1 Prepared by Paul Grotevant and Christina, ITS Last Edited May 8, 2015 SOLUTION PLAN REQUIREMENTS ANALYSIS DESIGN BUILD TEST TRAIN/DEPLOY MAINTENANCE Project Charter Executive Summary The campus Drupal community and Web Technology Infrastructure (WTI) Subcommittee have been requesting increased support for Drupal for several years. To fulfill this request, Information Technology Services (ITS) is building a Managed Drupal service. The Managed Drupal service will provide simplified, scalable management of Drupal websites; a supported site-building platform in the form of a Drupal distribution containing UTspecific functionality and themes; and technical support and content strategy consultation for campus site owners. The Managed Drupal (MDIP) will include the development of the service and its functions, a period of integration and onboarding on the selected 3 rd party hosted platform (Pantheon One), and a pilot phase that will include the migration of a selection of sites representing various use cases to the new service. Business Need and Background Based on demand from IT governance and the campus Drupal community, as well as an internal need for the scalable management of large numbers of sites, ITS plans to build a Managed Drupal service. This service will provide simplified, scalable management of Drupal websites; a supported site-building platform in the form of a Drupal distribution containing UT-specific functionality and themes; and technical support and content strategy consultation for campus site owners. The technical foundation of the service will be dedicated Drupal hosting infrastructure that is optimized for performance, streamlined maintenance, and community-requested features. The business need for a Managed Drupal service at UT Austin can be divided into three main categories: Community Demand for Central Management Use of Drupal at UT Austin has been steadily increasing as Web publishers have continued to transition from static HTML technology to dynamic content management systems. As Drupal adoption has increased, many units at the University are dealing with reductions in technical staff and are looking for ways to publish and manage complex websites with fewer resources. This situation has driven demand and fast growth for ITS managed WordPress service, sites.utexas.edu, and there has been similar demand for a managed Drupal service expressed through IT governance and discussions with the UT Drupal Users Group. Page 1 of 5
2 Brand Standards and Design The University Communications department has been engaged in a multi-year project to redesign the university s home and core pages, which includes a transition to using responsive design technology to accommodate the growing number of mobile Web users. The scope of this project also includes design templates and pre-built functionality for specific Web publishing use cases such as faculty profiles and course listings, which University Communications plans to provide to every campus unit in the form of a managed Drupal site-building platform. This platform will empower Web publishers to quickly build and easily maintain websites that fulfill the most common functional and design requirements at the university. Technology Historically, the university s legacy shared hosting platform did not provide strong support for Drupal due to specific technology constraints, which resulted in poor performance for Drupal sites. This situation drove the owners of many of the more advanced Drupal sites on campus to purchase virtual servers and managed server support from ITS. This situation should improve considerably with the October 2014 launch of UT Web, which provides most of the enabling technologies for a Drupal site to work with acceptable performance. However, there is a new class of Drupal-tuned cloud hosting providers which not only provide a highly managed hosting stack that is specifically tuned for Drupal, but also have sophisticated built-in tools for developer-focused tasks such as version control, continuous integration, and dev/stage/prod workflow. Additionally, these providers offer specialized products targeted at organizations that need to centrally manage large numbers of Drupal sites. Project Description and Scope Prior to the MDIP, ITS Apps completed the Managed Drupal Hosting Assessment (MDHA) project which included the documentation of a set of Managed Drupal service hosting requirements and use cases, the evaluation of potential Drupal hosting solutions to support the service, and the selection and procurement of the hosting solution that best met the requirements. After soliciting and evaluating detailed written proposals and on-site demos from vendors, an internal evaluation team determined that Pantheon One represents the best product choice for the Managed Drupal service. The Managed Drupal will include the following: The design and development of the new service, i.e. define the funding model, the Service Level Agreement, the documentation, etc. The investigation of possible integration needs that might be created while using ITS technologies on the Pantheon One platform (e.g. authentication, SSL certificates). The definition and migration of 10 to 20 sites on the Pantheon One platform as a pilot phase before launching the service to the UT community. Project Goals The Managed Drupal service goals are to: Provide Drupal-optimized site hosting and developer tools for site owners at UT Austin. Project Charter Page 2 of 5
3 Allow web publishers to easily create sophisticated UT-branded, responsively designed websites in Drupal using a common site platform, which will include a UT-branded theme, and common functionality in the form of modular features that can be enabled or disabled. Allow web publishers to leverage the benefits of Drupal-optimized hosting and developer tools by migrating existing sites or building new sites from a Drupal core distribution, i.e. use of the common site platform not required. Allow ITS to provide a scalable Drupal management service for web publishers who do not want or have the capacity to be responsible for their site s core and module updates, creating a shared services -like model for Drupal site maintenance. In partnership with University Communications, provide content strategy support for web publishers migrating or creating sites in a Managed Drupal service. Project Schedule The project will include seven phases. The Plan phase will include all of the project initiation activities. During the Requirements and Solution Analysis phases all of the integration needs of using ITS technologies on the Pantheon One platform will be identified. The Design phase will include the design and development of the business model of the service. The Test phase will include the service s team onboarding and testing of the Pantheon One platform in collaboration with Pantheon s customer support team. The Migration phase will include the migration of a selected group of Drupal sites to Pantheon One. Finally, in the Deployment phase the service will be launched to UT web publishers. A high-level project schedule is outlined below. At this time, the estimated completion is December PHASE FTE Q1 Q2 Q3 Q4 Mar Apr May Jun Jul Aug Sep Oct Nov Dec Plan 1 Requirements 1 Solution Analysis 1 Design 1 Test (Onboarding) 2 Migration (Pilot) 2 Deployment 1 Project Charter Page 3 of 5
4 Project Management and Governance Role Name(s)/Organization(s) Responsibilities Executive Sponsor Julienne VanDerZiel, ITS Applications Review and approve changes in project scope, schedule and budget. Customer Steering Committee Project Team Information Security Office Point of Contact Customer Support Services Point of Contact Stakeholder(s) Michael Caldwell, Office of Admissions Aaron Choate, University of Texas Libraries Bryan Christian, University Communications Tim Fackler, College of Liberal Arts Blake Justice, University Unions Lori Lacy, LBJ School of Public Affairs Matt Mangum, Cockrell School of Engineering Steven Nevers, Moody College of Communication Sara Somabhatta, University Development Office Sarah Snow, College of Fine Arts Francine Bray Mark Fullmer Joe Goodman Paul Grotevant Christina Mike Marcello Kathy Perry Jason Ragland Jeff Hauger Campus Drupal developers University CSUs using Drupal Provide sign-off for project deliverables. Make recommendations regarding changes to project scope, schedule, and budget. Create project deliverables and documentation. Project Facilities and Resources The following staff resources will be required for this project: IT Manager: 0.15 FTE Project Manager: 0.15 FTE 2 Drupal Developers: 0.20 FTE each Technical Writer: 0.20 FTE Tester: 0.15 FTE Project Charter Page 4 of 5
5 Impact Analysis Current University Drupal developers and application administrators will be encouraged to migrate existing sites and build new sites on the Managed Drupal service. Assumptions The solution is only intended to support websites built on the Drupal CMS platform. The Managed Drupal service will be owned and sustained by the Web and Contract Services team in ITS Applications. Constraints Any desired features of the Managed Drupal service must be supported by the Pantheon website management platform. The project schedule will be dependent on departments following the migration plan. Any delays during the migration will result in delaying the actual launch of the service. Risks Dependency on contract negotiations and procurement process for the Pantheon One platform may cause delays in the project schedule. Integrating ITS technologies with the Pantheon One platform may result in additional work and delays in the project schedule. Dependency on the Digital Experience Project Phase 2 work may cause delays in the project schedule. Revision History Version Date Updater Name Description V 0.1 3/19/2015 Paul Grotevant and Christina V 0.2 3/23/2015 Paul Grotevant and Christina V 0.3 3/27/2015 Paul Grotevant and Christina V 1.0 4/27/2015 Paul Grotevant and Christina Initial draft completed. Initial feedback from the team was incorporated. Approved by the Director with minor edits. Approved by the CSC. Project Charter Page 5 of 5
Drupal Foundation Project Charter
Prepared by Christina Konstantinidou, ITS Last Edited February 10, 2014 SOLUTION PLAN REQUIREMENTS ANALYSIS DESIGN BUILD TEST TRAIN/DEPLOY MAINTENANCE Drupal Foundation Project Charter Executive Summary
More informationDrupal Services Program Charter
Prepared by Christina Konstantinidou, ITS Last Edited January 3, 2014 SOLUTION PLAN REQUIREMENTS ANALYSIS DESIGN BUILD TEST TRAIN/DEPLOY MAINTENANCE Drupal Services Program Charter Executive Summary The
More informationDESIGN BUILD TEST TRAIN/DEPLOY MAINTENANCE
Prepared by Jenn Coast and Christina Konstantinidou, ITS Last Edited May 8, 2015 SOLUTION PLAN REQUIREMENTS ANALYSIS DESIGN BUILD TEST TRAIN/DEPLOY MAINTENANCE Project Charter Executive Summary With the
More informationSharePoint 2013 Project Charter
Prepared by David Moss Last Edited June 27, 2014 SOLUTION PLAN REQUIREMENTS ANALYSIS DESIGN BUILD TEST TRAIN/DEPLOY MAINTENANCE SharePoint 2013 Project Charter Executive Summary The SharePoint 2013 project
More informationDESIGN BUILD TEST TRAIN/DEPLOY MAINTENANCE
SOLUTION PLAN REQUIREMENTS ANALYSIS DESIGN BUILD TEST TRAIN/DEPLOY MAINTENANCE Executive Summary The project will document campus requirements for IAM functionality and select and procure one or more technology
More informationProject Charter. UT Web Infrastructure Project Document Version 9.0 Prepared by John Lovelace & David Moss Last Edited March 13, 2012
Prepared by John Lovelace & David Moss Last Edited March 13, 2012 Project Charter UT Web Infrastructure Project Executive Summary The goal of this project is to select and implement a solution that will
More informationFYI - UT Drupal Kit 2.0. December 9, 2015
December 9, 2015 Presenters Paul Grotevant, ITS Applica=ons Mike Marsello, ITS Applica=ons Mark Fullmer, ITS Applica=ons Henry Tijerina, Office of the President/Office of the Provost 2 Agenda Intro/Background
More informationAT&T Global Network Client for Windows Product Support Matrix January 29, 2015
AT&T Global Network Client for Windows Product Support Matrix January 29, 2015 Product Support Matrix Following is the Product Support Matrix for the AT&T Global Network Client. See the AT&T Global Network
More informationDESIGN BUILD TEST TRAIN/DEPLOY MAINTENANCE. This project is part of the Identity and Access Management Roadmap.
April 5, 2015 SOLUTION PLAN REQUIREMENTS ANALYSIS DESIGN BUILD TEST TRAIN/DEPLOY MAINTENANCE Executive Summary The (CARE) project will improve the resiliency of the UTLogin, Shibboleth, and Active Directory
More informationProject Charter. Office 365 2015 Migrations Document Version 2.0 Prepared by Sabina Winters, ITS Last Edited February 19, 2015
Prepared by Sabina Winters, ITS Last Edited February 19, 2015 SOLUTION PLAN REQUIREMENTS ANALYSIS DESIGN BUILD TEST TRAIN/DEPLOY MAINTENANCE Executive Summary In December of 2014, the IT Governance Architecture
More informationCOMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun
More informationCOMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun
More informationOPERATIONAL IT COMMITTEE MEETING AGENDA WEDNESDAY, MAY 23, 2012 3:00 4:00 p.m. FAC 228D
OPERATIONAL IT COMMITTEE MEETING AGENDA WEDNESDAY, MAY 3, 01 3:00 4:00 p.m. FAC 8D I. Cloud File Sharing Task Force Recommendations (Ryan Baldwin) II. UDC Printer Repair Transition to Campus Store (Michael
More informationUniversity of Wisconsin System Strategic Initiatives
University of Wisconsin System Strategic Initiatives April 27,2015 Sasi K. Pillay UWSA CIO 1 Principles Mission Enablement Reduction of Risk Cost-effective Operations 2 The Four Tenets A. Elevate the Professionalism
More informationProject Charter. Secure Message System Upgrade
Prepared by Cooper Henson, ITS Last Edited March 24, 2014 Project Charter Secure Message System Executive Summary The Secure Message System provides authorized employees in The University of Texas System
More informationCase 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138. Exhibit 8
Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138 Exhibit 8 Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 2 of 138 Domain Name: CELLULARVERISON.COM Updated Date: 12-dec-2007
More informationProject Charter. Identity & Access Management Strategy. Executive Summary. Business Need and Background. Document Version 1.
August 30, 2012 Executive Summary The Identity and Access (IAM) Strategy project will provide a roadmap for implementing a comprehensive and full- featured set of IAM services to encourage collaboration,
More information1 ERP_GEUPD (Group Email Upgrade) Project Charter Version 1.4 Prepared by Cooper Henson, ITS Last Edited November 15, 2012
1 ERP_GEUPD (Group Prepared by Cooper Henson, ITS Last Edited November 15, 2012 Project Charter Group Email Conversion Project ID ERP_GEUPD Business need The Group Email application allows users to send
More informationCASI Project Charter. Centralized Authentication System Implementation. Executive Summary. Business Need and Background
Prepared by Kara Nicholas, ITS Executive Summary The (CASI) project involves the development and release of a new UT EID- based authentication, to replace the aging Central Web Authentication (CWA). CASI
More informationEnhanced Vessel Traffic Management System Booking Slots Available and Vessels Booked per Day From 12-JAN-2016 To 30-JUN-2017
From -JAN- To -JUN- -JAN- VIRP Page Period Period Period -JAN- 8 -JAN- 8 9 -JAN- 8 8 -JAN- -JAN- -JAN- 8-JAN- 9-JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- 8-JAN- 9-JAN- -JAN- -JAN- -FEB- : days
More informationARCHITECTURE)&)INFRASTRUCTURE)COMMITTEE)MEETING)AGENDA)) Friday,)April)11,)2014) 9:00) )10:30)AM) FAC)228D!!!! I.!9:00!!9:15!IT!Shared!
ARCHITECTURE)&)INFRASTRUCTURE)COMMITTEE)MEETING)AGENDA)) Friday,)April)11,)2014) 9:00) )10:30)AM) FAC)228D I.9:00 9:15ITSharedServices Update II.9:15 9:30VoIPUpdate(John%Lovelace) III.9:30 9:50OpenSSLUpdate(Cam%Beasley)
More informationOE PROJECT CHARTER TEMPLATE
PROJECT : BearBuy Implementation PREPARED BY: Vanessa Wong and Jon Conhaim DATE (MM/DD/YYYY): 07/23/2011 PROJECT CHARTER VERSION HISTORY VERSION DATE COMMENTS (DRAFT, SIGNED, REVISED CURRENT STATUS) (MM/DD/YYYY)
More informationJISC data.bris project & EPSRC Platform project: progress against workplan (October 2012)
Project Name : data.bris DBSG/5/2 JISC data.bris project & EPSRC Platform project: progress against workplan (October 2012) WORKPACKAGES Month: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Oct 11 Nov Dec
More informationTask Force Charter. Mobile Strategy Document Version 3.0 Chief Information Officer, ITS Last Edited December 17, 2012.
Chief Information Officer, ITS Last Edited December 17, 2012 Task Force Charter Mobile Strategy Executive Summary The mobile strategy will provide the policies, best practices, mobile website and application
More informationWaterloo CMS Project. Project Charter Information Systems and Technology (IST) University of Waterloo (UW) Waterloo, Ontario, Canada
Waterloo CMS Project Project Charter Information Systems and Technology (IST) University of Waterloo (UW) Waterloo, Ontario, Canada Charter Date: September 4, 2009 Revision Date: February 10, 2010 Maintained
More informationAnalysis One Code Desc. Transaction Amount. Fiscal Period
Analysis One Code Desc Transaction Amount Fiscal Period 57.63 Oct-12 12.13 Oct-12-38.90 Oct-12-773.00 Oct-12-800.00 Oct-12-187.00 Oct-12-82.00 Oct-12-82.00 Oct-12-110.00 Oct-12-1115.25 Oct-12-71.00 Oct-12-41.00
More informationWhy Choose the Oracle Taleo Recruiting Cloud?
Agenda Executive Summary This presentation provides an overview of the fixed scope offering of Oracle s Fusion HCM Cloud solution from METSCON IT Systems METSCON is a key partner of Oracle in the HCM space
More informationFederal Cloud Computing Initiative Overview
Federal Cloud Computing Initiative Overview Program Status To support the Federal Cloud Computing Direction and Deployment Approach, the ITI Line of Business PMO has been refocused as the Cloud Computing
More informationARCHITECTURE & INFRASTRUCTURE COMMITTEE MEETING AGENDA FRIDAY, December 14, 2012 9:00 10:30 AM FAC 228D
ARCHITECTURE & INFRASTRUCTURE COMMITTEE MEETING AGENDA FRIDAY, December 14, 2012 9:00 10:30 AM FAC 228D I. Mobile Strategy Update (Mike Horn) II. Application Team Priorities (Julienne VanDerZiel) III.
More informationCounty of Orange ~ Information Technology Quarterly IT Project Status Detail Report Fiscal Year 2014-15, 1st Quarter
County of Orange ~ Information Technology Quarterly IT Project Detail Report Fiscal Year 2014-15, 1st Quarter Executive Summary The Quarterly IT Project Detail report provides an inventory of all County
More informationIAM Committee Meeting Agenda 3/14/2016
IAM Committee Meeting Agenda 3/14/2016 Attending: Thomas Beard, Cam Beasley, CW Belcher, Michael Bos, Bill Bova, John Chambers, Fred Gilmore, Ty Lehman, Andy Loomis, Shelley Powers, Steve Rung, Karen Weisbrodt
More informationProject Management 101. Laura Gettings November 2013
Project Management 101 Laura Gettings November 2013 For GBTA Introductions Overview What is a Project? What is Project Management? Why do we need Project Management? Plan the Process Create a Project Charter
More informationStaff Survey 2013 - A Summary of Service
Meeting Trust Board Part I Date 24 July 2014 Subject Staff Survey Action Plan Reporting Officer Nikki Prince, HR Director Purpose To approve Please indicate as appropriate Trust Objective Principle Objective
More informationPreparing Your Business for Magento 2.0
Preparing Your Business for Magento 2.0 William Harvey Director of Business Operations Magento Commerce How is Magento 2.0 different than 1.x? How is Magento 2.0 different than 1.x? New architecture Out-of-the-box
More informationRoles: Scrum Master & Project Manager
Roles: Scrum Master & Project Manager Scrum Master: Facilitate collaborative meetings Track team performance Remove impediments (Risk, Issue) Validate team alignment to Agile framework and scope Drive
More informationManaging Open Source Code Best Practices
Managing Open Source Code Best Practices September 24, 2008 Agenda Welcome and Introduction Eran Strod Open Source Best Practices Hal Hearst Questions & Answers Next Steps About Black Duck Software Accelerate
More informationBb Upgrade Timeline. Oct Nov Dec Jan 2011 Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan 2012. PDFmyURL.com
Bb Upgrade Timeline Oct Nov Dec Jan 2011 Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan 2012 Technology Create a training plan for Bb early adopters and mentors Conduct Transitioning to Bb 9.1 training
More informationProject Charter Content Management System REPLACEMENT
Project Created By Executive Sponsor Content Management System Replacement System Kelly Mullin, Paul Burr, Parporn Metharom, Jason Bogal, Barbara Barry, Lori Piccinini Nancy Leuenhagen, Laura Schmidt Date
More informationSchools Interoperability Framework (SIF) Project Overview
Schools Interoperability Framework (SIF) Project Overview Agenda Introductions Quick review of past successes and challenges Overview of refined strategy Timeline Questions and answers 2 Review of Past
More informationGTA Board of Directors September 4, 2014
GTA Board of Directors September 4, 2014 Our Strategic Vision Our Mission A transparent, integrated enterprise where technology decisions are made with the citizen in mind To provide technology leadership
More informationFixed Scope Offering for. Oracle Taleo EE Saas Implementation
Fixed Scope Offering for Oracle Taleo EE Saas Implementation Agenda Company Profile Business Challenges Business Objectives Solution Proposal Scope Modules and Functionalities Implementation Approach Project
More informationThe Impact of Medicare Part D on the Percent Gross Margin Earned by Texas Independent Pharmacies for Dual Eligible Beneficiary Claims
The Impact of Medicare Part D on the Percent Gross Margin Earned by Texas Independent Pharmacies for Dual Eligible Beneficiary Claims Angela Winegar, M.S., Marvin Shepherd, Ph.D., Ken Lawson, Ph.D., and
More informationCommittee of the Whole. January 22, 2014
Committee of the Whole January 22, 2014 Drivers for 2003 IT Outsourcing Cost savings - privatization model ($2- $3MM/year) Cost avoidance Data center lease with County expiring ($3.5MM) Disaster recovery
More informationNesmith Library, Windham, NH
REQUEST FOR PROPOSAL for a Drupal or WordPress Website and Website Design Services. I. Project Summary The Nesmith Library is seeking a website developer to create a content management system using Drupal
More informationAnatomy of an Enterprise Software Delivery Project
Chapter 2 Anatomy of an Enterprise Software Delivery Project Chapter Summary I present an example of a typical enterprise software delivery project. I examine its key characteristics and analyze specific
More informationHow To Be Successful At Workday
VMware Global HR Application in the Cloud March 2012 VMware HR System Replacement: Key Drivers for Change HR systems footprint was not optimized or scalable to support VMware s growth. Original core HR
More informationHow To Write A System Replacement Plan
BUSINESS SERVICES COMMITTEE (BSC) Meeting Agenda May 11, 2012 2:00 pm to 3:30 pm FAC 228D I. Identity Management Strategy (C.W. Belcher) II. imodules (John McCall) III. Administrative System Master Plan
More informationPurchased Services Areas of Opportunity:
Purchased Services Areas of Opportunity: How Texas Children's Hospital Achieved Significant Cost Savings For Its Contract Staffing Purchased Services Presented by Edward M. Lewis, C.P.M., CMRP Supply Chain
More informationiapps Consulting DWC LLC Fixed Scope Offering (FSO) For Taleo Recruit and On-Boarding Drive Transformation Create Value
iapps Consulting DWC LLC Fixed Scope Offering (FSO) For Taleo Recruit and On-Boarding Drive Transformation Create Value 18-05-2015 1 About Us We are a technology and business consulting firm, focused on
More informationBenefits of Latest Innovations in Campus Planning
Exempt Employee Association 01/29/13 Agenda icat Objectives CedarCrestone Overview Project Scope and Timeline Project Methodology What is Changing and Your Involvement Change Management Overview Closing
More informationExecutive Branch IT Reorganization Project Plan
Office of Information Resource Management Executive Branch Project Plan Work Program Funded by for IT Appropriations Reorganization 2007, 2009 and Five Small Projects Date: August 2009 Version: 1.3 Revision
More informationPROJECT: Online Shop STATUS REPORT September 2015
PROJECT: Online Shop STATUS REPORT September Key Project Roles Project Sponsor: Paul Dowler Project Director: Program Manager: Project Manager: Ryan Giltrap Solution Coordinator: Ivan Saric Business Analyst:
More informationOPERATIONS SERVICE UPDATE
OPERATIONS SERVICE UPDATE EXECUTIVE SUMMARY Policy Processing At the June 24 Citizens Board of Governors meeting, Staff committed to achieving year end policy processing service goals by September 1, 24.
More informationEnterprise Projects Fiscal Year 2011/2012 Third Quarter Report
Enterprise Projects Fiscal Year 2011/2012 Third Quarter Report Enterprise Projects Fiscal Year 2011/2012 Third Quarter Report The Enterprise Program Investment Council (EPIC) is responsible for governance
More informationDevelopment of the Cooperative, Masters Nurse Practitioner Program in South Africa. Progress Report September 28, 2007
Development of the Cooperative, Masters Nurse Practitioner Program in South Africa Progress Report September 28, 2007 This is the second progress report for the cooperative MNP program at UWC. This report
More informationDRUPAL Web Content Management (WCM) Cloud Solution. RFP Q&A Session Jan. 21, 2015
DRUPAL Web Content Management (WCM) Cloud Solution RFP Q&A Session Jan. 21, 2015 CONTENTS Project Overview Current State: Vision WCM Future State: Drupal WCM Cloud Solution RFP - Response Matrix Brief
More informationProject Charter Client: IPS
Project Summary Project* IPS Integration with Global Financials Client* Mercer IPS Primary Contact Chi Swain Engagement Manager* Project Manager* Tracking/Billing Code* Description* Irene Spyke Joy Wallace
More informationIdentity and Access Management Memorial s Strategic Roadmap
Identity and Access Management Memorial s Strategic Roadmap Executive Summary January 29, 2015 Identity and Access Management Identity and Access Management (IAM) is an integrated system of policies, business
More informationThe Path Forward: Integrated Transition Plan October 2015
The Path Forward: Integrated Transition Plan October 2015 Table of Contents The Plan 5 Transitioning to a Modern System 5 PwC: 19 Recommendations 6 Validation Process 6 Value for Money 9 Looking to the
More informationIII. 9:35-9:50 Retirement of Web Space- Communication Plan Endorse (Dave Moss)
ARCHITECTURE & INFRASTRUCTURE COMMITTEE MEETING AGENDA FRIDAY, October 11, 2013 9:00-10:30 AM FAC 228D I. 9:00-9:15 Administrative Systems Update (Mary Knight) II. 9:15-9:35 Priorities Finalization Endorse
More informationRESEARCH AND EDUCATIONAL TECHNOLOGY COMMITTEE MEETING AGENDA Thursday, May 17, 2012 8:00-9:00 a.m. FAC 228D
RESEARCH AND EDUCATIONAL TECHNOLOGY COMMITTEE MEETING AGENDA Thursday, May 17, 2012 8:00-9:00 a.m. FAC 228D I. Learning Management System (David Moss Dennis Klenk, Mario Guerra) II. My Edu (Brad Englert)
More informationMichigan Department of Human Services MiSACWIS Overview and Update
Michigan Department of Human Services MiSACWIS Overview and Update Steve Yager C h i l d r e n s S e r v i c e s D i r e c t o r 1 Definition of MiSACWIS Michigan Statewide Automated Child Welfare Information
More informationEDI Services helps healthcare network streamline workflow, increase productivity, and improve revenue cycle management.
GE Healthcare Results summary 2008 2010 Reduced eligibility rejection rate from 2% to 0.8% Reduced overall rejection rate from 6.4% to 4% Reduced cost to collect from 8.3% to 6.3% Increased the number
More informationInsurance and Banking Subcommittee
Insurance and Banking Subcommittee Citizens Depopulation Update September 16, 2015 Christine Ashburn VP Communications, Legislative and External Affairs 2 3 Depopulation Customer Communications 1. 40 days
More informationCharter & Scope Statement Web & Portal Redesign. Brookdale Community College
Charter & Scope Statement Web & Portal Redesign Brookdale Community College May October, 2012 Table of Contents PROJECT PURPOSE AND JUSTIFICATION 3 EXECUTIVE SUMMARY 3 PROJECT SCOPE AND DELIVERABLES PROJECT
More informationProject Charter. VoIP Plan Task Force Document Version 3 Prepared by Sandra Germenis, ITS Last Edited October 19, 2010. VoIP Plan Task Force
Prepared by Sandra Germenis, ITS Last Edited October 19, Project Charter Summary A task force of representatives from McCombs School of Business, The College of Natural Sciences, the College of Liberal
More informationCloud. Pure and simple.
IBM Competitive Project Office Cloud. Pure and simple. Summary and Action We showed you how PureApplication is the solid cloud application platform of choice It has Patterns of Expertise for easy topology
More informationCompany A Project Plan
Company A Project Plan Project Name: Close Optimization Project Example Prepared By: David Done - Project Manager Title: John Doe -Project Manager Date: March 17, 2011 Project Plan Approval Signatures
More informationObjectives for today. Cloud Computing i det offentlige UK Public Sector G-Cloud, Applications Store & Data Centre Strategy
Cloud Computing i det offentlige UK Public Sector G-Cloud, Applications Store & Data Centre Strategy This is not just about technology. The main area of change, thus the major challenge, is how we as leaders
More informationIAMUCLA 2.0 SSO Updates
IAMUCLA 2.0 SSO Updates Common Systems Group Meeting July 27, 2015 IAMUCLA 2.0 Projects Password Security Concerns Technology Evolution Health Systems SSO Support Departmental/Service Accounts Testing
More informationProject title (in Chinese) 項 目
II Project Information Project title (in English) Project title (in Chinese) HKCAAVQ IT Infrastructure Development 香 港 學 術 及 職 業 資 歷 評 審 局 資 訊 系 統 基 建 發 展 Project 項 目 Project summary (Please provide an
More informationContact us to find the program that s right for you: Phone: 780-492-5832 // executiveeducation@ualberta.ca
September 2014- August EXECUTIVE EDUCATION PROGRAM CALENDAR START HERE Executive Education Program Calendar Executive Education s 2014- professional development programs are listed within this guide. Select
More informationPortal Annual Report 2012/13
Portal Annual Report 2012/13 Introduction This report is provided for a diverse audience and covers the year 1st September 2012 31st August 2013, the seventh year of operation of the Portal. The Portal
More informationOhio Christian University Website Redesign
Ohio Christian University Website Redesign Project Description and Request for Proposal January 2013 Contents Project Summary... 2 Goals... 2 Audience... 2 About Ohio Christian University... 2 Site Information...
More informationAgriLife Information Technology IT General Session January 2010
AgriLife Information Technology IT General Session January 2010 Agenda Topics Year in Review Enterprise IT Services Update FirstCall Overview and Next Steps Sophos Antivirus Initiative Update Information/
More informationSAP NetWeaver Identity Management Experiences from an Implementation at Colgate-Palmolive Company
[ [ SAP NetWeaver Identity Management Experiences from an Implementation at Colgate-Palmolive Company Sarah Henriquez Senior Manager IT Risk Management, Colgate-Palmolive Kristian Lehment Product Manager
More informationFour Reasons Your Technical Team Will Love Acquia Cloud Site Factory
Four Reasons Your Technical Team Will Love Acquia Cloud Site Factory Table of Contents The Journey You ve Accepted.... 3 The Freedom of Open Source and Power of Drupal.... 4 Manage and Deploy Tens, Hundreds,
More informationProject Update December 2, 2008 2008 Innovation Grant Program
Tri-University Vulnerability Scanning/Management Solution Project Update December 2, 2008 2008 Innovation Grant Program 1 Project Summary This grant application is part of a previous project report presented
More informationUR Financials Project
UR Financials Project Demo Days February 2015 Agenda UR Financials Project Update January Close Progress Reporting Enhancements Training Update Workday Releases Communications Saving Filters Demonstration
More informationSalesforce Turbo Implementation
Salesforce Turbo Implementation 1 Choose your Salesforce Turbo Implementaion Program The AppShark Turbo Implementation Program starts with 1 week of to understand your business requirements and 1-3 weeks
More informationAdministrative Systems Modernization Program ASMP 2.0. Town Hall April 1, 2014
Administrative Systems Modernization Program ASMP 2.0 Town Hall April 1, 2014 It all started 2006 Core Application Strategy for the Enterprise (CASE) 2009 Strategic IT Accountability Board (SITAB) Report
More informationComputing & Telecommunications Services Monthly Report March 2015
March 215 Monthly Report Computing & Telecommunications Services Monthly Report March 215 CaTS Help Desk (937) 775-4827 1-888-775-4827 25 Library Annex helpdesk@wright.edu www.wright.edu/cats/ Last Modified
More informationACTIVE MICROSOFT CERTIFICATIONS:
Last Activity Recorded : May 30, 2014 Microsoft Certification ID : 375009 SUSANNE SCHNEIDER KAISERSTRASSE 53 REUTLINGEN, 72764 DE SUSANNE.SCHNEIDER@KIT-KOM.DE *Charter- Certification that was achieved
More informationAshley Institute of Training Schedule of VET Tuition Fees 2015
Ashley Institute of Training Schedule of VET Fees Year of Study Group ID:DECE15G1 Total Course Fees $ 12,000 29-Aug- 17-Oct- 50 14-Sep- 0.167 blended various $2,000 CHC02 Best practice 24-Oct- 12-Dec-
More informationFixed Scope Offering for Oracle Fusion HCM. Slide 1
Fixed Scope Offering for Oracle Fusion HCM Slide 1 Today s Business Challenges Adopt leading Global HCM practices. Streamline the HCM processes and achieve measurable efficiencies. Achieve HR excellence
More informationLong Live Hosting! Use Solution-based Offers to Re-position Your Business and Reach New Audiences. 2014 Parallels IP Holdings GmbH
Long Live Hosting! Use Solution-based Offers to Re-position Your Business and Reach New Audiences 2014 Parallels IP Holdings GmbH 2 3 4 300K New Webservers were added in 2013 350000 300000 250000 200000
More informationGuide to Getting Started with the CommIT Pilot
Guide to Getting Started with the CommIT Pilot Fall 2013 2 Table of Contents What is the CommIT Pilot?... 3 What is the scope for the Pilot?... 3 What is the timeframe for the Pilot?... 5 What are the
More informationCABINET 9 th February 2006. Report of the Director of Partnerships and Customer Services
CABINET 9 th February 2006 Report of the Director of Partnerships and Customer Services ITEM 11 CRM DEVELOPMENT Purpose of the Report To seek approval to the replacement for the Council s Customer Relationship
More informationInformation Technology Services ServiceNow: Change Management Phase I Project Charter
ServiceNow: Change Management Phase I Project Charter VERSION: 1.3 REVISION DATE: 9/28/2011 Approval of the Project Charter indicates an understanding of the purpose and content described in this deliverable.
More informationProposal to Reduce Opening Hours at the Revenues & Benefits Coventry Call Centre
Proposal to Reduce Opening Hours at the Revenues & Benefits Coventry Call Centre Proposal To change the opening hours of the Revenues & Benefits Call Centre to 9am until 5pm Monday to Friday with effect
More informationInformation Technology Strategic Plan 2013 9/23/2013
Information Technology Strategic Plan 2013 9/23/2013 Unit Mission Statement: Information Technology Shared Services is dedicated to providing unparalleled service and support to the UC Davis College of
More informationCPSC ITDS/RAM Pilot System: PGA Message Set
CPSC ITDS/RAM Pilot System: PGA Message Set Electronic Certificate Filing Test March 27, 2015 This presentation has not been reviewed or approved by the Commission and may not reflect its views CPSC Background
More informationFederal Segment Architecture Methodology (FSAM): An Overview
Information Resources Management College Federal Segment Architecture Methodology (FSAM): An Overview Dr. Stan Boddie & Prof. Matt Newman 1 a global learning community for government s most promising information
More informationAUSTIN PEAY STATE UNIVERSITY RFQ 16-010 Web Content Management System Questions & Answers
1) I was curious if APSU s CMS RFP was strictly for moving off of Drupal? The university is intending to move away from an open source system. 2) How is the current website(s) hosted? Are you seeking to
More informationEmployers Compliance with the Health Insurance Act Annual Report 2015
Employers Compliance with the Health Insurance Act Annual Report 2015 ea Health Council Health Council: Employers Compliance with the Health Insurance Act 1970 Annual Report 2015 Contact us: If you would
More informationDRUPAL WEBSITE PLATFORM BUYER S GUIDE
THE DRUPAL WEBSITE PLATFORM BUYER S GUIDE 5 Steps to Selecting the Best Technology to Build, Launch, and Manage Your Drupal Site 1 The Drupal Website Platform Buyer s Guide EVERYTHING YOU NEED TO KNOW
More informationStudent Contact Center: From Development to Delivery. A Vision for Anytime, Anywhere Student Services
Student Contact Center: From Development to Delivery A Vision for Anytime, Anywhere Student Services The Vision Single Source of Information Walk In Needs Met Here! Phone Email Agents empowered Departments
More informationProject Report and Recommendations
Prepared by Jennifer Jobst, ITS Last Edited July 1, 2011 Project Executive Summary In March 2011, Information Technology Services (ITS) and the Center for Teaching and Learning (CTL) jointly released a
More informationReverse Transfer on a National Scale: Why? How?
Reverse Transfer on a National Scale: Why? How? Registrars and Provosts Meeting Charleston, West Virginia March 11, 2015 3/17/2015 1 What is reverse transfer? 3/17/2015 2 It s a big issue 3/17/2015 3 How
More information7 Characteristics of High Performing Firms. Smartsoftware Seminar
7 Characteristics of High Performing Firms Smartsoftware Seminar Key Characteristics 1. Rock Solid Reputation 2. Determined Leadership 3. Enlightened Management 4. Well Managed Projects 5. Innovative Culture
More information