CYCLE CHEMISTRY COMMISSIONING
|
|
|
- Hannah Barker
- 9 years ago
- Views:
Transcription
1 CYCLE CHEMISTRY COMMISSIONING Otakar Jonas, P.E., Ph.D. Lee Machemer, P.E. Jonas, Inc Faun Road Wilmington, DE USA Abstract This paper presents an outline of cycle chemistry commissioning guidelines and a brief description of selected case histories where delays of commercial operation and equipment damage resulted from insufficient water chemistry-related commissioning. Operation delays have resulted in cost penalties of millions of dollars (at ~$300,000/day) and the equipment damage has been as high as $100 million in one unit. The ultimate root cause of the above problems is poor system management by OEMs, architect engineers, operators, and chemistry consultants. The technical root causes, all of them predictable and correctable, include bad design and material selection, water treatment system operation and chemicals, instrumentation and chemical control not ready, corrosion during equipment storage, high boiler carry-over, and lack of operator and chemist training. Introduction Commissioning delays and equipment damage as a result of inadequate commissioning have been a major problem for over 50% (estimate) of new units of all types and for older units after upgrades and operation and chemistry changes. Today, most of these problems can be avoided because there is sufficient knowledge in the areas of water chemistry and corrosion [1 to 29] and ample experience. It is mostly a problem of the transfer and use of the knowledge and of management. During commissioning, the risk of water chemistry-related delays is high, while at the same time, the analysis and control of cycle chemistry is typically at its lowest level in the life of the unit. Many problems can be avoided if the proper steps are taken throughout the design, construction and commissioning of the unit. These delays are a result of the lack of readiness of the cycle chemistry-related equipment, accumulation of corrosion products, the use of the wrong water treatment chemicals, and a general neglect of cycle chemistry and corrosion.
2 A solution to reduce the frequency of cycle chemistry-related delays is to implement Cycle Chemistry Commissioning Guidelines for all new plants, major equipment upgrades, and after operation (load increase, base load to cycling, etc.) and water chemistry changes. This paper outlines such a document and presents case histories where the use of these Guidelines could have prevented problems and saved millions of dollars. Commissioning Guidelines The Cycle Chemistry Commissioning Guidelines are a combination of action items and checklists for verifying that all cycle chemistry-related equipment is operational and in good condition, personnel are properly trained, and procedures are in place for sampling, analysis and control of cycle chemistry parameters. In order to be the most effective, the Guidelines must be customized for each plant based on cycle design and type of operation. The purpose of the Guidelines is to prevent delays in the commissioning activities and prevent short- and long-term cycle chemistry and corrosion problems. To achieve this, the Guidelines contain all of the steps which must be taken to ensure the entire cycle is as clean as possible so that the cycle chemistry can quickly be brought within recommended limits. They also make sure that the water and steam sampling and analysis systems are prepared to obtain and analyze water and steam samples at the first fire. The Guidelines are most effective when they include the cycle design review, material selection, and water chemistry control (water treatment and monitoring) verification. This requires the cooperation of OEMs, architect engineers, owners, and operators. The following are the topics which should be covered in the Commissioning Guidelines: Review of cycle and component design (chemistry vs. corrosion, impurity transport, flowaccelerated corrosion, heat flux, stresses, etc.) [1 to 8] Water chemistry control and management guidelines - plant specific [9 to 20] Equipment preservation during manufacture, transport, storage, erection, and layup and the subsequent removal of preservatives Training of operators and chemists before the start of commissioning Manuals Inspections of cycle chemistry-related equipment Maintenance procedures Pre-operational cleaning (acid, steam/air blow) and hydrotesting [26 to 28] Pre-steaming checks - boiler, turbine, condensate polishing, condenser, etc. Performance testing - steam purity/carry-over, boiler hideout, iron transport, etc. [2, 9 to 23] Sampling system design and operation [21 to 23] Cooling water system Chemical discharges/disposal
3 Chemical laboratory Safety issues [8] Commissioning schedule Each topic should have its own action items and a checklist of tasks to be signed off at different times during the plant design, construction and commissioning processes. Individual items in the checklist should be assigned to the contractor and owner representatives, and the timing of the checks should be coordinated with the erection and commissioning schedule. In order to be an effective document, management must be involved in its application and require that all pertinent items be signed off before proceeding. These Guidelines would not be a substitute for other commissioning and operation documents. Design Review - The purpose of the steam cycle design review [2 to 8] is to theoretically establish cycle chemical transport characteristics such as sources, transport, and removal of corrosion products, deaeration characteristics, effects of condenser leaks and air inleakage, and decomposition and transport of organics. The review of component design should focus on concentration of impurities on component surfaces (i.e., boiler tubes and turbines), and on the effects of heat transfer and stress on corrosion, stress corrosion, and corrosion fatigue. Performance Testing - should include experimental determination of the cycle chemical transport characteristics, in particular boiler carry-over and steam purity, boiler hideout, deaeration, makeup and polisher performance, and iron transport. It may require intensive twoweek monitoring of water and steam chemistry under anticipated operating conditions. Additional chemists and consultants may be needed. This does not have to be performed during commissioning, but it should be done within the first two months of normal operation. Case Histories There have been many commissioning delays and later problems which have occurred as a result of cycle chemistry-related issues which should have been found during commissioning. There have also been good experiences with units where water chemistry commissioning, design review, and performance testing have been applied. The first example is of a new 800 MW, 3 pressure, 1920 psig HP boiler pressure combined cycle unit with an air cooled condenser and powdered resin condensate polisher where commissioning guidelines have been implemented from the design phase to commercial operation. Water treatment is AVT with ammonia and hydrazine except for the LP boilers which use congruent phosphate treatment. HRSG preoperational chemical cleaning was with citric acid and steam piping was cleaned using extensive air blow. This unit experienced no water chemistry related delays and water chemistry guidelines were met during commissioning. A summary of water and steam chemistry for this unit is given in Table 1.
4 Table 1 Summary of Water and Steam Chemistry During and After Commissioning of a Combined Cycle Unit for which Water Chemistry Commissioning Guidelines were Used Parameter HP Economizer Inlet HP Boiler Water HP Superheated Steam Sodium (ppb) Chloride (ppb) < 0.2 Sulfate (ppb) < < 0.5 TOC (ppb) N/A N/A 7 Iron (ppb) N/A - Not Analyzed Table 2 gives examples of commissioning related problems for combined cycle and conventional fossil units. Illustrations of the problems are shown in Figures 1 to 5. The problems include cycle contamination because of undetected condenser leaks, corrosion of equipment during unprotected storage, high cation conductivity of steam because of decomposition of organic water treatment chemicals, poor performance of condensate polishers and subsequent turbine corrosion, high boiler carry-over leading to turbine deposits and stress corrosion cracking, and flow-accelerated corrosion. Table 2 Examples of Problems Experienced During Commissioning No. Problem Root Cause Solution Combined Cycles 1 Corrosion of HRSG panels after hydrotesting during storage and shipment HRSGs not completely drained after the factory hydrotest and not protected during shipment and storage Preoperational chemical cleaning; not originally planned 2 Corrosion of HRSG during unprotected storage - 11 tons of Fe removed during pre-op cleaning Unit not properly stored during construction and heavy corrosion of boiler surfaces by wet salt air. No action taken
5 3 Cycle contamination with seawater - several condenser tube leaks during commissioning, including three major leaks (chloride up to 16,000 ppm in boiler water) 4 During commissioning, unit was shut down due to failure of the HP steam bypass valve to close past 45% due to heavy dark gray deposit (47.7% Cl) Condenser tubes buckled and pulled away from tube sheets, tubes rupture due to improper venting, lack of monitoring, poor communication between chemists and operators 23 condenser tubes had broken, resulting in massive contamination of system, leak not detected due to inoperable and insufficient monitoring, disregard for chemistry Plug leaking tubes, fill and drain both HRSGs four times, operation on turbine bypass for 7 days to achieve HP steam purity limits Two chemical cleanings were required (see details in Case 5 below) and commissioning was delayed over 7 months 5 Brackish water contamination (Case 4) results in heavy deposits (0.25 inch (6 mm) thick in primary superheater tubes (Figure 1). Corrective chemical cleaning stopped due to iron citrate and tarry organic deposit formation; Figure 2 Chemical cleaning of the HRSG after a condenser leak was poorly controlled and the high concentrations of chloride and iron in the system overwhelmed the citric acid and inhibitor. Inspections, testing to determine how to clean system, second corrective chemical cleaning using a special phosphoric acid solution was performed before the citric acid cleaning was restarted 6 Steam cation cond. limits not met due to high concentration of organic acids. These acids also increased flow-accelerated corrosion of carbon steel components resulting in high iron in boiler water. Occurred in many HRSGs. 7 Flow-accelerated corrosion (FAC) of carbon steel HRSG components. Occurred in hundreds of HRSGs. The organic water treatment chemicals being used were breaking down in the boiler and superheater to form volatile organic acids which were transported throughout the cycle HRSGs designed using carbon steel in high velocity sections which were within the temperature range where FAC is prevalent Water treatment programs modified to use non-organic water treatment chemicals such as ammonia, hydrazine (carbohydrazide), and sodium phosphate or scavenger concentration reduced Increase of ph and DO. Newer HRSGs are designed with low alloy steels in areas which are most susceptible to FAC 8 Hydrogen damage of HRSG tubes and turbine pitting Seawater contamination of makeup storage barge, insufficient monitoring Replaced damaged tubes, dumped contaminated water, tightened chemistry control
6 9 Flow-accelerated corrosion of IP and LP drum internals (Figure 3), Fe in blowdown up to 15 ppm Conventional Fossil Boiler Units 10 Seawater contamination - condenser tube leak increased sodium concentrations and conductivity around the cycle for hours Water chemistry - decomposition of organics, low ph, high conc. of oxygen scavenger, design - high flow velocity Due to improper installation and loss of cooling water while dumping steam, one condenser tube plug falling out and six loose. The chemistry control was not fully functional and operator and chemist training was inadequate Replaced with stainless steel, reduced organics and scavenger System drained and refilled 5 times with demin. water. Condenser tube plugs reinstalled. Boiler and turbine inspection - OK. Chemical control tightened 11 Pitting and corrosion fatigue of L-1R blades in oncethrough boiler units 12 Stress corrosion of LP turbine disks in a supercritical unit (Figure 4) Marginal operation of condensate polishers, blades near resonance Operation of condensate polishers beyond ammonia breakthrough, high NaOH in steam Blade redesign and replacement, improvement of CP operation Disks replaced, operation of CP improved 13 Extensive boiler tube caustic corrosion (Figure 5) in high pressure drum boiler during one year at MCR/overpressure [6] High heat flux at MCR not compatible with phosphate boiler water control Replaced tubes, changed to AVT 14 Overheat failures of superheater tubes within one month of operation High boiler carry-over and heavy deposits in SH because of a missing plug (for a soot blower) in the steam drum Replaced superheater tubes, installed plug, started steam chemistry monitoring 15 Destructive overspeed of new industrial turbine after 16 hours of operation High boiler carry-over of boiler water with polymeric dispersant resulted in "gluing" of turbine control valves in the open position New turbine, carry-over control Nuclear PWR Units Many U.S. PWR units have been significantly damaged during commissioning and the first few fuel cycles. The corrosion damage has been a consequence of a combination of design, wrong
7 water chemistry guidelines, and cycle contamination (condenser leaks, air inleakage, malfunctioning condensate polishers) during commissioning and early operation. The results, which have been costly to the nuclear industry include steam generator tube denting requiring steam generator replacement, turbine stress corrosion cracking requiring whole turbine or rotor replacement, and flow-accelerated corrosion of feedwater and wet steam piping and turbine casing. Figure 6 is an example of steam generator water chemistry for a PWR unit using seawater condenser cooling. It illustrates the degree of non-compliance with specified chloride limits during early operation. Conclusions and Recommendations 1. Many delays which have occurred during commissioning of new units could have been avoided or greatly reduced if Cycle Chemistry Commissioning Guidelines had been used. These problems not only add to the overall project cost, but can cause significant delays which can result in late penalties (~$300,000/day). Even more costly are the corrosion and scale and deposit problems which occur after commissioning. These are often the result of marginal design of cycle components combined with water and steam chemistry problems which were not discovered during commissioning. Costs for these problems range from 0.1 to 100 million dollars. 2. The Cycle Chemistry Commissioning Guidelines should include sections on cycle and component design, equipment preservation, water chemistry control and manuals, training, discharges, and safety issues. They should be unit specific and should be jointly implemented by architect engineers, OEMs, operators, and owners. 3. Design review of the steam cycle, material selection, sampling and instrumentation, and main components should be performed as early as possible. It is an effective way to prevent water chemistry and corrosion related problems. Selection of water treatment should fit the design. 4. Performance testing of the steam cycle water chemistry related characteristics during commissioning or within ~2 months of commercial operation can prevent major corrosion and deposition problems. It should include monitoring of all control parameters and their conformance with guidelines and the evaluation of deaeration, makeup, condensate polishing, and boiler carry-over and steam purity. References 1. ASME Handbook on Water Technology for Thermal Power Systems. ASME, O. Jonas. "Transport of Chemicals in Steam Cycles." Paper 245. Corrosion/85. NACE, O. Jonas. "Corrosion and Water Chemistry Problems in Steam Systems - Root Causes and Solutions." Materials Performance. December Low-Temperature Corrosion Problems in Fossil Power Plants - State of Knowledge Report. Electric Power Research Institute, Palo Alto, CA. To Be Published Flow-Accelerated Corrosion in Power Plants. EPRI, Palo Alto, CA TR
8 6. O. Jonas and K. Layton. "Phosphate Boiler Water Treatment for High Pressure Boilers." Proceedings: Second Fossil Plant Cycle Chemistry Conference. January GS O. Jonas. "Corrosion and Deposition Problems in Steam Cycles." Power Station Chemistry 2000 Conference. Queensland, Australia. May O. Jonas. "Safety Issues in Fossil and Industrial Steam Systems." Mat'ls Perf. May O. Jonas. "Understanding Steam-Cycle Chemistry." Power. September-October O. Jonas and R. B. Dooley. "International Water Treatment Practices and Experience." Paper No. IWC International Water Conference. Pittsburgh, PA O. Jonas. "Current Water Treatment Practices - Utility and Industrial Steam Systems." Materials Performance. October O. Jonas. "Effective Cycle Chemistry Control." Power Station Chemistry 2000 Conference. Queensland, Australia. May 15-16, Interim Consensus Guidelines on Fossil Plant Cycle Chemistry. Electric Power Research Institute, Palo Alto, CA, June CS Guidelines on Cycle Chemistry for Fluidized-Bed Combustion Plants. Electric Power Research Institute, Palo Alto, CA, September TR Cycle Chemistry Guidelines for Fossil Plants: Phosphate Treatment for Drum Units. Electric Power Research Institute, Palo Alto, CA, December TR All-Volatile Treatment Guidelines for Fossil Plants. Electric Power Research Institute, Palo Alto, CA, April TR Cycle Chemistry Guidelines for Fossil Plants: Oxygenated Treatment. Electric Power Research Institute, Palo Alto, CA, December TR Cycle Chemistry Guidelines for Combined Cycle Power Plants. Electric Power Research Institute, Palo Alto, CA, December TR Selection and Optimization of Boiler Water and Feedwater Treatments for Fossil Plants. Electric Power Research Institute, Palo Alto, CA, March TR Cycling, Startup, Shutdown, and Layup Fossil Plant Cycle Chem. Guidelines for Operators and Chemists. Electric Power Research Institute, Palo Alto, CA, August TR Guideline Manual on Instrumentation and Control for Fossil Plant Cycle Chemistry. Electric Power Research Institute, Palo Alto, CA, April CS O. Jonas. Development of a Steam Sampling System. Electric Power Research Institute, Palo Alto, CA, Dec TR S. P. Hall. Quality Control in Power Plant Laboratories. Illinois Power Co., O. Jonas. Beware of Organic Impurities in Steam Power Systems. Power, 126:9, pp , September O. Jonas. Use of Organic Water Treatment Chemicals. VGB Conference, Organische Konditionierungs-und Sauerstoffbindemittel, Lahnstein, Germany, March Guidelines for Chemical Cleaning of Conventional Fossil Plant Equipment. EPRI, Palo Alto, CA. November TR J. Sullivan and J. McGraw. "Chemical Cleaning Heat Recovery Steam Generator's (HRSG's) - Top 11 Lessons Learned." Paper No. IWC International Water Conference, Pittsburgh, PA K. Hansen and J. Jevec. "Pre-Operational Cleaning from the Boiler Manufacturer's Viewpoint." Paper No. IWC International Water Conference, Pittsburgh, PA
9 Figure 1 Heavy Deposit in HP Superheater Tube after Cycle Contamination with Brackish Water Figure 2 SEM and Elemental Analysis of the Black Tarry Deposit which Formed after Unsuccessful Chemical Cleaning
10 Figure 3 Flow-Accelerated Corrosion of Carbon Steel Channel Separators in the LP Drum Figure 4 Massive Stress Corrosion Cracking L-1 LP Turbine Disk caused by High Concentration of NaOH in Steam
11 Figure 5 Corroded Waterwall Tube from a High Pressure Drum Boiler after One Year Operation at MCR Figure 6 Chloride Concentration in Steam Generator Water throughout Several Fuel Cycles of a PWR Unit
DEGASSED CATION CONDUCTIVITY MEASUREMENT
(Presented at EPRI's 8th International Conference on Cycle Chemistry in Fossil and Combined Cycle Plants with Heat Recovery Steam Generators - June 20-23, 2006 Calgary, Alberta Canada) DEGASSED CATION
WATER CHEMISTRY AND CORROSION - MISSING KNOWLEDGE
WATER CHEMISTRY AND CORROSION - MISSING KNOWLEDGE Otakar Jonas, P.E. Ph.D. 1113 Faun Road Wilmington, DE 198803 Tel: (302) 478-1375 Fax: (302) 478-8173 Email: [email protected] Abstract This paper
World Class Water Chemistry By Accident? BRO Chemistry Session 8/5/2014
World Class Water Chemistry By Accident? BRO Chemistry Session 8/5/2014 From Safe by Accident? by Judy Agnew & Aubrey Daniels Despite decades of reduction in safety related deaths and injuries on the job,
A Primer on Protecting Idle Boilers By Howard Benisvy, Member ASHRAE
The following article was published in ASHRAE Journal, December 2002. Copyright 2002 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. It is presented for educational purposes
INSTRUCTION MANUAL. Boil-Out TABLE OF CONTENTS SAFETY WARNINGS 2-3 RESPONSIBILITY 3 INTRODUCTION 3 PRE-BOIL OUT PROCEDURES 3-5 BOIL OUT PROCESS 5-9
TABLE OF CONTENTS Description Page Number SAFETY WARNINGS 2-3 RESPONSIBILITY 3 INTRODUCTION 3 PRE-BOIL OUT PROCEDURES 3-5 BOIL OUT PROCESS 5-9 Indeck Keystone Energy, LLC. 5451 Merwin Lane, Suite 100 Erie,
Inferred ph in Steam Plant Water Chemistry Monitoring
Application Data Sheet ADS 4900-87/rev.B January 2009 Power Industry Inferred ph in Steam Plant Water Chemistry Monitoring INTRODUCTION Inferred ph means ph calculated from straight and cation conductivity.
The control of corrosive conditions caused by concentration of low-volatility solutes in boilers and steam generators
P R E P R I N T ICPWS XV Berlin, September 8 11, 2008 The control of corrosive conditions caused by concentration of low-volatility solutes in boilers and steam generators Geoffrey J Bignold GJB Chemistry
The International Association for the Properties of Water and Steam. Technical Guidance Document: Steam Purity for Turbine Operation
The International Association for the Properties of Water and Steam London, United Kingdom September 2013 Technical Guidance Document: Steam Purity for Turbine Operation 2013 International Association
Water Efficiency. Water Management Options. Boilers. for Commercial, Industrial and Institutional Facilities. Boiler Water Impurities
Water Efficiency Water Management Options Boilers for Commercial, Industrial and Institutional Facilities Boiler Water Impurities All boiler make-up water contains impurities. As clean steam is released
NPL Report MATC (A) 95 Steam Turbine Operating Conditions, Chemistry of Condensates, and Environment Assisted Cracking A Critical Review
Steam Turbine Operating Conditions, Chemistry of Condensates, and Environment Assisted Cracking A Critical Review Shengqi Zhou and Alan Turnbull May 2002 Date: May 2002 Steam Turbine Operating Conditions,
CURRENT EXPERIENCE IN TYPICAL PROBLEMS AND FAILURES WITH BOILER PIPING COMPONENTS AND SUPPORTS
A DB RILEY TECHNICAL PUBLICATION CURRENT EXPERIENCE IN TYPICAL PROBLEMS AND FAILURES WITH BOILER PIPING COMPONENTS AND SUPPORTS by James P. King, Design Manager DB Riley, Inc. Presented at the 1998 ASME
Boiler Preparation, Start-Up and Shutdown
Boiler Preparation, Start-Up and Shutdown Learning Outcome When you complete this module you will be able to: Describe the basic preparation of a boiler for start-up, and the start-up and shutdown procedures.
BASIC WATER TREATMENT OF STEAM BOILERS
BASIC WATER TREATMENT OF STEAM BOILERS Steve Kenny and Dave Pope Chemco Water Technology Vancouver, WA This is a brief discussion on low-pressure steam boiler chemistry. It provides dry kiln boiler operators
HOW TO SELECT A LOW VOLUME (L.V ) BOILER
HOW TO SELECT A LOW VOLUME (L.V ) BOILER FREQUENTLY ASKED QUESTIONS OR COMMENTS ON BOILERS Dear Potential Customer: Low Volume Operator Exempt boilers have been marketed in Ontario to eliminate the requirement
The National Board of Boiler and Pressure Vessel Inspectors 1055 Crupper Avenue Columbus, Ohio 43229 614.888.8320
TheNationalBoardofBoilerandPressureVesselInspectors 1055CrupperAvenue Columbus,Ohio43229 614.888.8320 NB-410, Revision 3 Sept, 2015 1 1.0 GENERAL The purpose of this document is to provide basic guidelines
Best Practice in Boiler Water Treatment
Best Practice in Boiler Water Treatment Boiler Water Treatment Part 2 Internal Treatment Objectives of Internal Water Treatment 1 To control the level of total dissolved solids (TDS) within the boiler
steam centre of excellence Steam Boiler System Optimization
Steam Boiler System Optimization Introduction Gas Cost Metering Fluids Fuel, Water, Steam Steam Costs Boiler House Stack Losses Boiler Waterside Surfaces Blowdown Current Natural Gas Cost Projected Cost
High-Pressure Steam Cycle and Boiler Water Treatment
High-Pressure Steam Cycle and Boiler Water Treatment High Pressure Boilers Pressure range 60-84 bar Critical needs High quality makeup water External pre-treatment through distillation and mechanical deaeration
Hydrogen Exchange Resin. Steam Purity Analysis
Circular No. 47 1955 STATE OF ILLINOIS WILLIAM G. STRATTON, Governor Hydrogen Exchange Resin ror Steam Purity Analysis by R. W. Lane, T. E. Larson and J. W. Pankey Issued by Department of Registration
OPERATING EXPERIENCE OF LARGE REHEAT HRSGs in MERCHANT SERVICE
OPERATING EXPERIENCE OF LARGE REHEAT HRSGs in MERCHANT SERVICE Peter S. Jackson, PE David S. Moelling, PE Frederick C. Anderson, PE James W. Malloy TETRA ENGINEERING GROUP TETRA ENGINEERING GROUP TETRA
Boiler Chemistry Management Using Coordinated Approach of Chemicals, Membranes and Online Monitoring
Technical Paper Boiler Chemistry Management Using Coordinated Approach of Chemicals, Membranes and Online Monitoring Authors: Rajendra Prasad Kalakodimi, Lead Technologist, and Mel J. Esmacher, Engineering
I. STEAM GENERATION, BOILER TYPES
I. STEAM GENERATION, BOILER TYPES and BOILER PLANT SYSTEMS 1 Steam Generation Water s Unique Properties: High Thermal Capacity (Specific Heat) High Critical Temperature Ideal Medium for Heat Delivery High
Design Factors and Water Chemistry Practices - Supercritical Power Cycles
PREPRINT-ICPWS XV Berlin, September 8-11, 2008 Design Factors and Water Chemistry Practices - Supercritical Power Cycles Frank Gabrielli Alstom Windsor, USA, [email protected] and Horst
SUGAR MILL BOILER CYCLE CHEMISTRY: AN UPDATE ON BEST PRACTICES DAVID RODMAN. Nalco Australia Pty Ltd, Townsville
SUGAR MILL BOILER CYCLE CHEMISTRY: AN UPDATE ON BEST PRACTICES By DAVID RODMAN Nalco Australia Pty Ltd, Townsville KEYWORDS: Sugar, Boiler, Water Chemistry, Deposit, Water Treatment. Abstract SUGAR mill
Technical Presentation IMPORTANT TOPICS
BOILER WATER TREATMENT FOR KILN DRY OPERATIONS Technical Presentation IMPORTANT TOPICS PRETREATMENT TEMPERATURE VS OXYGEN FEED WATER / DA BOILER WATER CONDENSATE 1 Boiler Water Pretreatment Purpose - Statistically
Boiler Blowdown. Boiler Blowdown Benefits. Best Operating Practices for Boiler Blowdown
Boiler Blowdown Even with the best pretreatment programs, boiler feedwater often contains some degree of impurities, such as suspended and dissolved solids. The impurities can remain and accumulate inside
Case History Report The Dolphin Nonchemical Device Boilers and Cooling Tower
Case History Report The Dolphin Nonchemical Device Boilers and Cooling Tower Device Evaluated "The Dolphin HYTRONIC Series 1000" pulsed power water treatment device (Dolphin) manufactured by Clearwater
Routine and Emergency Boiler Operation
Routine and Emergency Boiler Operation Learning Outcome When you complete this module you will be able to: Describe the routine safe and efficient operation of a packaged boiler. Learning Objectives Here
Energy Efficient Operations and Maintenance Strategies for Boilers
Energy Efficient Operations and Maintenance Strategies for Boilers Large, complex and widely used, industrial boilers are major consumers of fuel. Proper operations and maintenance (O&M) procedures must
Operational Flexibility Enhancements of Combined Cycle Power Plants. Dr. Norbert Henkel, Erich Schmid and Edwin Gobrecht
Operational Flexibility Enhancements of Combined Cycle Power Plants Dr. Norbert Henkel, Erich Schmid and Edwin Gobrecht Siemens AG, Energy Sector Germany POWER-GEN Asia 2008 Kuala Lumpur, Malaysia October
Sulfites for Oxygen Control
If you would like a more detailed version of this report, please request SOS from [email protected] along with your e-mail address. A. Introduction Sulfites for Oxygen Control Robert R. Cavano
WATER TREATMENT THE NEED FOR CONTROL COMMON IMPURITIES FOUND IN WATER. CALCIUM CARBONATE (CaCO3) CALCIUM SULFATE (CaSO4) MAGNESIUM SULFATE (MgSO4)
THE NEED FOR CONTROL Vecom Marine clean ships - clean seas BOILER WATER TREATMENT Whether distilled or raw (city) water is used for boiler make-up, chemical treatment is necessary to counteract harmful
Glob. J. Petrol. Chem. Eng. 002
Global Journal of Petroleum and Chemical Engineering ISSN: XXXX-XXXX Vol. 2 (1), pp. 1-1, January, 214. Global Science Research Journals Full Length Research Paper Corrosion-erosion on waste heat recovery
The Current State of Boiler Tube Failures in Fossil Plants
The Current State of Boiler Tube Failures in Fossil Plants Barry Dooley Peter S. Chang The Current State of Boiler Tube Failures in Fossil Plants INTRODUCTION At the last international boiler tube failure
9707 Key West Avenue, Suite 100 Rockville, MD 20850 Phone: 301-740-1421 Fax: 301-990-9771 E-Mail: [email protected]
9707 Key West Avenue, Suite 100 Rockville, MD 20850 Phone: 301-740-1421 Fax: 301-990-9771 E-Mail: [email protected] Part of the recertification process is to obtain Continuing Education Units (CEUs). One way
Investigating the Impact of Boiler Aging In Replacement Decisions
Investigating the Impact of Boiler Aging In Replacement Decisions Siddika Pasi and Michael R. Muller, Rutgers University - Center for Advanced Energy Systems ABSTRACT Traditionally boilers were believed
How To Prevent Corrosion In A Steam Electric Power Plant
Keeping corrosion at bay Analysis in ultra-supercritical power plants Corrosion is the natural enemy of steam-electric power plants, eating away at pipes, turbine blades, and rotors. The lack of a separation
1. A belt pulley is 3 ft. in diameter and rotates at 250 rpm. The belt which is 5 ins. wide makes an angle of contact of 190 over the pulley.
Sample Questions REVISED FIRST CLASS PARTS A1, A2, AND A3 (NOTE: these questions are intended as representations of the style of questions that may appear on examinations. They are not intended as study
Some Criteria for Choosing a Steam Boiler for a Microbrewery
Some Criteria for Choosing a Steam Boiler for a Microbrewery Jack Coe Rite Engineering and Manufacturing Corporation Breweries rely on steam heating for a number of functions, primarily to heat the brew
NALCO BT-25 Boiler Internal Treatment
PRODUCT NAME NALCO BT-25 Boiler Internal Treatment PRODUCT DESCRIPTION AND APPLICATION NALCO BT-25 is an innovative program that combines the use of polyphosphate and the most advanced synthetic organic
Steam System Best Practices Condensate System Piping
Steam System Best Practices Condensate System Piping Summary The best method for improving steam system energy efficiency, reducing chemical costs, and reducing make-up water costs is to return the maximum
Recovery Boiler Research Needs An Industry Perspective
Recovery Boiler Research Needs An Industry Perspective Andrew Jones International Paper 7th International Colloquium on Black Liquor Combustion and Gasification International Paper Recovery Operation Goals
WATER WALL BOILER FOR AIR AND OXYGEN FIRED CLAUS SULPHUR RECOVERY UNITS
WATER WALL BOILER FOR AIR AND OXYGEN FIRED CLAUS SULPHUR RECOVERY UNITS Abstract Mahin RAMESHNI, P.E. Technical Director, Sulphur Technology [email protected] WorleyParsons 125 West Huntington
Industrial Water Reuse and Wastewater Minimization
Technical Paper Industrial Water Reuse and Wastewater Minimization Author: James P. McIntyre, P.E. Abstract Many industrial users of fresh water are under increasing pressure to reuse water within their
Overview of Heat Recovery Boiler Systems and Operating Costs Factors Effecting Blowdown Blowdown Heat Recovery The Energy Tank
Overview of Heat Recovery Boiler Systems and Operating Costs Factors Effecting Blowdown Blowdown Heat Recovery The Energy Tank Unbiased, Third-Party, Water & Energy Management Consulting Firm: - Not affiliated
Association of Water Technologies Technical Manual
7.0 Chemical Treatment 7.1 OVERVIEW This section deals with specific chemical treatments. Type, purpose, and application are all discussed. The treatments are divided along the lines of preboiler and condensate
CONTENTS. ZVU Engineering a.s., Member of ZVU Group, WASTE HEAT BOILERS Page 2
WASTE HEAT BOILERS CONTENTS 1 INTRODUCTION... 3 2 CONCEPTION OF WASTE HEAT BOILERS... 4 2.1 Complex Solution...4 2.2 Kind of Heat Exchange...5 2.3 Heat Recovery Units and Their Usage...5 2.4 Materials
Boiler Blowdown Analysis In An Industrial Boiler
IOSR Journal of Engineering (IOSRJEN) ISSN (e): 2250-3021, ISSN (p): 2278-8719 Vol. 05, Issue 07 (July. 2015), V3 PP 22-28 www.iosrjen.org Boiler Blowdown Analysis In An Industrial Boiler Keerthi R Lekshmi
12 Ways To Avoid Boiler Tube Corrosion
12 Ways To Avoid Boiler Tube Corrosion By: H. F. Hinst Plant Metallurgist Tubular Products Division, Keystone Plant The Babcock & Wilcox Company Corrosion troubles in low pressure heating boilers -- which
BRAZED PLATE INSTALLATION MANUAL
www.brazedplate.com BRAZED PLATE INSTALLATION MANUAL S.E.C. Heat Exchangers P.E.I. CANADA C0A 1A0 tel; 902-659-2424 fax; 902-659-2800 Table of Contents Description...2 Mounting position...3 Piping connections......3
ALS TRIBOLOGY Engine Coolant Reference Guide
ALS TRIBOLOGY Engine Coolant Reference Guide Engine coolants are a mixture of, inhibitors, and water. Each formula is designed for specific protection and engine requirements. Mixing different coolants
Specific Volume of Liquid (Column 7). The volume per unit of mass in cubic feet per pound.
Steam Tables What They Are How to Use Them The heat quantities and temperature/ pressure relationships referred to in this Handbook are taken from the Properties of Saturated Steam table. Definitions of
Boiler and Steam Efficiency What does it mean?
PACIA Carbon Solutions Forum 3-29 September 20 Boiler and Steam Efficiency What does it mean? Andrew Hook - Area Manager, Nalco 1 Purpose, Process, Payoff Purpose: To explain boiler and steam efficiencies
Carbon Dioxide and Dissolved Oxygen Removal From Makeup Water By Gas Transfer Membranes
Technical Paper Carbon Dioxide and Dissolved Oxygen Removal From Makeup Water By Gas Transfer Membranes Authors: S.H. Macklin, Northeast Utilities, W.E. Haas, GE Water & Process Technologies and W.S. Miller,
Energy Efficiency in Steam Systems
Energy Efficiency in Steam Systems Fundamentals of Energy Efficiency: An Introductory Workshop April 2008 John S. Raschko, Ph.D. Mass. Office of Technical Assistance www.mass.gov/envir/ota (617) 626-1093
Portable leak detection instrument improves heat rate at electric power plant. By Terrence O'Hanlon, CMRP Reliabilityweb.com
Portable leak detection instrument improves heat rate at electric power plant. By Terrence O'Hanlon, CMRP Reliabilityweb.com By using a ruggedized portable ultrasonic leak detector, Mr. Brian Thorp, PdM
Steam Generation Efficiency Module Blowdown Losses Section
Steam End User Training Steam Generation Efficiency Module Blowdown Losses Section Slide 1 Blowdown Losses Module This section will discuss blowdown loss and its affect on boiler efficiency. [Slide Visual
Water Treatment, Cycle Chemistry, Boiler Operation and Related Problems/Failures on Steam Generator Systems > 30 bar
Page 1 Water Treatment, Cycle Chemistry, Boiler Operation and Related Problems/Failures on Steam Generator Systems > 30 bar By Mr. Ludwig Hoehenberger, TÜV SÜD, Munich,. Phone: +49 89 5791 1063; Telefax:
Evaluate, Clean, and Tune Guidance
Evaluate, Clean, and Tune Guidance The Evaluate, Clean and Tune (ECT) process serves three essential purposes in the Weatherization Assistance Program (WAP). The first is to evaluate the existing system
1. Inspection and monitoring... 3
1 Index 1. Inspection and monitoring... 3 1.1 Handling of new elements... 3 1.1.1 Storage of original packaged RO elements... 3 1.1.2 Packing... 3 1.2 Initial start- up checks of a plant... 3 1.2.1 Preparation
OPPORTUNITIES FOR HEAT RATE REDUCTIONS IN EXISTING COAL- FIRED POWER PLANTS: A STRATEGY TO REDUCE CARBON CAPTURE COSTS
CONFERENCE PROCEEDINGS OPPORTUNITIES FOR HEAT RATE REDUCTIONS IN EXISTING COAL- FIRED POWER PLANTS: A STRATEGY TO REDUCE CARBON CAPTURE COSTS by Edward K. Levy, Nenad Sarunac, and Carlos Romero Energy
Reuse of Alternative Water Sources for Cooling Tower Systems Two Case Studies Using Non-Traditional Water Sources
Reuse of Alternative Water Sources for Cooling Tower Systems Two Case Studies Using Non-Traditional Water Sources Matthew L. Haikalis Veolia Water Solutions & Technologies April 24, 2013 Operational Priorities
Design of Purified Water and Water For Injection Systems. Hugh Hodkinson Engineers Ireland Chemical & Process Division
Design of Purified Water and Water For Injection Systems Hugh Hodkinson Engineers Ireland Chemical & Process Division Introduction My Background What s this lecture about? What should you get out of it?
2014 Service Technician Training Program Closed Loop Systems
1/20/14 2014 Service Technician Training Program Closed Loop Systems Daniel S. Krack, CWT 2 Closed Loop Cooling and Heating The Closed Loop Cooling Advantages High Efficiency Chillers, Heat Exchangers,
Lessons Learned, Best Practices and Observations. 2014 2016 Plant Winterization Visits
Lessons Learned, Best Practices and Observations 2014 2016 Plant Winterization Visits EQUIPMENT PROTECTION: Although some of the observations and practices were unique to an entity, the following can be
CHALLENGES IN A DILUTION STEAM GENERATOR SYSTEM
CHALLENGES IN A DILUTION STEAM GENERATOR SYSTEM Lee Siang Hua Titan Petrochemicals (M) Sdn Bhd Cheah Phaik Sim Titan Petrochemicals (M) sdn Bhd [email protected] Karl Kolmetz Westlake Group, Lake Charles,
C. starting positive displacement pumps with the discharge valve closed.
KNOWLEDGE: K1.04 [3.4/3.6] P78 The possibility of water hammer in a liquid system is minimized by... A. maintaining temperature above the saturation temperature. B. starting centrifugal pumps with the
VAD. Variable Area Desuperheaters
Desuperheater overview Steam used in process plants can be superheated, that is, heated to a temperature above saturation. The excess of temperature above its saturation is called 'superheat'. Desuperheated
TRIAL CHEMICAL CLEANING OF FOULED APH BASKETS
TRIAL CHEMICAL CLEANING OF FOULED APH BASKETS Dr. Abhay Kumar Sahay, AGM(CC OS) Bijay Manjul, AGM( Operation) Kahalgaon Boiler has three inputs Steam generator 1. WATER 2. COAL 3. AIR Burner Air preheater
Best Practices: The Engineering Approach for Industrial Boilers Natalie R. Blake, ONDEO Nalco
Best Practices: The Engineering Approach for Industrial Boilers Natalie R. Blake, ONDEO Nalco ABSTRACT A plant s boilers represent a large capital investment, as well as a crucial portion of overall plant
Research for leachables of nuclear grade cation exchange resin
International Journal of Smart Grid and Clean Energy Research for leachables of nuclear grade cation exchange resin Liang-Cheng Chen, Dah-Yu Kao, Tung-Jen Wen, Ping-Ji Huang Institute of Nuclear Energy
The Technology and Business of Power Andrew Valencia, P.E. Lower Colorado River Authority
The Technology and Business of Power Andrew Valencia, P.E. Lower Colorado River Authority 1 2 What is Efficiency? Efficiency: What you get divided by what you pay for Heatrate is a measure of plant efficiency
STEAM TURBINE CORROSION AND DEPOSITS PROBLEMS AND SOLUTIONS
STEAM TURBINE CORROSION AND DEPOSITS PROBLEMS AND SOLUTIONS by Otakar Jonas Consultant and Lee Machemer Senior Engineer Jonas, Inc. Wilmington, Delaware Otakar Jonas is a Consultant with Jonas, Inc., in
Standard Recommendations for Pressure Part Inspection During a Boiler Life Extension Program
Standard Recommendations for Pressure Part Inspection During a Boiler Life Extension Program M.N. Hovinga G.J. Nakoneczny Babcock & Wilcox Barberton, Ohio, U.S.A. Presented to: ICOLM (International Conference
Boiler and Burner Cleaning and Servicing Specifications
Boiler and Burner Cleaning and Servicing Specifications The Town of Groton of Public Works Department is requesting bids to provide manufacturers recommended maintenance, repairs and emergency service
A Guide to Trouble-Free Cooling Towers
A Guide to Trouble-Free Cooling Towers A basic understanding of cooling tower operation and maintenance will help keep a cooling water system running in top condition, year after year By David M. Suptic
WARNING: IMPROPER SERVICING AND START-UP OF THIS EQUIPMENT MAY CREATE A POTENTIAL HAZARD TO EQUIPMENT AND TO OPERATORS OR PERSONS IN THE BUILDING.
START-UP AND OPERATION WATER BOILERS WARNING: IMPROPER SERVICING AND START-UP OF THIS EQUIPMENT MAY CREATE A POTENTIAL HAZARD TO EQUIPMENT AND TO OPERATORS OR PERSONS IN THE BUILDING. SERVICING AND START-UP
HIGH PRESSURE FEEDWATER HEATER REPAIR
HIGH PRESSURE FEEDWATER HEATER REPAIR B. W. Helton II Tennessee Valley Authority 1101 Market Street Chattanooga, Tennessee 37402 Peter Tallman CTI Industries Inc. 200 Benton Street Stratford, Connecticut
Boiler Calculations. Helsinki University of Technology Department of Mechanical Engineering. Sebastian Teir, Antto Kulla
Helsinki University of Technology Department of Mechanical Engineering Energy Engineering and Environmental Protection Publications Steam Boiler Technology ebook Espoo 2002 Boiler Calculations Sebastian
MHI s Energy Efficient Flue Gas CO 2 Capture Technology and Large Scale CCS Demonstration Test at Coal-fired Power Plants in USA
MHI s Energy Efficient Flue Gas CO 2 Capture Technology and Large Scale CCS Demonstration Test at Coal-fired Power Plants in USA 26 MASAKI IIJIMA *1 TATSUTO NAGAYASU *2 TAKASHI KAMIJYO *3 SHINSUKE NAKATANI
Recover Heat from Boiler Blowdown Water
Prepared for California Energy Commission (CEC) Prepared By: Southern California Gas Company (A Sempra Energy Utility) E3M Inc. May 2012 i Disclaimer The CEC and its contractor, Southern California Gas
Committed to make a better world
Committed to make a better world 1. Higher Availability & Reliability 2. Highest Plant efficiency 3. Lower Heat Rate 4. Minimum Auxiliary Power Consumption 5. Minimum Emission of Pollutants Committed to
! WARNING. McDonnell & Miller Installation & Maintenance Instructions MM-217(I) Series 150S and 157S (Snap Switch, All Models except 157S-RB-P)
Series 150S and 157S (Snap Switch, All Models except 157S-RB-P) Low Water Cut-Off/Pump Controllers For Steam Boilers and Other Level Control Applications McDonnell & Miller Installation & Maintenance Instructions
Wall Thinning Trend Analyses for Secondary Side Piping of Korean NPPs
Transactions of the 17 th International Conference on Structural Mechanics in Reactor Technology (SMiRT 17) Prague, Czech Republic, August 17 22, 2003 Wall Thinning Trend Analyses for Secondary Side Piping
Review of Potential Efficiency Improvements at Coal-Fired Power Plants
Review of Potential Efficiency Improvements at Coal-Fired Power Plants Introduction The Clean Air Markets Division, U.S. Environmental Protection Agency requested that Perrin Quarles Associates, Inc.,
Chapter 2.2: Boilers
Chapter 2.2: Boilers Part I: Objective type Questions and Answers 1. The minimum capacity of any closed vessel which generates steam under Indian Boilers Regulation Act is. a) 2.275 liters b) 22.75 kilo
Effective Deoxygenation by a Hybrid Process Combining Gas Transfer Membranes with Catalytic Oxygen Reduction
Technical Paper Effective Deoxygenation by a Hybrid Process Combining Gas Transfer Membranes with Catalytic Oxygen Reduction Authors: S. B. Gorry, GE, W. E. Haas, GE and J. W. Mahaffee, Baltimore Gas &
Low Load Operational Flexibility for Siemens G-class Gas Turbines
Low Load Operational Flexibility for Siemens G-class Gas Turbines Power-Gen International 2008 Orlando, Florida www.siemens.com Power-Gen International Orlando, Florida December 2008 2 Low Load Operational
Guidelines for Selecting and Maintaining Glycol Based Heat Transfer Fluids
Guidelines for Selecting and Maintaining Based Heat Transfer Fluids David Berry Engineering Manager, Chem-Aqua Canada Allan Browning Technical Marketing Manager, Chem-Aqua, Inc. Based Heat Transfer Fluids
Filtering Samples to On-Line Process Analyzers. Guidelines for Proper Filtration and Delivery of Samples to On-Line Process Analyzers
Filtering Samples to On-Line Process Analyzers Guidelines for Proper Filtration and Delivery of Samples to On-Line Process Analyzers Filtering samples to on-line analyzers Use these guidelines to ensure
Troubleshooting Your RO
Troubleshooting Your RO Summary: There can be many reasons why a RO system suffers a loss in performance, and is unable to produce the proper quantity and/or quality of permeate water. Similar to a doctor
Progress on High Efficiency Coal Power Plants
CoalFleet for Tomorrow Progress on High Efficiency Coal Power Plants Dr. Jeff Phillips Sr. Program Manager, Generation McIlvaine Webcast March 1, 2012 CoalFleet for Tomorrow is a registered service mark
How To Clean Up A Reactor Water Cleanup
General Electric Systems Technology Manual Chapter 2.8 Reactor Water Cleanup System TABLE OF CONTENTS 2.8 REACTOR CLEANUP SYSTEM... 1 2.8.1 Introduction... 2 2.8.2 System Description... 2 2.8.3 Component
GENERAL PROPERTIES //////////////////////////////////////////////////////
ALLOY 625 DATA SHEET //// Alloy 625 (UNS designation N06625) is a nickel-chromium-molybdenum alloy possessing excellent resistance to oxidation and corrosion over a broad range of corrosive conditions,
Loviisa 3 unique possibility for large scale CHP generation and CO 2 reductions. Nici Bergroth, Fortum Oyj FORS-seminar 26.11.
Loviisa 3 unique possibility for large scale CHP generation and CO 2 reductions Nici Bergroth, Fortum Oyj FORS-seminar 26.11.2009, Otaniemi Loviisa 3 CHP Basis for the Loviisa 3 CHP alternative Replacement
Hot Water Boilers and Controls Why Condensing Boilers are Different. Presented Oct. 14, 2008 Long Island Chapter, ASHRAE
Hot Water Boilers and Controls Why Condensing Boilers are Different Presented Oct. 14, 2008 Long Island Chapter, ASHRAE H.W. Boilers and Controls Major types of boilers Advantages and disadvantages Resistance
FLASH TANK ECONOMIZER PRODUCT GUIDE
FLASH TANK ECONOMIZER PRODUCT GUIDE Overview A flash tank is used to recover blowdown energy in the form of flash steam and blowdown. This can only be used with a deaerator or some other pressurized device.
Power Plants. BENSON Once-Through Heat Recovery Steam Generator. Power Generation
Power Plants BENSON Once-Through Heat Recovery Steam Generator Power Generation BENSON Once-Through technology for Heat Recovery Steam Generators New application of proven technology Siemens development
IMPLEMENTATION OF BOILER BEST PRACTICES
IMPLEMENTATION OF BOILER BEST PRACTICES Natalie R. Blake Market Development Manager Nalco Chemical Company Naperville, IL ABSTRACT Boilers are an essential part of any industrial plant, and their efficient,