New. Deve. Document Type. Issue Date 07/09/2015 UNCLASSIFIED. Classification
|
|
|
- Evelyn Morris
- 10 years ago
- Views:
Transcription
1 Building Design Guide Deve lopments New Engineering External Plant - FTTX Document Number NBN-TE-CTO-284 Document Type Guideline Author External Networks Approver (Owner) National Engineering Manager External Networks Status Issued Issue Date 07/09/2015 Revision Number 7.0 Classification
2 Document Control This document is provided for information purposes only. This document is subject to the information classification set out on the top of each page. If no information classification has been included, this document must be treated as, SENSITIVE and must not be disclosed other than with the consent of nbn. The recipient (including third parties) must make and rely on their own inquiries as to the currency, accuracy and completeness of the information contained herein and must not use this document other than with the consent of nbn. Copyright nbnlimited All rights reserved. Revision History Date Revision Details General Update to whole document including document template Figure 24 and Figure 25 updated nbnlimited Uncontrolled when printed Page 2 of 47
3 Contents 1 About This Document Purpose Scope In Scope Out of Scope Audience Related Documents What's Changed In This Release Introduction Scope General Requirements New Development MPS/MDU ACMA Wiring Rules Network Boundary Point Essential Services Mounting Template nbn s MDU/MPS Categories MDU/MPS Classification Basic Principles Lead-in to the Building Entry Space and Location Requirements Premises Connection Device Basement or Telecommunications Room Cable Transition Location (CTL) Enclosure Concept Drawing of Comms room layout (Combined PDH, FDT, Outdoor NTDs) Telecommunications Riser/Closet Working Height and Space Pathways Property boundary to Telecommunications room: Telecommunications Riser/Closet to Living Unit Concept Drawing Elevations nbnlimited Uncontrolled when printed Page 3 of 47
4 5.3.1 Vertical Distribution Single line Diagram Living unit NTD elevations Mounting Surface Templates and Locations Indoor NTD Mounting Surface Templates Mounting Locations Minimum Home Distributor dimensions Indoor Composite Layouts Power Outlet(s) Installation Specifications and Rules for NTDs and PSUs Ventilation requirements Appendix A Key Terms Appendix B MPS/MDU Pathway Design Checklist Appendix C nbn Fibre Pathways Informal Visual Inspection Checklist MPS/MDU Figures Figure 1: Basic network elements in relation to a typical MPS... 9 Figure 2: Earthing Requirements Figure 3: Outdoor NTD Composite Layout (Landscape) Figure 4: Outdoor NTD Composite Layout (Portrait) Figure 5: Nominal conduit dimensions Figure 6: Gas Meter Figure 7: Gas Meter Enclosure Figure 8: Gas Cylinder Clearances Figure 9: Example Fibre / Premises Distribution Hub/Internal Locations Clearance Requirements Figure 10: Example CTL clearance requirements Figure 11: Concept design of typical front elevation Comms room Figure 12: Example of typical Comms room Figure 13: Example of access clearances for a single FDT or FCD (all dimensions in mm) Figure 14: Slot Example Telecommunications Riser/Closet Floor or Ceiling Entry Figure 15: Sleeve Example Telecommunications Riser/Closet Floor or Ceiling Entry Figure 16: nbn Pathway from Property Boundary to Communications Room Figure 17: nbn Pathway using all P23 ID conduit to feed typical Apartment floor Example layout nbnlimited Uncontrolled when printed Page 4 of 47
5 Figure 18: nbn Pathway using combination Cable Tray and P23 ID conduit to feed typical Apartment floor Example layout Figure 19: Concept design of Vertical Single line diagram Figure 20: Concept design of NTD location in living unit (In Robe) Figure 21: Indoor NTD Mounting Surface Templates Figure 22: NTD Enclosure Landscape Orientation Figure 23: NTD Enclosure Portrait Orientation Figure 24: Ventilation Upper/Lower Figure 25: Ventilation Openings Tables Table 1: Outdoor NTD Mounting Template Table 2: MPS Categories Table 3: Gas Cylinder/Bottle Clearances Table 4: PCD Clearances Table 5: Mounting Locations Table 6: Home Distributor Dimensions Table 7: NTD Enclosure Mounting Template Table 8: Ventilation requirements Table 9: Additional ventilation requirements Table 10: Ventilation Requirements Table 11: Acronym Definitions nbnlimited Uncontrolled when printed Page 5 of 47
6 1 About This Document This document, in conjunction with documents listed in 1.7 Related documents, provides guidelines for developers building Multi Premises Sites (MPS) 1.1 Purpose This document deals with the provision of appropriate pathways and spaces in vertical and horizontal MPS sites for the delivery of fibre to the premises infrastructure in new developments. This document outlines nbn s conduit and spatial requirements within an MPS in order for its fibre to the premises infrastructure to be deployed. 1.2 Scope In Scope Building design guidelines for the clearances and pathways required to survey, design and install equipment for nbn within a New Development MDU Out of Scope Any building design guidelines for the clearances and pathways for Brownfield MDU/MPS sites Any specific recommendations for acceptable vendor products in relation to cable management options 1.3 Audience Type here New Development site developers New Development site designers Building Contractors 1.4 Related Documents Document [1] AS/NZS 1477:2006 PVC pipes and fittings for pressure applications Owner and Link Standards Australia [2] AS/NZS 2032:2006 Installation of PVC pipe systems Standards Australia [3] AS/NZS 2053:2001 Conduits and fittings for electrical installations [4] AS/NZS 3080:2003 Telecommunications installations Generic Cabling for commercial premises Standards Australia Standards Australia nbnlimited Uncontrolled when printed Page 6 of 47
7 [5] AS/NZS 3084:2003 Telecommunications pathways and spaces for commercial buildings Standards Australia [6] AS/ACIF S008:2006 Requirements for customer cabling Australian Communications Industry Forum [7] AS/ACIF S009:2006 Installation requirements for customer cabling [8] NBN-TE-CTO-194 New Developments: Deployment of the Nbnnduit and Pit Network Guidelines for Developers Australian Communications Industry Forum CTO/NAT [9] Building Code of Australia [10] NBN-NO-GDE-0011 Residential preparation and installation CTO/NAT 1.5 What's Changed In This Release Changes in this document revision 7.0 dated 07/09/15 compared to the previous revision 6.0 dated 15/06/13 are summarised below: Section 4.5, 4.9, 4.9.2, and Appendix B Whole Document Figure 24 and 25 Details Addition of Outdoor NTD requirements for Essential Services, and NTD Enclosure. Included ventilation requirements. General updates to all sections Uploaded Pictures nbnlimited Uncontrolled when printed Page 7 of 47
8 2 Introduction The term Multi-Premises Site (MPS) refers to any development of two or more premises (also known as living units, premises or dwellings) that are joined by a common wall or property boundary and are generally managed by a Body Corporate. Examples of an MPS include apartments, town houses, retirement villages, groups of strata title units and the like. In addition to living units, an MPS can also include retail and commercial premises. An MDU (multi-dwelling unit) is a category of MPS that only contains living units (no retail/commercial premises). nbnlimited Uncontrolled when printed Page 8 of 47
9 Building Design Guide New Developments 3 Scope This document addresses the internal space requirements and minimum clearances required to assist in the implementation of the nbn fibre network build where a shared common building servicess entry (Lead-in) is utilised to access the street fibre network. The intended audience are any of the following:- Developer or Designer Developer s Consultant Developer s Building Contractor nbnn Designer or Planner Premises Distribution area Horizontal Distribution area Backbone Distribution Area Premises Distribution Hub Outside Plant Distributio on Cable Property Boundary Figure 1: Basic network elements in relation to a typical MPS nbnlimited Uncontrolled when printed Page 9 of 47
10 4 General Requirements 4.1 New Development MPS/MDU The Developer, Developer s consultant or contractor are responsible for the following:- Provision of a suitable lead-in from the property boundary to the building entrance facility through to any area designated for Telecommunications services. Where diversity or other special needs exist, an alternative entry location may also be required. Provision of suitable space and access for the installation, maintenance and repair of all nbn. network elements up to and including the Network Termination Device (NTD) and Power Supply Unit (PSU). Provision of a minimum of P23mm nominal inside diameter, white, rigid communications conduit with draw string, from either the telecommunications room or riser/closet location to each NTD location. Provision of Mains Power to NTD locations Provision of Comms earth terminal where required nbn is responsible for: The cabling, installation and maintenance of all network elements up to and including the NTD and PSU, with the exception of the PSU batteries originally supplied at the time of installation. Compliance to the Building Code of Australia for all cabling and with reasonable directions provided by authorised developers, builders, owners, managers and customers in respect to building and fire authority requirements. In the cases where requests are received which are regarded as unreasonable, advice may be sought. 4.2 ACMA Wiring Rules The ACMA wiring rules do not apply to cabling up to and including the network boundary point. Any cabling work performed on the customer side of the network boundary point is subject to ACMA requirements. Cabling work includes the connection, installation or maintenance (repair) of customer cabling. 4.3 Network Boundary Point The Network boundary point will be at the service output ports on the nbn. NTD, i.e. the data (UNI-D) and phone (UNI-V) service sockets on the rear of the nbn. NTD. (As per AS/ACIF S ) the NTD is labelled as a Network Termination Device (NTD). 4.4 Essential Services When provisioning for an essential service, such as a lift phone, managed alarm system or fire panel the Outdoor NTD device must be used. The Outdoor NTD unlike the Indoor NTD has specific earthing requirements as described below. Refer to Section Mounting Surface Template for Outdoor NTD spatial requirements. nbnlimited Uncontrolled when printed Page 10 of 47
11 Note: 1) The CET earth must be provided by a licensed electrician engaged by the developer or construction contractor. 2) Whilst the NTD being used for essential services is called an Outdoor NTD, this will always be used/located (typically in a Comms cupboard or room) indoors for new development MDU/MPS s areas. The Outdoor NTD specific earthing requirements: Earthing conductor for the nbn Outdoor NTD must be earthed for safety reasons and for remote testing purposes. Where the electrical earth electrode is near the nbn Outdoor NTD and is accessible, a 6 mm² green/yellow equipotential bonding conductor may be run between the Outdoor NTD and the electrode and must be connected to the electrode by a separate earthing clip. The connection must be labelled Telecommunications Bonding Conductor or nbn in accordance with the requirements of AS/NZS Provide a 6 mm² green/yellow equipotential bonding conductor between the earthing bar in the electrical switchboard and a Communications Earth Terminal (CET) in the communications compartment of the combined enclosure or, where a combined enclosure has not been provided, located near but not in the switchboard (in accordance with Clause of AS/NZS 3000:2007); and Where a combined enclosure is not used, run a 2.5 mm², 4 mm² or 6 mm² green/yellow earthing conductor from the CET to the NTD location. This arrangement is shown below: The length of the equipotential bonding and earthing conductors is unimportant for the purpose of earthing the Outdoor NTD, as this earth is provided for electrical safety reasons, not for lightning surge protection purposes. The earthing conductor need not be installed in conduit within the wall cavity. The earthing conductor must be tied or taped to either the lead-in conduit or the customer cabling conduit (the earthing conductor may enter either the left hand or the right hand cable entry port, whichever is more convenient). Figure 2: Earthing Requirements NOTES: nbnlimited Uncontrolled when printed Page 11 of 47
12 1. The bonding conductor must be labelled Telecommunications Bonding Conductor at the switchboard end and also at the Communications Earth Terminal (CET) end if the CET is not within sight of the switchboard. 2. The CET must be located within 1m of the essential services outdoor NTD. 3. A licensed electrician must make the bonding conductor connection inside the electrical switchboard. 4. The earthing conductor will be connected to the Outdoor NTD by the nbn installer 5. CET not to be used for non nbn services Mounting Template Parameter Mounting Surface Template for Outdoor NTD A landscape layout 1 of the Outdoor NTD Figure 3: Outdoor NTD Composite Layout (Landscape) Note: A GPO must be provided by the end user outside the area assigned for the installation of nbn s equipment 2. 1 Additional area must be provided if the Open Enclosure / Home Distributor is designed for non-nbn cable patching, devices or equipment. 2 The position of the GPO is these diagrams are for illustrative purposes only. The GPO may be positioned anywhere adjacent to the perimeter of the Mounting Surface Template and as close as practical to it, in accordance with wiring standards. The electrician should avoid mixing power cabling with data, telephone, RF and fibre in the same vertical corridor. nbnlimited Uncontrolled when printed Page 12 of 47
13 A portrait layout of the Outdoor NTD Note: Figure 4: Outdoor NTD Composite Layout (Portrait) A GPO must be provided by the end user outside the area assigned for the installation of nbn s equipment 3. Table 1: Outdoor NTD Mounting Template 3 The position of the GPO is these diagrams are for illustrative purposes only. The GPO may be positioned anywhere adjacent to the perimeter of the Mounting Surface Template and as close as practical to it, in accordance with wiring standards. The electrician should avoid mixing power cabling with data, telephone, RF and fibre in the same vertical corridor. nbnlimited Uncontrolled when printed Page 13 of 47
14 4.5 nbn s MDU/MPS Categories An MDU/MPS is classified by nbn. according to the types of buildings on a building site or development. Each MPS within a development can be categorised by one of the following definitions: MDU Category Horizontal Vertical Hybrid Characterisation Close resemblance to single dwelling units in a street. Buildings maybe clustered into semidetached or terrace arrangements, but the entry facility is common for at least two living units. Pathways between living units resemble those detailed in document NBN- TE-CTO-194. Multiple floors, multiple living units per floor, likely to have several vertical spaces for services. Includes one or more telecommunications rooms/spaces as per AS/NZS 3084:2003. Multiple buildings on a site. Apartments in horizontal and vertical configurations that may have common access pathways between structures. Multiple access spaces are generally required. Table 2: MPS Categories 4.6 MDU/MPS Classification This section specifies the minimum requirements for the various MDU/MPS types, however, these are standard guidelines only. Please refer any concerns to nbn for non-standard installations or specific recommendations Basic Principles The following installation principles apply: Space requirements must be applied in accordance with AS/NZS 3084:2003, unless otherwise specified in this document. The NTD and PSU must be located in an area that is controlled by the end user at all times Lead-in to the Building Entry 2 60 premises nbn requires 1 x white P50 PVC conduit with a minimum wall thickness of 3.65mm. Greater than 60 premises nbn requires a minimum of 1 x P100 telecommunications conduit. nbnlimited Uncontrolled when printed Page 14 of 47
15 P20 P50 P100 Figure 5: Nominal conduit dimensions 4.7 Space and Location Requirements Premises Connection Device The PCDs will typically be mounted on the exterior of a premise (to include small MPS/MDUs). In some cases, the cabling design may require installation in an interior space such as under a stairwell. In these cases, the TE Connectivity PCD is preferred since it is constructed with low-smoke, zerohalogen (LSZH) material. Preferred Location - Requirements The PCD locations should be at a location minimum of 300mm from ground and no higher than 1.8m from ground level (that is without a ladder), and Accessible from solid ground, a slab, deck, veranda or balcony that is at ground level, or is elevated and supported or filled with no risk of falling off the edge, OR An elevated balcony with a rail or fence, provided a worker accessing the PCD remains wholly within the balcony without leaning out. This will eliminate the risk of working at heights for future workers, and ensure the PCD is accessible for repair to minimise the impact of potential future service disruption. The location must also meet all other location requirements described in this document. The Delivery Partner must clearly communicate the safety and access reasons for the intended location to the Body Corporate (or equivalent). Non-preferred location Preferred Location is not reasonably practicable In consideration of all the relevant safety risks, where it is not reasonably practicable to design a location consistent with the Preferred Location described above, the Delivery Partner must document on the design the risk based reasons for the non-preferred location. Non-preferred location Body Corporate Rejects Preferred Location Where a preferred location is identified but this is rejected by the Body Corporate (or equivalent) the final design (with a non-preferred location) must state that the safety and access reasons for the intended preferred location were explained and still rejected. Non-preferred location Requirements nbnlimited Uncontrolled when printed Page 15 of 47
16 Where it is not reasonably practicable to design a location consistent with the Preferred Location described above, the non-preferred location must meet the following requirements: The minimum height reasonably practicable, but no higher than 4m to the top of the PCD from ground level (which where near an edge is the lowest level), and Sufficient extra fibre length is coiled in the PCD to allow it to be uncoiled so the PCD end/connector is accessible from the ground, and Must be accessible using a ladder that can be safely located, secured and used by one person, including but not limited to: Flat stable ground surface With sufficient clearance away from the wall and other structures Not in an area of heavy vehicle or pedestrian traffic Separation from other services The following sections detail the clearances which must be maintained for safety and practicality of installing the PCDs Gas Meter Clearances The clearance for a Gas Meter is dependent on whether the Gas Meter is enclosed within an enclosure or outside of a closure. The following Figure 6 depicts the clearances required for a Gas Meter not enclosed: Figure 6: Gas Meter The distances are measured from the surface of the gas meter, gas regulator or any gas fitting, whichever is the outermost Note The hazardous area does not extend outside: An approved gas enclosure; or The gas compartment of a combined gas and telecommunications enclosure approved by the relevant gas utility nbnlimited Uncontrolled when printed Page 16 of 47
17 The following Figure 7 depicts the clearances required for a Gas Meter enclosed: Figure 7: Gas Meter Enclosure A minimum clearance of 150mm is required from an approved Gas Meter Enclosure Gas Cylinder Clearances The following clearances apply to a fixed Gas Cylinder or a Exchangeable Gas Bottle. Figure 8 explains the required clearances: Figure 8: Gas Cylinder Clearances Dimensions Exchangeable Gas Bottle In-Situ Gas Cylinder A 500mm 1500mm B 1500mm 3500mm C 500mm 500mm Table 3: Gas Cylinder/Bottle Clearances The horizontal distances are measured from the centre line of the Gas Cylinder or Bottle The vertical distances are measured from the top of any Gas Cylinder/Bottle valve nbnlimited Uncontrolled when printed Page 17 of 47
18 Other Utility and Obstruction Clearances The following table covers the other utilities and obstructions where clearances must be adhered too. Obstruction/Utility Working clearances Fixed Services: Pipes, Taps, Water Meters Power source: Including the point where the premises power supply cable connects to the property electrical board Corner of wall and exterior structure such as window or balcony Left of PCD for the door to open Space under eaves from aerially fed PCD Clearance 2000mm H x 900mm W x 900mm D 150mm 150mm 100mm 255mm 100mm Table 4: PCD Clearances nbnlimited Uncontrolled when printed Page 18 of 47
19 4.7.2 Basement or Telecommunications Room The size of an MDU/MPS and the solution required will determine the amount of space required. A dedicated telecom room is desired but not required. For example, if a Premises Distribution Hub (PDH) is required to service the building, an adequate space to mount and work on and around the cabinet is required whether or not it is in a dedicated telecom room. The specific area and clearance requirements will depend upon the number of premises being supported since that will determine the number and type of hardware products to be installed. Refer to Figure 9 for the generic clearance/space requirements for an MDU/MPS that requires a PDH cabinet with dimensions of 800 x 600x 400 (mm). Access clearances are defined in AS/ACIF S009:2006, figures D.2 and D3 [7] and must be referred to for complete guidance. This configuration may be replicated multiple times for very large developments, however it is recommended to refer the layout/design to nbn for each large installation to confirm compliance. The PDH is required when there are 60+ residential premises. Otherwise a CTL is used. Where there are multiple PDHs required, the first PDH requires a total clearance of 1200mm horizontally and every subsequent PDH on the same wall will only require 900mm width of reservation. Cable access space (150x50 min) 900min Minimum cable access space can be located anywhere across the width of the PDH Cable Tray Entry Area Wall PDH min 2000max Clear access space (Indicated by shaded area) 600 PDH Note :- It is preferable that the full width of the PDH be kept clear for cable access min Finished ground or floor level Side View Front View Figure 9: Example Fibre / Premises Distribution Hub/Internal Locations Clearance Requirements Note: The depth of the PDH is 400mm however a minimum depth of 450mm is required in any communications cupboard where a PDH will be located. nbnlimited Uncontrolled when printed Page 19 of 47
20 4.7.3 Cable Transition Location (CTL) Enclosure A CTL may be mounted outside on the side of the MPS or inside. The clearance requirements are shown below. 900min Wall CTL 900min 2000max Cable access space (300(w)x100(d)x150(h) min) Clear access space (Indicated by shaded area) Minimum cable access space can be located anywhere across the width of the CTL 300 CTL 300 Note :- It is preferable that the full width of the CTL be kept clear for cable access Finished ground or floor level Side View Front View Figure 10: Example CTL clearance requirements nbnlimited Uncontrolled when printed Page 20 of 47
21 4.7.4 Concept Drawing of Comms room layout (Combined PDH, FDT, Outdoor NTDs) Figure 11: Concept design of typical front elevation Comms room Figure 12: Example of typical Comms room nbnlimited Uncontrolled when printed Page 21 of 47
22 NBN-TE-CTO-284 Rev Telecommunications Riser/Closet There are two main products that are mounted in a telecommunications riser/closet: Distributor (FCD) and/or the Fibre Distribution Terminal (FDT). There are three types of dimensionss referenced below: The Fibre Collector 1. The minimum space required to physically mount an FCD or FDT to a wall. 2. The minimum clearance required around a FCD/FDT or grouping of products (the working height and space) Working Height and Space Telecommunication products need to be mounted at a comfortable working height and need to have sufficient access space around the product(s) for initial installation, ongoing maintenance, configuration modifications, and troubleshooting. An FCD and FDT have the following minimum equirements see below: CAUTION: Falls from heights can result in serious injury or death. nbn has developed equipment location information in consideration of the risk of working at heights. This information is designedd to facilitate the elimination or minimisation of work at heights throughh the design and installation process by the surveyor, designer and installer. Before commencing any installation that requires working at heights, all personnel must be thoroughly familiar with their applicable, state or territories, Workplace Health and Safety regulations, as well as your companies and/or Principal Contractor s safety practices and policies. Working at heights requires the person or persons carrying out the work, to be properly trained and deemed competent. Personnel performing the work will require a SWMS (safe work method statement) or risk assessment that would identify the necessary controls in order to carry out the work safely. Refer to nbnn Critical Risk Controls document NBN-HSE-SSW-STD-0249 (CRC #4), and applicable legislation and codes of practice. nbnlimited Uncontrolled when printed Page 22 of 47
23 Mounted no closer to the floor than 450mm from the bottom of the FCD/FDT, and no higher than 1800mm to the top of the FCD/FDT. Minimum of 900mm clear space in front of the FCD/FDT. Minimum of 300mm on each side of the FCD/FDT (or on each side of a grouping of FCD/FDTs). The telecommunications closet/riser is also required to have a minimum 50x50 mm floor slot or 1 x white telecommunications conduit cut nominally 25mm above or below the floor slab, as appropriate (see Figure 14/15). If there are living units above and below the floor slab, bi-directional access is required. Note: The diagrams in this section do not include the conduit or other pathway to units. Any fire stopping requirements for penetrations of the walls, floors or ceilings must be installed in accordance with the Building Code of Australia (BCA). nbn does not provide or certify any fire stopping. Figure 13: Example of access clearances for a single FDT or FCD (all dimensions in mm) nbnlimited Uncontrolled when printed Page 23 of 47
24 OR Figure 14: Slot Example Telecommunications Riser/Closet Floor or Ceiling Entry Figure 15: Sleeve Example Telecommunications Riser/Closet Floor or Ceiling Entry Note: For vertical pathways between floors, as a minimum the ability to anchor cables every 800mm is required. nbnlimited Uncontrolled when printed Page 24 of 47
25 5 Pathways 5.1 Property boundary to Telecommunications room: Communication pathways may be provided using the options below. At any pathway transition point, no fibre is to be self-supported over a distance greater than 200mm. Note: Conduits require drawstring Figure 16: nbn Pathway from Property Boundary to Communications Room nbnlimited Uncontrolled when printed Page 25 of 47
26 5.2 Telecommunications Riser/Closet to Living Unit Communications pathways may be provided using the options below. Options 1 & 2 will be used in new development MDU/MPS. Option 1: Dedicated Conduit Cabling from the Living Unit to the Telecommunications Riser/Closet requires a minimum of a P23mm inside diameter rigid white communication conduit with a draw string from the Telecommunications Riser or Closet location to each NTD location within a premise. No section of conduit shall be longer than 50 metres between pull/draw points and contain the equivalent of no more than three 90º 300mm radius bends. Conduits can be surface mounted in common areas or cast in slab Notes: All conduits and drawstrings must be labelled referencing the respective Apartment/Unit numbers. A single 100mm radius bend maybe used to replace a 300mm radius bend as the final transition from horizontal to vertical with agreement of the relevant nbn representative Figure 17: nbn Pathway using all P23 ID conduit to feed typical Apartment floor Example layout 1 nbnlimited Uncontrolled when printed Page 26 of 47
27 Option 2: Cable Tray and Conduit Where a combination of cable tray and conduit is utilised for cabling from the Telecommunications Riser/Closet to the living unit, access panels must be provided at any change of direction of cable tray, cable tray/conduit transition or no more than 15m apart. Where cable tray is shared with other services, there must be a minimum of 100mm separation from the nbn network infrastructure. Figure 18: nbn Pathway using combination Cable Tray and P23 ID conduit to feed typical Apartment floor Example layout 2 The allowable pathway solutions in order of preference by nbn are as follows: 3. P23mm nominal internal diameter rigid communications conduit 4. P50mm ID Rigid Communications Trunk Conduit 5. Cable tray nbnlimited Uncontrolled when printed Page 27 of 47
28 5.3 Concept Drawing Elevations Vertical Distribution Single line Diagram Figure 19: Concept design of Vertical Single line diagram Living unit NTD elevations Figure 20: Concept design of NTD location in living unit (In Robe) nbnlimited Uncontrolled when printed Page 28 of 47
29 6 Mounting Surface Templates and Locations Builders and building owners must make one of the following types of location available for the installation of nbn equipment. Each must provide the minimum mounting template shown in figure Indoor NTD Mounting Surface Templates Indoor NTD Mounting Surface Templates shows indoor NTD landscape and portrait indoor mounting surface templates. Space must be available for a 230VAC power outlet adjacent to the mounting surface template. The 230VAC power outlet may be positioned anywhere adjacent to the perimeter of the mounting surface template and as close as practical to it, in accordance with wiring standards, to minimise cable length. Note: Maximum mounting height above ground level is 1.7m to the top of the NTD Enclosure. Minimum mounting height above ground level is 0.7m to the top of the NTD Enclosure. Figure 21: Indoor NTD Mounting Surface Templates 6.2 Mounting Locations nbn distinguishes between three types of mounting locations where equipment may be mounted within the confines of a mounting surface template. Table below summarises the types of mounting locations. Location Type Open Wall Areas Open Enclosures Description An area on an open wall with either no obstructions, or only partial obstructions. Open Wall areas use the bulk space of the room for air circulation A partially-enclosed area that contains no internal obstructions. Open Enclosures use the bulk space of the enclosure and the absence of obstructions for air circulation. nbnlimited Uncontrolled when printed Page 29 of 47
30 Confined areas A cabinet or cupboard (including a Home Distributor or Utilities Enclosure) dedicated to communications equipment. Confined areas need ventilation to be added to the design to improve the air circulation Table 5: Mounting Locations nbn requires Contractors to adhere to construction and ventilation requirements when installing equipment in mounting locations. 6.3 Minimum Home Distributor dimensions nbn equipment may be installed into a Home Distributor that meets or exceeds the following size requirements. Parameter Minimum mounting surface area required for an Indoor NTD composite layout Minimum mounting surface area required for an Indoor NTD composite layout Minimum internal clearance between nbn equipment and Home Distributor door / cover Minimum internal clearance from the rear of the nbn equipment and Home Distributor/Cover Minimum inside volume required for a Home Distributor Home Distributor Dimensions 2,000 square centimetres, measured within the Home Distributor.4 2,000 square centimetres, measured within the Home Distributor. 4 2 centimetres 10 centimetres 20 litres. 4 Table 6: Home Distributor Dimensions 4 This volume is sufficient to accommodate the I-240G-R Indoor NTD, the Battery Backup PSU, NTD Enclosure and GPO. Additional volume must be provided to accommodate patch panels or other end user equipment. nbnlimited Uncontrolled when printed Page 30 of 47
31 6.3.1 Indoor Composite Layouts Parameter Mounting Surface Template for NTD Enclosure Mounting Surface Template for a landscape orientation OR Figure 22: NTD Enclosure Landscape Orientation Note: A GPO must be provided by the end user outside the area assigned for the installation of nbn s equipment 5. 5 The position of the GPO is these diagrams are for illustrative purposes only. The GPO may be positioned anywhere adjacent to the perimeter of the Mounting Surface Template and as close as practical to it, in accordance with wiring standards. The electrician should avoid mixing power cabling with data, telephone, RF and fibre in the same vertical corridor. nbnlimited Uncontrolled when printed Page 31 of 47
32 Mounting Surface Template for a portrait orientation OR Power Outlet(s) Figure 23: NTD Enclosure Portrait Orientation Note: A GPO must be provided by the end user outside the area assigned for the installation of nbn s equipment 6. Table 7: NTD Enclosure Mounting Template The GPO to power the installation is not included within the dimensions of the mounting surface, but is shown adjacent in each of the above examples. Ensure that the GPO is positioned up to 200mm from the nbn equipment template. Recommended: Provide a double GPO, so that one socket is available for customer devices, such as an internet router. Locating the new GPO as close as possible to the equipment location minimises safety issues with excess cord, and improves the look of the installation. 6 The position of the GPO is these diagrams are for illustrative purposes only. The GPO may be positioned anywhere adjacent to the perimeter of the Mounting Surface Template and as close as practical to it, in accordance with wiring standards. The electrician should avoid mixing power cabling with data, telephone, RF and fibre in the same vertical corridor. nbnlimited Uncontrolled when printed Page 32 of 47
33 6.3.3 Installation Specifications and Rules for NTDs and PSUs Note: The Indoor NTD and its PSU are suitable for installation in Standard Circumstances All of the following checks must be true for an installation to be categorised as Standard Circumstances : 6. The NTD and PSU are installed in a building where people normally live, work or meet 7, but not in a place that is open to public access. 7. The NTD and PSU a. are installed inside the same building as each other b. are not installed on the external surface of an external wall 8, and c. are not installed in an enclosure situated on or embedded into the external surface of an external wall 8 of the building; 8. The end user cabling 9 remains wholly within the same building containing the NTD and PSU If a Battery Backup PSU is deployed, it is mounted and semi-permanently secured to a wall or permanent fixed enclosure. 10. Neither the NTD nor PSU are installed in a situation where they might be reasonably expected to experience damp, moist or excessively humid conditions. 11. Neither the NTD nor the PSU are installed within a roof cavity. 12. Neither the NTD nor the PSU are installed below a floor outside the normal living, working or occupancy areas of the building Neither the NTD nor the PSU are installed in a cupboard / Enclosure / Home Distributor or in a confined space where a. it might reasonably be expected that linen, clothing or towels might be stored in direct contact with the NTD or PSU, or b. it might be reasonably presumed that items could be stored that restrict free airflow around the NTD or PSU, or c. Gases may be trapped due to limited or no ventilation 12, or because the design or situation of the Enclosure / Home Distributor is such that there is a potential for ventilation to be inhibited. 7 This means that the Indoor NTD and PSU should not be installed in a building or structure separate from where the services will be reticulated, or in a hut or street cabinet or another kind of enclosure such as a telephone booth where the environmental conditions may extend outside the specifications permitted for the NTD, PSU or battery. 8 The external surface of an external wall refers to the outside of a building, and would include, as an example, an undercover area within an enclosed patio, plus similar circumstances. The installation of an NTD and PSU on the internal surface of an external wall refers to the inside of a building and this situation is not meant to be precluded by these points, however may fall under other circumstances outlined later in this list. 9 End user cabling includes any cables that contain electrical conductors or conductive components, for the purpose of reticulating any UNI-V or UNI-D service, or reticulating PSU power. This term is intended to mean the same as the term customer cabling in AS/CA S This means that there must not be any electrically conductive telephone or data or PSU power cables between the main building and a separate freestanding building. 11 This means that neither the NTD nor the PSU may be installed under a home between the floor and bare earth, or in a location that cannot be locked up. 12 VRLA batteries, of the kind used in the Battery Backup Power Supply Unit, may emit hydrogen and oxygen gas under some circumstances, such as battery overcharging. VRLA batteries may be installed into office or end user enclosures providing the enclosure provides for exchange of air with the ambient atmosphere, as described in section nbnlimited Uncontrolled when printed Page 33 of 47
34 14. Neither the NTD nor the PSU are installed a. in a location where the ambient temperature in the immediate vicinity of the NTD or PSU might routinely exceed +40C13 or fall below 0C or b. On a surface where the surface temperature might routinely exceed +40C 13 or fall below 0C. 15. Neither the NTD nor the PSU are installed in a location where the power or end user cabling 9 might a. be a tripping or strangulation hazard 14, or b. Be accidently wrenched or damaged by tripping, passing by, or another inadvertent disturbance. 16. Neither the NTD nor the PSU are installed a. onto an accessible conductive / metallic surface or b. Encompassing a General Purpose Outlet (powerpoint) unless all accessible conductive surfaces and parts have been protectively earthed in accordance with AS3000 and AS/CA S The PSU AC power cord is not routed through an opening in a metallic surface unless the metallic edges of that opening are appropriately protected by a grommet or similar device. 18. Neither the NTD nor the PSU are at risk of being damaged. 2.4 of AS/NZS While not strictly applicable to nbn s application, sections 2.6 and 2.7 of AS provide cogent recommendations. 13 This means that neither the NTD nor the PSU may be installed directly onto a northern or western facing masonry wall where (a) the wall is likely to be subjected to heating through solar loading and the heat may be transferred to the surface on which the NTD or PSU is mounted, or (b) near a space or water heater or a heater vent. Note that Indoor NTDs and PSUs may be installed on northern or western facing masonry cavity walls if the cavity is fitted with R1.5 or higher rated batts. Also note that if a wall would be subjected to solar loading but for a tree that is currently providing shade, the installer should assess future circumstances assuming the tree has been removed. 14 Cables and equipment must be installed in accordance with local OH&S regulations and requirements. It is beyond the scope of this document to specify values. 15 This addresses potential breaches of primary insulation, inadvertent detachment of live conductors coming into contact with exposed metallic parts, and other potential risks in situations where conductors carrying mains potential are routed into conductive / metallic enclosures. Refer to 2.7 of AS/CA S009. nbnlimited Uncontrolled when printed Page 34 of 47
35 6.3.4 Ventilation requirements nbn requires that enclosures for the nbn Equipment only, satisfy the following thermal ventilation requirements: Volume of Open Enclosure or Home Distributor 20 litres (minimum volume requirement) Between 20 litres and 60 litres Greater than 60 litres Required ventilation area (for each of the Upper and the Lower ventilation region) 60 square centimetres. 60 square centimetres, plus an additional 1.5 square centimetres per litre of volume over 20 litres. 120 square centimetres, plus an additional 0.1 square centimetres per litre of volume over 60 litres. Table 8: Ventilation requirements Calculating Ventilation Area For each ventilation region, use the following steps to calculate the required ventilation area (in square centimetres): 19. Use the following formula to calculate the volume: 1000 Where: W, H and D are the internal width, height and depth of the enclosure (in centimetres) volume is expressed in litres 20. Based on the volume you calculated in step 1, determine the required ventilation area (in square centimetres). For volumes between 20 litres and 60 litres: For volumes greater than 60 litres: Example An enclosure with internal dimensions of width 38 cm, height 65 cm and depth 13 cm, has the following volume: litres 1000 As this volume is between 20 litres and 60 litres, we calculate the required ventilation area for each of the upper and lower ventilation areas as: nbnlimited Uncontrolled when printed Page 35 of 47
36 Additional Requirements Rule Doors or covers must not obstruct ventilation Obstructed ventilation does not count towards thermal ventilation assessment Ventilation openings must not be used for cable ingress/egress at any time Notes An Open Enclosure or Home Distributor design must not rely on a cover or doors being opened to meet the thermal ventilation requirements. Examples of obstructed ventilation include (but are not limited to) the following: An Open Enclosure or Home Distributor is installed into a cavity An Open Enclosure or Home Distributor is surrounded by a purposedesigned architrave An Open Enclosure or Home Distributor is fitted with fixed shelving An Open Enclosure or Home Distributor has the capability of being fitted with removable shelving This ensures that cables can neither obstruct nor reduce the free flow of air into and out of the Open Enclosure or Home Distributor, and compromise its effective ventilation. Table 9: Additional ventilation requirements nbnlimited Uncontrolled when printed Page 36 of 47
37 NBN-TE-CTO-284 Rev 7. 0 Parameter Ventilation to dissipate gases released during battery charging Ventilation Requirement a. Ventilation must be provided in an Upper Ventilation Region no further than 100mm from the top surface of the Open Enclosure Area or Home Distributor b. Ventilation must be provided in a Lower Ventilation Region no further than 100mm from the bottom surface of the Open Enclosure Area or Home Distributor c. The combined cross sectional ventilation area in the Upper Ventilation Region must be at least 5 square centimetres unimpeded 16 d. The combined cross sectional ventilation area in the Lower Ventilation Region must be at least 5 square centimetres unimpeded. Figure 24: Ventilation Upper/ /Lower This ventilation must exit towards the top/bottom, sides or front of the Open Enclosure Area or Home Distributor and must not exit into 17 a wall cavity. Ventilation that may be obstructed when an Open Enclosure Area or Home Distributor is embedded into a wall cavity or surrounded by a purpose designed architrave is to be disregardedd when the adequacy of ventilation is assessed. 16 Unimpeded is also intended to mean unobstructed, and refers to the minimum effective cross-sectional area of airways intendedd for ventilation. 17 The requirements for separate upper and lower ventilationn areas may be met with (a) upper and lower circular holes each of at least 25mmm diameter, (b) multiple circular holes with areas that sum to at least 5 square centimetres in each of the upper and lower enclosuree spaces, (c) one or more ventilation slots in each of the upper and lower enclosure spaces with cross-sectional areas that sum to at least 5 square centimetres each. nbnlimited Uncontrolled when printed Page 37 of 47
38 NBN-TE-CTO-284 Rev 7. 0 Arrangement of Enclosure / Home Distributor ventilation openings Proximity of a ventilation opening to the face of a device Where feasible, ventilation openings should be arranged in accordance with the recommendations of AS , and in particular: ventilation openings should be distributedd across the breadth of the upper and lower ventilation regions of the Enclosure / Home Distributor, as close to the top and as close to the bottom of the enclosure as practical ventilation openings should be positioned to ensure airflow acrosss both the NTD and the Battery Backup PSU The area delimited by the perimeter of the inner opening of a ventilation opening must be at least 20mm from any of the six faces of an active or passive device 19 Cable ingress / egress and ventilation Doors or covers may not obstruct ventilation Figure 25: Ventilation Openings Ventilation openings must not be used or intended to be used for cable ingress / egress 20. An Open Enclosure or Home Distributor design must not rely on a cover or doors being opened to meet any of the ventilation requirements. 18 AS covers secondary batteries for use with stand alone power systems, and so is not strictly applicable to nbn s application which draws power from the consumer AC mains. In the absence of a relevant standard covering the battery capacity deployed in nbn s Battery Backup PSU, we have referenced sections of AS , which are arguably agnostic to the source of power, and provide relevant guidance regarding ventilation. 19 This is equivalent to saying that a device may not be mounted within 20mm of a ventilation hole, either in the two dimensions of the mounting surface, or in the third dimension above the mounting surface. 20 This requirement is to ensure thatt cables cannot obstruct and reduce the free flow of air into and out of the Open Enclosure or Home Distributor, thereby compromising the ventilation. nbnlimited Uncontrolled when printed Page 38 of 47
39 NBN-TE-CTO-284 Rev 7. 0 Compliance with standards governing safe location of VRLA Batteries and Battery Backup PSUs Battery Backup PSUs must not be installed onto a wall area, or into an Open Enclosure or Home Distributor if an unenclosed Battery Backup PSU would be contrary to local standards or regulation at that location 21 Table 10: Ventilation Requirements 21 Batteries should not be situated in areas where gas emission, however minor, could give rise to safety risk. Installing the Battery Backup PSU into an Open Enclosure or Home Distributor that is itself in such an areaa will not mitigate a latent safety risk so the BB PSU should not be installed in such locations nbnlimited Uncontrolled when printed Page 39 of 47
40 Appendix A Key Terms Term Description ACMA Australian Communications and Media Authority. It is the Federal Government body that licenses Australia s telecommunications carriers and regulates fixed line and mobile telecommunications. BCA Building Code of Australia CPE Customer Premises Equipment CTL Cable Transition Location FCD Fibre Collector Distributor FDA Fibre Distribution Area. The area served via a single Fibre Distribution Hub (FDH) FDH Fibre Distribution Hub FDT Fibre Distribution Terminal FSA Fibre Serving Area FSAM Fibre Serving Area Module GPO General Purpose Power Outlet IMC Internal Multi-fibre Cable ISDC Internal Service Drop Cable LFN Local Fibre Network Living Unit A valid physical address in the Geocoded National Address File (GNAF) provided by PSMA Australia Limited. MDU MPS Multi-Dwelling Unit: Refers to blocks of flats, apartments etc. that is made up entirely of residential premises. MDU is a type of MPS. Multi-Premises Site: Refers to blocks of flats, apartments etc. that includes both residential premises and retail/commercial premises. NTD Network Termination Device. The NTD is an active device that terminates the optical signal from the nbn and then provides one or more Service Delivery Points (SDPs) as physical electrical interfaces. nbnlimited Uncontrolled when printed Page 40 of 47
41 ODF Optical Distribution Frame. A passive device which terminates cables, allowing arbitrary interconnections to be made. ONT Optical Network Terminal. Generic term for the device at the user / customer end of an optical communication network referred in nbn documentation as an NTD. OSP Patch cord PCD Outside Plant A cable with connector(s) on both ends. Premises Connection Device. A connection-point; box, or connector where drop fibre cable finishes and Premises fibre cable commences. May incorporate slack cable storage. A convenient place to cease build drop activity and commence customer connection activity. Pigtail A cable with connector(s) only on one end. PDH Premises Distribution Hub. Similar to a Fibre Distribution Hub however located within a premises Premises A Residence, Unit, House, Occupancy, Tenancy, Retail, Shop Front, Hotel, Hostel, Doctor, Medical, Clinic, Medical Imaging Centre, Laboratory, Living Unit etc. Also, a valid physical address in the Geocoded National Address File (GNAF) provided by PSMA Australia Limited. POI Point of Interconnect PSU Power Supply Unit Table 11: Acronym Definitions nbnlimited Uncontrolled when printed Page 41 of 47
42 Appendix B MPS/MDU Pathway Design Checklist Greenfield MPS/MDU Pathway Design Checklist Check the following detail: 1. Ensure a floor plan for each different floor layout is supplied depicting the communication pathway from Riser Cupboard to Apartment (like floors can be shown on one floor plan). Note: All effort to ensure pathways are supplied in with minimal layers sufficient to capture nbn requirements. No other utilities to be reflected. 2. Ensure the lead-in pathway is shown going from the Property Boundary to the Communications Room (conduit, cable tray or combination of both). 3. Provide a front elevation of riser cupboard layout with space reserved for nbn equipment is provided (FCD/FDT). 4. Ensure Communications Room has the spatial requirements for NTD/PSUs to service lifts and FIP. Note: 1 x NTD/PSU combination per lift and 1 x NTD/PSU per FIP. Provide a front elevation of communications room and/or cupboard layout with space reserved for nbn equipment is provided (PDH and essential services CPE). Note: NTD/PSU combinations for essential services can be located in alternate locations upon consultation and agreement with your nbn Account Manager. 5. Ensure pathways from the communications room to each riser are shown (conduit, cable tray or combination of both). 6. Ensure the riser cupboard shows an FDT on each floor and the spatial dimensions of the riser cupboards are in accordance with nbn guidelines on a floor plan. 7. Provide a schematic of the riser shaft depicting the distance between floors. 8. If the pathways from the riser cupboard to the apartment are a full conduit solution, then depict each individual pathway in no more than three bends. nbnlimited Uncontrolled when printed Page 42 of 47
43 9. If the pathway from the riser cupboard to the apartment is a combination conduit/cable tray then Access Panels must be depicted in the designs at every cable tray change in direction as well as any point where the individual P23 ID lead-ins meet the cable tray. Access Panels will be no longer than 15m apart. 10. The location and spatial separations for the nbn CPE (NTD/PSU) must be in accordance with nbn Guidelines. 11. All Design Drawings must be submitted in.dwg format to scale. Note: All.dwg format pathway design drawings must be a single DWG/CAD with all information built in the file. No attachment/ binding OR X-Ref. Minimum AutoCad version All Technical Guidelines can be found at the nbn Website Floor plans denote Apartment/ Unit numbers. 13. For Horizontal or Hybrid MDUs the Developer must submit Pit and Pipe Asbuilts that adhere to the nbn technical guidelines before nbn can deem the Design fit for purpose (for Hybrid MDUs checkpoints 1-11 must be checked as well) For any clarification on the Communications Pathway designs please refer to your nbn Account Manager. nbnlimited Uncontrolled when printed Page 43 of 47
44 Appendix C nbn Fibre Pathways Informal Visual Inspection Checklist MPS/MDU *THIS IS NOT A CERTIFICATE OF PRACTICAL COMPLETION* DEVELOPMENT SITE PROJECT ID ADDRESS INSPECTION DATE INSPECTED FLOOR/S ITE M DESCRIPTION PASS Y/N or N/A Photo taken Y/N DETAILS Lead -in conduit ( this is the conduit from the property boundary to within the communications room/ cupboard Lead in conduit is located at property boundary edge within 2m of nbn (or 1 Telstra manhole/pit where applicable) pit in road reserve or as close to 2m as possible. 2 Lead-in Conduit Strung? 3 4 Lead-in Conduit capped at property boundary Lead-in conduit installed as per design? Communications Room (this is the room where the PDH/ CTL & essential services will be located Sufficient space for PDH &CTL location as per Guidelines? Sufficient space for essential services? Reserved location for essential service GPO sockets CET (Communications earth Terminal ) 6mm² earth cable installed from electrical switch board Reserved space and cable tray for cable management around nbn equipment Pathway transition points, No fibre to be self supported over a max nbnlimited Uncontrolled when printed Page 44 of 47
45 7 distance of 200mm Fibre route not crossing other services 8 Cable tray or min P50mmID used? 9 Permanent lighting available 10 Lockable door present 11 Comms Room clean, tidy and dry Trunk Pathways (this is the pathways from the comms room to riser & from riser to P23 premises conduit) 1 Cable tray or min of Nominal P50 All conduit strung & labelled where 2 required Fibre route not crossing other 3 services A min of 100mm separation from 4 other services has been reserved within cable tray 450 x 450 Ceiling Access Panels installed in locations were cable tray will be enclosed. Small section of 5 perforated cable tray to be installed at intersections of P50 and P23 conduits to tie up transitioning premise cables. Ceiling Access Panels no more than 6 15m apart when cable tray in use. No section of P50 conduit is to be 7 longer than 50m. Pre-formed 90 degree bends radius 8 used for all P50. Pathway transition points, No fibre to 9 be self supported over a max distance of 200mm Conduit/Cable tray installed as per 10 design? Riser Cupboards (this is the cupboard where the FDT FCD will be located) Sufficient space for nbn equipment as per Guidelines? Reserved space for cable management around nbn equipment and cable tray installed Wall mounted Cable Management is installed from riser hole to riser hole A min of 100mm separation from other services has been reserved within cable tray nbnlimited Uncontrolled when printed Page 45 of 47
46 Fibre route not crossing other 5 services Pathway transition points, No fibre to 6 be self supported over a max distance of 200mm Fire stopping arrangements 7 Discussed Premise conduit & NTD location 1 All Premise conduit must be rigid, white P23 ID telecommunications 2 All conduit must be strung All conduit must be labelled with unit 3 ID (on string and conduit) Ensure no more than 3 x 90 degree 4 bends between drawer points. Pre-formed 90 degree bends used, 300mm for lateral pathway & 100mm 5 for ceiling drop to wall cavity. (No handmade bends) No conduit section longer than 50 6 metres NTD/PSU Spatial location reserved 7 as per nbn Guideline templates NTD/PSU location has sufficient 8 ventilation as per nbn Guideline 9 All conduits installed as per design. 10 Conduit must finish maximum 100mm from NTD enclosure location. 11 All conduits must be glued OTHER/MISC 1 *Provision of this document does not confirm that the Developer has or will achieve Practical Completion in relation to the Pathway Works or any other works. If the Developer believes that it has achieved Practical Completion of the Pathway Works, it should give a formal Notice of Practical Completion to nbn in accordance with the requirements of the Developer Agreement. Upon receipt of the formal Notice of Practical Completion, nbn will assess whether Practical Completion has been achieved in respect of the whole of the Pathway Works (or any agreed separable portion). Unless nbn has agreed in its Developer Agreement with you, or signed a separate letter agreement confirming that separable portions apply, an inspection for the purposes of Practical Completion may only be conducted where the whole of the Pathway Works have been completed by the Developer. Construction Project Manager nbnlimited Uncontrolled when printed Page 46 of 47
47 QA & Construction Supervisor Photos of Observations nbnlimited Uncontrolled when printed Page 47 of 47
Trial Exams C. Standards and Regulations. Examination No: GH-08-C- 1 hour and 5 minutes plus 10 minutes reading time
Trial Exams C Standards and Regulations Examination No: GH-08-C- This test is intended to gauge your knowledge of essential information contained within AS/CA S009:2013. To qualify for an allpication to
INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1
City of Cotati Building Division 201 W. Sierra Ave. Cotati, CA 94931 707 665-3637 Fax 792-4604 INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1 Any PV system on a new structures should be included
Fire. The Fire Installers Mate. A guide to fire alarm systems design
Fire The Fire Installers Mate A guide to fire alarm systems design BS 5839 Part 1:2002 A guide to BS 5839 Part 1:2002 Disclaimer This booklet is not intended to be a comprehensive guide to all aspects
AVAILABLE TO DOWNLOAD ON THE APOLLO APP. Fire Alarm Systems Design. a guide to BS5839
AVAILABLE TO DOWNLOAD ON THE APOLLO APP a guide to Fire Alarm Systems Design BS5839 Part1:2013 The Regulatory Reform (Fire Safety) Order (FSO) became law on 1 October 2006 Legally you must comply! What
Facilities Access Service OVERVIEW OF THE NBN CO FACILITIES ACCESS SERVICE
Facilities Access Service OVERVIEW OF THE NBN CO FACILITIES ACCESS SERVICE NBN Co Limited Overview of the NBN Co Facilities Access Service April 2012 Copyright This document is subject to copyright and
Fibre Optic Wiring Guide for Multiple Dwelling Units (MDUs)
Fibre Optic Wiring Guide for Multiple Dwelling Units (MDUs) Greenfield/Brownfield Renovations Table of Contents Future-Proof your Building... 1 MTS Fibre Optics Installation Guidelines... 2 MTS Fibre Optics
Excerpts from the Canadian National Building Code (NBC)
Excerpts from the Canadian National Building Code (NBC) Reproduced here with Permission of the Copyright Owner, the National Research Council of Canada, Institute for Research in Construction. For more
IT&T Infrastructure Standards
Technology Services IT&T Infrastructure Standards Version 1.5 17 th April 2015 Page 1 Table of contents 1 CHANGE HISTORY... 3 1.1 DOCUMENT HISTORY... 3 1.2 REVIEWERS... 3 1.3 APPROVALS... 3 2 INTRODUCTION...
COMMUNICATIONS ALLIANCE LTD NATIONAL BROADBAND NETWORK FIBRE READY DISTRIBUTION NETWORKS
COMMUNICATIONS ALLIANCE LTD NATIONAL BROADBAND NETWORK FIBRE READY DISTRIBUTION NETWORKS National Broadband Network - Fibre Ready Distribution Networks Industry Guideline Communications Alliance Ltd (formerly
Information and Communication Technology Network Cabling Infrastructure Standard
Approved on Dec-2005 by Eugene Formato Manager, Communications Services Last Amended Aug-2009 by Jarren Beveridge Network Engineer, Communications Services Scheduled for Review Jan-2010 Information and
Please check with your local inspection authority for any additional requirements before installation.
Specifications for Residential Overhead Electric Service Installation This brochure addresses most typical residential overhead service installations. Variances for the following specifications must be
UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS
UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS: Carefully read these instructions before installing your new air-conditioner. AUSTRALIAN AUTOMOTIVE AIR AL00500054E 1 Table
Residential Decks. Planning and Development Services Department
Building Safety Division 8500 Santa Fe Drive Overland Park, KS 66212 (913) 895-6225 Fax (913) 895-5016 Email: [email protected] Planning and Development Services Department Residential Decks
For business. Wiring your business for broadband. What happens when copper is required?
For business Wiring your business for broadband Your cabling requirements are dependent on the size and complexity of your business. Smaller businesses should follow the wiring recommendations for residential
Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016. Underground branch circuit feeding a detached garage:
Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, 2016 * Garage construction requires permits (electrical, building) * Permits must be applied for at the time. * Dial
Guideline for Fire Safety Elements of Solar Photovoltaic Systems July 17, 2008 Rev: 1/1/10
Guideline for Fire Safety Elements of Solar Photovoltaic Systems July 17, 2008 Rev: 1/1/10 This document was developed by the Orange County Fire Chiefs Association, Orange County Fire Marshal Committee.
Electrical. This section applies to the design and installation of building power distribution systems.
Basis of Design This section applies to the design and installation of building power distribution systems. Design Criteria This section contains the architectural, structural and mechanical provisions
ICTCBL2065B Splice and terminate optical fibre cable for carriers and service providers
ICTCBL2065B Splice and terminate optical fibre cable for carriers and service providers Release 1 ICTCBL2065B Splice and terminate optical fibre cable for carriers and service providers Modification History
Cable Entry Guide. Document No: TG-001 Issue Date: 14/07/2012 Version: 2.8
Cable Entry Guide Document No: TG-001 Issue Date: 14/07/2012 Version: 2.8 Document Control Sheet Record of Issue Issue Date Description 1.0 14-Jan-08 2.0 14-Feb-09 Removed references to different types
HEAVY DUTY STORAGE GAS
Multi-Fin flue technology Flue damper saves energy Electronic controls HEAVY DUTY STORAGE GAS Dependability The Rheem heavy duty gas range is the work horse of the industry having proved itself over many
PREPARING FOR THE NBN FIBRE CONNECTIONS
PREPARING FOR THE NBN FIBRE CONNECTIONS WELCOME TO TPG AND THANK YOU FOR CHOOSING TPG NBN SERVICE! You re only days away from enjoying the benefits of Australia s leading-edge fibre optic network To help
TIA 569 Standards Update Pathways & Spaces. Ignacio Diaz, RCDD April 25, 2012
TIA 569 Standards Update Pathways & Spaces Ignacio Diaz, RCDD April 25, 2012 The purpose of this Standard is to standardize specific pathway and space design and construction practices in support of telecommunications
Adult Family Home (AFH) LOCAL BUILDING INSPECTION CHECKLIST Code References: 2012 IRC Section R325 (WAC 51-51) APPLICATION NUMBER:
Adult Family Home (AFH) LOCAL BUILDING INSPECTION CHECKLIST Code References: 2012 IRC Section R325 (WAC 51-51) APPLICATION NUMBER: SECTIONS 1, 2, 3, AND 4 MUST BE COMPLETED BY APPLICANT BEFORE INSPECTION
Building Code Clarifications - 7. Fire Resistance
Building Code Clarifications - 7. Fire Resistance 7.1 (15-12-030) Use of combustibles in Type III construction roof assemblies Code Section (15-12-030) Use of Combustibles was revised on May 17, 2000,
800 Communications Circuits
ARTICLE 800 Communications Circuits INTRODUCTION TO ARTICLE 800 COMMUNICATIONS CIRCUITS This article has its roots in telephone technology. Consequently, it addresses telephone and related systems that
A guide to connecting to fibre optic networks for homeowners, architects, builders and developers.
A guide to connecting to fibre optic networks for homeowners, architects, builders and developers. Chorus is New Zealand s largest telecommunications utility company. We maintain and build the local access
Ministry of the Environment Decree. on housing design
G1 THE NATIONAL BUILDING CODE OF FINLAND Housing Design Regulations and Guidelines 2005 Ministry of the Environment Decree on housing design adopted in Helsinki on the 1 st of October 2004 In accordance
TYPICAL FIRE SAFETY INSPECTION VIOLATIONS
TYPICAL FIRE SAFETY INSPECTION VIOLATIONS The following is a list of typical violations often found by inspectors and a generic solution. You can use this list to improve the safety of your facility, to
Workplace Health, Safety & Welfare
Relevant Legislation Workplace (Health, Safety and Welfare) Regulations 1992 Construction (Design & Management) Regulations 2015 Provision & Use of Work Equipment Regulations 1998 (PUWER) Lifting Operations
This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.
Basement Finishing Guide Community Development Department Building Inspections Division 5200 85 th Avenue North / Brooklyn Park, MN 55443 Phone: (763) 488-6379 / Fax: (763) 493-8171 6/15 www.brooklynpark.org
Standards. www.nordx.com 5 ANSI/TIA/EIA-569-A (CSA T530)
The primary focus of this standard is to provide design specifications and guidance for all building facilities relating to telecommunications cabling systems and components. This standard identifies and
Los Angeles Fire Department Requirement No. 96 SOLAR PHOTOVOLTAIC SYSTEM
Los Angeles Fire Department Requirement No. 96 SOLAR PHOTOVOLTAIC SYSTEM The following is the Los Angeles Fire Department s minimum requirement for Solar Photovoltaic System Installations. The City of
CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT
Page 1 CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT CIVIC CENTRE 2141 MAJOR MACKENZIE DRIVE MAPLE ONTARIO L6A 1T1 905-832-2281 Page 2 SECTION 1 - GENERAL OBJECTIVES To provide
The replacement or modification of existing windows shall comply with the following requirements:
City of La Habra Heights Building Division 1245 N. Hacienda Road La Habra Heights, CA 90631 Office: (562) 694-6302 ext. 228 Fax: (562) 690-5010 WINDOW REPLACEMENT 2010 CALIFORNIA RESIDENTIAL CODE (CRC)
How To Build A Basement House
Single Family Basement Finish Purpose of Guide The purpose of this guide is to assist you in the permit process for your project. This handout is intended as a basic plan submittal under the 2009 International
Multiple Solutions for Connecting Multiple Dwelling Units (MDUs) WHITE PAPER
Multiple Solutions for Connecting Multiple Dwelling Units (MDUs) WHITE PAPER Multiple Solutions for Connecting Multiple Dwelling Units (MDUs) Abstract Fiber-to-the-Premises (FTTP) networks increasingly
Mandatory Part 1.4 BUILD OVER OR NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS
Mandatory Part 1.4 BUILD OVER OR NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS Table of Contents Purpose... 2 Commencement... 2 Application... 2 Referral Agency... 2 Compliance with the QDC... 2 Associated
SOLAR PV STANDARD ELECTRICAL PLAN Microinverter Systems for Single Family Dwellings
*** Provide this document to the inspector along with ALL system installation instructions *** Project Address: Scope: Standard plan for the installation of grounded microinverter solar PV systems, not
Solar Panel Installations
Solar Panel Installations Page 1 of 6 SINGLE-FAMILY RESIDENTIAL CHECKLIST City of Hayward Development Services Department Revised: 7-09-15 PERMIT REQUIREMENTS Permits are required for all solar panel installations.
Arapahoe County Residential Water Heater Installation and Inspection Guide
Arapahoe County Residential Water Heater Installation and Inspection Guide The attached handout is designed to be a general permit submittal and inspection guide covering most installation instances, however
Listed are common requirements that apply to existing solar installations when altered, added to or reconfigured.
SOLAR ALTERATIONS REQUIREMENTS August 2015 These requirements address typical alterations to solar installations; they cannot address every scenario. In Victoria, an alteration to a solar installation
9.8.1.1. General (1) This Section applies to the design and construction of interior and exterior stairs, steps, ramps, railings and guards.
Section 9.8. Stairs, Ramps, Handrails and Guards 9.8.1. Application 9.8.1.1. General (1) This Section applies to the design and construction of interior and exterior stairs, steps, ramps, railings and
WorkSafe Guidance Document FALL PROTECTION IN RESIDENTIAL CONSTRUCTION
WorkSafe Guidance Document FALL PROTECTION IN RESIDENTIAL CONSTRUCTION WorkSafe Guidance Document Fall Protection in Residential Construction Table of Contents Executive Summary... 1 Introduction... 1
RESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS
RESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS The following guidelines are intended to assist with the permit acquisition process with regard to Plumbing Alterations. Not all information, or additional
Storage System. Planning Checklist. EC1434-2-E1, First Edition
Storage System Planning Checklist EC1434-2-E1, First Edition Proprietary Rights Notice This document contains proprietary information of Engenio Information Technologies, Inc. and Storage Technology Corporation.
Builder Specifications for Solar Ready Homes
Builder Specifications for Solar Ready Homes This document specifies the essential elements required to make a new home ready for the future installation of roof-mounted solar domestic hot water and photovoltaic
MP 3.4 SWIMMING POOL BARRIERS. Table of Contents
Table of Contents Commencement... 2 Application... 2 Referral Agency... 2 Compliance with the QDC... 2 Relationship between the Standard and this part... 2 Associated Requirements... 2 Referenced Documents...
Do I need planning permission?
Do I need planning permission? Advice for householders on house improvements on house improvements Planning Services www.leeds.gov.uk/planning What does this leaflet cover? Certain minor changes to a house
AUSTAR Multi Dwelling Unit Installation Guidelines 2008
AUSTAR Multi Dwelling Unit Installation Guidelines 2008 Document Control Sheet Contact for inquiries and Proposed Changes If there are any questions regarding this document, or suggestions for inclusion
Refuse and Recycling Advice note For Developers. September 2015
Refuse and Recycling Advice note For Developers Contents: September 2015 1.0 Refuse and recycling Background Information 1.1 Introduction 2.0 Planning and design 2.1 Good Practice 2.2 Internal storage
CODE OF PRACTICE FOR THE PROVISION OF ACCESS FACILITIES IN BUILDINGS FOR THE SUPPLY OF TELECOMMUNICATIONS AND BROADCASTING SERVICES
Document Ref. No.: CoP-1/01 CODE OF PRACTICE FOR THE PROVISION OF ACCESS FACILITIES IN BUILDINGS FOR THE SUPPLY OF TELECOMMUNICATIONS AND BROADCASTING SERVICES COMMUNICATIONS AUTHORITY April 01 Contents
Installation Instructions
Installation Instructions Pedestal Models FS 500 LE FS 800 LE Insert Models IS 500 LE IS 800 LE Pecan Engineering Pty Ltd 13 Acorn Road Dry Creek South Australia 5094 Email [email protected] Phone:
Gas Meter Clearances and Service Installation Requirements
March 2015 Gas Meter Clearances and Service Installation Requirements Builder/Owner/Developer Requirements Call PSE s Customer Construction Services 1-888-321-7779 or visit PSE.com/CustomerConstruction
Engineering Standard
Public Transport Services Engineering Standard Stations - Bicycle Facilities PART 129013 AR-PW-PM-SPE-00129013 (D073) Document Control Document Status Document Amendment Record Revision Change Description
Structured Cabling, Earthing & Equipotential Bonding
White Paper Information and Communication Technology Structured Cabling, Earthing & Equipotential Bonding English Rev. 1.0.1 / 2012-06-01 1 Abstract All Dallmeier network products (PoE cameras, recorders,
FAQs-Main switchboard design criteria
FAQs-Main switchboard design criteria Q: What is the Australian standard for main switchboards? Current Australian standard is AS/NZS 3439.1: 2002 originating from IEC 60439. The new series of standard
Single Family Residential Basement Finish
How to Use This Guide Building Guide Pottawattamie County Planning & Development Department Building & Safety Division Single Family Residential Basement Finish Provide two (2) sets of plans and complete
BUILDING PERMIT SPECIFICATIONS
BUILDING PERMIT SPECIFICATIONS The below noted requirements are based upon La Plata County Building Code. These specifications are not intended as a complete set of requirements, but are intended to provide
2. What building projects are exempted? (permit not required)
BUILDING AND SAFETY DEPARTMENT 1. What building projects require a permit? Following is a list of projects that require building permits based on Appendix chapter 1 of the California Building Code and
ABB Stotz-Kontakt GmbH ABB safe&smart Project planning of security systems
ABB Stotz-Kontakt GmbH ABB safe&smart Project planning of security systems Content Introduction Preventing unauthorized access by perimeter surveillance Monitoring unauthorized access by indoor surveillance
Cooktop Low-Profile Ventilation Hoods
INSTALLATION GUIDE Cooktop Low-Profile Ventilation Hoods Contents Wolf Cooktop Low-Profile Ventilation Hoods........ 3 Cooktop Low-Profile Hood Specifications.......... 4 Cooktop Low-Profile Hood Installation............
BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY
MURRAY SHIRE COUNCIL BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY ADOPTED: 1 May 2012 1 BUILDING OVER OR NEAR WATER AND SEWER MAINS POLICY CONTENTS 1. Objective... 2 2. Requirements for Building Near
Services Enclosures and Protected Shafts - Maintaining Compartmentation
Introduction When a fire resisting element is used to provide fire compartmentation, every opening that allows services to pass through the element must be adequately protected by sealing, or fire stopping
UNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-27 05 14.00 10 (April 2006) -------------------------------- Preparing Activity: USACE Superseding UFGS-27 05 14.00 10 (April 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS
LIEBERT VNSA Installation Sheet
LIEBERT VNSA Installation Sheet Description The Liebert vnsa network switch is designed for connecting multiple Ethernet-ready devices and comes in various models. The unit may have: A Liebert icom display
Planning Information. Passenger and Freight Elevators.
A company of ThyssenKrupp Elevator Thyssen Aufzüge tk This planning information will give you an overview of the most important planning criteria of passenger and freight elevators. However you should
Appendix G. Security management plan
Appendix G Security management plan Security Management Plan Prepared by: Kann Finch Group Project Energy Australia Belmore Park Zone 1- Sub-station component General Design Requirements The perimeter
County of Riverside Building and Safety Department
County of Riverside Building and Safety Department Mike Lara Director Photovoltaic Permitting Guidelines The information provided in this document is general and is intended only as a guide. Each project
ST Series POWER SUPPLIES USER INSTRUCTIONS
Introduction These instructions detail the installation and operation requirements for the ST20 & ST35 power supplies. These have been designed for operation in RV s providing a DC power system, with optional
Building Control Guidance Note
Issued 01/01/13 Rev Page 1 of 5 If you intend to convert an existing loft space into additional rooms you will need to apply for Building Regulation Approval. You may also need Planning Permission if you
Name Of Occupancy Date. Yes No Describe
FIRE PREVENTION INSPECTION CHECKLIST For Class A Occupancy (For Assembly Buildings, Bars, Restaurants, Gyms, Churches, Arenas, Theatres or wherever people gather) Name Of Occupancy Date Physical Address
4 Installation Requirements
4 Installation Requirements 9 4.1 Code Reference The authority having jurisdiction should be referenced to determine what law, ordinance or code shall apply in the use of flexible duct. Ducts conforming
Electrical Service Guidelines
Electrical Service Guidelines Middle Tennessee Electric Membership Corporation Revised: May 23, 2013 MTEMC's Electrical Guidelines TABLE OF CONTENTS Right-of-Way Clearance Guide 3 MTEMC Requirements 4
Department for Communities and Local Government
Department for Communities and Local Government Permitted development for householders Technical Guidance April 2014 Department for Communities and Local Government Please note: This technical guidance
Installation. Smart-UPS VT MGE Galaxy 3500. Maintenance Bypass Panel. 10-40 kva 400 V
Installation Smart-UPS VT MGE Galaxy 3500 Maintenance Bypass Panel 10-40 kva 400 V Contents Safety.................................................. 1 Save these instructions...................................
INSTALLATION REQUIREMENTS FOR DOMESTIC GAS WATER HEATERS ( RATED HEAT INPUT UP TO 70 kw )
THE GOVERNMENT OF THE HONG KONG SPECIAL ADMINISTRATIVE REGION INSTALLATION REQUIREMENTS FOR DOMESTIC GAS WATER HEATERS ( RATED HEAT INPUT UP TO 70 kw ) CODE OF PRACTICE GU 03 Issue 2 : October 2001 (Rev.
ELECTRICAL PRACTICES FOR CONSTRUCTION WORK
CONTRACTOR S CHECKLIST ELECTRICAL PRACTICES FOR CONSTRUCTION WORK 2007 WorkCover. Watching out for you. New South Wales Government Disclaimer This publication contains information regarding occupational
BS5839 Part 1:2002 Overview
BS5839 Part 1:2002 Overview 1 Contents Introduction So why is the current standard being revised? The brief for the new standard Changes to structure of current Standard Enhanced certification of Fire
ARE YOU WIRING FOR A SMART HOME? Guidelines for homeowners on the wiring requirements for telecommunications and other wired services.
ARE YOU WIRING FOR A SMART HOME? Guidelines for homeowners on the wiring requirements for telecommunications and other wired services. INTRODUCTION Installing the right wiring when building or renovating
Enable Networks UFB Services Agreement Service Description for Central Office and POI Co-location Service
Enable Networks UFB Services Agreement Service Description for Central Office and POI Co-location Service 1 Interpretation 1.1 The Central Office and POI Co-location Service described in this Service Description
City of Riverside Building & Safety Division Phone: (951) 826-5697 www.riversideca.gov
City of Riverside Building & Safety Division Phone: (951) 826-5697 www.riversideca.gov PHOTOVOLTAIC PERMITTING GUIDELINES The information provided in this document is general and is intended only as a
What you need to know about. Smoke alarms for residential buildings
What you need to know about Smoke alarms for residential buildings Are s compulsory? Smoke alarms are compulsory and must be installed in residential buildings on or near the ceiling of every storey. What
Vestibule Case Study. Vestibule Requirement Intent [2003 IECC, 2006 IECC, 2003 IBC, 2006 IBC, 90.1-2001, 90.1-2004]
Vestibule Case Study [2003 IECC, 2006 IECC, 2003 IBC, 2006 IBC, 90.1-2001, 90.1-2004] Vestibule Requirement Intent Page 1 of 14 The primary intent behind the requirement for a vestibule is to reduce infiltration
MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS
MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS 01. SAFETY INSPECTION of service equipment at FPL Power Source 02. Construction GFI power outlets (Temp Pole for Construction) 03. 90 day temporary power
ELECTRIC METERING COMMERCIAL & INDUSTRIAL
ELECTRIC METERING COMMERCIAL & 1.0 INDEX 1.0 INDEX 2.0 SCOPE 3.0 GENERAL REQUIREMENTS 4.0 METER LOCATIONS 5.0 UNDERGROUND TERMINATIONS 6.0 METERING TRANSFORMER ENCLOSURES 7.0 SINGLE CUSTOMER METER INSTALLATIONS
Utilities and existing services
Construction Services Building standards for mechanical and electrical installations Utilities and existing services October 2012 Directorate: Environment Construction Services - Building standards for
COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES
COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES These guidelines are to be used for ALL commercial cooking hoods, ventilation systems and related fire suppression
Decree of the Ministry of the Environment on fire safety of ventilation systems
THE NATIONAL BUILDING CODE OF FINLAND MINISTRY OF THE ENVIRONMENT Housing and Building Department Decree of the Ministry of the Environment on fire safety of ventilation systems Adopted in Helsinki, 18
Guidance on Householder permitted development rights
FORWARD CONTENTS CLOSE Guidance on Householder permitted development rights Circular 1/2012 CONTENTS BACK FORWARD CLOSE 1. INTRODUCTION 04 2. BEFORE STARTING 05 3. MAIN CONCEPTS 07 Principal elevation
TELUS Residential Service Conduit Requirements for Stand Alone Homes and Duplexes in Fibre Only Communities
1 TELUS Residential Service Conduit Requirements for Stand Alone Homes and Duplexes in Fibre Only Communities Beginning in January 2010 TELUS began designing new subdivisions within the Top 48 population
50AI01oe 02/15. Labko GRP cesspools. Instructions for installation, operation and maintenance
02/15 Labko GRP cesspools Instructions for installation, operation and maintenance Reliable solutions Wastewater treatment systems Contents 1 LABKO CESSPOOLS... 3 1.1 GENERAL... 3 1.2 IMPORTANT TO KNOW
Florida Building Code 2004 SECTION 1009 STAIRWAYS AND HANDRAILS
Florida Building Code 2004 SECTION 1009 STAIRWAYS AND HANDRAILS 1009.1 Stairway width. The width of stairways shall be determined as specified in Section 1005.1, but such width shall not be less than 44
Electrical Safety Tips. Help us keep you safe
Electrical Safety Tips Help us keep you safe To help you stay safe when using electricity, ActewAGL has compiled these electrical safety tips. For natural gas safety tips please see ActewAGL s natural
Enable Networks UFB Services Agreement Service Description for Central Office and POI Co-location Service
Enable Networks UFB s Agreement Description for Central Office and POI Co-location 1 Interpretation 1.1 The Central Office and POI Co-location described in this Description will be available from the date
- 5 - Table1. Maximum Compartment Volumes
- 5 - Part II - SPECIFIC REQUIREMENTS 5. Compartmentation 5.1 Every building should be divided into compartments by walls and floors to inhibit the spread of fire. 5.2 Compartment walls, compartment floors,
INSIDE TELEPHONE WIRING FOR Business
Do It Yourself Guide INSIDE TELEPHONE WIRING FOR Business As of March 1, 2015 all single line business customers that have a demarcation point such as but not limited to a Network Interface Device (NID),
