1 REQUEST FOR PROPOSALS The Board of Supervisors of Tazewell County, Virginia is soliciting proposals, pursuant to Section of the Code of Virginia, from private entities to design and build an onsite waste water treatment facility to be located on Cavitts Creek Park in Tazewell County, Virginia. The proposal shall include a plan whereby the proposer shall design and construct the facility in accordance with the specifications on file in the County Engineer's Office at 106 East Main Street in Tazewell, Virginia and posted on the County's website at The facilities effluent must meet or exceed the qualitative standards set forth in the specifications and comply with any and all other Federal, State, and local regulations for waste water treatment. The proposal must include the estimated cost of the facility, the estimated cost of annual operations, including any utility costs and labor. Cost shall not be the sole factor considered in awarding the contract but shall be a heavily weighted factor in evaluating the proposals. The proposals also shall include any warrantee of the system. Proposals shall be evaluated in accordance with Tazewell County's Public Private Partnership Procurement procedures and policies, copies of which are available at the Tazewell County Administration Office at the address below indicated. Proposals must be submitted in sealed envelopes labeled Cavitts Creek Waste Water Treatment Proposals to the County Administrator s Office at 108 East Main Street, Tazewell, Virginia All proposals shall be delivered to the Office of the County Administrator no later than the 31st day of August, 2015 by 2:00PM. Proposals not submitted by that date and time shall not be considered. Proposals submitted electronically shall not be considered. Owners of Small Businesses as well as Women and Minority owners of businesses are encouraged to apply. Please direct any inquiries to Matthew Anderson, Tazewell County Engineer at P age
2 Cavitts Creek Park Waste Water Treatment Facility Specifications Proposed Waste Water Treatment Facilities must meet or exceed the following specifications. All specifications must be addressed or explained in each proposal. System Engineering and Permitting: The selected proposal shall provide all required engineering, design, and permitting for the facility. This system must meet all applicable federal, state, and local requirements. This facility will be located in proximity to an existing recreational water impoundment which also serves as a drinking water source. Construction and Installation: The selected proposal shall be responsible for fully supplying, installing and constructing the proposed wastewater treatment facility. This will include the system, system structure, housing structure, electrical and plumbing connections, as well as all appurtenances to create a fully operable wastewater system. Construction shall be completed in a manner so to minimize safety hazards to park visitors or personnel and interference with Park activities. System Size and Type: The proposed onsite wastewater treatment system shall be modular and scalable, allowing for future expansion. It shall have a minimum capacity of 6,000 gpd and maximum capacity of 8,000 gpd for purposes of this proposal. It shall have an operational life span of 30 years or more. The entire system, including the housing structure, should have the capability of fitting into a footprint of 1,000 square feet or less. The proposed housing structure shall reflect a similar architecture to existing facilities on-site. Fixed bed technology should be utilized for this treatment system. Outflow parameters shall not exceed the following: BOD 20 mg/l TSS 15 mg/l ph Proposals must include estimated outflow BODs, TSS, and ph for the proposed system. 2 P age
3 System Operations and Maintenance: The system shall be energy efficient, with energy consumption of less than 10% of equivalent conventional systems. It should be capable of adapting to large fluctuations in the influent capacity and temperature, while also being environmentally friendly, with little to no odor and little to no noise discernible outside the facility housing during operation. Operations costs should be low, with lifetime O&M costs not exceeding more than 10% of the total system capital investment and an annual cost of 2% or less of the total systems capital investment for the biological system's parts replacement. The system should minimize excess sludge, producing less than 0.5% on a daily capacity basis. Sludge in the system shall have a minimum age of at least 45 days. Required maintenance shall be very simple with weekly or less frequent site visits required to insure proper operation. Warranty: The biological reactors or similar system shall have a minimum of five year warranty from the date of system startup. 3 P age
4 Project Location: Lake Witten (Cavitts Creek Dam /Upper Clinch Valley Dam 1B) is located in the just north of Tazewell Virginia, as shown in the location map below. On the following page you will find a map showing the area of the facility. 4 P age
5 5 P age
6 Additional Information: The Cavitts Creek PPEA project will consist of a wastewater treatment facility to be designed and constructed on the site in the approximate area shown on the previous page. This facility will serve a group of cabins (true number is currently unknown, but estimated at single or double room facilities) in the area noted on the map. This is the reason that the RFP requested that the proposed system be scalable. This system will not be used as an RV dump station. The project will include all items listed in the proposal request. The lake is currently owned and operated as a recreational facility by the. While the dam serves as a flood control facility, the lake also serves as an emergency backup water source for the Tazewell County Public Service Authority. Any project undertaken must not jeopardize that ability. Erosion and Sediment Control Permitting Should the project require the disturbance (i.e. grading, excavation, etc.) of 10,000 square feet of soil, it will be necessary to apply for an erosion and sediment control permit from the county. This will require the services of a Professional Engineer or Licensed Land Surveyor licensed in the State of Virginia. The consultant shall produce an erosion and sediment control plan with a narrative as per the Virginia Erosion and Sediment Control Laws and the Virginia Erosion and Sediment Control Handbook. These shall be sent in no later than ten days prior to a Planning Commission Meeting (currently the second Thursday of each month). After receipt of these documents, the Engineering Department will review and attempt to work out any issues with the consultant prior to the meeting. A representative of the project team must then be present at the Planning Commission Meeting, where the permit will receive approval or be disapproved. If disapproved, the owner will receive notice in writing of the deficiencies and will have an opportunity to resubmit. All permit fees and bonds are waived for erosion and sediment control permits. Prior to issuing the permit, we must have copies of any other outstanding permits required by the project, including, but not limited to the following groups (as applicable) : VDOT, US Army Corps of Engineers, VDH, and DEQ. Virginia Stormwater Permit Stormwater permitting in Tazewell County is conducted by the Virginia DEQ. The consultant completing the Erosion and Sediment Control permitting and design can provide guidance for this process as well. Should the disturbance be less than one acre, such a permit is not required. Should it exceed one acre, the consultant will have to prepare a Stormwater Pollution Prevention Plan (SWPPP) and if necessary, design any structures required by the Virginia Stormwater Design Guidelines. Such facilities will need to be constructed as part of the project. Floodplain This property is not in the floodplain. Building Codes Our Building Safety Department is currently enforcing the 2015 Virginia USBC and 2015 IBC Building Codes. Building Permit fees are waived for this project. 6 P age
7 Appalachian Power Contact For design and loading contact information, please contact James "Steve" Browning with AEP. He can direct you to the individuals with AEP that you need to speak with. James "Steve" Browning Appalachian Power Technician (276) Crab Orchard Road Tazewell, VA Natural Gas At this time, there is no natural gas available to the site. Please any questions you may have to Matthew Anderson, County Engineer, at so that answers may be submitted as additional information on the website. 7 P age
PUBLIC NOTICE Application for Permit
PUBLIC NOTICE Application for Permit 30-Day Notice Issue Date: June 20, 2016 Expiration Date: July 20, 2016 US Army Corps of Engineers No: NWP-2010-535 Oregon Department of State Lands No: 58311-RF Interested
More informationINFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY
ORDER NO. R5-2011-XXXX INFORMATION SHEET Background Triangle Rock, Inc. (Discharger) submitted a Report of Waste Discharge (RWD) on 23 August 2010. The Discharger is expanding the mining operations at
More informationPursuant to Department of Environmental Protection Rules Chapter 555, effective March 9, 2009
APPLICATION FOR ADDITION OF TRANSPORTED WASTES IN WASTEWATER TREATMENT FACILITIES Pursuant to Department of Environmental Protection Rules Chapter 555, effective March 9, 2009 This application is to be
More informationAn Algae Based Treatment System Provides A Truly Sustainable Treatment Solution For Small & Seasonal Wastewater Treatment Plants
An Algae Based Treatment System Provides A Truly Sustainable Treatment Solution For Small & Seasonal Wastewater Treatment Plants Agenda Small and Seasonal Plant Issues Algae and Bacteria in Symbiosis Cincinnati
More informationCONSTRUCTION PERMIT SUBMITTAL CHECKLIST
LAS VEGAS VALLEY STORMWATER QUALITY MANAGEMENT PROGRAM CONSTRUCTION PERMIT SUBMITTAL CHECKLIST (Applies to all Grading Site Development Building and Encroachment Permits and plans including Final Parcel
More informationRecycle treated effluent to meet looi of the facility's non-potable water needs. nutrient removal and activated carbon adsorption.
INNOVATIVE ADVANCED T R. U m SY- ACHIEVES "ZERO DISCBARGE" Dal6 E. Chaudhary, P.E., Vice President Robert E. Hagadorn, P.E., Senior Vice President Bazen and Savyer Environmental Engineers C Scientist,
More informationNEVADA CITY WASTEWATER TREATMENT INQUIRY
NEVADA CITY WASTEWATER TREATMENT INQUIRY REASON FOR INVESTIGATION The 2003-2004 Grand Jury investigated the status of wastewater treatment in unincorporated Nevada County. This year, the Grand Jury investigated
More informationPolicy and Procedures for the Evaluation of Downstream Impoundments
I. Definitions A. Potential Influence Area is defined as the closer of 1. The point at which the total drainage area is at least 100 times greater than the maximum proposed disturbed area, or 2. An offsite
More informationREFERENCE. All National Grid personnel who plan and perform work involving protected water resources are responsible for:
EG-30NY ENVIRONMENTAL GUIDANCE PAGE 1 of 9 DATE 10/1/10 EP 3 Natural Resource Protection 1.0 SCOPE AND RESPONSIBILITIES National Grid s New York service territory encompasses thousands of wetlands, lakes,
More informationORANGE COUNTY EROSION CONTROL BOND PACKET
EROSION CONTROL BOND PACKET Memo - Re. erosion control permitting and bonding 2 Erosion and sediment control fees.3 Surety requirements for single-family residential development 4 Land disturbance calculation
More informationAn introduction to EPAS
An introduction to EPAS Process-technical advice for your water and wastewater treatment plant In response to the growing demand for professional environmental process and technological advice, EPAS (Eco
More informationFinding of No Significant Impact
Finding of No Significant Impact PROPOSED CONSTRUCTION AND OPERATION OF OPERATIONAL READINESS TRAINING COMPLEX FORT HUNTER LIGGETT, MONTEREY COUNTY, CALIFORNIA Pursuant to the Council on Environmental
More informationCONTRACTOR ENVIRONMENTAL LIABILITY 101. Violation of environmental laws may result in fine or imprisonment or both.
CONTRACTOR ENVIRONMENTAL LIABILITY 101 Violation of environmental laws may result in fine or imprisonment or both. To avoid potential liability, contractors must be aware of the requirements of the various
More informationAdopted 9/23/98 CHATTAHOOCHEE CORRIDOR PLAN. The goals of the Chattahoochee Corridor Plan (hereinafter also referred to as the Plan ) are:
CHATTAHOOCHEE CORRIDOR PLAN Adopted 9/23/98 PART 1: GOALS. POLICY. COVERAGE. A. Goals The goals of the Chattahoochee Corridor Plan (hereinafter also referred to as the Plan ) are: 1. Preservation and protection
More informationPackage Treatment Plant Policy and Procedure
Package Treatment Plant Policy and Procedure PURPOSE There has been increased interest in the use of package treatment plants for new development proposals in the County. Current review procedures are
More informationImproper storage of fuel on construction sites will increase the risk of water pollution that may occur as a result of leaks or spills.
WQ-10 Best Management Practice (BMP) Water Quality Protection Guideline Secondary Containment Design Standards Fuel Storage on Construction Sites According to the EPA, the majority of water pollution in
More informationDOCKET NO. D-2005-007 CP-2 DELAWARE RIVER BASIN COMMISSION
DOCKET NO. D-2005-007 CP-2 DELAWARE RIVER BASIN COMMISSION East Vincent Township Bartons Meadows Wastewater Treatment Plant East Vincent Township, Chester County, Pennsylvania PROCEEDINGS This docket is
More informationSITE DEVELOPMENT PLAN CHECKLIST. Project Name: Site Plan No.:
SITE DEVELOPMENT PLAN CHECKLIST 5/12/05 Rev.3/14/06 Project Name: Site Plan No.: REVIEW CRITERIA Plans: A site development plan (signed and sealed) shall be on a 24 x 36 sheet at a scale that is no smaller
More informationGOALS, OBJECTIVES AND POLICIES
GOALS, OBJECTIVES AND POLICIES The following goal, objective and policy statements have been developed for the use of local policy makers in guiding and directing the decision making process as it relates
More informationThe Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08
The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08 Fairfax County requires developers to post a performance bond if they are
More informationVirginia Department of Transportation Rural Rustic Road Program Manual
Virginia Department of Transportation Rural Rustic Road Program Manual Prepared by Local Assistance Division Virginia Department of Transportation 1401 East Broad Street Richmond, Virginia 23219 Jennifer
More informationAmeren Callaway Energy Center-Water Treatment Plant Sedimentation Basins #5 , MO-0098001, Construction Permit No. CP0001707, Callaway County
Ms. Gail Geary Ameren Missouri 1901 Chouteau Ave. PO Box 66149, MC 602 St. Louis, MO 63166-6149 RE: Ameren Callaway Energy Center-Water Treatment Plant Sedimentation Basins #5 , MO-0098001, Construction,
More informationCLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE
1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,
More informationHow To Get A Stormwater Discharge Permit In A City Of Scottsdale
Environmental Regulations Guide Section 4 Pollution Prevention 4. 0 Pollution Prevention The Pollution Prevention Act (PPA) focuses on source reduction, i.e. on reducing the amount of pollution through
More informationOPERATIONS & MAINTENANCE FY 2012-2013 Adopted Budget
SERVICE DESCRIPTION To maintain all of the transferred and accepted infrastructure within the district including water, wastewater, and stormwater systems, streetlights, traffic signals, and landscaping
More informationNEW CONSTRUCTION FINANCING PROGRAM
NEW CONSTRUCTION FINANCING PROGRAM Program Guide The is an Equal Housing Opportunity Lender I. Program Purpose The New Construction Financing Program (the Program ) encourages WV licensed home builders
More informationNASA Stennis Space Center Environmental Resources Document
16.0 Major Environmental Considerations for Proposed Actions All construction, rocket testing, and operations that may potentially impact environmental media, such as air, water, land, aquatic and biotic
More informationREQUEST FOR PROPOSAL YEARBOOK PUBLISHING & PRINTING RFP # 13PA006P
REQUEST FOR PROPOSAL YEARBOOK PUBLISHING & PRINTING RFP # 13PA006P Canyons School District Purchasing Department 9361 South 300 East Sandy, Utah 84070-2538 Table of Contents I. GENERAL... 2 A. Intent of
More informationVILLAGE OF PLEASANT PRAIRIE COMMERCIAL COMMUNICATION PERMIT
VILLAGE OF PLEASANT PRAIRIE COMMERCIAL COMMUNICATION PERMIT CLASS 1 COLLOCATION New Commercial Communication Structure Substantial Modification Please check one of the following: CLASS 2 COLLOCATION OTHER
More informationSECTION ELEVEN: ACTIVITIES REQUIRING A CERTIFIED EROSION AND SEDIMENT CONTROL PLAN 1
SECTION ELEVEN: ACTIVITIES REQUIRING A CERTIFIED EROSION AND SEDIMENT CONTROL PLAN 1 An application for approval of a soil erosion and sediment control plan in accordance with these regulations shall be
More informationAnswers to Commonly Asked Questions
County of San Diego, Planning & Development Services FIRESTORM POLICY AND GUIDANCE DOCUMENT BUILDING DIVISION Answers to Commonly Asked Questions The County of San Diego understands the confusion and frustration
More informationREQUEST FOR PROPOSAL. for CONSTRUCTION MANAGEMENT SERVICES. for the ENCINA WASTEWATER AUTHORITY FY 2015 MAJOR PLANT REHABILITATION PROJECT
REQUEST FOR PROPOSAL for CONSTRUCTION MANAGEMENT SERVICES for the ENCINA WASTEWATER AUTHORITY FY 2015 MAJOR PLANT REHABILITATION PROJECT Ref: Admin.15 12265c September 23, 2015 Proposals Due November 2,
More informationExhibit 1 to Part 3 Project-Specific Terms
Exhibit 1 to Part 3 Project-Specific Terms (Date of Standard Exhibit 1 to Part 3: May 2014) Part 3 (2013 Lump Sum Agreement Between Department and Design-Builder), Part 4 (2013 General Conditions of Contract
More informationAnish Jantrania (photo) and Allen Knapp
WATER QUALITY VERSUS PROCESS MONITORING CHARLES CITY COUNTY, VA PROJECT Anish Jantrania (photo) and Allen Knapp Anish Jantrania Technical Services Engineer Virginia Department of Health Richmond, VA 23219,
More informationNPDES Permit No. IL0020737. Notice No. SKT:13120601.bah. Public Notice Beginning Date: April 9, 2014. Public Notice Ending Date: May 9, 2014
Public Notice/Fact Sheet Issued By: Notice No. SKT:13120601.bah Public Notice Beginning Date: April 9, 2014 Public Notice Ending Date: May 9, 2014 National Pollutant Discharge Elimination System (NPDES)
More informationSECTION 15 FLOODPLAIN MANAGEMENT
SECTION 15 15.1 Purpose Certain areas of the City of Gardiner, Maine, are subject to periodic flooding, causing serious damages to properties within these areas. Relief is available in the form of flood
More informationCapital Construction and Debt Service
Capital Construction and Debt Service This section includes an overview and summary of appropriations and expenditures for the design, construction, and repair of major capital assets such as roads, bridges,
More informationMARICOPA COUNTY ENVIRONMENTAL HEALTH CODE CHAPTER II SEWAGE AND WASTES SECTION 8
MARICOPA COUNTY ENVIRONMENTAL HEALTH CODE CHAPTER II SEWAGE AND WASTES SECTION 8 ONSITE WASTEWATER TREATMENT FACILITIES REGULATION 1. Definitions a. Aggregate means a clean graded hard rock, volcanic rock,
More informationRESTRICTIVE COVENANTS. THIS DECLARATION OF RESTRICTIVE COVENANTS is made this day of, 20, by RECITALS
STATE OF NEW YORK COUNTY OF DECLARATION OF RESTRICTIVE COVENANTS THIS DECLARATION OF RESTRICTIVE COVENANTS is made this day of, 20, by, ("Declarant"), A New York corporation with offices at,, New York.
More informationCity of Gardner Electric, Water and Wastewater Utilities. Request for Information (RFI) 1. Purpose of Request
City of Gardner Electric, Water and Wastewater Utilities Request for Information (RFI) 1. Purpose of Request The City of Gardner ( City ), faces challenges related to maintaining its basic infrastructure,
More informationMarch 2008. Prepared by: Irvine Ranch Water District. 15600 Sand Canyon Avenue. Irvine, CA 92618. Contact: Natalie Likens (949) 453-5633
ADDENDUM TO THE MICHELSON WATER RECLAMATION PLANT PHASE 2 & 3 CAPACITY EXPANSION PROJECT FEBRUARY 2006 FINAL ENVIRONMENTAL IMPACT REPORT AND THE SAN JOAQUIN FRESHWATER MARSH ENHANCEMENT PLAN REVISED SEPTEMBER
More informationLower Crooked Creek Watershed Conservation Plan EXECUTIVE SUMMARY
EXECUTIVE SUMMARY Project Background Located in southwestern Pennsylvania, Crooked Creek is a major tributary of the Allegheny River, entering near Ford City in Armstrong County. It is rich in natural
More informationNEW JERSEY ENVIRONMENTAL INFRASTRUCTURE TRUST. Financial Assistance Programs for Environmental Infrastructure Facilities
ENVIRONMENTAL PROTECTION AND NEW JERSEY ENVIRONMENTAL INFRASTRUCTURE TRUST Financial Assistance Programs for Environmental Infrastructure Facilities Proposed Readoption: N.J.A.C. 7:22 Authorized By: Bob
More informationREQUEST FOR PROPOSAL FOR GENERAL CONTRACTOR FOR AFFORDABLE MULTI-FAMILY HOUSING BREVARD COUNTY, FLORIDA. Issue Date: March 10, 2015
REQUEST FOR PROPOSAL FOR GENERAL CONTRACTOR FOR AFFORDABLE MULTI-FAMILY HOUSING BREVARD COUNTY, FLORIDA Issue Date: March 10, 2015 CLOSING DATE: Tuesday, March 31st, 2015, 2:00 p.m. EST Housing Authority
More information1.7.0 Floodplain Modification Criteria
1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:
More informationDGS-30-300 (VCCS Rev. 04/15) Page 1 of 7 REQUEST FOR PROPOSALS
(VCCS Rev. 04/15) Page 1 of 7 REQUEST FOR PROPOSALS Issue Date: July 10, 2015 RFP: LFCC-F-18161AE Title: Virginia Community College System Lord Fairfax Community College, Fauquier Campus Construct Academic
More informationWaldo Canyon Fire. Mark Shea Watershed Planning Supervisor August 23, 2012
Mark Shea Watershed Planning Supervisor August 23, 2012 Fire Started: Saturday June 23, 2012 Fire Progression June 23 2500 acres June 24 3600 acres June 25 4500 acres June 26 15622 acres June 27-28
More informationAN AEM TOOL FOR THE EVALUATION OF UNDESIGNED WASTE STORAGE FACILITIES
AN AEM TOOL FOR THE EVALUATION OF UNDESIGNED WASTE STORAGE FACILITIES REFERENCE National Handbook of Conservation Practices Code NY313 Waste Storage Facility. INTRODUCTION CAFO permits require an Agricultural
More informationClean Air, Clean Water
DIVISION OF AIR AND WATER QUALITY STATE DISCHARGE PERMIT & CERT. PROGRAM 610 University Avenue Fairbanks, AK 99709-3643 PHONE: (907) 451-2360 FAX: (907) 451-2187 http://www.state.ak.us/dec/ October 3,
More informationSan Diego Integrated Regional Water Management Implementation Grant Proposal Economic Analysis Flood Damage Reduction Costs and Benefits
Attachment 9 San Diego Integrated Regional Water Management Economic Analysis Flood Damage Reduction Costs and Benefits Attachment 9 consists of the following items: Flood Damage Reduction Costs and Benefits.
More informationSPECIAL USE PERMIT 22-01. JCSA Groundwater Treatment Facility Staff Report for the November 5, 2001, Planning Commission Public Hearing
SPECIAL USE PERMIT 22-01. JCSA Groundwater Treatment Facility Staff Report for the November 5, 2001, Planning Commission Public Hearing This report is prepared by the James City County Planning Division
More informationCanadian Environmental Technology Verification Program Applicant Information Package CONTENTS
Canadian Environmental Technology Verification Program CONTENTS Contents... 1 Overview... 2 Performance Verification... 2 Application Information... 2 How much does verification cost?... 2 What is the
More informationMine Plan of Operations Reclamation Bond Checklist
Mine Plan of Operations Reclamation Bond Checklist NOTE: This checklist is provided to assist the operator in calculating the engineering and environmental costs required to properly stabilize, reclaim,
More informationHealth Consultation MID-AMERICA TANNING COMPANY SERGEANT BLUFF, WOODBURY COUNTY, IOWA EPA FACILITY ID: IAD085824688 FEBRUARY 17, 2005
Health Consultation MID-AMERICA TANNING COMPANY SERGEANT BLUFF, WOODBURY COUNTY, IOWA EPA FACILITY ID: IAD085824688 FEBRUARY 17, 2005 U.S. DEPARTMENT OF HEALTH AND HUMAN SERVICES Public Health Service
More informationHarris County Flood Control District. Policy, Criteria, and Procedure Manual
Harris County Flood Control District Policy, Criteria, and Procedure Manual For Approval and Acceptance of Infrastructure General Review October 10, 2003 Draft Please Provide Written Comments to the HCFCD
More informationMBJ Environmental Programmes
MBJ Airports Limited Environmental Policy The following is MBJ Airports Limited s (MBJ) Environmental Policy for Sangster International Airport (SIA): Integrate environmental management measures with planning,
More informationProposal For Proposals in Utah
REQUEST FOR PROPOSAL DUE: March 28, 2008 2:00 PM, Auxiliary Services Bldg., 9150 South 500 West Sandy, Utah 84070-2538 Richard E Field Chief Procurement Officer TABLE OF CONTENTS I. GENERAL RFP INFORMATION...3
More informationUpper Roanoke River (Roanoke and Botetourt Counties, Cities of Roanoke and Salem, Town of Vinton) TMDL Implementation (Cleanup) Plan Development
Upper Roanoke River (Roanoke and Botetourt Counties, Cities of Roanoke and Salem, Town of Vinton) TMDL Implementation (Cleanup) Plan Development Residential and Agricultural Working Group Meeting 1 Thursday
More informationSewerage Management System for Reduction of River Pollution
Sewerage Management System for Reduction of River Pollution Peter Hartwig Germany Content page: 1 Introduction 1 2 Total emissions 3 3 Discharge from the wastewater treatment plants 4 4 Discharge from
More informationBond Release Process for New Subdivision Developments in Fairfax County
Bond Release Process for New Subdivision Developments in Fairfax County An Overview for Homeowners Associations A Fairfax County, Va., publication April 2009 For more information or to request this document
More informationImproper storage of potential pollutants will increase the risk of water pollution that may occur because of spills.
WQ-3 Best Management Practice (BMP) Water Quality Protection Guideline Secondary Containment Design and Operation Standards Section 1. Introduction According to the EPA, the majority of water pollution
More informationG3 GRANT LID RETROFIT FOR THE ASHLAND MUNICIPAL PARKING LOT
G3 GRANT LID RETROFIT FOR THE ASHLAND MUNICIPAL PARKING LOT GREEN STREETS GREEN JOBS GREEN TOWNS PROJECT INFORMATION: Location: Ashland, VA Project Type: Design and Construction Restoration Practice: Bioretention,
More informationRequest for Proposal Permitting Software
Request for Proposal Permitting Software Date Issued: October 7, 2015 Proposals Due no later than: 2:00pm EST on November 10, 2015 Page 1 of 10 Revised 10/5/2015 TABLE OF CONTENTS Section I Introduction
More informationALTERNATIVE SOURCES OF FUNDING FOR
November 2015 ALTERNATIVE SOURCES OF FUNDING FOR Flood-Related General Water Management Water Supply Projects The following inventory contains information about a variety of funding programs offered by
More informationDirector of Utilities. Manager. Regulatory Compliance Supervisor. Distribution Supervisor. Utilities Analyst. Account Clerk. Water
DEPARTMENT ORGANIZATIONAL CHART WATER RESOURCES Director of Utilities Secretary Resources Manager Business Services Manager Utilities Engineer Resources Supervisor Distribution Supervisor Utilities Project
More informationSECTION 1 UTILITY OVERVIEW, INTRODUCTION, and PROJECT BACKGROUND
SECTION 1 UTILITY OVERVIEW, INTRODUCTION, and PROJECT BACKGROUND Wastewater Utility Overview In the late 1950 s, the Village of Old Forge began to realize the impacts of dumping sewage in the Moose River.
More informationONSITE WASTEWATER TREATMENT SYSTEM Property Transfer Certification Instructions and Inspection Report
ONSITE WASTEWATER TREATMENT SYSTEM Property Transfer Certification Instructions and Inspection Report These instructions are for homeowners and inspectors completing the onsite wastewater treatment system
More information1.782 Environmental Engineering Masters of Engineering Project
MIT OpenCourseWare http://ocw.mit.edu 1.782 Environmental Engineering Masters of Engineering Project Fall 2007 - Spring 2008 For information about citing these materials or our Terms of Use, visit: http://ocw.mit.edu/terms.
More informationStrategic Plan for Mercury Remediation at Y-12
Strategic Plan for Mercury Remediation at Y-12 Laura Wilkerson Portfolio Federal Project Director for Y-12 Projects ORSSAB Meeting April 9, 2014 1 Y-12 National Security Complex (Y-12) City of Oak Ridge
More informationREQUEST FOR PROPOSALS (RFP) FOR FINANCIAL AUDIT SERVICES
REQUEST FOR PROPOSALS (RFP) FOR FINANCIAL AUDIT SERVICES Issued by: City of Clewiston 115 W. Ventura Avenue Clewiston, Florida 33440 September 30, 2015 1 REQUEST FOR PROPOSALS FOR FINANCIAL AUDIT SERVICES
More informationOTHER FUNDS AND ACCOUNTS
OTHER FUNDS AND ACCOUNTS CAPITAL PROJECTS FUNDS, SPECIAL REVENUE FUNDS OTHER FUNDS AND ACCOUNTS CAPITAL PROJECTS FUNDS Fund No. 530 Correctional Facilities Construction Fund 541 Correctional Facilities
More informationSample DEQ Plan Submitter s Checklist for Stormwater Management Plans
APPENDIX IV Version: February 2, 2015 Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans Please fill in all blanks and please reference the plan sheets/pages where the information may
More informationCONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE
CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE The following template may be used as a general guide for development of a Stormwater Pollution Prevention Plan (SWPPP) for construction activities.
More informationDouglas County, Nevada Request for Qualifications Douglas County Public Works Asset Management Plan
Douglas County, Nevada Request for Qualifications Douglas County Public Works Asset Management Plan Douglas County, Nevada ( County ) is soliciting Statement of Qualifications (SOQ) from qualified firms
More informationAPPLICATION PROCESS FOR LAND DISTURBING PERMIT
PREFACE: APPLICATION PROCESS FOR LAND DISTURBING PERMIT The property owner, developer and designated planners and engineers shall review the general development plans and detailed plans of the Local Issuing
More informationAgua Hedionda Creek Flood Plain Information; Department of Army, Los Angeles District,
Bibliography Agua Hedionda Creek Flood Plain Information; Department of Army, Los Angeles District, California and Maps. US Army Corps of Engineers July 1973 pg. 24 Aqua Hedionda Lagoon Foundation Framework
More information5. Environmental Analysis
5.11 The potential for adverse impacts on utilities and service systems was evaluated based on information concerning current service levels and the ability of the service providers to accommodate the
More informationProposed Terms of Reference for EIA studies
1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.
More informationSECTION 1.0 STATUTORY AUTHORIZATION AND PURPOSE
A local law for Flood Damage Prevention as authorized by the New York State Constitution, Article IX, Section 2, and Environmental Conservation Law, Article 36 1.1 FINDINGS SECTION 1.0 STATUTORY AUTHORIZATION
More informationExperts Review of Aerobic Treatment Unit Operation and Maintenance. Bruce Lesikar Texas AgriLife Extension Service
Experts Review of Aerobic Treatment Unit Operation and Maintenance Bruce Lesikar Texas AgriLife Extension Service Overview Overview of Aerobic Treatment Units Installing for accessibility to system components
More informationOAKLAND COUNTY MICHIGAN Nortel Meridian 1 Option 11c PBX Support and Maintenance REQUEST FOR PROPOSAL (RFP) Distributed on:
OAKLAND COUNTY MICHIGAN Nortel Meridian 1 Option 11c PBX Support and Maintenance REQUEST FOR PROPOSAL (RFP) Distributed on: TABLE OF CONTENTS SECTION 1: BACKGROUND INFORMATION 1.1 Oakland County Overview...
More informationState of Kansas Coal Combustion Residuals Part 256 Plan. Kansas Department of Health and Environment Bureau of Waste Management
State of Kansas Coal Combustion Residuals Part 256 Plan Kansas Department of Health and Environment Bureau of Waste Management 9/29/2015 Table of Contents Chapter 1 - Introduction...1 Chapter 2 - Compliance
More informationElectronic Signature and Fee Payment Confirmation
Jeff Levine, AICP, Director Planning & Urban Development Department Electronic Signature and Fee Payment Confirmation Notice: Your electronic signature is considered a legal signature per state law. By
More information2006 Standard Application Processing Time. 10 months. 14 months
Air and Radiation Management Administration General Permit to Construct - without expanded public review Air Quality Permit to Construct - with expanded public review but limited public interest 11 months
More informationInland Wetlands and Watercourses Permit Water Quality Certification. Attn: Mark W. Alexander, Transportation Assistant Planning Director
79 Elm Street Hartford, CT 06106-5127 www.ct.gov/deep Affirmative Action/Equal Opportunity Employer Inland Wetlands and Watercourses Permit Water Quality Certification Permittee: Connecticut Department
More informationGENERAL OBLIGATION BONDS
DESCRIPTIONS GENERAL OBLIGATION BONDS Appendix C, page 2 GENERAL OBLIGATION BONDS State Transportation Bonds --- 1968 An amount of $640,000,000 was authorized to improve the public transportation system.
More informationOWNERS NAME PHONE OWNERS ADDRESS APPLICANTS NAME PHONE APPLICANTS ADDRESS
TOWN OF SWANSBORO 502 Church Street, Swansboro, NC 28584 FLOODPLAIN DEVELOPMENT PERMIT OWNERS NAME PHONE OWNERS ADDRESS APPLICANTS NAME PHONE APPLICANTS ADDRESS Per Article 21, Section 21-7. Establishment
More informationPreserve the Tax-Exempt Status of Municipal Bonds
The, and its members, support the preservation of the existing tax-exempt status of municipal bonds. Specifically, FAC supports legislative provisions that: Uphold the tax-exempt status of municipal bonds.
More informationProposed Plan for Outfall 200 (OF200) Mercury Treatment Facility (MTF)
Proposed Plan for Outfall 200 (OF200) Mercury Treatment Facility (MTF) Jason Darby Oak Ridge Office of Environmental Management Site Specific Advisory Board Meeting September 9, 2015 Background Mercury
More informationBOROUGH OF HADDONFIELD CAMDEN COUNTY NEW JERSEY ARCHITECTURAL SERVICES RELATED TO THE HADDONFIELD LIBRARY REQUEST FOR PROPOSAL
BOROUGH OF HADDONFIELD CAMDEN COUNTY NEW JERSEY ARCHITECTURAL SERVICES RELATED TO THE HADDONFIELD PUBLIC LIBRARY REQUEST FOR PROPOSAL Project Name: ARCHITECTURAL SERVICES RELATED TO THE HADDONFIELD PUBLIC
More informationMassachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report
Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. A. Introduction A Stormwater Report must be submitted with the Notice of Intent
More informationBUILDING PERMIT APPLICATION APPLICABLE TO CITY LIMITS AND ETJ CHAPTER 18, General
BUILDING PERMIT APPLICATION APPLICABLE TO CITY LIMITS AND ETJ CHAPTER 18, General Property Address: Property Owner: Lot: Block: Subdivision: Lot Size: Scope of Work: Note: Please attach copies of all general
More informationIn addition to the terms defined in this By-law, the following terms shall have the corresponding meanings for the purposes of this Section:
Click here to access definitions SECTION 12 FLOODPLAIN LANDS 12.1 INTERPRETATION In addition to the terms defined in this By-law, the following terms shall have the corresponding meanings for the purposes
More informationContaminants of Concern Exposure Pathways
Table of Contents Purpose... 1 Background... 1 Contaminants of Concern... 2 Exposure Pathways... 2 Community Health Concerns... 3 Recommendations... 3 Pubic Health Action Plan... 3 Figure 1 : Site Map...
More informationGeorgia Department of Public Health. Georgia Onsite Sewage Management Systems. Background and Use of Onsite Wastewater Treatment Systems in Georgia
Georgia Department of Public Health Georgia Onsite Sewage Management Systems Background and Use of Onsite Wastewater Treatment Systems in Georgia Background On-site sewage management systems are designed
More informationRequest for Proposals RFP To Develop a Senior Affordable Housing Complex in Vernon Town Center
Request for Proposals RFP To Develop a Senior Affordable Housing Complex in Vernon Town Vernon Township, Sussex County, New Jersey Issued by: Mayor Victor J. Marrotta and the Vernon Township Council 21
More informationAN INITIATIVE TO IMPROVE
L OW E R C A R M E L R I V E R A N D L AG O O N F L O O D P L A I N R E S TO R AT I O N A N D E N H A N C E M E N T P R O J E C T AN INITIATIVE TO IMPROVE FLOOD PROTECTION RESTORE AND PROTECT RIPARIAN
More informationSaudi Aramco Project Development
Saudi Aramco Project Development Wastewater Treatment Facilities Jeddah Refinery And Marine Area December 2007 Facilities Planning Dept. OBJECTIVE: Provide an overview of the complexities of developing
More informationGeneral Permit for Activities Promoting Waterway - Floodplain Connectivity [working title]
General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title] Purpose These rules set forth the conditions under which a person may, without an individual removal-fill permit
More information3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN
3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards
More information