Case Study of Stone Veneer Failure Deepak Ahuja, M.S., P.E., M. ASCE Stewart M. Verhulst, M.S., P.E., M. ASCE Andrew M. Noble III, B.Arch., R.A.

Size: px
Start display at page:

Download "Case Study of Stone Veneer Failure Deepak Ahuja, M.S., P.E., M. ASCE Stewart M. Verhulst, M.S., P.E., M. ASCE Andrew M. Noble III, B.Arch., R.A."

Transcription

1 Case Study of Stone Veneer Failure Deepak Ahuja, M.S., P.E., M. ASCE Stewart M. Verhulst, M.S., P.E., M. ASCE Andrew M. Noble III, B.Arch., R.A. Abstract The primary concerns for veneer systems are typically cosmetic (appearance) and the function as part of the building envelope, especially regarding moisture issues. However, the selection of the veneer system and the execution of the veneer support can become issues of public safety. This case study outlines issues of veneer-related safety on two public buildings with similar construction. Improper selection of the veneer materials during the design phase of the project and improper execution during the construction phase caused several safety concerns around the entire building perimeters. The safety issues were not caused by special or unique conditions imposed on the structure. Consideration and execution of fundamental issues related to exterior veneer material selection and the installation of a stone veneer system would have prevented all of the unsafe conditions. Introduction Two public buildings located in San Antonio, Texas, were experiencing failure of the stone veneer system. For the purposes of this discussion, "failure" is defined as a loss of function or serviceability, including conditions which render a building unsafe. Generally speaking, the failure observed was in the form of stone veneer (both pieces of stone and also entire stones) which had fallen from the façades or were in danger of falling. The buildings were of similar construction with the same types of veneer systems and materials. The buildings were so similar that the topics discussed apply to both; however, where discussed separately they will be referred to as Building A and Building B. The authors performed an investigation of the cause of failure of the veneer. The structures were approximately six years old at the time of investigation (they were built in the late 1990's); however, stone veneer failure had been ongoing for some time prior. Both Buildings A and B are five-story buildings with conventional reinforced concrete framing. Refer to Figures 1 and 2 for representative views of each building exterior. The total height of the dimension stone veneer varies from three stories to five stories at each building; with porcelain tile at the remaining portions of the building façades

2 at the fourth and fifth floors. The lighter veneer in Figures 1 and 2 is indicative of the limestone, and the darker-colored veneer is indicative of the sandstone (also, the porcelain tile is visible and is darker in appearance than the sandstone). Figure 1. General view of Building A exterior. Figure 2. General view of Building B exterior. Documents made available during the investigation include architectural and structural plans, the project manual (specifications), and some submittals for the stone, which included pre-construction test data. Dimension Stone Veneer General. Dimension Stone is defined as, "a natural building stone that has been cut and finished to specifications" (MIA, 1999). Two main types of dimension stone veneer were used in the veneer for the buildings, limestone with a natural rock face and red sandstone with a natural rock face. All of the stone veneer on the buildings has been observed to have the rift or grain in a vertical orientation. Therefore, the

3 forces from the stones self-weight are in-line with the direction of the layering within the stone (refer to Figure 3). The specifications indicate a dimensional stone depth of 2 1/2"-3" for the veneer system; and Type N mortar with Type S lime for the mortar in the dimension stone veneer system. A typical dimension stone in the veneer system measures 24" wide x 20" high and has an estimated weight of 115 lbs. The specifications indicate stainless steel anchors, spaced at 18" on-center, for the stone veneer anchors. The design documents indicate a steel lintel support for the veneer at each floor level. Figure 3. View of stone veneer note vertical orientation of the grain. Exterior stone systems must be designed to withstand stresses affecting the building such as: self-weight of the stone veneer, pressure from wind loading, structural movements, thermal expansion and contraction, moisture migration and condensation, wet/dry cycles, and freeze/thaw cycles. To ensure that stone veneer systems are properly designed, material characteristics of the stone must be tested prior to the stones application on a building. The primary concerns with the veneer system included flaking of the stone veneer (delamination from the stone surface) falling off the building onto the ground below, some areas of large separations at mortar joints (reportedly increasing in size despite some efforts at previous repair), and progressive movement and deflection of stone veneer above openings. There were no reports of the sandstone delaminating at the structures and only limited amounts of delaminated sandstone were observed at the site in comparison with the limestone. The areas around the buildings are public spaces, some of which are gathering spaces and walkway areas which experience relatively high traffic volume. The delamination of the limestone was of sufficient size and frequency to be a potential danger to the public health, safety, and welfare. Laboratory Testing. Laboratory testing for the dimension stone (limestone and sandstone) was performed prior to construction, and some additional testing was performed during the investigation.

4 The project specifications indicate that both the limestone and sandstone are to be Classification II type stone. Considering limestone, the minimum compressive strength is indicated as 12,000 psi and the maximum absorption rate is listed as 5% in the specifications, although ASTM C 568 Standard Specification for Limestone Dimension Stone specifies a minimum compression strength of 4,000 psi and a maximum absorption rate of 7.5% for Classification II stone. The specifications for the sandstone were unclear due to conflicting stone types indicated in the drawings and specifications. Due to the limited occurrence of sandstone delamination, the testing performed during the investigation was focused primarily on the limestone material. Some of the pre-construction test data was available for review during the investigation of the stone failure. Pre-construction testing of the limestone indicated absorption rates of up to 6.3% and compressive strengths as low as 8,480 psi for the limestone. These test results indicate that the limestone does not meet the project specifications for compressive strength and absorption rate; however, the values from the testing do comply with the requirements of Classification II stone from ASTM C 568. Pre-construction testing for the sandstone indicated that the compressive strengths and absorption rates of the sandstone material complied with the requirements of a Classification II stone from ASTM C 616 Standard Specification for Quartz-Based Dimension Stone. As part of the investigation of the failed stone, samples of the sandstone and limestone were taken from the site and submitted to a testing laboratory for additional evaluation and testing. Samples of both limestone and sandstone were examined petrographically. During petrographic examination, the sandstone was determined to be of good quality. This testing also indicated that the internal layering is not pronounced and there does not appear to be a large percentage of impurities present in the sandstone. Based on this evaluation and the general lack of sandstone distress, further testing was not performed on the sandstone. The petrographic examination of the limestone indicated organic matter, carbon, ironcontaining minerals, and clay minerals distributed in the bedding planes. It was also determined that large iron-ore inclusions discovered in the stone could have a negative impact on the durability of the limestone. The limestone samples were tested for compressive strength and for absorption rate. The compressive testing was performed in accordance with C170 Standard Test Method for Compressive Strength of Dimension Stone. The results of the testing indicated that the limestone complied with the requirements of a Classification II stone per ASTM C 568 for both compressive strength and for absorption rate,

5 although some of the compressive strength results were below the 12,000 psi limit of the project specifications. ASTM C 568 also states that, "Limestone shall be sound, durable, and free of spalls, cracks, open seams, pits, or other defects that are likely to impair its structural integrity in its intended use." The limestone observed at the buildings does not comply with this requirement, as several stones were observed to have separations and spalls at the bedding planes (Figures 3-6). Delamination of Stone. Pieces of delaminated stone were noted all along the perimeter of the building (Figures 4 and 5). The stone debris at the surrounding ground was of various sizes, although it should be noted that the size of debris is misleading, as the stone shatters when it falls from the wall above and impacts the ground. The largest debris pieces observed were up to 7" in length (Figure 5) and were generally about 1/4" thick. All of the limestone veneer on the buildings has been observed to have the rift (or grain) in a vertical orientation. Figure 4. Pieces of delaminated limestone veneer on the ground. Figure 5. Piece of delaminated limestone measures 7" in length. As noted above, the dimension stone veneer was specified to be 2 1/2" 3" in

6 thickness. Stone thicknesses outside of this range were observed at the subject buildings, with stones as thin as 2". Active delamination was observed at the limestone veneer for the buildings. Figure 6 indicates a piece of limestone which has delaminated from the surface of a veneer stone, but has not yet fallen. This condition exists throughout the exterior veneer walls of both buildings. Figure 6. Delaminated limestone veneer at Building A. The delamination and distress at the sandstone was not as significant as at the limestone. Generally, the sandstone was performing adequately; however, other issues, such as a reduced bearing area due to the lack of a full mortar bed could contribute to future distress of the stone. It is our opinion that the full depth of the mortar joints is paramount to preserving the integrity of both the limestone and the sandstone. The mortar bedding is addressed below in the "Mortar" section. Expansion Joints. Another issue regarding the dimension stone veneer was expansion joint width. Horizontal expansion joints are indicated on the plans in the exterior walls at each floor level. The expansion joints occur where steel relief angles support the load of the veneer from floor-to-floor (approximately 16 ). The horizontal expansion joints occur under the veneer course that rests directly on the relief angle and serve to separate the two fields of stone veneer and transfer the veneer weight to the concrete structure of the building. The second floor expansion joint is indicated in the design documents for both structures to be 7/8" in width and the expansion joints at the third and fourth floors are indicated to be 3/4" wide. However, a subsequent revision note to the drawings indicates that horizontal expansion joints at all levels are to be 1/2" wide. During evaluation of the buildings, the horizontal expansion joints were measured to have joint widths typically less than that indicated on the plans. Some expansion joints were completely closed, that is, the stones on either side of the joint were in

7 direct contact (Figure 7). Also, expansion joint sealant material appeared compressed and was observed to be bulging at many joints. Delamination of the stones was observed at the corners of the joints where the stones were in contact. Figure 7. Delaminated stone pieces with no expansion joint. Some expansion joints were probed to determine if the joint extends the full depth of the stone veneer. Locations were observed where a knife probe could penetrate only 1/8" inward from the outer surface of the expansion joint sealant. Based on the observed conditions at other joints, it was likely that the stones were in contact behind the sealant, compressing the sealant out of the expansion joint and transmitting expansion stresses between the stone surfaces along the length of the joint. Alternatively, the expansion joints may be filled with mortar behind the sealant. Measurements of the expansion joints were commonly only 1/4" wide, and several joints were determined to not extend for the full depth of the stone. Also, at some expansion joints, stones were observed to be "buckling" (i.e. deflecting outward at the joint). The lack of proper expansion joints was contributing to the delamination of the stones at the corners. The lack of joints also causes increased stresses in the stone veneer when it experiences movement or expansion, such as related to temperature or moisture. Mortar. Mortar comprises only a small portion of a stone veneer wall; however, the influence of the mortar on the performance of the veneer wall is disproportionately large. Therefore, degradation or improper installation of the mortar can significantly impact the performance of a veneer wall. Masonry mortar is generally composed of cement, lime, sand, and water. Type I cement is the most common type used. Lime aids the workability and bonding characteristics of mortar and the only lime suitable for masonry work is Type S lime. The mortar specified for the site was Type N mortar with Type S lime. Considering masonry construction, the most important property of a masonry mortar is bond strength. Workmanship is an important factor in establishing the bond

8 between the mortar and adjacent stones, and full mortar joints must be provided at all contact surfaces for proper bonding (Beall, 1993). Various instances of loose, displaced mortar were noted along the east side of the veneer clad beams and columns. Mortar was observed missing at joints between the coping stones as well. Generally, the observed mortar bed depth was not in compliance with the depth required by the construction documents. Mortar joint separations measured up to 0.06" in width, and several locations were observed where the mortar had fallen completely out of the joint. At some locations, the pattern of the mortar displacement was indicative of differential movement between the coping stones (pre-cast stone) and veneer stone. Some samples of the loose mortar were collected and were typically observed to be only of partial depth of the full joint. Close observation of mortar samples indicated a typical intimacy of contact of 80%-90%; however, the intimacy of contact was as low as 60% at some locations. The most significant sections of missing mortar were observed at the corners of columns, however, large sections without mortar were observed at window openings and building corners also. Based on our observations, the primary causes of mortar displacement are the physical movement of the veneer stones in conjunction with insufficient mortar depth at the joints. The Project Specifications for both buildings stated that, the stone veneer should be set, " in full bed of mortar with vertical joints slushed full, unless otherwise indicated." Based on measurements from mortar samples taken from the site, the bed depth of the samples ranged from 1" to 3", and averaged 2" on one building and 1 5/8" on the other. Of the samples from both buildings, 64% had measured mortar depths of 2" or less. Figure 8 indicates a typical piece of mortar extracted from the joints, measuring only 1" in depth. The lack of full mortar joint depth indicates improper construction and contributes to a loss of strength in the overall veneer wall system. Incomplete horizontal mortar beds would also cause increased bearing stresses at the ends of the stone veneer. This could cause stress concentrations at the stone surface and could contribute to the failure of the stone along lamination planes.

9 Figure 8. Depth only 1" at extracted mortar. Veneer Anchorage and Support Separations and evidence of movement and rotation were observed at the coping stones and windowsill stones throughout both buildings. The material for the coping stones and windowsills was precast stone. Some coping stones could be easily displaced by prying with a screwdriver in the separated joint. The pattern and type of separations at some of the stone veneer were such that even a brief, non-intrusive evaluation raised concern over safety, especially at high-traffic areas. Further investigation was performed by removing stones or by observation with a scope at selected areas. Some of these are discussed below: Building maintenance personnel reported that there had been previous repairs to windowsill stones due to excessive movement. One area had reportedly moved 3"-4" outward from the building necessitating repair. No anchors were discovered during this repair and some remedial anchor clips were provided afterward. At other windowsill stones removed previously, the dowel pins called for in the architectural details were not observed during the repairs and no under-sill anchorage existed. Also, at some windowsill stones, evidence of further movement at repaired stones indicated that the remedial anchor clips were not performing adequately to anchor the stone. At the façade of one building, there was a veneer-clad wing wall above a fourth floor terrace area. This wall was topped with coping stones, with the top of the wall angled downward toward the exterior. There was a concrete beam running along the top of the wall (below the coping and veneer). A coping stone was removed from this wall to observe the anchorage of the coping and the condition at the wall cavity. The coping stone was easily removed and was determined to have no anchorage to the structure. Some of the other coping stones were scanned with a metal detector to locate veneer

10 anchors into the concrete beam and veneer; no fasteners were detected. At the corner of the fourth floor terrace (at the front façade and located over a high-traffic courtyard area), stone coping and angled veneer were present along the wall. The coping at this corner was observed up close from the terrace above and also with the use of an articulating boom man-lift. Separations and displaced mortar were noted at the joints between the angled veneer stones and between the coping stones. The veneer is angled 45 at this location (see Figure 9 to view the angled stone veneer). At the first stone from the corner, mortar was missing from most of the vertical joint and the second coping stone from the corner had apparently rotated outward. Evidence of residual moisture was observed at the joints between the coping and the angled veneer and also at the joints along the bottom of the angled veneer. These joints and the stone adjacent to the joints appeared to be saturated with water. A detail in the architectural plans illustrates a section through the sloped veneer and the coping. Per this detail, the angled stone is anchored to a metal stud wall at the bottom by a stainless steel anchor and is anchored into the coping stone at the top by a stainless steel anchor pin. In turn, the coping stone is indicated to be set flush against the concrete frame and anchored with a stainless steel anchor fastening the stone to the concrete. Also, the coping stones are indicated to be supported vertically at the concrete wall by a relief angle. There is no indicated anchorage to the relief angle to prevent lateral displacement. This detail occurred at other areas on both buildings, raising concerns around the building perimeters. Some mortar displacement was noted at the angled veneer at other areas, indicating possible movement. At the northeast corner, the stone at the corner was separated 1/4" and the horizontal mortar joint below had fractured, apparently from differential movement. This corner stone and the two stones adjacent were loose. They could be rotated slightly at the outside edge by hand. These stones, especially the corner stone, exhibited a range of rotational movement which was not consistent with the attachment detail indicated in the drawings for the building. A metal detector was used to locate the anchors for the coping stones and for the angled veneer. Generally, it was observed that there were two anchors along both the top and bottom of the angled veneer. However, at the corner coping stone, no anchor attachment was noted. Because the loose and rotating coping stones at the northeast corner were a concern, a block of the stone veneer at the east side of the corner was removed to allow visibility into the wall cavity and behind the coping. This removed 15" x 7" block was not anchored to the wall at the top or bottom and was only

11 supported by the mortar joints at the bottom and the sides and by the caulk material in the joint along the top of the stone. From this opening, the condition along the back side of the coping stones was visible. Metal shelf angles for the stone railing and for the coping at the edge were noted. Corrosion was observed at visible sections of the angles. Also, the coping was not set flush with the concrete frame and there was no anchor attachment visible from the coping into the concrete. The lack of a coping-to-concrete anchor was noted along the entire visible length at the back side of the coping. The conditions at this area of the building represented a danger to public health, safety, and welfare. Figure 9. Angled stone veneer at fourth floor. There is no mechanical horizontal anchorage to the concrete structure. The front fourth floor terrace of one structure had a stone balustrade, which separated from a storefront window system for a conference room. Large separations were observed at the vertical mortar joints in the wall below. A vertical column of three spacer stones bridged the gap between the balustrade and the storefront framing. Mortar was missing at the base of the stone assembly, indicating a lack of bearing support. The stones were easily moved and rotated by hand. Further investigation was performed from the building exterior, using the lift. It was noted that the stones were set on a relief angle below the balustrade. The stones were observed to bear on crumbling mortar, a significant amount of which was missing from the outside edge of the support. The gap between the stone and the relief angle was measured as 1/2" at the outer edge. Due to the obvious safety concern, the loose stones were removed immediately and were set onto the fourth floor balcony. As these stones were removed, the mortar application at the stone joints was determined to be inconsistent (i.e., uneven and incomplete "buttering" of the stones at the joints). Also, there was no anchorage from the spacer stones to the adjacent

12 baluster stones. A mortar sample was taken from the joints around the stones after they were removed. The mortar at this location was determined to be Type O mortar and was moderately soft, eroded severely with a high water-to-cement ratio, and of poorer quality than other mortar samples taken from the veneer walls. The quality of the mortar varied greatly even with in the relatively small sample. The veneer support was observable at a typical door header condition by using a boroscope to view the wall cavity. A steel angle lintel was observed behind the header stone. Observations in the cavity indicated that the angle was not set into the notch at the back side of the stone. Rather, a metal extension was apparently welded onto the edge of the angle and supported the stone at a notch in the back side of the header stone. This indicates a lack of coordination and/or workmanship during the installation of the veneer system. At the main ground level entry to one of the structures, separated and displaced dimension stone veneer was observed. The mortar joints in the stone veneer above the center opening were separated, and a downward movement of the veneer was observed in the approximate shape of an arch starting from the header course above the opening. Figure 10 below shows the displacement of the veneer above the entry and the loose mortar. The separations were measured, as 15/16" at horizontal joints and the mortar was loose and easily removed by hand. Some repairs had been done previously; however, the separations re-opened and the stone continued to displace. Although the support could not be seen from the wall cavity due to excessive mortar, similar details at other openings had a lack of full support for the stone. At one location above another entry door, a gap between the stone and the steel support lintel was observed. Figure 10. Veneer displacement and loose mortar above entry.

13 Conclusions The damage observed at the veneer systems for the subject buildings is related to both design issues and construction issues. The contributing factors to the stone delamination included the selection of the limestone material to be edge-set in the veneer system, the lack of full-depth mortar, and the lack of proper expansion joints. In addition to the delamination of the dimension stone, differential movement and displacement was observed at veneer which was not properly supported or anchored. The anchors specified at the coping and windowsill stones were not installed during the original construction of the buildings. Also, the dimension stone was visibly displaced at several openings due to a lack of proper vertical support. Differential movements in the dimension stone due to improper or non-existent anchorage and the lack of proper mortar depth has also caused mortar to be completely displaced from a significant number of mortar joints. Proper anchorage of the stones and proper installation of full depth mortar would have prevented this problem. The conditions at the dimension stone and coping at the veneer system created conditions which were potential dangers to the public health, safety, and welfare. This case study illustrates how design decisions and execution of support for heavy stone veneers can affect the safety of a building. Consideration and execution of fundamental issues related to exterior veneer material selection and the installation of a stone veneer system would have prevented all of the unsafe conditions. References Amrhein, James E. and Merrigan, Michael W. (1989). Marble and Stone Slab Veneer, Second Edition, Masonry Institute of America, Los Angeles, California. American Society for Testing and Materials (ASTM). (1999). ASTM C Standard Test Method for Compression Strength of Dimension Stone, Reapproved 1999, West Conshohocken, Pennslyvania. American Society for Testing and Materials (ASTM). (1999). ASTM C Standard Specification for Limestone Dimension Stone, West Conshohocken, Pennslyvania. American Society for Testing and Materials (ASTM). (1999). ASTM C Standard Specification for Quartz-Based Dimension Stone, West Conshohocken, Pennslyvania. Beall, Christine. (1993). Masonry Design and Detailing For Architects, Engineers,

14 and Contractors, Third Edition, McGraw-Hill, Inc. Bortz, Seymour A. and Wonneberger, Bernhard. (1997). "Laboratory Evaluation of Building Stone Weathering." Degradation of Natural Building Stone, Geotechnical Special Publication No. 72, American Society of Civil Engineers, Reston Virginia, Labuz, J.F. (editor) (1997). Degradation of Natural Building Stone, Geotechnical Special Publication No. 72, American Society of Civil Engineers, Reston Virginia. Marble Institute of America (MIA). (1999). Design Manual, Marble and Stone Slab Veneer, Marble Institute of America, Cleveland Ohio.

EAST LYME HIGH SCHOOL

EAST LYME HIGH SCHOOL Overview: 1971 N 1966 GYM 1966 CLASSROOM WING 1966 AUD. 1971 GYM 1998 1998 POOL EAST LYME HIGH SCHOOL Original 1966 Building: The original East Lyme High School was constructed in 1966 and was composed

More information

Investigation of Foundation Failure. Step 1 - Data Collection. Investigation Steps

Investigation of Foundation Failure. Step 1 - Data Collection. Investigation Steps Foundations on Expansive Clay Soil Part 3 - Investigation of Failed Foundations Presented by: Eric Green, P.E. Structural Engineer Slide 1 Copyright Eric Green 2005 Investigation of Foundation Failure

More information

PART 1 GENERAL 1.1 SECTION INCLUDES

PART 1 GENERAL 1.1 SECTION INCLUDES J-1 Section 09110 Long Form Specification INTERIOR METAL STUD FRAMING This section includes lightweight, usually 0.036 inch (0.9 mm) thick or lighter, non-axial load bearing metal stud framing including

More information

PART E SPECIFICATIONS

PART E SPECIFICATIONS PART E SPECIFICATIONS Page 1 of 5 PART E - SPECIFICATIONS GENERAL E1. APPLICABLE SPECIFICATIONS, STANDARD DETAILS AND DRAWINGS E1.1 The City of Winnipeg Works and Operations Division Standard Construction

More information

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing 1 Most basements show some signs of leaking and cracking. Through the years, problems with water, poor soils, grading, drainage and possible settling affect the integrity of a basement. Being able to recognize

More information

Building Condition Assessment: 215-219 West Lexington Street Baltimore, Maryland

Building Condition Assessment: 215-219 West Lexington Street Baltimore, Maryland KPA The Joint Venture of EBA Engineering, Inc. and Kennedy Porter & Associates, Inc. 4813 Seton Drive, Baltimore, MD 21215 Phone: (410-358-7171) Fax: (410)358-7213 Building Condition Assessment: Baltimore,

More information

Lighthouse Engineering, L.L.C.

Lighthouse Engineering, L.L.C. Registered Engineering Firm (F: 9334) Phone: 214-577-1077 Fax: 214-224-0549 Website: www.lighthouseeng.com Email: Office@LighthouseEng.com Thursday, September 04, 2014 TO: Our Client RE: Initial Engineering

More information

Structural Assessment Report

Structural Assessment Report Report Dallas Township Elementary School Dallas, Pennsylvania (JBCI Project No. 144911) 1655 Suburban Station Building 1617 John F. Kennedy Boulevard Philadelphia PA 19103 215 665 0497 5 Sandwood Drive

More information

Ver. 2. Guide to. Inspecting Residential Brick Veneer

Ver. 2. Guide to. Inspecting Residential Brick Veneer Ver. 2 Guide to Inspecting Residential Brick Veneer 1. A guide created by industry professionals. The knowledgeable staff at MASONPRO together with technical support from the Masonry Institute of Michigan

More information

Building Foundation and Structure

Building Foundation and Structure Building Foundation and Structure Overview The construction of the Hall of Waters building began in 1936, and was constructed over the original site of the Siloam and Sulpho-Saline Springs. The original

More information

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003) NCMA TEK National Concrete Masonry Association an information series from the national authority on concrete masonry technology CONCRETE MASONRY FOUNDATION WALL DETAILS TEK 5-3A Details (2003) Keywords:

More information

TECHNICAL BULLETIN. Oil Canning in Metal Roof and Metal Wall Systems. What Is Oil Canning?

TECHNICAL BULLETIN. Oil Canning in Metal Roof and Metal Wall Systems. What Is Oil Canning? TECHNICAL BULLETIN Oil Canning in Metal Roof and Metal Wall Systems What Is Oil Canning? Oil Canning can be defined as visible waviness in the flat areas of metal roofing and metal wall panels. In technical

More information

Guide for SOLID CONCRETE BLOCK SEALS

Guide for SOLID CONCRETE BLOCK SEALS Guide for SOLID CONCRETE BLOCK SEALS July, 2006 Mine Safety and Health Administration SOLID CONCRETE BLOCK SEAL Formersection 30 CFR 75.335(a)(1) specifies requirements for seals constructed using solid

More information

Mark Cramer Inspection Services, Inc.

Mark Cramer Inspection Services, Inc. Mark Cramer Inspection Services, Inc. 492 Twentieth Avenue, Indian Rocks Beach, FL 34635-2970 (727) 595-4211 Fax (727) 596-7583 Certified Member #12085 American Society of Home Inspectors Construction

More information

Vanishing Lid Trays Construction Methods with Tile or Masonry

Vanishing Lid Trays Construction Methods with Tile or Masonry 1-800-447-2838 Installation Instructions Vanishing Lid Trays Construction Methods with Tile or Masonry Table of Contents 1. Tools and Equipment...1 2. Vanishing Lid Trays...3 2.1 Materials for Finished

More information

Window Installation Instructions

Window Installation Instructions Caution The correct installation methods of windows in full frame or insert applications is critical towards achieving the tested performance of the window and longterm enjoyment and energy savings for

More information

Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training

Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training Foundations 65 5 FOUNDATIONS by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. 66 Foundations Foundations 67 FOUNDATIONS Let's assume that the retrofit has been done correctly from the roofline

More information

City of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures

City of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures City of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures SECTION 7201 - PURPOSE The purpose of this appendix chapter is to establish minimum prescriptive standards

More information

March 19, 2014. Ms. Jean McDonald CAP Management 910 16th Street, Suite 1010 Denver, Colorado 80202

March 19, 2014. Ms. Jean McDonald CAP Management 910 16th Street, Suite 1010 Denver, Colorado 80202 Ms. Jean McDonald CAP Management 910 16th Street, Suite 1010 Denver, Colorado 80202 Re: Prospector s Point Walkway/Façade Repairs Martin/Martin, Inc Project No.: 13.0358.S.02 Ms. McDonald: Per your request

More information

1997 Uniform Administrative Code Amendment for Earthen Material and Straw Bale Structures Tucson/Pima County, Arizona

1997 Uniform Administrative Code Amendment for Earthen Material and Straw Bale Structures Tucson/Pima County, Arizona for Earthen Material and Straw Bale Structures SECTION 70 - GENERAL "APPENDIX CHAPTER 7 - EARTHEN MATERIAL STRUCTURES 70. Purpose. The purpose of this chapter is to establish minimum standards of safety

More information

Introduction...COMB-2 Design Considerations and Examples...COMB-3

Introduction...COMB-2 Design Considerations and Examples...COMB-3 SECTION DIRECTORY General Information Introduction...COMB-2 Design Considerations and Examples...COMB-3 Combination Assembly Recommendations and Limitations Composite Configurations...COMB-4 Typical Sealant

More information

Photo courtesy of Delta Stone, Heber City, UT. Installation Solutions for: Manufactured Stone, Natural Thin Veneer, and Thin Brick

Photo courtesy of Delta Stone, Heber City, UT. Installation Solutions for: Manufactured Stone, Natural Thin Veneer, and Thin Brick Photo courtesy of Delta Stone, Heber City, UT Installation Solutions for: Manufactured Stone, Natural Thin Veneer, and Thin Brick THIN VENEER INSTALLATION SYSTEMS PREMIUM BONDING MORTARS Premium PCL Stone

More information

Page & Turnbull imagining change in historic environments through design, research, and technology

Page & Turnbull imagining change in historic environments through design, research, and technology DCI+SDE STRUCTURAL EVALUATIONS OFFICE BUILDING, TOOL SHED & WATER TANK, AND BLACKSMITH & MACHINE SHOP BUILDINGS SAN FRANCISCO, CALIFORNIA [14290] PRIMARY PROJECT CONTACT: H. Ruth Todd, FAIA, AICP, LEED

More information

Ceramic Glazed Brick Exterior Walls

Ceramic Glazed Brick Exterior Walls TECHNICAL NOTES on Brick Construction 13 1850 Centennial Park Drive, Reston, Virginia 20191 www.gobrick.com 703-620-0010 Ceramic Glazed Brick Exterior Walls Abstract: Buildings and other structures employ

More information

Chapter 36 - STRAW BALE CONSTRUCTION SECTION 3601 - PURPOSE. SECTION 3602 - SCOPE. SECTION 3603 - DEFINITIONS.

Chapter 36 - STRAW BALE CONSTRUCTION SECTION 3601 - PURPOSE. SECTION 3602 - SCOPE. SECTION 3603 - DEFINITIONS. Austin City Code - Volume II TITLE 25 LAND DEVELOPMENT\CHAPTER 25-12 TECHNICAL CODES\ARTICLE 1: UNIFORM BUILDING CODE\25-12-3 LOCAL AMENDMENTS TO THE BUILDING CODE Chapter 36 - STRAW BALE CONSTRUCTION

More information

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Architectural. Roofing. Basis of Design

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Architectural. Roofing. Basis of Design Basis of Design This section applies to roofing membranes, flashing and accessories. Design Criteria Adhere to the standards and details of the latest editions of the National Contractors Association (NRCA)

More information

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION General 7 www.meadowburke.com 877-518-7665 MB1109 CONCRETE FLOOR SLAB AND CASTING BED CONSTRUCTION Quality Construction Begins at Ground Level Everything

More information

Assessing Curtain Walls

Assessing Curtain Walls Assessing Curtain Walls Considerations and Best Practices Paul E Beers GCI Consultants, LLC pbeers@gciconsultants.com What is a Curtain Wall System? A curtain wall system is an outer covering of a building

More information

9.8.1.1. General (1) This Section applies to the design and construction of interior and exterior stairs, steps, ramps, railings and guards.

9.8.1.1. General (1) This Section applies to the design and construction of interior and exterior stairs, steps, ramps, railings and guards. Section 9.8. Stairs, Ramps, Handrails and Guards 9.8.1. Application 9.8.1.1. General (1) This Section applies to the design and construction of interior and exterior stairs, steps, ramps, railings and

More information

TITLE: MASONRY PARAPET WALLS AND FLAT ROOF REQUIREMENTS 11/1/09

TITLE: MASONRY PARAPET WALLS AND FLAT ROOF REQUIREMENTS 11/1/09 TITLE: MASONRY PARAPET WALLS AND FLAT ROOF REQUIREMENTS 11/1/09 PMT GUIDE # 10 Book of Order Section G-10.0102o: "The session is responsible for the mission and government of the particular church. It

More information

Building Condition Assessment: 109-111 North Howard Street Baltimore, Maryland

Building Condition Assessment: 109-111 North Howard Street Baltimore, Maryland KPA The Joint Venture of EBA Engineering, Inc. and Kennedy Porter & Associates, Inc. 4813 Seton Drive, Baltimore, MD 21215 Phone: (410-358-7171) Fax: (410)358-7213 Building Condition Assessment: Baltimore,

More information

Garver Feed Mill Condition Evaluation

Garver Feed Mill Condition Evaluation Garver Feed Mill Condition Evaluation OUTLINE Brick masonry overview Condition assessment & methodology Project overview Existing conditions Stabilization Probable costs Summary BRICK MASONRY OVERVIEW

More information

3 Masonry and Manufactured Stone (Interior and Exterior)

3 Masonry and Manufactured Stone (Interior and Exterior) 3 Masonry and Manufactured Stone (Interior and Exterior) 3.1 Efflorescence (a whitish crystalline powder) is present on masonry surfaces. Efflorescence commonly occurs on masonry surfaces. This is not

More information

STRUCTURAL ASSESSMENT

STRUCTURAL ASSESSMENT STRUCTURAL ASSESSMENT Project: 1432-1434 East Commerce St. Job. No: 122200 Location: San Antonio, TX Date: Dec. 10, 2012 Weather: Sunny, Windy,60 deg Performed by: Jeff Haughton and Frank Lamas, Alpha

More information

How to build a Pizza Oven in 4 days

How to build a Pizza Oven in 4 days How to build a Pizza Oven in 4 days Preparation day (slab) 1. Foundation 1500 deep x 1300 wide x 75mm deep Required 20 bags cement pre mix. If you already have a concrete base, you save this prep day DAY

More information

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM Chapter 9 STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM 9.1 BACKGROUND Steel is widely used in the construction of multi-storey buildings. However, steel construction is seldom used and is traditionally

More information

SECTION 3 ONM & J STRUCTURAL ANALYSIS

SECTION 3 ONM & J STRUCTURAL ANALYSIS Historic Boynton Beach High School Existing Building Assessment City of Boynton Beach February 10, 2011 SECTION 3 ONM & J STRUCTURAL ANALYSIS STRUCTURAL ENGINEERS SPECIAL INSPECTORS STRUCTURAL CONDITION

More information

Common Perils of Ceramic Floor Tile Systems. Parkway, Suite 220, Plano, Texas 75093; PH (469) 429-9000; email: bbarrett@architecturalengineers.

Common Perils of Ceramic Floor Tile Systems. Parkway, Suite 220, Plano, Texas 75093; PH (469) 429-9000; email: bbarrett@architecturalengineers. Common Perils of Ceramic Floor Tile Systems Bart B. Barrett, P.E. 1 and James M. Falls, E.I. 2 1 Central Florida Branch Director, Nelson Architectural Engineers, Inc., 2740 Dallas Parkway, Suite 220, Plano,

More information

Fire and Concrete Structures

Fire and Concrete Structures Fire and Concrete Structures Authors: David N. Bilow, P.E., S.E., Director, Engineered Structures, Portland Cement Association 5420 Old Orchard Road, Skokie, IL 60077,Phone 847-972-9064, email: dbilow@cement.org

More information

Brick Veneer Construction

Brick Veneer Construction Brick Veneer Construction Check list of suggested tools & support items Claw hammer Tape measure 3/4" [19 or 20] Wood chisel Wood or plastic shims Pry bar Utility knife Caulking and caulking gun Power

More information

Packaged Terminal Air Conditioner Wall Sleeve Installation

Packaged Terminal Air Conditioner Wall Sleeve Installation Installation & Maintenance Data IM 1196 Group: PTAC Part Number: 910141799 Date: October 2013 Packaged Terminal Air Conditioner Installation x 42" PGAN with Top-Mounted Hydronic Heat Note: Installation

More information

Roof Inspection. Summary Report

Roof Inspection. Summary Report www.real-estate-inspections.com Roof Inspection Summary Report Subject Property Prepared for: File Number: Client in Detroit 05-15-RF-004 Inspector: Craig Milliken, PE # 32779 CPM Real Estate Inspections,

More information

MUNICODE SERVICES LTD.

MUNICODE SERVICES LTD. The Preserved Wood Foundation Guide MUNICODE SERVICES LTD. Prepared by MuniCode Services Ltd. Outline and Restrictions of this Guide The following information required for the construction of Preserved

More information

Technical Notes 3B - Brick Masonry Section Properties May 1993

Technical Notes 3B - Brick Masonry Section Properties May 1993 Technical Notes 3B - Brick Masonry Section Properties May 1993 Abstract: This Technical Notes is a design aid for the Building Code Requirements for Masonry Structures (ACI 530/ASCE 5/TMS 402-92) and Specifications

More information

Wastewater Capital Projects Management Standard Construction Specification

Wastewater Capital Projects Management Standard Construction Specification CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,

More information

PELHAM MEMORIAL HIGH SCHOOL STONE FAÇADE REPORT. November 2007

PELHAM MEMORIAL HIGH SCHOOL STONE FAÇADE REPORT. November 2007 PELHAM MEMORIAL HIGH SCHOOL STONE FAÇADE REPORT November 2007 PURPOSE OF INVESTIGATION Determine possible locations of moisture intrusion into and through facade. Determine cause of horizontal and vertical

More information

The Impact of Market Demands on Residential Post-Tensioned Foundation Design: An Ethical Dilemma

The Impact of Market Demands on Residential Post-Tensioned Foundation Design: An Ethical Dilemma The Impact of Market Demands on Residential Post-Tensioned Foundation Design: An Ethical Dilemma Bart B. Barrett, B.S., P.E.1 Kerry S. Lee, M.B.A., P.E., M. ASCE2 Erik L. Nelson, Ph.D., P.E., M. ASCE3

More information

Installation Solutions for: Manufactured Stone, Natural Thin Veneer, and Thin Brick ARCHITECTURAL SPECIFICATIONS / CAD MODELS TVISTM WARRANTIES

Installation Solutions for: Manufactured Stone, Natural Thin Veneer, and Thin Brick ARCHITECTURAL SPECIFICATIONS / CAD MODELS TVISTM WARRANTIES ARCHITECTURAL SPECIFICATIONS / CAD MODELS With more than 40 years of manufacturing high quality, innovative building products in the commercial and residential markets, Custom Building Products TVISTM

More information

Project Report. Structural Investigations Hotel del Sol Yuma, Arizona

Project Report. Structural Investigations Hotel del Sol Yuma, Arizona Project Report Structural Investigations Yuma, Arizona Prepared by: 2619 Spruce Street Boulder, CO 80302 303-444-3620 Prepared for: Principle Engineering Group, Inc. 833 East Plaza Circle, Suite 100 Yuma,

More information

cement Masonry Cement Engineered for quality and reliability, Lafarge cements for masonry deliver consistent performance. page 2 Lafarge Cement

cement Masonry Cement Engineered for quality and reliability, Lafarge cements for masonry deliver consistent performance. page 2 Lafarge Cement cement Masonry Cement Engineered for quality and reliability, Lafarge cements for masonry deliver consistent performance. page 2 Lafarge Cement Lafarge in North America The Lafarge Group is the world leader

More information

JANUARY, 2016 TR-7100 Windows (Fixed) 1 EC 97909-071 085113 ALUMINUM WINDOWS Guide Specs

JANUARY, 2016 TR-7100 Windows (Fixed) 1 EC 97909-071 085113 ALUMINUM WINDOWS Guide Specs JANUARY, 2016 TR-7100 Windows (Fixed) 1 EC 97909-071 085113 ALUMINUM WINDOWS Guide Specs SECTION 085113 ALUMINUM WINDOWS This suggested guide specification has been developed using the current edition

More information

Avoiding Air Barrier Pitfalls

Avoiding Air Barrier Pitfalls Avoiding Air Barrier Pitfalls Design & Durability November 2013 Air barriers, when correctly installed, help buildings achieve high levels of energy efficiency by decreasing heat loss. For example, great

More information

The Difference Between Cast Stone and Adhered Manufactured Stone Masonry Veneer

The Difference Between Cast Stone and Adhered Manufactured Stone Masonry Veneer Submitted 9/16/08 For publication - Feb 2009 Masonry Construction Magazine by Bill Russell Chairman, Cast Stone Institute Committee on Educational Standards On many construction documents today, there

More information

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL 7.0 7.1 GENERAL For the purpose of this manual, culverts are defined as structures that are completely surrounded by soil and located below the surface of the roadway parallel to the general direction

More information

LAYING BLOCK AND BRICK

LAYING BLOCK AND BRICK LAYING BLOCK AND BRICK Products highlighted in this section: SAKRETE Type N Mortar Mix SAKRETE Type S Mortar Mix Brick And Block Laying Basics The first step in building a brick or block wall is to construct

More information

Reference: BRM-00220488-A0 July 18 th, 2014. Cursory Visual Review of Various Below Grade Spaces and Exposed Foundation Walls

Reference: BRM-00220488-A0 July 18 th, 2014. Cursory Visual Review of Various Below Grade Spaces and Exposed Foundation Walls Reference: BRM-00220488-A0 July 18 th, 2014 Toronto Catholic District School Board 80 Sheppard Avenue East Toronto, Ontario M2N 6E8 Re: 1.0 Introduction Exp Services Inc. (exp) was retained by the Toronto

More information

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM Shepherd University Board of Governors June 9, 2005 Agenda Item No. 9 SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM In 1994 construction began on the Byrd Science and

More information

Chapter. Restoration of Damaged Structures

Chapter. Restoration of Damaged Structures 5 Chapter Restoration of Damaged Structures Bringing back a damaged structure to its pre-earthquake state and original strength is called restoration. This is the first step of building rehabilitation.

More information

Waterproofing Problems: A Simple Explanation, A Simple Solution

Waterproofing Problems: A Simple Explanation, A Simple Solution Waterproofing Problems: A Simple Explanation, A Simple Solution The purpose of this paper is to point out the underlying causes of waterproofing problems and simple means of preventing them. Such problems

More information

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing Substrate, structural panel, bonded waterproofing The universal substrate for tiles Perfect covering No matter whether you work with mosaics or large format tiles, an absolutely level substrate with straight

More information

Structural Failures Cost Lives and Time

Structural Failures Cost Lives and Time Structural Failures Cost Lives and Time Recent failures of storage bins, silos and other structures highlight the need to increase awareness of hazards associated with these structures. Since 2010, one

More information

Safe & Sound Bridge Terminology

Safe & Sound Bridge Terminology Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries

More information

DE Frame with C Series Sidelight

DE Frame with C Series Sidelight TOOLS REQUIRED Tape measure 6' magnetic level 3' magnetic level Screw gun with clutch adjusted #2 phillips tip #3 phillips tip Screwdriver (used to adjust frame on will using oval slots) Pry Bar Powder

More information

201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE

201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE STRUCTURAL INSPECTION REPORT DRAFT 201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE TOWN OF PRESCOTT Date: November 2013 GENIVAR No.: 131-20617-00 2611 Queensview Drive, Suite 300, Ottawa,

More information

CPA Steel Stud Framing Page 1 of 11

CPA Steel Stud Framing Page 1 of 11 CPA Steel Stud Framing Page 1 of 11 STEEL STUD FRAMING General Requirements City of Palo Alto (CPA) Building Inspection Division 285 Hamilton Ave. Inspection Request: 650 329-2496 Building Division IVR#

More information

Lighthouse Engineering, L.L.C.

Lighthouse Engineering, L.L.C. Wednesday, August 20, 2014 Lighthouse Engineering, L.L.C. Michael Gandy, P.E. Registered Professional Engineer (TX: 95672) Registered Engineering Firm (F: 9334) Phone: 214-577-1077 Fax: 214-224-0549 Website:

More information

AMERICAN GOTHIC PLAYHOUSE

AMERICAN GOTHIC PLAYHOUSE AMERICAN GOTHIC PLAYHOUSE Project Plan #856 Sheet 1 of 5 Pick a spot and get started with the beautiful that your kids will love. The design of the playhouse includes 35 square feet of interior space plus

More information

Fiberglas, Exterior Wall Thermal Insulation

Fiberglas, Exterior Wall Thermal Insulation PROJECT ENGINEER RESPONSIBILITY: This is a general specification guide, intended to be used by experienced construction professionals, in conjunction with good construction practice and professional judgment.

More information

4.3.5 - Breakaway Walls

4.3.5 - Breakaway Walls 4.3.5 - Breakaway Walls Elevation of a structure on a properly designed foundation reduces the potential for water damage from flooding. When the space below the lowest elevated floor is maintained free

More information

National Home Builder - Name Wednesday, August 20, 2014 Regional Customer Care Manager 1234 Main Street Houston, Texas 77067

National Home Builder - Name Wednesday, August 20, 2014 Regional Customer Care Manager 1234 Main Street Houston, Texas 77067 Lighthouse Engineering, L.L.C. Michael Gandy, P.E. Registered Professional Engineer (TX: 95672) Registered Engineering Firm (F: 9334) Phone: 214-577-1077 Fax: 214-224-0549 Website: www.lighthouseeng.com

More information

Diameter. Swift Lift Round Recess Plug. Note: The diameter of the narrow recess plug is the same as the diameter of the round recess plug.

Diameter. Swift Lift Round Recess Plug. Note: The diameter of the narrow recess plug is the same as the diameter of the round recess plug. P-5 The P-5 is hot forged from carbon steel. The formed head provis spherical seating that the Lifting Eye engages, while a disc-shaped foot is embedd in the concrete. Due to its being a forged part, the

More information

RESIDENTIAL MASONRY A BEST PRACTICES GUIDE

RESIDENTIAL MASONRY A BEST PRACTICES GUIDE RESIDENTIAL MASONRY A BEST PRACTICES GUIDE Build With Brick Build With Boral CONTENTS BRICK :01 MASONRY CEMENT :03 MASONRY SAND :04 WALL TIES :05 STEEL LINTELS :07 DRAINAGE WALL SYSTEM :09 FLASHING :11

More information

Adding Brick Veneer to Existing Construction

Adding Brick Veneer to Existing Construction TECHNICAL NOTES on Brick Construction 1850 Centennial Park Drive, Reston, Virginia 20191 www.gobrick.com 703-620-0010 28A April 2008 Adding Brick Veneer to Construction Abstract: This Technical Note presents

More information

6 RETROFITTING POST & PIER HOUSES

6 RETROFITTING POST & PIER HOUSES Retrofitting Post & Pier Houses 71 6 RETROFITTING POST & PIER HOUSES by James E. Russell, P.E. 72 Retrofitting Post & Pier Houses Retrofitting Post & Pier Houses 73 RETROFITTING POST AND PIER HOUSES This

More information

STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM Installed in Pre-engineered Steel Buildings Provides Lowest Cost Construction Method for CORROSIVE AND WET Environments PREFERRED SOLUTIONS, INC.

More information

GOOD NEWS BUT NOT ALWAYS

GOOD NEWS BUT NOT ALWAYS GOOD NEWS BUT NOT ALWAYS The prospective homebuyer and homeowner in the Amarillo area are indeed fortunate. Typically, he has a wide choice of type home, size, and location for wide ranges of pricing.

More information

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit R-H-DI1 INSULATION BATT NR-E-IB1 Avoid Using Batt Insulation With Metal Framing Batt insulation should not be used with metal framing systems. Although it is common to see fiberglass batt insulation installed

More information

Design and Construction of Cantilevered Reinforced Concrete Structures

Design and Construction of Cantilevered Reinforced Concrete Structures Buildings Department Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-68 Design and Construction of Cantilevered Reinforced Concrete Structures

More information

FAÇADE CONDITIONS. An Illustrated Glossary of Visual Symptoms. Edited by Dan Eschenasy, PE Chief Structural Engineer NYC Department of Buildings

FAÇADE CONDITIONS. An Illustrated Glossary of Visual Symptoms. Edited by Dan Eschenasy, PE Chief Structural Engineer NYC Department of Buildings FAÇADE CONDITIONS An Illustrated Glossary of Visual Symptoms Edited by Dan Eschenasy, PE Chief Structural Engineer NYC Department of Buildings 1 1. Intent, Scope and Purpose This glossary is intended to

More information

Schluter -KERDI-BOARD Substrate, building panel, bonded waterproofing

Schluter -KERDI-BOARD Substrate, building panel, bonded waterproofing Schluter -KERDI-BOARD Substrate, building panel, bonded waterproofing Schluter -KERDI-BOARD The universal substrate for tiles Flat. Level. Plumb. Square. No matter the quality, cost, or extravagance of

More information

PANELIZED HOME INSTALLATION GUIDELINE

PANELIZED HOME INSTALLATION GUIDELINE PANELIZED HOME INSTALLATION GUIDELINE A typical home package will be constructed of Snap-N-Lock Insulated Panels clad with steel skins. 4" panels will be used for the walls, and 6" panels for the roof.

More information

HEDDERMAN ENGINEERING, INC. www.heddermanengineering.com Office 281-355-9911, Fax 281-355-9903 office@heddermanengineering.com

HEDDERMAN ENGINEERING, INC. www.heddermanengineering.com Office 281-355-9911, Fax 281-355-9903 office@heddermanengineering.com HEDDERMAN ENGINEERING, INC. www.heddermanengineering.com Office 281-355-9911, Fax 281-355-9903 office@heddermanengineering.com, 2011 TO: Mr. REF: CONDITION OF PROPERTY SURVEY Dear Mr. : At your request,

More information

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

CONCRETE SEGMENTAL RETAINING WALL SYSTEM CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Work shall consist of furnishing and constructing a Rockwood Vintage TM unit segmental retaining wall (SRW)

More information

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs February 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements...................................

More information

DESIGNING STRUCTURES IN EXPANSIVE CLAY

DESIGNING STRUCTURES IN EXPANSIVE CLAY DESIGNING STRUCTURES IN EXPANSIVE CLAY A GUIDE FOR A RCHITECTS AND E NGINEERS Table of Contents 1. Introduction Page 1 2. Common Foundation Systems Page 2 3. Drilled Piers Page 3 a. Skin Friction Piers

More information

Section 5A: Guide to Designing with AAC

Section 5A: Guide to Designing with AAC Section 5A: Guide to Designing with AAC 5A.1 Introduction... 3 5A.3 Hebel Reinforced AAC Panels... 4 5A.4 Hebel AAC Panel Design Properties... 6 5A.5 Hebel AAC Floor and Roof Panel Spans... 6 5A.6 Deflection...

More information

TFL CUSTOM FIREPLACES WITH MASONRY BRICK LININGS. standard INSTALLATION SPECIFICATION INTO TIMBER FRAMING

TFL CUSTOM FIREPLACES WITH MASONRY BRICK LININGS. standard INSTALLATION SPECIFICATION INTO TIMBER FRAMING 6.CW.1A TFL CUSTOM FIREPLACES WITH MASONRY BRICK LININGS wood or gas standard INSTALLATION SPECIFICATION INTO TIMBER FRAMING The Fireplace Ltd is able to design and fabricate custom brick open masonry

More information

Metropolitan Builders Association Masonry & Concrete Standard

Metropolitan Builders Association Masonry & Concrete Standard Metropolitan Builders Association Masonry & Concrete Standard Background Masonry and concrete work in residential construction often provides the base structure upon which the house is built or as a veneer.

More information

ASTM E 1886 and ASTM E 1996 TEST REPORT. Rendered to: NORSE, INC.

ASTM E 1886 and ASTM E 1996 TEST REPORT. Rendered to: NORSE, INC. Architectural Testing ASTM E 1886 and ASTM E 1996 TEST REPORT Rendered to: NORSE, INC. SERIES/MODEL: Flush Mount/Surface Mount PRODUCT TYPE: Hurricane Shutter Fastening System This report contains in its

More information

K2 STONE NATURAL VENEER

K2 STONE NATURAL VENEER INTRODUCTION WHAT IS K2 NATURAL THINSTONE VENEER? Natural K2 Stone veneer is real stone, cut 1 inch thick, making it light enough to be installed as a veneer. Sometimes referred to as thin veneer, thin

More information

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel

More information

SECTION 07 42 13 METAL WALL PANELS

SECTION 07 42 13 METAL WALL PANELS Mitsubishi Plastics Composites America, Inc. 401 Volvo Parkway Chesapeake, VA 23320 Phone: (800) 422-7270 Fax: (757) 436-1896 E-mail: info@alpolic.com www.alpolic-northamerica.com This MANU-SPEC utilizes

More information

September 1, 2003 CONCRETE MANUAL 5-694.900 CONCRETE PAVEMENT REHABILITATION 5-694.900

September 1, 2003 CONCRETE MANUAL 5-694.900 CONCRETE PAVEMENT REHABILITATION 5-694.900 September 1, 2003 CONCRETE MANUAL 5-694.900 5-694.901 GENERAL CONCRETE PAVEMENT REHABILITATION 5-694.900 Concrete Pavement Rehabilitation is an extremely valuable tool of the Minnesota Department of Transportation

More information

The WANZ Guide to Window Installation

The WANZ Guide to Window Installation The WANZ Guide to Window Installation as described in E2/AS1 Amendment 5 Ver. 1.1 Page 2 of 74 Contents Overview Page 5 Objective Page 5 Scope Page 5 Opening Preparation Page 7 Step P1 Preliminary Check

More information

Architectural Condition Survey

Architectural Condition Survey Architectural Condition Survey Santa Fe Railroad / AMTRAK Depot, Lawrence. Kansas for the City of Lawrence, 2002 Survey: (student) PI: William Carswell, Associate Dean, School of Architecture, University

More information

Heating Load Calculation

Heating Load Calculation Heating Load Calculation ME 425 Air Conditioning System Design Keith E. Elder, P.E. Heating Load Calculation The heating load calculation begins with the determination of heat loss through a variety of

More information

Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. The Leading Edge.

Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. The Leading Edge. TM TM Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. SM The Leading Edge. 10 One Major Causes of foundation settlement or more conditions may

More information

14 September 2015. Sarah Zorn Planning and Economic Development 25 West Fourth Street, Ste. 1100 St. Paul, MN 55102

14 September 2015. Sarah Zorn Planning and Economic Development 25 West Fourth Street, Ste. 1100 St. Paul, MN 55102 Sarah Zorn Planning and Economic Development 25 West Fourth Street, Ste. 1100 St. Paul, MN 55102 Project No.: 15538.00 Re: Structural Condition Review of the building at 700 4 th St. E. Dear Sarah: We

More information

Chapter 2 Basis of design and materials

Chapter 2 Basis of design and materials Chapter 2 Basis of design and materials 2.1 Structural action It is necessary to start a design by deciding on the type and layout of structure to be used. Tentative sizes must be allocated to each structural

More information

Minor Cracks in Horizontal Surfaces

Minor Cracks in Horizontal Surfaces Cracks, chips and broken or flaking areas in concrete are not only unsightly, they can lead to further deterioration of the surface. The result is a costly replacement project as opposed to a simple repair.

More information