TECHNICAL SPECIFICATION FOR SOLUTION HEATTREATMENT FURNACE

Size: px
Start display at page:

Download "TECHNICAL SPECIFICATION FOR SOLUTION HEATTREATMENT FURNACE"

Transcription

1 TECHNICAL SPECIFICATION FOR SOLUTION HEATTREATMENT FURNACE Nomenclature: Solution Heat treatment furnace for Aluminum alloys. Sr. Technical Details No. 1.0 DESCRIPTION: Electrically heated, forced air circulation & vertical drop type solution treatment furnace for 84mm Carl. Gustav Components as per Component drawing enclosed. Quantity per batch - 300nos minimum. Weight of the component 0.5kg approx. 2.0 Scope: Design, manufacture, supply, assembly, erection, commissioning of the furnace to its design parameters, capacity & rated out put. 3.0 SEQUENCE OF OPERATION: The following sequence of operation will have to be followed for Charging / Discharging of charging Stand/Tray. 3.1 One loaded charging stand/tray is placed on the trolley at the charging station with the help of hoist. 3.2 The trolley is pushed and brought underneath the furnace lid. 3.3 The furnace lid is lowered and each half is removed away horizontally to two sides. 3.4 The charging stand is hooked with the charge hoisting chain/ rope manually by the furnace operator and lifted in to the furnace. 3.5 The furnace lid is closed and furnace is switched ON. 3.6 The charging trolley is moved to the charging station. 3.7 After completion of heat treatment cycle, the furnace lid is lowered and each half is moving away horizontally to two sides. 3.8 Charging stand/tray is lowered down into the quench tank with the help of charge hoisting/lowering devices. 3.9 The lid should be closed after the charge is removed from the furnace After completion of quenching, the charging stand/tray is raised The trolley is pushed underneath the furnace lid The charging stand/trolley hoisting chain/rope is released and the trolley with the charge is moved back to the charging and discharging station. The above sequence should be repeated for second charge. Firm has to confirm that quenching operation should be completed with in 15 seconds with the system as proposed above. Varying speed of rope/chain should be achieved by variable frequency drive The above cycle should be able to be fed through SCADA system consisting of software, with branded PC of Pentium Core Two Duo processor of minimum 1GB Ram. Further in event of failure of SCADA the whole furnace should also be operated through manual setting on the display panel. 4.0 DESIGN PARAMETERS: 4.1 Maximum furnace temperature: 700 degree centigrade. 4.2 Working Temperature: degree centigrade 4.3 Furnace Dimensions: Diameter: Firm to design in respect of capacity mentioned in clause no.1.0 and same to be mentioned in technical offer Depth: Firm to design in respect of capacity mentioned in clause no.1.0 and same to be mentioned in technical offer Temperature variation with in the furnace: + / degree centigrade Variation of temperature in furnace chamber: Steady state soaking condition, with in 5 degree centigrade. 4.4 RATING: Firm to design in respect of maximum power efficiency and capacity mentioned in clause no.1.0 and same to be mentioned in technical offer. 4.5 RATE OF HEATING: Rate of temperature rise should be C per hour from ambient

2 temperature when furnace is in no load condition. Suitable rating should be provided based on heating the charge load of about 200kg in addition to charging stand whose weight is approx. 200kg from ambient to 550 degree centigrade. The average soaking period will be 30 minutes after furnace reaches a study state temperature i.e. 550 degree centigrade. 4.6 FURNACE CONSTRUCTION: The furnace should be double chamber construction, one chamber used as a working chamber and the other chamber to accommodate heater unit. The furnace casing of working chamber would be in the form of double cased construction, the outer casing being constructed from mild steel sheet of minimum 6mm and the inner sheet would be constructed from stainless steel (SS310) sheet of minimum 3mm thickness. The space in between the outer and inner casing should be filled with thick insulation of appropriate density to reduce heat losses to minimum. With the insulation of ceramic blanket & insulating bricks, the skin temperature should not exceeds 20 degree centigrade above ambient temperature. The heater chamber should be adjacent to working chamber. The individual heating element of heater chamber should be easily replaceable from top side of the heating chamber for easy maintenance. Hot air ductwork should be provided for effective circulation. The whole furnace should be rest on a raised platform to accommodate the charging trolley underneath the furnace HEATING ELEMENT: Heating element should do the heating of air for recirculation, located outside the working chamber but in the recirculation air path. This should consist of vertically mounted Bayonet type Kanthal A1 / strip type Nichrome 80:20 heating elements with surface load not exceeding 1.5 to 2 watts/square centimeter. Firm to submit the required documents to prove the same. Composition of element and its size and watt density should be specifically mentioned in technical offer THERMO COUPLE: Duplex K type thermocouples should be supplied along with complete mounting arrangements at various positions for indicating the temperature of furnace zones and furnace charge. Renowned make with necessary compensating lead wires to be provided. The distance between the two thermocouples should be with in one meter RECIRCULATION FAN: To provide the necessary air for recirculation, a high capacity plug type centrifugal flow fan should be provided, which should be complete with electric motor, starter and V-belt drive. Recirculation fan should be fabricated in SS 304, with minimum 10 HP motor RECIRCULATION DUCTING: Recirculation ducting made of stainless steel grade AISI 310, 3mm thick should be provided. Material used for the construction of fan impeller, shaft are heatresisting steel grade AISI 310 to withstand the temperature and duty conditions FURNACE LID: The furnace should be provided with one lid split in to two halves mounted at the bottom of the furnace and should be of horizontal sliding type. Horizontal sliding motion of the door would be achieved Pneumatically & Mechanically. The sealing of the door would be achieved by Pneumatic & Mechanical operated clamps. Limit switch would be mounted such that when the furnace lid is opened, recirculation fan stops. Door should remain in closed position in case of power failure & pressure drop. Furnace lid to be lined with ceramic blanket & backed with Rock wool insulation FURNACE REFRACTORY: To be Quoted by firm in view of the skin temperature. Firm to ensure the skin temperature of the furnace should not exceed 20 0 C above the ambient temperature. Material come in contact with heating element should have Fe 2 O 3 content below 0.5% and for same suitable test certificate to be provided by firm. Firm to specify the details of refractory material used and its thickness for furnace and furnace lid in technical bid. 5.0 AUXILIARIES COMPULSORY REQUIRED ALONG WITH FURNACE: 5.1 Charge loading trolley: To facilitate charging of charging stand/tray into the furnace and removal of quenched charging stand/tray from the quench tank, one trolley mounted on rails should be provided. The trolley should be located immediately below the furnace lid but above quench tank. The trolley should be operated with electric motor between the charge loading/unloading station and below the furnace lid.

3 5.2 Charge hoist rope/ chain: Lifting of charging stand/tray from the trolley into the furnace and lowering from the furnace into the quench tank should be achieved by an electromechanical drive. Chain should be of SS 304 material to withstand furnace temperature. 5.3 Charging stand/ tray: Charging stand/tray should be designed for easy loading and unloading component and no scratches should be projected on the components while loading, quenching and unloading. The charging stand should be manufactured from stainless steel to specification AISI Design of the charging stand/tray should be circular tier type with central stem. Firm should provide one set with furnace & one set additional. 5.4 WATER QUENCHING TANK: Construction: To quench the charge, after heat treatment, a square type water quench tank made of stainless steel plate of minimum 8mm thickness with suitable surrounding reinforcement to be provided. The tank size should be designed by firm. There should be Out flow openings at the top of the tank with filter nets, connected to a collector. The quench tank should be located in a pit below the furnace lid. The pit should be located below the ground level. Capacity of the tank, inlet and out let water flow should be designed such that the quenching water temperature is always maintain between degree centigrade Agitation Pump: To provide necessary agitation of quenching water, water pump of adequate capacity should be provided. The inlet to this pump should be taken from the bottom of collector mentioned above. The delivery of water from the pump is done at the side of the quench tank and nearer to the tank bottom. All pumps & motors should be mounted on ground floor for easy maintenance. One additional pump for dewatering of tank should be provided Water Pipe Work: All necessary water pipe connections to the quench tank from the abovementioned point should be done by supplier. If cooling tower is required to maintain the quenching water temperature between 25 to 30 degree centigrade, it should be part of the supply. 6.0 INSTRUMENTATION / ELECTRICAL PANEL: 6.1 The Control panel should be made out of 16 B.G. CRCA sheet, factory finished and painted with powder coated paint of gray color and should be designed as per I.P.55 protection and mounted one foot above ground level. 6.2 The control panel should have one incoming switch of adequate capacity as per plant requirement and should be SIEMENS/ SCHNIDER/ G.E/ L&T make only for switching the panel. 6.3 The plant should be controlled through PLC system of SIEMENS/ ALLEN BRADLEY/ MITSUBISHI make only. The PLC programming should be such that tracing of fault is very easy, maintenance friendly by giving alarm listing for each and every fault possibility complete in all respects. 6.4 Digital Profile temperature controller with 4 ram & 4 soak to be provided. It should be of Eurotherm/ Honeywell/ Maxthermo/Taie make. 6.5 For recording the process temperature Six point graphic recorder to be provided. Paperless recorder which produces real time display, stores data on a flash memory card and sends data via Ethernet to a remote PC for real time monitoring and display. It should be made of Eurotherm / Chino / Honeywell/ Brainchild. 6.6 All panel meter such as Ammeter, Voltmeter, Power meter, Energy meter etc. should be supplied only digital type of TOSNIWAL/ AE/ L&T/ RISHAB make only with suitable selector switch. 6.7 All indicating & controlling equipment should be nicely mounted on the front position of the control panel. The indicating equipment should be such that at a glance one can understand the status of the plant. The hardware should be Teknic/Schneider/Siemens make only. 6.8 The power & control wiring should be done through copper cables of suitable size up to junction box close to furnace. From the junction box to all equipment mounted over furnace, it should be made of fibre glass insulated flexible stranded copper conductor wire of fire proof with adequate capacity.

4 6.9 The complete design of control panel should be simple & easy as per maintenance point of view Hard copy of PLC programming & Original software of PLC and SCADA should be given along with electrical circuit diagram. Back up of PLC program in CD Control panel having provision of switches to perform all operations in manual in case of PLC failure All motors will be provided with thermal over load relays 6.13 Over temperature controller will switch OFF the heating element in case of failure of main controller Emergency shut OFF switch with indicator to be provided An audiovisual Alarm system is required on panel top for indicating the fault condition viz. over temperature, motor failure, no water circulation for running motors and for cycle completion Overload safety should be provided for electrical system One energy meter to monitor the power consumption to be supplied All motors supplied should be made of SIEMENS/ CG/ ABB/ BHARAT BIJILI / KIRLOSKAR 6.19 All items being brought out for the construction of the plant should be disclosed with the full address & telephone numbers so that the requirement of the same can be purchased/technical discussion can be had directly with those sources Temperature recorder: To record temperature in working chamber, one 6 point paperless chart recorder to be provided with necessary thermocouples and required long compensating cable is to be included. Make of recorder should be Eurotherm/ Honeywell / Brainchild / Chino Temperature control: Temperature Controller is to be done with the help of Thyristor drive with separate PID controller for further retransmitting output for PLC in put, to achieve +/-2.5 degree celsius with a digital temperature display on the control deck of the furnace as well as on SCADA system monitor. SCADA system to be provided to record & store temperature as per Batch No. for a period of 6 months. The system should be capable of showing a Graph of temperature with respect to time for particular Lot No. Temperature setting should be provided in both systems in automatic as well as in manual modes. The SCADA system will be installed at about 100 meter from the furnace. Three position (Top, middle and bottom) sensors along with controller of digital display type work in conjunction with suitable thermocouple, with desired length of compensating cable to be provided. Thyristor drive should be of Eurotherm /ABB / Danfoss/ Honeywell make. Over temperature cut off contractor should be provided in each zone to safe guard the furnace against short circuit of thyristor Quenching water temperature indicator is to be provided. 7.0 SAFETY FEATURES: 7.1 Over temperature safety: To provide safety against over temperature, an indicating controller with thermocouple should be provided with alarm indication. 7.2 Fan failure safety: One pressure switch is included in the air path of heater chamber to switch OFF heater unit in the event of fan failure SPARES REQUIRED: Following spares should be supplied essentially along with furnace. Two sets of Thermocouples, one number thyristor drive, two sets of over temperature controllers and indicators, 10 numbers of thyristor fuses, two sets limit switches (for door and for chain), two sets of all type of sensors and over load relays and contactors used in furnace, two sets of out put relay cards, and 2 nos. of emergency switches. One set of heating elements for each zone. One set of mechanical spares i.e bearings, fan impellers, gear boxes etc. to be supplied along with furnace. And spares to be supplied along with furnace to run the furnace trouble free for a period of 2 years based on 2shifts X 8 hrs. Details of the spare parts and its source list are to be given to OFA. Components/ items used in furnace should be available in market for next ten years.

5 9.00 GENERAL FEATURES: 9.1 TRAINING: The supplier shall impart necessary training to the purchaser's personnel for proper operation and maintenance of the plant. 9.2 TECHNICAL LITERATURE: The supplier shall provide illustrations, pictures, drawings, product catalogues with his offer to provide general idea of the product being offered. 9.3 INSTRUCTION MANUAL : Operation Manual - 4 sets, Maintenance Manual-4 sets complete with Electrical Circuit drawings, Spare parts Manual - 4 sets & trouble shooting manuals, and Manuals of original equipment suppliers for the bought out items shall also be supplied (in English Language). In addition to the above manuals firm should supply the data of spare part list, trouble shooting procedure, list of consumables, fast wearing parts. All warranty documents of items used in furnace should be hand over to OFA after commissioning. 9.4 SPACE REQUIREMENT: Firm should submit G.A. drawing showing complete furnace overall dimensions, materials, charging stand/tray design, quenching tank etc. with the tender to study the working of the offered furnace. Furnace height should not exceed 6300mm. 9.5 Approved G.A drawing and Foundation drawing should be submitted by firm with in 30days from placement of Purchase order. 9.6 Civil foundation work will be carried out by the purchaser (OFA) as per supplier's foundation drawing. 9.7 Supplier shall undertake to unload and shift the consignment to the storage area and erection site in case a single consignment weighs more than 5 Metric Tons. In all other cases the purchaser (OFA) shall provide / facilitate unloading of consignment at OFA on receipt under the vendor's supervision. 9.8 To ensure completeness of the equipment the supplier shall include in his scope of supply all auxiliary items like piping, interconnecting cables, other items which will be necessary for running of furnace for 3 months but are not included in this specification Supplier shall be responsible for safe delivery of entire consignment at consignee's site in good condition INSPECTION CRITERIA: 10.1 After placement of order, firm to visit the site before manufacturing the equipment Before manufacturing the equipment firm has to take drawing approval from the OFA. The drawing will consists of all details of material, dimensions, type of bearings used, type of gear boxes used etc Firm has to offer two stage inspection of the equipment. One is during manufacturing the equipment and another is pre dispatch inspection PRE DISPATCH INSPECTION: Pre-dispatch inspection will be carried out by OFA PDI team by dry operation (with out heating) of the furnace at the firm's premises before clearing for dispatch of the equipment. OFA team will check the functioning of all equipments in cold run. Firm to show the related test documents for material conformity /make of all items used in the furnace and the test certificate must be from any NABL accreditated lab ERECTION & COMMISSIONING: It shall be the responsibility of the supplier to arrange for erection of the entire equipment and commission it satisfactorily to achieve the rated output, using their own tools/tackles, man and material etc. On successful commissioning of the equipment the supplier shall arrange to demonstrate the equipment for continuous operation at the rated output. The tenderer shall quote the charges for erection & commissioning separately and likely period for erection/ commissioning and other terms and conditions. Equipment unloading inside the shop will also be the responsibility of the supplier POWER SUPPLY: The power supply available is 440±10V, 50Hz, 3 phase AC. Any other voltage required shall be arranged through inbuilt transformer by the vendor to be installed in the control panel WATER SUPPLY: Normal water supply will be provided if required at the site. Temperature of

6 the water normally does not exceed 35 degrees centigrade COMPRESSED AIR: Compressed air is available up to a maximum pressure of 5 Kg/sq cm FINAL ACCEPTANCE TERMS: After successful erection of the furnace by the supplier, the furnace will be put to trial without and with load. The performance of the furnace will be observed during the trail for 21continuous working days (2 shifts X 8 hrs per day). Firm has to prove the furnace parameters to specification. Firm has to prove component hardness of 70 to 80 VPN after the solution heat treatment with OFA heat treatment cycle. After satisfactory completion of the trials, the furnace will be considered as commissioned. Operational controls and parameters of SCADA system should be proved during trials Warrantee / Guarantee: Guarantee for complete furnace and all supplied accessories/ equipments/items for 12 Months from the date of satisfactory commissioning of the equipment.

TECHNICAL SPECIFICATION FOR PROJECTION WELDING MACHINE (Qty. 2 Nos.)

TECHNICAL SPECIFICATION FOR PROJECTION WELDING MACHINE (Qty. 2 Nos.) TECHNICAL SPECIFICATION FOR PROJECTION WELDING MACHINE (Qty. 2 Nos.) 1. Requirement: Two (02) Nos. DC Type, 3 phase, 3 wire Projection Welding Machine is required for welding of ventilation M.S. / Stainless

More information

heat treatment equipment & accessories

heat treatment equipment & accessories heat treatment equipment & accessories INDUSTRIAL FURNACES Dear Customer, ElectroHeat Sweden AB is an innovative company based in Gothenburg, Sweden, and has been operating since 1975. We manufacture industrial

More information

heat treatment equipment & accessories

heat treatment equipment & accessories heat treatment equipment & accessories Dear Customer, ElectroHeat Sweden AB is an innovative company based in Gothenburg, and has been operating since 1975. We manufacture industrial furnaces and heat

More information

SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT

SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT PART 1 - GENERAL 1.1 DESCRIPTION A. The Work specified in this Section consists of designing, furnishing and installing factory-assembled

More information

HEAVY DUTY STORAGE GAS

HEAVY DUTY STORAGE GAS Multi-Fin flue technology Flue damper saves energy Electronic controls HEAVY DUTY STORAGE GAS Dependability The Rheem heavy duty gas range is the work horse of the industry having proved itself over many

More information

Solar Hot Water Heaters

Solar Hot Water Heaters Solar Hot Water Heaters Three High Vacuum Water inlet Stainless Steel screw Gel seal and insulation Water outlet Dust proof seals Non Pressure Models Details ASWH-1b ( Color Painted 304 ) ASWH-1c ( stainless

More information

SECTION 23 81 43 HEAT PUMPS

SECTION 23 81 43 HEAT PUMPS SECTION 23 81 43 HEAT PUMPS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Packaged rooftop heat pumps. 1.2 REFERENCES A. American Society of Heating, Refrigerating and Air-Conditioning Engineers:

More information

Pump Specifications 250 Series Submersible Sump / Effluent Pump 2 Solids handling

Pump Specifications 250 Series Submersible Sump / Effluent Pump 2 Solids handling Pump Specifications 250 Series Submersible Sump / Effluent Pump 2 Solids handling 250_P1 R10/7/2015 Copyright 2015 Liberty Pumps Inc. All rights reserved. Specifications subject to change without notice.

More information

Current valve. for AC 24 V pulse/pause control of electrical loads up to 30 kw

Current valve. for AC 24 V pulse/pause control of electrical loads up to 30 kw 4 937 DESIO Current valve for AC 24 V pulse/pause control of electrical loads up to 30 kw SEA45.1 Use The current valve is used for the control of electric heating elements in heating, ventilation and

More information

SPECIFICATIONS FOR TENDER NO: PSNR/SCP/VKS/E 1635 ANNEXURE I TECHNICAL SPECIFICATIONS FOR LIGHTING HIGH MAST

SPECIFICATIONS FOR TENDER NO: PSNR/SCP/VKS/E 1635 ANNEXURE I TECHNICAL SPECIFICATIONS FOR LIGHTING HIGH MAST TECHNICAL SPECIFICATIONS FOR LIGHTING HIGH MAST ANNEXURE I Sl.No. Description for BHEL Requirement Offered Deviation Scope of supply, erection and commissioning: 1 The scope of this specification covers

More information

Défumair XR. ventilation and cmv. fire grade - label CE. smoke-extraction fan extraction casing for kitchen at F400-120. advantages.

Défumair XR. ventilation and cmv. fire grade - label CE. smoke-extraction fan extraction casing for kitchen at F400-120. advantages. Défumair XR smoke-extraction fan extraction casing for kitchen at F400-120 Personalisation : - Phonic insulation version by insulated double-skin panels through 25 mm glass wool, class M1. advantages Originally

More information

Cooking at the Speed of light!

Cooking at the Speed of light! Cooking at the Infrared Cooking & Colouring Infrabaker is a modular infrared continuous cooking system developed by Infrabaker International. The machine is designed to cook and/or put colour on a wide

More information

FIRE ALARM AND DETECTION SYSTEMS SECTION 16721

FIRE ALARM AND DETECTION SYSTEMS SECTION 16721 PART 1 - GENERAL 1.01 WORK INCLUDED FIRE ALARM AND DETECTION SYSTEMS SECTION 16721 A. Provide a complete fully addressable, power limited, fire detection and evacuation system. The system shall be connected

More information

REVIEWED BY CAPITAL PROJECTS MANAGER (DAN REDDY) GENERAL MANAGER EQUIPMENT ENGINEERING & ASSET MANAGEMENT (HAMILTON NXUMALO)

REVIEWED BY CAPITAL PROJECTS MANAGER (DAN REDDY) GENERAL MANAGER EQUIPMENT ENGINEERING & ASSET MANAGEMENT (HAMILTON NXUMALO) SA Port Operations DOCUMENT TYPE: REFERENCE EEAM-Q-014 (ORIGINAL SPECIFICATION HE8.2.3 Ver5) REVISION 0 SPECIFICATION TITLE: SPECIFICATION FOR ELECTRICAL MOTORS AND GENERATORS PAGE 0 of 07 COMPILED BY

More information

1x90 TONS TENSIONERS TECHNICAL PROPOSAL. 1 X 90 Tons 30 m/min Tensioners TECHNICAL PROPOSAL JOB 08/059. 0 19/02/2008 Basic proposal PP GM SB

1x90 TONS TENSIONERS TECHNICAL PROPOSAL. 1 X 90 Tons 30 m/min Tensioners TECHNICAL PROPOSAL JOB 08/059. 0 19/02/2008 Basic proposal PP GM SB Pagina N.: 1 of 19 1 X 90 Tons 30 m/min Tensioners JOB 08/059 0 19/02/2008 Basic proposal PP GM SB Rev N Date Issue Description Prepared by Checked by Approved by Pagina N.: 2 of 19 TABLE OF CONTENTS:

More information

TIG INVERTER INSTRUCTION MANUAL

TIG INVERTER INSTRUCTION MANUAL TIG INVERTER INSTRUCTION MANUAL Contents Warning General Description Block Diagram Main Parameters Circuit Diagram Installation and Operation Caution Maintenance Spare Parts List Troubleshooting 3 4 4

More information

BB-18 Black Body High Vacuum System Technical Description

BB-18 Black Body High Vacuum System Technical Description BB-18 Black Body High Vacuum System Technical Description The BB-18 Black Body is versatile and is programmed for use as a fixed cold target at 80 K or variable target, at 80 K- 350 K no extra cost. The

More information

MODEL HSR-007 Direct Drive Rolling Steel

MODEL HSR-007 Direct Drive Rolling Steel MODEL HSR-007 Direct Drive Rolling Steel 200 Fairview Road, Unit #2, Barrie, Ontario L4N 8Z8 Tel: 866-792-9968 or 705-792-9968 Fax: 705-735-9564 www.tnrdoors.com email: [email protected] Model HSR-007

More information

SERVER ROOM CABINET INSTALLATION CONCEPTS

SERVER ROOM CABINET INSTALLATION CONCEPTS SERVER ROOM CABINET INSTALLATION CONCEPTS SERVER ROOM CABINET INSTALLATION CONCEPTS SERVER ROOM CABINET INSTALLATION CONCEPTS ZPAS 169 EXAMPLES OF SERVER ROOMS PROJECTS WITH ZPAS CABINETS Data Box in the

More information

SECTION 15750 PACKAGED ROOFTOP AIR CONDITIONING UNITS

SECTION 15750 PACKAGED ROOFTOP AIR CONDITIONING UNITS SECTION 15750 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes requirements for roof mounted, self-contained units, with electric cooling, and electric or reverse refrigeration cycle (heat pump) heating

More information

Procurement Specification for a High Security Lift Arm Barrier (HSLAB) EB950 CR Armstrong High Security Lift Arm Barrier

Procurement Specification for a High Security Lift Arm Barrier (HSLAB) EB950 CR Armstrong High Security Lift Arm Barrier Procurement Specification for a High Security Lift Arm Barrier (HSLAB) EB950 CR Armstrong High Security Lift Arm Barrier A. Requirement This document is to be used to specify the physical and operational

More information

32:(5#5$7,1* 4833#USP283#+] 4;33#USP293#+] 3ULPH 113 kva, 90 kw 124 kva, 99 kw 6WDQGE\ 114 kva, 91 kw 125 kva, 100 kw

32:(5#5$7,1* 4833#USP283#+] 4;33#USP293#+] 3ULPH 113 kva, 90 kw 124 kva, 99 kw 6WDQGE\ 114 kva, 91 kw 125 kva, 100 kw ,1'8675,$/#*(16(7 6HULHV#'9#448 32:(5#5$7,1* 4833#USP283#+] 4;33#USP293#+] 3ULPH 113 kva, 90 kw 124 kva, 99 kw 6WDQGE\ 114 kva, 91 kw 125 kva, 100 kw Generator set consisting of engine and alternator mounted

More information

TELESCOPE Motorized Lighting Suspension

TELESCOPE Motorized Lighting Suspension TELESCOPE Motorized Lighting Suspension Mod. 8400 FEATURES The De Sisti TELESCOPE is a single point suspension specifically designed to provide rigidity and stabilization of all moving parts. It can extend

More information

WHOLESALE DIRECT INC. 5620 WEST 65TH STREET

WHOLESALE DIRECT INC. 5620 WEST 65TH STREET Auto Pump V 200 100 0 100 Max Rating Vehicle mount compressor ensures truck air brake system is properly pressurized for immediate dispatch from station Pressure switch regulated operation automatically

More information

CLOSE CONTROL SYSTEM. PFD series provide you with highly reliable computer room cooling system. High Reliability

CLOSE CONTROL SYSTEM. PFD series provide you with highly reliable computer room cooling system. High Reliability PFD-P250VM-E PUHY-P250YJM-A(-BS) PUHY-P500YSJM-A(-BS) PQHY-P250YHM-A CLOSE CONTROL SYSTEM MITSUBISHI ELECTRIC s Close Control System (PFD series) is specifically designed for computer rooms, laboratories

More information

HERZ-Thermal Actuators

HERZ-Thermal Actuators HERZ-Thermal Actuators Data Sheet 7708-7990, Issue 1011 Dimensions in mm 1 7710 00 1 7710 01 1 7711 18 1 7710 80 1 7710 81 1 7711 80 1 7711 81 1 7990 00 1 7980 00 1 7708 11 1 7708 10 1 7708 23 1 7709 01

More information

MEDIUM VOLTAGE CE-BF SWITCHBOARDS. UP TO 40.5 kv. CE - BF - C - en - REV.00 2012.4

MEDIUM VOLTAGE CE-BF SWITCHBOARDS. UP TO 40.5 kv. CE - BF - C - en - REV.00 2012.4 CE - BF - C - en - REV.00 2012.4 APPLICATION CE-BF Switchbords up to 40.5 kv are designed for use in public and industrial distribution system up to 40,5KV for the operation and protection of lines, transformers,

More information

Commercial Gas Furnace Upflow

Commercial Gas Furnace Upflow Commercial Gas Furnace Upflow Model G24-200 80% A.F.U.E. 200,000 Btuh Input Heating Cap. 7.5 or 10 Tons Nominal Add-On Cooling GUK FEATURES Certified by A.G.A./C.G.A. Laboratories. Heavy gauge painted

More information

PS1800 Centrifugal Pumping Systems

PS1800 Centrifugal Pumping Systems PS1 Centrifugal Pumping Systems General Data and Sizing Tables The curve show the performance range of 4 models at 1Wp solar array - irradiation of 6kWh/m² on a tilted surface - ambient temperature 3 C

More information

Freezers - Ultrafreezers. Platilab & Irilab Series

Freezers - Ultrafreezers. Platilab & Irilab Series Freezers - Ultrafreezers Platilab & Irilab Series PLATILAB: top security and performances with reliable temperature control. IRILAB: combining the high reliability of PLATILAB with the possibility to store

More information

understanding medium frequency induction melting furnace and its components

understanding medium frequency induction melting furnace and its components understanding medium frequency induction melting furnace and its components 9 Spruce Street, Jersey City, NJ 07306 USA [email protected] INDUCTION MELTING FURNACE AND ITS COMPONENTS The purpose

More information

Max primary circuit temperature 90ºC Max primary circuit temp. 90ºC Max secondary circuit temperature 45ºC Max secondary circuit temp.

Max primary circuit temperature 90ºC Max primary circuit temp. 90ºC Max secondary circuit temperature 45ºC Max secondary circuit temp. EGLISH 1 Product description exchanger equipped with an electronic control unit and circulation pump for the primary circuit. All Aqua-Mex variants can be ordered with an interior coil of either titanium

More information

Operators manual Basic water heater

Operators manual Basic water heater Operators manual Basic water heater Isotemp Basic water heater has been designed and produced to ensure that your water heater will give long and trouble free operation for many years. It is important,

More information

SECTION 23 81 03 - PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM

SECTION 23 81 03 - PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM SECTION 23 81 03 - PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Packaged rooftop air conditioning unit (5 tons and smaller). 2. Roof curb. 1.2

More information

The Embassy of the United States of America invites you to submit an offer for supply and install the following A/Cs:

The Embassy of the United States of America invites you to submit an offer for supply and install the following A/Cs: RFQ number PR4877728 The Embassy of the United States of America invites you to submit an offer for supply and install the following A/Cs: A- Supplying and installing 30 high wall A/C split unit 3HP- 24,000

More information

Installation and maintenance instructions. Danfoss Vent

Installation and maintenance instructions. Danfoss Vent Installation and maintenance instructions Danfoss Vent 1 Unit design... 2 2 Project planning and installation instructions... 3 2.1 Ventilation...3 2.2 Piping installation....3 2.3 Condensation line...4

More information

300 Series PA Pump and Cooler Assemblies

300 Series PA Pump and Cooler Assemblies Type 300 Series PA Sizes 300 thru 370 (Page 1 of 9) 300 Series PA Pump and Cooler Assemblies Pump and Cooler Assemblies with Air/Oil Heat Exchanger When compact gear drives require assistance to dissipate

More information

ACS-30-EU-EMDR-10-MOD

ACS-30-EU-EMDR-10-MOD Multi-application heat tracing Control and Monitoring in commercial and residential buildings Roof & Gutter de-icing sensor module Technical Information Approvals Module IP rating Ambient operating temperature

More information

TFSR & TFSK Roof Fans

TFSR & TFSK Roof Fans Fans Air Handling Units Air Distribution Products Fire Safety Air Conditioning Air Curtains and Heating Products Tunnel Fans TFSR & TFSK Roof Fans With swing-out function 2 I TFSR/TFSK TFSR & TFSK Roof

More information

SECTION 11 78 13 MORTUARY REFRIGERATORS

SECTION 11 78 13 MORTUARY REFRIGERATORS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 11 78 13 MORTUARY REFRIGERATORS SPEC WRITER NOTE: Delete between //---// if not applicable to project. Also delete any other item or paragraph not applicable in

More information

Element D Services Heating, Ventilating, and Air Conditioning

Element D Services Heating, Ventilating, and Air Conditioning PART 1 - GENERAL 1.01 OVERVIEW A. This section supplements Design Guideline Element D3041 on air handling distribution with specific criteria for projects involving design of a Data Center spaces B. Refer

More information

UGVCL/SP/591/11KV HT AB CABLE

UGVCL/SP/591/11KV HT AB CABLE TECHNICAL SPECIFICATION FOR 11KV AERIAL BUNCHED CABLES FOR OVERHEAD LINES (CROSSED LINKED POLYTHENE DRY GAS CURED) 1. SCOPE This specification covers requirements of XLPE insulated, 11 KV Aerial Bunched

More information

JAWAHARLAL NEHRU UNIVERSITY

JAWAHARLAL NEHRU UNIVERSITY School of Biotechnology JAWAHARLAL NEHRU UNIVERSITY New Delhi 110 067 Tender No. JNU/SBT/DBT-BUILDER/Data Centre/2015-16 Sealed Quotation for the establishment of a Data Centre for High-End Computational

More information

A GUIDE TO SELECTING YOUR INDUSTRIAL OVEN

A GUIDE TO SELECTING YOUR INDUSTRIAL OVEN A GUIDE TO SELECTING YOUR INDUSTRIAL OVEN Application 1 The first step in selecting an industrial oven is defining the required heat application that your oven will be used for. Heat processing is extensively

More information

SECTION 16720 - FIRE AND SMOKE ALARM SYSTEM. City of San Diego, CWP Guidelines

SECTION 16720 - FIRE AND SMOKE ALARM SYSTEM. City of San Diego, CWP Guidelines PART 1 -- GENERAL 1.1 WORK OF THIS SECTION SECTION 16720 - City of San Diego, CWP Guidelines A. The WORK of this Section includes providing manual and automatic fire alarm and smoke detection systems meeting

More information

Gas Unit Heaters Duct Furnaces Horizontal - 60 HZ Form No. LF24-100-400 (10/2011) LF24 Standard

Gas Unit Heaters Duct Furnaces Horizontal - 60 HZ Form No. LF24-100-400 (10/2011) LF24 Standard LF Standard Features Horizontal unit heaters are compact in design and easy to install. Steady State Efficiencies of up to 80.%. Ideal for economical commercial heating systems. Shipped completely assembled

More information

SunMaxx Solar Filling Station Operating Instructions

SunMaxx Solar Filling Station Operating Instructions SunMaxx Solar Filling Operating Instructions Content 1. Declaration of conformity... 2 2. Introduction... 2 3. Transportation and unpacking... 4 4. Mounting and commissioning... 5 5. End of operation...

More information

Pump Specifications 405 Series Commercial Drain Pump (High-Temp) 2 Solids handling

Pump Specifications 405 Series Commercial Drain Pump (High-Temp) 2 Solids handling Pump Specifications 405 Series Commercial Drain Pump (High-Temp) 2 Solids handling 405_P1 R1/27/2012 Copyright 2012 Liberty Pumps Inc. All rights reserved. Specifications subject to change without notice.

More information

Low Voltage Switchboards The Best Technical Solution for Your Ship

Low Voltage Switchboards The Best Technical Solution for Your Ship The Best Technical Solution for Your Ship Wärtsilä SAM Electronics Optimal Power Distribution The uninterrupted supply of power to systems and consumers onboard modern ships is an extremly important matter.

More information

26 3213.13 Diesel Engine Driven Generators Page 1 of 6

26 3213.13 Diesel Engine Driven Generators Page 1 of 6 Last Update: December 8, 2014 A. Description of System Consultant s Handbook Page 1 of 6 1. Provide a diesel engine driven electric generating unit, factory assembled, tested and certified to operate at

More information

Power consumption (kw)

Power consumption (kw) OS Series Series description LIT OS systems are applied to wastewater disinfection. The models of this series were developed on base of high-efficiency low-pressure amalgam lamps and have all components

More information

Frequently Asked Questions. Air Top Diesel Heaters. 2000STC, Evo 40 & Evo 55

Frequently Asked Questions. Air Top Diesel Heaters. 2000STC, Evo 40 & Evo 55 Frequently Asked Questions Air Top Diesel Heaters 2000STC, Evo 40 & Evo 55 Question 1 What power outputs are the heaters available in? There are 3 models 2kW, 4kW and 5.5kW Question 2 What voltage are

More information

Please also see 10 golden rules for correct Saniflo installation on www.saniflo.co.uk

Please also see 10 golden rules for correct Saniflo installation on www.saniflo.co.uk 1. Description Sanicom is a lifting pump for wastewater used in commercial applications (restaurants, hairdressing salons, the catering industry etc.). The unit operates automatically, has a high performance

More information

PART 1 - INTRODUCTION...

PART 1 - INTRODUCTION... Table of Contents PART 1 - INTRODUCTION... 3 1.1 General... 3 1.2 Sensor Features... 3 1.3 Sensor Specifications (CDE-45P)... 4 Figure 1-1 CDE-45P Sensor Dimensions (standard, convertible style)... 4 PART

More information

3.1.1 Full Type Tests & Routine Tests according to Clause 8 2 & 8 3. 4.0 Instructions For Installation, Operation & Maintenance

3.1.1 Full Type Tests & Routine Tests according to Clause 8 2 & 8 3. 4.0 Instructions For Installation, Operation & Maintenance SPECIFICATION FOR LOW VOLTAGE SWITCHBOARD SEN I N D E X Description 10 STANDARD TECHNICAL REQUIREMENTS 11 Standards 12 General Operating Conditions 13 General Description Of Switchboard 131 Structure 132

More information

ECOCIAT. Domestic hot water heat recovery unit

ECOCIAT. Domestic hot water heat recovery unit Heat recovery unit Domestic hot water High energy efficiency with R410A Compact and quiet Scroll compressors Brazed-plate heat exchangers Heating Heat recovery ENVIRONMENTALLY HFC R410A PROTECTION DE FRIENDLY

More information

FFI. Advances in Medium and Low Voltage Power Distribution ESS Metron Expo and Technical Seminars. Presented By: Greg Pelster & Robert Schmid

FFI. Advances in Medium and Low Voltage Power Distribution ESS Metron Expo and Technical Seminars. Presented By: Greg Pelster & Robert Schmid Advances in Medium and Low Voltage Power Distribution ESS Metron Expo and Technical Seminars Presented By: Greg Pelster & Robert Schmid FFI Ferrie, Franzmann Industries LOW VOLTAGE SWITCHGEAR & LOW VOLTAGE

More information

ELECTRONIC THERMOSTAT AND THERMOMETER With SPEED CONTROL

ELECTRONIC THERMOSTAT AND THERMOMETER With SPEED CONTROL 148 OLD CONCORD TURNPIKE, BARRINGTON NH 03825 USA TEL (603) 868-5720 FAX (603) 868-1040 1-800-435-6708 E-Mail:[email protected] www.seafrost.com ELECTRONIC THERMOSTAT AND THERMOMETER With SPEED CONTROL

More information

Automatic Door Openers and ADA Devices Rev. 0 Bid # 48240056. Scope of Work

Automatic Door Openers and ADA Devices Rev. 0 Bid # 48240056. Scope of Work Scope of Work I. Scope of Solicitation II. Instructions to Offerors III. Scope of Work / Specifications IV. Terms and Conditions - Special I. SCOPE OF SOLICITATION Clemson is seeking to initiate a turnkey

More information

Type: DILM115(RAC240) Article No.: 239548 Sales text Contactor,55kW/400V,AC operated. Ordering information

Type: DILM115(RAC240) Article No.: 239548 Sales text Contactor,55kW/400V,AC operated. Ordering information Type: DILM115(RAC240) Article No.: 239548 Sales text Contactor,55kW/400V,AC operated Ordering information Connection technique Description Description Rated operational current Screw terminals 3 pole AC

More information

Cold Room & Refrigeration System (Casserole Assembly) No of units: 1

Cold Room & Refrigeration System (Casserole Assembly) No of units: 1 Technical Specifications Cold Room & Refrigeration System (Casserole Assembly) No of units: 1 For chiller storage of all sorts of items Chiller storage temperature: 2-5 C Provides excellent thermal efficiency

More information

Climasys Thermal Management System. Schneider Electric Universal Enclosures 2009

Climasys Thermal Management System. Schneider Electric Universal Enclosures 2009 Climasys Thermal Management System Schneider Electric Universal Enclosures 2009 Schneider Electric Universal Enclosures The specialist in sealed equipment What is the mission of Schneider Electric Universal

More information

Magnum Mobile Generator MMG55 Specifications

Magnum Mobile Generator MMG55 Specifications Empowering Real People Magnum Mobile Generator MMG55 Specifications ENGINE John Deere PE5030TF270 - turbocharged, diesel engine o Prime - 72 hp @ 1800 rpm o Standby - 80 hp @ 1800 rpm o 4 cylinder o 3.0

More information

Heating and Hot Water Services Controls General Technical Specification

Heating and Hot Water Services Controls General Technical Specification Construction Services Heating and Hot Water Services Controls General Technical Specification Version 1.0 Environment Heating and Hot Water Services Controls General Technical Specification Contents 1.

More information

SECTION 16721 FIRE ALARM AND DETECTION SYSTEMS

SECTION 16721 FIRE ALARM AND DETECTION SYSTEMS SECTION 16721 FIRE ALARM AND DETECTION SYSTEMS The equipment requirements of this section apply to the IUB Campus. The IUPUI Campus has a preferred vendor agreement for fire alarm systems. Contact Pat

More information

Fire. The Fire Installers Mate. A guide to fire alarm systems design

Fire. The Fire Installers Mate. A guide to fire alarm systems design Fire The Fire Installers Mate A guide to fire alarm systems design BS 5839 Part 1:2002 A guide to BS 5839 Part 1:2002 Disclaimer This booklet is not intended to be a comprehensive guide to all aspects

More information

Annex-A TECHNICAL SPECIFICATION

Annex-A TECHNICAL SPECIFICATION Annex-A TECHNICAL SPECIFICATION FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF 0.4kV (2,000kVA) DIESEL GENERATOR 1 1.0 SCOPE This specification covers the requirements of design, manufacture, delivery

More information

Operation manual and Spare parts list 1400 - EL PUMP. November

Operation manual and Spare parts list 1400 - EL PUMP. November Operation manual and Spare parts list 1400 - EL PUMP 10 GB November 1 KIMADAN A/S KIMADAN A/S 2 Operational manual and spare parts list 1400 El-pump 15, 20, 25 HP 5 30 kw 6 1. Description.. 3 2. Installation

More information

1-Way Chilled Water Cassettes KCO 60, 90 & 120. Technical Brochure. TM KCO-W.1GB Date : November 2005 Supersedes : None

1-Way Chilled Water Cassettes KCO 60, 90 & 120. Technical Brochure. TM KCO-W.1GB Date : November 2005 Supersedes : None 1-Way Chilled Water Cassettes KCO 60, 90 & 120 Technical Brochure TM KCO-W.1GB Date : November 2005 Supersedes : None General Features Control valve (optional) Air vent In-tube electric heating elements

More information

Electronics Ltd. Presenting. Power, Intelligence... with a sense of feeling

Electronics Ltd. Presenting. Power, Intelligence... with a sense of feeling Electronics Ltd Presenting Power, Intelligence... with a sense of feeling By Appointment to Her Majesty The Queen Supplier of Fire Detection Equipment Kentec Electronics Ltd. Dartford Plug in slots K772

More information

CRN32-2-2 A-F-G-E-HQQE 3x400D 50 HZ

CRN32-2-2 A-F-G-E-HQQE 3x400D 50 HZ GRUNDFOS DATA BOOKLET CRN32-2-2 A-F-G-E-HQQE 3x4D 5 HZ Grundfos Pump 96122352 Thank you for your interest in our products Please contact us for more information, or visit our website http://www.lenntech.com/grundfos/crn32/96122352/crn-32-2-2-a-f-g-e-hqqe.html

More information

COMMISSIONING OF HVAC SYSTEMS

COMMISSIONING OF HVAC SYSTEMS FORM CL-01 SYSTEMS / EQUIPMENT INCLUDED : SYSTEM STARTUP CHECKLIST I - PRE - STARTUP INSPECTION EQUIPMENT MOUNTING & SETTING CONTROL, INTERLOCK & POWER WIRING ALIGNMENT OF MOTORS & DRIVES PIPING, CONNECTIONS

More information

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations. DIVISION 16 ELECTRICAL SECTION 16100 - ELECTRICAL PART 1 - GENERAL SCOPE All electrical work as shown on the drawings and as necessary to provide a complete electrical system. Include primary service,

More information

Explosion-Proof Electric Unit Heaters

Explosion-Proof Electric Unit Heaters Type FX4 FX4 Explosion-Proof Electric Air Heaters FX4 heaters are UL listed and/or CSA certified for use in hazardous locations. They are designed for dry indoor industrial applications such as oil refineries,

More information

Recommended Product Specifications Fuel Day Tank System Tramont UTRS Fuel Day Tank

Recommended Product Specifications Fuel Day Tank System Tramont UTRS Fuel Day Tank Recommended Product Specifications Fuel Day Tank System Tramont UTRS Fuel Day Tank This specification describes requirements for a Diesel Fuel Day Tank System consisting of one or more fuel tanks, an Electronic

More information

LOADING DOCK EQUIPMENT. A. Section 03100 - Concrete Forms and Accessories: Placement of anchors into concrete.

LOADING DOCK EQUIPMENT. A. Section 03100 - Concrete Forms and Accessories: Placement of anchors into concrete. LOADING DOCK EQUIPMENT PART 1 GENERAL 1.1 SECTION INCLUDES A. Loading dock equipment of the following types: 1. Dock lifts. 2. Control stations. 1.2 RELATED SECTIONS A. Section 03100 - Concrete Forms and

More information

CORNER FRIDGE REFRIGERATION UNIT INSTALLATION AND OPERATION INSTRUCTIONS

CORNER FRIDGE REFRIGERATION UNIT INSTALLATION AND OPERATION INSTRUCTIONS CORNER FRIDGE REFRIGERATION UNIT INSTALLATION AND OPERATION INSTRUCTIONS D E F Y I N G C O N V E N T I O N Congratulations on your new Corner Fridge Your new corner fridge may have different functions

More information

Oil and Coolant Circulating Heating System. Model - OCSM

Oil and Coolant Circulating Heating System. Model - OCSM Oil and Coolant Circulating Heating System Model - OCSM Installation & Operation Manual 216280-000 REV 2 Identifying Your System The HOTSTART heating system is designed to heat fluids for use in marine

More information

Data Sheet VITOSOL 100. Flat collectors for the utilisation of solar energy. Vitosol 100. Part nos. and prices: see price list

Data Sheet VITOSOL 100. Flat collectors for the utilisation of solar energy. Vitosol 100. Part nos. and prices: see price list VITOSOL 100 Flat collectors for the utilisation of solar energy Data Sheet Part nos. and prices: see price list File in: Vitotec 1 Manual, Index 16 Vitosol 100 Type s 1.7 Vitosol 100 Type s 2.5 Vitosol

More information

TECHNICAL SPECIFICATION FOR HIGH TENSION LINE HARDWARE AND ACCESSORIES FOR ACSR PANTHER & WOLF CONDUCTOR

TECHNICAL SPECIFICATION FOR HIGH TENSION LINE HARDWARE AND ACCESSORIES FOR ACSR PANTHER & WOLF CONDUCTOR TECHNICAL SPECIFICATION FOR HIGH TENSION LINE HARDWARE AND ACCESSORIES FOR ACSR PANTHER & WOLF CONDUCTOR 1.1.0 SCOPE : This specification covers design, manufacture, testing at manufacture s works before

More information

PELLEXIA COMFORT ENVIRONMENT COMPATIBLE

PELLEXIA COMFORT ENVIRONMENT COMPATIBLE PELLEXIA COMFORT ENVIRONMENT COMPATIBLE To valorize the pellet MODEL nominal output min/max kw global output min/max % pellet reservoir content kg PELLEXIA 7 8 7 8,8 89 50 PELLEXIA 40 3 39,7 85 90,3 50

More information

PRODUCT PRODUCT CODE TECHNICAL INSTRUCTIONS PAGE

PRODUCT PRODUCT CODE TECHNICAL INSTRUCTIONS PAGE Table of Contents PRODUCT PRODUCT CODE TECHNICAL INSTRUCTIONS PAGE # Electric Room Comfort Controller NEW! RDY2000 Room Comfort Controller RDY 129-905 D-3 Electric for Specialized Applications Surface

More information

FVA/A1 saturated-steam sterilizer

FVA/A1 saturated-steam sterilizer FVA/A1 where technology innovation and design come together FVA/A1 saturated-steam sterilizer www.fedegariautoklaven.ch Fedegari's new FVA/A1 series of automatic vertical sterilizers has been expressly

More information

CoolTop. A unique water cooled air-conditioning unit for server room cooling from the top AC-TOPx-CW-240/60

CoolTop. A unique water cooled air-conditioning unit for server room cooling from the top AC-TOPx-CW-240/60 CoolTop A unique water cooled air-conditioning unit for server room cooling from the top AC-TOPx-CW-240/60 Application CoolTop is a new, unique air conditioning unit especially designed for datacenters.

More information

Technical data. Danfoss DHP-A

Technical data. Danfoss DHP-A Technical data Danfoss DHP-A An air heat pump which produces both heat and hot water Can operate efficiently down to -0 C Danfoss TWS tank gives plenty of hot water quickly and with low operating costs

More information

LANDFILL GAS ENCLOSED FLARE SYSTEM

LANDFILL GAS ENCLOSED FLARE SYSTEM LANDFILL GAS ENCLOSED FLARE SYSTEM Part 1. General 1.01 Description A. Information within this specification describes an enclosed flare system designed specifically for the combustion of landfill gas.

More information

A1.5 Classroom Standards

A1.5 Classroom Standards A1.5 Classroom Standards Note: The following standards have been developed and adopted by KU's Instructional and Mediated Spaces Committee (IMSAC), which includes representatives from DCM, Instructional

More information

TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT

TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT 1.1 General 1.1.1 These Special Conditions of Contract supplement the General Instructions.

More information

Light Duty Commercial Electric Water Heater

Light Duty Commercial Electric Water Heater Features Heavy Duty Construction Hydrastone cement lining provides longer tank life Copper-silicon tappings cannot rust or corrode High impact composite jacket eliminates damage during installation and

More information

REB 1 REB 3 REB 5 REB 6 REB 8 REB 10 REB 12 REB 16

REB 1 REB 3 REB 5 REB 6 REB 8 REB 10 REB 12 REB 16 REB 1 REB 3 REB 5 REB 6 REB 8 REB 10 REB 12 REB 16 Manually Operated Electronic Speed Controller Single Phase For all applications using suitably specified single-phase induction motor fans 1 GENERAL The

More information

High Capacity Hot Air Dryer

High Capacity Hot Air Dryer High Capacity Hot Air Dryer MADE IN AUSTRIA autumn 2015 www.zimmer-austria.com page 1 Hot air dryer type: Compact HC The modular construction of the high efficiency and powerful hot air nozzle dryer is

More information

Double Rotary Tablet Press. (Pharma Press Gmp Model) Instrumented Tablet Press (Pharma Press-II)

Double Rotary Tablet Press. (Pharma Press Gmp Model) Instrumented Tablet Press (Pharma Press-II) Press (Pharma Mega Press Gmp Model) Press (Pharma Mega Press Gmp Model) CE Approved Double Rotary Tablet Press (Pharma Press Gmp Model) Rotary Tablet Press GMP Model Press (Pharma Mega Press Gmp Model)

More information

BILL OF QUANTITY FOR THE HVAC WORKS OF The Institute of space technology, near Toll Plaza (G.T. Road,) Islamabad

BILL OF QUANTITY FOR THE HVAC WORKS OF The Institute of space technology, near Toll Plaza (G.T. Road,) Islamabad BILL OF QUANTITY FOR THE HVAC WORKS OF The Institute of space technology, near Toll Plaza (G.T. Road,) Islamabad PLEASE MARK TICK ON LEFT BOX WHICH EQUIPMENT YOU HAVE QUOTED PROPOSAL BASED ON CHINESE EQUIPMENT

More information

COOLSIDE box R410A. conditioned server - racks for direct installation into the room INVERTER E C

COOLSIDE box R410A. conditioned server - racks for direct installation into the room INVERTER E C COOLS conditioned server - racks for direct installation into the room COOLSIDE box INVERTER R410A E C 2 COOLSIDE box GENERAL FEATURES COOLSIDE BOX is a split system consisting of an outdoor motocondensing

More information

Service manual. Website: www.andico.com.au CAUTION - BEFORE SERVICING THE UNIT, READ THE SAFETY - PRECAUTIONS IN THIS MANUAL.

Service manual. Website: www.andico.com.au CAUTION - BEFORE SERVICING THE UNIT, READ THE SAFETY - PRECAUTIONS IN THIS MANUAL. Website: www.andico.com.au Service manual CAUTION - BEFORE SERVICING THE UNIT, READ THE SAFETY - PRECAUTIONS IN THIS MANUAL. - ONLY FOR AUTHORISED SERVICE PERSONNEL. MODELS: MPK1-09CR-QB8 MPK1-12ER-QB6

More information

TECHNICAL SPECIFICATIONS & TERMS AND CONDITIONS FOR SOLAR WATER HEATER (FPC/ETC)

TECHNICAL SPECIFICATIONS & TERMS AND CONDITIONS FOR SOLAR WATER HEATER (FPC/ETC) TECHNICAL SPECIFICATIONS & TERMS AND CONDITIONS FOR SOLAR WATER HEATER (FPC/ETC) Prepared by Committee for Technology Assessment and Analyzing the installation of Solar Water Heater Systems in Government

More information

O-I DUBI PLANT FANS Quotation Spec Data & Specifications

O-I DUBI PLANT FANS Quotation Spec Data & Specifications TECHNICAL DATA O-I DUBI PLANT FANS Quotation Spec Data & Specifications 1 page for the global informations + 12 pages for the fans data Revision 2 end april Global informations: These fans are a replacement

More information

R22. K Control. Indoor Unit. Nomenclature. Compatibility PL H 3 G K H B. Unit style Heat Pump Horse Power

R22. K Control. Indoor Unit. Nomenclature. Compatibility PL H 3 G K H B. Unit style Heat Pump Horse Power R22. K Control. Indoor Unit. Nomenclature. PL H 3 G K H B Compatibility Unit style Heat Pump Horse Power Control Boost Heaters R22. K Control. Outdoor Unit. Nomenclature. PU H 3 Y K A Compatibility Outdoor

More information

AFE424 SERVICE PARTS

AFE424 SERVICE PARTS This is the parts list for the AFE. When looking up part numbers, always check the complete model and serial numbers to be certain of ordering the correct parts. The Air Cooled model has also been manufactured

More information