Zamzuri,*,

More information

Lecture notes: 160B revised 9/28/06 Lecture 1: Exchange Rates and the Foreign Exchange Market FT chapter 13

Lecture notes: 160B revised 9/28/06 Lecture 1: Exchange Rates and the Foreign Exchange Market FT chapter 13 Lctur nots: 160B rvisd 9/28/06 Lctur 1: xchang Rats and th Forign xchang Markt FT chaptr 13 Topics: xchang Rats Forign xchang markt Asst approach to xchang rats Intrst Rat Parity Conditions 1) Dfinitions

More information

Strategies of ThromRail Structures and Network Marketing

Strategies of ThromRail Structures and Network Marketing 2014 Excutiv Mssag Progrss Card? Whr ar w going? This yar, w survyd our ntir staff, asking whr thy thought th AEC industry was hading in th nxt 20 yars. Th answrs wr illuminating, with about on-third rlating

More information

TELL YOUR STORY WITH MYNEWSDESK The world's leading all-in-one brand newsroom and multimedia PR platform

TELL YOUR STORY WITH MYNEWSDESK The world's leading all-in-one brand newsroom and multimedia PR platform TELL YOUR STORY WITH MYNEWSDESK Th world's lading all-in-on brand nwsroom and multimdia PR platform SO WHAT'S THE STORY WITH MYNEWSDESK? Th world s lading all-in-on nwsroom and digital PR platform. Usd

More information

A Theoretical Model of Public Response to the Homeland Security Advisory System

A Theoretical Model of Public Response to the Homeland Security Advisory System A Thortical Modl of Public Rspons to th Homland Scurity Advisory Systm Amy (Wnxuan) Ding Dpartmnt of Information and Dcision Scincs Univrsity of Illinois Chicago, IL 60607 wxding@uicdu Using a diffrntial

More information

Parallel and Distributed Programming. Performance Metrics

Parallel and Distributed Programming. Performance Metrics Paralll and Distributd Programming Prformanc! wo main goals to b achivd with th dsign of aralll alications ar:! Prformanc: th caacity to rduc th tim to solv th roblm whn th comuting rsourcs incras;! Scalability:

More information