JTAG Connector Engineering Design Progress Report March 7, 2011

Size: px
Start display at page:

Download "JTAG Connector Engineering Design Progress Report March 7, 2011"

Transcription

1 Portland State University JTAG Connector Engineering Design Progress Report March 7, 2011 A Joint Project with the Intel Corporation Hawthorn Farm Campus Group members: David Stepnowski Jeremiah Martin Khaled Alshaiban Long Nguyen Tinh Tran Intel Sponsors: Michelle L. Seale Frank W. Joyce PSU Advisor: Chien Wern Winter 2011

2 Executive Summary The JTAG project was proposed to the Mechanical Engineering Department at PSU by Intel. Its objective is to design a hand operated device that can reduce the connecting time between a JTAG testing board and a test circuit board. Intel currently employs a process which involves attaching a small testing circuit board, called a surfboard, and block of contact pins using nuts and bolts for attachment to the circuit board to be tested. This process takes three to four minutes. A reduction of the overall connecting time to less than 30 seconds is desired. There is very little space available near the pad contact area of the circuit boards to be tested, which acts as an important constraint on possible designs. The following document outlines the progress of the JTAG project and describes the design process that the JTAG team has followed. The JTAG capstone team has completed the following: a Product Design Specification (PDS) document, internal and external research, and concept evaluation and selection. All milestones were achieved on time. The external research was performed to identify any related products and to quantify their ability to meet the design criteria outlined in the PDS report. None of the products identified in the external research were capable of meeting all the necessary requirements. The internal research phase yielded 17 concepts. Concept screening, evaluation, and selection processes were preformed to reduce the original 17 designs down to one. The Holding Block design received the highest ratings in the selection process and was selected to move onto the detailed design phase. The Holding Block design will incorporate the surfboard and pin block components that are used in the current process. The Holding block design concept is in compliance with the PDS document. The design is expected to: have an application time of less than 30 seconds, exceed the life cycle target of 1000 duty cycles, require no maintenance over the life cycle, and provide a consistent and evenly distributed contact force. A simplified model of the selected design was presented to the customer at Intel and was well received. 1

3 Contents EXECUTIVE SUMMARY... 1 INTRODUCTION... 3 MISSION STATEMENT... 4 PROJECT PLAN... 4 PDS SUMMARY... 5 EXTERNAL SEARCH... 5 INTERNAL SEARCH... 7 TOP LEVEL DESIGN EVALUATION DETAILED DESIGN PROGRESS CONCLUSION BIBLIOGRAPHY APPENDICES

4 Introduction JTAG, also known as boundary-scan, is a name given to the IEEE standard (1). The name is taken from Joint Test Action Group, the body that originally created the standard (2). JTAG is used for board level testing. The current method in use at Intel to make board connections for JTAG testing involves the installation of a small circuit board (called a surfboard) to the device under test (DUT). There are two disadvantages of this method that are desirable to improve. Firstly, the surfboard is attached to the DUT with screws and nuts, which require the operator to use a screwdriver to remove the surfboard after every PCB (printed circuit board) is tested. Some DUTs are composed of two printed circuit boards clamped together by nuts and bolts, so they also need to be disassembled before the surfboard can be connected. This installation and removal process is considered overly time consuming. Secondly, the assembly includes many small components that have a possibly of being misplaced. Therefore, the objective of this project is to produce a prototype that will decrease the connection/disconnection time and reduce the probability of lost components while maintaining signal integrity. The JTAG connector must also be capable of attaching to a variety of PCB assemblies as shown in Figure 1. PCB Fasteners DUT Fasteners Surfboard Figure 1: Shows the current method used to fasten a JTAG Surfboard to a bi-level PCB test assembly. 3

5 Mission statement The JTAG capstone team will design a small hand operated device that will attach testing connectors to a circuit board. The time to apply or remove the testing connectors must be shorter than the currently employed methods. This device should not require operator assembly to function and needs to provide sufficient contact force to maintain signal integrity between the surfboard and the test PCB. This device must not interfere with any existing components on the circuit board and must meet Intel s ergonomic requirements. A working prototype of the connector will be delivered to Intel s representatives no later than June Project Plan The following project milestones have been completed: PDS report, external/internal research and final concept evaluation. The next phase of the project is detailed design. During this phase of the project the final selected design will be broken down into functional subsystems. Each one of these subsystems will be subject to an individual engineering design optimization process. Models of these detailed designs will be created in a 3D format using the CAD software, SolidWorks. These solid models will be utilized in the fabrication of the first prototypes. System level detailed designs are to be finished and discussed with the sponsors by April 12th. The first prototypes are to be fabricated no later than April 28th, allowing time for design optimization, revision and testing. The final prototype design will be accompanied by a user's guide and other documentation that outlines the functional specifications for the JTAG connector. The deliverables will be handed over to the project team sponsors at Intel during the week of June 13th, The project schedule may be subject to change, if unforeseen complications arise. Currently, the project is on schedule and within budget. 4

6 PDS Summary The purpose of the Product Design Specification (PDS) is to focus the efforts of the design team on creating a product that best suits the customer's needs. The PDS report is referenced at every step of the design process to validate design decisions and create design evaluation and selection metrics. Adhering to the process of referencing the PDS, making design decisions, and validating design decisions will ensure a prototype of the JTAG connector that should meet and/or exceed all the customer's needs. A summary of the Product Design Specification table can be found in Appendix 1. External Search The external search presented a wide range of solutions to the JTAG connecter issue. An external search was performed to indentify competing and related products. Currently, there are many products which are designed to provide electrical connections between printed circuit boards. The following are three examples of devices found: 1. Tyco Electronics HXC125 Board-to-Board Connector Mechanism: Using a medium connector between the boards to provide electrical connection, the boards are clamped together by 2 small rods and a spring plate. Comments: This design can provide sufficient contact force and satisfy the space requirement. However, operators would have difficulties in dealing with several small components. Figure 2: Tyco Electronics' HXC125 Board-to-board connector 5

7 2. Quick Release Fasteners: Mechanism: The printed circuit boards are clamped together by bolts with locks at the ends as shown in Figure 3. The locks are triggered by either turning or pushing the caps at the head of the bolt, depending on the specific model. Comments: This device offers a quick assembly time and is Figure 3: Cam-lock Quick Release Fasteners easy to handle. However, because of the very small size of locking elements, the contact force and clamping force may not be maintained. 3. Bed of Nails: Mechanism: The two boards that need to be connected are held in two separate plates. The operator pulls the lever to bring the plates close together. The pins in the upper plate would provide electrical connections. Comments: Operation on the Bed of Nails is fast and simple with high precision. The main disadvantage of this design is its size. The equipment would not fit within allowable workbench area. Figure 4: X-Test Bed of Nails 6

8 As can be seen, none of the researched products were capable of meeting all the requirements outlined in the PDS report (Appendix 1). Sub-systems of each design documented in the external search were evaluated and used in later brainstorming sessions. Internal Search The PDS criteria were analyzed, discussed, and resulted in several brainstorming sessions to develop design concepts. These efforts produced 17 designs for the JTAG connector. These designs fell into three basic categories: table mount jigs capable of holding and supporting the test assembly; small hand held connectors that used springs, cams, and levers to apply contact force; and devices that use locking pin assemblies to fasten a surfboard to a test PCB. Top Level Design Evaluation Concept Screening After having produced 17 designs the team began initial screening of the designs. Initially similar designs were combined, giving the combined designs the best features of the similar designs. In the next step of the screening process, each member of the JTAG team was allotted 10 points to grade the feasibility of each design. The five designs that received the highest point ratings were chosen to move on to the concept evaluation phase of the project. Detailed drawing and functional explanations of these five concepts can be found in Appendix 2. Final Design Evaluation The goal of the final design evaluation was to select a single design concept using an unbiased systematic approach. The following steps explain the process that was followed in evaluating and selecting the final design. Seven PDS criteria were selected based on importance and scalability to characterize and evaluate the form and function of the JTAG connector. A 10 point grading system was then used to assign individual weighted values to the seven criteria. Each criterion was then assigned a scalable metric or metric 7

9 system. The following list shows the seven PDS criteria that were selected, their individual weights, and associated metric or metric system: Application Time; Estimated time spent by an operator to apply the JTAG connector. o Weight: 3.5 o Metric: The PDS criteria target requires an application time of less than 30 seconds. Each team member was timed while acting out a mock assembly process. Their times were normalized with the PDS target value of 30 seconds. This quotient was then subtracted from 1 and then multiplied by 5 to arrive at score. Ease of Use: Educated guess as to the operational ease of use. o Weight: 1.5 o Metric: This criterion was broken down into 3 sub-categories: A.) Required effort to operate the connector (e.g. repetitive motion or application of excessive force). B.) Effort spent on locating the board in the device and aligning the connection holes. C.) Accessibility to the DUT after assembly for further testing. The three sub categories were given individual weighted values based on a 5 point scale. The weighted values of the three subcategories are (A = 2), (B = 3), and (C = 4). o Each design concept was evaluated using the 3 sub-categories and received 0-5 points, 5 being the best grade. The 3 sub-category point values were summed and divided by 15. This normalized point value was then multiplied by 5 to get a total score for the main Ease of use criterion. Life Cycle: The ability of the connector to meet or exceed the PDS target of 1000 cycles before replacement. o Weight: 1.04 o Metric: A thought experiment was done on each of the design concepts to determine likely points of failure. The JTAG team members then assigned 8

10 each design concept a value of 1-5. A score of 5 indicating that a design would be less likely to fail during the first 1000 operational cycles. Supports the Weight of the Test Assembly: The ability of the design concept to support the weight of the PCB without causing damage to any part of the assembly. o Weight: 0.72 o Metric: A thought experiment was done for each concept design to determine the likelihood of catastrophic failure in the connector. The JTAG team members then assigned each concept design a value of 1-5. A point value of 5 subjectively indicating a design that is impervious to catastrophic failure. Cost: The cost of prototyping, and manufacturing. o Weight: 1.0 o Metric: The total cost is broken down into two categories: prototype cost, and manufacturing cost. Prototype Cost: Assumptions #1: Shop or machining time cost $100 per hour. Each machined feature takes 15 minutes to complete. Refer to Appendix 4 for an example of the cost calculation. Manufacturing Costs: Assumptions #2: Costs are proportional to the prototyping cost depending on the manufacturing processes involved in mass production. The proportionality constant is a value of = 0.1 to 1. A value of = 1 would indicate that each new connector would cost as much as the first to manufacture. The grading of the Cost criteria for each of the design concepts is completed by first calculating the prototyping cost using Assumption #1. The manufacturing cost is then calculated by finding the product of the prototyping cost and the manufacturing cost proportionality constant ( ) using Assumption #2. The sum of the prototyping cost and 9

11 manufacturing cost is given a relative score of 1 to 5. A score of 5 indicating that the design will be relatively inexpensive compared to the other designs. Refer to Appendix 4 for an example of the total cost calculation. Maintenance: Whether or not the design concept will require maintenance before its life cycle is complete. o Weight: 0.64 o Metric: A thought experiment was done on each of the design concepts to determine the likelihood of required maintenance. Factors taken into consideration during the thought experiment were: number of total parts, number of moving parts, durability of design, and materials used in construction. A subjective value of 1 through 5 was given to each of the designs. A value of 5 indicating that the design concept would not require maintenance. Contact Force: The criterion was subdivided into two separate categories: consistency and distribution. Each sub-category was weighted evenly o Weight: 1.6 o Metric: Consistency and Distribution Consistency refers the ability of the design concept to apply a consistence force over the life cycle of the connector. Distribution refers to the ability of the design concept to apply an evenly distributed load over the contact area. The JTAG team members then assigned each design concept a value of 1-5 for each sub-category. The sum of the two subcategories scores was normalized and multiplied by 5. A high score of 5 for this criterion indicates that the design applies a constant, evenly distributed contact force over the contact area. A low score for this criterion indicates that the design could apply an inconsistent contact force, or one away from the pad area. 10

12 Design Evaluation Decision Matrix Each design concept was scored on a scale of 1 to 5 using the PDS criteria explained in the Final Design Selection section. The total rating for a design concept was determined by summing the products the PDS criteria weights and design concept ratings. The design evaluation decision matrix is shown below in Table 1. Table 1: Shows the design evaluation decision matrix. Each of the design concepts (A) through (E) were scored on a scale of 1 to 5 according the metrics outlined in section in the Final Design Selection section. A rating of 5 indicates excellent performance and a rating of 1 indicates poor performance. Decision Criteria Weight A) Table Mount Jig (B)Vertical Sliding Clip Design Concepts Rating (5-0) (C) Hook Frame (D) Holding Block (E) Hand Held Clip Application Time Ease of Use Life cycle Supports Weight Cost Maintenance Contact Force Total Results of Design Evaluation The results of the design evaluation, as shown in Table 1, indicate that the design concept D, the Holding Block, is the highest ranking design. A detailed drawing and a functional explanation for the Holding Block design can be found in Appendix 2 - Concept D. Detailed Design Progress Due to the results of the design evaluation, the group has elected to go with the Holding Block design. This particular design integrates the surfboard and pogo pin block into a 11

13 holding block. The connecting pins are held in the locked position by springs. The operator pulls up on the control knob thereby creating a gap for the PCB to be inserted. The block is then aligned with the PCB holes and the control knob is released. A pressure plate pushes down on the surfboard and pogo pin assembly with the required contact force. Several issues will be resolved during the detail design process. The block shape will be modified to allow for connection of the test cables to the surfboard. The control knob will be properly sized to meet Intel s ergonomic standards. An external search will be performed to identify any possible off the shelf components which could reduce the total cost of the prototype. Failure points in the design will be analyzed to determine if stress reduction is possible. The materials used in the Holding Block design will be analyzed for mechanical and electrical properties, performance, and cost. To optimize the overall performance of the JTAG holding block, the design will be decomposed into 5 subsystems. Each subsystem will checked against the PDS criteria and analyzed, as necessary, for purposes of material selection and possible form changes. Effects of variations in dimensions and geometry will be considered for purposes of tolerancing. Small scale changes to the parts and subsystems will be considered to better meet PDS requirements. Conclusion The JTAG project is up to date and on schedule up through the Concept Evaluation and Selection phase. A Product Design Specification or PDS report was developed to address design criteria, customer requirements and priorities. This document has been used as a guideline for any decisions made in the steps that follow. In the external search phase of the project, many board to board connectors were studied. The external search verified that an off the shelf, hand-operated connector which meets the requirements defined in the PDS report is not available on the market. Therefore, a design for an original JTAG connector is necessary. 12

14 In the internal search phase of the project, 17 concepts were generated; five of which were chosen to be evaluated. The seven decision criteria selected from the PDS in order of importance are: application time, contact force, ease of use, life cycle, ability to support board weight, cost (exclude operation time), and maintenance. The seven criteria were used in a decision matrix to select the final design, Holding Block (Appendix 2 Concept D). The Holding Block design concept was checked against the PDS report to assure full compliance. The Holding Block design exceeds many of the PDS target guidelines: reduces application by an estimated 20 seconds, expected to meet and exceed the life cycle target of 1000 duty cycles, require little or no maintenance over the design's life cycle, and provide a consistent and evenly distributed contact force. A simplified model of the final design was presented, explained and well received by the customers at Intel. The next phase of the JTAG project will be detail design, modeling, prototyping, and testing. During the detail design of Holding Block, it will be decomposed into functional subsystems which will be analyzed for optimization. Each subsystem will be subject to an individual design process before a full design is created. Finally, the working prototype will be fabricated for testing and validation. The complete prototype and all documentations are expected to be delivered to the customer by June

15 Bibliography 1. Corelis Inc. JTAG Tutorial. [Online] Texas Instruments. IEEE Std (JTAG) Testability Intel Inc. Ergonomics Design Guidelines & Assessment Methods

16 Appendix 1 Product Design Specification or (PDS) Table Priority Requirements Customer Metric Target Target Basis Verification Performance High Shorter Device Application Time Intel Assembly time (sec) Less than 30 sec Customer Defined Assembly Time Trial High No Electrical Damage Intel Resistivity ~10 8 ohm cm Customer Defined Measurement High Minimal Parts to Assemble During Operation Intel # of Parts to Assemble High Required Contact Force Intel Force (lb) ~0.5 lb Less than 6 Current Process Measurement Customer Defined Estimate Measurement Medium Long Life Cycle Intel # of Testing Cycles Greater than 1000 Customer Defined Cycle Testing Medium Supports the Weight of Test Circuit Boards Without Failure Intel Force (lb) ~ 0.5 lb Customer Defined Measurement Medium Hand Operated Intel N/A No Tools Needed Customer Defined Prototyping Low Connection Versatility Intel N/A Environment Multiple Configurations Customer Defined High Meets Ergonomic Constraints Intel Ergonomics [1] Full Compliance Customer Defined Medium Life in Service Operate in Standard Environment Intel Temperature ( C) & Pressure (atm) Prototyping Measurement / Comparison STP Customer Defined Testing Medium Long Life Cycle Intel # of Duty Cycles Greater than 1000 Customer Defined Analysis 15

17 Product Design Specification or (PDS) Table, Continued Priority Requirements Customer Metric Target Target Basis Verification Cost Low Low Cost Production Model Intel Cost per Unit in $ $100 per part at lot size of 10 Customer Defined Low Inexpensive Prototype Intel & Team Cost in $ Less than $1500 Customer Defined Quantity Low Mass Production Intel Size and Shape High Weight Medium Materials Fits Within Allowable Footprint Area Must Meet Intel Ergonomics Specifications Manufacturability at Lot Size Lot size of x 10 mm Pad Intel mm Footprint Intel Force (lb) Full Compliance Customer Defined Team Measurement Customer Documentation Manufacturing Quotes Manufacturing Quotes Manufacturing Quotes Prototyping Measurement High No Electrical Damage Intel Resistivity ~10 8 ohm cm Customer Defined Measurement Low Must Not be Cost Prohibitive Team Cost per Unit in $ Less than $100 per unit Customer Defined Manufacturing Quotes Ergonomics High Must Meet Intel Ergonomics Specifications Intel Company Ergonomic Standards Doc. [1] Full Compliance Customer Documentation Measurement Medium Ease of Use Team Subjective Rating: point scale Effort, Locating, and Accessibility Observation 16

18 Product Design Specification or (PDS) Table, Continued Priority Requirements Customer Metric Target Target Basis Verification Quality and Reliability Medium Requires no Maintenance Intel N/A No Maintenance Customer Defined Medium Disposal Low Documentation Supports the Weight of Test Circuit Boards Creates no Disposables Until Life Cycle is Complete Intel Intel Pounds (lb) Life Cycle Greater than or equal to 0.5 lb Greater than 1000 Cycles Customer Defined Customer Defined Manufacturing Quotes Measurement Testing High Final Report PSU Due Date June-2011 PSU Grading High 3D Models and Drawings Intel Project Completion June-2011 PSU Receipt Medium PDS PSU Due Date February 9th PSU Grading Medium Progress Report PSU Due Date March 7th PSU Grading 17

19 Appendix 2 Internal Search Concepts Concept A, Table Mount Jig Figure 2.1 Conceptual drawing of the Table Mount Jig design. Functional Break Down The figure above shows the Table Mounted Jig with Linear bearings. The entire fixture is located on cammed supports which allow the entire fixture to be raised and lowered. The Base Plate has 3-4 linear bearings fixed vertically to its top surface. There is a fixed stopper plate mounted to the top of the linear bearings. The Surfboard mounting plate is free to move vertically. A hand operated mode of force applies pressure between the Top Stopper Plate and the Surfboard Mount. To operate the device, first the entire fixture is raised or lowered to match the height of the test PCB. The test PCB is then inserted into the fixture such that the edge of the board makes contact with the Edge Locator. The test PCB is then adjusted until the spring loaded locators 18

20 slide into the PCB's test port holes. Once the test PCB is in place the Surf Board assembly is clamped down into position via a lever mechanism, gravity, spring assembly, or other force applying device. Concept B, Vertical Sliding track Figure D model of the Vertical Sliding Track design. Functional Breakdown The figure above shows the Vertical Sliding Track Concept. The Surfboard mounting plate can move up and down along the vertical track. The Horizontal PCB Clamp can also travel up and down on the vertical tracks. The pogopin connector and locating pins are fixed to the Surfboard. The surf board clamping mechanism is opened and the test PCB is placed in to the test fixture such that the locating pins and pogo pin connector align with the holes in the PCB. The surfboard clamping mechanism is then aligned and engaged, holding the test PCB in a vertical position. The horizontal PCB clamp is then lowered to make contact with the upper edge of the 19

21 test PCB. This contact should apply enough force to hold the test PCB in place for the duration of the test. The surfaces that contact the edges of the test PCB will be covered with a non conductive rubber like material. The clamping mechanism could utilize a spring clip, hinge and spring setup, variable height knob, cammed leaver, or other clamping force device. Concept C, Hook Frame Figure D model of the Hook Frame design. Functional Breakdown The figure above describes the Hooking frame, a device to clamp a PCB, surfboard and pogo pin block together. The pogo pin block and surfboard are placed on the lower plate (with locating edge) and held by two rods with some locking mechanism to ensure they stay in place during assembly operations. The upper plate is held by two straight bars connected to lower plate and can freely move up and down. The PCB will be placed under the upper plate (with a locating edge and locking mechanism). Two hooks are fixed on the lower plate. When the upper plate come to the clamping position, a hook will keep both plates in position and maintain clamping force. 20

22 Concept D, Holding Block Figure D model of the Holding Block design. Functional Breakdown The surfboard and pogo pin will be integrated into the holding block. There are springs which force the connecting pins downward. When assembling, the operator uses a finger to pull up the connecting pins, leaving space for the PCB to be inserted. The PCB can be slid back and forth until the two connecting pin are aligned with the holes on PCB. The operator releases the connecting pins when the PCB is properly aligned. When dissembling, the operator pulls the connecting pins up then pulls the PCB out. A model of the concept can be seen in Fig

23 Concept E, Hand Held Clip Figure D model of the Hand Held Clip design. Functional Breakdown This design uses a subassembly composed of the surfboard, the pogo pin block, and two pins, which after insertion hold the subassembly together. The subassembly is attached to the clamping device/frame. The clamping action is hand operated. The pins that hold the subassembly together also serve to correctly position the pin block over the PCB pad. The operator simply ensures that the pin ends are in the holes found on both sides of the PCB pad. The design can be modified to allow for clamping to be made with one clamp that passes under and over the center of the surfboard and pogo pin block. The arms of the clamping device may need to be modified to meet ergonomic standards. A model of the design can be seen in Fig

24 Appendix 3 Figure 3.1: Shows the Gantt chart for the JTAG project. The table on the left shows the task section, duration, and start and ending dates. The graph on right displays visual representations of the time frame for particular tasks. 23

25 Appendix 4 Cost Criteria, Calculation Example The following calculation is presented as an example of how the Cost criterion was scored in the Top Level Design Evaluation. The cost of machining a part is based on an estimated labor cost of $100 per hour and that each feature or machined section takes 15 minutes to complete. Using those values, the final cost for each feature is considered to be $25 per feature. It is assumed that the cost of materials used is insignificant relative to machining costs. The figure below represents a fictional part with a number of design features. The total number of features are counted and multiplied by $25 to obtain a cost estimate for the initial machining costs. 2 Holes 3 Sides to Square Up 3 Fillets 1 Ridge 1 Flange Figure 4.1: The figure below represents an example part with a number of design features. All of the machined features are labeled. The label "3 Sides to Square Up" refers to the first operation of making the piece of work square on all sides. 24

26 Table 4.1: Shows the total number of features and associated cost Features Qty. Cost/Feature Cost $ Holes 2 $25 50 Ridges 1 $25 25 Flanges 1 $25 25 Fillets 3 $25 75 Squared Sides 3 $25 75 Total 10 $ As Table 4.1 indicates the estimated initial fabrication cost for the part shown in Figure 4.1 is $250. The production cost is assumed to be proportional to the initial fabrication cost, materials used and manufacturing process cost. This proportionality is signified by the constant which has a value of 0 to 1. A value of = 1 indicates that the production cost is roughly the same as the initial fabrication cost. For the sake of the costing example it will be assumed that the part will cost roughly = 1/2 of the initial fabrication cost. The following is an example calculation used estimate the total cost of production. Initial fabrication cost = $250 Production Proportionality = 0.5 Lot Size = 10 each Total _ Cost $1500 The estimated total cost to fabricate and produce the part shown in Figure 4.1 is $1500. This value is by no means representative of the true cost to fabricate and produce the part. This cost estimating system is only used to compare each of the design cost against each other. 25

FL ADJUSTABLE RIDER BACKREST MOUNTING HARDWARE KIT

FL ADJUSTABLE RIDER BACKREST MOUNTING HARDWARE KIT -J070 REV. 0-0-0 FL ADJUSTABLE RIDER BACKREST MOUNTING HARDWARE KIT GENERAL Kit Number 9-09A Models For model fitment information, see the P&A Retail Catalog or the Parts and Accessories section of www.harley-davidson.com

More information

Trillium 40 Axis Spring Tensioner Wire Replacement Instructions

Trillium 40 Axis Spring Tensioner Wire Replacement Instructions Trillium 40 Axis Spring Tensioner Wire Replacement Instructions 1 Overview The objective is to replace the broken axis spring tensioner wire. This requires the following tasks: 1. Remove the seismometer

More information

Mounting Instructions for SP4 Power Modules

Mounting Instructions for SP4 Power Modules Mounting Instructions for SP4 Power Modules Pierre-Laurent Doumergue R&D Engineer Microsemi Power Module Products 26 rue de Campilleau 33 520 Bruges, France Introduction: This application note gives the

More information

758 Heavy-duty Ratchet Guy Wire Cutter

758 Heavy-duty Ratchet Guy Wire Cutter INSTRUCTION MANUAL 758 Heavy-duty Ratchet Guy Wire Cutter Read and understand all of the instructions and safety information in this manual before operating or servicing this tool. Register this product

More information

INSTALLATION AND OPERATING INSTRUCTIONS For Model GL1 Gate Locks

INSTALLATION AND OPERATING INSTRUCTIONS For Model GL1 Gate Locks Securitron Magnalock Corp. www.securitron.com ASSA ABLOY, the global leader Tel 800.624.5625 [email protected] in door opening solutions INSTALLATION AND OPERATING INSTRUCTIONS For Model GL1 Gate

More information

HP 16/18-Port Cable Management Kit Installation Guide

HP 16/18-Port Cable Management Kit Installation Guide HP 16/18-Port Cable Management Kit Installation Guide Abstract This document describes how to attach the HP 16 Port or 18 Port Cable Management Kit to an HP rack. The cable management bracket is designed

More information

MODEL T10023 ACCESSORY KIT #1 FOR T10010/T10097 WET GRINDER

MODEL T10023 ACCESSORY KIT #1 FOR T10010/T10097 WET GRINDER MODEL T0023 ACCESSORY KIT # FOR T000/T0097 WET GRINDER INSTRUCTION SHEET Introduction The Model T0023 Accessory Kit # for the Model T000/T0097 Wet Grinder includes fixtures for sharpening small knives,

More information

HOME GYM. Model. Retain This Manual for Reference OWNER'S MANUAL. www.hyper-extension.com

HOME GYM. Model. Retain This Manual for Reference OWNER'S MANUAL. www.hyper-extension.com NOTE: Please read all instructions carefully before using this product Table of Contents Safety Notice www.hyper-extension.com HOME GYM 50036 Hardware Identifier Assembly Instruction Parts List Warranty

More information

STEEL-RITE II or III COMMERCIAL SECTIONAL DOOR Owner s Manual Supplement Model 52242 NOTICE TO USER

STEEL-RITE II or III COMMERCIAL SECTIONAL DOOR Owner s Manual Supplement Model 52242 NOTICE TO USER STEEL-RITE II or III COMMERCIAL SECTIONAL DOOR Owner s Manual Supplement Model 52242 NOTICE TO USER Thank you for purchasing the Steel-Rite II or III, model 52242 commercial sectional door from RITE-HITE

More information

LED MOTION ACTIVATED FLOOD LIGHT

LED MOTION ACTIVATED FLOOD LIGHT Utilitech & UT Design are registered trademarks of LF, LLC. All Rights Reserved. ITEM #0611551, #0611550 LED MOTION ACTIVATED FLOOD LIGHT MODEL #SE1036-BP2-02LF0-U, SE1036-WH3-02LF0-U Français p. 10 Español

More information

Rack installation instructions

Rack installation instructions Rack installation instructions Review the documentation that comes with the rack cabinet for safety and cabling information. Before you install the server in a rack cabinet, review the following guidelines:

More information

SECTION G2: CABLE PROCESSOR MODULE MAINTENANCE

SECTION G2: CABLE PROCESSOR MODULE MAINTENANCE SECTION G2: CABLE PROCESSOR MODULE MAINTENANCE Cable Processor Module overview WARNING! When tipping the Cable Processor Module back, (after removing the toggle arm pin), use extreme caution not to drop

More information

Navico-Northstar 2kW JRC Radar Package, Scanner Cable Removal and Replacement

Navico-Northstar 2kW JRC Radar Package, Scanner Cable Removal and Replacement Navico-Northstar 2kW JRC Radar Package, Scanner Cable Removal and Replacement This work instruction describes the methods and means for which to remove and reinstall optional scanner cable configurations

More information

TONNEAU INSTALLATION GUIDE

TONNEAU INSTALLATION GUIDE TONNEAU INSTALLATION GUIDE Warranty, Care & Maintenance Model 4056 Toyota Tacoma Double Cab 5' Short Bed 2005-Current (With Multi-Track System) EASY AS 1-2-3! NORMAL INSTALLATION TIME 30 MINUTES For Warranty

More information

Working Drawing and Assemblies. Chapter 10

Working Drawing and Assemblies. Chapter 10 Working Drawing and Assemblies Chapter 10 Objectives 1.Define working drawings. 2. Describe how working drawings are used in industry. 3. List the major components of a complete set of working drawings.

More information

HP 36-Port InfiniBand Switch Cable Management Kit Installation Guide

HP 36-Port InfiniBand Switch Cable Management Kit Installation Guide HP 36-Port InfiniBand Switch Cable Management Kit Installation Guide HP Part Number: 574412-doc Published: May 2009 Copyright 2009 Hewlett-Packard Development Company, L.P. The information contained herein

More information

Automated Contact Resistance Tester CR-2601

Automated Contact Resistance Tester CR-2601 Automated Contact Resistance Tester CR-2601 What s New What s New Summary of Hardware Improvements: The middle Stiffener has been improved and no longer comes in direct contact with the main board thus

More information

HYDRAULIC LIFT TABLE CART 2200-LB.

HYDRAULIC LIFT TABLE CART 2200-LB. HYDRAULIC LIFT TABLE CART 2200-LB. OWNER S MANUAL WARNING: Read carefully and understand all MACHINE ADJUSTMENT AND OPERATION INSTRUCTIONS before operating. Failure to follow the safety rules and other

More information

CHAPTER 65 TAIL ROTOR DRIVE SYSTEM. Section Title Page

CHAPTER 65 TAIL ROTOR DRIVE SYSTEM. Section Title Page CHAPTER 65 TAIL ROTOR DRIVE SYSTEM Section Title Page 65-00 Description........................................ 65.1 65-10 Tail Rotor Drive Fan Shaft.............................. 65.1 65-20 Tail Rotor

More information

I BEAM TRACK INSTALLATION

I BEAM TRACK INSTALLATION PDQ 0/700 FESTOON SYSTEM INSTALLATION AND MAINTENANCE INSTRUCTIONS INTRODUCTION The PDQ Festoon System was designed to run on one of three sizes of I-beams: S x., S8 x 8. and S x.. System trolleys must

More information

BUNK BED. Model No.: DA3797E - Espresso DA3797P- Pine. UPC CODE: 0-65857-16117-5 (Espresso) 0-65857-16116-8 (Pine) NOTE: Lot number: Date of purchase:

BUNK BED. Model No.: DA3797E - Espresso DA3797P- Pine. UPC CODE: 0-65857-16117-5 (Espresso) 0-65857-16116-8 (Pine) NOTE: Lot number: Date of purchase: BUNK BED Model No.: DA3797E - Espresso DA3797P- Pine UPC CODE: 0-65857-16117-5 (Espresso) 0-65857-16116-8 (Pine) NOTE: THIS INSTRUCTION BOOKLET CONTAINS IMPORTANT SAFETY INFORMATION. PLEASE READ AND KEEP

More information

KEYPAD LOCK RETROFIT KIT

KEYPAD LOCK RETROFIT KIT KEYPAD LOCK RETROFIT KIT INSTRUCTIONS FOR ASSEMBLY IMPORTANT READ & SAVE THESE INSTRUCTIONS Tools Required for Assembly 5/32 hex (Allen) wrench #2 Phillips screwdriver Isopropyl alcohol or alcohol wipes

More information

Original Assembly Guide

Original Assembly Guide TCT Multipurpose Single Bevel Sliding Compound Mitre Saw Original Assembly Guide Read instructions before assembling this tool. Table of Contents GB Assembly Guide Read instructions before assembling this

More information

Trunnion-Design Ball Valves

Trunnion-Design Ball Valves Trunnion-Design Ball Valves 12" 20" (DN 300 500) Series 7150 12" (DN 300) Series 730S 12" 20" (DN 300 500) Series 7300 14" 24" (DN 350 600) Series 9150 14" 24" (DN 350 600) Series 9300 Installation, Maintenance

More information

MOVIEtube CR. Cinematography Rig. Setup Camera Sony PDW-F3 (MTCR-P-10-01) Version 03-2011 / English

MOVIEtube CR. Cinematography Rig. Setup Camera Sony PDW-F3 (MTCR-P-10-01) Version 03-2011 / English MOVIEtube CR Cinematography Rig (MTCR-P-10-01) Setup Camera Sony PDW-F3 Version 03-2011 / English Step by step assembly instruction 1) The MOVIEtube CR (MTCR-P-10-01) is supplied as shown in the picture

More information

Remote Head REMO ONE. Code 5750. Manual

Remote Head REMO ONE. Code 5750. Manual Remote Head REMO ONE Code 5750 Manual by sachtler. All rights reserved Version: 1.2/09/05 Issue date: September 2005 Order no.: srh20t010a We want you to receive Sachtler products that are always state

More information

R O A D M A S T E R, I N C.

R O A D M A S T E R, I N C. R O A D M A S T E R, I N C. 11 10 20 12 4 18 19 1 2 13 16 ITEM QTY NAME MATERIAL 1...2... 1/2" x 3 1/2" BOLT... 350103-00 2...2... 1/2" x 2" BOLT... 350097-00 3...6... 1/2" x 1 1/2" BOLT... 350095-00 4...2...

More information

Owner s Manual Read and keep this manual. Patents World Wide

Owner s Manual Read and keep this manual. Patents World Wide Owner s Manual Read and keep this manual. Patents World Wide S & S Industries, Inc., Sarasota, FL, USA www.trail-gator.com Copyright 2008 All Rights Reserved The following manual is provided to assist

More information

INSTRUCTION MANUAL (WINDOW WIPER)

INSTRUCTION MANUAL (WINDOW WIPER) INSTRUCTION MANUAL (WINDOW WIPER) SUBJECT CONTENTS PAGE 1. GENERAL 2 2. CONTRUCTION 2 2-1. STRAIGHT LINE TYPE WINDOW WIPER 2 2-2. CONTROL BOX 2 2-3. SPARE PARTS 2 3. MECHANISM AND OPERATION 2 3-1. STRAIGHT

More information

Dell P Series Monitor VESA Mounting Bracket Installation Instructions

Dell P Series Monitor VESA Mounting Bracket Installation Instructions Dell P Series Monitor VESA Mounting Bracket Installation Instructions The VESA mounting bracket enables a Wyse cloud client to be mounted to the Dell P Series Monitor and the Dell E24 Monitor. The cloud

More information

Table of Contents WARNING SYMBOLS AND DEFINITIONS

Table of Contents WARNING SYMBOLS AND DEFINITIONS Table of Contents SAFETY INSTALLATION OPERATION MAINTENANCE Safety... 2 Specifications... 4 Installation... 5 Operation... 8 WARNING SYMBOLS AND DEFINITIONS Maintenance... 9 Parts List and Assembly Diagram...

More information

ASSEMBLY MANUAL SE-4S35

ASSEMBLY MANUAL SE-4S35 Automatic drive ASSEBLY ANUAL SE-4S35 AI-4S35 SG-4R35 Battery box otor unit Inter-4 hub CONTENTS WARNING 1 INSTALLATION CONITIONS Battery box Speed sensor Cable lengths and diameters otor unit Recommended

More information

PUMP JACK SYSTEM AND ACCESSORIES

PUMP JACK SYSTEM AND ACCESSORIES Pump Jack Model # 2200 A low cost, easy to operate, safe, portable scaffolding built of rugged steel. It's perfect for shingling, siding, sheathing, insulating, painting, building, roofing, home repair

More information

Horizontal Mini Blinds Installation Guide

Horizontal Mini Blinds Installation Guide Horizontal Mini Blinds Installation Guide We make it easy! BTG 468298 EN_ rev0614 For more safety information: 1-866-662-0666 or.www.healthcanada.gc.ca/blindcords Before starting Your new Blinds To Go

More information

Installation Instructions 4508 4508S

Installation Instructions 4508 4508S SYMPHONY Spread Lavatory Faucet with Speed Connect Drain Congratulations on purchasing your American Standard faucet with Speed Connect drain, a feature found only on American Standard faucets. Speed Connect

More information

MEASURING WHEEL ALIGNMENT

MEASURING WHEEL ALIGNMENT MEASURING WHEEL ALIGNMENT 2003-04 WHEEL ALIGNMENT Specifications & Procedures - Hummer - H2 Steering and vibration complaints are not always the result of improper alignment. One possible cause is wheel

More information

Window Installation Instructions

Window Installation Instructions Caution The correct installation methods of windows in full frame or insert applications is critical towards achieving the tested performance of the window and longterm enjoyment and energy savings for

More information

2740 Whitten Rd Bldg 103 Memphis, TN 38133 Telephone 901-380-9290 Email [email protected]

2740 Whitten Rd Bldg 103 Memphis, TN 38133 Telephone 901-380-9290 Email Bwilliams@Dieselcare.net Fuel Injection Pump Replacement REMOVAL Diesel Care & Performance Inc 1. Disconnect negative battery terminal. 2. Remove throttle linkage. Fuel Injection Pump Bracket 3. Remove injection pump bracket.

More information

BOBBIN WINDER - TYPES & FUNCTION

BOBBIN WINDER - TYPES & FUNCTION BOBBIN WINDER - TYPES & FUNCTION 13.1.006 The bobbin winder is a separate unit screwed on to the machine, adjacent to the balance wheel. Its function is to wind a reserve of cotton evenly onto an empty

More information

ASSEMBLY INSTRUCTIONS Residential Roof solutions

ASSEMBLY INSTRUCTIONS Residential Roof solutions ASSEMBLY INSTRUCTIONS Residential Roof solutions CROSSRAIL System USA Table of contents TABLE OF CONTENTS THE COMPANY SAFETY REGULATIONS MATERIALS REQUIRED TOOLS REQUIRED ASSEMBLY TERMS AND CONDITIONS

More information

AMF112 Instruction Manual

AMF112 Instruction Manual AMF112 Instruction Manual Scan here to view product demo and install videos or visit san.us/103 Milestone AV Technologies 6436 City West Parkway Eden Prairie, MN 55344 USA Customer Service Americas: 800-359-5520

More information

INSTALLATION INSTRUCTIONS for Bifold Doors (JII103)

INSTALLATION INSTRUCTIONS for Bifold Doors (JII103) Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for premium composite, hollow and solid core molded Bifold Doors. Bifolds are designed for fast

More information

Installation and Operating Instructions Installation Instructions for SS EPE-316L Series

Installation and Operating Instructions Installation Instructions for SS EPE-316L Series INSTR3010 0406 Installation and Operating Instructions Installation Instructions for SS EPE-316L Series Congratulations on your purchase of this Aqua-Pure high flow, single housing filtration system. This

More information

PS6500 Storage Arrays Rack Mount Instructions

PS6500 Storage Arrays Rack Mount Instructions PS6500 Storage Arrays Rack Mount Instructions Part Number: R724M Rev. A01 Copyright 2010 Dell, Inc. All rights reserved. Dell is a trademark of Dell, Inc. EqualLogic is a registered trademark. All trademarks

More information

1000-LB. TRAILER JACK OWNER S MANUAL

1000-LB. TRAILER JACK OWNER S MANUAL 1000-LB. TRAILER JACK OWNER S MANUAL WARNING: Read carefully and understand all INSTRUCTIONS before operating. Failure to follow the safety rules and other basic safety precautions may result in serious

More information

Round Housing with Side Ports

Round Housing with Side Ports Power Steering Steering Control Unit (SCU) Parts and Repair Information 5 Series Steering Control Units 001 Square Housing with Side Ports Round Housing with Side Ports T E L RP Round Housing with End

More information

TOYOTA Tundra 2007 - BACK-UP CAMERA SYSTEM Preparation

TOYOTA Tundra 2007 - BACK-UP CAMERA SYSTEM Preparation Preparation Part Number(s): PT233-34070, PT923-35070-11, PT923-35070-43 NOTE: Part number of this accessory may not be the same as part number shown. Back Up Monitor Kit Contents PT923-35070-11 / PT923-35070-43

More information

Range Road RR Series Semi-Automatic Firewood Processor. Crated Unit Assembly Manual

Range Road RR Series Semi-Automatic Firewood Processor. Crated Unit Assembly Manual Range Road RR Series Semi-Automatic Firewood Processor Crated Unit Assembly Manual 1 1) Undo 8-18mm x 19mm Nuts and bolts, 2 on each leg of top frame 2) Lift top of Metal crate off and move out of work

More information

Assembly and Usage Instructions

Assembly and Usage Instructions Assembly and Usage Instructions A Product 5885 West Van Horn Tavern Road Columbia, MO 65203 www.caldwellshooting.com Instruction #1001667 Limited Warranty Every Caldwell product is warrantied to be free

More information

CALIBRATION FOR LAL20X & LAL24X

CALIBRATION FOR LAL20X & LAL24X CALIBRATION AND FAULT FINDING FOR LAL20X & LAL24X DUMPY LEVELS MEASURING EXPERTS SINCE 1869 How The LAL20X & LAL24X Works The Automatic level is called Automatic because it requires only a simple basic

More information

OHIO University Mechanical Engineering Summary Report: Human Power System for Small Appliances and Machinery

OHIO University Mechanical Engineering Summary Report: Human Power System for Small Appliances and Machinery OHIO University Mechanical Engineering Summary Report: Human Power System for Small Appliances and Machinery Appalachian Human Power Brad Bundy Ben Chovan Zach Fetchu Ed Passarrelli Ryan Tedford Will Zaylor

More information

GEH6290. Mechanism Circuit Breaker. Handle Operating Mechanism Cat. No. Type NEMA 1, 3R, 12, 13 NEMA 4/4X Cat. No. Cat. No. Series Instruction

GEH6290. Mechanism Circuit Breaker. Handle Operating Mechanism Cat. No. Type NEMA 1, 3R, 12, 13 NEMA 4/4X Cat. No. Cat. No. Series Instruction GEH6290 g Cable Operator Mechanisms for E150, SE150, SF250, and SG600 Spectra RMS Circuit Breakers Type SCH1/1X, SCH2/2X Flange-Mounted Handle Assemblies, Cable Series SC3L SC10L and Type SC0M1A, SCOM1EF,

More information

K. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS...Ins 10. FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS...Ins 11

K. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS...Ins 10. FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS...Ins 11 K. D. FRAME ASSEMBLY FOR MASONRY WALLS...........................Ins 2 FRAME INSTALLATION DETAILS FOR MASONRY WALLS......................Ins 3 INSTALLING EXISTING MASONRY WALL ANCHORS IN FRAME..................Ins

More information

INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS

INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS 2009 Pella Corporation INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS Part Number: 80WH0100 Installation Instructions for Typical Wood Frame Construction.

More information

METHOD OF TEST FOR SAMPLING AND TESTING CRUMB RUBBER MODIFIER

METHOD OF TEST FOR SAMPLING AND TESTING CRUMB RUBBER MODIFIER STATE OF CALIFORNIA BUSINESS, TRANSPORTATION AND HOUSING AGENCY DEPARTMENT OF TRANSPORTATION DIVISION OF ENGINEERING SERVICES Transportation Laboratory 5900 Folsom Boulevard Sacramento, California 95819-4612

More information

Ceiling Mounted Folding Attic Ladders Installation Instructions

Ceiling Mounted Folding Attic Ladders Installation Instructions Ceiling Mounted Folding Attic Ladders Installation Instructions WARNING Before you start installing your new Louisville Ceiling Mounted Folding Attic Ladder, you must read and understand the following:

More information

Installation Instructions 6028.801

Installation Instructions 6028.801 DAZZLE Installation Instructions 08.80 Spread Lavatory Faucet with Speed Connect Drain* Congratulations on purchasing your American Standard faucet with Speed Connect drain, a feature found only on American

More information

AMF112 (6904-002010 <00>) 13mm (1/2 in.)

AMF112 (6904-002010 <00>) 13mm (1/2 in.) AMF112 () Concrete Wood 13mm (1/2 in.) 5.5mm (7/32 in.) 10mm (3/8 in.) Sanus Systems 2221 Hwy 36 West Saint Paul, MN 55113 USA Customer Service Americas: 800-359-5520 651-484-7988 [email protected] Europe,

More information

AMPSEAL* Automotive Plug Connector and Header Assembly

AMPSEAL* Automotive Plug Connector and Header Assembly AMPSEAL* Automotive Plug Connector and Header Assembly Application Specification 24 SEP 97 Rev E All dimensions are given in millimeters unless otherwise specified. All dimensional tolerances are +0.2

More information

ReadyKart Mobile Processing Station Instructions for Use

ReadyKart Mobile Processing Station Instructions for Use GE Healthcare Instructions 28-9606-47 AB ReadyKart Mobile Processing Station Instructions for Use Contents ReadyToProcess 1 Introduction... 1 2 General Description... 2 3 Description of Components... 4

More information

Sliding Barn Door Hardware Installation Instructions BALDUR and ODEN

Sliding Barn Door Hardware Installation Instructions BALDUR and ODEN Sliding Barn Door Hardware Installation Instructions BALDUR and ODEN Installation Instructions Structural Information For standard systems and most custom single door opening systems. General Overview

More information

-1- SPECIFICATIONS 002085 CONE SETTER PLATFORM ATTACHMENT INDEX

-1- SPECIFICATIONS 002085 CONE SETTER PLATFORM ATTACHMENT INDEX -1-002085 CONE SETTER PLATFORM ATTACHMENT INDEX I. GENERAL EQUIPMENT : A. Intent Statement B. Cone Setter Platform II. III. 1. Understructure Frame 2. Mounting Components 3. Paint 4. Basket 5. Labels 6.

More information

Introduction to Solid Modeling Using SolidWorks 2012 SolidWorks Simulation Tutorial Page 1

Introduction to Solid Modeling Using SolidWorks 2012 SolidWorks Simulation Tutorial Page 1 Introduction to Solid Modeling Using SolidWorks 2012 SolidWorks Simulation Tutorial Page 1 In this tutorial, we will use the SolidWorks Simulation finite element analysis (FEA) program to analyze the response

More information

INSTRUCTIONS: LocknCharge Laptop Carts

INSTRUCTIONS: LocknCharge Laptop Carts INSTRUCTIONS: LocknCharge Laptop Carts www.lockncharge.com Extra Tools required: Hammer, Philips head screwdriver, medium adjustable spanner. (Allen key supplied) (Panel colours for illustration purposes

More information

AVENTOS HF Narrow aluminum door application

AVENTOS HF Narrow aluminum door application AVENTOS HF Narrow aluminum door application Lift mechanism set Lift mechanism (qty ) #7 x 35 mm (-3/8 ) wood screw (qty 0) Power factor 85 30 ( lift mechanism req.) 0F00.N5 3 470 0F00.N5 47 880 0F500.N5

More information

Installation information. METTLER TOLEDO MultiRange DW150 / DW150T wall scale

Installation information. METTLER TOLEDO MultiRange DW150 / DW150T wall scale Installation information METTLER TOLEDO MultiRange DW150 / DW150T wall scale DW150 / DW150T wall scale Contents Contents Page 1. Installation... 2 1.1 Preparatory work... 2 1.2 Installing the wall plates

More information

Volkswagen Jetta, Golf, GTI 1999, 2000 Brake System 46 Brakes - Mechanical Components (Page GR-46)

Volkswagen Jetta, Golf, GTI 1999, 2000 Brake System 46 Brakes - Mechanical Components (Page GR-46) 46 Brakes - Mechanical Components (Page GR-46) Front brakes Brake pads, removing and installing Brake pads, removing and installing FN 3 brake caliper, servicing FS III brake caliper, servicing Rear wheel

More information

Instructions for assembly of your Pop-Up Display

Instructions for assembly of your Pop-Up Display Instructions for assembly of your Pop-Up Display I: Frame a) With the Pop-Up Frame still in the travel case, open the cloth bag. Make note of the ten black pegs on the top. These pegs represent the TOP

More information

Tips and Techniques on the PR-620

Tips and Techniques on the PR-620 Techniques and Tips on the PR-620 Learn how to demonstrate the PR-620 and make it look as easy as it really is. Topics to be covered will be: basic operation, machine threading, screen icons, merging patterns,

More information

B098N USERS: MACHINE MANUFACTURERS DRAUGHTSMEN OPERATORS MAINTENANCE WORKERS ANY OTHERS

B098N USERS: MACHINE MANUFACTURERS DRAUGHTSMEN OPERATORS MAINTENANCE WORKERS ANY OTHERS INSTRUCTION MANUAL TRAVELLING BEAM DEVICE MANUAL CODE B098N USERS: MACHINE MANUFACTURERS DRAUGHTSMEN OPERATORS MAINTENANCE WORKERS ANY OTHERS REV. DESCRIZIONE REDATTO/GESTITO APPROVATO COD. IDENT. PAGINE

More information

SUSP-06, Torsion Bars - Removing, Replacing, and Indexing

SUSP-06, Torsion Bars - Removing, Replacing, and Indexing Introduction SUSP-06, Torsion Bars - Removing, Replacing, and Indexing Replacing the torsion bar on a 944 is not all that difficult. However, reindexing the torsion after completion is a pain and can be

More information

Speed-Mat Rectangle Cutter

Speed-Mat Rectangle Cutter Speed-Mat Rectangle Cutter 1 Honeycomb baseboard. 2 Left hold down. 14 3 Bottom hold down. 4 4 Left / right rule. 8 5 8 5 Left / right rule pointer. 1 6 Top / bottom rule. 7 Top / bottom rule pointer.

More information

CETAC Z-Drive Assembly

CETAC Z-Drive Assembly CETAC Z-Drive Assembly Replacement Guide Manual Part Number 610144 Rev 1, 2012 CETAC Technologies, Printed in USA Overview This guide describes the necessary steps to replace the Z-drive assembly on your

More information

HAND CRIMP TOOL Specification Sheet Order No. 63819-0900

HAND CRIMP TOOL Specification Sheet Order No. 63819-0900 HAND CRIMP TOOL Specification Sheet Order No. 63819-0900 FEATURES TYPE 4D Œ A full cycle ratcheting hand tool ensures complete crimps Œ Ergonomic soft grip handles for comfortable crimping Œ A precision

More information

Router Table Plans. www.bobsplans.com

Router Table Plans. www.bobsplans.com www.bobsplans.com Router Table Plans Increase the capabilities of your router with this weekend project. Features a sliding fence with EZ-Mount clamps. These clamps are simple to make and grip tightly

More information

SPRITE and BIGFOOT DESKTOP CNC MACHINE KIT ASSEMBLY INSTRUCTIONS

SPRITE and BIGFOOT DESKTOP CNC MACHINE KIT ASSEMBLY INSTRUCTIONS SPRITE and BIGFOOT DESKTOP CNC MACHINE KIT ASSEMBLY INSTRUCTIONS README FIRST: Thank you for purchasing your MyDIYCNC Desktop CNC Machine Kit. We hope this versatile and innovative machine brings you many

More information

Number Wheeler P/N Description Set Rex P/N Notes 1 603500 Base 1 J001 2 603501 Support, Right 1 J002 3 603502 Support, Left 1 J003 4 600328 Nut (M8)

Number Wheeler P/N Description Set Rex P/N Notes 1 603500 Base 1 J001 2 603501 Support, Right 1 J002 3 603502 Support, Left 1 J003 4 600328 Nut (M8) 1 603500 Base 1 J001 2 603501 Support, Right 1 J002 3 603502 Support, Left 1 J003 4 600328 Nut (M8) 4 5 600130 Spring Washer (8mm) 4 6 600344 Roll Pin (M6x30) 4 7 600129 Socket Hd Cap Screw (M8x25) 4 8

More information

OEM Manual MODEL 2350 ELECTRONIC DUAL CYLINDER SCALE

OEM Manual MODEL 2350 ELECTRONIC DUAL CYLINDER SCALE OEM Manual MODEL 2350 ELECTRONIC DUAL CYLINDER SCALE Scaletron Industries, Ltd. Bedminster Industrial Park 53 Apple Tree Lane P.O. Box 365 Plumsteadville, PA 18949 USA Toll Free: 1-800-257-5911 (USA &

More information

Sliding Door Hardware Installation Instructions

Sliding Door Hardware Installation Instructions Sliding Door Hardware Installation Instructions Installation Instructions Structural Information For standard systems and most custom single door opening systems. General Overview ff All Krown Lab sliding

More information

Fisher 1052 Size 20 Diaphragm Rotary Actuator with F and G Mounting Adaptation

Fisher 1052 Size 20 Diaphragm Rotary Actuator with F and G Mounting Adaptation Instruction Manual 1052 Size 20 Actuator (F & G) Fisher 1052 Size 20 Diaphragm Rotary Actuator with F and G Mounting Adaptation Contents Introduction... 1 Scope of manual... 1 Description... 1 Specifications...

More information

Advanced bolt assessment through process automation

Advanced bolt assessment through process automation Titelmasterformat Bolt Assessment inside durch ANSYS Klicken bearbeiten Advanced bolt assessment through process automation Contents Short presentation of VDI 2230 Workflow with Bolt Assessment inside

More information

Rear wheel brakes, servicing. Стр. 1 из 45. Note:

Rear wheel brakes, servicing. Стр. 1 из 45. Note: Volkswagen Touareg - Rear wheel brakes, servicing Стр. 1 из 45 46-2 Rear wheel brakes, servicing Rear brakes, FN 44 brake caliper, servicing Note: After replacing brake pads, depress brake pedal firmly

More information

1-800-295-5510 uline.com SPECIFICATIONS

1-800-295-5510 uline.com SPECIFICATIONS H-1394, H-1395, H-1396 H-1397, H-3859, H-3860 π GRAVITY CONVEYOR 1-800-295-5510 uline.com SPECIFICATIONS Conveyor Bed Width In (mm) 18, 24, 30 (457, 610, 762) Load Capacity Per Linear Foot (305mm) Lbs

More information

Chapter 10 - Scaffolding Systems

Chapter 10 - Scaffolding Systems Chapter 10 - Scaffolding Systems Contents Chapter 10 - Scaffolding Systems... 10-1 Check and Oil the Pump Jacks... 10-4 Set Pump Jack Brackets... Error! Bookmark not defined. Set Pump Jack Poles... 10-5

More information

Chelsea Loft Bed WARNING:

Chelsea Loft Bed WARNING: Chelsea Loft Bed WARNING: Failure to follow these warnings and assembly instructions could result in serious injury or death. Read all instructions before assembling bunk bed. KEEP INSTRUCTIONS FOR FUTURE

More information

Rating when used as a weight carrying hitch without spring bars:

Rating when used as a weight carrying hitch without spring bars: BOLT-TOGETHER WEIGHT DISTRIBUTING HITCH SYSTEM Rating when used as a weight distributing hitch with spring bars: Part Number 48051 4805 48053 48054 Max Tongue Weight 550 Ibs. 750 Ibs. 1000 Ibs. 1400 lbs.

More information

Installation guide for the SafeLine type anchorage device. Tested in compliance with EN 795: 1996. No.: SE-...

Installation guide for the SafeLine type anchorage device. Tested in compliance with EN 795: 1996. No.: SE-... Installation guide for the SafeLine type anchorage device Tested in compliance with EN 795: 1996 No.: SE-... Version: 09.10.2008 SE 67 Subject to technical alterations! Contents 1. General information

More information

INSTRUCTION MANUAL AND PARTS LIST MODEL 14-10

INSTRUCTION MANUAL AND PARTS LIST MODEL 14-10 VERTICAL BAND SAWS INSTRUCTION MANUAL AND PARTS LIST MODEL 1-10 DAKE/PARMA WHEN ORDERING PARTS GIVE COMPLETE SERIAL NUMBER OF MACHINE GIVE PART NUMBER AND NAME GIVE AMOUNT REQUIRED Unless the above data

More information

CHAPTER 12 : OXFORD MERMAID & RANGER HOIST PRODUCTS

CHAPTER 12 : OXFORD MERMAID & RANGER HOIST PRODUCTS CHAPTER 12 : OXFORD MERMAID & RANGER HOIST PRODUCTS Sunrise Medical is ISO 9001 certified, which ensures quality at all stages of the development and production of this hoist. Contents MODEL SERIAL NO.

More information

MAGNETIC CARD READER DESIGN KIT TECHNICAL SPECIFICATION

MAGNETIC CARD READER DESIGN KIT TECHNICAL SPECIFICATION MAGNETIC CARD READER DESIGN KIT TECHNICAL SPECIFICATION Part Number: 99821002 Rev 21 FEBRUARY 2011 REGISTERED TO ISO 9001:2008 1710 Apollo Court Seal Beach, CA 90740 Phone: (562) 546-6400 FAX: (562) 546-6301

More information

Steel Bridge Design E90 Project Proposal

Steel Bridge Design E90 Project Proposal Steel Bridge Design E90 Project Proposal 12/5/07 Abstract We propose to design and construct a steel bridge to the specifications and constraints governing the 2008 ASCE/AISC Steel Bridge Competition.

More information

SECTION 27 05 36 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

SECTION 27 05 36 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS SECTION 27 05 36 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1 GENERAL 1.01 DESCRIPTION A. The work covered by this section of the Specifications includes all labor necessary to perform and complete such

More information

SET-UP AND INSTALLATION FOR LEAD SCREW CARTRIDGE ASSEMBLY

SET-UP AND INSTALLATION FOR LEAD SCREW CARTRIDGE ASSEMBLY SET-UP AND INSTALLATION FOR LEAD SCREW CARTRIDGE ASSEMBLY 82-13-1 O-Ring (Rear) The Lead Screw Assembly is shipped separately. Note: Install Electrical and Pneumatic Circuitry. Be Sure electrical and pneumatic

More information

Precision Miniature Load Cell. Models 8431, 8432 with Overload Protection

Precision Miniature Load Cell. Models 8431, 8432 with Overload Protection w Technical Product Information Precision Miniature Load Cell with Overload Protection 1. Introduction The load cells in the model 8431 and 8432 series are primarily designed for the measurement of force

More information

North Carolina FFA Association Agricultural Mechanics Career Development Event

North Carolina FFA Association Agricultural Mechanics Career Development Event North Carolina FFA Association Three (3) of the following Agricultural Mechanics Performance Skills will be selected for the state competition. North Carolina FFA Association Agricultural Mechanics Performance

More information

The Bonelle Tool and Cutter Grinder

The Bonelle Tool and Cutter Grinder The Bonelle Tool and Cutter Grinder The grinder was constructed about 1987 and exhibited at the 89th Model Engineering exhibition where it was awarded a bronze medal (see ME Vol164 No 3868 page 273). Subsequently

More information

AVENTOS HF Wood / wide aluminum door application

AVENTOS HF Wood / wide aluminum door application AVENTOS HF Wood / wide aluminum door application Lift mechanism set Lift mechanism (qty 2) #7 x 35 mm (-3/8 ) wood screw (qty 0) Power factor 85 230 ( lift mechanism req.) 20F2200.N5 23 470 20F2200.N5

More information

GEK-90214B. GE Lift Truck. User s Guide 144D2933G1 144D2912G1 144D2911G5

GEK-90214B. GE Lift Truck. User s Guide 144D2933G1 144D2912G1 144D2911G5 g GEK-90214B GE Lift Truck User s Guide 144D2933G1 144D2912G1 144D2911G5 GE LIFT TRUCK EACH USER HAS THE RESPONSIBILITY TO INSTRUCT ALL PERSONNEL ASSOCIATED WITH THIS EQUIPMENT ON ALL SAFETY PRECAUTIONS

More information

ALBINS SEQUENTIAL SHIFTER

ALBINS SEQUENTIAL SHIFTER ALBINS SEQUENTIAL SHIFTER Updated 12/11/11 8-AGB5-INST GENERAL NOTES The Albins Sequential Shifter is specifically designed for AGB transaxles. It features an integral reverse lockout lever and has a position

More information

V47 Series Temperature Actuated Modulating Water Valves

V47 Series Temperature Actuated Modulating Water Valves V47 Series Temperature Actuated Modulating Water Valves Master Catalog 125 Valves, Miscellaneous (Other Than Gas) Section V Product Bulletin V47 Issue Date 0286 Application The V47 modulating valves regulate

More information