WIRING GUIDE. Form rev.1. Certified to CSA C22-2 No.24 Conforms to UL Standard 873

Size: px
Start display at page:

Download "WIRING GUIDE. Form 031914 rev.1. Certified to CSA C22-2 No.24 Conforms to UL Standard 873"

Transcription

1 WIRIG GUIDE The ZSR101 is a versatile single relay control with two outputs for operating a 120 VAC with boiler enable, or two 120 VAC devices without boiler enable. Features include rear knock outs for 4x4 junction box mounting, convenient pre-installed jumper for operation, and 10 amp total load rating. The ZSR Series of controls is for zoning using s. Up to 6 zone s (model dependent) along with a primary can be operated. Zone priority is selectable with 1-hour time-out feature. Other features include exercising, selectable post purge, and 3 ground terminals for simplified wiring. The ZVR Series of controls is for zoning using zone valves. Up to 6 valves (model dependent), along with a system, secondary (s), and primary can be operated. Zone priority is selectable with 1-hour time-out feature. System status (on\off) during priority is also selectable. Replaceable snap-fit 40 VA transformer standard for 3 & 4 zone models expandable to 80 VA with 2nd transformer. 6 zone model has two 40 VA (80 VA) transformers Certified to CSA C22-2 o.24 Conforms to U Standard 873 Form rev.1

2 2

3 IDEX Z-one Relay thermostat connections Thermostat wiring... 3 ZSR101 - single zone relay Product overview... 4 Operation and cover removal...5 A1 - Single thermostat...6 A2 - Multiple thermostats...8 A3 - Single master thermostat, with TRVs, variable speed ZSR103, ZSR104 & ZSR106 - multi-zone relay Product overview Circuit board Cover removal Product details B1 - Mod/Con boiler, hydro separator or buffer tank, zone s B2 - Traditional boiler, indirect w/ priority, zone s B3 - Mod/Con boiler, primary loop, closely spaced tees, zone s ZVR103, ZVR104 & ZVR106 - multi-zone valve control Product overview Circuit board Cover removal, Transformer Installation...24 Product details C1 - Mod/Con boiler, hydro separator, zone valves C2 - Mod/Con boiler, indirect on primary side of hydro sep, zone valves C3 - Mod/Con boiler, indirect on load side of hydro sep, zone valves C4 - Mod/Con boiler, indirect on primary side of hydro sep, master and slave control C5 - Traditional boiler, indirect (no priority) with valve C6 - Traditional boiler with reset control, priority indirect with valve C7 - Mod/Con boiler, hydro separator, zone valve (more than 6), multiple secondary s Caleffi shall not be liable for damages resulting from misapplication or misuse of it products. 3

4 Z-one Thermostat Connections 2-Wire Thermostats 4-Wire Thermostats 4 All Caleffi Z-one controls use the same interface to connect to thermostats. This interface is very flexible and allows many different types of thermostats to be connected to the control including 2, 3 and 4 wire versions. In addition, any type of switching device can be used to signal a heat demand by connecting the R & W (T & T) terminals together. The terminals are dual labeled to help simplify wiring. Z-one T-stat interface R W C T T COM T-STAT 1 R W C R W C R W C R W C R W C R W CTHM 1 R W C RX X W C R W R W C W C D P T T COM T T COM T T COM T T COM T T COM T T COM T T COM T THM T 1COM THM T 2 T THM COM3 T THM T4 COMTHM 5 THM 6COMMS T-STAT 2 T-STAT 3 T-STAT 4 Description TRASFORMER 12/20VA R = 24 VAC Supply W = Heat Call ER C = 24 VAC Common POWER I Function GROUDS ZSR106 R&W: When connected, signals a heat demand. R&C: Provides 24 VAC to powered thermostats. There are a few different types of 2 wire thermostats including bi-metallic, power stealing and battery powered. All of these thermostats connect in the same manner to the Caleffi Z-one series of controls. Connect R to R and W to W. See below. C R Rh W1 R W C R W C R W C R W C R W C R W C D P X X T T COM T T COM T T COM T T COM T T COM T T COM COMMS D THM P 2 THM 3 THM 4 THM 5 THM 6 PWR T T COM COMMS T-STAT 5 T-STAT 6 3-Wire Thermostats TRASFORMER DipSwitches Master Slave Three wire thermostats Priority OFF 12/20VA get Priority O their power from the Primary OFF Primary O Exercise OFF Exercise O Post Purge OFF Post Purge O control Z6P they are connected to. R & C from the DipSwitches Z-one Control supply 24 VAC to the thermostat at all times while the W lead signals a heat demand. Master Slave Priority OFF Priority O Primary OFF Primary O Exercise OFF Exercise O POWER I Post Purge OFF Post Purge O GROUDS 6 PRIMARY 1 To connect a 4-wire thermostat to the Z-one series controls, connect R to R, W to W and C to C. A jumper in the thermostat is also required between R & Rh as shown below. Similar to a 3-wire thermostat, R & C from the Z-one Control supply constant 24 VAC to the thermostat. PWR ZOE1 Dry Contacts DipSwitches ZOE1 ZOE2 Master Slave A heat demand Priority OFF can Priority O also be initiated by any type Primary OFF Primary O Exercise OFF Exercise O ZOE3 of device that Post Purge OFF has Post dry Purge Ocontacts (dry contacts are Z6P ZOE2 a set of contacts that open and close but do not ZOE4 have any voltage present until supplied from an ZOE5 outside source). The end switch on a Z-one series ZOE3 zone valve is an example of a dry contact. Using ZOE6 PRIMARY a dry 3 contact 4 to connect 5 6 R to W will initiate a heat ZOE4 demand. 2 ZOE5 PWR ZOE1 ZOE2 ZOE3 ZOE4 ZOE5 ZOE6 ROUDS WARIG: EVER COECT R & C DIRECTY, R W C this will be a direct short X Xon the 24 VAC supply T T COM THM THM 2 THM 3 THM Z6P SAFETY ISTRUCTIO TRASFORMER This safety alert symbol will 12/20VA be used in this manual to draw attention to safety related instructions. When used, the safety alert symbol means ATTETIO! BECOME AERT! YOUR SAFETY IS IVOVED! FAIURE TO FOOW THESE ISTRUCTIOS MAY RESUT I A SAFETY HAZARD. CAUTIO: All work must be performed by qualified personnel trained in the POWER I proper application, installation, and maintenance GROUDS of systems 1 in accordance 2 3 with all 4 applicable codes and ordinances. W C X R XW PRIMARY THM 5 THM 6 R W C R W C R W C R W C R C D P T T COM T T COM T T COM T T COM T T COM T T COM COMMS THM 1 Master Priority OFF Primary OFF Exercise OFF Post Purge OFF DipSwitches 5 Slave Priority O Primary O Exercise O Post Purge O ZOE6 R W C R W C R W C R W C R W C D P T PWR T COM T T COM T T COM T T COM T T COM COMMS THM 2 THM 3 THM 4 THM 5 THM 6 ZOE1 Always refer to the thermostat manufacturer s instructions. ZOE2 DipSwitches Master Slave TRASFORMER ZOE3 Priority OFF Priority O Primary OFF Primary O 12/20VA CAUTIO: Electrical shock hazard. Disconnect Exercise OFF power Exercise before O installation to prevent Post Purge OFF Post Purge O electrical shock or ZOE4 equipment Z6P damage. Make sure all connections are in accordance with the electrical wiring diagram and in accordance with national and local electrical codes. ZOE5 ZOE6 PRIMARY POWER I CAUTIO: Avoid electrical noise interference. Do not install near large conductors, PRIMARY GROUDS electrical machinery, or welding equipment. Avoid locations where excessive moisture, corrosive fumes, vibration, or explosive vapors are present. P ZO ZO ZO ZO ZO ZO Caleffi shall not be liable for damages resulting from misapplication or misuse of it products.

5 Wiring of 2 wire or 3 zone valve to Caleffi Z-one Relay Wiring a 2 wire zone valve to Caleffi Z-one Relay Wiring a 3 wire zone valve to Caleffi Z-one Relay Since a two wire actuator does not have an end switch for feedback to the relay box, the end switch terminals must have a jumper to simulate R W C D P Xthe Xend swith. If the R end W Cswitch jumper Ris not W Cinstalled, R W no C R W C R W C T T COM T T COM T T COM T T COM T T COM T T COM COMMS demand will be sent to the boiler and the s will not turn on. T-STAT 1 T-STAT 2 T-STAT 3 T-STAT 4 ZVR106 The Taco 570 zone valve presents a unique wiring challenge. When connecting the Taco 570 zone valve to the Caleffi Z-one Relay, the wiring of this valve can only be done PWR in one way. The left motor terminal on the ZVR series control must be connected to terminal T-STAT 6 2 on the zone valve. The right motor terminal must be connected TSAT1 ZOE1 to terminal 1 on the zone valve. astly, the left end switch terminal T-STAT 5 MASTER SAVE must be connected to terminal 3 on the zone valve. Failure to TSAT2 ZOE2 follow schematic will lead to damage of product. TSAT3 ZOE3 TSAT4 ZOE4 STATUS DURIG O OFF O OFF TSAT5 ZOE5 TSAT6 ZOE6 POWER I SEC SYSTEM ZOE 1 ZOE 2 ZOE 3 ZOE 4 ZOE 5 ZOE 6 M

6 Certified to CSA C22-2 o.24 Conforms to U Standard 873 ZSR101 - Single Zone Switching Relay Overview Compatible with 2, 3 and 4-wire thermostats or other low voltage controllers with switching action 120 VAC input Heavy duty, sealed, DPDT, fuse protected relay (with spare fuse) Two dry contact outputs (Relay 1 and Relay 2) for operating 120 VAC with boiler enable or two devices without boiler enable 5 A capacity each relay - 10 A total Rear knock-outs for mounting onto 4 x4 junction box High capacity 6VA transformer Simplified wiring with pre-installed jumper 100% factory tested with 3 year warranty ET certified See technical brochure A for more product information.

7 Operating Principles When a zone has a demand from a thermostat (TT or R W) the relay will close sending 120 VAC to Relay #1 O terminal and switching the on, and the C to O dry R R TW W CT C COM contact on relay #2 closes, T T COM signaling the boiler of a heating demand. PWR R, W, C and T T Comm dual labeling at thermostat terminals. Compatible TRASFORMER with low voltage 2, 3, or 4 wire thermostats or any other low voltage devices having a switching ZOE 1 ZSR101 action. Zone Supply 120 VAC hot to terminal and 120 VAC neutral to. A factory installed jumper from terminal to the 1 C terminal Zone of Relay 1 is supplied for simplified connection. TRASFORMER 6 VA Transformer. PWR ZOE Dual labeled T-stat terminals. Compatible with 2, 3 and 4 wire T-stats. Replaceable fuses. POWER I REAY #1 REAY #2 C O C C O C 120VAC input power connection POWER I C REAY #1 O C C REAY #2 If dry contacts are desired from relay #1, remove the factory installed jumper between and C. Cover removal Hold either the left or the right end of the box up and at an angle. Use body for stabilizing relay box. Insert screwdriver and push tab inward. O C Turn box and repeat inserting screwdriver and pushin tab inward on opposite side, cover should release from base. Keyhole mounting which fits a 4X4 junction box. Pre-installed jumper. Slide cover off base. Rear knockout for 4X4 junction box. Mounting: Do not mount to a surface that exceeds 115 F (45 C). The unit must be only located in dry interior locations. Use only copper conductor supply wire suitable for at least 105 C. All circuits must have a common disconnect and be connected to the same pole of the disconnect. It is not suitable for installation in hazardous locations. 7

8 A1 - Single thermostat 8 R W C T T com power zone transformer Caleffi! single zone relay REAY 1 REAY 2 C /O /C C /O /C T T Hydronic diagram is for illustration purposes only, some components have been removed for simplicity.

9 Description of terminals C O C = Ground = eutral (Common leg of 120 VAC) = ine (live leg of 120 VAC) = Common terminal = ormally Open terminal = ormally Closed terminal ote: There is a factory installed jumper between the 120 VAC line () and the common terminal of relay #1 (C). Thermostat terminals R = 24 VAC W = Heat call C = Common of 24 VAC Sequence of Operation / Settings A demand occurs and closes RW (TT) Relay #1 and relay #2 both fire connecting the common terminal to the O terminal. If the factory installed jumper has not been removed, the O terminal of relay #1 will deliver the hot leg of 120 VAC. Relay #2 has dry contacts. The zone ED illuminates. The demand is satisfied and opens RW (TT). The relay contacts return to their normal position (common to normally closed). The zone ED turns off. WARIG: EVER COECT R & C DIRECTY, this will be a direct short on the 24 VAC supply 9

10 A2 - Multiple thermostats 10 End switch wires transformer R W C T T com power zone Caleffi! single zone relay R W 4-wire zone valve 4-wire zone valve R W R W 4-wire zone valve REAY 1 REAY 2 C /O /C C /O /C 24 VAC T T Hydronic diagram is for illustration purposes only and could be missing system components.

11 Description of terminals C O C = Ground = eutral (Common leg of 120 VAC) = ine (live leg of 120 VAC) = Common terminal = ormally Open terminal = ormally Closed terminal ote: There is a factory installed jumper between the 120 VAC line () and the common terminal of relay #1 (C). Thermostat terminals R = 24 VAC W = Heat call C = Common of 24 VAC WARIG: EVER COECT R & C DIRECTY, this will be a direct short on the 24 VAC supply Sequence of Operation / Settings There is a demand by one of the t-stats which sends power to the corresponding zone valve. When the zone valve opens, its end switch contacts close and signal a demand to the RW (TT) contacts on the single zone relay control. Relay #1 and relay #2 fire If the factory installed jumper has not been removed, the O terminal of relay #1 will deliver the hot leg of 120 VAC thus firing the. Relay #2 closes the TT contacts on the boiler signally a demand. The Zone ED illuminates. When the last of the T-stats is satisfied, the corresponding zone valves closes which opens the end switch contacts. The relay contacts return to their normal position turning off power to the system and opening the RW (TT) contacts. The Zone ED turns off. 11

12 A3 - Single master thermostat, panel radiators with TRVs, variable speed 12 TRV TRV thermostatic! radiator valves! (TRV) on each! radiator TRV TRV TRV TRV buffer tank R W C T T com power transformer zone Caleffi! single zone relay REAY 1 REAY 2 C /O/C C /O/C T T Hydronic diagram is for illustration purposes only, some components have been removed for simplicity.

13 Description of terminals C O C = Ground = eutral (Common leg of 120 VAC) = ine (live leg of 120 VAC) = Common terminal = ormally Open terminal = ormally Closed terminal ote: There is a factory installed jumper between the 120 VAC line () and the common terminal of relay #1 (C). Thermostat terminals R = 24 VAC W = Heat call C = Common of 24 VAC WARIG: EVER COECT R & C DIRECTY, this will be a direct short on the 24 VAC supply Sequence of Operation / Settings A single master thermostat is wired to the ZSR101 control. The master thermostat is set to a slightly higher set point than the desired room temperatures on the thermostatic radiator valves. When the temperature drops below the thermostat s set point, a heat demand is initiated by closing the R & W terminals. Relay #1 and relay #2 both fire. If the factory installed jumper has not been removed, the O terminal of relay #1 will deliver 120 VAC line to the variable speed circulator. Relay #2 closes the TT contacts on the boiler signaling a demand. The Zone ED illuminates. Using an outside air sensor and system temperature sensor located in the buffer tank, the boiler determines if the water in the boiler meets the target temperature based off the outside air reset curve. As long as the master thermostat is calling, the boiler will maintain the buffer tank to the target temperature. The thermostatic radiator valves modulate the flow through the panel radiators because the variable speed circulator is enabled. When the master thermostat reaches set point, the master thermostat will open the contact between R & W. The relay contacts return to their normal position turning off power to the variable speed circulator and opening the RW (TT) contacts. Both the boiler and are no longer enabled. The Zone ED turns off. 13

14 Certified to CSA C22-2 o.24 Conforms to U Standard 873 ZSR10X - Multi-Zone Pump Control Overview Compatible with low voltage 2, 3, or 4 wire thermostats R, W, C and TT Comm dual labeling at thermostat terminals Z-oneink unlimited zone expansion 120 VAC outputs Selectable priority with 1 hour time-out feature Selectable post purge and exercise Dry contacts for (), capable of switching line voltage High capacity transformer arge terminal connections Simplified wiring with extra ground terminals Heavy duty sealed relays Fuse protected (with spare fuse) Front ED lights 100% Factory tested with 3 year warranty ET approved See technical brochure A for more product information.

15 XX Closes for heat demand and demand. Rated for 120 VAC, 2 amps. () closes only during priority call. Rated for 120 VAC, 2 amps. Dual labeled T-stat terminals. Compatible with 2, 3 and 4 wire T-stats. Selectable DIP switches. 3 wire communications to expansion board. Power O ED. ED for each zone. 120 VAC input power connection Multiple ground connections for easy wiring. Replaceable fuses (2 extra included under cover). 120 VAC zone outputs. 120 VAC primary output. 15

16 Cover removal 16 Hold either the left or the right end of the box up and at an angle. Use body for stabilizing relay box. Insert screwdriver and push tab inward, cover should release from base. Roll cover off base. Mounting: Do not mount to a surface that exceeds 115 F (45 C). The unit must be only located in dry interior locations. Use only copper conductor supply wire suitable for at least 105 C. All circuits must have a common disconnect and be connected to the same pole of the disconnect. It is not suitable for installation in hazardous locations.

17 Maintenance and Repair: The Caleffi Z-one multi-zone control The DIP Switches on the ZSR series T T COM T T COM T T COM T T COM T T COM T T COM COMMS comes with two spare fuses. If control fails or is damaged, replace control with can be positioned for the following DipSwitches functional one. T-STAT 1 T-STAT operations. 2 T-STAT 3 T-STAT 4 T-STAT 5 T-STAT 6 Master Slave Master / Slave: allows Priority OFF Priority O TRASFORMER for unlimited R R W C R Primary W C W C R OFF Primary O W C R W C R W Exercise OFF Exercise O X X expansion to additional relays. T T COM T T COM T T COM Post Purge T OFFT COMPost Purge T OT COM T T Boiler connections: Priority XX = Dry contacts rated up to 120 VAC, 2 Amps. T-STAT OFF / Priority 1ZSR106 T-STAT O: When 2 T-STAT 3 T-STAT 4 T-STAT 5 T-ST priority mode is O, upon demand, Closes when any zone calls including priority. Typically zone R1 will W operate C Ras priority W C and RDipSwitches all Wother Czones R are W temporarily C R switched W C off R W connected to TT on boiler control. X X (with T1 hour T time-out). COM T When T COM priority TMaster mode T COM Slave is OFF, T all Tzones COM remain T Tactive. COM T T Priority OFF Priority O () = Dry contacts rated up TRASFORMER Primary OFF Primary O to 120 VAC, 2 Primary T-STAT OFF / 1Primary T-STAT O: 2When T-STAT primary 3 T-STAT 4 T-STAT 5 T-STAT Exercise OFF Exercise mode O is O, the primary will Post Purge OFF Post Purge O Amps. Closes only when priority is enabled and calling. continue to operate during priority. R W C R W C R W C R W C R W C R W C D P Typically used to close ZR\ZC (120 VAC) or contacts (24 VAC) on boiler Exercise ZSR106 OFF / Exercise O: When exercise mode is DipSwitches PWR O, each circulator is T T COM T T COM T T COM T T COM T T COM T T COM COMMS Master Slave controls equipped with these features. switched on for 30 seconds following 6 72 Zone hours of inactivity. Priority OFF Priority O P T-STAT 1 T-STAT TRASFORMER Primary OFF Primary O POWER 2 T-STAT I 3 GROUDS T-STAT 4 T-STAT 5 T-STAT 6 Post Purge 1 OFF / Post 2 Purge O: 3 When post 4purge is O, 5Exercise the OFF priority 6 Exercise O Post Purge OFF Post Purge O Communication connections: continues operating for 2 minutes ZSR106 after the priority zone ZOE1 is switched DipSwitches off. Master Slave Connect terminals to matching terminal of slave boards Priority OFF Priority O TRASFORMER Primary OFF Primary O R D to W D, CP to RP, Ground W C to Ground R W C R W C D P Primary output: Exercise OFF Exercise O PWR ZOE2 COMMS Post Purge OFF Post Purge O T T COM T T COM T T COM T T COM Primary runs when any zone runs. Its status PRIMARY POWER I GROUDS DipSwitches T-STAT 3 T-STAT 4 T-STAT 5 T-STAT ZSR during priority (on\off) can be programmed using the DIP Master Slave ZOE3 Priority OFF switches. Priority O TRASFORMER Primary OFF Input Power: ZOE1 Primary O Exercise OFF = Exercise ine O (hot leg) of Post Purge OFF Post Purge O 120 VAC to power the = ine (hot leg) of 120 VAC supply POWER I GROUDS ZSR106 = eutral leg of 120 VAC 1 to power 2the 3 ZOE = eutral of 120 VAC ZOE2 = Ground DipSwitches ZOE5 ote: when connecting 2 or more Z-one controls, all Master Slave POWER I GROUDS ZOE3 Priority OFF Priority O WARIG: controls must be powered by the same 120 VAC circuit. EVER 1 COECT R 2& C DIRECTY, 3 this will be a 4direct short on 5 the 24 VAC 6 Primary OFF Primary O supply. Exercise OFF Exercise O ZOE6 Post Purge OFF Post Purge O ZOE4 Zone outputs: WARIG: When PRIMARY connecting 2 or more Z-one controls, all controls must be powered by Zone s GROUDS run when the same VAC circuit. corresponding thermostat ZOE5 initiates a demand. GROUD = Connect the ZOE6 WARIG: When replacing fuses, make sure power is disconnected to control box. ground from the to the ground terminal. PRIMARY 3 = Runs 4 when zone 5 #1 calls. 6 Can be programmed to be the priority zone. = ine (hot leg) of 120 VAC to power the = eutral leg of 120 VAC to power the X ZSR106 POWER I UMP 2 X X R W C R W C R W C R W C R W C R W C D P 17

18 B1 - Mod/con boiler, hydro separator or buffer tank, zone s 18 Pump 1 Pump 2 Pump 3 Pump 4 Buffer tank- Optional hydraulic separator X X R W C R W C R W C R W C R W C R W C D P T T COM T T COM T T COM T T COM T T COM T T COM COMMS T-STAT 1 T-STAT 2 T-STAT 3 T-STAT 4 T-STAT 5 T-STAT 6 PWR ZOE1 ZOE2 TRASFORMER ZSR106 DipSwitches Master Slave Priority OFF Priority O Primary OFF Primary O Exercise OFF Exercise O Post Purge OFF Post Purge O ZOE3 ZOE4 ZOE5 ZOE6 POWER I GROUDS PRIMARY Hydronic diagram is for illustration purposes only, some components have been removed for simplicity.

19 Description of terminals = Ground = eutral (Common leg of 120 VAC) = ine (Hot leg of 120 VAC) Thermostat terminals R = 24 VAC W = Heat call C = Common of 24 VAC Boiler terminals XX = Dry contacts rated up to 120 VAC, 2 Amps. Closes when any zone calls including priority. Typically connected to TT on boiler control. () = Dry contacts rated up to 120 VAC, 2 Amps. Closes only when priority is enabled and calling. Typically used to close ZR\ZC (120 VAC) or contacts (24 VAC) on boiler controls equipped with these features. Dip switch description Master / Slave: Used when joining 2 or more controls together. Only one Master per group Priority OFF / Priority O: Used to set Zone #1 as the priority zone. All other zones will hold off during priority. Priority has a one hour time out feature to prevent freeze up. Primary OFF / Primary O: Sets the status of the primary when there is a priority call. This allows the to be on either side of a hydro separator. Exercise OFF / Exercise O: When enabled the s will rub for 30 seconds after 72 hours without a demand. Post Purge OFF / Post Purge O: Allows the to run for 2 minutes after the demand has been satisfied. Sequence of Operation / Settings Priority switch: OFF Master / Slave switch: Master Status During Priority switch: OFF A demand occurs from any T-stat (T-stat closes TT terminals). The O ED illuminates for that zone. ZSR control sends 120 VAC to the corresponding zone and the primary outputs, XX contacts close to signal boiler of a demand. When the demand from the last T-stat calling is satisfied (T-stat opens TT terminals), the XX contacts are opened, the O ED turns off and the 120 VAC to the zone and primary outputs are dropped. WARIG: EVER COECT R & C DIRECTY, this will be a direct short on the 24 VAC supply 19

20 B2 - Traditional boiler, indirect w/ priority, zone s 20 Pump 2 Pump 3 Pump 4 Pump 5 Pump 6 boiler! high limit! control Pump 1! aquastat! aquastat X X R W C R W C R W C R W C R W C R W C D P T T COM T T COM T T COM T T COM T T COM T T COM COMMS THM 1 THM 2 THM 3 THM 4 THM 5 THM 6 PWR ZOE1 ZOE2 ZC ZR T T TRASFORMER 12/20VA ZSR106 Z6P DipSwitches Master Slave Priority OFF Priority O Primary OFF Primary O Exercise OFF Exercise O Post Purge OFF Post Purge O ZOE3 ZOE4 ZOE5 ZOE6 outdoor! temperature! sensor POWER I GROUDS PRIMARY Hydronic diagram is for illustration purposes only, some components have been removed for simplicity.

21 Description of terminals = Ground = eutral (Common leg of 120 VAC) = ine (Hot leg of 120 VAC) Thermostat terminals R = 24 VAC W = Heat call C = Common of 24 VAC Boiler terminals XX = Dry contacts rated up to 120 VAC, 2 Amps. Closes when any zone calls including priority. Typically connected to TT on boiler control. () = Dry contacts rated up to 120 VAC, 2 Amps. Closes only when priority is enabled and calling. Typically used to close ZR\ZC (120 VAC) or contacts (24 VAC) on boiler controls equipped with these features. Dip switch description Master / Slave: Used when joining 2 or more controls together. Only one Master per group Priority OFF / Priority O: Used to set Zone #1 as the priority zone. All other zones will hold off during priority. Priority has a one hour time out feature to prevent freeze up. Primary OFF / Primary O: Sets the status of the primary when there is a priority call. This allows the to be on either side of a hydro separator. Exercise OFF / Exercise O: When enabled the s will rub for 30 seconds after 72 hours without a demand. Post Purge OFF / Post Purge O: Allows the to run for 2 minutes after the demand has been satisfied. WARIG: EVER COECT R & C DIRECTY, this will be a direct short on the 24 VAC supply Sequence of Operation / Settings Priority switch: O (Zone #1 becomes priority) Master/Slave switch: Master Primary Status During Priority switch: OFF A demand occurs from a T-stat (T-stat closes TT terminals) in zones 2 thru 6. The O ED illuminates for that zone. ZSR control sends 120 VAC to the corresponding zone terminals to fire the zone and closes the XX contacts to signal a heat demand to the boiler. The PRIMARY output will also deliver 120 VAC even if no is connected. When the demand from the T-stat is satisfied (T-stat opens TT terminals), the O ED turns off. 120 VAC is dropped from the corresponding zone terminals. If no other zones are calling, power is dropped to the SEC and SYSTEM and the XX contacts are opened. If a demand occurs from the aquastat (zone #1), The O ED illuminates for Zone #1. If any other zone was calling (Zones 2 thru 6) when Zone #1 called, power (120 VAC) is dropped to those zone s. The XX and contacts close. The contacts deliver 120 VAC Once the Zone #1 demand is satisfied, power to the is dropped, the contacts open. If a demand from zones 2 thru 6 is present, 120 VAC is delivered to the corresponding zone (s) and the O ED for those zones will illuminate. The XX contacts close to signal a heat demand to the boiler. When all zones are satisfied, the XX contacts open and power (120 VAC) is turned off to all of the zone s. Time Out \ Freeze Prevention Feature After one hour of a priority demand, the control will open the contacts and turn off power to the. If a heating demand is present from Zones #2-6, the control will satisfy those demands before going back to the call. After the heating demands are met, the control will go back to and re-set the one hour timer. 21

22 B3 - Mod/Con boiler, primary loop, closely spaced tees, zone s 22 Pump 1 Pump 2 Pump 3 boiler Primary X X R W C T T COM T-STAT 1 R W C R W C R W C R W C R W C D P T T COM T T COM T T COM T T COM T T COM COMMS T-STAT 2 T-STAT 3 T-STAT 4 T-STAT 5 T-STAT 6 PWR ZOE1 ZOE2 TRASFORMER 3 ZSR106 3 DipSwitches Master Slave Priority OFF Priority O Primary OFF Primary O Exercise OFF Exercise O Post Purge OFF Post Purge O ZOE3 ZOE4 ZOE5 ZOE6 POWER I GROUDS PRIMARY Primary boiler Hydronic diagram is for illustration purposes only, some components have been removed for simplicity.

23 Description of terminals = Ground = eutral (Common leg of 120 VAC) = ine (Hot leg of 120 VAC) Thermostat terminals R = 24 VAC W = Heat call C = Common of 24 VAC Boiler terminals XX = Dry contacts rated up to 120 VAC, 2 Amps. Closes when any zone calls including priority. Typically connected to TT on boiler control. () = Dry contacts rated up to 120 VAC, 2 Amps. Closes only when priority is enabled and calling. Typically used to close ZR\ZC (120 VAC) or contacts (24 VAC) on boiler controls equipped with these features. Dip switch description Master / Slave: Used when joining 2 or more controls together. Only one Master per group Priority OFF / Priority O: Used to set Zone #1 as the priority zone. All other zones will hold off during priority. Priority has a one hour time out feature to prevent freeze up. Primary OFF / Primary O: Sets the status of the primary when there is a priority call. This allows the to be on either side of a hydro separator. Exercise OFF / Exercise O: When enabled the s will rub for 30 seconds after 72 hours without a demand. Post Purge OFF / Post Purge O: Allows the to run for 2 minutes after the demand has been satisfied. Sequence of Operation / Settings Priority switch OFF Master / Slave switch: Master Status During Priority switch: OFF A demand occurs from any T-stat (T-stat closes TT terminals). The O ED illuminates for that zone. ZSR control sends 120 VAC to the corresponding zone and the primary outputs, XX contacts close to signal boiler of a demand. When the demand from the T-stat is satisfied (T-stat opens TT terminals), the XX contacts are opened, the O ED turns off and the 120 VAC to the zone and primary outputs are turned off. ATERATE WIRIG: The boiler can be controlled by the Mod/Con boiler if equiped to do so. WARIG: EVER COECT R & C DIRECTY, this will be a direct short on the 24 VAC supply 23

24 Certified to CSA C22-2 o.24 Conforms to U Standard 873 ZVR10X - Multi-Zone Valve Control Overview Compatible with low voltage 2, 3, or 4 wire thermostats R, W, C and TT Comm dual labeling at thermostat terminals Z-oneink unlimited zone expansion Selectable priority with 1 hour time-out feature System status selectable during priority Pump will start only after the zone valve end switch is closed Dry contacts for (), capable of switching line voltage arge terminal connections High capacity 40 VA transformer standard for 3 and 4 zone models-expandable to 80 VA, and 80 VA for the 6 zone model Automatic resettable fuse Controls system, secondary, and priority Front ED ights 100% Factory tested with 3 year warranty ET approved See technical brochure A for more product information.

25 XX Closes for heat demand and demand. Rated for 120 VAC 2 amps. () closes only during priority call. Rated for 120 VAC, 2 amps. Dual labeled T-stat terminals. Compatible with 2, 3 and 4 wire T-stats. Master/Slave jumper. 3 wire communications to expansion board. Power O ED. Transformer connections. ED illuminates when end switch closes. 120 VAC input power connection. 120 VAC output to s. System (boiler ) status during priority can be changed with jumper. ZOE #1 priority. Zone valve motor connections. Zone valve end switch connection. ED illuminates with call for heat. 25

26 Cover removal 26 Hold either the left or the right end of the box up and at an angle. Use body for stabilizing relay box. Insert screwdriver and push tab inward, cover should release from base. Roll cover off base. Transformer Installation Mount box on stable surface using level. Remove transformer(s) from packaging. Slide bottom end of transformer into bottom latch. Snap top of transformer into latch arms. Mounting: Do not mount to a surface that exceeds 115 F (45 C). The unit must be only located in dry interior locations. Use only copper conductor supply wire suitable for at least 105 C. All circuits must have a common disconnect and be connected to the same pole of the disconnect. It is not suitable for installation in hazardous locations. Feed wiring through hole near the top of the transformer and insert transformer plug into the socket. Repeat process for 2nd transformer if using six valve relay box.

27 TSAT1 ZO T R W C R W C R W C R W C R MASTER W SAVE C R W C D X X MASTER SAVE T T COM T T COM T T COM T T COM T T COM T T COMTSAT2 ZO Maintenance and Repair: The Caleffi Z-one multi-zone valve relay comes with Thermostat connections T T-STAT 1 T-STAT 2 T-STAT 3 T-STAT 4 T-STAT R = 24 VAC. 5 T-STAT 6 a resettable fuse and requires no maintenance. If control fails or is damaged, R W C R W C R W C R W C R replace control with functional one. X X W = Heat call T T COM T T COM T T COM TSAT3 T T COM ZO TT ZVR106 ZVR106 C = Common of 24 VAC R W C R W C T-STAT R W 1C T-STAT R W 2C T-STAT R W 3C T-STAT R W 4 C T The ZVR series of controls is programmed X6 X Zone Heat demand is initiated by closing R T T COM T T COM T T COM T T COM T T COM MASTER T SAVE T COM T by positioning a series of jumpers. Example to W. T-STAT 1 T-STAT 2 T-STAT 3 T-STAT 4 T-STAT 5TSAT4 T-STAT ZO 6 photo to right shows jumper in off position STATUS 24 VAC is always present between R (left photo) and on position (right photo). DURIG STATUS & C. T Jumpers are used for the following R W C R W C R W C R W C R W C DURIG X X TSAT5 ZO T T COM T T COM T T COM T T COM T T COM Dip operations. O OFF Mas Priority O / Priority OFF: When priority ZVR106 T-STAT 1 T-STAT 2 T-STAT 36 T-STAT Zone4 T-STAT Priority 5 T O Zone valve O OFF TRASFORMER connections Primary O DipSwitches Exercise O jumper is O, upon demand, zone O 1 will OFF Master Slave Motor = 24 VAC to power TSAT6 the zone Post ZO Purge O POWER I SEC SYSTEM Priority OFF Priority operate as priority and all other zones are O OFF TRASFORMER ZOE 1 ZOE 2 ZOE valve 3 motorzoe ZSR106 Primary 4 OFF ZOE Primary O5 ZOE Exercise OFF Exercise O temporarily switched off (with 1 hour time- When priority mode SEC is OFF, any SYSTEM zones ZSR106 End Switch MOTOR= Post Connects SWITCH Purge OFF MOTOR to Post end Purge SWITCH switch O MOTOR S R Iout). that were ZOE 1 ZOE 2 ZOE 3 ZOE 4 ZOE 5 ZOE 6 active when zone 1 was switched STATUS on zone valve. Must be jumpered if DURIG using a 2 wire zone valve. W C R W C R W C R W C D P on will remain on. PWR ZVR106 TStatus COMDuring T Priority T COMO / TStatus T During COM T T COM COMMS Input power -STAT Priority 3 OFF: T-STAT When 4status T-STAT jumper is 5O, = ine 6 (hot Zone leg) of 120 VAC supply T-STAT 6 O OFF POWER I GROUDS P the system will continue to operate O OFF = eutral of 120 VAC during priority. TSAT1 ZOE1 STATUS = Ground POWER I GROUDS 1 DURIG Master / POWER Slave: allows I for unlimited expansion SEC SYSTEM MASTER SAVE to additional ZVR relays. ZOE 1 ZOE 2 ZOE 3 ZOE 4 ZOE 5 O OFF Pump TSAT2 outputs ZOE2 O OFF MOTOR SWITC SYSTEM = Runs when any Boiler Connections POWER I SEC SYSTEM zone ZOE calls 1 for heat. ZOEWhen 2 priority ZOEis 3 XX = Dry contacts rated up to 120 VAC, 2 Amps. Closes when any zone calls TSAT3 ZOE3 ZVR106 enabled, the status of the (on\ M including priority. Typically connected to TT on boiler control. off) during a priority call is selected via 6 Zone () = Dry contacts rated up to 120 VAC, 2 Amps. Closes only a jumper when priority is enabled and calling. Typically used to close ZR\ZC (120 VAC) TSAT4 ZOE4 or contacts (24 VAC) on boiler controls equipped with these features. SEC = Runs when any zone calls for heat except the priority zone when it is enabled. Communication connections = Runs when the priority zone calls. A jumper is required TSAT5 ZOE5 between the SWITCH terminals when using a for. Connect terminals to matching terminal of RITY W slave C boards R W C R W C R W C D P WARIG: EVER COECT R & C DIRECTY, this will be a direct short on the 24 PWR T D COM to D, T P to T P, COM Ground T to T Ground COM T T COM COMMS TSAT6 VAC ZOE6 supply. -STAT OFF Use 3 18 T-STAT gauge 4 thermostat T-STAT 5 wire. T-STAT Wire 6 should be shielded if located in close proximity to high voltage wiring. ZOE1 E 1 SWITCH Zone ZOE 2 ZOE 3 ZOE 4 ZOE 5 ZOE 6 ZOE2 DipSwitches Master Slave ZOE3 Priority OFF Primary OFF Priority O Primary O T-STAT 1 T-STAT 2 T-STAT 3 T-STAT 4 T-STAT 5 T-STAT 6 WARIG: When connecting 2 or more Z-one controls, all controls must be powered by the same 120 VAC circuit. 27

28 C1 - Mod/Con boiler, hydro separator, zone valves 28 mod/con! boiler ZV1 ZV2 ZV3 ZV4 ZV5 ZV6 SYSTEM! SECODARY! X X R W C R W C R W C R W C R W C R W C D P T T COM T T COM T T COM T T COM T T COM T T COM COMMS T-STAT 1 T-STAT 2 T-STAT 3 T-STAT 4 T-STAT 5 T-STAT 6 PWR TSAT1 ZOE1 ZVR106 MASTER SAVE TSAT2 ZOE2 TSAT3 ZOE3 TSAT4 ZOE4 STATUS DURIG O OFF O OFF TSAT5 ZOE5 TSAT6 ZOE6 POWER I SEC SYSTEM ZOE 1 ZOE 2 ZOE 3 ZOE 4 ZOE 5 ZOE 6 Hydronic diagram is for illustration purposes only, some components have been removed for simplicity.

29 Description of terminals = Ground = eutral (common leg of 120 VAC) = ine (live leg of 120 VAC) Thermostat terminals R = 24 VAC W = Heat call C = Common of 24 VAC Boiler terminals XX = Dry contacts rated up to 120 VAC, 2 Amps. Closes when any zone calls including priority. Typically connected to TT on boiler control. () = Dry contacts rated up to 120 VAC, 2 Amps. Closes only when priority is enabled and calling. Typically used to close ZR\ZC (120 VAC) or contacts (24 VAC) on boiler controls equipped with these features. Pump terminals SYSTEM = Runs when any zone calls for heat. When priority is enabled, the status of the (on\off) during a priority call is selected via a jumper SEC = Runs when any zone calls for heat except the priority zone when it is enabled. = Runs when the priority zone calls. A jumper is required between the SWITCH terminals when using a. Valve terminals Motor = 24 VAC to power the zone valve motor End Switch = Connects to end switch on zone valve. Must be jumpered if using a 2 wire zone valve. Sequence of Operation / Settings Priority Jumper: OFF Master / Slave Jumper: Master Status During Priority: OFF A demand occurs from any T-stat (T-stat closes TT terminals). The T-STAT CA ED illuminates for that zone. ZVR control sends 24 VAC to the corresponding zone MOTOR terminals to open the zone valve. When the end switch on the zone valve closes, the control sends 120 VAC to SEC and SYSTEM. The VAVE OPE ED illuminates for that zone and the XX contacts close to signal a heat demand to the boiler. When the demand from the T-stat is satisfied (T-stat opens TT terminals), both the T-STAT CA and VAVE OPE ED s turn off. 24 VAC is dropped from the corresponding zone MOTOR terminals. If no other zones are calling, power is turned off to the SEC and SYSTEM and the XX contacts are opened. WARIG: EVER COECT R & C DIRECTY, this will be a direct short on the 24 VAC supply 29

30 C2 - Mod/Con boiler, priority indirect on primary side of hydro sep, zone valves 30 mod/con! boiler ZV2 ZV3 ZV4 ZV5 ZV6! aquastat! SYSTEM! SECODARY!! AQUASTAT X X R W C R W C R W C R W C R W C R W C D P T T COM T T COM T T COM T T COM T T COM T T COM COMMS T-STAT 1 T-STAT 2 T-STAT 3 T-STAT 4 T-STAT 5 T-STAT 6 PWR TSAT1 ZOE1 ZVR106 MASTER SAVE TSAT2 ZOE2 TSAT3 ZOE3 TSAT4 ZOE4 STATUS DURIG O OFF O OFF TSAT5 ZOE5 TSAT6 ZOE6 POWER I SEC SYSTEM ZOE 1 ZOE 2 ZOE 3 ZOE 4 ZOE 5 ZOE 6 Buffer tank- Optional hydraulic separator! SECODARY! ZV2 ZV3 ZV4 ZV5 ZV6 SYSTEM! Hydronic diagram is for illustration purposes only, some components have been removed for simplicity.

31 Description of terminals = Ground = eutral (common leg of 120 VAC) = ine (live leg of 120 VAC) Thermostat terminals R = 24 VAC W = Heat call C = Common of 24 VAC Boiler terminals XX = Dry contacts rated up to 120 VAC, 2 Amps. Closes when any zone calls including priority. Typically connected to TT on boiler control. () = Dry contacts rated up to 120 VAC, 2 Amps. Closes only when priority is enabled and calling. Typically used to close ZR\ZC (120 VAC) or contacts (24 VAC) on boiler controls equipped with these features. Pump terminals SYSTEM = Runs when any zone calls for heat. When priority is enabled, the status of the (on\off) during a priority call is selected via a jumper SEC = Runs when any zone calls for heat except the priority zone when it is enabled. = Runs when the priority zone calls. A jumper is required between the SWITCH terminals when using a. Valve terminals Motor = 24 VAC to power the zone valve motor End Switch = Connects to end switch on zone valve. Must be jumpered if using a 2 wire zone valve. WARIG: EVER COECT R & C DIRECTY, this will be a direct short on the 24 VAC supply Sequence of Operation / Settings Priority Jumper: O (Zone #1 becomes priority) Master/Slave Jumper: Master Status During Priority: OFF A demand occurs from a T-stat (T-stat closes TT terminals) in zones 2 thru 6. The T-STAT CA ED illuminates for that zone. ZVR control sends 24 VAC to the corresponding zone MOTOR terminals to open the zone valve. When the end switch on the zone valve closes, the control sends 120 VAC to SEC and SYSTEM. The VAVE OPE ED illuminates for that zone and the XX contacts close to signal a heat demand to the boiler. When the demand from the T-stat is satisfied (T-stat opens TT terminals), both the T-STAT CA and VAVE OPE ED s turn off. 24 VAC is dropped from the corresponding zone MOTOR terminals. If no other zones are calling, power is dropped to the SEC and SYSTEM and the XX contacts are opened. If a demand occurs from the aquastat (zone #1), The T-STAT CA ED illuminates for Zone #1 and the VAVE OPE ED will illuminate. (When using a, a jumper must be installed on Zone #1 end switch terminals.) If any other zone was calling (Zones 2 thru 6) when Zone #1 called, power (24 VAC) is dropped to those zones. The XX and contacts close. The contacts deliver 120 VAC The SEC and SYSTEM are off. Once the Zone #1 demand is satisfied, power to the is dropped, the contacts open. If a demand from zones 2 thru 6 is present, 24 VAC is delivered to the corresponding zone valve(s) and the T-STAT CA ED s illuminate. When the zone valve end switch closes, the VAVE OPE ED illuminates, the XX contacts close, the SEC and SYSTEM terminals deliver 120 VAC. Time Out \ Freeze Prevention Feature After one hour of a priority demand, the control will open the contacts and turn off power to the and Zone Valve #1. If a heating demand is present from Zones #2-6, the control will satisfy those demands before going back to the call. After the heating demands are met, the control will go back to and re-set the one hour timer. 31

32 C3 - Mod/Con boiler, priority indirect on load side of hydro sep, zone valves 32 Buffer tank- Optional hydraulic separator ZV2 ZV3 ZV4 ZV5 ZV6 SYSTEM! SECODARY!!! AQUASTAT! AQUASTAT X X R W C R W C R W C R W C R W C R W C D P T T COM COMMS T T COM T T COM T T COM T T COM T T COM T-STAT 1 T-STAT 2 T-STAT 3 T-STAT 4 T-STAT 5 T-STAT 6 PWR TSAT1 ZOE1 ZVR106 MASTER SAVE TSAT2 ZOE2 TSAT3 ZOE3 TSAT4 ZOE4 STATUS DURIG O OFF O OFF TSAT5 ZOE5 TSAT6 ZOE6 POWER I SEC SYSTEM ZOE 1 ZOE 2 ZOE 3 ZOE 4 ZOE 5 ZOE 6 Hydronic diagram is for illustration purposes only, some components have been removed for simplicity.

33 Description of terminals = Ground = eutral (common leg of 120 VAC) = ine (live leg of 120 VAC) Thermostat terminals R = 24 VAC W = Heat call C = Common of 24 VAC Boiler terminals XX = Dry contacts rated up to 120 VAC, 2 Amps. Closes when any zone calls including priority. Typically connected to TT on boiler control. () = Dry contacts rated up to 120 VAC, 2 Amps. Closes only when priority is enabled and calling. Typically used to close ZR\ZC (120 VAC) or contacts (24 VAC) on boiler controls equipped with these features. Pump terminals SYSTEM = Runs when any zone calls for heat. When priority is enabled, the status of the (on\off) during a priority call is selected via a jumper SEC = Runs when any zone calls for heat except the priority zone when it is enabled. = Runs when the priority zone calls. A jumper is required between the SWITCH terminals when using a. Valve terminals Motor = 24 VAC to power the zone valve motor End Switch = Connects to end switch on zone valve. Must be jumpered if using a 2 wire zone valve. WARIG: EVER COECT R & C DIRECTY, this will be a direct short on the 24 VAC supply Sequence of Operation / Settings Priority Jumper: O (Zone #1 becomes priority) Master/Slave Jumper: Master Status During Priority: O A demand occurs from a T-stat (T-stat closes TT terminals) in zones 2 thru 6. The T-STAT CA ED illuminates for that zone. ZVR control sends 24 VAC to the corresponding zone MOTOR terminals to open the zone valve. When the end switch on the zone valve closes, the control sends 120 VAC to SEC and SYSTEM. The VAVE OPE ED illuminates for that zone and the XX contacts close to signal a heat demand to the boiler. When the demand from the T-stat is satisfied (T-stat opens TT terminals), both the T-STAT CA and VAVE OPE ED s turn off. 24 VAC is dropped from the corresponding zone MOTOR terminals. If no other zones are calling, power is dropped to the SEC and SYSTEM and the XX contacts are opened. If a demand occurs from the aquastat (zone #1), The T-STAT CA ED illuminates for Zone #1 and the VAVE OPE ED will illuminate. (When using a, a jumper must be installed on Zone #1 end switch terminals.) If any other zone was calling (Zones 2 thru 6) when Zone #1 called, power (24 VAC) is dropped to those zones. The XX and contacts close. The and SYSTEM contacts deliver 120 VAC The SEC is off. Once the Zone #1 demand is satisfied, power to the and SYSTEM is dropped, the contacts open. If a demand from zones 2 thru 6 is present, 24 VAC is delivered to the corresponding zone valve(s) and the T-STAT CA ED s illuminate. When the zone valve end switch closes, the VAVE OPE ED illuminates, the XX contacts close, the SEC and SYSTEM terminals deliver 120 VAC. Time Out \ Freeze Prevention Feature After one hour of a priority demand, the control will open the contacts and turn off power to the and Zone Valve #1. If a heating demand is present from Zones #2-6, the control will satisfy those demands before going back to the call. After the heating demands are met, the control will go back to for and re-set the one hour timer. 33

34 C4- Mod/Con boiler, priority indirect on primary side of hydro sep, expansion control 34 Buffer tank - Optional hydraulic separator ZV2 ZV3 ZV4 ZV5 ZV6 ZV7 ZV8 ZV9 ZV10 ZV11 ZV12 SECODARY!! AQUASTAT! SYSTEM!! AQUASTAT X X R W C R W C R W C R W C R W C R W C D P T T COM T T COM T T COM T T COM T T COM T T COM COMMS T-STAT 1 T-STAT 2 T-STAT 3 T-STAT 4 T-STAT 5 T-STAT 6 PWR TSAT1 ZOE1 X X R W C R W C R W C R W C R W C R W C D P T T COM T T COM T T COM T T COM T T COM T T COM COMMS T-STAT 1 T-STAT 2 T-STAT 3 T-STAT 4 T-STAT 5 T-STAT 6 PWR TSAT1 ZOE1 MASTER SAVE TSAT2 ZOE2 MASTER SAVE TSAT2 ZOE2 ZVR106 TSAT3 ZOE3 TSAT4 ZOE4 ZVR106 TSAT3 ZOE3 TSAT4 ZOE4 STATUS DURIG O OFF O OFF TSAT5 ZOE5 TSAT6 ZOE6 STATUS DURIG O OFF O OFF TSAT5 ZOE5 TSAT6 ZOE6 POWER I SEC SYSTEM ZOE 1 ZOE 2 ZOE 3 ZOE 4 ZOE 5 ZOE 6 POWER I SEC SYSTEM ZOE 1 ZOE 2 ZOE 3 ZOE 4 ZOE 5 ZOE 6! SECODARY! SECODARY SYSTEM! SYSTEM ZV2 ZV3 ZV4 ZV5 ZV6 ZV7 ZV8 ZV9 ZV10 ZV11 ZV12 Hydronic diagram is for illustration purposes only, some components have been removed for simplicity.

35 Description of terminals = Ground = eutral (common leg of 120 VAC) = ine (live leg of 120 VAC) Thermostat terminals R = 24 VAC W = Heat call C = Common of 24 VAC Boiler terminals XX = Dry contacts rated up to 120 VAC, 2 Amps. Closes when any zone calls including priority. Typically connected to TT on boiler control. () = Dry contacts rated up to 120 VAC, 2 Amps. Closes only when priority is enabled and calling. Typically used to close ZR\ZC (120 VAC) or contacts (24 VAC) on boiler controls equipped with these features. Pump terminals SYSTEM = Runs when any zone calls for heat. When priority is enabled, the status of the (on\off) during a priority call is selected via a jumper SEC = Runs when any zone calls for heat except the priority zone when it is enabled. = Runs when the priority zone calls. A jumper is required between the SWITCH terminals when using a. Valve terminals Motor = 24 VAC to power the zone valve motor End Switch = Connects to end switch on zone valve. Must be jumpered if using a 2 wire zone valve. WARIG: EVER COECT R & C DIRECTY, this will be a direct short on the 24 VAC supply Sequence of Operation / Settings Control #1 (Master) Priority Jumper: O (Zone #1 becomes priority) Master/Slave Jumper: Master Status During Priority: OFF Control #2 (Slave) Priority Jumper: OFF Master/Slave Jumper: Slave Status During Priority: OFF A demand occurs from a T-stat (T-stat closes TT terminals) in zones 2 thru 12. The T-STAT CA ED illuminates for that zone. ZVR control sends 24 VAC to the corresponding zone MOTOR terminals to open the zone valve. When the end switch on the zone valve closes, the control sends 120 VAC to SEC and SYSTEM. The VAVE OPE ED illuminates for that zone and the XX contacts close to signal a heat demand to the boiler. OTE: The SEC output is only fired on the control that receives the t-stat call. For instance, if a zone from control #1 calls, the SEC on control #1 fires but SEC on control #2 does not. When using a single secondary with 2 controls, the secondary must be connected to the SYSTEM terminals. (An alternative wiring option for secondary is to wire the secondary to the SEC terminals of both controls). When the demand from the T-stat is satisfied (T-stat opens TT terminals), both the T-STAT CA and VAVE OPE ED s turn off. 24 VAC is dropped from the corresponding zone MOTOR terminals. If no other zones are calling, power is dropped to the SEC and SYSTEM and the XX contacts are opened. If a demand occurs from the aquastat (zone #1), The T-STAT CA ED illuminates for Zone #1 and the VAVE OPE ED will illuminate. (When using a, a jumper must be installed on Zone #1 end switch terminals.) If any other zone was calling (Zones 2 thru 12) when Zone #1 called, power (24 VAC) is dropped to those zones. The XX and contacts close. The contacts deliver 120 VAC The SEC and SYSTEM are off. Once the Zone #1 demand is satisfied, power to the is dropped, the contacts open. If a demand from zones 2 thru 12 is present, 24 VAC is delivered to the corresponding zone valve(s) and the T-STAT CA ED s illuminate. When the zone valve end switch closes, the VAVE OPE ED illuminates, the XX contacts close, the SEC and SYSTEM terminals deliver 120 VAC. Time Out \ Freeze Prevention Feature After one hour of a priority demand, the control will open the contacts and turn off power to the and Zone Valve #1. If a heating demand is present from Zones #2-12, the control will satisfy those demands before going back to the call. After the heating demands are met, the control will go back to for and re-set the one hour timer. 35

36 C5 - Traditional boiler, indirect (no priority) with valve, zone valves 36 SYSTEM! ZV2 ZV3 ZV4 ZV5 ZV6 ZV1! aquastat X X R W C T T COM THM 1 R W C R W C R W C R W C R W C D P T T COM T T COM T T COM T T COM T T COM COMMS THM 2 THM 3 THM 4 THM 5 THM 6 Master/Slave PWR THM1 ZOE1 ZRV106 Z6V THM2 ZOE2 THM3 ZOE3 THM4 ZOE4 THM5 ZOE5 STATUS DURIG THM6 ZOE6 POWER I SEC SYSTEM ZOE 1 ZOE 2 ZOE 3 ZOE 4 ZOE 5 ZOE 6 Hydronic diagram is for illustration purposes only, some components have been removed for simplicity.

37 Description of terminals = Ground = eutral (common leg of 120 VAC) = ine (live leg of 120 VAC) Thermostat terminals R = 24 VAC W = Heat call C = Common of 24 VAC Boiler terminals XX = Dry contacts rated up to 120 VAC, 2 Amps. Closes when any zone calls including priority. Typically connected to TT on boiler control. () = Dry contacts rated up to 120 VAC, 2 Amps. Closes only when priority is enabled and calling. Typically used to close ZR\ZC (120 VAC) or contacts (24 VAC) on boiler controls equipped with these features. Pump terminals SYSTEM = Runs when any zone calls for heat. When priority is enabled, the status of the (on\off) during a priority call is selected via a jumper SEC = Runs when any zone calls for heat except the priority zone when it is enabled. = Runs when the priority zone calls. A jumper is required between the SWITCH terminals when using a. Valve terminals Motor = 24 VAC to power the zone valve motor End Switch = Connects to end switch on zone valve. Must be jumpered if using a 2 wire zone valve. Sequence of Operation / Settings Priority Jumper: OFF Master/Slave Jumper: Master Status During Priority: OFF A demand occurs from a T-stat (T-stat closes TT terminals) in zones 2 thru 6 otr the aquastat on zone #1. The T-STAT CA ED illuminates for that zone. ZVR control sends 24 VAC to the corresponding zone MOTOR terminals to open the zone valve. When the end switch on the zone valve closes, the control sends 120 VAC to SEC and SYSTEM. The VAVE OPE ED illuminates for that zone and the XX contacts close to signal a heat demand to the boiler. When the demand from the T-stat is satisfied (T-stat opens TT terminals), both the T-STAT CA and VAVE OPE ED s turn off. 24 VAC is dropped from the corresponding zone MOTOR terminals. If no other zones are calling, power is turned off to the SEC and SYSTEM and the XX contacts are opened. WARIG: EVER COECT R & C DIRECTY, this will be a direct short on the 24 VAC supply 37

38 C6- Traditional boiler with reset control, priority indirect with valve, zone valves 38 SYSTEM! ZV2 ZV3 ZV4 ZV5 ZV6 ZV1! aquastat! aquastat X X R W C T T COM THM 1 R W C R W C R W C R W C R W C D P T T COM T T COM T T COM T T COM T T COM COMMS THM 2 THM 3 THM 4 THM 5 THM 6 Master/Slave THM1 PWR ZOE1 ZCZR T T ZRV106 Z6V THM2 THM3 THM4 ZOE2 ZOE3 ZOE4 THM5 ZOE5 STATUS DURIG THM6 ZOE6 POWER I SEC SYSTEM ZOE 1 ZOE 2 ZOE 3 ZOE 4 ZOE 5 ZOE 6 Hydronic diagram is for illustration purposes only, some components have been removed for simplicity.

39 Description of terminals = Ground = eutral (common leg of 120 VAC) = ine (live leg of 120 VAC) Thermostat terminals R = 24 VAC W = Heat call C = Common of 24 VAC Boiler terminals XX = Dry contacts rated up to 120 VAC, 2 Amps. Closes when any zone calls including priority. Typically connected to TT on boiler control. () = Dry contacts rated up to 120 VAC, 2 Amps. Closes only when priority is enabled and calling. Typically used to close ZR\ZC (120 VAC) or contacts (24 VAC) on boiler controls equipped with these features. Pump terminals SYSTEM = Runs when any zone calls for heat. When priority is enabled, the status of the (on\off) during a priority call is selected via a jumper SEC = Runs when any zone calls for heat except the priority zone when it is enabled. = Runs when the priority zone calls. A jumper is required between the SWITCH terminals when using a. Valve terminals Motor = 24 VAC to power the zone valve motor End Switch = Connects to end switch on zone valve. Must be jumpered if using a 2 wire zone valve. WARIG: EVER COECT R & C DIRECTY, this will be a direct short on the 24 VAC supply Sequence of Operation Priority Jumper: O (Zone #1 becomes priority) Master/Slave Jumper: Master Status During Priority: O A demand occurs from a T-stat (T-stat closes TT terminals) in zones 2 thru 6. The T-STAT CA ED illuminates for that zone. ZVR control sends 24 VAC to the corresponding zone MOTOR terminals to open the zone valve. When the end switch on the zone valve closes, the control sends 120 VAC to SEC and SYSTEM. The VAVE OPE ED illuminates for that zone and the XX contacts close to signal a heat demand to the boiler. When the demand from the T-stat is satisfied (T-stat opens TT terminals), both the T-STAT CA and VAVE OPE ED s turn off. 24 VAC is dropped from the corresponding zone MOTOR terminals. If no other zones are calling, power is dropped to the SEC and SYSTEM and the XX contacts are opened. If a demand occurs from the aquastat (zone #1), The T-STAT CA ED illuminates for Zone #1 and the VAVE OPE ED will illuminate. (When using a, a jumper must be installed on Zone #1 end switch terminals.) If any other zone was calling (Zones 2 thru 6) when Zone #1 called, power (24 VAC) is dropped to those zones. The XX and contacts close. The and SYSTEM contacts deliver 120 VAC The SEC is off. Once the Zone #1 demand is satisfied, power to the and SYSTEM is dropped, the contacts open. If a demand from zones 2 thru 6 is present, 24 VAC is delivered to the corresponding zone valve(s) and the T-STAT CA ED s illuminate. When the zone valve end switch closes, the VAVE OPE ED illuminates, the XX contacts close, the SEC and SYSTEM terminals deliver 120 VAC. Time Out \ Freeze Prevention Feature After one hour of a priority demand, the control will open the contacts and turn off power to the and Zone Valve #1. If a heating demand is present from Zones #2-6, the control will satisfy those demands before going back to the call. After the heating demands are met, the control will go back to and re-set the one hour timer. 39

40 C7 - Mod/Con boiler, hydro separator, zone valves (more than 6), multiple secondary s 40 "A"! "B"! A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11A12 SYSTEM! X X R W C R W C R W C R W C R W C R W C D P T T COM T T COM T T COM T T COM T T COM T T COM COMMS T-STAT 1 T-STAT 2 T-STAT 3 T-STAT 4 T-STAT 5 T-STAT 6 PWR TSAT1 ZOE1 X X R W C R W C R W C R W C R W C R W C D P T T COM T T COM T T COM T T COM T T COM T T COM COMMS T-STAT 1 T-STAT 2 T-STAT 3 T-STAT 4 T-STAT 5 T-STAT 6 PWR TSAT1 ZOE1 MASTER SAVE TSAT2 ZOE2 MASTER SAVE TSAT2 ZOE2 ZVR106 TSAT3 ZOE3 TSAT4 ZOE4 ZVR106 TSAT3 ZOE3 TSAT4 ZOE4 STATUS DURIG O OFF O OFF TSAT5 ZOE5 TSAT6 ZOE6 STATUS DURIG O OFF O OFF TSAT5 ZOE5 TSAT6 ZOE6 POWER I SEC SYSTEM ZOE 1 ZOE 2 ZOE 3 ZOE 4 ZOE 5 ZOE 6 POWER I SEC SYSTEM ZOE 1 ZOE 2 ZOE 3 ZOE 4 ZOE 5 ZOE 6 SYSTEM! "B"! "A"! A1 A2 A3 A4 A5 A6 Hydronic diagram is for illustration purposes only, some components have been removed for simplicity. A7 A8 A9 A10 A11 A12

41 Description of terminals = Ground = eutral (common leg of 120 VAC) = ine (live leg of 120 VAC) Thermostat terminals R = 24 VAC W = Heat call C = Common of 24 VAC Boiler terminals XX = Dry contacts rated up to 120 VAC, 2 Amps. Closes when any zone calls including priority. Typically connected to TT on boiler control. () = Dry contacts rated up to 120 VAC, 2 Amps. Closes only when priority is enabled and calling. Typically used to close ZR\ZC (120 VAC) or contacts (24 VAC) on boiler controls equipped with these features. Pump terminals SYSTEM = Runs when any zone calls for heat. When priority is enabled, the status of the (on\off) during a priority call is selected via a jumper SEC = Runs when any zone calls for heat except the priority zone when it is enabled. = Runs when the priority zone calls. A jumper is required between the SWITCH terminals when using a. Valve terminals Motor = 24 VAC to power the zone valve motor End Switch = Connects to end switch on zone valve. Must be jumpered if using a 2 wire zone valve. WARIG: EVER COECT R & C DIRECTY, this will be a direct short on the 24 VAC supply Sequence of Operation / Settings Control #1 (Master) Priority Jumper: OFF Master/Slave Jumper: Master Status During Priority: OFF Control #2 (Slave) Priority Jumper: OFF Master/Slave Jumper: Slave Status During Priority: OFF A demand occurs from a T-stat (T-stat closes TT terminals) in zones 1 thru 12. The T-STAT CA ED illuminates for that zone. ZVR control sends 24 VAC to the corresponding zone MOTOR terminals to open the zone valve. When the end switch on the zone valve closes, the control sends 120 VAC to SYSTEM and to the SEC located on the ZVR control that is seeing the demand. The VAVE OPE ED illuminates for that zone and the XX contacts close to signal a heat demand to the boiler. OTE: The SEC output is only fired on the control that receives the t-stat call. For instance, if a zone from control #1 calls, the SEC on control #1 fires but SEC on control #2 does not. When the demand from the T-stat is satisfied (T-stat opens TT terminals), both the T-STAT CA and VAVE OPE ED s turn off. 24 VAC is dropped from the corresponding zone MOTOR terminals. If no other zones are calling, power is turned off to the SEC and SYSTEM and the XX contacts are opened. 41

42 Caleffi orth America, Inc. / 3883 W Milwaukee Rd / Milwaukee, WI Tel: / Fax: / [email protected] Copyright 2014 Caleffi orth America, Inc 42

PART 8: FIELD WIRING. n WARNING NOTICE. Boiler Manual

PART 8: FIELD WIRING. n WARNING NOTICE. Boiler Manual PART 8: FIELD WIRING A. INSTALLATION MUST COMPLY WITH: 1. National Electrical Code and any other national, state, provincial or local codes or regulations. 2. In Canada, CSA C22.1 Canadian Electrical Code

More information

Wireless 7 Day Programmable Room Thermostat

Wireless 7 Day Programmable Room Thermostat Wireless 7 Day Programmable Room Thermostat Cat. No. TRT037 Transmitter Receiver Operating & Installation Instructions What is a programmable room thermostat? an explanation for householders A programmable

More information

INSTALLATION & SERVICE MANUAL. Display Panel

INSTALLATION & SERVICE MANUAL. Display Panel INSTALLATION & SERVICE MANUAL Display Panel The PowerLine EMS TM is a specialized power distribution and energy management system intended to be used in recreational vehicles. The Control Module is housed

More information

INSTALLATION AND OPERATION MANUAL

INSTALLATION AND OPERATION MANUAL RCS MODEL ZC4 4 ZONE HVAC INSTALLATION AND OPERATION MANUAL DCN: 141-0020-02 /0/03 INTRODUCTION The 4 Zone HVAC Controller series allows up to 4 standard electronic thermostats to independently control

More information

Digi-Motor Installation Guide

Digi-Motor Installation Guide Digi-Motor Installation Guide Installation Video...located at marsdelivers.com Digi-Motor Installation Guide Digi-Motor For technical assistance with your Azure Digi-Motor, call the MARS technical support

More information

MODEL 5010 DUAL CHANNEL SMOKE/FIRE DETECTION MODULE

MODEL 5010 DUAL CHANNEL SMOKE/FIRE DETECTION MODULE DESCRIPTION MODEL 5010 DUAL CHANNEL SMOKE/FIRE DETECTION MODULE DESCRIPTION The SST Model 5010 Two Channel Smoke/Fire Detection Module provides two independent detection input channels for the NOVA-5000

More information

Electrical Circuits... 2. Types of Electrical Switches... 3. Switch Operation... 4. Standard Combinations... 6

Electrical Circuits... 2. Types of Electrical Switches... 3. Switch Operation... 4. Standard Combinations... 6 TEIAL AD GEERAL IFORMATIO BASI WIRIG LIK O DESIRED PAGE Electrical ircuits........................................................................... 2 Types of Electrical Switches..................................................................

More information

BASIC WIRING Electrical Circuits...141. Types of Electrical Switches...142. Switch Operation...143. Standard Combinations...144

BASIC WIRING Electrical Circuits...141. Types of Electrical Switches...142. Switch Operation...143. Standard Combinations...144 TEIAL AD GEERAL IFORMATIO ontents BASI WIRIG Electrical ircuits...........................................................................141 Types of Electrical Switches..................................................................142

More information

I nstallation. M100Q Series Proportional Actuator with R81Q Controller Board for Thermistor Sensor Applications. Tools Needed.

I nstallation. M100Q Series Proportional Actuator with R81Q Controller Board for Thermistor Sensor Applications. Tools Needed. FANs 268.1, 1628.3 Installation Bulletin M100Q Issue Date 1099 M100Q Series Proportional Actuator with R81Q Controller Board for Thermistor Sensor Applications I nstallation Parts Included M110QGA-1 and

More information

Advantium 2 Plus Alarm

Advantium 2 Plus Alarm ADI 9510-B Advantium 2 Plus Alarm INSTALLATION AND OPERATING INSTRUCTIONS Carefully Read These Instructions Before Operating Carefully Read These Controls Corporation of America 1501 Harpers Road Virginia

More information

PART 11: START-UP PROCEDURES FOR THE INSTALLER

PART 11: START-UP PROCEDURES FOR THE INSTALLER PART 11: START-UP PROCEDURES FOR THE INSTALLER NOTICE It is important to note that the user can adjust the heat curve down by adjusting the central heating temperature to a lower setting. 212 CENTRAL HEATING

More information

Comfort Control Relay Panel (CCRP)

Comfort Control Relay Panel (CCRP) CCRP9 "Commitment to Innovation" OPERATION & INSTALLATION GUIDE FOR Comfort Control Panel (CCRP) Off-Peak System Control 9 Pole CCRP 4 Pole CCRP (Applicable to Software Version 14.0-14.9) "Manufactured

More information

SET1E. Installation & User Instructions. Electronic timeswitch for heating & hot water. Certification Mark

SET1E. Installation & User Instructions. Electronic timeswitch for heating & hot water. Certification Mark SET1E Electronic timeswitch for heating & hot water Installation & User Instructions Certification Mark Index INDEX Installation Product specification 3 Installation 4-5 Wiring 5-10 Replacement 11-13 User

More information

Rain+Birdt. Simple To Set Timer (SST) Setup & Operation Instructions. English. 1-800- RAIN BIRD (800-724-6247) or visit www.rainbird.

Rain+Birdt. Simple To Set Timer (SST) Setup & Operation Instructions. English. 1-800- RAIN BIRD (800-724-6247) or visit www.rainbird. Rain+Birdt Simple To Set r (SST) Setup & Operation Instructions English Installation...2 Tools and Supplies Needed...2 Step 1. Mount r...2 Step 2. Connect Power...2 Indoor r...2 Outdoor r...2 Step 3. Connect

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS LIGHTING CONTROL PANELS 4 AND 8 RELAYS INSTALLATION INSTRUCTIONS INSTALLATION OVERVIEW The installation instructions contained in this document are provided as a guide for proper and reliable installation.

More information

Install Guide CT100. Caution. Caution ENGLISH. disconnect the power supply before beginning work.

Install Guide CT100. Caution. Caution ENGLISH. disconnect the power supply before beginning work. Install Guide CT100 PG 1 Caution top cover Your thermostat is a precise instrument, handle it with care. Turn off electricity to the system before installing or servicing thermostat or any part of the

More information

GeniSys 12V. Model 7556. Description / Applications. Advanced 12 Vdc Burner Control

GeniSys 12V. Model 7556. Description / Applications. Advanced 12 Vdc Burner Control PARTS & ACCESSORIES GeniSys 12V Model 7556 Advanced 12 Vdc Burner Control Description / Applications The Beckett GeniSys TM 12V Advanced Burner Control is a 12 Vdc primary safety control for oil burners

More information

ETC TWO STAGE ELECTRONIC TEMPERATURE CONTROL

ETC TWO STAGE ELECTRONIC TEMPERATURE CONTROL RANCO INSTALLATION INSTRUCTIONS ETC TWO STAGE ELECTRONIC TEMPERATURE CONTROL Relay Electrical Ratings PRODUCT DESCRIPTION The Ranco ETC is a microprocessor-based family of electronic temperature controls,

More information

Short Range Wireless Switch System Handheld 8 Installation and Operations Guide

Short Range Wireless Switch System Handheld 8 Installation and Operations Guide Phone: (866) 701-1146 Fax: (425) 216-7558 www.remotecontroltech.com Short Range Wireless Switch System Handheld 8 Installation and Operations Guide Introduction... 2 Before Installation... 2 Receiver Installation...

More information

=============================== WARNING

=============================== WARNING =============================== WARNING EXPLANATION OF GRAPHICAL SYMBOLS This symbol is intended to alert the user to the presence of unprotected dangerous voltage" within the product's enclosure that

More information

Automatic Phone-Out Home Monitoring Systems

Automatic Phone-Out Home Monitoring Systems Automatic Phone-Out Home Monitoring Systems Power Outage and Freeze Alarm Model Number: THP202 Power Outage, Freeze and Flood Alarm Product Description Model Number: THP201 These monitoring systems are

More information

Nest Learning Thermostat Installation Guide. Installation step-by-step

Nest Learning Thermostat Installation Guide. Installation step-by-step Nest Learning Thermostat Installation Guide Installation step-by-step Contents Compatibility. 3 In the box. 4 Before you start. 5 Choose an installation method. 6 Replacing an existing wired thermostat.

More information

RVR Hybrid System Installer Instructions - 10052012. RVR Hybrid System Controller Installation Instructions

RVR Hybrid System Installer Instructions - 10052012. RVR Hybrid System Controller Installation Instructions RVR Hybrid System Controller Installation Instructions 1 Introduction to Hybrid Systems The RVR Hybrid system uses a combination of the Immergas Audax range of heat pumps with gas or oil boilers to create

More information

The All New... TACO ZONE CONTROLS WIRING GUIDE

The All New... TACO ZONE CONTROLS WIRING GUIDE he All ew... ACO ZOE COROLS WIRIG GUIDE Pages Switching Relays Single Zone Wiring 4 Switching Relays Oil Boiler Wiring Safety otice 5 Switching Relays O EXP Connected ogether with Priority 6 9 Switching

More information

RI-215A Operator s Manual. Part Number: 71-0045RK Revision 0 Released: 10/3/05

RI-215A Operator s Manual. Part Number: 71-0045RK Revision 0 Released: 10/3/05 RI-215A Operator s Manual Part Number: 71-0045RK Revision 0 Released: 10/3/05 Warranty RKI Instruments, Inc., warrants gas alarm equipment sold by us to be free from defects in materials and workmanship,

More information

Boiler Applications Drawings

Boiler Applications Drawings Boiler pplications Drawings 800000026 Rev D Contents Drawing No. Boiler Model Description Information... Q & E Series Boilers... EV-10-0001 Rev B... Q & E Series Boilers... Boiler Flat Roof Multiple Termination

More information

GENERAL SUPPLEMENT 410. Radiantec CONTROLS FOR RADIANT HEATING CONTROLS PURPOSE OF RADIANTEC CONTROLS

GENERAL SUPPLEMENT 410. Radiantec CONTROLS FOR RADIANT HEATING CONTROLS PURPOSE OF RADIANTEC CONTROLS Radiantec ONTROLS FOR RADIANT HEATING GENERAL SUPPLEMENT 410 ONTROLS This supplement presents a layman s language narrative about Radiantec ompany controls, their design and their installation. This supplement

More information

with MERCURY FREE 1 HP Relays ! WARNING Before using this product read and understand instructions.

with MERCURY FREE 1 HP Relays ! WARNING Before using this product read and understand instructions. B Installation & Maintenance Instructions MM-414 Series 150E and 157E Low Water Cut-Off/Pump Controllers For Steam Boilers and Other Level Control Applications A Typical Applications: Primary or secondary

More information

Drayton Digistat +2RF/+3RF

Drayton Digistat +2RF/+3RF /+3RF Programmable Room Thermostat Wireless Model: RF700/22090 Model: RF701/22092 Power Supply: Battery - Thermostat Mains - Digistat SCR Invensys Controls Europe Customer Service Tel: 0845 130 5522 Customer

More information

CM705B - Universal Expander Module CM707B - Plug On Zone Expander Security Systems

CM705B - Universal Expander Module CM707B - Plug On Zone Expander Security Systems CM705B - Universal Expander Module CM707B - Plug On Zone Expander Security Systems EN Security System CM705B CM705B - Universal Expander Module The CM705B universal expander provides a cost effective way

More information

PK5500 v1.1 Installation Instructions

PK5500 v1.1 Installation Instructions PK5500 v1.1 Installation Instructions 1 2 3 4 5 6 7 8 9 * 0 # WARNING: Please refer to the System Installation Manual for information on limitations regarding product use and function and information on

More information

16/32 Channel 1U Rack Mount CCTV Power Supply

16/32 Channel 1U Rack Mount CCTV Power Supply 16/32 Channel 1U Rack Mount CCTV Power Supply Manual PH-A3224-GUQ Shown 16-Channel 32-Channel PTC PH-A1612-PUQ PH-A3224-PUQ Glass Fuse PH-A1612-GUQ PH-A3224-GUQ Industrial design 12 Amp 3 Amps per channel

More information

TIG INVERTER INSTRUCTION MANUAL

TIG INVERTER INSTRUCTION MANUAL TIG INVERTER INSTRUCTION MANUAL Contents Warning General Description Block Diagram Main Parameters Circuit Diagram Installation and Operation Caution Maintenance Spare Parts List Troubleshooting 3 4 4

More information

Failure code manual. content

Failure code manual. content Failure code manual content 一 wall split AC series 2 二 floor standing AC series. 4 三 portable AC series.. 5 四 dehumidifer 6 五 DC inverter single split series...7 六 DC inverter multi-split series 10 1 一

More information

RDJ10RF/SET. Wireless room temperature controller with 24-hour time switch and LCD. Programmable, for heating systems

RDJ10RF/SET. Wireless room temperature controller with 24-hour time switch and LCD. Programmable, for heating systems 3 072 RDJ10RF RCR10/433 Wireless room temperature controller with 24-hour time switch and LCD Programmable, for heating systems RDJ10RF/SET Operating modes: Automatic, Comfort, Energy Saving, and Frost

More information

Single Station Remote Alarm

Single Station Remote Alarm ADI 5106G Certified ISO 9001:2000 Single Station Remote Alarm 529 5106-01-120 529 5106-01-220 INSTALLATION AND OPERATING INSTRUCTIONS Carefully Read These Instructions Before Operating Controls Corporation

More information

Installation Guide for Hive Active Heating

Installation Guide for Hive Active Heating Installation Guide for Hive Active Heating Important note: Installation should only ever be carried out by a qualified engineer. Technical Support If you need to contact Hive s Technical Support team during

More information

DC400 Dispensing Cutoff System

DC400 Dispensing Cutoff System DC400 Dispensing Cutoff System DC404 and DC406 Installation Instructions Franklin Fueling Systems 3760 Marsh Rd. Madison, WI 53718 USA Tel: +1 608 838 8786 800 225 9787 Fax: +1 608 838 6433 www.franklinfueling.com

More information

TECHNICAL BULLETIN. Wiring Diagrams. TPI Wiring. TB1010-04 Rev. March 4, 2013 Page 1 of 5. Switch Settings 3 PHASE POWER SUPPLY 3 PHASE POWER SUPPLY

TECHNICAL BULLETIN. Wiring Diagrams. TPI Wiring. TB1010-04 Rev. March 4, 2013 Page 1 of 5. Switch Settings 3 PHASE POWER SUPPLY 3 PHASE POWER SUPPLY Page 1 of 5 Wiring and Programming of the TPI (Turbine Pump Interface) with an FEPetro SCIII (3-Phase Smart Controller) Overview The STP-SCIII 3-Phase Smart Controller can be controlled by the INCON TPI

More information

Install Guide CT101. Caution. Caution

Install Guide CT101. Caution. Caution Install Guide CT101 PG 1 Caution top cover Your thermostat is a precise instrument, handle it with care. Turn off electricity to the system before installing or servicing thermostat or any part of the

More information

Table of Contents. 1 - Specifications...3. 2 - Installation...3. 3 - Wiring...5. 4 - User controls...7

Table of Contents. 1 - Specifications...3. 2 - Installation...3. 3 - Wiring...5. 4 - User controls...7 THERMOSTATS Table of Contents Page 1 - Specifications...3 1.1 - Product range...3 ARTTH001 (DSL-610)...3 ARTTH002 (DSL-700)...3 ARTTH003 (DSL-600)...3 1.2 - Technical data...3 1.3 - Power failures...3

More information

COMPUTHERM Q7 Programmable, digital room thermostat. Operating Instructions

COMPUTHERM Q7 Programmable, digital room thermostat. Operating Instructions COMPUTHERM Q7 Programmable, digital room thermostat Operating Instructions GENERAL DESCRIPTION OF THE THERMOSTAT The COMPUTHERM Q7 type switched-mode room thermostat is suitable to regulate the overwhelming

More information

Pre-Fab Easy Installation For Models: 006-CT-USK, 008-CT-USK Installation and Operating Instructions for Existing Homes with Standard Piping

Pre-Fab Easy Installation For Models: 006-CT-USK, 008-CT-USK Installation and Operating Instructions for Existing Homes with Standard Piping Instruction Sheet 102-140 Pre-Fab Easy Installation For Models: 006-CT-USK, 008-CT-USK Installation and Operating Instructions for Existing Homes with Standard Piping Plant I.D. 001-1024 EFFECTIVE: November

More information

Fan Coil EC Motor Control

Fan Coil EC Motor Control Fan Coil EC Motor Control G3 PWM BARD The Enviro-Tec Generation 3 PWM (G3 PWM) board provides a pulse-width modulated (PWM) signal to the EC motor to control fan speed. The board is factory programmed

More information

INSTALLATION GUIDE. Card Reader & Controller with KIM Swipe Reader for Solitaire 850 / 950 / 850L Learnlok PK2930

INSTALLATION GUIDE. Card Reader & Controller with KIM Swipe Reader for Solitaire 850 / 950 / 850L Learnlok PK2930 INSTALLATION GUIDE Card Reader & Controller with KIM Swipe Reader for Solitaire 850 / 950 / 850L Learnlok PK2930 Card Reader and Controller Model 3.5 with KIM Swipe Reader Table of Contents 1. Features..................................

More information

G670 Intermittent Pilot Ignition Controls

G670 Intermittent Pilot Ignition Controls Installation Sheets Manual 121 Gas Combustion Combination Controls and Systems Section G Technical Bulletin Issue Date 0300 Intermittent Pilot Ignition Controls Figure 1: Intermittent Pilot Ignition Control

More information

98371000 REV. REL 1302 WEST BEARDSLEY AVENUE P.O. BOX 1127 ELKHART IN 46515 (574) 295-8330 FAX (574) 293-9914 2011 ELKHART BRASS MFG. CO., INC.

98371000 REV. REL 1302 WEST BEARDSLEY AVENUE P.O. BOX 1127 ELKHART IN 46515 (574) 295-8330 FAX (574) 293-9914 2011 ELKHART BRASS MFG. CO., INC. 81471067 Electric Monitor Motor Control Panel For use with Model 8394059 SPIT-FIRE Monitor Installation, Operation, and Maintenance Instructions FOR ATEX APPLICATIONS 1302 WEST BEARDSLEY AVENUE P.O. BOX

More information

INSTALLATION AND OPERATING INSTRUCTIONS For Model GL1 Gate Locks

INSTALLATION AND OPERATING INSTRUCTIONS For Model GL1 Gate Locks Securitron Magnalock Corp. www.securitron.com ASSA ABLOY, the global leader Tel 800.624.5625 [email protected] in door opening solutions INSTALLATION AND OPERATING INSTRUCTIONS For Model GL1 Gate

More information

Programming Logic controllers

Programming Logic controllers Programming Logic controllers Programmable Logic Controller (PLC) is a microprocessor based system that uses programmable memory to store instructions and implement functions such as logic, sequencing,

More information

Install Guide 3M-50. Caution. Caution

Install Guide 3M-50. Caution. Caution PG 1 Install Guide 3M-50 aution Your thermostat is a precise instrument, handle it with care. Turn off electricity to the HVA system before installing or servicing thermostat or any part of the system.

More information

REB 1 REB 3 REB 5 REB 6 REB 8 REB 10 REB 12 REB 16

REB 1 REB 3 REB 5 REB 6 REB 8 REB 10 REB 12 REB 16 REB 1 REB 3 REB 5 REB 6 REB 8 REB 10 REB 12 REB 16 Manually Operated Electronic Speed Controller Single Phase For all applications using suitably specified single-phase induction motor fans 1 GENERAL The

More information

prestige Condensing Water Boiler SERVICE TECHNICIAN S TROUBLE SHOOTING GUIDE 2008-36 TSG-PRESTIGE Date revised: 12/6/10

prestige Condensing Water Boiler SERVICE TECHNICIAN S TROUBLE SHOOTING GUIDE 2008-36 TSG-PRESTIGE Date revised: 12/6/10 prestige Condensing Water Boiler SERVICE TECHNICIAN S TROUBLE SHOOTING GUIDE Date revised: 12/6/10 2008-36 TSG-PRESTIGE Table of Contents INTRODUCTION Page 1-2 SERVICING TIPS AND INSTRUCTIONS Page 3-4

More information

DIGITAL ALARM II FOR HOSPITALS AND LABORATORIES INSTALLATION AND OPERATING INSTRUCTIONS 52 635.0

DIGITAL ALARM II FOR HOSPITALS AND LABORATORIES INSTALLATION AND OPERATING INSTRUCTIONS 52 635.0 Form No. 74-00-4001 S168-195-001 Revision E DIGITAL ALARM II FOR HOSPITALS AND LABORATORIES INSTALLATION AND OPERATING INSTRUCTIONS 52 635.0 INTRODUCTION Allied Healthcare Products, Inc. s Digital Alarm

More information

! WARNING. McDonnell & Miller Installation & Maintenance Instructions MM-217(I) Series 150S and 157S (Snap Switch, All Models except 157S-RB-P)

! WARNING. McDonnell & Miller Installation & Maintenance Instructions MM-217(I) Series 150S and 157S (Snap Switch, All Models except 157S-RB-P) Series 150S and 157S (Snap Switch, All Models except 157S-RB-P) Low Water Cut-Off/Pump Controllers For Steam Boilers and Other Level Control Applications McDonnell & Miller Installation & Maintenance Instructions

More information

presents Hydraulic Separation Beyond Primary / Secondary Piping

presents Hydraulic Separation Beyond Primary / Secondary Piping presents Hydraulic Separation Beyond Primary / Secondary Piping This Webinar is exclusively sponsored and the property of Caleffi Hydronic Solutions. All rights reserved. October 2007 Modern compact boilers

More information

OPL BASIC. Dosing System for Professional Laundry machines. Contents

OPL BASIC. Dosing System for Professional Laundry machines. Contents OPL BASIC Dosing System for Professional Laundry machines Contents 1 Getting Started. Page 2 2 Installation. Page 4 3 Set Up & Operation. Page 8 4 Maintenance & Accessories. Page 10 5 Troubleshooting Page

More information

FIRERAY 2000 Installation Guide

FIRERAY 2000 Installation Guide FIRERAY 2000 Installation Guide Features Range 33ft to 330 ft. 24Vdc operation Selectable alarm thresholds Low current consumption Ground level electronics Manual or Automatic reset System Description

More information

Water Leak Detection System

Water Leak Detection System Water Leak Detection System Installation and Operating Manual 505-334-5865 ph 505-334-5867 fax www.rodisystems.com email:[email protected] 936 Highway 516 Aztec, NM 87410-2828 Manual Revisions and Copyright

More information

Fundamentals of HVAC Control Systems

Fundamentals of HVAC Control Systems ASHRAE Hong Kong Chapter Technical Workshop Fundamentals of HVAC Control Systems 18, 19, 25, 26 April 2007 2007 ASHRAE Hong Kong Chapter Slide 1 Chapter 5 Control Diagrams and Sequences 2007 ASHRAE Hong

More information

Manual for Fire Suppression & Methane Detection System

Manual for Fire Suppression & Methane Detection System Manual for Fire Suppression & Methane Detection System Fogmaker North America Post address: 150 Gordon Dr Exton, PA 19341 Delivery address: 150 Gordon Dr Exton, PA 19341 Tel: 610-265-3610 Fax: 610-265-8327

More information

CONTROL PANEL INSTALLATION INSTRUCTIONS. Single Phase Simplex Page 2-7. 3-Phase Simplex Page 8-13

CONTROL PANEL INSTALLATION INSTRUCTIONS. Single Phase Simplex Page 2-7. 3-Phase Simplex Page 8-13 CONTROL PANEL INSTALLATION INSTRUCTIONS Single Phase Simplex Page 2-7 3-Phase Simplex Page 8-13 Single Phase Simplex SXL21=3, SXL24=3, SXH21=3, and SXH24=3 Manufactured by SJE-Rhombus Installation Instructions

More information

THERMONET UNDERFLOOR HEATING STANDARD THERMOSTAT KIT STOCK CODE 5260

THERMONET UNDERFLOOR HEATING STANDARD THERMOSTAT KIT STOCK CODE 5260 THERMONET UNDERFLOOR HEATING STANDARD THERMOSTAT KIT STOCK CODE 5260 STANDARD THERMOSTAT KIT 1.0 KIT CONTENTS Parts included: 1 x Thermostat 1 x Wall plate 2 x Mounting box screws 1 x Floor temperature

More information

T7079A,B Solid State Remote Temperature Controllers

T7079A,B Solid State Remote Temperature Controllers T7079A,B Solid State Remote Temperature Controllers FEATURES PRODUCT DATA Switch selection of heat or cool mode. Temperature sensing up to 400 feet. Does not require field calibration. 0K NTC temperature

More information

Installation and maintenance instructions. Danfoss Vent

Installation and maintenance instructions. Danfoss Vent Installation and maintenance instructions Danfoss Vent 1 Unit design... 2 2 Project planning and installation instructions... 3 2.1 Ventilation...3 2.2 Piping installation....3 2.3 Condensation line...4

More information

ELECTRIC CENTRAL HEATING FLOW BOILER

ELECTRIC CENTRAL HEATING FLOW BOILER ELECTRIC CENTRAL HEATING FLOW BOILER EKCO.T Used product can t be treated as general communal waste. Disassembled appliance has to be delivered to the collection point of electrical and electronic equipment

More information

Sensi TM. Wi-Fi Programmable Thermostat MANUAL OPERATION. Version: March 2016 2016 Emerson Electric Co. All rights reserved.

Sensi TM. Wi-Fi Programmable Thermostat MANUAL OPERATION. Version: March 2016 2016 Emerson Electric Co. All rights reserved. Sensi TM Wi-Fi Programmable Thermostat MANUAL OPERATION Version: March 2016 2016 Emerson Electric Co. All rights reserved. Contents MANUAL OPERATION GUIDE Buttons and Icons 3 Basic Functionality 4 Manual

More information

Operating Instructions

Operating Instructions Important information: These instructions contain safety information, read and follow them carefully. Dialight will not accept any responsibility for injury, damage or loss which may occur due to incorrect

More information

USER MANUAL WARNING! CONTENTS MODEL 1 SPECIFICATIONS READ ALL INSTRUCTIONS BEFORE PROCEEDING. Non-Programmable Single Stage Heat/Cool Thermostat

USER MANUAL WARNING! CONTENTS MODEL 1 SPECIFICATIONS READ ALL INSTRUCTIONS BEFORE PROCEEDING. Non-Programmable Single Stage Heat/Cool Thermostat Builder MODEL 1010 Series Non-Programmable Single Stage Heat/Cool Thermostat USER MANUAL Compatible with low voltage single stage gas, oil or electric heating or cooling systems, including single stage

More information

VC Series Zone Valves BALANCED 2-WAY AND 3-WAY HYDRONIC VALVES

VC Series Zone Valves BALANCED 2-WAY AND 3-WAY HYDRONIC VALVES VC Series Zone Valves BALANCED 2-WAY AND 3-WAY HYDRONIC VALVES PRODUCT DATA Design VC Series zone valves consist of: 2-way or 3-way valve housing available with various connection ends Spindle and cartridge

More information

Adjustable room thermostat for heating only or cooling only systems

Adjustable room thermostat for heating only or cooling only systems 3 003 Room hermostat RAA30 Adjustable room thermostat for heating only or cooling only systems Room thermostat with manual O/OFF switch wo-position control witching voltage AC 24 250 V Use he RAA30 room

More information

NSI DIGITAL DIMMING SYSTEM DDS 9800 DIMMER PACKS

NSI DIGITAL DIMMING SYSTEM DDS 9800 DIMMER PACKS NSI DIGITAL DIMMING SYSTEM NSI DIGITAL DIMMING SYSTEM DDS 9800 DIMMER PACKS Software Revision 1.41, Version C UL, Mfg Q3/96, and above SPECIFICATIONS Number of Channels: 9800 : 8 channels Output capacity:

More information

Installing the Tracer ZN517 Unitary Controller Ordering number: 4950 0496, 4950 0596

Installing the Tracer ZN517 Unitary Controller Ordering number: 4950 0496, 4950 0596 Installing the Tracer ZN517 Unitary Controller Ordering number: 4950 0496, 4950 0596 Product overview The Tracer ZN517 controller is a field-installed, application-specific controller that provides directdigital

More information

PRODUCT PRODUCT CODE TECHNICAL INSTRUCTIONS PAGE

PRODUCT PRODUCT CODE TECHNICAL INSTRUCTIONS PAGE Table of Contents PRODUCT PRODUCT CODE TECHNICAL INSTRUCTIONS PAGE # Electric Room Comfort Controller NEW! RDY2000 Room Comfort Controller RDY 129-905 D-3 Electric for Specialized Applications Surface

More information

Comfort Compact Controller ZG 215N

Comfort Compact Controller ZG 215N Comfort Compact Controller ZG 215N OPERATION AND PUTTING INTO SERVICE 1 2 3 4 5 6 7 20 16 12 86 4 2 Xp 100 % 90 80 70 60 50 40 A 20...90 C 2 1,4 4 2,8 6 4,2 8 5,5 10 7,0 12 8,2 14 9,6 16 10,9 18 12,4 20

More information

Your safety and the safety of others are very important.

Your safety and the safety of others are very important. NATURAL GAS TO PROPANE CONVERSION KIT 090 INSTALLATION INSTRUCTIONS FOR ALTITUDES 0 -,00 FT. ONLY PROPANE CONVERSION KIT SAFETY... INSTALLATION REQUIREMENTS... Tools and Parts... LP Gas Requirements...

More information

Installation and Troubleshooting Instructions for Electric Tankless Residential Water Heaters.

Installation and Troubleshooting Instructions for Electric Tankless Residential Water Heaters. Model Number: Serial Number: Information Manual Installation and Troubleshooting Instructions for Electric Tankless Residential Water Heaters. ATTENTION: IF YOU ARE NOT A LICENSED PLUMBER OR A LICENSED

More information

PSU-U-24V/AC-6A/10/FTA-TR-MC PSAC 0624

PSU-U-24V/AC-6A/10/FTA-TR-MC PSAC 0624 PSU-U-24V/AC-6A/10/FTA-TR-MC PSAC 0624 v.1.0 AC/AC power supply unit Edition: 1 from 24 th October 2008 Supercedes edition: ---------- 10062009 CONTENTS: 1. Technical description. 1.1. General description

More information

USER S MANUAL HSC-24A

USER S MANUAL HSC-24A AIRREX AIR CONDITIONER USER S MANUAL HSC-24A Thank you for purchasing an AIRREX AIR CONDITIONER. BEFORE operation please read this user s manual carefully. Keep this manual readily available. It is ESSENTIAL

More information

SYSTEM 4C. C R H Electronics Design

SYSTEM 4C. C R H Electronics Design SYSTEM 4C C R H Electronics Design SYSTEM 4C All in one modular 4 axis CNC drive board By C R Harding Specifications Main PCB & Input PCB Available with up to 4 Axis X, Y, Z, A outputs. Independent 25

More information

GENERATOR START CONTROL MODULE - MINI (2 Wire to 3 Wire)

GENERATOR START CONTROL MODULE - MINI (2 Wire to 3 Wire) FEATURES & APPLICATIONS Inexpensive 2 wire to 3 wire start controller for electric start high speed gas generators. Optimized for use with Outback Invertors. Supports three types of 3 wire generator control

More information

Installation and Service Instructions for use by heating contractor SM1 SOLAR CONTROL MODULE IMPORTANT

Installation and Service Instructions for use by heating contractor SM1 SOLAR CONTROL MODULE IMPORTANT Installation and Service Instructions for use by heating contractor Solar Control Module for solar connections to the Vitotronic control SM1 SOLAR CONTROL MODULE Product may not be exactly as shown IMPORTANT

More information

BACnet Automation Interface Module (Network Version)

BACnet Automation Interface Module (Network Version) Sense +V Tx Rx LAN LINK Over ARCNET KBaud BACnet Rx BACnet Tx Archive Valid Port S Tx Port S Rx Low Battery Network- Enhanced Access Default MSTP PTP = Download Required on Rnet and Port S IP Address IP

More information

Part I - Installation

Part I - Installation 400 Series Pressure and Differential Pressure Switches Types: H400, H402, H403, H400K, H402K, J400, J402, J403, J400K, J402K UNITED ELECTRIC CONTROLS Installation and Maintenance Instructions Please read

More information

TOYOTA TECHNICAL. An example of a tire pressure monitor valve sub-assembly. This mounts to a drop area in the wheel.

TOYOTA TECHNICAL. An example of a tire pressure monitor valve sub-assembly. This mounts to a drop area in the wheel. TOYOTA TIRE PRESSURE WARNING SYSTEM Toyota uses various tire pressure warning systems. Here, we ll discuss the system featured on the 2006 Land Cruiser. Combination meter warning reset switch warning reset

More information

Portable Air Conditioner

Portable Air Conditioner Portable Air Conditioner Owner's Manual Model:3 in 1 12,000 Btu/h Series 3 Please read this owner s manual carefully before operation and retain it for future reference. CONTENTS 1. SUMMARY...1 2. PORTABLE

More information

USER S MANUAL. MaxPower 400-600 UPS. Uninterruptible Power System 28-2MAXPO0018

USER S MANUAL. MaxPower 400-600 UPS. Uninterruptible Power System 28-2MAXPO0018 USER S MANUAL MaxPower 400-600 UPS Uninterruptible Power System 28-2MAXPO0018 IMPORTANT SAFETY INSTRUCTIONS SAVE THESE INSTRUCTIONS This manual contains important instructions for models MaxPower 400 and

More information

LK Electric Boiler - 4,5

LK Electric Boiler - 4,5 LK Electric Boiler -, Design LK Electric Boiler, kw is a wall-mounted electric boiler, intended primarily for low-temperature heating systems, e.g. under floor heating. LK Electric Boiler, kw is delivered

More information

How to read this guide

How to read this guide How to read this guide The following shows the symbols used in this Quick start guide with descriptions and examples. Symbol Description Example P oint Reference Caution [ ] This symbol explains information

More information

PRESSURE AND TEMPERATURE SENSORS for use with the BURNERLOGIX Burner Management System and PPC4000 Series Fuel/Air Ratio Controller

PRESSURE AND TEMPERATURE SENSORS for use with the BURNERLOGIX Burner Management System and PPC4000 Series Fuel/Air Ratio Controller BLZPTS-1 NOVEMBER 19, 2013 TS350 TS752 BLPS PRESSURE AND TEMPERATURE SENSORS for use with the BURNERLOGIX Burner Management System and PPC4000 Series Fuel/Air Ratio Controller DESCRIPTION The BLPS, TS350

More information

Sense Components. Sense monitor. Antenna assembly. External mounting kit Current sensors. Download the Sense app. Go to sense.com/app.

Sense Components. Sense monitor. Antenna assembly. External mounting kit Current sensors. Download the Sense app. Go to sense.com/app. Sense Components Sense monitor Antenna assembly External mounting kit Current sensors Download the Sense app. Go to sense.com/app Power cable Technical Specifications Sense is a home energy monitoring

More information

Programmable Room Thermostat 7 Day (5-2 Day) Models: 22083 / 22087 Power Supply: Battery / Mains

Programmable Room Thermostat 7 Day (5-2 Day) Models: 22083 / 22087 Power Supply: Battery / Mains Drayton Programmable Room Thermostat 7 Day (5-2 Day) Models: 22083 / 22087 Power Supply: Battery / Mains Invensys Controls Europe Technical Helpline: +44 (0) 845 130 7722 www.draytoncontrols.co.uk Installation

More information

Operation and Installation Manual

Operation and Installation Manual Operation and Installation Manual RCM-10 Remote Control Monitor and RSM-10 Remote Status Monitor for the CNA-100 & CNA-200 Automations Revision 1.1 9/98 WARRANTY INFORMATION The RCM-10 Remote Control

More information

OPERATING INSTRUCTIONS (TRANSLATION OF THE ORIGINAL) SUPPLEMENTARY OPERATING INSTRUCTIONS FOR YOUR AIR CURTAIN SYSTEM. Serial number: Year: --- Page 1

OPERATING INSTRUCTIONS (TRANSLATION OF THE ORIGINAL) SUPPLEMENTARY OPERATING INSTRUCTIONS FOR YOUR AIR CURTAIN SYSTEM. Serial number: Year: --- Page 1 --- OPERATING INSTRUCTIONS (TRANSLATION OF THE ORIGINAL) SUPPLEMENTARY OPERATING INSTRUCTIONS FOR YOUR AIR CURTAIN SYSTEM Serial number: Year: Please quote this number when contacting customer service!

More information

2.0 Installation 1. Remove the cover using a small flat blade screwdriver. Figure 2: Cover Removal

2.0 Installation 1. Remove the cover using a small flat blade screwdriver. Figure 2: Cover Removal O N DS160/DS161 Installation Guide High Performance Request-to-Exit Sensors 1.0 Description The DS160/161 is a passive-infrared (PIR) detector designed for Request to Exit (REX) interior applications.

More information

Fully Pumped Systems

Fully Pumped Systems Fully Pumped Systems (also see the picture gallery and System Basics) The term for any boiler that uses a pump to move all the heat from the boiler to every part of the system is fully pumped. As a rule

More information

HMI display Installation Guide

HMI display Installation Guide HMI display Installation Guide Product Description Specifications Important Information o Package Contents o Related Documents o Accessories Cautions and Warnings Mounting and Dimensions o BAC-DIS-ENC

More information

Troubleshooting Guide, Freedom and Fleet Power Inverter/Chargers

Troubleshooting Guide, Freedom and Fleet Power Inverter/Chargers Technical Note Freedom/Fleet Power 512-0084-01-01 Rev 1 Troubleshooting Guide, Freedom and Fleet Power Inverter/Chargers Overview This document is a guide for troubleshooting inverters, battery chargers,

More information

INSTALLATION MANUAL 3RP / 5RP 4-BUTTON SERIES VEHICLE SECURITY SYSTEMS

INSTALLATION MANUAL 3RP / 5RP 4-BUTTON SERIES VEHICLE SECURITY SYSTEMS 3RP / 5RP 4-BUTTON SERIES VEHICLE SECURITY SYSTEMS INSTALLATION MANUAL Before you begin the installation Read the INSTRUCTIONS! Always use a multi-meter when verifying vehicle wiring. Before mounting the

More information

Frequently Asked Questions for TFT Remote Controlled Monitors. First Rev 4/6/2005 SGMc Second Rev 5/7/2005 Third Rev 11/15/2005

Frequently Asked Questions for TFT Remote Controlled Monitors. First Rev 4/6/2005 SGMc Second Rev 5/7/2005 Third Rev 11/15/2005 Frequently Asked Questions for TFT Remote Controlled Monitors. First Rev 4/6/2005 SGMc Second Rev 5/7/2005 Third Rev 11/15/2005 1. What was the primary spark that started the fire under TFT to make remote

More information