ERTMS deployment challenges in a deregulated market. Björn Westerberg April 25, 2012
|
|
|
- Philomena O’Connor’
- 9 years ago
- Views:
Transcription
1 ERTMS deployment challenges in a deregulated market Björn Westerberg April 25, 2012
2 Agenda SJ AB Overview ERTMS Challenges 1 Service to Customer 2 OneCommonSystem 3 Finding a Business Case 2
3 SJ AB Operates 90% of rail passenger services in Sweden exceeding 100 km 55% share of the total Swedish rail market Approx. 4,500 employees Sales of SEK 9 billion in 2011 Limited liability company owned by the Swedish state 110,000 passengers per day 3
4 First challenge Service to the customer ERTMS is an internal railway production system Safe Reliable Cost efficient i Scandinavian cross border solutions already exist Norway/Sweden/Denmark/Germany Deployment of ERTMS shall not be noticed by the customers Please, do not disturbe! 4
5 ERTMS up and running in Sweden The new Botnia line opened with ERTMS august 2010 Demand from passengers and freight operators Traffic volumes delayed Temporary approvals Vehicles and infrastructure will be updated in several steps and some new borders have arisen 5
6 SJ achievements until April 2012 Started retrofitting first locos summer of 2009 ETCS and integrated STM Commercial operation Sept 2010 Botnia line with ERTMS Operation with STM on legacy system Over night trains Regional traffic with two EMU s Availability performance program 20 EMU s with ETCS/STM to be delivered before summer 2012 Tests performed with SJ s locos in Norway March
7 The Swedish approval process so far Unusually complicated Mix of national and TSI requirements (national STM and generic application ver 2.3.0d) Specific Application for each vehicle class Uncertainties about criteria for updates ISA and NoBo have been cost drivers Delays compared to original schedules Today Interims approval TSI conformity and RAM to be fulfilled There is only an integrated national STM Fig. SJ:s Approval roadmap for Rc6E 7
8 What to come Ådalsbanan planned for august 2012 Refurbished track and ERTMS trackside Haparanda and Västerdal lines Corridor B Stockholm/Hallsberg Öresund link Affects almost all rail traffic in Sweden Co-ordination between Dk, Se and No Installation while running rail traffic Lead time for vehicle retrofitting 3,5 years after official STM s are available Danish STM needed for the Øresund link Traffic with STM on legacy system will dominate the coming years Trafikverket has chosen the vehicle strategy 8
9 Second challenge one common system Quotes from ERA march
10 Software compatibility 42 different lines Built in mechanisms with changes and updates Complexity track vehicle Still an approval for each vehicle to each ERTMS line STM according to national requirements Major assets in each approved and operational system Changes and updates are cost drivers 10
11 Updates and approvals to come Planned updates Final version ETCS/STM (TSD 2.3.0d & RAM) Update of GSM-R to handle interference with public telecom Installation of Danish STM 2.3.0d incl. new Swedish approval Baseline 3 for ETCS Approvals and possible updates ETCS/STM to handle balis errors in legacy system (ATC) ETCS/STM to second Swedish trackside supplier ETCS/STM to track side supplier in eastern Denmark ETCS/STM to Norwegien track side supplier (not yet selected) Error corrections Cross border acceptance for updates Dependence on trackside planning and updates Man i cabbage field, Edvard Munch 1916, Nasjonalmuseet, Oslo 11
12 Reliability and LCC Life Cycle Cost Initial installation preliminary version Update BD 2.3.0d Update new trackside application Update STM dk Update Baseline 3 x.x x.x x.x x.x x.x x.x etc. SJ is participating in DSV-program (reliability verification) with other operators on behalf of the infrastructure owner Trafikverket. The DSV program will ensure a year of operation with the final software and regular reports to the Transport Safety Authority, that the system is reliable. Only after this, serial installation commence in both infrastructure and vehicles. The objective is that a new train protection system from a customer perspective is more efficient and stable than the old ATP-system. So far, 1.5 million km traveled in the DSV. The distance between traffic-disturbing failures was 3,449 km. Final software version EOS 3 will, at best, begin to be verified during autumn 2012 and will last for 12 months to come. SJ AB, JS
13 Overall steering and control ERA has the main responsibility but not sufficient resources Need to finalize ERTMS specifications Still national interests Cross acceptance progress slowly Need for stability in national requirements STM and approval process System owner on national level Fi F U i i 9 11 mars 2010 t ti t th ERTMS f i R Assignment and tasks Resources for system integration Fig. From Unisig presentation at the ERTMS conference in Rome 13
14 Third challenge Finding a business case Interoperability will be the same Proven solutions exists today Norway Sweden Denmark - Germany Botnia line is new infrastructure New revenues compared to costs and risks Business opportunities ERTMS on existing track Increased costs Technical risks and traffic disturbances Swedish corridor B is early deployment of level 2 on a line with intense traffic X2000 towards Stockholm in winter conditions Photo: Stefan Nilsson 14
15 A deregulated market Infrastructure Managers versus operators/rosco s Upfront investments depending on selected ERTMS strategy Present EU funding not sufficient i for operator s business cases Supply industry versus investors The signalling industry has - naturally - commercial interests Strong links to a supplier once it has been contracted NSA and NoBo s National organizational procedures Commercial interests and protecting accreditation ti Parties not getting benefits from ERTMS are delaying installation Fruit Dish, Bottle and Violin Pablo Picasso
16 Wish list before leaving shore A new traffic management system should: Be introduced without disturbing existing traffic Be cheaper than the system it replaces Offer higher capacity Be driven by commercial needs not by law ERTMS needs more business focus Båden sættes i søen, Oscar Björck 1884, Skagens Museum 16
17 How the ensure success for ERTMS in a deregulated market? Allways keep the rail customer in mind Understand and respect each others interests Operators are to take commercial risks and investments are to give financial return The wish list from operators: Clear decisions and reliable time schedules incl. time for testing and reliability assurance Service to rail customers during installation Finalize specifications ERA and NSA National STM s available System owner with resources for integretion When there is a positive business case for the operators, there will be momentum in ERTMS deployment Hip, Hip, Hurra. P.S. Krøyer, Skagen Museum 17
ERTMS for a competitive railway
ERTMS for a competitive railway A joint cross-border traffic management system for railways Sweden and Europe need a competitive railway system. With the focus on this, EU decided in 1996 that a standardized
IQ-C Action plan 2006-2008-2012 for rail freight corridor Rotterdam-Genoa
IQ-C Action plan 2006-2008-2012 for rail freight corridor Rotterdam-Genoa July 2006 (Initial Document) August 2008 (Update) The action plan has been decided upon by the Ministries of Transport from Germany,
Agenda. 1. The basis for the Danish Signalling Programme 2. Procurement Phase 3. Way ahead 4. Benefits
A Case study from Denmark Danish Signalling Programme Bent Ahlgren, Banedanmark and Anders Møller, Rambøll Agenda 1. The basis for the Danish Signalling Programme 2. Procurement Phase 3. Way ahead 4. Benefits
Coexistence between GSM-R and 3G / 4G-Systems in the 900 MHz Frequency Band - Swedish View.
Coexistence between GSM-R and 3G / 4G-Systems in the 900 MHz Frequency Band - Swedish View. TRV 2013/13976 1 March 2013 Contributors to this document Trafikverket (Swedish Transport Administration) Transportstyrelsen
GNSS for Train Control Systems
GNSS for Train Control Systems A step-change innovation for the competitiveness of the rail industry Francesco Rispoli VP Satellite Projects & Rail TLC Innovation and Competitivity Unit Brussels, 4 June
The Danish Transport System. Facts and Figures
The Danish Transport System Facts and Figures 2 The Ministry of Transport Udgivet af: Ministry of Transport Frederiksholms Kanal 27 DK-1220 København K Udarbejdet af: Transportministeriet ISBN, trykt version:
Fit for the European Rail Market Training Competence - Certification
SIAFI Europe Seminar Paris, 29 September 2008 Fit for the European Rail Market Training Competence - Certification European Railway Agency Interoperability Unit n 1 EU Rail Policy: The Core Aim To adapt
Banedanmark. TØF Jernbane i vækst. Signalprogrammet. Morten Søndergaard, Programme Director
Banedanmark TØF Jernbane i vækst. Signalprogrammet Juni 2010 Morten Søndergaard, Programme Director Agenda 1. Background 2. Total renewal principles 3. Roll out plans and time schedule 4. Procurement and
How to Overcome Challenges in Placing in Services of Rolling Stock Vehicles in Europe
How to Overcome Challenges in Placing in Services of Rolling Stock Vehicles in Europe Alfred Beer Unit Manager Rolling Stock (TÜV SÜD Rail GmbH, Germany) Lighthouse Event, Copenhagen, Denmark 20 th November
ERTMS/ETCS Configuration Management
ERTMS/ETCS Configuration Management Bernhard Stamm Siemens Transportation Systems Nick Cory Bombardier Transportation 1 Configuration Management What is it? What to? Why? How? When? Who does it? 2 Configuration
Signaling Programme. Signaling Programme - Laboratory Test. 05.05.2015 Gitte Oberbossel
Signaling Programme Signaling Programme - Laboratory Test 05.05.2015 Gitte Oberbossel 1 Agenda F-Banen signaling programme and migration strategy Simple solution overview of signaling programme and scope
The Shared Railway System - The framework. Richard Lockett Head of Cross Acceptance European Railway Agency
The Shared Railway System - The framework Richard Lockett Head of Cross Acceptance European Railway Agency Agenda ERA A shared system 6 key principles Comparisons- Imagine if.? 2 The European Railway Agency
ERTMS deployment in Spain as a real demonstration of interoperability. Near future challenges
ERTMS deployment in Spain as a real demonstration of interoperability. Near future challenges J. Iglesias 1, A. Arranz 1, M. Cambronero 1,C. de la Roza 1, B. Domingo 1, J. Tamarit 2, J. Bueno 2, C. Arias
Banebranchen New line Copenhagen-Ringsted
Banebranchen New line Copenhagen-Ringsted 11th May 2011 High speed Copenhagen-Ringsted High speed Copenhagen Ringsted first phase of The one-hour target Caracteristics Denmark s first High-Speed railway,
White Paper European Railway Traffic Management System - ERTMS
Kapsch CarrierCom White Paper European Railway Traffic Management System - ERTMS always one step ahead ERTMS: A common signaling and communication system. Railways operate in a competitive environment
Trade & Transport Corridors. European Projects & Initiatives
Trade & Transport Corridors European Projects & Initiatives Trade Corridors A concept in evolution WORLD BANK Assisting land-locked countries which depend on overland routes to access sea-ports for international
Congestion management Dansk Energi`s complaint regarding Swedish TSO practice
European Commission DG Competition Antitrust registry B149 BRUSSELS Belgium Deres ref./your ref.: Vår ref./our ref.: Dato/date.: 5/78 Oslo, 27 October 26 742/HOW/SL Congestion management Dansk Energi`s
RAIL FREIGHT CORRIDOR 1 NSA WORKING GROUP GUIDELINE FOR CCS AUTHORISATION ON RAIL FREIGHT CORRIDOR 1
RAIL FREIGHT CORRIDOR 1 NSA WORKING GROUP GUIDELINE FOR CCS AUTHORISATION ON RAIL FREIGHT CORRIDOR 1 Version : 1.0 Date : 13/12/2013 Guideline for CCS Authorisation Version 1.0 1 / 67 Edited by Quality
BOMBARDIER INTERFLO*550 for ERTMS Regional
BOMBARDIER INTERFLO*550 for ERTMS Regional An application of ERTMS technology for Regional lines *Trademark of Bombardier Inc. and its subsidiaries What is Regional ERTMS? A UIC initiative, originally
CTCS Chinese Train Control System
CTCS Chinese Train Control System B. Ning, T. Tang, K. Qiu, C. Gao & Q. Wang Department of Control Engineering, School of Electronics and Information Engineering, Northern Jiaotong University, P. R. China
Train Fund Denmark. Electrification of the main railway lines Realisation of the 1 Hour Model vision. 1 Hour. Transportministeriet
Train Fund Denmark Train Fund Denmark 3.7 billion Euro from harmonization of the tax revenues in the North Sea will finance a major modernisation of the Danish railway. Train Fund Denmark will finance
This is why the Swedish Transport Administration was formed
This is why the Swedish Transport Administration was formed An approach that embraces all means of transportation A clearer customer perspective Strong regional ties A more efficient organisation To support
HS line TSI Conformity Certification and Safety Assessment
Roma-Napoli HS line TSI Conformity Certification and Safety Assessment Roma, 16 December 2004 Carlo Carganico Rome Naples Certification: contents EU and Italian railway legislation RFI: role and responsibility
Railway Simulation & Timetable Planning
Your Local Partner for Railway Projects Anywhere in South East Asia Railway Simulation & Timetable Planning Engineering & Maintenance CONSULTING SIMULATION PLANNING ENGINEERING PRODUCTS TECH SUPPORT Simulation
Measure 9: Updating the interoperability directives on high-speed and conventional railway networks First page:
Measure 9: Updating the interoperability directives on high-speed and conventional railway networks First page: Policy package: 2A: Rail liberalisation and harmonisation Measure 9: Updating the interoperability
TEN-T guidelines and CEF
TEN-T guidelines and CEF 2e TEN-T CONFERENTIE Duurzame samenwerking in de logistieke sector Nederland Noordrijn-Westfalen Horst Herald Ruijters MOVE B1, 30 October 2014 What is the new trans-european transport
Rail Liberalisation in Sweden Evolution, Experience and Future Outlook
Rail Liberalisation in Sweden Evolution, Experience and Future Outlook Dr. Gunnar Alexandersson Senior Policy Adviser Association of Swedish Train Operating Companies - ASTOC Visit from RFF, 25 October
NOBINA AB INVESTOR PRESENTATION, Q3, SEPTEMBER NOVEMBER 2015
NOBINA AB INVESTOR PRESENTATION,, SEPTEMBER NOVEMBER 2015 LARGEST PUBLIC TRANSPORT COMPANY IN THE NORDIC REGION Nobina s economies of scale, market expertrise and outstanding bus fleet, combined with long-term
European Power Exchanges Challenges for market integration
Mikael Lundin CEO Nord Pool Spot AS European Power Exchanges Challenges for market integration Helsinki, March 17 th 2011 About Nord Pool Spot Nord Pool Spot runs the largest market for power in the world
Financing the European Mobility Network with the Connecting Europe Facility
Financing the European Mobility Network with the Connecting Europe Facility Stéphane Ouaki, Head of Unit DG MOVE, European Commission Budapest, 22 January 2013 Key elements of the new TEN-T policy Support
COMMISSION IMPLEMENTING DECISION. of XXX
EUROPEAN COMMISSION Brussels, XXX [ ](2015) XXX draft COMMISSION IMPLEMENTING DECISION of XXX amending Commission Implementing Decision C(2014) 1921 as amended by Decision C(2015) 2192 establishing a Multi-Annual
Climate and sustainable energy work in Regional Council of Skåne and the. Next Move project
Climate and sustainable energy work in Regional Council of Skåne and the Next Move project Oddvar Fiskesjö Environmental Unit Development and urban planning Regional Council of Skåne Sweden Skåne Southernmost
3 RBC INTERFACE TO INTERLOCKINGS IN FINLAND
RBC INTERFACE TO CURRENT INTERLOCKINGS IN FINLAND Laura Järvinen, M.Sc (Tech), VR Track Oy Lassi Matikainen, M.Sc. (Tech), VR Track Oy SUMMARY The signalling systems in Finland originate from many decades
BV has developed as well as initiated development of several simulation models. The models communicate with the Track Information System, BIS.
Simulation models: important aids for Banverket's planning process M. Wahlborg Banverket Swedish National Rail Administration, Planning Department, S-781 85 Borlange, Sweden Abstract When making decisions
ERTMS UNIT ERTMS CHANGE CONTROL MANAGEMENT EUROPEAN RAILWAY AGENCY. Reference: ERA_ERTMS_0001 Document type: Version : 1.2.
EUROPEAN RAILWAY AGENCY ERTMS UNIT Reference: ERA_ERTMS_0001 Document type: Version : 1.2 Date : 11/05/06 Name Edited by Quality review Approved by A. HOUGARDY E. LEPAILLEUR A. CHIAPPINI P. GUIDO Position
Investment projects on PKP Polish Railway Lines network
Railway Kolej of the nowoczesnych new technologies technologii Railway of the new technologies Investment projects on PKP Polish Railway Lines network Warsaw, October 2012 Jacek Poniewierski Director of
Financial Analysis, Traffic Forecast and Analysis of Railway Payment
FIXED LINK ACROSS FEHMARNBELT Trafikministeriet, København Bundesministerium für Verkehr, Bau- und Wohnungswesen, Berlin Financial Analysis, Traffic Forecast and Analysis of Railway Payment Summary Report
Certification Case: Locomotives for Corridor A (and more)
Certification Case: Locomotives for Corridor A (and more) Dr.ir. L. (Lieuwe) Zigterman MIRSE Inhoud Lieuwe Zigterman DoorZigt B.V. Casus: certificering ES64F4: Gebaseerd op ervaringen opgedaan bij KEMA
Application Form Part A
A1 Proposal TENtec nr. 2014-FI-TM-0142-M (26195427) MAP Call 2014 F01 Priority 1: (F01) Pre-identified projects on the Core Network corridors Railways Inland Waterways and Ports Roads Maritime Ports Priority
European Rail Traffic Management System (ERTMS) Complete Solutions for ETCS and GSM-R
European Rail Traffic Management System (ERTMS) Complete Solutions for ETCS and GSM-R Basis for interoperability European Rail Traffic Management System from Siemens Transportation Systems and Nokia Siemens
Power market integration. Geir-Arne Mo Team Lead Nordic Spot Trading Bergen Energi AS
Power market integration Geir-Arne Mo Team Lead Nordic Spot Trading Bergen Energi AS 1 Geir-Arne Mo Some background information: Working for Bergen Energi since 2015 Team Lead Nordic Spot Trading I work
ERTMS - National implementation plan
ERTMS Page: 2 av 9 ERTMS - National implementation plan 00E First release 09.07.2013 KLY SKEI KJENSV Revision Reason for issue Date Created by Contr. by Appr. by Title: ERTMS - National implementation
Interim report January 1 March 31, 2014
Odd Molly International AB (publ) Stockholm, Sweden, April 29, 2014 Interim report January 1 March 31, 2014 More stores and new sales organization January 1 March 31, 2014 Net sales amounted to SEK 82.8
Andrew Hulatt Vix Technology Electronic Ticketing interoperability, standards & future
Andrew Hulatt Vix Technology Electronic Ticketing interoperability, standards & future Vix Technology Overview Over 25 years of experience 17 offices in 13 countries 120 MEUR revenue 80M smartcards in
Service Catalog in PostNord. Dorthe Benche 24-04-2015
Service Catalog in PostNord Dorthe Benche 24-04-2015 This is PostNord PostNord offers communication and logistics solutions to, from and within the Nordic region. We are the regional industry leader and
Weight and dimensions of heavy commercial vehicles as established by Directive 96/53/EC and the European Modular System (EMS)
Weight and dimensions of heavy commercial vehicles as established by Directive 96/53/EC and the European Modular System (EMS) Workshop on LHVs Stefan Larsson Director, Regulatory Projects June 24, 2009
2015 CEF Transport Calls for Proposals COUNTRY FICHE. Czech Republic
Millions Millions Millions 2015 CEF Transport Calls for s COUNTRY FICHE Czech Republic Key facts and figures Evaluation results Eligible vs Recommended proposals by call 700 600 500 400 300 200 100 0 32
A Greener Transport System in Denmark. Environmentally Friendly and Energy Efficient Transport
A Greener Transport System in Denmark Environmentally Friendly and Energy Efficient Transport Udgivet af: Ministry of Transport Frederiksholms Kanal 27 DK-1220 København K Udarbejdet af: Transportministeriet
Focus on the SAS Group 2006
Focus on the SAS Group 2006 The SAS Group s airline network and hotels Approx. 1,520 daily departures 147 destinations 217 hotels The SAS Group is the 4 th largest airline group in Europe The SAS Group
Railway Safety Directive 2004/49/EC
Railway Safety Directive 2004/49/EC Dragan JOVICIC Safety Assessment Sector Slide n 1 Content 1. Existing railway context & 1 st steps for establishing a EU railway area 2. Objectives of the European Union
Toll ring around Oslo: How car owners help paying for improved mobility, and better environment too
Toll ring around Oslo: How car owners help paying for improved mobility, and better environment too Kristian Wærsted City Hall Chief Engineer (NPRA) Road tolling in Norway Trondheim Bergen (1986) (1991)
A WIDER SHARING ECOSYSTEM. The pivotal role of data in transport solutions
A WIDER SHARING ECOSYSTEM The pivotal role of data in transport solutions October 2015 A MARKET ON THE MOVE CONTENTS 3 TRANSPORT TRENDS 4 THE ROAD AHEAD 5 TRANSPARENCY LEADS TO TRUST 6 DATA LOCATION AND
Nordic Waterproofing announces its initial public offering on Nasdaq Stockholm and prospectus in connection therewith
PRESS RELASE Helsingborg, Sweden, 30 May 2016 Nordic Waterproofing announces its initial public offering on Nasdaq Stockholm and prospectus in connection therewith IN WHICH THE DISTRIBUTION OR RELEASE
Return of experience on certification of the CCS subsystem from the independent laboratories
Return of experience on certification of the CCS subsystem from the independent laboratories ERA ETCS Conference on Testing and Certification 29th of March in Lille Contents Brief Introduction into the
ALL-ELECTRIC CAR SUBSCRIPTION
ALL-ELECTRIC CAR SUBSCRIPTION Car ownership is losing its value as status symbol. To an increasing number of people the car is just a way to transport themselves between different locations. It is access
ATLAS. Proven Technology & Partnership For interoperability
ATLAS Trainborne ETCS solution Proven Technology & Partnership For interoperability TECHNOLOGY AND INTEGRATION EXPERTISE YOU CAN RELY ON The ERTMS (European Rail Traffic Management System) standard aims
ScandFibre Logistics. Rail conquers sea? Mats Erkén Baltic Shipping Days. Oct 30th, 2012
ScandFibre Logistics Rail conquers sea? Mats Erkén Baltic Shipping Days Oct 30th, 2012 ScandFibre Logistics - Owners / Partners 20 % each 10 plants total 2 History 2000-2005 Phase 1 - Rail 99 2006-2010
Public Transport in Sweden Organisation and Integration
Public Transport in Sweden Organisation and Integration Bertil Hylén VTI Statens väg- och transportforskningsinstitut Swedish National Road and Transport Reearch Institute [email protected] Poland Basic
HSL Zuid. Phase II Implementation Concept. Final Report. Study for alternative transport system on HSL Zuid
HSL Zuid Phase II Implementation Concept Final Report Study for alternative transport system on HSL Zuid DB International GmbH Central Germany and Western Europe Oskar-Sommer-Straße 15 D-60596 Frankfurt
UNIFE World Rail Market Study
UNIFE World Rail Market Study Status quo and outlook 2020 Commissioned by UNIFE, the European Rail Industry And conducted by The Boston Consulting Group 2 1 Executive Summary This is the third "World Rail
AGREEMENT REGARDING THE EXECUTIVE BOARD OF RAIL FREIGHT CORRIDOR RHINE-ALPINE
AGREEMENT REGARDING THE EXECUTIVE BOARD OF RAIL FREIGHT CORRIDOR RHINE-ALPINE Zeebrugge- Antwerp/Amsterdam/Vlissingen/Rotterdam/Duisburg-Basel-Milan-Genoa BETWEEN THE MINISTERS IN CHARGE OF TRANSPORT OF
Procedures during the settlement of claims
Procedures during the settlement of claims 1 Introduction Liability and compensation in the event of property damage or personal injury are specified in the Swedish Transport Administration's General Terms
VÝZKUMNÝ ÚSTAV ŽELEZNIČNÍ, a.s.
VÝZKUMNÝ ÚSTAV ŽELEZNIČNÍ, a.s. Railway Research Institute, j.s.c. www.cdvuz.cz Test Centre VUZ Velim Who we are A joint stock profit making company The shares are owned by Czech Railways, j.s.c. VUZ is
SHOPPING CENTRES IN SWEDEN. - Part of the Olav Thon Group
SHOPPING CENTRES IN SWEDEN - Part of the Olav Thon Group 2016 SWEDEN WE ARE INVESTING IN SWEDEN! 2 SWEDEN The Olav Thon Group currently owns and manages 12 Swedish shopping centres, and has thus positioned
Finn Frogne A/S. The World Leader in Taxi Technology. Nye partnerskaber
Finn Frogne A/S The World Leader in Technology Nye partnerskaber Finn Frogne A/S Among the biggest suppliers of Traffic Management Systems with 40 years of experience 8.000 systems in use with 60.000 components,
High speed railway principles
High speed railway principles Ignacio Barrón de Angoiti, Director High Speed, International Railway Association (UIC) Professional Conference on High Speed In the World and in the Czech Republic Praha,
SAS Q3 2014/2015 TELECONFERENCE 08.09.2015
SAS Q3 2014/2015 TELECONFERENCE 08.09.2015 Q3 brief summary Q3 update Commercial initiatives paying off EuroBonus members up 15% - now 4 million Summer program with 47 seasonal routes well received by
Complementary Tests: the key of the successful ERTMS deployment in Spain.
Complementary Tests: the key of the successful ERTMS deployment in Spain. M. Cambronero 1, A.. Arranz 1,, C. de la Roza 1, B. Domingo 1, J. Gómez 1 ; J. Iglesias 1, J. Santiago 2, C. Arias 3 1 ADIF. Spanish
Metrological standardisation for rail applications of satellite based localisation systems
1. Introduction 2. System parts 3. Metrological values 4. Standardisation of metrology 5. Applications 6. Conclusion Metrological standardisation for rail applications of satellite based localisation systems
SUPPLY, DEMAND, ENERGY AND LOCATION: THE FOUR PILLARS TO SUCCESS
SUPPLY, DEMAND, ENERGY AND LOCATION: THE FOUR PILLARS TO SUCCESS DC RADAR The second edition of the Arcadis European Data Centre Radar, produced in conjunction with ixconsulting, is based upon extensive
Common Safety Method for risk evaluation and assessment
Common Safety Method for risk evaluation and assessment Guidance on the application of Commission Regulation (EU) 402/2013 March 2015 Contents 1. Introduction 4 Background 4 Purpose of this guidance 5
Travel pros and cons of the use of tourism statistics as a source
Travel pros and cons of the use of tourism statistics as a source Selma M. Mulalic Nordic meeting Stockholm, September 2012 Settlements statistics terminated Settlements statistics terminated by end 2004
SUPPLY, DEMAND, ENERGY AND LOCATION: THE FOUR PILLARS TO SUCCESS
SUPPLY, DEMAND, ENERGY AND LOCATION: THE FOUR PILLARS TO SUCCESS DC RADAR The second edition of the Arcadis European Data Centre Radar, produced in conjunction with ixconsulting, is based upon extensive
TECHNOLOGICAL MATURITY OF ERTMS ON THE READINESS OF ERTMS BASED SIGNALLING
Intended for Ministerie van Infrastructure en Milieu Document type Report Date August 2013 TECHNOLOGICAL MATURITY OF ERTMS ON THE READINESS OF ERTMS BASED SIGNALLING CONTENTS Executive Summary 1 1. INTRODUCTION
Why build the Silvertown Tunnel?
Why build the Silvertown Tunnel? Over the last 30 years east London has changed with the redevelopment of former industrial areas into major commercial and residential districts. The development of Canary
siemens.com/mobility Metro Oslo Environmental Product Declaration according to ISO 14021
siemens.com/mobility Metro Oslo Environmental Product Declaration according to ISO 14021 Product description One train consists of three cars in the configuration Mc-M-Mc. The cars at the front and at
GSM-Railway Yesterday, Today and Tomorrow. Peter Tiberg May 2009
GSM-Railway Yesterday, Today and Tomorrow Peter Tiberg May 2009 1 Nokia Siemens Networks Agenda GSM-R? Yesterday, Today, Tomorrow Challenges 2 Nokia Siemens Networks Make trains the first choice for 21st