1 Prepared by John Lovelace & David Moss Last Edited March 13, 2012 Project Charter UT Web Infrastructure Project Executive Summary The goal of this project is to select and implement a solution that will replace the aging/out-of-warranty hardware platform currently being used by the centralized Web hosting service. The project will examine the best practices and options available in the marketplace and select and deploy a solution that is state-of-the-art, secure, user friendly, manageable and scalable to replace the home grown service that currently supports more than 500 Web sites campus wide. Replacing this infrastructure should encourage continued use and attract further adoption. Business Need and Background The existing centralized Web hosting service is a home grown solution that has been in place since the 1990s. It is currently running on aging servers that are or will be end of life by the vendor. The service is developed using a UNIX framework, requiring tedious access and management knowledge that is not well known by the user community. It is a critical service that houses some 500+ Web sites for all campus units, including the main Web site. Customer feedback regarding the current service cited it was lacking features, difficult to use, not scalable/supportable and not reliable/redundant. It was noted as the most desired service to be improved based on the latest ITS Applications campus wide survey. Project Description This project will gather existing Web hosting requirements, perform analysis and establish a set of recommended policies, procedures and guidelines for UT s next generation Web hosting needs. The project team will also work with campus stakeholders to conduct an evaluation to identify alternatives, including possible cloud-based, outsourced or managed service offerings. Once a recommendation is made and approved, deployment of the new service offering and migration of existing Web sites will be completed. Project Goals There are five main areas to address: Requirements definition and gap analysis. 1
2 Conduct evaluation to determine the best option for the UT environment. Deployment of the new service as well as associated policies and procedures. Migration of existing Web sites to the new service. Address immediate emergency Web hosting needs for and emergency.utexas.edu. Schedule and Milestones The following is a list of the major project milestones and dates. Milestone/Deliverable Target Date Emergency Web hosting solution implemented End of February 2012 Approved project charter End of February 2102 Develop project plan and timeline End of February 2012 (initial phases) Define requirements End of March 2012 Request for Qualifications (RFQ) / Request for Proposal (RFP) processes April-June 2012 Procurement process July 2012 Setup of the new service August-September 2012 Test migration (e.g., ITS Web sites) October-November 2012 Training and documentation October-November 2012 Production deployment December 2012-January 2013 Migration of existing Websites End of April 2013 Scope In Scope The following deliverables or tasks are in scope for this project: Phase Zero Emergency Web hosting for and emergency.utexas.edu. o Select vendor and execute contract. o Acquire off-campus hardware and storage. o Migrate content and setup access permissions. o Remove existing hardware from Arlington site. o Update documentation for emergency Web service. Phase One Project Initiation, Requirements Gathering & Evaluation: o Seek IT governance support and obtain funding approval. o Conduct requirements definition and gap analysis (this process will include major university customers such as University Communications, Development Office, large schools and colleges). o Conduct evaluation including internally hosted solutions, externally hosted solutions or a combination of both. o Select best solution. Project Charter 2
3 o Determine provisioning and service-rate structure. Phase Two Deployment: o Deployment of proper infrastructure (servers, storage, security, networking, etc.) or provisioning of hosting environment with an external vendor. o Establish and publish proper procedures, standards and guidelines. o Internal testing of infrastructure, including usability, accessibility, and security requirements. Phase Three Migration: o Develop migration strategy. o Create new user/web site provisioning process. o Training and documentation for users (e.g., ITS Web site, Wiki and FYI sessions). o Establish proper hosting operating procedures. o Develop maintenance and stewardship/its User Services support documentation. o Partner with campus units to confirm migration process. o Finalize migration strategy and communicate with existing Web site owners. o Migrate sites to the new service (in conjunction with Web site owners). o A limited number (5-10) of web sites will need to be migrated from outside the current central web hosting environments to validate the service will function for future additional sites. Out of Scope The following deliverables or tasks are out-of-scope for this project: Custom Web site content development and management. Disaster recovery service for all hosted Web sites. Migration of campus units running their own Web servers. Project Management and Governance Role Name(s)/Title(s) Responsibilities Time Commit Executive Sponsor Project Steering Committee Brad Englert, CIO Responsible for the success of the project. Cam Beasley, Information Security Office (invited as needed) Michael Caldwell, Office of Admissions Pei Chen, ITS Systems Nyleva Corley, University Communications, Digital Content Strategic project guidance and validation, management support, and resource allocation. Make final recommendation to the senior staff. Project Charter 3
4 Group Cesar De La Garza, Development Office Neal Gibson, University Operations Paul Grotevant, Undergraduate Studies Ladd Hanson University Libraries Keene Haywood, Center for Teaching and Learning Joe Howe, Cockrell School of Engineering Khaled Jaber, College of Communication Adam Norwood, College of Law Steve Preiss, Student Affairs, Office of the Dean of Students Julienne VanDerZiel, ITS Applications Kamran Ziai, College of Pharmacy Project Management John Lovelace, ITS Special Projects David Moss, ITS Systems Provide project planning, coordination, and communications. Provide overall status reporting of deliverables to ITS senior staff. Track progress toward completion of the identified project goals. Technical Managers Jenn Coast, ITS Applications Rich Zoch, ITS Systems Technical Leads Matt Wedgwood, ITS Systems Larry Archer, ITS Applications Provide managerial resources and guidance to be utilized for project initiation, planning, design and execution. Provide technical resources to be utilized for project initiation, planning, design and execution. Project Charter 4
5 Star Salzman, Information Security Office Technical Team Mic Kaczmarczik, ITS Systems Confirm solution conforms to the standard operation guidelines of campus services. Communications Betsy Busby Generate documentation and communication process and deliverables. Assist with other project management responsibilities such as planning and coordination. Stakeholder(s) IT Governance, University Communications Customers utilizing the chosen solution. Project Facilities and Resources The following facilities and resources will be required for this project. ITS staff resource for maintaining infrastructure, services, and development/integration. Role Name ITS Unit Average Time Commitment (%) Project Management John Lovelace Special Projects Project Management David Moss Systems 50% combined Technical Lead Matt Wedgwood Systems 50% Technical Team Mic Kaczmarczik Systems 50% Technical Team Larry Archer Applications TBD UDC Facilities Support Lisa Wright UDC As required Networking TBD Networking & Telecommunications As required Communications Betsy Busby User Services As required Impact Analysis This project is expected to have the following impacts: An easy-to-use, low-maintenance, feature rich Web site deployment and management framework for all campus units, which will drive up adoption and lower maintenance costs. A well-understood standard operating procedure for Web hosting that will provide sustainability and consistency to all users of this service. Project Charter 5
6 Scalable and secure backend infrastructure with minimal management overhead. Migration of existing Web sites will be relatively disruptive. Some house cleaning will occur. Disaster recovery capability for critical sites and emergency.utexas.edu. Assumptions The following assumptions have been made for this project: Infrastructure redesign is planned to replace Web Central and Windows Web Publishing services. It will not replace hosting on UT Direct. Will require adequate campus-wide participation such as training, requirements and migration planning. Will require creation of new procedures and standards. Will need to test with several types of customers before rolling out campus-wide. There may be a need for interim redirects of site address during the migration phase. Some sites will be found to be dead and will be determined to be retired vs. migrated. Customers with Web sites that are highly customized or using nonstandard tools might be unable to migrate to the new service without additional internal conversion support or other hosting options. Project resources will be available as required. Analysis of web hosting service options will not only consider the web hosting environment but the underlying technologies, such as database services, supporting it. Any web site belonging to a student organization that is still hosted on Web Central or Windows Web Publishing at the time of the migration will be considered in scope for migration to the new hosting service. Constraints This project has the following constraints: Existing infrastructure reaching end-of-life may impact the target completion date. Customers may have business-related constraints regarding timing of their migration. Legal review or contract-negotiations processes may impact the schedule. Risks This project has the following risks: This project will impact many Web sites, including the main utexas.edu site. The project poses risk not only to the public-facing front door to the university, but also to internal operations that are dependent on these site(s). This project requires participation across campus and agreement to migrate sites to the new infrastructure; this will require strong executive support through IT governance. Project Charter 6
7 Staff changes or turnover could impact ability to meet scheduled timeline. Revision History Version Date Description V.01 8/23/2011 Initial draft completed. V. 02 9/14/2011 Additional information added from 9/7 meeting with Pei Chen and Julienne VanDerZiel. V. 03 9/16/2011 Updated with feedback from project team at 9/15/11 kick-off meeting. V.04 9/22/2011 Minor changes made based on project team feedback provided via . V.05 9/23/2011 Additions/modifications made to Business Need and Background, Project Description, Project Goals, Scope (In Scope and Out of Scope) and Assumptions. V.06 9/27/2011 Updated with feedback from project team at 9/26/11 meeting. v.07 10/4/2011 Formatted for style. v.08 2/6/2012 Updated Schedule and Milestones, added Project Steering Committee to Project Management and Governance, added resource name to Communications roles in Project Facilities and Resources. v.09 2/23/2012 Updates to Scope, Project Facilities and Resource, and Assumptions from Steering Committee incorporated. Signatures Name Role Signature Date Project Charter 7
DESIGN BUILD TEST TRAIN/DEPLOY MAINTENANCE
Prepared by Jenn Coast and Christina Konstantinidou, ITS Last Edited May 8, 2015 SOLUTION PLAN REQUIREMENTS ANALYSIS DESIGN BUILD TEST TRAIN/DEPLOY MAINTENANCE Project Charter Executive Summary With the
Task Force Charter. Mobile Strategy Document Version 3.0 Chief Information Officer, ITS Last Edited December 17, 2012.
Chief Information Officer, ITS Last Edited December 17, 2012 Task Force Charter Mobile Strategy Executive Summary The mobile strategy will provide the policies, best practices, mobile website and application
CASI Project Charter. Centralized Authentication System Implementation. Executive Summary. Business Need and Background
Prepared by Kara Nicholas, ITS Executive Summary The (CASI) project involves the development and release of a new UT EID- based authentication, to replace the aging Central Web Authentication (CWA). CASI
Project Charter. Identity & Access Management Strategy. Executive Summary. Business Need and Background. Document Version 1.
August 30, 2012 Executive Summary The Identity and Access (IAM) Strategy project will provide a roadmap for implementing a comprehensive and full- featured set of IAM services to encourage collaboration,
SharePoint 2013 Project Charter
Prepared by David Moss Last Edited June 27, 2014 SOLUTION PLAN REQUIREMENTS ANALYSIS DESIGN BUILD TEST TRAIN/DEPLOY MAINTENANCE SharePoint 2013 Project Charter Executive Summary The SharePoint 2013 project
Project Charter. Secure Message System Upgrade
Prepared by Cooper Henson, ITS Last Edited March 24, 2014 Project Charter Secure Message System Executive Summary The Secure Message System provides authorized employees in The University of Texas System
Drupal Foundation Project Charter
Prepared by Christina Konstantinidou, ITS Last Edited February 10, 2014 SOLUTION PLAN REQUIREMENTS ANALYSIS DESIGN BUILD TEST TRAIN/DEPLOY MAINTENANCE Drupal Foundation Project Charter Executive Summary
DESIGN BUILD TEST TRAIN/DEPLOY MAINTENANCE. This project is part of the Identity and Access Management Roadmap.
April 5, 2015 SOLUTION PLAN REQUIREMENTS ANALYSIS DESIGN BUILD TEST TRAIN/DEPLOY MAINTENANCE Executive Summary The (CARE) project will improve the resiliency of the UTLogin, Shibboleth, and Active Directory
VoIP Deployment Committee Charter
Version 1.6 Prepared by William Green, ITS Last Edited October 30, 2012 Charter Summary A task force and executive committee of representatives from the College of Natural Sciences, Cockrell School of
Project Charter. Office 365 2015 Migrations Document Version 2.0 Prepared by Sabina Winters, ITS Last Edited February 19, 2015
Prepared by Sabina Winters, ITS Last Edited February 19, 2015 SOLUTION PLAN REQUIREMENTS ANALYSIS DESIGN BUILD TEST TRAIN/DEPLOY MAINTENANCE Executive Summary In December of 2014, the IT Governance Architecture
Project Charter. VoIP Plan Task Force Document Version 3 Prepared by Sandra Germenis, ITS Last Edited October 19, 2010. VoIP Plan Task Force
Prepared by Sandra Germenis, ITS Last Edited October 19, Project Charter Summary A task force of representatives from McCombs School of Business, The College of Natural Sciences, the College of Liberal
How To Write A System Replacement Plan
BUSINESS SERVICES COMMITTEE (BSC) Meeting Agenda May 11, 2012 2:00 pm to 3:30 pm FAC 228D I. Identity Management Strategy (C.W. Belcher) II. imodules (John McCall) III. Administrative System Master Plan
ELECTRONIC FILE STORAGE. Laurie Hafner Dahms Mark Wilson. David Bronder
ELECTRONIC FILE STORAGE Project Information Project Team Leads: Project Manager: Laurie Hafner Dahms Mark Wilson David Bronder TeamDynamix Project Number: 241112 Project Overview Centralize standard electronic
University Data Center @CRB Communication Plan
University Data Center @CRB Communication Plan Last revision date: December 3, 2009 This communication plan describes our strategy for keeping the project s stakeholders sufficiently informed to avoid
DESIGN BUILD TEST TRAIN/DEPLOY MAINTENANCE
SOLUTION PLAN REQUIREMENTS ANALYSIS DESIGN BUILD TEST TRAIN/DEPLOY MAINTENANCE Executive Summary The project will document campus requirements for IAM functionality and select and procure one or more technology
OE PROJECT CHARTER TEMPLATE
PROJECT : PREPARED BY: DATE (MM/DD/YYYY): Project Name Typically the Project Manager Project Charter Last Modified Date PROJECT CHARTER VERSION HISTORY VERSION DATE (MM/DD/YYYY) COMMENTS (DRAFT, SIGNED,
Project Charter Updated
Enterprise IT Service Management Pilot Proof of Concept Project Charter Updated Prepared By: M. Riley & J. Foster Date of Publication: March 13, 2006 Date Last Revised: April 25, 2007 PMO CH1, 8/01 Document
Active Directory Federation Services (ADFS) in Production Project Charter. Version 1.2
Active Directory Federation Services (ADFS) in Production Project Charter Version 1.2 Document Revision History Version Number Date Description 0.0 8-7-12 Initial charter from RonM 1.0 8-21-12 Updates
Program Lifecycle Methodology Version 1.7
Version 1.7 March 30, 2011 REVISION HISTORY VERSION NO. DATE DESCRIPTION AUTHOR 1.0 Initial Draft Hkelley 1.2 10/22/08 Updated with feedback Hkelley 1.3 1/7/2009 Copy edited Kevans 1.4 4/22/2010 Updated
PROJECT SCOPE STATEMENT
PROJECT SCOPE STATEMENT Note: Any work not explicitly included in the Project Scope Statement is implicitly excluded from the project. Project Name: Prepared by: BI - IT Governance Amy Winkel Date: 12/20/2010
IT Project: System Implementation Project Template Description
2929 Campus Drive Suite 250 IT Project: System Implementation Project Template Description Table of Contents Introduction... 2 Project Phases... 3 Initiation & Requirements Gathering Milestone... 3 Initiation
Crosswalk Between Current and New PMP Task Classifications
Crosswalk Between Current and New PMP Task Classifications Domain 01 Initiating the Project Conduct project selection methods (e.g., cost benefit analysis, selection criteria) through meetings with the
Module 11 Stakeholder Management PMP Exam Questions
Module 11 Stakeholder Management PMP Exam Questions PMP, PMBOK and the Registered Education Provider logo are registered marks of the Project Management Institute, Inc Question 1 You are the project manager
Information Technology Services ServiceNow: Change Management Phase I Project Charter
ServiceNow: Change Management Phase I Project Charter VERSION: 1.3 REVISION DATE: 9/28/2011 Approval of the Project Charter indicates an understanding of the purpose and content described in this deliverable.
[BSU Mobile] [Version Number 1.2] Project Charter. Bridgewater State University Information Technology. BSU Mobile. Project ID: 209358
Project Charter Bridgewater State University Information Technology BSU Mobile Project ID: 209358 VERSION: [1.2] REVISION DATE: [10 May 2013] i Contents Section 1. Project Overview... 1 1.1 Problem Statement...
Bid/Proposal No. P15/9888 Business Intelligence Management
Answers to Vendor Questions Questions are in black, Answers are in red 1. Who is the Executive Sponsor(s) for this project Information not available at this time 2. Will PCC provide the selected consultant
LEXEVS OPERATIONS AND MAINTENCE SUPPORT PROJECT MANAGEMENT PLAN
LEXEVS OPERATIONS AND MAINTENCE SUPPORT PROJECT MANAGEMENT PLAN Version Number: 1.0 Version Date: October 1, 2014 VERSION HISTORY Version Number Implemented By Revision Date Approved By Approval Date 1.0
How To Write A Project Management Plan
Enter Project Name Project Management Plan (PMP) Kickoff Month, Day, Year 1 Purpose The Project Management Plan (PMP) is a formal, approved document used to manage project execution. The PMP documents
EXAMPLE <PROJECT NAME> DATE
EXAMPLE DATE TABLE OF CONTENTS 1. EXECUTIVE SUMMARY... 2 1.1. Issue... 2 1.2. Anticipated Outcomes... 2 1.3. Recommendation... 2 1.4. Justification... 3 2. BUSINESS CASE ANALYSIS TEAM...
STRATEGIC IT ACCOUNTABILITY BOARD (SITAB) AGENDA WEDNESDAY, JUNE 15, 2011 2:30 3:30 p.m. STARK LIBRARY
STRATEGIC IT ACCOUNTABILITY BOARD (SITAB) AGENDA WEDNESDAY, JUNE 15, 2011 2:30 3:30 p.m. STARK LIBRARY Attendees: William Powers Alex Albright, Jay Boisseau, Pat Clubb, Brad Englert, Rod Hart, Kevin Hegarty,
Project Charter Content Management System REPLACEMENT
Project Created By Executive Sponsor Content Management System Replacement System Kelly Mullin, Paul Burr, Parporn Metharom, Jason Bogal, Barbara Barry, Lori Piccinini Nancy Leuenhagen, Laura Schmidt Date
Helping Coyotes Catch Road Runners Since 1949. Project Alpha: Call Tracking System Upgrade
Helping Coyotes Catch Road Runners Since 1949 Project Alpha: Call Tracking System Upgrade Project Charter V2.0 July 8, 2013 TABLE OF CONTENTS 1 INTRODUCTION/HISTORY... 3 1.1 About this Document What is
Minnesota Health Insurance Exchange (MNHIX)
Minnesota Health Insurance Exchange (MNHIX) 1.2 Plan September 21st, 2012 Version: FINAL v.1.0 11/9/2012 2:58 PM Page 1 of 87 T A B L E O F C O N T E N T S 1 Introduction to the Plan... 12 2 Integration
Procurement Reporting - OBIEE
UC BERKELEY Procurement Reporting - OBIEE Project Charter Tracey Bolton 9/7/2011 0 P age Version 3 Project Name: Prepared by: EDW Procurement Reporting Project Tracey Bolton Date (MM/DD/YYYY): 08/4/2011
Project Knowledge Areas
From Houston S: The Project Manager s Guide to Health Information Technology Implementation. Chicago: HIMSS; 2011; pp 27 39. This book is available on the HIMSS online bookstore at www. himss.org/store.
Project Planning Worksheet
Project Planning Worksheet Project Name: Prepared by: Department: Date: Background and Overview Give the business reason for requesting this project, and an overview of the work to be completed. Risks
Information Technology Services Project Management Office Operations Guide
Information Technology Services Project Management Office Operations Guide Revised 3/31/2015 Table of Contents ABOUT US... 4 WORKFLOW... 5 PROJECT LIFECYCLE... 6 PROJECT INITIATION... 6 PROJECT PLANNING...
Development, Acquisition, Implementation, and Maintenance of Application Systems
Development, Acquisition, Implementation, and Maintenance of Application Systems Part of a series of notes to help Centers review their own Center internal management processes from the point of view of
STRATEGIC PLANNING PROCESS TIMELINE AND MILESTONES
STRATEGIC PLANNING PROCESS TIMELINE AND MILESTONES MAY 10, 2013 In January 2012 the strategic planning Leadership Council was appointed by President David Chicoine and chaired by Provost Laurie Nichols.
Cloud Based Email and Collaboration Project Charter
Cloud Based Email and Collaboration Project Charter Business Case Analysis Phase Version 0.9.5 May 23, 2012 Prepared by: Carol Gravatt Project Directors: Bob Micielli, DNR Dave Kirk, OCIO Document Revision
Learning Management System (LMS) Solution
Learning Management System (LMS) Solution Project Manger: Joyce Crockett Project Start Date: 5/1/09 VERSION: 1.0 Project End Date: 1/29/2010 REVISION DATE: [DATE] Identify document changes. Version Date
Company A Project Plan
Company A Project Plan Project Name: Close Optimization Project Example Prepared By: David Done - Project Manager Title: John Doe -Project Manager Date: March 17, 2011 Project Plan Approval Signatures
Scope of Work Microsoft Infrastructure Upgrade
Introduction Scope of Work Microsoft Infrastructure Upgrade The University of Texas M. D. Anderson Cancer Center (M. D. Anderson) in Houston, Texas, celebrating six decades of Making Cancer History, is
Oakland County Department of Information Technology Project Scope and Approach
Oakland County Department of Information Technology Project Scope and Approach Project Name: Mobile Device Management Project ID: TN5186MD Leadership Group: Information Technology Steering Committee Department:
Digital Public Library of America (DPLA)
Digital Public Library of America (DPLA) Front End Design and Implementation Request For Proposal Summary The Digital Public Library of America (DPLA) seeks a skilled interactive agency to design and develop
Specialist Cloud Services Lot 4 Cloud EDRM Consultancy Services
Specialist Cloud Services Lot 4 Cloud EDRM Consultancy Services Page 1 1 Contents 1 Contents... 2 2 Transcend360 Introduction... 3 3 Service overview... 4 3.1 Service introduction... 4 3.2 Service description...
Web Function & Design Project Charter UCSC Web Presence & Services Program
Web Function & Design Project Charter UCSC Web Presence & Services Program 5/21/2009 Final Author: ITS Project Management Office THINKING AT THE EDGE Table of Contents 1 PROJECT BACKGROUND... 1 1.1 The
Phase III Work Team Project Charter Email and Calendar Consolidation Implementation
Charter approved August 24, 2012 Phase III Work Team Project Charter Email and Calendar Consolidation Implementation Team Name Email and Calendar Consolidation Implementation Team Objective Team objectives
Hamilton Campus. Information Technology Strategic Project Plan
Hamilton Campus Information Technology Strategic Project Plan July 2007 Revised: June 2009 C:\Users\lipnicje\Documents\Documents\MUH IT SP\MUHITSP_final.doc 12/19/12 Page: 1 Table of Contents Executive
Project Charter. Online Expense Claims Final Version
Project Charter Online Expense Claims Final Version Connie A. van Oostveen, Ann Williams-Gorrie Last updated: November 13, 2012 Introduction The purpose of the online expense project is to better manage
Template K Implementation Requirements Instructions for RFP Response RFP #
Template K Implementation Requirements Instructions for RFP Response Table of Contents 1.0 Project Management Approach... 3 1.1 Program and Project Management... 3 1.2 Change Management Plan... 3 1.3 Relationship
<name of project> Software Project Management Plan
The document in this file is adapted from the IEEE standards for Software Project Management Plans, 1058-1998, which conforms to the requirements of ISO standard 12207 Software Life Cycle Processes. Tailor
IAM Committee Meeting Notes 11/9/2015
IAM Committee Meeting Notes 11/9/2015 Attendees: Thomas Beard, CW Belcher, Michael Bos, John Chambers, Cesar de la Garza, Fred Gilmore, Ty Lehman, Andy Loomis, Darin Mattke, Michelle McKenzie, Shelley
ERP Survey Questionnaire
0 ERP Survey Questionnaire Thank you for your participation in the EDUCAUSE study of Enterprise Resource Planning (ERP) systems. The survey is a key part of a major study on ERP in higher education in
44-76 mix 2. Exam Code:MB5-705. Exam Name: Managing Microsoft Dynamics Implementations Exam
44-76 mix 2 Number: MB5-705 Passing Score: 800 Time Limit: 120 min File Version: 22.5 http://www.gratisexam.com/ Exam Code:MB5-705 Exam Name: Managing Microsoft Dynamics Implementations Exam Exam A QUESTION
Those who do not remember the past are condemned to repeat it. - George Santayana - Philosopher
Those who do not remember the past are condemned to repeat it. - George Santayana - Philosopher ERP Implementation Update Implementation Overview High Level Project Plan Monthly Milestones July Activities
PHASE 8: IMPLEMENTATION PHASE
PHASE 8: IMPLEMENTATION PHASE The Implementation Phase has one key activity: deploying the new system in its target environment. Supporting actions include training end-users and preparing to turn the
California Department of Mental Health Information Technology Attention: MHSA-IT 1600 9 th Street, Room 141 Sacramento, CA 95814
IT Project Status Report For an MHSA-Funded IT Project Please send the Signed Original to the following address: California Department of Mental Health Information Technology Attention: MHSA-IT 1600 9
Services Providers. Ivan Soto
SOP s for Managing Application Services Providers Ivan Soto Learning Objectives At the end of this session we will have covered: Types of Managed Services Outsourcing process Quality expectations for Managed
Project Charter EMI Outreach July 25, 2011. OE Project Charter. 1.0 July 25, 2011 Draft w/ VC Denton comments included 1.1 11/02/2011 Proofed/edited
Project Charter EMI Outreach July 25, 2011 OE Project Charter Project Name: Energy Management: Marketing and Outreach Prepared by: Lisa McNeilly Date (MM/DD/YYYY): July 25, 2011 Project Charter Version
_experience the commitment TM. Seek service, not just servers
The complete cloud Creating and preserving cloud savings, security and service quality transition planning and service management ABOUT THIS PAPER Creating and preserving cloud infrastructure savings,
ASSAM POWER GENERATION CORPORATION LIMITED
ASSAM POWER GENERATION CORPORATION LIMITED Notice Inviting Expression of Interest for Consultancy in connection of Assam Power Sector Investment Program financed by ADB NIT No. NIT/PMU/05 of 2014-15 Director
IAM Committee Meeting Agenda 3/14/2016
IAM Committee Meeting Agenda 3/14/2016 Attending: Thomas Beard, Cam Beasley, CW Belcher, Michael Bos, Bill Bova, John Chambers, Fred Gilmore, Ty Lehman, Andy Loomis, Shelley Powers, Steve Rung, Karen Weisbrodt
Change Management Approach
Workforce Transition Agenda NextGen Vision Five Principles Change Management Approach 1 Google Vision Support U-M s leadership in teaching, learning and discovery by helping students, faculty, and staff
Board of Trustees IT Subcommittee Meeting. November 3, 2014 2:00-2:50 PM Harper Center 3023
Board of Trustees IT Subcommittee Meeting November 3, 2014 2:00-2:50 PM Harper Center 3023 Agenda Introductions June 2, 2014 Meeting Minutes Creighton University Digital Strategy Information Technology
Charter & Scope Statement Web & Portal Redesign. Brookdale Community College
Charter & Scope Statement Web & Portal Redesign Brookdale Community College May October, 2012 Table of Contents PROJECT PURPOSE AND JUSTIFICATION 3 EXECUTIVE SUMMARY 3 PROJECT SCOPE AND DELIVERABLES PROJECT
Specialist Cloud Services Lot 4 Cloud Printing and Imaging Consultancy Services
Specialist Cloud Services Lot 4 Cloud Printing and Imaging Consultancy Services Page 1 1 Contents 1 Contents... 2 2 Transcend360 Introduction... 3 3 Service overview... 4 3.1 Service introduction... 4
Microsoft Active Directory Project
Microsoft Active Directory Project Simcoe County District School Board Project Kick-off Meeting Rami Wehbe (Solution Architect) January 18, 2012 Agenda Introductions Project objectives and drivers Approach
Selecting a Commission and Incentive Compensation System
Selecting a Commission and Incentive Compensation System Corporations are increasingly looking for outside vendors to provide software products to manage commission, sales incentive, and bonus programs.
Project Charter IDENTITY AND ACCESS MANAGEMENT. Project Information. Project Overview. Project Purpose and Benefits to Campus. Project Scope Statement
IDENTITY AND ACCESS MANAGEMENT Project Information Project Team Leads: Project Manager: Mike, Noel, Brandon Mills, Jordan O Konek, Chris Pruess Kris Halter TeamDynamix Project Number: 241151 Project Overview
Integrating Project Management and Service Management
Integrating Project and Integrating Project and By Reg Lo with contributions from Michael Robinson. 1 Introduction Project has become a well recognized management discipline within IT. is also becoming
Chapter 6 Implementation Planning
Chapter 6 Planning Planning- Division into Work Packages The following are the recommended Work Packages Overall Change Programme Work Package 1 E-Cabinet Model Work Package 2 Security Policy Design Work