1 ONLINE CLOSED-LOOP OPTIMIZATION OF DISTRIBUTION NETWORK WITHOUT VERIFICATION OF DISPATCHER Vlado KUBIC David VRCHOVSKÝ Vít MACH-ŽIŽKA ČEZ Distribuce, a. s. Czech Rep. ČEZ Distribuce, a. s. Czech Rep. Elektrosystem, a. s. Czech Rep. ABSTRACT Generally, a 110 kv network fed in parallel by several transformers 400 and 220/110 kv, and more generators, requires huge demands on operating control. The operation must comply with strict requirements concerning supply reliability, an electric energy quality supply compliance, and economic indicators. Thus, the reason for the connected network in this manner is a fact that it feeds the industrial region, where many factories with a high consumption are located. The supply interruption would cause a considerable damage, and concerning the chemical industry, also emergency cases could be a possible outcome with ecological effects. It was assumed sufficient for the reliable network control when the team of experienced operators had a quality control system SCADA at their disposal. However, during emergency and failure states the difficult, an uneasy situation arose. Therefore it has been decided to deploy the control system with the optimization function. INTRODUCTION The distributor cannot interfere with the production and consumption of the active power. Therefore the optimization function is used, by which is the reactive power controlled, supplied from the 110 kv system connected generators and 400 and 220/110 kv transformers. The function searches the state for the minimum of the active losses on all grid elements providing the compliance with all limit conditions. The exceeded limit correction is prior to the loss minimization. The optimization algorithm, so-called Volt-VAr-Control (VVC) fed by the results of Load Flow, which is preceded by the complete State Estimation including the transmission network (TS) 400 and 220 kv. VVC function does not directly control the generators. Computational and regulatory function are separated. Thus, the generators are regulated constantly provided even for the case of shut-down of the computational module. The generators are controlled by the regulatory automation that receives the voltage values from VVC for the particular 110 kv buses control, socalled pilot nodes (PN). The regulatory automation controls related generators through the secondary voltage regulation. It means that in all respected pilot nodes the required voltage levels are reached and sustained. The generators are controlled in the closed-loop and without the prior operator verification. CONTROLLED NETWORK DESCRIPTION Network range The network was originally divided into the four independent areas. Each area was fed supplied by single 400 (220)/110 kv transformer and related generators. The network basic connection change was performed to connect all independent parts. Transmission capacities of the transmission lines as well as the transformers enabled such a change without additional investments. The consumption diversification also corresponded with this intention. Fig. 1 - Source connection CIRED /5
2 The network characteristic data: Load - active 937 MW Load - reactive 185 MVAr No. of transformers 400/220 kv 4 Transformers inst. output 1100 MVA Number of generators 17 Generators - inst. output 1105 MVA Generators - regulatory scale -136 /+640 MVAr Number of buses 84 Number of 110 kv lines 91 Number of trans. 110/MV 104 Network protection However, for such a new connection it was essential to improve the network protection. Due to the connection being designed by parallel operation of two bridges, it was essential to short-circuit protect the bridge diagonals, and concurrently find and realize controlled network splitting locations. These protections can divide connected areas into two independent stable parts. Further it was essential to provide the protection to distinguish the short-circuits from exceeding overflows on 400 (220)/110 kv transformers over the 110 kv system. It could be caused with faulty connection TS after breakdown. Important stations were equipped with differential bus protections including the switch failure function. Secondary distance protections were deployed for creation of the backup with fast response. The shortcircuits protections on busbar couplers assure certain function of automatic reclosing equipment. OPTIMIZATION METHOD The optimization is defined by variables, constraints and objective function. The objective function is optimization of active power losses by changing variables, in the course of maintaining constrains. Control variables Element Variable Limit Num. Generator Q Capability Curve 17 Transformer TAP High/Low 4 Reactive power limits of the generators are derived from the Capability Curves automatically according to actual active power. Required Q reserve can be configured for each of the generators. The generator is used as control variable if availability signal from the power plant is sent. Constraints Element Constraint Limit Num. Bus U High/Low 88 Generator U High/Low 17 Transformer Q High/Low 4 Line I High 85 Voltage magnitude limits of the buses can be set absolutely or relatively towards to the input value. The relative limits are set on selected buses of a 400 kv transmission system (TS) to prevent the Q flow changes on transformers 400 (220)/110kV. The other limits are set absolutely. All of the constraints are considered as a hard. This means there is only one set of limits that needs to be satisfied. Fig. 2 - The grid protection principle [1] Fig. 3 - VVC principle CIRED /5
3 Objective function The optimization objective is to minimize active power losses changing variables in the course of maintaining constrains. Element Number Line 85 Transformer 21 Implementation VCC calculation is implemented using full AC power flow equations. It is used instead of more common linearized DC approximations. All of the equations are expressed in rectangular coordinates. If we consider the constraints, variables and objective function defined above, we obtain a large scale Nonlinear Programming Problem (NLP). Three different solvers can be used to solve the NLP: IPOPT is probably the most advanced solver nowadays at a free disposal of initiative COIN-OR. Implements the Primal-Dual Interior Point Filter Line Search algorithm. This is used as a main VCC solver. KNITRO is solver of the company ZIENA. Implements of three different algorithms based on the Interior Point Methods. It has been used only for the evaluation purposes during the VVC development frame. It is not available for a production HW. ESNLP is solver designed and developed by the company ELEKTROSYSTEM of own. There is implemented the Newton Method with penalty functions. The most error-prone part of the development frame is the code of the Power Flow equations and their first and second derivatives, which are used to assemble the Jacobian and Hessian matrices. Therefore, the code of the equations was not written by hand. Instead of it was generated automatically by Maxima (a computer algebra system) on the symbolic level. Efficiency For reliable VVC function, the whole of 110 kv network, including TS of all the Czech Republic, comes into the calculation. The calculation for the given region processes 5700 measured values and 4200 element states, which are determinant for the system topology. The calculation usually converges in iterations. The calculation on the HW machine equipped with Intel Xeon processor with frequency 2.67GHz spends ms. The calculation behavior corresponds with the description according [2]. NETWORK CONTROL It now has been 10 years since the first experiments with VVC function deployment in the CEZ Distribuce, a.s. network. It has gradually been perfected and extended. In 2013 the control system change took a place which now can extend the optimization function onto complete DS and even include the Q flow monitoring on 400 (220) / 110 kv transformers of the TS. The VVC results transmission into reality The calculation module which consists of SE, LF, VVC runs in interval of 20 seconds. The results are transmitted into the regulatory automation if they meet the parametrically conditions: - Loss mitigation reduced > 0.2 MW or 2% - Voltage violation on buses is > 0.2% - Q violation on generators is > 0.2% - I flow violation on branches is > 10% - Q flow violation on TS transformers is > 5 MVAr The regulatory automation keeps required voltage in the pilot nodes with accuracy of +/-0.1 kv. The change of the 400/110 kv and 220/110 kv transformers tap positions according to the VVC calculation is performed by the control operator manually when changing the grid connection and load changes. Network control reliability It has been verified in practice that in such complicated network, the control operator cannot permanently monitor and verify VVC results. Therefore, it has been decided to deploy the optimization in the closed-loop without verification by the control operator. This had been preceded by the calculation reliability analyses and safety and deployment of the safety bars. These bars contain following elements: 1. Unreliable VVC result will not be transmitted into the regulatory automation 2. Regulatory automation will not accept the out-of-limit values 3. Regulatory automation monitors the actual generators TG limits 4. Generators TG control system monitors its own limits 5. SCADA - the alarm for the control operator 6. Control operator has an option to input different voltage values 7. Control operator has an option to shut down the regulation In actual operation, only points of 1, 2 and 3were used. In case of not transmitting the VVC results into the regulatory automation, the last input voltage value is retained. CIRED /5
4 Practical experiences from operation For VVC evaluation to be objective it is necessary to take into account all influences. There is significant influence not only from the system load or the supply dislocation, but also from the actual network connection. Therefore, for the evaluation the basic network connection has been used. Load system was 80% of the maximum. For the initial a voltage value the basic setting was 118 kv and level regulators of insensitivity of +/- 2 kv was used. Results: Q supply redistribution The required supply changes of the reactive power from the generators varied from -36 to +9 MVAr and the change of the transformers tap positions from 0 to 2 taps. Fig. 5 - Voltage progress Tab. 4 - Q supply division change Voltage values As seen in the diagram below, the progression of the voltage values with the VVC function on and off from 7:00 to 15:00. It is apparent that with help of VVC the voltage was controlled in the within the limits of to kv. During time of disconnection of VVC function was the voltage controlled with help of the secondary block regulator, which preserved the last input value from VVC converted to the applied voltage. The voltage was being kept within the limits of kv. It is apparent from the results that, even though the secondary block regulation responded to the load elevation influence in the network, the voltage in the pilot node decreased for 0.8 kv. This change is under the level voltage regulators sensitivity abilities of 400/110 kv transformers which is in given pilot node +/ kv. After switching on the VVC, there was an elevation of the applied voltage to the value of kv, and thus the voltage in PN returned to its original value. This change would not be significant, if there were not 7 pilot nodes connected concurrently into the network. Even with such small uncoordinated changes of the Q supplies, there is an increase of losses. Active loss mitigation The 110 kv lines, 400 (220)/110 kv transformers and generator block transformers are included in the optimization. 110/MV transformer taps are controlled by the local transformer automations, therefore they are not included in the optimization. It is apparent from the values presented that even though the losses on the lines decrease about 7% (tab.6), the total losses decreases only about 2.5% (tab.7). The reason of such a situation origins in the fact that 110/MV transformers are not included in the optimization and their loss are approx. 60% of total loss. We can also see the inverse influence of the voltage level on the transformer winding loss and the no-load loss (tab. 9). Tab. 6 - Loss mitigation on lines total (MW/%) (LF sign. black column, VVC sign. green column) Tab. 7- Loss mitigation total (MW /%) Tab. 8 - Loss mitigation on lines - detail (kw/%) Tab. 9 - Loss mitigation on transformers total (MW/%) (Tr PK sign. winding loss, Tr Po sig. no-load loss) CIRED /5
5 Tab Loss mitigation on block transformers (kw/%) Regulatory accuracy The real loss mitigation following the performed regulation is, in most cases, lower than the VVC calculation has set. This is due to the regulatory inaccuracy. The estimated values are used for the VVC calculation, thus the absolute accuracy, but the regulation progresses with help of the measured values with limited accuracy that degrades the regulation result. To remove this defect by changing the equipment with the higher accuracy class is not possible. There is solution to argue for, namely using the estimated values for regulation too. Such a test has been performed and the impact on the regulation progress was significant. When using estimated values, the measurement inaccuracy influence was removed it was also possible to use more accuracy control of voltage 110 kv level on +/-50V. The biggest difference between measured and estimated voltage value was recorded on 0.6 kv level. The measured value was lower, which caused Q supply from the resources in this PN to be elevated to 57 MVAr instead of requested 32 MVAr. It became evident in a way in which Q flow was 25 MVAr instead of expected close to zero on respected lines. In this case the change of the measuring elements was performed. The test demonstrated that the regulation with help of estimated values is an efficient one. This way of regulation juxtaposes huge amount of requirements on whole EMS calculation mode, i.e. its continuity and flawlessness. In this case the psychological effect is also not insignificant especially when the control operators are used to using purely measured values. 118,2 118,0 117,8 117,6 117,4 117,2 117,0 116,8 116,6 116,4 12:05:00 12:12:12 12:19:24 12:26:36 12:33:48 U - required U - estimated U - measured RESULTS Optimization VVC online closed-loop function deployment has enabled to change the basic connection of network, thereby giving the operator a bigger flexibility when maintaining the equipment and fundamentally increasing the feeding reliability. Even under extreme weather conditions, when some of DS equipment was destroyed together with TS, the customers were been not disconnected in this part of distribution system. Voltage and flow values are permanently monitored. Values are sustained within required limits. The voltage fluctuation has been decreased in 110 kv network and thereby decreasing number of voltage regulations at 110/ MV transformers. The transmission of the reactive power is controlled on 400 (220) /110 kv transformers in co-operation with the TS operator. The loss minimization criterion could be applied only with design of basic connection. After VVC online closeloop function deployment, the loss is minimized permanently regardless the system connection. CONCLUSION AND OUTLOOK CEZ Distribuce, a.s. cannot perceive the optimization function only as an experiment, on contrary, it sees it as a part of 110 kv network control. Another two regions will obtain this function in 2015, thereby covering almost 30% of 110 kv DS in operation. REFERENCES [1] J. Bermann, 2004, Propojení oblastí 110 kv: Výškov Chotějovice 2+2, ABB s.r.o. [2] F. Capitanescu, M. Glavic, D. Ernst, 2007, Interiorpoint problems, Electric Power Systems Research 77(5-6), [3] R.D. Zimmerman, C.E. Murillo-Sanchez, R. J. Thomas, 2009, MATPOWER S Extensible Optimal Power Flow Architecture, Power & Energy Society General Meeting, PES '09. IEEE [4] A. Wächter and L. T. Biegler, 2006, On the Implementation of a Primal-Dual Interior Point Filter Line Search Algorithm for Large-Scale Nonlinear Programming, Mathematical Programming 106(1), pp [5] Dr. E. Baková, J. Vitinger, J. Holubová, 2006, Regulace podle estimovaných hodnot, EGÚ Praha Engineering, a.s. Fig Measured and estimated voltage [5] CIRED /5
CO-ORDINATION OF PARALLEL AC-DC SYSTEMS FOR OPTIMUM PERFORMANCE
CO-ORDINATION OF PARALLEL AC-DC SYSTEMS FOR OPTIMUM PERFORMANCE Ana Diez Castro & Rickard Ellström Ying Jiang Häfner Christer Liljegren Vattenfall Utveckling AB ABB Power Systems Gotlands Energiverk AB
Nuclear Power Plant Electrical Power Supply System Requirements
1 Nuclear Power Plant Electrical Power Supply System Requirements Željko Jurković, Krško NPP, [email protected] Abstract Various regulations and standards require from electrical power system of the
4.1.1 Generator Owner 4.1.2 Transmission Owner that owns synchronous condenser(s)
A. Introduction 1. Title: Verification and Data Reporting of Generator Real and Reactive Power Capability and Synchronous Condenser Reactive Power Capability 2. Number: MOD-025-2 3. Purpose: To ensure
System Protection Schemes in Eastern Denmark
System Protection Schemes in Eastern Denmark Joana Rasmussen COWI A/S, Energy Department System Protection Schemes in Eastern Denmark 1.Advanced system protection schemes are investigated and perspectives
UNDERSTANDING POWER FACTOR AND INPUT CURRENT HARMONICS IN SWITCHED MODE POWER SUPPLIES
UNDERSTANDING POWER FACTOR AND INPUT CURRENT HARMONICS IN SWITCHED MODE POWER SUPPLIES WHITE PAPER: TW0062 36 Newburgh Road Hackettstown, NJ 07840 Feb 2009 Alan Gobbi About the Author Alan Gobbi Alan Gobbi
Power System review W I L L I A M V. T O R R E A P R I L 1 0, 2 0 1 3
Power System review W I L L I A M V. T O R R E A P R I L 1 0, 2 0 1 3 Basics of Power systems Network topology Transmission and Distribution Load and Resource Balance Economic Dispatch Steady State System
Control Development and Modeling for Flexible DC Grids in Modelica
Control Development and Modeling for Flexible DC Grids in Modelica Andreas Olenmark 1 Jens Sloth 2 Anna Johnsson 3 Carl Wilhelmsson 3 Jörgen Svensson 4 1 One Nordic AB, Sweden, [email protected].
Energy Management Systems (EMS)
Energy Management Systems (EMS) Introduction Abstract This talk deals with the role of an Energy Management System (EMS) in the overall Smart Grid. Why an EMS is needed will be discussed and its importance
What Matters for Successful Integration of Distributed Generation
What Matters for Successful Integration of Distributed Generation Thomas Ackermann Energynautics GmbH, Germany [email protected] Expert User of DIgSILENT PowerFactory for Power Systems Studies
S a f e G u i d a n c e. Single Lamp Control and Monitoring
Single Lamp Control and Monitoring S a f e G u i d a n c e Separation brings Benefits Traditionally designed power supplies for airfield lighting systems require separate series circuits when switching.
300 MW Variable Speed Drives for Pump-Storage Plant Application Goldisthal
May 24 MW Variable Speed Drives for Aurélie Bocquel APCG / 4BOC4 (MW-Goldisthal 1-5-24).PPT MW Variable Speed Drives for Content Major benefits of the cyclo-converter driven doubly-fed induction machines
LAB1 INTRODUCTION TO PSS/E EE 461 Power Systems Colorado State University
LAB1 INTRODUCTION TO PSS/E EE 461 Power Systems Colorado State University PURPOSE: The purpose of this lab is to introduce PSS/E. This lab will introduce the following aspects of PSS/E: Introduction to
Power products and systems. Intelligent solutions for power distribution Zone concept
Power products and systems Intelligent solutions for power distribution Zone concept Securing continuous power supply ABB is one of the world's leading power and automation technology companies whose products,
The design and performance of Static Var Compensators for particle accelerators
CERN-ACC-2015-0104 [email protected] The design and performance of Static Var Compensators for particle accelerators Karsten Kahle, Francisco R. Blánquez, Charles-Mathieu Genton CERN, Geneva, Switzerland,
Green Power Connection Net Energy Metering Engineering Review Process in Delaware and Speeding Up the Application Fee Process
Green Power Connection Net Energy Metering Engineering Review Process in Delaware and Speeding Up the Application Fee Process Presented by: Marianne Mannschreck Date: Welcome A Look at the Net Energy Metering
COMPARISON OF THE FACTS EQUIPMENT OPERATION IN TRANSMISSION AND DISTRIBUTION SYSTEMS
COMPARISON OF THE FACTS EQUIPMENT OPERATION IN TRANSMISSION AND DISTRIBUTION SYSTEMS Afshin LASHKAR ARA Azad University of Dezfoul - Iran [email protected] Seyed Ali NABAVI NIAKI University of Mazandaran
A progressive method to solve large-scale AC Optimal Power Flow with discrete variables and control of the feasibility
A progressive method to solve large-scale AC Optimal Power Flow with discrete variables and control of the feasibility Manuel Ruiz, Jean Maeght, Alexandre Marié, Patrick Panciatici and Arnaud Renaud [email protected]
water is cooled in a secondary cooling control tasks: use of seawater. Treatment of the seawater formation of algal vegetation.
for the start-up and shut-down procedures in the case of longer standstills. The diesel exhaust is fed into two turbochargers. A portion of the exhaust gases can be utilized in a waste-heat boiler producing
AC 2012-4561: MATHEMATICAL MODELING AND SIMULATION US- ING LABVIEW AND LABVIEW MATHSCRIPT
AC 2012-4561: MATHEMATICAL MODELING AND SIMULATION US- ING LABVIEW AND LABVIEW MATHSCRIPT Dr. Nikunja Swain, South Carolina State University Nikunja Swain is a professor in the College of Science, Mathematics,
Transient analysis of integrated solar/diesel hybrid power system using MATLAB Simulink
Transient analysis of integrated solar/diesel hybrid power system using ATLAB Simulink Takyin Taky Chan School of Electrical Engineering Victoria University PO Box 14428 C, elbourne 81, Australia. [email protected]
VOLTAGE CONTROL IN DISTRIBUTION SYSTEMS AS A LIMITATION OF THE HOSTING CAPACITY FOR DISTRIBUTED ENERGY RESOURCES
VOLTAGE CONTROL IN DISTRIBUTION SYSTEMS AS A LIMITATION OF THE HOSTING CAPACITY FOR DISTRIBUTED ENERGY RESOURCES C. Schwaegerl*, M.H.J. Bollen, K. Karoui #, A. Yagmur + *Siemens AG, # Tractebel STRI AB
2012 San Francisco Colloquium
2012 San Francisco Colloquium http : //www.cigre.org HVDC and Power Electronic Systems for Overhead Line and Insulated Cable Applications B4-8 Trans Bay Cable A Breakthrough of VSC Multilevel Converters
INTRODUCTION TO HARMONIC ASSESSMENT IN POWER SYSTEMS
INTRODUCTION TO HARMONIC ASSESSMENT IN POWER SYSTEMS LIST OF CONTENT 1. INTRODUCTION... 1 2. HARMONIC VOLTAGE ASSESSMENT REQUIREMENT IN THE UK... 2 3. THE ASSESSMENT... 2 3.1. SYSTEM MODELLING...3 3.2.
Product Data Bulletin
Product Data Bulletin Power System Harmonics Causes and Effects of Variable Frequency Drives Relative to the IEEE 519-1992 Standard Raleigh, NC, U.S.A. INTRODUCTION This document describes power system
SYNCHRONOUS MACHINES
SYNCHRONOUS MACHINES The geometry of a synchronous machine is quite similar to that of the induction machine. The stator core and windings of a three-phase synchronous machine are practically identical
Totally Integrated Power SIESTORAGE. The modular energy storage system for a reliable power supply. www.siemens.com/siestorage
Totally Integrated Power SIESTORAGE The modular energy storage system for a reliable power supply www.siemens.com/siestorage Totally Integrated Power (TIP) We bring power to the point. Our products, systems,
Isolated-Parallel UPS Configuration
Isolated-Parallel UPS Configuration 1 Inhalt 1 Introduction... 4 2 IP systems configuration... 6 3 Projects... 17 4 Conclusions... 17 2 Abstract The isolated-parallel UPS configuration has become well
Voltage Regulator SPAU 341 C. Product Guide
Issued: July 1998 Status: Updated Version: D/25.04.2006 Data subject to change without notice Features Comprehensive voltage regulation for power transformers with on-load tapchangers in distribution substations
A new cost model for comparison of Point to Point and Enterprise Service Bus integration styles
A new cost model for comparison of Point to Point and Enterprise Service Bus integration styles MICHAL KÖKÖRČENÝ Department of Information Technologies Unicorn College V kapslovně 2767/2, Prague, 130 00
Wide Area Monitoring Current Continental Europe TSOs Applications Overview
Wide Area Monitoring Current Continental Europe TSOs Applications Overview Version 5 System Protection & Dynamics Working Group 20th September 2015 1. Content 1. Content... 2 2. Introduction... 3 3. Main
INTELLIGENT ENERGY MANAGEMENT OF ELECTRICAL POWER SYSTEMS WITH DISTRIBUTED FEEDING ON THE BASIS OF FORECASTS OF DEMAND AND GENERATION Chr.
INTELLIGENT ENERGY MANAGEMENT OF ELECTRICAL POWER SYSTEMS WITH DISTRIBUTED FEEDING ON THE BASIS OF FORECASTS OF DEMAND AND GENERATION Chr. Meisenbach M. Hable G. Winkler P. Meier Technology, Laboratory
Email: [email protected]. 2Azerbaijan Shahid Madani University. This paper is extracted from the M.Sc. Thesis
Introduce an Optimal Pricing Strategy Using the Parameter of "Contingency Analysis" Neplan Software in the Power Market Case Study (Azerbaijan Electricity Network) ABSTRACT Jalil Modabe 1, Navid Taghizadegan
Asset Management and Condition Monitoring
Asset Management and Condition Monitoring SIMATIC PCS 7 Monitoring Block PumpMon Function Block for cost-effective Monitoring and Diagnostics of Centrifugal Pumps August 2008 Especially in chemical industries,
Disturbance Recoder SPCR 8C27. Product Guide
Issued: April 1999 Status: Updated Version: C/26.04.2006 Data subject to change without notice Features Versatile digital disturbance recorder module for recording various phenomena in the electric power
TERMS AND CONDITIONS
Virginia Electric and Power Company TERMS AND CONDITIONS XXIV. GENERATOR INTERCONNECTION STANDARD Electric generator interconnection service includes only the ability to interconnect an electric generator
Digital Pressure Measuring Instrument MDR480
Description The digital panel instrument MDR480 is designed to measure, display, and monitor pressures in industrial applications. The instrument is panel mounted with a front frame dimension of 96 mm
POWER SYSTEM HARMONICS. A Reference Guide to Causes, Effects and Corrective Measures AN ALLEN-BRADLEY SERIES OF ISSUES AND ANSWERS
A Reference Guide to Causes, Effects and Corrective Measures AN ALLEN-BRADLEY SERIES OF ISSUES AND ANSWERS By: Robert G. Ellis, P. Eng., Rockwell Automation Medium Voltage Business CONTENTS INTRODUCTION...
PowerWorld Simulator
PowerWorld Simulator Quick Start Guide 2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330 [email protected] http://www.powerworld.com Purpose This quick start guide is intended to
EssPro Energy Storage Grid Substation The power to control energy
EssPro Energy Storage Grid Substation The power to control energy EssPro Grid gives you the power to control energy helping to keep smart grids in balance Maximizing the value and performance of energy
Lecture - 4 Diode Rectifier Circuits
Basic Electronics (Module 1 Semiconductor Diodes) Dr. Chitralekha Mahanta Department of Electronics and Communication Engineering Indian Institute of Technology, Guwahati Lecture - 4 Diode Rectifier Circuits
Transistor Characteristics and Single Transistor Amplifier Sept. 8, 1997
Physics 623 Transistor Characteristics and Single Transistor Amplifier Sept. 8, 1997 1 Purpose To measure and understand the common emitter transistor characteristic curves. To use the base current gain
For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V - 690 V - 1000 V (at 50 Hz)
24 1. NETWORK CONFIGURATIONS definition Standard IEC 38 defines voltage ratings as follows: - Low voltage () For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V - 690
Modular I/O System Analog and Digital Interface Modules
OPERATING INSTRUCTIONS Modular I/O System Analog and Digital Interface Modules Installation Operation Maintenance Document Information Document ID Title: Operating Instructions Modular I/O System Part
DC TRANSMISSION BASED ON VOLTAGE SOURCE CONVERTERS
DC TRANSMISSION BASED ON VOLTAGE SOURCE CONVERTERS by Gunnar Asplund, Kjell Eriksson, Hongbo Jiang, Johan Lindberg, Rolf Pålsson, Kjell Svensson ABB Power Systems AB Sweden SUMMARY Voltage Source Converters
Technical Information POWER PLANT CONTROLLER
Technical Information POWER PLANT CONTROLLER Content The Power Plant Controller offers intelligent and flexible solutions for the control of all PV power plants in the megawatt range. It is suitable for
Safety technique. Emergency stop module BO 5988 safemaster
Safety technique Emergency stop module BO 5988 safemaster 0221562 Function diagram Pushbutton on Mains or emergencystop () K1 According to EC Directive for machines 98/37/EG According to IEC/E 60204-1
On-site Measurement of Load and No-load Losses of GSU Transformer
On-site Measurement of Load and No-load Losses of GSU Transformer DRAGANA NAUMOI-UKOI, SLOBODAN SKUNDRI, LJUBISA NIKOLI, ALEKSANDAR ZIGI, DRAGAN KOAEI, SRDJAN MILOSALJEI Electrical engineering institute
Documentation for. KL2602 and KL2622. Two-channel Relay Output Terminals for 230 V AC / 30 V DC. Version: 1.4 Date: 2013-03-20
Documentation for KL2602 and KL2622 Two-channel Relay Output Terminals for 230 V AC / 30 V DC Version: 1.4 Date: 2013-03-20 Table of contents Table of contents 1 Foreword 1 1.1 Notes on the documentation
Current and voltage measuring relays
Current and voltage measuring relays RXIK 1, RXEEB 1 and Page 1 Issued June 1999 Changed since July 1998 Data subject to change without notice RXIK 1 RXEEB 1 (SE980082) (SE980081) (SE970869) Features Application
Understanding Delta Conversion Online "Power Regulation" - Part 2
Application Note #40 Understanding Delta Conversion Online "Power Regulation" - Part 2 Introduction This application note is the second in a series on delta conversion theory of operation. For complete
Venteea A Smart Grid demonstrator for the DRES integration on the MV distribution networks. www.venteea.fr/en/
Venteea A Smart Grid demonstrator for the DRES integration on the MV distribution networks www.venteea.fr/en/ Lille, le 26 novembre 2015 Agenda Project overarching objectives The consortium The added value
ends of transmission line are used for relay operation [70]. Another type of
69 CHAPTER-4 TRANSMISSION LINE DIFFERENTIAL PROTECTION USING WIRELESS TECHNOLOGY 4.1 INTRODUCTION The probability of fault occurrence on the overhead lines is much more due to their greater lengths and
Offshore Platform Powered With New Electrical Motor Drive System
Offshore Platform Powered With New Electrical Motor Drive System Authors: Jan O. Lamell, M.Sc E.E. ABB Automation Technologies Presenters: Thomas Johansson, M.Sc E.E. ABB Automation Technologies Timothy
South African Distribution Code
South African Distribution Code Glossary and Definitions Version 6.0 July 2014 This document is approved by the National Energy Regulator of South Africa (NERSA) Issued by: RSA Grid Code Secretariat Contact:
Transformerless UPS systems and the 9900 By: John Steele, EIT Engineering Manager
Transformerless UPS systems and the 9900 By: John Steele, EIT Engineering Manager Introduction There is a growing trend in the UPS industry to create a highly efficient, more lightweight and smaller UPS
COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN. Top Energy Limited
PB ASSOCIATES COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN Prepared for PB Associates Quality System: Document Identifier : 153162 Top Energy Final Report Revision : 2 Report Status : Final Date
ADVANCED CONTROL TECHNIQUE OF CENTRIFUGAL COMPRESSOR FOR COMPLEX GAS COMPRESSION PROCESSES
ADVANCED CONTROL TECHNIQUE OF CENTRIFUGAL COMPRESSOR FOR COMPLEX GAS COMPRESSION PROCESSES by Kazuhiro Takeda Research Manager, Research and Development Center and Kengo Hirano Instrument and Control Engineer,
OPTIMAL DISPATCH OF POWER GENERATION SOFTWARE PACKAGE USING MATLAB
OPTIMAL DISPATCH OF POWER GENERATION SOFTWARE PACKAGE USING MATLAB MUHAMAD FIRDAUS BIN RAMLI UNIVERSITI MALAYSIA PAHANG v ABSTRACT In the reality practical power system, power plants are not at the same
Power System Simulation for Engineers (PSS/E version 33)
Power System Simulation for Engineers (PSS/E version 33) Here are instructions for accessing and using the PSS/E-33 software. On-campus students should access this software at any of the computers in the
Topics. HVDC Fundamentals
Topics HVDC Fundamentals Conventional Converters Capacitor Commutated Converters Voltage Source Converters Reactive Power Requirements System Configurations Tapping Control basics High Power Transmission
Candle Plant process automation based on ABB 800xA Distributed Control Systems
Candle Plant process automation based on ABB 800xA Distributed Control Systems Yousef Iskandarani and Karina Nohammer Department of Engineering University of Agder Jon Lilletuns vei 9, 4879 Grimstad Norway
Cost Benefit Methodology for Optimal Design of Offshore Transmission Systems
Centre for Sustainable Electricity and Distributed Generation Cost Benefit Methodology for Optimal Design of Offshore Transmission Systems Predrag Djapic and Goran Strbac July 2008 FUNDED BY BERR URN 08/1144
HIGH FREQUENCY TRANSFORMER WITH TRANSFORMER SWITCHOVER
OPTIMUM EFFICIENCY AND FLEXIBLE USE HIGH FREQUENCY TRANSFORMER WITH TRANSFORMER SWITCHOVER One of the many requirements of the modern inverter is a broad, coordinated input and MPP voltage range with a
METHODOLOGICAL CONSIDERATIONS OF DRIVE SYSTEM SIMULATION, WHEN COUPLING FINITE ELEMENT MACHINE MODELS WITH THE CIRCUIT SIMULATOR MODELS OF CONVERTERS.
SEDM 24 June 16th - 18th, CPRI (Italy) METHODOLOGICL CONSIDERTIONS OF DRIVE SYSTEM SIMULTION, WHEN COUPLING FINITE ELEMENT MCHINE MODELS WITH THE CIRCUIT SIMULTOR MODELS OF CONVERTERS. Áron Szûcs BB Electrical
Physics 623 Transistor Characteristics and Single Transistor Amplifier Sept. 13, 2006
Physics 623 Transistor Characteristics and Single Transistor Amplifier Sept. 13, 2006 1 Purpose To measure and understand the common emitter transistor characteristic curves. To use the base current gain
NC-12 Modbus Application
NC-12 Modbus Application NC-12 1 Table of Contents 1 Table of Contents... 2 2 Glossary... 3 SCADA...3 3 NC-12 Modbus in general... 3 4 Entire system... 4 4.1 PFC to PC connection alternatives...4 4.1.1
Product and Applications Description. Application Programs. Example of Operation. GAMMA instabus Technical Product-Information.
Product and Applications Description The power supply units N 125/x2 can supply DC 24 V power from an additional pair of terminals (yellowwhite). This DC 24 V output voltage can be used to power e.g. an
Introduction to Ontario's Physical Markets
Introduction to Ontario's Physical Markets Introduction to Ontario s Physical Markets AN IESO MARKETPLACE TRAINING PUBLICATION This document has been prepared to assist in the IESO training of market
CLASS Voltage Regulation Scheme. 27 February 2014
CLASS Voltage Regulation Scheme 27 February 2014 Functional Specifications and Voltage Regulation Scheme for the Autonomous Substation Controllers (ASCs) Date: 27 February 2014 Page 2 of 26 Table of Contents
Simulation and Analysis of Parameter Identification Techniques for Induction Motor Drive
International Journal of Electronic and Electrical Engineering. ISSN 0974-2174 Volume 7, Number 10 (2014), pp. 1027-1035 International Research Publication House http://www.irphouse.com Simulation and
A Direct Numerical Method for Observability Analysis
IEEE TRANSACTIONS ON POWER SYSTEMS, VOL 15, NO 2, MAY 2000 625 A Direct Numerical Method for Observability Analysis Bei Gou and Ali Abur, Senior Member, IEEE Abstract This paper presents an algebraic method
ALARM ANNUNCIATOR ME - 3010 INSTRUCTION MANUAL
ALARM ANNUNCIATOR ME - 3010 INSTRUCTION MANUAL INTRODUCTION... 2.. TECHNICAL DATA... 3 ACCESSORIES... 5. INSTALLATION... 7 OPERATION... 12. TECHNICAL INFORMATION... 13 MAINTENANCE... 14. CONFIGURATIONS...
Il Progetto INTEGRIS. Risultati e nuove prospettive per lo sviluppo delle Smart Grid October 2nd 2013 Brescia
Il Progetto INTEGRIS. Risultati e nuove prospettive per lo sviluppo delle Smart Grid October 2nd 2013 Brescia From INTEGRIS a solution architecture for energy smart grids Jean Wild - Schneider Electric
Steady-State Power System Security Analysis with PowerWorld Simulator
Steady-State Power System Security Analysis with PowerWorld Simulator S: Power System Modeling Methods and Equations 00 South First Street Champaign, Illinois 680 + (7) 384.6330 [email protected]
Droop Control Forhybrid Micro grids With Wind Energy Source
Droop Control Forhybrid Micro grids With Wind Energy Source [1] Dinesh Kesaboina [2] K.Vaisakh [1][2] Department of Electrical & Electronics Engineering Andhra University College of Engineering Visakhapatnam,
USB2.0 Technical Manual
TDK EMC Technology Practice Section USB2.0 Technical Manual TDK Corporation Magnetics Business Group Mitsuharu Mizutani 1 Introduction USB2.0 was released in April of 2000 and it has become the standard
The Key Technology Research of Virtual Laboratory based On Cloud Computing Ling Zhang
International Conference on Advances in Mechanical Engineering and Industrial Informatics (AMEII 2015) The Key Technology Research of Virtual Laboratory based On Cloud Computing Ling Zhang Nanjing Communications
Kinetic energy recovery on railway systems with feedback to the grid
Kinetic energy recovery on railway systems with feedback to the grid Authors: J.M. ORTEGA, METRO DE BILBAO;S:A: H. IBAIONDO, A. ROMO. INGETEAM TRACTION,S.A. 1. Introduction The increasing concern with
LAB 7 MOSFET CHARACTERISTICS AND APPLICATIONS
LAB 7 MOSFET CHARACTERISTICS AND APPLICATIONS Objective In this experiment you will study the i-v characteristics of an MOS transistor. You will use the MOSFET as a variable resistor and as a switch. BACKGROUND
General Validation Test Program for Wind Power Plants Connected to the Hydro-Québec Transmission System
General Validation Test Program for Wind Power Plants Connected to the Hydro-Québec Transmission System Direction Planification des actifs et expertise de transport February 2011 TABLE OF CONTENTS 1. CONDUCTING
Module 5. Broadcast Communication Networks. Version 2 CSE IIT, Kharagpur
Module 5 Broadcast Communication Networks Lesson 1 Network Topology Specific Instructional Objectives At the end of this lesson, the students will be able to: Specify what is meant by network topology
SOFTWARE FOR THE OPTIMAL ALLOCATION OF EV CHARGERS INTO THE POWER DISTRIBUTION GRID
SOFTWARE FOR THE OPTIMAL ALLOCATION OF EV CHARGERS INTO THE POWER DISTRIBUTION GRID Amparo MOCHOLÍ MUNERA, Carlos BLASCO LLOPIS, Irene AGUADO CORTEZÓN, Vicente FUSTER ROIG Instituto Tecnológico de la Energía
Laws and price drive interest in LNG as marine fuel
Laws and price drive interest in LNG as marine fuel The use of LNG as a marine fuel is one of the hottest topics in shipping. This growing interest is driven by legislation and price. By Henrique Pestana
Introduction. Harmonics and IEEE 519 Page 1 of 19
Introduction In an ideal power system, the voltage supplied to customer equipment, and the resulting load current are perfect sine waves. In practice, however, conditions are never ideal, so these waveforms
Power Quality Paper #3
The Effect of Voltage Dips On Induction Motors by: M D McCulloch 1. INTRODUCTION Voltage depressions caused by faults on the system affect the performance of induction motors, in terms of the production
ABB PSPS Erich Steinmann; Generator control-2013
ABB PSPS Erich Steinmann; Generator control-2013 GENERATOR CONTROL THE MODULAR SOLUTION FOR GENERATORS To make sure that power is efficiently converted into electric energy, it is necessary to supervise
Chapter 2 The Research on Fault Diagnosis of Building Electrical System Based on RBF Neural Network
Chapter 2 The Research on Fault Diagnosis of Building Electrical System Based on RBF Neural Network Qian Wu, Yahui Wang, Long Zhang and Li Shen Abstract Building electrical system fault diagnosis is the
HVDC 2000 a new generation of high-voltage DC converter stations
HVDC 2000 a new generation of high-voltage DC converter stations Improved performance and robustness, shorter lead times and faster delivery, plus reduced maintenance needs, were the development goals
Agenda do Mini-Curso. Sérgio Yoshio Fujii. Ethan Boardman. [email protected]. [email protected]
Agenda do Mini-Curso Sérgio Yoshio Fujii [email protected] Ethan Boardman [email protected] Agenda do Mini-Curso Sistemas de Distribuição (DMS) Characteristics of Distribution Network
APPLICATION NOTE USING A MODEL 3060-MS SERIES AS A REGENERATIVE AC SOURCE FOR PV INVERTER TEST APPLICATIONS. Abstract.
USING A MODEL 3060-MS SERIES AS A REGENERATIVE AC SOURCE FOR PV INVERTER TEST APPLICATIONS Abstract This application note describes the necessary procedure to use a standard Pacific Power Source Model
Improving Market Clearing Software Performance to Meet Existing and Future Challenges MISO s Perspective
Improving Market Clearing Software Performance to Meet Existing and Future Challenges MISO s Perspective FERC Technical Conference on Increasing Real-Time and Day-Ahead Market Efficiency through Improved
DIODE CIRCUITS LABORATORY. Fig. 8.1a Fig 8.1b
DIODE CIRCUITS LABORATORY A solid state diode consists of a junction of either dissimilar semiconductors (pn junction diode) or a metal and a semiconductor (Schottky barrier diode). Regardless of the type,
Modelling framework for power systems. Juha Kiviluoma Erkka Rinne Niina Helistö Miguel Azevedo
S VISIONS SCIENCE TECHNOLOGY RESEARCH HIGHLIGHT 196 Modelling framework for power systems Juha Kiviluoma Erkka Rinne Niina Helistö Miguel Azevedo VTT TECHNOLOGY 196 Modelling framework for power systems
Introduction to PowerWorld Simulator: Interface and Common Tools
Introduction to PowerWorld Simulator: Interface and Common Tools 2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330 [email protected] http://www.powerworld.com Fault Analysis Analysis
VOLTAGE REGULATOR AND PARALLEL OPERATION
VOLTAGE REGULATOR AND PARALLEL OPERATION Generator sets are operated in parallel to improve fuel economy and reliability of the power supply. Economy is improved with multiple paralleled generators by
Japan s Largest Photovoltaic Power Plant
Hitachi Review Vol. 63 (2014), No. 7 398 Featured Articles Japan s Largest Photovoltaic Power Plant Turnkey Construction Contract and Commissioning of Oita Solar Power Yuichi Nagayama Tetsuharu Ohya Hiroaki
Mixing Sodium and Lead Battery Technologies in Telecom Applications
Mixing Sodium and Lead Battery Technologies in Telecom Applications Paul Smith Shanon Kolasienski Technical Marketing Manager Application Engineer GE Critical Power GE Energy Storage Plano, TX 75074 Schenectady,
Use and Application of Output Limiting Amplifiers (HFA1115, HFA1130, HFA1135)
Use and Application of Output Limiting Amplifiers (HFA111, HFA110, HFA11) Application Note November 1996 AN96 Introduction Amplifiers with internal voltage clamps, also known as limiting amplifiers, have
How To Choose A Transformer
Consider open loop MV network as an example source 1 source 2 NC NC NC or NO main MV switchboard A B Detail design of substation NC NC NC NO NC NC switchboard 1 switchboard 2 switchboard 3 MV MV MV LV