ERTMS deployment challenges in a deregulated market. Björn Westerberg April 25, 2012

Size: px
Start display at page:

Download "ERTMS deployment challenges in a deregulated market. Björn Westerberg April 25, 2012"

Transcription

1 ERTMS deployment challenges in a deregulated market Björn Westerberg April 25, 2012

2 Agenda SJ AB Overview ERTMS Challenges 1 Service to Customer 2 OneCommonSystem 3 Finding a Business Case 2

3 SJ AB Operates 90% of rail passenger services in Sweden exceeding 100 km 55% share of the total Swedish rail market Approx. 4,500 employees Sales of SEK 9 billion in 2011 Limited liability company owned by the Swedish state 110,000 passengers per day 3

4 First challenge Service to the customer ERTMS is an internal railway production system Safe Reliable Cost efficient i Scandinavian cross border solutions already exist Norway/Sweden/Denmark/Germany Deployment of ERTMS shall not be noticed by the customers Please, do not disturbe! 4

5 ERTMS up and running in Sweden The new Botnia line opened with ERTMS august 2010 Demand from passengers and freight operators Traffic volumes delayed Temporary approvals Vehicles and infrastructure will be updated in several steps and some new borders have arisen 5

6 SJ achievements until April 2012 Started retrofitting first locos summer of 2009 ETCS and integrated STM Commercial operation Sept 2010 Botnia line with ERTMS Operation with STM on legacy system Over night trains Regional traffic with two EMU s Availability performance program 20 EMU s with ETCS/STM to be delivered before summer 2012 Tests performed with SJ s locos in Norway March

7 The Swedish approval process so far Unusually complicated Mix of national and TSI requirements (national STM and generic application ver 2.3.0d) Specific Application for each vehicle class Uncertainties about criteria for updates ISA and NoBo have been cost drivers Delays compared to original schedules Today Interims approval TSI conformity and RAM to be fulfilled There is only an integrated national STM Fig. SJ:s Approval roadmap for Rc6E 7

8 What to come Ådalsbanan planned for august 2012 Refurbished track and ERTMS trackside Haparanda and Västerdal lines Corridor B Stockholm/Hallsberg Öresund link Affects almost all rail traffic in Sweden Co-ordination between Dk, Se and No Installation while running rail traffic Lead time for vehicle retrofitting 3,5 years after official STM s are available Danish STM needed for the Øresund link Traffic with STM on legacy system will dominate the coming years Trafikverket has chosen the vehicle strategy 8

9 Second challenge one common system Quotes from ERA march

10 Software compatibility 42 different lines Built in mechanisms with changes and updates Complexity track vehicle Still an approval for each vehicle to each ERTMS line STM according to national requirements Major assets in each approved and operational system Changes and updates are cost drivers 10

11 Updates and approvals to come Planned updates Final version ETCS/STM (TSD 2.3.0d & RAM) Update of GSM-R to handle interference with public telecom Installation of Danish STM 2.3.0d incl. new Swedish approval Baseline 3 for ETCS Approvals and possible updates ETCS/STM to handle balis errors in legacy system (ATC) ETCS/STM to second Swedish trackside supplier ETCS/STM to track side supplier in eastern Denmark ETCS/STM to Norwegien track side supplier (not yet selected) Error corrections Cross border acceptance for updates Dependence on trackside planning and updates Man i cabbage field, Edvard Munch 1916, Nasjonalmuseet, Oslo 11

12 Reliability and LCC Life Cycle Cost Initial installation preliminary version Update BD 2.3.0d Update new trackside application Update STM dk Update Baseline 3 x.x x.x x.x x.x x.x x.x etc. SJ is participating in DSV-program (reliability verification) with other operators on behalf of the infrastructure owner Trafikverket. The DSV program will ensure a year of operation with the final software and regular reports to the Transport Safety Authority, that the system is reliable. Only after this, serial installation commence in both infrastructure and vehicles. The objective is that a new train protection system from a customer perspective is more efficient and stable than the old ATP-system. So far, 1.5 million km traveled in the DSV. The distance between traffic-disturbing failures was 3,449 km. Final software version EOS 3 will, at best, begin to be verified during autumn 2012 and will last for 12 months to come. SJ AB, JS

13 Overall steering and control ERA has the main responsibility but not sufficient resources Need to finalize ERTMS specifications Still national interests Cross acceptance progress slowly Need for stability in national requirements STM and approval process System owner on national level Fi F U i i 9 11 mars 2010 t ti t th ERTMS f i R Assignment and tasks Resources for system integration Fig. From Unisig presentation at the ERTMS conference in Rome 13

14 Third challenge Finding a business case Interoperability will be the same Proven solutions exists today Norway Sweden Denmark - Germany Botnia line is new infrastructure New revenues compared to costs and risks Business opportunities ERTMS on existing track Increased costs Technical risks and traffic disturbances Swedish corridor B is early deployment of level 2 on a line with intense traffic X2000 towards Stockholm in winter conditions Photo: Stefan Nilsson 14

15 A deregulated market Infrastructure Managers versus operators/rosco s Upfront investments depending on selected ERTMS strategy Present EU funding not sufficient i for operator s business cases Supply industry versus investors The signalling industry has - naturally - commercial interests Strong links to a supplier once it has been contracted NSA and NoBo s National organizational procedures Commercial interests and protecting accreditation ti Parties not getting benefits from ERTMS are delaying installation Fruit Dish, Bottle and Violin Pablo Picasso

16 Wish list before leaving shore A new traffic management system should: Be introduced without disturbing existing traffic Be cheaper than the system it replaces Offer higher capacity Be driven by commercial needs not by law ERTMS needs more business focus Båden sættes i søen, Oscar Björck 1884, Skagens Museum 16

17 How the ensure success for ERTMS in a deregulated market? Allways keep the rail customer in mind Understand and respect each others interests Operators are to take commercial risks and investments are to give financial return The wish list from operators: Clear decisions and reliable time schedules incl. time for testing and reliability assurance Service to rail customers during installation Finalize specifications ERA and NSA National STM s available System owner with resources for integretion When there is a positive business case for the operators, there will be momentum in ERTMS deployment Hip, Hip, Hurra. P.S. Krøyer, Skagen Museum 17

ERTMS for a competitive railway

ERTMS for a competitive railway ERTMS for a competitive railway A joint cross-border traffic management system for railways Sweden and Europe need a competitive railway system. With the focus on this, EU decided in 1996 that a standardized

More information

IQ-C Action plan 2006-2008-2012 for rail freight corridor Rotterdam-Genoa

IQ-C Action plan 2006-2008-2012 for rail freight corridor Rotterdam-Genoa IQ-C Action plan 2006-2008-2012 for rail freight corridor Rotterdam-Genoa July 2006 (Initial Document) August 2008 (Update) The action plan has been decided upon by the Ministries of Transport from Germany,

More information

Agenda. 1. The basis for the Danish Signalling Programme 2. Procurement Phase 3. Way ahead 4. Benefits

Agenda. 1. The basis for the Danish Signalling Programme 2. Procurement Phase 3. Way ahead 4. Benefits A Case study from Denmark Danish Signalling Programme Bent Ahlgren, Banedanmark and Anders Møller, Rambøll Agenda 1. The basis for the Danish Signalling Programme 2. Procurement Phase 3. Way ahead 4. Benefits

More information

Coexistence between GSM-R and 3G / 4G-Systems in the 900 MHz Frequency Band - Swedish View.

Coexistence between GSM-R and 3G / 4G-Systems in the 900 MHz Frequency Band - Swedish View. Coexistence between GSM-R and 3G / 4G-Systems in the 900 MHz Frequency Band - Swedish View. TRV 2013/13976 1 March 2013 Contributors to this document Trafikverket (Swedish Transport Administration) Transportstyrelsen

More information

GNSS for Train Control Systems

GNSS for Train Control Systems GNSS for Train Control Systems A step-change innovation for the competitiveness of the rail industry Francesco Rispoli VP Satellite Projects & Rail TLC Innovation and Competitivity Unit Brussels, 4 June

More information

The Danish Transport System. Facts and Figures

The Danish Transport System. Facts and Figures The Danish Transport System Facts and Figures 2 The Ministry of Transport Udgivet af: Ministry of Transport Frederiksholms Kanal 27 DK-1220 København K Udarbejdet af: Transportministeriet ISBN, trykt version:

More information

Fit for the European Rail Market Training Competence - Certification

Fit for the European Rail Market Training Competence - Certification SIAFI Europe Seminar Paris, 29 September 2008 Fit for the European Rail Market Training Competence - Certification European Railway Agency Interoperability Unit n 1 EU Rail Policy: The Core Aim To adapt

More information

Banedanmark. TØF Jernbane i vækst. Signalprogrammet. Morten Søndergaard, Programme Director

Banedanmark. TØF Jernbane i vækst. Signalprogrammet. Morten Søndergaard, Programme Director Banedanmark TØF Jernbane i vækst. Signalprogrammet Juni 2010 Morten Søndergaard, Programme Director Agenda 1. Background 2. Total renewal principles 3. Roll out plans and time schedule 4. Procurement and

More information

How to Overcome Challenges in Placing in Services of Rolling Stock Vehicles in Europe

How to Overcome Challenges in Placing in Services of Rolling Stock Vehicles in Europe How to Overcome Challenges in Placing in Services of Rolling Stock Vehicles in Europe Alfred Beer Unit Manager Rolling Stock (TÜV SÜD Rail GmbH, Germany) Lighthouse Event, Copenhagen, Denmark 20 th November

More information

ERTMS/ETCS Configuration Management

ERTMS/ETCS Configuration Management ERTMS/ETCS Configuration Management Bernhard Stamm Siemens Transportation Systems Nick Cory Bombardier Transportation 1 Configuration Management What is it? What to? Why? How? When? Who does it? 2 Configuration

More information

Signaling Programme. Signaling Programme - Laboratory Test. 05.05.2015 Gitte Oberbossel

Signaling Programme. Signaling Programme - Laboratory Test. 05.05.2015 Gitte Oberbossel Signaling Programme Signaling Programme - Laboratory Test 05.05.2015 Gitte Oberbossel 1 Agenda F-Banen signaling programme and migration strategy Simple solution overview of signaling programme and scope

More information

The Shared Railway System - The framework. Richard Lockett Head of Cross Acceptance European Railway Agency

The Shared Railway System - The framework. Richard Lockett Head of Cross Acceptance European Railway Agency The Shared Railway System - The framework Richard Lockett Head of Cross Acceptance European Railway Agency Agenda ERA A shared system 6 key principles Comparisons- Imagine if.? 2 The European Railway Agency

More information

ERTMS deployment in Spain as a real demonstration of interoperability. Near future challenges

ERTMS deployment in Spain as a real demonstration of interoperability. Near future challenges ERTMS deployment in Spain as a real demonstration of interoperability. Near future challenges J. Iglesias 1, A. Arranz 1, M. Cambronero 1,C. de la Roza 1, B. Domingo 1, J. Tamarit 2, J. Bueno 2, C. Arias

More information

Banebranchen New line Copenhagen-Ringsted

Banebranchen New line Copenhagen-Ringsted Banebranchen New line Copenhagen-Ringsted 11th May 2011 High speed Copenhagen-Ringsted High speed Copenhagen Ringsted first phase of The one-hour target Caracteristics Denmark s first High-Speed railway,

More information

White Paper European Railway Traffic Management System - ERTMS

White Paper European Railway Traffic Management System - ERTMS Kapsch CarrierCom White Paper European Railway Traffic Management System - ERTMS always one step ahead ERTMS: A common signaling and communication system. Railways operate in a competitive environment

More information

Trade & Transport Corridors. European Projects & Initiatives

Trade & Transport Corridors. European Projects & Initiatives Trade & Transport Corridors European Projects & Initiatives Trade Corridors A concept in evolution WORLD BANK Assisting land-locked countries which depend on overland routes to access sea-ports for international

More information

Congestion management Dansk Energi`s complaint regarding Swedish TSO practice

Congestion management Dansk Energi`s complaint regarding Swedish TSO practice European Commission DG Competition Antitrust registry B149 BRUSSELS Belgium Deres ref./your ref.: Vår ref./our ref.: Dato/date.: 5/78 Oslo, 27 October 26 742/HOW/SL Congestion management Dansk Energi`s

More information

RAIL FREIGHT CORRIDOR 1 NSA WORKING GROUP GUIDELINE FOR CCS AUTHORISATION ON RAIL FREIGHT CORRIDOR 1

RAIL FREIGHT CORRIDOR 1 NSA WORKING GROUP GUIDELINE FOR CCS AUTHORISATION ON RAIL FREIGHT CORRIDOR 1 RAIL FREIGHT CORRIDOR 1 NSA WORKING GROUP GUIDELINE FOR CCS AUTHORISATION ON RAIL FREIGHT CORRIDOR 1 Version : 1.0 Date : 13/12/2013 Guideline for CCS Authorisation Version 1.0 1 / 67 Edited by Quality

More information

BOMBARDIER INTERFLO*550 for ERTMS Regional

BOMBARDIER INTERFLO*550 for ERTMS Regional BOMBARDIER INTERFLO*550 for ERTMS Regional An application of ERTMS technology for Regional lines *Trademark of Bombardier Inc. and its subsidiaries What is Regional ERTMS? A UIC initiative, originally

More information

CTCS Chinese Train Control System

CTCS Chinese Train Control System CTCS Chinese Train Control System B. Ning, T. Tang, K. Qiu, C. Gao & Q. Wang Department of Control Engineering, School of Electronics and Information Engineering, Northern Jiaotong University, P. R. China

More information

Train Fund Denmark. Electrification of the main railway lines Realisation of the 1 Hour Model vision. 1 Hour. Transportministeriet

Train Fund Denmark. Electrification of the main railway lines Realisation of the 1 Hour Model vision. 1 Hour. Transportministeriet Train Fund Denmark Train Fund Denmark 3.7 billion Euro from harmonization of the tax revenues in the North Sea will finance a major modernisation of the Danish railway. Train Fund Denmark will finance

More information

This is why the Swedish Transport Administration was formed

This is why the Swedish Transport Administration was formed This is why the Swedish Transport Administration was formed An approach that embraces all means of transportation A clearer customer perspective Strong regional ties A more efficient organisation To support

More information

HS line TSI Conformity Certification and Safety Assessment

HS line TSI Conformity Certification and Safety Assessment Roma-Napoli HS line TSI Conformity Certification and Safety Assessment Roma, 16 December 2004 Carlo Carganico Rome Naples Certification: contents EU and Italian railway legislation RFI: role and responsibility

More information

Railway Simulation & Timetable Planning

Railway Simulation & Timetable Planning Your Local Partner for Railway Projects Anywhere in South East Asia Railway Simulation & Timetable Planning Engineering & Maintenance CONSULTING SIMULATION PLANNING ENGINEERING PRODUCTS TECH SUPPORT Simulation

More information

Measure 9: Updating the interoperability directives on high-speed and conventional railway networks First page:

Measure 9: Updating the interoperability directives on high-speed and conventional railway networks First page: Measure 9: Updating the interoperability directives on high-speed and conventional railway networks First page: Policy package: 2A: Rail liberalisation and harmonisation Measure 9: Updating the interoperability

More information

TEN-T guidelines and CEF

TEN-T guidelines and CEF TEN-T guidelines and CEF 2e TEN-T CONFERENTIE Duurzame samenwerking in de logistieke sector Nederland Noordrijn-Westfalen Horst Herald Ruijters MOVE B1, 30 October 2014 What is the new trans-european transport

More information

Rail Liberalisation in Sweden Evolution, Experience and Future Outlook

Rail Liberalisation in Sweden Evolution, Experience and Future Outlook Rail Liberalisation in Sweden Evolution, Experience and Future Outlook Dr. Gunnar Alexandersson Senior Policy Adviser Association of Swedish Train Operating Companies - ASTOC Visit from RFF, 25 October

More information

NOBINA AB INVESTOR PRESENTATION, Q3, SEPTEMBER NOVEMBER 2015

NOBINA AB INVESTOR PRESENTATION, Q3, SEPTEMBER NOVEMBER 2015 NOBINA AB INVESTOR PRESENTATION,, SEPTEMBER NOVEMBER 2015 LARGEST PUBLIC TRANSPORT COMPANY IN THE NORDIC REGION Nobina s economies of scale, market expertrise and outstanding bus fleet, combined with long-term

More information

European Power Exchanges Challenges for market integration

European Power Exchanges Challenges for market integration Mikael Lundin CEO Nord Pool Spot AS European Power Exchanges Challenges for market integration Helsinki, March 17 th 2011 About Nord Pool Spot Nord Pool Spot runs the largest market for power in the world

More information

Financing the European Mobility Network with the Connecting Europe Facility

Financing the European Mobility Network with the Connecting Europe Facility Financing the European Mobility Network with the Connecting Europe Facility Stéphane Ouaki, Head of Unit DG MOVE, European Commission Budapest, 22 January 2013 Key elements of the new TEN-T policy Support

More information

COMMISSION IMPLEMENTING DECISION. of XXX

COMMISSION IMPLEMENTING DECISION. of XXX EUROPEAN COMMISSION Brussels, XXX [ ](2015) XXX draft COMMISSION IMPLEMENTING DECISION of XXX amending Commission Implementing Decision C(2014) 1921 as amended by Decision C(2015) 2192 establishing a Multi-Annual

More information

Climate and sustainable energy work in Regional Council of Skåne and the. Next Move project

Climate and sustainable energy work in Regional Council of Skåne and the. Next Move project Climate and sustainable energy work in Regional Council of Skåne and the Next Move project Oddvar Fiskesjö Environmental Unit Development and urban planning Regional Council of Skåne Sweden Skåne Southernmost

More information

3 RBC INTERFACE TO INTERLOCKINGS IN FINLAND

3 RBC INTERFACE TO INTERLOCKINGS IN FINLAND RBC INTERFACE TO CURRENT INTERLOCKINGS IN FINLAND Laura Järvinen, M.Sc (Tech), VR Track Oy Lassi Matikainen, M.Sc. (Tech), VR Track Oy SUMMARY The signalling systems in Finland originate from many decades

More information

BV has developed as well as initiated development of several simulation models. The models communicate with the Track Information System, BIS.

BV has developed as well as initiated development of several simulation models. The models communicate with the Track Information System, BIS. Simulation models: important aids for Banverket's planning process M. Wahlborg Banverket Swedish National Rail Administration, Planning Department, S-781 85 Borlange, Sweden Abstract When making decisions

More information

ERTMS UNIT ERTMS CHANGE CONTROL MANAGEMENT EUROPEAN RAILWAY AGENCY. Reference: ERA_ERTMS_0001 Document type: Version : 1.2.

ERTMS UNIT ERTMS CHANGE CONTROL MANAGEMENT EUROPEAN RAILWAY AGENCY. Reference: ERA_ERTMS_0001 Document type: Version : 1.2. EUROPEAN RAILWAY AGENCY ERTMS UNIT Reference: ERA_ERTMS_0001 Document type: Version : 1.2 Date : 11/05/06 Name Edited by Quality review Approved by A. HOUGARDY E. LEPAILLEUR A. CHIAPPINI P. GUIDO Position

More information

Investment projects on PKP Polish Railway Lines network

Investment projects on PKP Polish Railway Lines network Railway Kolej of the nowoczesnych new technologies technologii Railway of the new technologies Investment projects on PKP Polish Railway Lines network Warsaw, October 2012 Jacek Poniewierski Director of

More information

Financial Analysis, Traffic Forecast and Analysis of Railway Payment

Financial Analysis, Traffic Forecast and Analysis of Railway Payment FIXED LINK ACROSS FEHMARNBELT Trafikministeriet, København Bundesministerium für Verkehr, Bau- und Wohnungswesen, Berlin Financial Analysis, Traffic Forecast and Analysis of Railway Payment Summary Report

More information

Certification Case: Locomotives for Corridor A (and more)

Certification Case: Locomotives for Corridor A (and more) Certification Case: Locomotives for Corridor A (and more) Dr.ir. L. (Lieuwe) Zigterman MIRSE Inhoud Lieuwe Zigterman DoorZigt B.V. Casus: certificering ES64F4: Gebaseerd op ervaringen opgedaan bij KEMA

More information

Application Form Part A

Application Form Part A A1 Proposal TENtec nr. 2014-FI-TM-0142-M (26195427) MAP Call 2014 F01 Priority 1: (F01) Pre-identified projects on the Core Network corridors Railways Inland Waterways and Ports Roads Maritime Ports Priority

More information

European Rail Traffic Management System (ERTMS) Complete Solutions for ETCS and GSM-R

European Rail Traffic Management System (ERTMS) Complete Solutions for ETCS and GSM-R European Rail Traffic Management System (ERTMS) Complete Solutions for ETCS and GSM-R Basis for interoperability European Rail Traffic Management System from Siemens Transportation Systems and Nokia Siemens

More information

Power market integration. Geir-Arne Mo Team Lead Nordic Spot Trading Bergen Energi AS

Power market integration. Geir-Arne Mo Team Lead Nordic Spot Trading Bergen Energi AS Power market integration Geir-Arne Mo Team Lead Nordic Spot Trading Bergen Energi AS 1 Geir-Arne Mo Some background information: Working for Bergen Energi since 2015 Team Lead Nordic Spot Trading I work

More information

ERTMS - National implementation plan

ERTMS - National implementation plan ERTMS Page: 2 av 9 ERTMS - National implementation plan 00E First release 09.07.2013 KLY SKEI KJENSV Revision Reason for issue Date Created by Contr. by Appr. by Title: ERTMS - National implementation

More information

Interim report January 1 March 31, 2014

Interim report January 1 March 31, 2014 Odd Molly International AB (publ) Stockholm, Sweden, April 29, 2014 Interim report January 1 March 31, 2014 More stores and new sales organization January 1 March 31, 2014 Net sales amounted to SEK 82.8

More information

Andrew Hulatt Vix Technology Electronic Ticketing interoperability, standards & future

Andrew Hulatt Vix Technology Electronic Ticketing interoperability, standards & future Andrew Hulatt Vix Technology Electronic Ticketing interoperability, standards & future Vix Technology Overview Over 25 years of experience 17 offices in 13 countries 120 MEUR revenue 80M smartcards in

More information

Service Catalog in PostNord. Dorthe Benche 24-04-2015

Service Catalog in PostNord. Dorthe Benche 24-04-2015 Service Catalog in PostNord Dorthe Benche 24-04-2015 This is PostNord PostNord offers communication and logistics solutions to, from and within the Nordic region. We are the regional industry leader and

More information

Weight and dimensions of heavy commercial vehicles as established by Directive 96/53/EC and the European Modular System (EMS)

Weight and dimensions of heavy commercial vehicles as established by Directive 96/53/EC and the European Modular System (EMS) Weight and dimensions of heavy commercial vehicles as established by Directive 96/53/EC and the European Modular System (EMS) Workshop on LHVs Stefan Larsson Director, Regulatory Projects June 24, 2009

More information

2015 CEF Transport Calls for Proposals COUNTRY FICHE. Czech Republic

2015 CEF Transport Calls for Proposals COUNTRY FICHE. Czech Republic Millions Millions Millions 2015 CEF Transport Calls for s COUNTRY FICHE Czech Republic Key facts and figures Evaluation results Eligible vs Recommended proposals by call 700 600 500 400 300 200 100 0 32

More information

A Greener Transport System in Denmark. Environmentally Friendly and Energy Efficient Transport

A Greener Transport System in Denmark. Environmentally Friendly and Energy Efficient Transport A Greener Transport System in Denmark Environmentally Friendly and Energy Efficient Transport Udgivet af: Ministry of Transport Frederiksholms Kanal 27 DK-1220 København K Udarbejdet af: Transportministeriet

More information

Focus on the SAS Group 2006

Focus on the SAS Group 2006 Focus on the SAS Group 2006 The SAS Group s airline network and hotels Approx. 1,520 daily departures 147 destinations 217 hotels The SAS Group is the 4 th largest airline group in Europe The SAS Group

More information

Railway Safety Directive 2004/49/EC

Railway Safety Directive 2004/49/EC Railway Safety Directive 2004/49/EC Dragan JOVICIC Safety Assessment Sector Slide n 1 Content 1. Existing railway context & 1 st steps for establishing a EU railway area 2. Objectives of the European Union

More information

Toll ring around Oslo: How car owners help paying for improved mobility, and better environment too

Toll ring around Oslo: How car owners help paying for improved mobility, and better environment too Toll ring around Oslo: How car owners help paying for improved mobility, and better environment too Kristian Wærsted City Hall Chief Engineer (NPRA) Road tolling in Norway Trondheim Bergen (1986) (1991)

More information

A WIDER SHARING ECOSYSTEM. The pivotal role of data in transport solutions

A WIDER SHARING ECOSYSTEM. The pivotal role of data in transport solutions A WIDER SHARING ECOSYSTEM The pivotal role of data in transport solutions October 2015 A MARKET ON THE MOVE CONTENTS 3 TRANSPORT TRENDS 4 THE ROAD AHEAD 5 TRANSPARENCY LEADS TO TRUST 6 DATA LOCATION AND

More information

Nordic Waterproofing announces its initial public offering on Nasdaq Stockholm and prospectus in connection therewith

Nordic Waterproofing announces its initial public offering on Nasdaq Stockholm and prospectus in connection therewith PRESS RELASE Helsingborg, Sweden, 30 May 2016 Nordic Waterproofing announces its initial public offering on Nasdaq Stockholm and prospectus in connection therewith IN WHICH THE DISTRIBUTION OR RELEASE

More information

Return of experience on certification of the CCS subsystem from the independent laboratories

Return of experience on certification of the CCS subsystem from the independent laboratories Return of experience on certification of the CCS subsystem from the independent laboratories ERA ETCS Conference on Testing and Certification 29th of March in Lille Contents Brief Introduction into the

More information

ALL-ELECTRIC CAR SUBSCRIPTION

ALL-ELECTRIC CAR SUBSCRIPTION ALL-ELECTRIC CAR SUBSCRIPTION Car ownership is losing its value as status symbol. To an increasing number of people the car is just a way to transport themselves between different locations. It is access

More information

ATLAS. Proven Technology & Partnership For interoperability

ATLAS. Proven Technology & Partnership For interoperability ATLAS Trainborne ETCS solution Proven Technology & Partnership For interoperability TECHNOLOGY AND INTEGRATION EXPERTISE YOU CAN RELY ON The ERTMS (European Rail Traffic Management System) standard aims

More information

ScandFibre Logistics. Rail conquers sea? Mats Erkén Baltic Shipping Days. Oct 30th, 2012

ScandFibre Logistics. Rail conquers sea? Mats Erkén Baltic Shipping Days. Oct 30th, 2012 ScandFibre Logistics Rail conquers sea? Mats Erkén Baltic Shipping Days Oct 30th, 2012 ScandFibre Logistics - Owners / Partners 20 % each 10 plants total 2 History 2000-2005 Phase 1 - Rail 99 2006-2010

More information

Public Transport in Sweden Organisation and Integration

Public Transport in Sweden Organisation and Integration Public Transport in Sweden Organisation and Integration Bertil Hylén VTI Statens väg- och transportforskningsinstitut Swedish National Road and Transport Reearch Institute [email protected] Poland Basic

More information

HSL Zuid. Phase II Implementation Concept. Final Report. Study for alternative transport system on HSL Zuid

HSL Zuid. Phase II Implementation Concept. Final Report. Study for alternative transport system on HSL Zuid HSL Zuid Phase II Implementation Concept Final Report Study for alternative transport system on HSL Zuid DB International GmbH Central Germany and Western Europe Oskar-Sommer-Straße 15 D-60596 Frankfurt

More information

UNIFE World Rail Market Study

UNIFE World Rail Market Study UNIFE World Rail Market Study Status quo and outlook 2020 Commissioned by UNIFE, the European Rail Industry And conducted by The Boston Consulting Group 2 1 Executive Summary This is the third "World Rail

More information

AGREEMENT REGARDING THE EXECUTIVE BOARD OF RAIL FREIGHT CORRIDOR RHINE-ALPINE

AGREEMENT REGARDING THE EXECUTIVE BOARD OF RAIL FREIGHT CORRIDOR RHINE-ALPINE AGREEMENT REGARDING THE EXECUTIVE BOARD OF RAIL FREIGHT CORRIDOR RHINE-ALPINE Zeebrugge- Antwerp/Amsterdam/Vlissingen/Rotterdam/Duisburg-Basel-Milan-Genoa BETWEEN THE MINISTERS IN CHARGE OF TRANSPORT OF

More information

Procedures during the settlement of claims

Procedures during the settlement of claims Procedures during the settlement of claims 1 Introduction Liability and compensation in the event of property damage or personal injury are specified in the Swedish Transport Administration's General Terms

More information

VÝZKUMNÝ ÚSTAV ŽELEZNIČNÍ, a.s.

VÝZKUMNÝ ÚSTAV ŽELEZNIČNÍ, a.s. VÝZKUMNÝ ÚSTAV ŽELEZNIČNÍ, a.s. Railway Research Institute, j.s.c. www.cdvuz.cz Test Centre VUZ Velim Who we are A joint stock profit making company The shares are owned by Czech Railways, j.s.c. VUZ is

More information

SHOPPING CENTRES IN SWEDEN. - Part of the Olav Thon Group

SHOPPING CENTRES IN SWEDEN. - Part of the Olav Thon Group SHOPPING CENTRES IN SWEDEN - Part of the Olav Thon Group 2016 SWEDEN WE ARE INVESTING IN SWEDEN! 2 SWEDEN The Olav Thon Group currently owns and manages 12 Swedish shopping centres, and has thus positioned

More information

Finn Frogne A/S. The World Leader in Taxi Technology. Nye partnerskaber

Finn Frogne A/S. The World Leader in Taxi Technology. Nye partnerskaber Finn Frogne A/S The World Leader in Technology Nye partnerskaber Finn Frogne A/S Among the biggest suppliers of Traffic Management Systems with 40 years of experience 8.000 systems in use with 60.000 components,

More information

High speed railway principles

High speed railway principles High speed railway principles Ignacio Barrón de Angoiti, Director High Speed, International Railway Association (UIC) Professional Conference on High Speed In the World and in the Czech Republic Praha,

More information

SAS Q3 2014/2015 TELECONFERENCE 08.09.2015

SAS Q3 2014/2015 TELECONFERENCE 08.09.2015 SAS Q3 2014/2015 TELECONFERENCE 08.09.2015 Q3 brief summary Q3 update Commercial initiatives paying off EuroBonus members up 15% - now 4 million Summer program with 47 seasonal routes well received by

More information

Complementary Tests: the key of the successful ERTMS deployment in Spain.

Complementary Tests: the key of the successful ERTMS deployment in Spain. Complementary Tests: the key of the successful ERTMS deployment in Spain. M. Cambronero 1, A.. Arranz 1,, C. de la Roza 1, B. Domingo 1, J. Gómez 1 ; J. Iglesias 1, J. Santiago 2, C. Arias 3 1 ADIF. Spanish

More information

Metrological standardisation for rail applications of satellite based localisation systems

Metrological standardisation for rail applications of satellite based localisation systems 1. Introduction 2. System parts 3. Metrological values 4. Standardisation of metrology 5. Applications 6. Conclusion Metrological standardisation for rail applications of satellite based localisation systems

More information

SUPPLY, DEMAND, ENERGY AND LOCATION: THE FOUR PILLARS TO SUCCESS

SUPPLY, DEMAND, ENERGY AND LOCATION: THE FOUR PILLARS TO SUCCESS SUPPLY, DEMAND, ENERGY AND LOCATION: THE FOUR PILLARS TO SUCCESS DC RADAR The second edition of the Arcadis European Data Centre Radar, produced in conjunction with ixconsulting, is based upon extensive

More information

Common Safety Method for risk evaluation and assessment

Common Safety Method for risk evaluation and assessment Common Safety Method for risk evaluation and assessment Guidance on the application of Commission Regulation (EU) 402/2013 March 2015 Contents 1. Introduction 4 Background 4 Purpose of this guidance 5

More information

Travel pros and cons of the use of tourism statistics as a source

Travel pros and cons of the use of tourism statistics as a source Travel pros and cons of the use of tourism statistics as a source Selma M. Mulalic Nordic meeting Stockholm, September 2012 Settlements statistics terminated Settlements statistics terminated by end 2004

More information

SUPPLY, DEMAND, ENERGY AND LOCATION: THE FOUR PILLARS TO SUCCESS

SUPPLY, DEMAND, ENERGY AND LOCATION: THE FOUR PILLARS TO SUCCESS SUPPLY, DEMAND, ENERGY AND LOCATION: THE FOUR PILLARS TO SUCCESS DC RADAR The second edition of the Arcadis European Data Centre Radar, produced in conjunction with ixconsulting, is based upon extensive

More information

TECHNOLOGICAL MATURITY OF ERTMS ON THE READINESS OF ERTMS BASED SIGNALLING

TECHNOLOGICAL MATURITY OF ERTMS ON THE READINESS OF ERTMS BASED SIGNALLING Intended for Ministerie van Infrastructure en Milieu Document type Report Date August 2013 TECHNOLOGICAL MATURITY OF ERTMS ON THE READINESS OF ERTMS BASED SIGNALLING CONTENTS Executive Summary 1 1. INTRODUCTION

More information

Why build the Silvertown Tunnel?

Why build the Silvertown Tunnel? Why build the Silvertown Tunnel? Over the last 30 years east London has changed with the redevelopment of former industrial areas into major commercial and residential districts. The development of Canary

More information

siemens.com/mobility Metro Oslo Environmental Product Declaration according to ISO 14021

siemens.com/mobility Metro Oslo Environmental Product Declaration according to ISO 14021 siemens.com/mobility Metro Oslo Environmental Product Declaration according to ISO 14021 Product description One train consists of three cars in the configuration Mc-M-Mc. The cars at the front and at

More information

GSM-Railway Yesterday, Today and Tomorrow. Peter Tiberg May 2009

GSM-Railway Yesterday, Today and Tomorrow. Peter Tiberg May 2009 GSM-Railway Yesterday, Today and Tomorrow Peter Tiberg May 2009 1 Nokia Siemens Networks Agenda GSM-R? Yesterday, Today, Tomorrow Challenges 2 Nokia Siemens Networks Make trains the first choice for 21st

More information