Costs and Sources of Funding
|
|
|
- Laura Spencer
- 9 years ago
- Views:
Transcription
1 Costs and Sources of Funding Earthworks approaching Bradley Viaduct 17. Costs and Sources of Funding
2 Costs and Sources of Funding Costs of finished works do of course vary widely. Bridges particularly depend upon whether they are proprietary standard designs or one-off features. In this section we can do little more than record the actual cost of various Greenways to give some indication of what can be achieved for particular budgets. The development costs of Greenway schemes can be high as there are many details to resolve and parties to satisfy. Our own records for Sustrans projects suggest that the cost of developing a scheme, successfully through to the planning approval stage and managing the works on the ground, amounts to some 17½% of the total project cost. (This excludes land negotiation and costs which we budget at 10% of the total.) We get very frustrated when larger sums than these are consumed in the early stages, often leaving the works themselves inadequately resourced. Connect2 and Greenway Design Guide
3 Examples of Construction Costs Scheme 1. Bawdrip to Chedzoy Riverside Path 1.9km constructed during 3 weeks of summer works by Sustrans Volunteers in This project was straightforward and all on Environment Agency land. The path specification was 100mm thick scalpings laid on a polypropylene geofabric, finished with 20mm layer of 3mm to dust carboniferous limestone verges from available soil, with asphalt links to the public highway, and fenced throughout with stockproof fencing. Final Costs Stockproof fencing and gates 8,000 Providing cattle troughs and water supply to all fields cut off from river 15,870 Self-drive plant hire 3,032 Operated plant 2,798 Materials 16,116 Contract works asphalt 1,117 Foreman for the duration 3,770 Sculptural seating 1,500 Volunteers expenses and costs 4,824 Management, development and contract 17.5% 9,980 Total 67,007 Costs per km 35, Costs and Sources of Funding
4 186 Scheme 2. Mirfield Helm Lane to Bradley Viaduct 2.4km long, including refurbishing bridge over main line railway, a major ramp linking the canal beneath Bradley Viaduct, waterproofing deck of viaduct and rebuilding most of one parapet wall, a climb of nearly 20m to overcome an infilled cutting, a cattle underpass and various ancillary measures. This project was constructed by Sustrans in-house construction team in a number of phases The finished surface is 60mm thick machine laid bitmac, 2.5m wide, laid on a stone base 150mm thick with geofabric where necessary on made-up ground. Final Costs Stockproof fencing 5,452 Self-drive plant hire 40,701 Fuel 6,264 Operated plant 8,932 Materials: sub base materials 24,000 multiple plate subway 7,000 Landscaping 960 Site Staff 140,724 Transport to site 12,220 Machine laid surfacing 56,021 Repairs to viaduct parapet walls 25,995 Sundry expenses 4,853 Management, development and site supervision 60,047 Total 393,169 Costs per km including ramped links 163,820 Finished surfacing, rebuilt parapet on right Bradley Viaduct showing loss of parapet Connect2 and Greenway Design Guide
5 187 Scheme 3. Railway Path between Langrick Bridge and Anton s Gowt in Lincolnshire 3.6km long, on the Boston-Lincoln route (NCN1). Contractor, CF Construction of Collingham, Newark, Nottinghamshire Final Costs Environment Impact Assessment 4,500 Tree/site Clearance 6,100 Site set up, preliminaries and site dismantling 10,740 Path construction (2.5m wide DBM surface on type 1 base) 233,980 Accommodation works 7,125 Fencing/access controls 13,500 Furniture purchase and installation (signs, various interesting seats, cycle stands, mileposts etc) 15,000 Artwork 14,500 Design and management of contract 33,200 Legal and Surveyor cost 150 Total 338,795 Costs per km 94,110 Scheme 4. Paths by contractors in Bury i. Banana path, 3m wide with timber edgings, 4 access controls and considerable tree work, specification as per section below - 186,000/km ii. 2.0m wide path as per specification below with no edgings - 125,000/km The railway path between Langrick Bridge and Anton s Gowt 17. Costs and Sources of Funding
6 188 Urban works are necessarily more varied in design and costings. The following budgets are used by the London Cycling Centre for Excellence for works in their area. Type of Facility Cost range ( 000s/km) (2007*) Gyratory type junctions Cycle track with major junctions Cycle track with simple junctions Segregated path with major junctions Segregated path with minor junctions Shared path with many junctions Shared path (conversion), few junctions Kerb segregated lane, many junctions Kerb segregated lane, few junctions Cycle lane with ASLs many junctions Cycle lane with few junctions Cycle lanes on bus lane route Home zones / cycle streets Traffic calmed / managed area Quiet routes town centres Quiet routes suburban Connect2 and Greenway Design Guide
7 189 Category Item Unit Cost ( ) (2007*) Construction Gravel or limestone path (250mm thick, no excavation) m Track construction (250mm thick, type 1 plus bitmac base no excavation or surfacing) m Extra for excavation and disposal m Extra for surfacing (see figure 7.3) m Extra for edging m 11.5 Extra for concrete kerbing m Extra for granite kerbing m Drainage Road gulley including pot No Gulley connection m Lighting Relocate lighting column (incl connections) No New lighting column (incl connections) No Illuminated bollard (incl connections) No Marking White line m 2.5 Raised white line (1049.1) m 11.5 Cycle logo (1057) No Parking Sheffield stand No Cycle locker including base No Signals Conversion of Pelican to Toucan No ** Toucan on single carriageway No ** Toucan on dual carriageway No ** Signs Small signs (up to 0.5 m2) No Medium sign m2) No Extra for sign post No Extra for illumination on lighting column No Extra for illumination on new post No Bollard cast iron or stainless steel No * Taken from London cycling Design Standards 2005 costs (Figs 7.5 & 7.6 pages ) costs increased by 8%pa to cover construction inflation, figures rounded to nearest 0.5 ** Figures rounded to nearest Costs and Sources of Funding
8 Sources of Funding Sources of funds for Greenways are as varied as the schemes themselves. Literally every project is funded in different ways and almost all from a package of different parts. Whilst this is not particularly satisfactory, it does seem to be the British way of doing things! Common sources of funds are Local authority transport budgets Local authority leisure, parks and countryside funds Developer contributions through section 106 agreements Development agency funding which may include European funding Landfill and aggregate tax sources Lottery funding From even this list it is clear that fund raising is a considerable operation in its own right, and even the success for the National Cycle Network in securing 43.5m in 1995, or the Connect2 application to Living Landmarks 50m fund, usually only contributes some 20% or so to overall scheme costs although a hugely important and catalytic action. But what should also be clear is that local authority transport funds are only part of an overall package and where they form the only source one must question whether they could have been more successfully used in drawing down further funding for other sources. Local Authority Transport 39.5m To date, Central Government in Westminster has only provided direct funding for the specific Safe Routes to Schools programme in England. This has been very welcome, and we hope that in due course the Government will fund the whole Greenway programme and developments of the Connect2 project as part of its National Transport Strategy. In Northern Ireland, Scotland and Wales, the autonomous administrations play a very more direct role in funding programmes in their areas which have proved highly effective. European Union 12.2m Non-Transport Local Authority 28.8m Regional 17.6m Regional Development Agencies Urban Development Corporations Public Bodies 12.4m Countryside Agency Welsh Development Agency British Waterways Countryside Council for Wales Environment Agency Scottish National Heritage Forward Scotland Tourist Boards National Parks Central Government 11.5m Sources of Funds for the National Cycle Network (Estimates as of May 2006) Landfill Tax 3.7m Other Funds 13.7 Private Sector Developers 6.6m Private Sector Donations and Charities 8.5m Millenium Fund 43.5m Bicycle Association 1m Sustrans 8.4m Connect2 and Greenway Design Guide
Aggregates for Path Construction
Aggregates for Path Construction Technical Information Note No. 7 October 2011 About Sustrans Sustrans makes smarter travel choices possible, desirable and inevitable. We re a leading UK charity enabling
VEHICLE CROSSOVER INFORMATION PACK
VEHICLE CROSSOVER INFORMATION PACK CONTENTS Introduction Section A Section B Section C Section D Section E Criteria for approving a vehicle crossover application (Diagrams to demonstrate measurement criteria)
APPENDIX C BLACKPOOL BRIDGES PROJECT COST ESTIMATES GROWTH FUND APPLICATION TO LANCASHIRE ENTERPRISE PARTNERSHIP
APPENDIX C BLACKPOOL BRIDGES PROJECT COST ESTIMATES GROWTH FUND APPLICATION TO LANCASHIRE ENTERPRISE PARTNERSHIP COST BASE: Q4 2014/15 (Version A - 02/02/2015) CONTROL SHEET Version Date Status A February
WELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE.
WELCOME WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE. The purpose of the exhibition is to provide the community with the opportunity to view our initial ideas
HIGHWAYS ASSET MANAGEMENT STRUCTURES TEAM GUIDANCE NOTE SMT/GN/03/10 TECHNICAL APPROVAL
HIGHWAYS ASSET MANAGEMENT STRUCTURES TEAM GUIDANCE NOTE SMT/GN/03/10 TECHNICAL APPROVAL Rev Purpose of Issue Originated Reviewed Authorised Date 0 First issue Anil Kumar Ken Duguid Stephen Pottle 21-07-2010
Development proposals will require to demonstrate, according to scale, type and location, that they:-
Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on
Unit Price Averages Reports
Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation
Engineering Standard
Public Transport Services Engineering Standard Stations - Bicycle Facilities PART 129013 AR-PW-PM-SPE-00129013 (D073) Document Control Document Status Document Amendment Record Revision Change Description
Highway Infrastructure Asset Management Strategy
Highway Infrastructure Asset Management Strategy City Development Highways and Transportation Highways Asset Management Page i Asset Management Strategic Documents Contents Page Foreword 4. 1 Introduction)...)))))))))))))))))))))))...
Energy Company Obligation (ECO): Technical Monitoring Questions
Energy Company Obligation (ECO) Technical Monitoring Questions v1 30/05/2013 Energy Company Obligation (ECO): Technical Monitoring Questions Under ECO suppliers are required to instruct suitably qualified
Economy, Transport and Environment Department. Traffic Management Policy & Guidance
Economy, Transport and Environment Department Traffic Management Policy & Guidance January 2014 Contents Part 1- Introduction to Traffic Management Traffic Management Strategy Legislation and the Legal
CONSTRUCTION SEQUENCE & PROGRAMME
CONSTRUCTION SEQUENCE & PROGRAMME 2 CONTENTS 1.0 Introduction 7 2.0 Key activities 8 2.1 Airport related activities 2.2 Construction of new roads and accesses 2.3 Earthworks zone a 2.4 Earthworks zone
Granger Bay Boulevard and Green Point Roundabout
Granger Bay Boulevard and Green Point Roundabout INTRODUCTION Aurecon was appointed for the design and construction supervision of the Granger Bay Boulevard and Green Point roundabout that provides access
Highway Asset Management Strategy
1. Introduction 1.1. Cheshire East Council (CEC) recognises the importance of its highway infrastructure and how an effectively maintained and managed network contributes to the achievement of its corporate
HIGHWAYS DEPARTMENT GUIDANCE NOTES ON THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE DECKS
HIGHWAYS DEPARTMENT GUIDANCE NOTES ON THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE DECKS Research & Development Division RD/GN/033 June 2008 THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE
WATERPROOFING FOR CONCRETE STRUCTURES
MANUAL OF CONTRACT DOCUMENTS FOR ROAD WORKS VOLUME 1 SPECIFICATION FOR ROAD WORKS SERIES 2000 WATERPROOFING FOR CONCRETE STRUCTURES Contents Clause Title Page 2001 General 2 2002 Protection of Bridge Deck
Defra s Water Availability and Quality Evidence Programme. COMPARATVE COSTINGS FOR SURFACE WATER SEWERS & SuDS
Defra s Water Availability and Quality Evidence Programme COMPARATVE COSTINGS FOR SURFACE WATER SEWERS & SuDS Caledonian Road Housing, Islington, London. R&D Technical Report Produced: February 2011 Author:
Siting Of Inductive Loops For Vehicle Detecting Equipments At Permanent Road Traffic Signal Installations
Traffic Systems and Signing MCE 0108 Issue C March 2002 Siting Of Inductive Loops For Vehicle Detecting Equipments At Permanent Road Traffic Signal Installations Crown Copyright 2002 Applications to reproduce
asphalt applications Construction and surfacing of footways and cycleways using asphalt mpa asphalt Asphalt Information Service
asphalt applications 11 Construction and surfacing of footways and cycleways using asphalt Asphalt Information Service mpa asphalt November 2009 Mineral Products Association Introduction The main use of
FINAL SECTION OF COASTAL PROTECTION RIVER DODDER PART 8 PROPOSALS London Bridge and New Bridge
FINAL SECTION OF COASTAL PROTECTION RIVER DODDER PART 8 PROPOSALS London Bridge and New Bridge Planning and Development Acts 2000-2006 Planning and Development Regulations 2001-2006, Part 8 March 2012
National Archives and Record Administration
National Archives and Record Administration Installation of Self-Closing Flood Barriers and Loading Dock Turntable Removal and Structural Slab Repairs ! 2010 Baltimore Washington Chapter Outstanding Repair
Understanding the British Standard for Gaps Gates and Stiles
Understanding the British Standard for Gaps Gates and Stiles BS5709:2006 explained The Standard covers gaps, pedestrian gates, bridle gates, kissing gates, dog gates (dog traps or latches) horse stiles,
CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES
CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES INTRODUCTION What is a Construction Management Plan? The City of Vincent requires careful management of construction involving excavation and retention
Highway Asset Management Strategy
Highway Asset Management Strategy April 2015 to March 2021 WiganCouncilOnline wigancouncil @wigancouncil wigan.gov.uk Highway Asset Management Strategy 1. Background This document forms our Highway Asset
APPENDIX A: ASSET INFORMATION STRATEGY
APPENDIX A: ASSET INFORMATION STRATEGY A1 1 Appendix A: Asset Information Strategy A1.0 Highway Assets For the purpose of this plan the Highway assets within Coventry have been broken down into nine groupings
Description Quantity Cost Total Cost
APPENDIX: ITEMIZED CONSTRUCTION COST ESTIMATE Description Quantity Cost Total Cost 1 CASCADE FALLS 1a Existing Cascade Falls Upgrades Structural Repairs - Steps, Railing, Walls, Pool Lump Sum $500,000
EI 08-002 ENGINEERING INSTRUCTION
To: New York State Department of Transportation ENGINEERING INSTRUCTION EI 08-002 Title: REVISED PLAN SHEET GUIDANCE Distribution: Approved: Manufacturers (18) Surveyors (33) Local Govt. (31) Consultants
Cycle Network Signing
Cycle Network Signing Technical Information Note No. 05 October 2012 About Sustrans Sustrans makes smarter travel choices possible, desirable and inevitable. We re a leading UK charity enabling people
SECTION 02100 SITE PREPARATION
SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division
H: Road Asset Management Plan February 2015
H: Road Asset Management Plan February 2015 Document Format This plan forms one part of a suite of Asset Management Plans that have been developed: A. Bridges B. Buildings C. Drainage D. Footpath E. Levee
PEDESTRIAN PLANNING AND DESIGN MARK BRUSSEL
PEDESTRIAN PLANNING AND DESIGN MARK BRUSSEL CONTENT OF LECTURE a) Walking as a transport mode b) Walking in Sub Sahara Africa c) Policies for pedestrians d) Pedestrian characteristics e) Network planning
approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013
Application for: planning permission; planning permission in principle; further applications; approval of matters specified in conditions; and mineral workings (if the planning authority do not have a
Stowmarket Area Action Plan (AAP) Examination
Stowmarket Area Action Plan (AAP) Examination Main Matters, Issues and Questions Matter 3 - Employment (Appendix) This contains additional information in support of the Hearing Statement and relates to
Before applying for a Road Opening Licence, please read and understand the following information.
Sept 2012 Before applying for a Road Opening Licence, please read and understand the following information. What is a Road Opening Licence? A Road Opening Licence (ROL) is a licence that allows the holder
Project Information. New Hope - Lambertville Toll Bridge - Pavement Rehabilitation & Approach Bridges Repairs -
Project Information Existing Conditions Cracked and settled pavement. Structural failure within the asphalt pavement section. Anticipated Project Elements Reconstruction of all asphalt pavement on US Route
HOME INSURANCE ASSESSMENT
m pl e HOME INSURANCE ASSESSMENT Sa Street Address, Suburb File. 0000 Date. December 2014 Street Address, Suburb Page 1 of 8 File. 0000 Date. December 2014 Client Name Street Address Suburb HOME INSURANCE
building on success Trees and Basements Partial Review of the Core Strategy February 2014
building on success Trees and Basements Partial Review of the Core Strategy February 2014 Regulation 19, Town and Country Planning (Local Planning) (England) Regulations 2012. 2 Contents 1. Introduction...
(52) In6 Publication CCM2 May 2000 ADVANCED DRAINAGE SYSTEM CATCHPITS, CHAMBERS & MANHOLES RIDGIDRAIN ENGINEERING EXCELLENCE
(52) In6 Publication CCM2 May 2000 ENGINEERING EXCELLENCE RIDGIDRAIN ADVANCED DRAINAGE SYSTEM CATCHPITS, CHAMBERS & MANHOLES AN INTRODUCTION TO POLYPIPE CIVILS LTD AN UNRIVALLED RANGE OF CATCHPITS MANHOLES
THE TOWN AND COUNTRY PLANNING ACT 1990 Grant of Planning Permission
Civic Offices Havant Hampshire PO9 2AX Tel (023)9247 4174 Fax(023)9244 6588 DX50005 Havant www.havant.gov.uk To: ADP Architects Ltd Richmond Court 94 Botley Road Park Gate Southampton, Hants SO311BA For:
What are the physical characteristics of York? Why problems do you think there could be in York use map evidence.
What are the physical characteristics of York? Why problems do you think there could be in York use map evidence. 2 (c) (ii) What is the straight line distance, to the nearest km, from the road junction
Maximum speed. Stop and Give way to Manually operated temporary No entry for give way traffic on STOP and GO signs vehicular traffic major road
Signs giving orders Signs with red circles are mostly prohibitive. Plates below signs qualify their message. Entry to 20 mph zone End of 20 mph zone Maximum speed National speed limit applies School crossing
Household waste & recycling storage requirements
South Gloucestershire Council Guidance for Developers on Household waste & recycling storage requirements INTRODUCTION As part of the Council s aim to improve the quality of life for residents as well
BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY
MURRAY SHIRE COUNCIL BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY ADOPTED: 1 May 2012 1 BUILDING OVER OR NEAR WATER AND SEWER MAINS POLICY CONTENTS 1. Objective... 2 2. Requirements for Building Near
INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE.
INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE. M.Sc. Gediminas Viršilas Head of Bridge Division, Lithuanian Road Administration Working group 2 of PIARC Technical Committee
Elevated Roads for Sri Lanka
Elevated Roads for Sri Lanka M.T.R. Jayasinghe (Senior Professor, Structural Engineering, University of Moratuwa) Senior Professor M.T.R. Jayasinghe is a Professor of Structural Engineering, University
SULTANATE OF OMAN SPECIAL ECONOMIC ZONE AUTHORITY AT DUQM
SULTANATE OF OMAN SPECIAL ECONOMIC ZONE AUTHORITY AT DUQM www.duqm.gov.om 1. INTRODUCTION 2. ACCESSIBILITY TO DUQM 3. SEZAD PREVIOUS MASTERPLAN 4. DUQM URBAN PLANNING 5. SPECIAL ECONOMIC ZONE DISTRICTS
Cathkin Relief Road Planning Statement
Cathkin Relief Road Planning Statement The Proposal This statement sets out the background to the Cathkin Relief Road project currently being progressed by South Lanarkshire Council. The project will provide
ROAD OPENING LICENCE APPLICATION FORM PLEASE READ ALL PARTS AND SECTIONS OF THIS FORM IN ADVANCE OF COMPLETING THE APPLICATION
ROAD OPENING LICENCE APPLICATION FORM PLEASE READ ALL PARTS AND SECTIONS OF THIS FORM IN ADVANCE OF COMPLETING THE APPLICATION N.B. WORK MUST NOT COMMENCE UNTIL LICENCE IS ISSUED June 2014 Roads Section
CONSTRUCTION COST GUIDE
KEEPING YOUR COSTS TO A MINIMUM CONSTRUCTION COST GUIDE SECOND HALF 2012 One Lower Leeson Street, Dublin 2, Ireland Telephone 01 685 7219 Email [email protected] Website www.build.ie SCSI TENDER INDICES Building
Erection of replacement warehouse building and erection of two buildings in connection with builder s merchants
Plan: O 02/00708/FUL Thames Ward (A) Address: Development: Applicant: London Works, Ripple Road, Barking Erection of replacement warehouse building and erection of two buildings in connection with builder
GUIDELINES FOR WORKING ON ROADS
GUIDELINES FOR WORKING ON ROADS Guide to the Safety, Health and Welfare at Work (Construction)(Amendment)(No. 2) Regulations 2008 (S.I. No. 423 of 2008) 7 CONTENTS Page Introduction.....................................................
A variety of traffic calming techniques have been developed. Some have been found to improve perceived and actual safety for cyclists.
Chapter 6 - Traffic Calming The object of traffic calming is to modify driver behaviour, control vehicle speeds and, in some circumstances, to reduce the volume of traffic. This reduces danger from traffic
DISTRIBUTION CONNECTION
DISTRIBUTION CONNECTION POLICY Page 1/15 TABLE OF CONTENTS 1 Introduction... 3 2 Acceptance of requests for a connection... 3 2.1 Who can request a connection... 3 2.2 How to request a connection... 4
How to build raised beds page
This leaflet has information to help you if you want to build a raised bed yourself or if you need information to give to a professional contractor. This information should be read in conjunction with
Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement. November 2013. with
Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement November 2013 with Tibbalds Planning & Urban Design 19 Maltings Place 169 Tower Bridge Road London SE1 3JB Telephone 020
TOWN OF NEW HAVEN ROAD PLAN
1 TOWN OF NEW HAVEN ROAD PLAN BACKGROUND The Town of New Haven, Vermont consists of 42 square miles of land and a population of approximately 1400 people. At the start of the 21 st century, it is served
Hampshire s Highway Asset Management Strategy. 1 Implementing Effective Asset Management
Hampshire s Highway Asset Management Strategy 1 Implementing Effective Asset Management 1.1 Hampshire County Council recognises the importance of the highway infrastructure in the context of the well being
www.pitchmasticpmb.com PmB Expansion Joints World leaders in expansion joint technology
www.pitchmasticpmb.com Expansion Joints World leaders in expansion joint technology High performance expansion joint solutions Pitchmastic offers a comprehensive range of specialist services to the civil
The Most Advanced Name in Drainage Systems. Geotextile Products
The Most Advanced Name in Drainage Systems Geotextile Products ADS MEETs YOUR Geotextile NEEDS Advanced Drainage Systems, Inc. (ADS) single wall and N12 dual wall pipe have become the industry standard
Segregation of Shared Use Routes
Segregation of Shared Use Routes Technical Information Note No. 19 April 2014 About Sustrans Sustrans makes smarter travel choices possible, desirable and inevitable. We re a leading UK charity enabling
Vehicular Access Standards
Development Control Advice Note 15 (2nd Edition) Vehicular Access Standards August 1999 Development Control Advice Note 15 Vehicular Access Standards This is a joint Planning and Roads Service Development
ASSET MANAGEMENT GUIDE FOR PROJECT DESIGN FORMAT
ASSET MANAGEMENT GUIDE FOR PROJECT DESIGN FORMAT 1. BACKGROUND There has been an increasing awareness of design features, which produce poor whole-of-life costs. These poor whole-of-life costs manifest
CURRENT PRACTICE SHEET
CURRENT PRACTICE SHEET INTRODUCTION An expansion joint can be defined as a device to support the surfacing, or to provide a running surface, across the expansion gap, ie the area between adjacent spans
"Description of the urban and architectural development conceptual design of the historical city centre of Gorzow Wlkp. R3DC4T
"Description of the urban and architectural development conceptual design of the historical city centre of Gorzow Wlkp. R3DC4T Gorzów Wielkopolski Gorzów Wielkopolski is an important regional city centre
UNIT PRICE LIST January 2009
UNIT PRICE LIST January 2009 1 INTRODUCTION The purpose of the Unit Price List is to provide a resource for the preparation of cost estimates for subdivisions and permit projects and should be used only
Why build the Silvertown Tunnel?
Why build the Silvertown Tunnel? Over the last 30 years east London has changed with the redevelopment of former industrial areas into major commercial and residential districts. The development of Canary
CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT
Page 1 CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT CIVIC CENTRE 2141 MAJOR MACKENZIE DRIVE MAPLE ONTARIO L6A 1T1 905-832-2281 Page 2 SECTION 1 - GENERAL OBJECTIVES To provide
Chapter 22. Lump Sum Project Guidelines
Chapter 22 Lump Sum Project Guidelines 22.1 General...22-1 22.2 Project Selection...22-3 22.3 Plans Preparation...22-5 22.4 Preliminary Estimate...22-7 22.5 Specifications...22-9 22.6 Contracts Administration...22-11
Delivering Engineering Services to UK Infrastructure through our branded businesses nationwide
Delivering Engineering Services to UK Infrastructure through our branded businesses nationwide Renew provides multidisciplinary engineering services to maintain and develop UK infrastructure focused in
Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets
Los Angeles County Department Of Public Works Land Development Division Bond Calculation Sheets Effective July 1, 2015 COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS LAND DEVELOPMENT DIVISION ROADS COST
Interim Advice Note 105/08 Implementation of Construction (Design and Management) 2007 And the withdrawal of SD 10/05 and SD 11/05
Interim Advice Note 105/08 Implementation of Construction (Design and Management) 2007 And the withdrawal of SD 10/05 and SD 11/05 IAN 105/08 1 of 7 Jan 2008 1. Introduction The Construction (Design and
Bruce Highway (Cooroy to Curra) Section A (Cooroy southern interchange to Sankeys Road)
Bruce Highway (Cooroy to Curra) Section A (Cooroy southern interchange to Sankeys Road) Industry Briefing - 13 February 2013 Bruce Highway Upgrade (Cooroy to Curra) The Bruce Highway Upgrade (Cooroy to
Tabulation of Bids. Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date: 03/04/14
Solcitation No: DTFH71-14-B-00008 Division: Eastern Federal Lands State: DC County: Federal Land: 1 out of 9 Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date:
How to implement cycling solutions in a post-communist street system (and mentality) Marcin Hyła, VeloForum, 16 Oct.
How to implement cycling solutions in a post-communist street system (and mentality) Marcin Hyła, www.miastadlarowerow.pl VeloForum, 16 Oct. 2010 th What has communism to do with cycling? No free flow
LANDSCAPE AND DEVELOPMENT CHECKLIST FOR MONMOUTHSHIRE COUNTY COUNCIL
LANDSCAPE AND DEVELOPMENT CHECKLIST FOR MONMOUTHSHIRE COUNTY COUNCIL 1 Introduction It is to the advantage of the developer to treat the environmental aspects of development proposals seriously and take
I-676 (Vine Expressway) Bridge Reconstruction Project 22 nd - 18 th Streets Philadelphia, PA. PSPE Presentation, December 3, 2015
I-676 (Vine Expressway) Bridge Reconstruction Project 22 nd - 18 th Streets Philadelphia, PA PSPE Presentation, December 3, 2015 Location Map N PROJECT LOCATION 22 nd 18 th Streets PHILADELPHIA, PA General
Government of the People s Republic of Bangladesh Ministry of Communications Roads and Highways Department PAVEMENT INVENTORY SURVEY MANUAL
Government of the People s Republic of Bangladesh Ministry of Communications PAVEMENT INVENTORY SURVEY MANUAL MAY 2005 TABLE OF CONTENTS 1. INTRODUCTION... 3 2. ROAD NUMBERING... 4 2.1 OBJECTIVE...4 2.2
Construction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot
Construction Management Statement Residential development at Bywell House, St Mary s Hill, Ascot Parking of Vehicles of Site Personnel, Operatives and Visitors Site staff, visitors to the development and
Temporary Traffic Management
Temporary Traffic Management Tom Kiddle 4 th July 2012 Temporary Traffic Management Auckland Transport TTM Operation Requirements AT TTM Audits Qualified Persons on site Pedestrian Management 1 AT Temporary
SECTION 02221 SELECTIVE DEMOLITION
SECTION 02221 PART 1 -GENERAL 1.01 DESCRIPTION This section includes all material, labor, machinery and supervision required to demolish and remove the following items where applicable and as noted on
Appendix 6 Storage and Collection of Waste and Recycling
Appendix 6 Storage and Collection of Waste and Recycling Appendix 6 Storage and Collection of Waste and Recycling September 2008 (Version 2) 1 Appendix 6 Appendix 6 Design and Sustainability SPD Storage
3.1 Historical Considerations
3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible
eastsussex.gov.uk Highway Asset Management Strategy 2015-2022
eastsussex.gov.uk Highway Asset Management Strategy 2015-2022 Contents Foreword... 1 Introduction... 3 Asset Management Framework... 6 Strategy for Main Asset Groups... 8 Data Management... 22 Best Practice
EAST AYRSHIRE COUNCIL. CABINET 24 April 2013 2013-14 BRIDGE AND CULVERT STRENGTHENING PROGRAMME
EAST AYRSHIRE COUNCIL CABINET 24 April 2013 2013-14 BRIDGE AND CULVERT STRENGTHENING PROGRAMME Report by the Depute Chief Executive/Executive Director of Neighbourhood Services PURPOSE OF REPORT 1 The
