HIGH PRESSURE FEEDWATER HEATER REPAIR
|
|
|
- Jennifer Pamela Caldwell
- 9 years ago
- Views:
Transcription
1 HIGH PRESSURE FEEDWATER HEATER REPAIR B. W. Helton II Tennessee Valley Authority 1101 Market Street Chattanooga, Tennessee Peter Tallman CTI Industries Inc. 200 Benton Street Stratford, Connecticut Prepared for presentation at the EPRI Feedwater Heater Technology Symposium October 9-11, 2001 Birmingham, Alabama
2 HIGH PRESSURE FEEDWATER HEATER REPAIR B. W. Helton II Tennessee Valley Authority 1101 Market Street Chattanooga, Tennessee Peter Tallman CTI Industries Inc. 200 Benton Street Stratford, Connecticut Abstract In late 1988 and early 1989, two of the four high pressure feedwater heaters at each of the three generating units at the Tennessee Valley Authority's (TVA) Thomas H. Allen Fossil Plant were replaced. In the Fall of 1997, after 8 1/2 years of service, a significant number of tubes failed suddenly in the two Allen unit 3 replacement heaters. Within a 14 month period, one of the unit 3 replacement heaters had 97 tube failures and the other had 171 failures. The mode of these tube failures was determined to be stress corrosion cracking (SCC) initiated at a tube roll transition located within the tubesheet. In order to prevent continued progression of tubing damage and to restore failed tubes to service, TVA employed CTI Industries to install stainless steel inserts in the inlet and outlet ends of each tube in the affected heaters. This paper discusses the failures, investigative techniques, probable root causes, and corrective measures evaluated and implemented to extend the service life of high pressure feedwater heaters at TVA's Allen Fossil Plant.
3 Introduction TVA is a federally owned and operated electric power company serving the Tennessee Valley. TVA s total net electric power generating capability is approximately 28,000 megawatts from a combination of fossil-fired, nuclear, hydroelectric, combustion turbine, and pumped storage plants. TVA's Allen Fossil Plant, located in Memphis Tennessee, was designed and constructed by Burns and Row Inc. for Memphis Light Gas and Water. The plant was placed into service in 1956, was purchased by TVA in 1984 and is an integral part of the TVA system. The Allen plant has three identical subcritical generating units. Each unit has a B&W coal fired wet bottom steam generator which produces 2,000,000 pounds of steam per hour to drive a Westinghouse tandem compound triple exhaust 'turbogenerator set at a rated capacity of 250,000 kw. Figure 1 depicts the steam/water cycle. The feedwater heating system for the Allen units includes a single string of three low pressure heaters, one deareating heater, and four high pressure heaters. The heaters are numbered #1 through #8. Heaters #1 through #3 are low pressure, heater #4 is a deaerator, and #5 through #8 are high pressure heaters with # 8 being the highest pressure. The system design includes capability to isolate each high pressure heater individually from extraction steam and to bypass feedwater around each heater individually. However, as with many facilities of this vintage, good isolation is not always achievable and depends on the condition of isolation equipment at any given time. The original #5 and #6 heaters, manufactured by the American Locomotive Co., were replaced on all 3 units between December 1988 and June1989, with replacement heaters designed and manufactured by Southwestern Engineering Company. The replacement heaters are closed, horizontal U tube, three zone, (desuperheating, condensing, and subcooling) heaters with full access channels. The U-tubes are SB drawn and stress relieved Monel, 5/8" OD x.060" wall tubing. The tubesheets are 10" thick carbon steel with Monel overlay machined to 1/4" thickness. The tubes are roller expanded inside the tubesheets and welded to the Monel overlay. Table 1 is a technical specification sheet for feedwater heaters #5 and #6. Chronology of Tube Failures and Diagnostic Efforts In October 1997 plant maintenance personnel plugged 28 leaking tubes in the Allen unit 3 feedwater heater #6. Prior to that date and since the initial operation of the replacement heaters in March 1989, there had been a total of 5 tube failures.
4 During a planned unit 3 maintenance outage in November 1997, pressure testing, eddy current examination, and borescope inspections revealed that tubes in both the #5 and #6 feedwater heaters had failed and were leaking at locations inside the tube sheets. The leaking tubes appeared to be randomly distributed throughout the tube bundle with inlet and outlet tube ends affected. In each of the 12 failed tubes in the #5 heater and in 3 tubes that had been plugged the month before in the #6 heater, the leaks were located with a borescope. This was accomplished by pressurizing the heater (to approximately 100 psig), applying soap solution to the inside of the tubes, and observing the bubble formations with the borescope. A special eddy current probe, designed to detect circumferential cracks and to minimize the response to conditions that are radially symmetrical, was used to inspect the tubes. Since no calibration standards were available for the conditions encountered, an eddy current pattern recognition scheme was developed based on comparisons between tubes where leaks could be observed with the borescope and others believed not to be damaged. By use of this method the leaks in all 12 failed tubes in the #5 heater and in the three unplugged failed tubes in the #6 heater were detected. Similar damage that had not progressed through wall in other tubes in both heaters was also detected using the procedure. The special probes were obtained from the EPRI NDE Center in Charlotte, North Carolina and are described briefly in figure 2. A number of Inlet and outlet tube ends from various locations within the tube bundle were inspected in both the #5 and # 6 heaters using the developed eddy current procedure. Eight percent of the nonleaking tube ends inspected in the #5 heater and five percent of those in the #6 heater exhibited eddy current signals characteristic of the damage observed in the tubes which were known to have failed. All damage detected was at precisely the same location in each tube. Upon completion of the inspections a failed section of one of the #5 heater tubes was removed for laboratory examination. Microscopic examination of the sample revealed the damage to be SCC at a tube roll transition. As indicated in figures 3 and 4, tube failure rates in both the #5 and #6 heaters increased during the months following the initial failures. Figures 3 and 4 are tube sheet plots showing the location of failed tubes in each heater. Description of Failures, Failure Mechanisms and Root Causes All the tube damage identified in the Allen unit 3 heaters #5 and #6 was located within the tube sheet at precisely 8 7 / 8 inches from the clad face of the tubesheet. Figure 7 is a sketch of the tube and tube sheet cross section depicting the location of failures and cracks. Microscopic examination of the retrieved failed section of tube revealed the damage to be longitudinal SCC at a tube roll transition. Borescope examinations performed after the initial discovery of the problem revealed that the failed tubes each had from one to three longitudinal cracks, all located precisely at the roll transition 8 7 / 8 inches from the clad face of the tubesheet.
5 SCC can occur when a susceptible material with high tinsel stress levels is subjected to a corrosive chemical environment. One of the specific primary causes of the Allen feedwater heater tube wall SCC is believed to be high residual stress levels at the channel end transitions of the tube rolls located at the shell side face of the tubesheets. The tube rolls in these heaters are unique to those in other high pressure heaters in the TVA Fossil System. Most TVA heater tubes are step rolled inside the tubesheets with the first roll starting near the feedwater side face of the tubesheet. As depicted by figure 7, the tube ends in the Allen #5 and #6 heaters have two distinct rolled areas separated by approximately 6 inches of tubing that is not rolled. It appears that when the smaller of the two rolls in each tube end was made the tubing may have been overly stressed by the operator end of the expander rolls. Most roller expanders available for installing tubes inside thick tubesheets are designed to step roll the tubes. This means that the operator or back end of the expander rolls are not typically tapered as much as the front ends. When tubes are step rolled care must be taken to overlap each roll so the operator ends of the tube expander rolls don t leave the tube wall deform and with high levels of residual stress. Overlapping successive rolls inside thick tubesheets ensures that the back ends of the expander rolls do not stress portions of the tube which have already been expanded by the previous roll step. Another primary cause of any SCC problem, given a susceptible material and sufficient tinsel stresses, is a conducive chemical environment. Inspection of the heater venting systems and a review of venting and feedwater treatment practices at the Allen plant provided no specific indication that heater shell side or waterside chemistry would have contributed to the problem. Ammonia, that can cause SCC in Monel, is present in the feedwater, but chemistry records indicate no unusually high concentrations. There was no evidence that concentrations of chlorides or other chemical species conducive to SCC of Monel had been introduced. Evaluation of Options for Restoring Heater Reliability and Function If the root causes of the tube failures could be eliminated or controlled and the failed and damaged tubes recovered or repaired, heater reliability and function could be restored. Elimination or reduction of the contributing tensile stresses would require that the tube ends be stress relieved. Options considered where: Use of high temperature steam from one of the Allen generating units Application of heat from electric resistance heating devices similar to those used for weld pre and post heat treatment Peening the tube IDs with grit or beads Re-expansion of the tubes at the tube roll transition where the SCC was occurring inside the tubesheets,
6 After careful consideration it was concluded that none of these methods would eliminate problems resulting from small undetected cracks in the tube. For this reason stress relieving was not considered a viable option for mitigation of the cracking problem. Elimination of the corrosive chemical environment was also not considered an endeavor likely to have an appreciable affect on the tube failures. Even though water chemistry was properly controlled, tubes continued to fail over a considerable period of time. It was thought likely that whatever constituents were causing the damage were concentrated inside many already developed cracks from which it would not be possible to effectively remove them. Damage Repair and Prevention While reasonable measures would be taken to prevent future detrimental chemical contamination of the feedwater heaters, none of the failure causes could be sufficiently eliminated or reduced to prevent continuing tube failures. Neither could the elimination of causes restore function to failed tubes or prevent premature failure of already badly damaged tubes. A number of alternatives for prevention of additional tube failures and restoration of function to failed tubes were evaluated. These included weld repair of failed and cracked tubes and installation of tube inserts by hydraulic or explosive expansion. Weld repair of failed and cracked tubes was investigated as an option. It was learned that tooling with which weld repairs could be made inside tubing with inside diameters of only 0.5 inch was not commercially available. While it appeared possible to have such tooling developed it clearly would not be a cost effective option because of the considerable expense for such development. Installation of tube inserts by hydraulic expansion was also evaluated as an option for restoration of tube function and reliability. This restoration technique was developed in the mid 1970 s to restore service life to heat exchanger tubes with various types of damage near the tube ends. Inlet end erosion and SCC are damage mechanisms which can be countered with this technique as are localized pitting, crevice corrosion, impingement and grooving which might occur near tube ends. The technique makes use of thin-walled metallic inserts, fabricated with a flair at one end and I.D. chamfer at the other end, which are expanded into the existing tube ends. Such inserts are also variously referred to as I.D. tube shields, or sleeves.
7 Figure 8 is a cross section sketch of a tube insert and figure 9 is a cross section sketch of an installed insert, tube, and tubesheet. The intent of insert installation in the Allen heaters would be to bridge degraded sections of the original tubes with a material which would preserve or restore the integrity of the tubes and tube to tube sheet joints. It would also be necessary that the insert installation not lead to other problems such as SCC of the original tube at or near the insert. TVA had two primary concerns regarding the installation of inserts in heat exchanger tubing. One was that the expansion of inserts into the existing tubing might induce additional excessive stresses and thereby promote further SCC. The other was that leak paths might develop between the OD of the inserts and the I.D. s of the existing tubing and that very small leaks through these paths might grow over time to unacceptable rates. Review of the application of this technique for rehabilitating feedwater heaters at other utilities indicated that function and reliability of the Allen feedwater heater tubes could be restored by the hydraulic expansion of inserts. In addition to having been demonstrated to be a successful option, installation of tube inserts by hydraulic expansion was also determined to be the most cost effective. Explosively expanded inserts was evaluated and also considered to be a viable option for recovering tube function and reliability. This method is considerably more expensive than hydraulic expansion and for the Allen feedwater heaters it was not considered to provided any significant advantage over hydraulic expansion. For TVA the decisive difference between the two methods was cost. According to budgetary estimates received, the explosive expansion method would have been approximately five (5) times the cost of hydraulic method. Implementation of solution Upon evaluation of the various alternatives considered it was TVA s decision to have metallic tube inserts fabricated and install by hydraulic expansion in the Allen unit 3 feedwater heater #5 & #6 tube ends. CTI Industries was contracted to fabricate and install the inserts and the installation was performed in September 1999, during a scheduled maintenance outage. The inserts were fabricated from 304 Stainless Steel seamless tubing, inch OD, inch wall thickness. Figures 9 depivts the as installed insert, tube, and tubesheet. In preparation for installation the heaters were opened and checked for additional tube failures which were documented. All the tube plugs were removed from previously failed tubes. To ensure reasonable cleanliness at the tube ID and insert interface, TVA cleaned each tube end to a depth of two feet using a portable pressure washer and blew each tube dry with station service air. At that point CTI Industries arrived on site to install the inserts. CTI wire brushed each tube end I.D., blew each end clear with compressed air, took ID measurements to determine expansion requirements, and placed inserts into each tube end.
8 The inserts were expanded with a hydroswage mandrel. The mandrel was coupled to a strain volume control hydroswage pump which was preset to achieve full length expansion of the insert. A hybrid expansion was then accomplished by roller expanding each insert at two areas within the tubesheet to torque controlled settings and also at the shell side end by mechanical settings. Finally the insert ends were flared to conform to the contour of the flared end of each tube. Upon completion of the installation the heater shells were pressurized to 100 psig and a leak check was made at the tube sheets using a soap solution. Conclusion During a short planned maintenance outage in March of 2000, the Allen unit 3 high pressure heater #5 was opened because of suspected tube leaks. Upon pressurizing the heater, to 100 psig, eight (8) tubes were found to be leaking. Seven of the leaks were determined to be from locations at the U bends. One tube was observed to have a very small leak from the shell side end of one of the inserts. This leak would not have been detected had the heater not been inspected because of the significant leaks found in the tubes which had failed at the U bends. By the installation of inserts TVA was successful in recovering 310 tubes in the #5 and #6 high pressure heaters at Allen unit 3. After the SCC problems were initially encountered with these two heaters, the same problem began to plague the #5 and #6 heaters at Allen unit 1. During a maintenance outage in March of 2000, CTI Industries installed inserts in all the tube ends of the unit 1 heater #6. Current plans are to have CTI install inserts in the #5 heater on that unit at the next available opportunity.
9 287,536 kw 1,230,584 # COND H2 COOLER SECT 1 OIL COOLER AIR EJECTOR 1,232,454 # CLAND CONDENSER ALLEN FOSSIL PLANT, UNITS 1-3 HEAT BALANCE 1,015,000 # 90,216 # SECT 2 HTR P 1,322,580 # 1,388,771 45,081 # 65,260 # HTR 2 HTR P 37.3 P SECT 3 SECT 4 CONDENSATE PUMP 48,065 # 2,000,000 # STEAM CHEST STEAM 1,572,872 # GENERATOR 221,093 # HTR 8 HTR 7 HTR 6 HTR F F F B.F. PUMP 1,572,872 # HTR F 67.9 P 163,245 # F 82,714 # F 1112 P P P P F F F 221,093 # 384,338 # 467,052 # 51,962 # F F F 519,014 # 2,000,000 # Figure 1.
10 TVA Allen Fossil Plant - Unit 3 High Pressure Feedwater Heater Specifications Feedwater Heaters No. 5 No. 6 Manufacturer : Southwestern Engineering Co. Type : Horizontal U-Tubes Design Operating Steam Inlet Temperature : F Design Operating Drain Inlet Temperature : F Design Operating Feedwater Inlet Temperature : F Design Operating Drain Outlet Temperature : F Design Operating Feedwater Outlet Temperature : F Design Operating Shell Pressure : psia Design Temperature, Shell Side Skirt : F Design Temperature, Shell : F Design Temperature, Tube Side : F Design Shell Pressure : psig Test Shell Pressure : psig Design Tube Side Pressure : psig 3,700 Test Tube Side Pressure : psig 5,550 Design Operating Tube Side Velocity : ft. / sec Number of "U" tubes : Tube Material : Monel SB DSR Tube OD : in Average Tube Wall : in Average Tube Wall - Three Inner Rows in Tube pitch : in Tube straight Length : in Tube sheet material : SA-350-LF2 Tube sheet thickness : in. 10 1/4 Tube to Tube Sheet Joint : Welded & Rolled Tube Sheet Overlay : Monel 1/4 in. after machining Date of Heater Manufacture : 10/87 Table 1.
11 EDDY CURRENT CALIBRATION & INSTRUMENT SETTINGS COMPANY, SITE, UNIT: TVA, Allen Fossil Plant, Unit 3 COMPONENTS: High Press Feedwater Heaters 5 & 6, TUBES: 5/8 x.060" Monel INSPECTOR: Allen Gallaher, E.T. Level III DATE: 11/14/97 MIZ- 17 Channel INSPECTION PROBE F1 F2 Size 0.46 Frequency ( KhZ ) Frequency ( KhZ ) Diff. / Abs. C1 C1 Type C1 Phase Manufacturer AECL Gain FO FF CHANNEL: 12 1/2 khz 90 o CRACK GOOD TS AREA 0 o 180 o CRACK ALL CAL. TUBE DEFECTS CRACK 270 o The Carter C1 eddy current probe is designed to detect circumferential cracks and to minimize response to conditions that are radially symmetrical such as tubesheet presence and the change in ID at tube expansion rolls. With no calibration standards available for these conditions a pattern recondition procedure was developed by comparing signals from failed tubes where leaks where observed visually with those from other tubes where no leaks were evident. The probe was obtained from the EPRI NDE Center in Charlotte, North Carolina. Figure 2
12 25% 180 TVA - ALLEN FOSSIL PLANT - UNIT 3 HP FEEDWATER HEATER # 5 - FAILED TUBES VS TIME % 140 FAILED TUBES CUMULATIVE FAILURES 15% 10% FAILED TUBES INITIAL OPERATION OF HEATER 5% 0 1/88 1/89 1/90 1/91 1/92 1/93 1/94 1/95 1/96 1/97 1/98 1/99 1/00 0% Figure % 180 TVA - ALLEN FOSSIL PLANT - UNIT 3 HP FEEDWATER HEATER # 6 - FAILED TUBES VS TIME % 140 CUMULATIVE FAILURES FAILED TUBES % 10% FAILED TUBES INITIAL OPERATION OF HEATER 5% 0 1/88 1/89 1/90 1/91 1/92 1/93 1/94 1/95 1/96 1/97 1/98 1/99 1/00 0% Figure 4.
13 TUBE SHEET / TUBE CROSS SECTION (MIN.) 1/8" 1 1/4" TUBE SHEET 2 1/4" 1/2" TUBE SEAL WELD CLADDING LOCATION OF CRACKS 10 1/4" Figure 7. TUBE INSERT CROSS SECTION 15" MATERIAL : O.D. : WALL THICKNESS : LENGTH : 304 SS in in. 15 in. Figure 8. ube Sheet / Tube / Cross Section sert Cross Section 1 1/4" (MIN.) 1/8" TUBE SHEET / TUBE / INSERT / CROSS SECTION TUBE SHEET 2 1/4" 1/2" INSERT SEAL WELD TUBE CLADDING LOCATION OF CRACKS 15" 10 1/4" Figure 9.
14 Plugged Tube # # # ) ) ) ) ) ) ) ) ) ##)#)))))))##))))# ))))))))))))))#)))))) )) )))))))))))))))##) )# #))#)#)))#))#)))))))))))))) )#))))#))))))))))))))))))))) ))###))#)))))))))))))))#))##))) ))))))#))))))))))))#)#)))))))) ))))))))))))))))#)))))))))))))))) ))))))))))))###)###)))##)))#)#))## ))######)#)#)#))#))#)###))#))))###### )))))))))))))))))))))))))))#))#))))))) ))))))))))#))))))))))))#))))))))))))))) )#####)#)###)#)))#)##))##))))))))))))))) )))))))))))))))))))))))#))#)))))))))))) )))))))))))))))))))))###)))))))))))))))) ))))#)#)#)))))))#)#)))))))))))))))))))))) ))#######)#######))))#)))#)))))#)##)#### #)))))##)#))# )######)))))#)) ))))))))))#)) )#))#))#)#)) )))))))))#)))) ##)))))####) )))))))))#)## #)##)))#))))))) ))))))))))))) )))))))))))) )))))))))))))) ))#))))))))) )))))))))))) ))))))) ))))))) )))))))))))) )))))))))))) ))))))) ))))))) )))))))))))) )))))))))))) )))))))))))))) ))#))))))))) )))))))))#)## #)##)))#))))))) ))))))))))))) )#))#))#)#)) )))))))))#)))) ##)))))####) #)))))##)#))# )######)))))#)) ))))))))))#)) ))#######)#######))))#)))#)))))#)##)#### ))))#)#)#)))))))#)#)))))))))))))))))))))) )))))))))))))))))))))###)))))))))))))))) )))))))))))))))))))))))#))#)))))))))))) )#####)#)###)#)))#)##))##))))))))))))))) ))))))))))#))))))))))))#))))))))))))))) )))))))))))))))))))))))))))#))#))))))) ))######)#)#)#))#))#)###))#))))###### ))))))))))))###)###)))##)))#)#))## ))))))))))))))))#)))))))))))))))) ))))))#))))))))))))#)#)))))))) ))###))#)))))))))))))))#))##))) )#))))#))))))))))))))))))))) #))#)#)))#))#)))))))))))))) )) )))))))))))))))##) )# ))))))))))))))#)))))) ##)#)))))))##))))# ##))))))))) Allen Fossil Plant Unit 3 HP Feedwater Heater #5, Sept. 99 Figure 5. Plugged Tube # ) ) ) ) ) ) ) ) ) ) ))))))))))))))))) ) )))))))))))))))))) ) ))))))))))))))))))))))))) )))))))))))))))))))))))))) ))))))))))))))))))))))))))))) )))))))))))))))))##))))))))))) ))))))#)))))))))#))#####)))))#) )))))))))))))))#######))######)))) ))##))##)#))))))#)))))))))))##))))) ##)##))))))))#)))))))##))#)))##))))) #)####)#))))))#)))))))##)#)))#))#)))### ))))))))))))))#))#))########)########))) )))##))))))))))))))))#############))))))) ))##)##)))##))#)))))))#))))))#)##))#))#))# ))))###)))))))))))))##)#)###)#)))#))))))) )#))))###)#))#)#))##))))))))###)))#)##)#)) #))))))##)#))))))))))))))))))))#))))))))))) ))))))))))))) )))))))#)))))) ))))))))))))) ##))))))))))) #)))))))#)))))) )#))))))##)#) )))))))#))))) )))##)))#)#)#) )))#)#))#)))) )))))#))#)#))) )#))))))))))))) )#)))))))))))) )))))))))))) ))##)))))))))) ))#))#))#))) ))##))##)))#) ))##)))#))))))) ))####))))#)) ))##))##)))#) ))##)))#)#))))) ))))####))))# )))))))))))) ))##)))))))))) ))#))#))#))) )))))#))#)#))) )#))))))))))))) )#)))))))))))) )))))))#))))) )))))))#)))))) ))##)))#)#)#) ##))))))))))) #)))))))#)))))) )#))))))##)#) ))))))))))))) )))))))))))))) ))))))))))))) #))))))##)#))))))))))))))))))))#))))))))))) )#))))###)#))#)#))##))))))))###)))#)##)#)) ))))###)))))))))))))##)#)###)#)))#))))))) ))##)##)))##))#)))))))#))))))#)##))#))#))# )))##))))))))))))))))#############))))))) ))))))))))))))#))#))########)########))) #)####)#))))))#)))))))##)#)))#))#)))### ##)##))))))))#)))))))##))#)))##))))) ))##))##)#))))))#)))))))))))##))))) )))))))))))))))#######))######)))) ))))))#)))))))))#))#####)))))#) )))))))))))))))))##))))))))))) ))))))))))))))))))))))))))))) )))))))))))))))))))))))))) ))))))))))))))))))))))))) ) )))))))))))))))))) ) ))))))))))))))))) )))))))))) Allen Fossil Plant Unit 3 HP Feedwater Heater #6, Sept. 99 Figure 6.
Heat Exchanger Thin Film Foul Release Applications Corrosion Resistant Protective Coatings Grit Blast Surface Prep of Tubular Equipment
Heat Exchanger Thin Film Foul Release Applications Corrosion Resistant Protective Coatings Grit Blast Surface Prep of Tubular Equipment Non-Destructive Examination Heat Exchanger Mechanical Repair Services
1. A belt pulley is 3 ft. in diameter and rotates at 250 rpm. The belt which is 5 ins. wide makes an angle of contact of 190 over the pulley.
Sample Questions REVISED FIRST CLASS PARTS A1, A2, AND A3 (NOTE: these questions are intended as representations of the style of questions that may appear on examinations. They are not intended as study
Oil and Gas Pipeline Design, Maintenance and Repair
Oil and Gas Pipeline Design, Maintenance and Repair Dr. Abdel-Alim Hashem Professor of Petroleum Engineering Mining, Petroleum & Metallurgical Eng. Dept. Faculty of Engineering Cairo University [email protected]
CURRENT EXPERIENCE IN TYPICAL PROBLEMS AND FAILURES WITH BOILER PIPING COMPONENTS AND SUPPORTS
A DB RILEY TECHNICAL PUBLICATION CURRENT EXPERIENCE IN TYPICAL PROBLEMS AND FAILURES WITH BOILER PIPING COMPONENTS AND SUPPORTS by James P. King, Design Manager DB Riley, Inc. Presented at the 1998 ASME
TEMA DESIGNATIONS OF HEAT EXCHANGERS REMOVABLE BUNDLE EXCHANGERS NON REMOVABLE BUNDLE EXCHANGERS SOURCE: WWW.WERMAC.ORG/
TEMA DESIGNATIONS OF HEAT EXCHANGERS Because of the number of variations in mechanical designs for front and rear heads and shells, and for commercial reasons, TEMA has designated a system of notations
Sulfur Tail Gas Thermal Oxidizer Systems By Peter Pickard
Sulfur Tail Gas Thermal Oxidizer Systems By Peter Pickard Introduction SRU s (Sulfur Recovery Units) are critical pieces of equipment in refineries and gas plants. SRUs remove sulfur compounds from certain
TITANIUM FABRICATION CORP.
TITANIUM FABRICATION CORP. Titanium, Zirconium, and Tantalum Clad Construction General Considerations In many applications, particularly for large pressure vessels designed for high temperature and pressure,
TUBE-TO-TUBESHEET JOINTS: THE MANY CHOICES ABSTRACT KEYWORDS. Seal welding, tube-to-tubesheet welds, heat exchanger, mock-up, tube expansion
B. J. Sanders Consultant 307 Meyer Street Alvin, Texas 77511 TUBE-TO-TUBESHEET JOINTS: THE MANY CHOICES ABSTRACT After a decision has been made to use zirconium as the material of construction for a shell
ELECTRODE BOILERS VAPOR POWER INTERNATIONAL
ELECTRODE BOILERS WITH JET-FLO Technology VAPOR POWER INTERNATIONAL ELECTRODE boilers The Electrode Steam Boiler with Jet-Flo technology consists of an insulated pressure vessel and is fully enclosed in
Seamless stainless tubes for hydraulic and instrumentation systems
Seamless stainless tubes for hydraulic and instrumentation systems stock assortment integrated production technical knowledge network of sales and service Reduce your lifecycle costs When selecting tubes
Selecting TEMA Type Heat Exchangers
Selecting TEMA Type Heat Exchangers TEMA is a set of standards developed by leading heat exchanger manufacturers that defines the heat exchanger style and the machining and assembly tolerances to be employed
Steam System Best Practices Condensate System Piping
Steam System Best Practices Condensate System Piping Summary The best method for improving steam system energy efficiency, reducing chemical costs, and reducing make-up water costs is to return the maximum
Portable leak detection instrument improves heat rate at electric power plant. By Terrence O'Hanlon, CMRP Reliabilityweb.com
Portable leak detection instrument improves heat rate at electric power plant. By Terrence O'Hanlon, CMRP Reliabilityweb.com By using a ruggedized portable ultrasonic leak detector, Mr. Brian Thorp, PdM
North American Stainless
North American Stainless Long Products Stainless Steel Grade Sheet 2205 UNS S2205 EN 1.4462 2304 UNS S2304 EN 1.4362 INTRODUCTION Types 2205 and 2304 are duplex stainless steel grades with a microstructure,
C. starting positive displacement pumps with the discharge valve closed.
KNOWLEDGE: K1.04 [3.4/3.6] P78 The possibility of water hammer in a liquid system is minimized by... A. maintaining temperature above the saturation temperature. B. starting centrifugal pumps with the
World Class Water Chemistry By Accident? BRO Chemistry Session 8/5/2014
World Class Water Chemistry By Accident? BRO Chemistry Session 8/5/2014 From Safe by Accident? by Judy Agnew & Aubrey Daniels Despite decades of reduction in safety related deaths and injuries on the job,
FIELD PERFORMANCE OF
FELD PERFORMANCE OF EROSON RESSTANT MATERALS ON BOLER NDUCED DRAF' FAN BLADES TENNESSEE VALLEY AUTHORT!if KNGSTON FOSSL PLANT May 1993 Prepared by TENNESSEE VALLEY AUTHORTY RESOURCE GROUP RESEARCH AND
Tube Damage Mechanism and Analysis in Feed Water Heaters
Tube Damage Mechanism and Analysis in Feed Water Heaters Asst. prof. Dr. Rafaa Abbas Al-Baldawi College of Engineering Al-Mustansirya University [email protected] Dr. Mohammed Najm Abdullah College of
QUADRANT SR- Thermal Oxidizer Process Design & Environmental Control Benefits for the Sand Coating Industries
> 99% VOC, HAP & CO Destruction Efficiency Time, temperature and turbulence are the basic design principles required for organic pollutant control. In the QUADRANT-SR SERIES Recuperative Thermal Oxidizers,
NFPA31FuelOilPiping 1 Revised 3-1-11
NFPA 31 Fuel Oil Piping, Installation and Testing Chapter 8 Fuel Piping Systems and Components 8.1 Scope. This chapter shall apply to piping systems and their components used to transfer fuel oil from
JIS G3472 Electric Resistance Welded Carbon Steel Tubes for Automobile Structural Purposes
JIS G3472 Electric Resistance Welded Carbon Steel Tubes for Automobile Structural Purposes 1. Scope This Japanese Industrial Standard specifies the electric resistance welded carbon steel tubes, hereinafter
This will also provide you with the knowledge to insure long life for your Investment
CONDUIT PIPE DRYING This Presentation will guide you to why systems fail! This will also provide you with the knowledge to insure long life for your Investment Drainable and Dryable System Design Trough
Specification for Rotary Drill Stem Elements
Addendum 1 March 2007 Effective Date: September 1, 2007 Specification for Rotary Drill Stem Elements ANSI/API SPECIFICATION 7-1 FIRST EDITION, MARCH 2006 EFFECTIVE DATE: SEPTEMBER 2006 ISO 10424-1:2004
Condition Assessment Services. Put our team of specialists to work for you
Condition Assessment Services Put our team of specialists to work for you HEADERS Don t let a steam leak be your first sign of header problems High Temperature Headers High temperature superheater and
PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta
PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification Number: 3503-11.2.610 Rev. 2 Rubber Lined Steel Pipe and Fittings Mechanically Coupled Plain End Type System Issued Revised Approved
Trouble shooting guide
guide DPR/PSR Leak Insuffi ciently tightened, shallow bite Tighten the nut according to correct number of turns, direct assembly only for maintanance/repair, use of recommended pre-assembly machines Mark
A World Class Manufacturer of Induction Bends
A World Class Manufacturer of Induction Bends COFELY FABRICOM BENDING A leading position in bending High Flexibility and Close Tolerances As a world leading manufacturer of pipe bends, produced by induction
ATI 2205 ATI 2205. Technical Data Sheet. Duplex Stainless Steel GENERAL PROPERTIES. (UNS S31803 and S32205)
ATI 2205 Duplex Stainless Steel (UNS S31803 and S32205) GENERAL PROPERTIES ATI 2205 alloy (UNS S31803 and/or S32205) is a nitrogen-enhanced duplex stainless steel alloy. The nitrogen serves to significantly
Standard Recommendations for Pressure Part Inspection During a Boiler Life Extension Program
Standard Recommendations for Pressure Part Inspection During a Boiler Life Extension Program M.N. Hovinga G.J. Nakoneczny Babcock & Wilcox Barberton, Ohio, U.S.A. Presented to: ICOLM (International Conference
I. STEAM GENERATION, BOILER TYPES
I. STEAM GENERATION, BOILER TYPES and BOILER PLANT SYSTEMS 1 Steam Generation Water s Unique Properties: High Thermal Capacity (Specific Heat) High Critical Temperature Ideal Medium for Heat Delivery High
PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT
PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT GENERAL INFORMATION 1.1 This section applies to piping systems for chilled water, hot water, condenser water, steam, condensate return, fuel oil, refrigerant
James M. Pleasants Company
James M. Pleasants Company SUBMITTAL DATA GAINESVILLE MECHANICAL DECEMBER 20, 2013 PROJECT: GSU: J-183 HUMANITIES LAW BLDG. QUOTE NO:12116 ENGINEER: STEVENS & WILKINSON GASKETED PLATE HEAT EXCHANGER Tag:
Float and Thermostatic Traps Series H, C and X
Hoffman Specialty Installation & Maintenance Instructions HS-(E) and Thermostatic Traps Series H, C and X Series C & NPT Series C NPT Series X NPT Series C NPT Series H Ratings Maximum Max. Operating NPT
DOCUMENTATION FOR QUALIFICATION SYSTEM
DOCUMENTATION FOR QUALIFICATION SYSTEM MATERIAL GROUP: PRESSURE EQUIPMENT MAINTENANCE, REPAIR INTERNAL CODE OF MATERIAL GROUP: MM10300 New code according the registration on myhome: MMGV03 CPV CODE: 45259000-7,
SERIES ASM NEOPRENE/EPMD FLANGED SINGLE SPHERE CONNECTOR CONNECTORS. Pressures to 225 PSIG (15.51 barg) Temperatures to 230ºF (110ºC)
APPLICATIONS Process Industry Weak Acids Alkalies Compressed Air Pulp & Paper MODELS ASM - Flanged Connection OPTIONS Control Rods Oil & Gas Water & Waste Pump suction & discharge Sea water Chemical lines
GEOTHERMAL POWER PLANTS IN JAPAN ADOPTING RECENT TECHNOLOGIES
GEOTHERMAL POWER PLANTS IN JAPAN ADOPTING RECENT TECHNOLOGIES Yoshisumi Nakagawa, Shojiro Saito Mitsubishi Heavy Industries, Ltd. Akunoura-machi, Nagasaki 850-0063, Japan Key-word: Sumikawa, Yamagawa,
Backup Fuel Oil System Decommissioning & Restoration Plan
Backup Fuel Oil System Page 1 of 19 Overview of Physical Fuel Oil System and Decommissioning Steps The fuel oil system at Milford Power consists of a number of subsystems. These include the following:
TYPE E Main Valve Sizes 3 /8 through 12
SD 3001F PRINTED IN U.S.A. SD 3001F/0707 A B TYPE E MAIN VALVE C D E TYPE E Main Valve Sizes 3 /8 through 12 The Spence Type E Main Valve is of normally closed, single seat design featuring packless construction,
Munchkin Heat Exchanger Maintenance
Munchkin Heat Exchanger Maintenance By: Mike Granahan *Refer to the appropriate boiler manual for your specific model number. Adjustment procedures will vary. Boiler shown below is an HTP Munchkin 80M
DIESEL EFFECT PROBLEM SOLVING DURING INJECTION MOULDING
RESEARCH PAPERS FACULTY OF MATERIALS SCIENCE AND TECHNOLOGY IN TRNAVA SLOVAK UNIVERSITY OF TECHNOLOGY IN BRATISLAVA 2014 Volume 22, Special Number DIESEL EFFECT PROBLEM SOLVING DURING INJECTION MOULDING
System Assessment Capabilities for Fossil Fuel Power Stations
System Assessment Capabilities for Fossil Fuel Power Stations Technical Services LifeCycle Advantage Educational Services Consulting Technology Advantage The mission of Flowserve Technical Services is
Crevice Corrosion on Stainless Steel Propeller Shafts
Crevice Corrosion on Stainless Steel Propeller Shafts A Quick Summary: What is it? How to Prevent it. How to Repair it. Stainless steel propeller shafts and running gear are subject to pitting & crevice
Application Guide. Compensators Hose Assemblies Expansion Joints FLEX-WELD INCORPORATED FLEX-WELD.COM. Manufactured By:
Compensators Hose Assemblies Expansion Joints Manufactured By: FLEX-WELD INCORPORATED FLEX-WELD.COM What we need to know... A. Physical / System Parameters 1 Size of Assembly: Measure Pipe size (ID) of
Field Welding Inspection Guide
Field Welding Inspection Guide Assistance in interpretation of any specification or questions concerning field welding issues can be obtained from the Office of Materials Management, Structural Welding
DEGASSED CATION CONDUCTIVITY MEASUREMENT
(Presented at EPRI's 8th International Conference on Cycle Chemistry in Fossil and Combined Cycle Plants with Heat Recovery Steam Generators - June 20-23, 2006 Calgary, Alberta Canada) DEGASSED CATION
Petrochemical Refinery Maintenance. Complete Maintenance Solutions
Petrochemical Refinery Maintenance Complete Maintenance Solutions The difference is our experience... Edmonton Exchanger has over 30 years of on-site maintenance and construction experience in the petrochemical
49 CFR 192 Transportation of Natural and Other Gas By Pipeline: Minimum Federal Safety Standards
49 CFR 192 Transportation of Natural and Other Gas By Pipeline: Minimum Federal Safety Standards THIS DOCUMENT CONTAINS ONLY THE SECTIONS NEEDED FOR THE API 1169 ICP EXAMS Subpart G General Construction
Mueller. Pipe Repair Products. Saddles Tapping Sleeves Pipe Repair Clamps A complete selection for all types of pipe... all from a single source.
Mueller Pipe Repair Products Saddles Tapping Sleeves Pipe Repair Clamps A complete selection for all types of pipe... all from a single source. SERVICE SADDLES Mueller service saddles, available in bronze,
Trouble Shooting. Pump
Trouble Shooting Pump Trouble Possible Cause Remedy Oil leaking in the area of water pump crankshaft Worn crankshaft seal, bad bearing, grooved shaft, or failure of retainer o-ring. Excessive play on crankshaft
High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines
High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines Jeff Schell General Manager United Pipeline Middle East, Inc. Introduction HDPE Liners A cost effective and environmentally beneficial
FIXED DISPLACEMENT HYDRAULIC VANE PUMPS BQ SERIES
BQ FIXED DISPLACEMENT HYDRAULIC VANE PUMPS BQ SERIES Versatility, power, compactness and low running costs are the main characteristics of B&C vane pumps. All the components subject to wear are contained
The soot and scale problems
Dr. Albrecht Kaupp Page 1 The soot and scale problems Issue Soot and scale do not only increase energy consumption but are as well a major cause of tube failure. Learning Objectives Understanding the implications
VACUUM REFRIGERATION SYSTEMS
VACUUM REFRIGERATION SYSTEMS CHILL VACTOR The Croll-Reynolds CHILL-VACTOR is a chiller that uses a vapor flashing process. Water has a pressure-temperature relationship which is its boiling point. If its
GENERAL RUBBER LINING PRINCIPLES
GENERAL RUBBER LINING PRINCIPLES I. METAL PREREQUISITES Metal to be lined should meet the requirements as stated in section 8 Metal Fabrication and section 12 Blasting and Cementing Procedures. The surface
Hot Water Boilers and Controls Why Condensing Boilers are Different. Presented Oct. 14, 2008 Long Island Chapter, ASHRAE
Hot Water Boilers and Controls Why Condensing Boilers are Different Presented Oct. 14, 2008 Long Island Chapter, ASHRAE H.W. Boilers and Controls Major types of boilers Advantages and disadvantages Resistance
SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD
SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD 21.01 SCOPE: It is the intent of the Specification to define the approved methods and materials
The Suitability of CRA Lined Pipes for Flowlines Susceptible to Lateral Buckling SUT Global Pipeline Buckling Symposium, 23 24 February 2011
The Suitability of CRA Lined Pipes for Flowlines Susceptible to Lateral Buckling SUT Global Pipeline Buckling Symposium, 23 24 February 2011 Duncan Wilmot, Technical Manager, Cladtek International, Australia
Weld Cracking. An Excerpt from The Fabricators' and Erectors' Guide to Welded Steel Construction. The James F. Lincoln Arc Welding Foundation
Weld Cracking An Excerpt from The Fabricators' and Erectors' Guide to Welded Steel Construction The James F. Lincoln Arc Welding Foundation Weld Cracking Several types of discontinuities may occur in welds
Tubing Data. Contents. Tubing Selection. Tubing Handling. Tubing Material. Tubing Outside Diameter Hardness. Tubing Wall Thickness
www.swagelok.com Tubing Data Contents Tubing Selection... 1 Tubing Handling.... 1 Gas Service... 2 Tubing Installation.... 2 Suggested Allowable Working Pressure Tables Carbon Steel Tubing... 3 Stainless
NEW SIX-SEALS CUTTING RING. INTERNATIONAL INDUSTRIAL PATENT Nr. 864061 of the 10/03/99 FLANKS AND DOES NOT REPLACE THE STANDARD RING CURRENTLY IN USE
B4 NEW SIX-SEALS CUTTING RING. INTERNATIONAL INDUSTRIAL PATENT Nr. 864061 of the 10/03/99 FLANKS AND DOES NOT REPLACE THE STANDARD RING CURRENTLY IN USE AVAILABLE IN CARBON AND STAINLESS STEEL 23 THEORY
GE Oil & Gas. Air cooled heat exchangers Robust and reliable for all loads and applications
GE Oil & Gas Air cooled heat exchangers Robust and reliable for all loads and applications What it is Air cooled heat exchangers are commonly used in industrial applications where a reliable source of
DESIGN STANDARDS SECTION 23 60 00
PART 1 - GENERAL 1.01 Work included: A. Piping, tubing and fittings. B. Piping specialties. C. Special duty valves. D. Refrigerants. E. Chillers. F. Refrigerant monitors. 1.02 General requirements: A.
10 Nuclear Power Reactors Figure 10.1
10 Nuclear Power Reactors Figure 10.1 89 10.1 What is a Nuclear Power Station? The purpose of a power station is to generate electricity safely reliably and economically. Figure 10.1 is the schematic of
RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000
RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings
Figure 1 (end) Updated document to corporate requirements Added text to Paragraph 2.4
This specification covers the requirements for application of ELCON Drawer Series Connectors: True Hot Plug, Blind Mating Mixed Signal and Power Connectors. These connectors are designed for use in pluggable
Boiler & Pressure Vessel Inspection discrepancies and failures
Boiler & Pressure Vessel Inspection discrepancies and failures Water Heaters / Pressure Vessels Pressure Vessels are inspected once every three years. This requires a test of A: safety relief devices B:
WASHING PROCESS OF CARGO TANKS ON TANKERS FOR TRANSPORTATION OF CRUDE OIL
WASHING PROCESS OF CARGO TANKS ON TANKERS FOR TRANSPORTATION OF CRUDE OIL Siniša Stojan, Ph.D. student Damir Dražić, Ph.D. student Brodotrogir, HR - 21220 Trogir, Croatia [email protected],
EJECTOR AIR REMOVAL SYSTEMS ENGINEERING DATA BULLETIN # PVS-80025201-ARS PAGE 1 OF 5
BULLETIN # PVS-80050-ARS PAGE OF 5 GENERAL Air Removal Systems generally consist of dual 00% (twin-element) ejecrs, single 00% surface-type inter- & aftercondensers, suction & discharge isolation valves
Defining Quality. Building Comfort. Heating and Cooling Coils
Defining Quality. Building Comfort. Heating and Cooling Coils Heating and Cooling Coils Heating and Cooling Coils For over 20 years, AAON has supplied the coil needs of industrial and commercial HVAC customers.
ENGINE COOLING SYSTEM
ENGINE COOLING SYSTEM 1988 Toyota Celica 1987-88 TOYOTA Engine Cooling Systems Celica DESCRIPTION The basic liquid cooling system consists of a radiator, water pump, thermostat, cooling fan, pressure cap,
Laboratory Line. Vertical and Bench-Top Life Science Autoclaves
Laboratory Line Vertical and Bench-Top Life Science Autoclaves The Advanced Laboratory Line The Full Spectrum of Laboratory Sterilizers Sterilization in a laboratory environment has its unique requirements.
5.2. Vaporizers - Types and Usage
5.2. Vaporizers - Types and Usage 5.2.1. General Vaporizers are constructed in numerous designs and operated in many modes. Depending upon the service application the design, construction, inspection,
3D Conjugate Heat Transfer Analysis of the Next Generation Inner Reflector Plug for the Spallation Neutron Source
3D Conjugate Heat Transfer Analysis of the Next Generation Inner Reflector Plug for the Spallation Neutron Source Ashraf Abdou Oak Ridge National Laboratory, Oak Ridge TN, USA March 18-20, 2013 STAR Global
Evaluate, Clean, and Tune Guidance
Evaluate, Clean, and Tune Guidance The Evaluate, Clean and Tune (ECT) process serves three essential purposes in the Weatherization Assistance Program (WAP). The first is to evaluate the existing system
Boiling Water Reactor Systems
Boiling Water (BWR) s This chapter will discuss the purposes of some of the major systems and components associated with a boiling water reactor (BWR) in the generation of electrical power. USNRC Technical
Wall Thinning Trend Analyses for Secondary Side Piping of Korean NPPs
Transactions of the 17 th International Conference on Structural Mechanics in Reactor Technology (SMiRT 17) Prague, Czech Republic, August 17 22, 2003 Wall Thinning Trend Analyses for Secondary Side Piping
ASME Packaged Indirect Fired Water Heater
Utilizes Or HTHW To Heat Domestic Water, Semi-Instantaneous or Storage Type Model BW Features Reliable Only high grade materials used in construction to ensure long operating life Hydrastone cement lining
REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES WITH CURED-IN-PLACE-PIPE LINER SECTION 02542
1.0 INTENT REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES 1.01 It is the intent of this specification to provide for the reconstruction of pipelines and conduits by the installation of a resin-impregnated
Turbine Modernization Projects at Susquehanna and Salem Nuclear Plants Maximize Performance at Current and Future Uprate Steam Conditions
Turbine Modernization Projects at Susquehanna and Salem Nuclear Plants Maximize Performance at Current and Future Uprate Steam Conditions POWER-GEN International 2006 Orlando, FL November 28-30, 2006 1
How To Clean Up A Reactor Water Cleanup
General Electric Systems Technology Manual Chapter 2.8 Reactor Water Cleanup System TABLE OF CONTENTS 2.8 REACTOR CLEANUP SYSTEM... 1 2.8.1 Introduction... 2 2.8.2 System Description... 2 2.8.3 Component
Heating Water by Direct Steam Injection
Heating Water by Direct Steam Injection Producing hot water by direct steam injection provides a solution where large volumes of hot water at precise temperatures are required, and where energy and space
Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos.
Exelon Generation 200 Exelo11 Way Kennett Square. PA 19348 www.pxeloncoroi.c cm 10 CFR 50.55a August 13, 2015 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Peach
Measuring the Condition of Prestressed Concrete Cylinder Pipe
Measuring the Condition of Prestressed Concrete Cylinder Pipe John Marshall, P.E.I, I J.W. Marshall and Associates, and Paul S. Fisk, President NDT Corporation Introduction Prestressed Concrete Cylinder
POLARIS AIR COMPRESSOR SERIES. engineering. excellence. stellar. performance. A World Leader for Centrifugal Compressors
POLARIS AIR COMPRESSOR SERIES engineering excellence stellar performance P - 3 0 0 RELIABLE 100% OIL-FREE ENGINEERED AIR A World Leader for Centrifugal Compressors It s simple: The Polaris Air Compressor
SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS
SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. The requirements for pipe material and installation in sewer and drainage collection systems. All materials
SECTION 5 COMMERCIAL REFRIGERATION UNIT 22 CONDENSERS
SECTION 5 COMMERCIAL REFRIGERATION UNIT 22 CONDENSERS UNIT OBJECTIVES After studying this unit, the reader should be able to explain the purpose of the condenser in a refrigeration system. describe differences
Equipment Performance Monitoring
Equipment Performance Monitoring Web-based equipment monitoring cuts costs and increases equipment uptime This document explains the process of how AMS Performance Monitor operates to enable organizations
FIXED DISPLACEMENT HYDRAULIC VANE PUMPS BQ SERIES
BQ FIXED DISPLACEMENT HYDRAULIC VANE PUMPS BQ SERIES Versatility, power, compactness and low running costs are the main characteristics of B&C vane pumps. All the components subject to wear are contained
Evaluation Of Hybrid Air- Cooled Flash/Binary Power Cycle
INL/CON-05-00740 PREPRINT Evaluation Of Hybrid Air- Cooled Flash/Binary Power Cycle Geothermal Resources Council Annual Meeting Greg Mines October 2005 This is a preprint of a paper intended for publication
FIXED DISPLACEMENT HYDRAULIC VANE PUMPS BQ SERIES
BQ FIXED DISPLACEMENT HYDRAULIC VANE PUMPS BQ SERIES Versatility, power, compactness and low running costs are the main characteristics of B&C vane pumps. All the components subject to wear are contained
Commercial Semi-Instantaneous Water Heaters
FEATURES HWI Models A. O. Smith s HWI models are available for operation with steam or boiler water as the energy source. They are factory assembled with components sized, piped and checked at the factory
Ultrasonic Reference Blocks
Ultrasonic Reference Blocks Custom and Standard Test Blocks for Nondestructive Testing Introduction 3 IIW Type 1 Calibration Block 4 Miniature Angle Beam (ROMPAS) Calibration Block 4 Distance Calibration
Hose Clamps & Fittings
All Stainless Steel Marine or Underground Hose Clamps 5/16 HEX HEAD SCREW 60000 SERIES Highly corrosion resistant Use for marine or underground applications Stainless Steel Band, Housing Plated Steel Screw
Contents and Nomenclature
DX Coils Contents and Nomenclature Nomenclature... 1 Evaporator Coil Types EN... 2 EF... 2 ER... 2 EJ... 3 EK... 3 Evaporator Construction Connections... 4 Tubing... 4 Headers... 5 Tube Supports... 5 Coil
Specification for Pipe Coating Repairs Offshore
Specification for Pipe Coating Repairs Offshore Specification for Pipe Coating Repairs Offshore 1 of 6 Table of Contents 1.0 SCOPE... 3 2.0 REFERENCE DOCUMENTS... 3 3.0 MATERIALS... 3 4.0 EQUIPMENT AND
RISK BASED INSPECTION (RBI)
1 RISK BASED INSPECTION (RBI) Roy Johnsen Professor, Institutt for produktutvikling og materialer (IPM), NTNU [email protected] Tlf: +47 93245101 2 CONTENT Introduction - Corrosion Management What is