1 Low Load Operational Flexibility for Siemens G-class Gas Turbines Power-Gen International 2008 Orlando, Florida
2 Power-Gen International Orlando, Florida December Low Load Operational Flexibility for Siemens G Class Gas Turbines Pratyush Nag *, David Little, Damien Teehan, Kris Wetzl, David Elwood Siemens Power Generation Inc, 4400 Alafaya Trail, Orlando, FL Abstract The US gas turbine (GT) power generation market has seen significant volatility in recent years. The trend is likely to continue given the changing environmental conditions: climatic changes, natural gas prices, nuclear and coal power generation. This volatility has required many gas turbine operators, who normally operated on a continuous basis (base load) to operate in an intermittent dispatch mode which has caused some operators to frequently shut down their units. This frequent cycling of units increases start-up and maintenance costs. It would be beneficial to these plants to operate at lower loads when power demand is low and ramp up to higher loads as demand increases. A key issue in operating at lower loads is an increase in Carbon Monoxide (CO) emissions. When the engines are base loaded, the combustion system operates at high firing temperatures and most of the CO is oxidized to Carbon Dioxide (CO 2 ). But at part loads, when the firing temperature is lower, the CO to CO 2 oxidation reaction is quenched by the cool regions near the walls of the combustion liner. This results in increased CO emissions at low loads. In order to provide greater operational flexibility to the G-class gas turbine operators, Siemens has developed an upgrade for the engine system designed to allow the gas turbine to operate at some lower loads while maintaining emissions within set limits. This developmental effort culminated in the recent installation and successful testing of the upgrade product at one of the Siemens G-class operating plant sites. The plant was previously operating between 70% and 100% of GT base load while maintaining their emissions limits. Now, with this upgrade product installed, they have operated as low as 32% of base load while still maintaining emissions within set limits. The plant has continued to operate in this mode as it undergoes further product validation. Some of the key items being evaluated as part of the validation are hot gas path and Heat Recovery Steam Generator (HRSG) components. Initial evaluation has been positive and further inspections and data analysis will continue through the validation phase. Upon successful completion of the validation phase, the product is expected to be rolled out to the other G-class engine sites. * Corresponding Author
3 Power-Gen International Orlando, Florida December Contents Introduction...4 Market drivers for low load operational flexibility...6 Design & Implementation...8 Results...10 Validation Operation...14 Conclusions...15 References...16 Permission for Use...16 Abbreviations...17
4 Power-Gen International Orlando, Florida December Introduction The W501G gas turbine design concept was driven by the changing power market. Between 1993 and 1995, the power market was moving towards deregulation and replacing aging base load plants, such as coal-based power plants. The market was demanding clean and highly efficient combined cycle plants. Fears of deregulation in the North American electricity market caused prospective plant buyers to turn to cleaner plants with shorter installation and commissioning times compared to traditional coal plants which had a six year lead time to permit and build. The belief at that time was that the new high-efficiency, low emissions, clean fuel plants would be the economic and environmental choice and displace coal plants. Because the W501G had a high efficiency (58% in CC application compared to the typical 54-55% efficiency CC power plant), it was intended to be operated primarily at base load. In the late 1990's there was an increased demand for electric power and a relatively low price for natural gas, about $2.50/MMBtu, causing an increased demand for gas turbines for simple and combined cycle operation. By 2002, the demand for power was subsiding and some areas were over capacity. Natural gas had increased to above $6/MMBtu and the price for electricity had decreased causing the gas turbine combined cycle plants to be operated at only 30% average capacity (higher utilization for advanced frames including the W501G fleet). The increased natural gas price has caused combined cycle plants to move lower in the dispatch order forcing them to operate in cycling duty mode. In this environment, the amount of time a merchant plant can operate profitably may be significantly reduced. [1,2] In response to the change in market demand for more cyclic operation design changes and improvements are continually being incorporated into the W501G engine. Customer feedback through user groups, direct feedback, and the analysis of data collected via Power Diagnostics allows Siemens to focus on development programs that are directly aligned with customer requirements. [1] The W501G adaptability to cyclic/flexible operation was further improved by enhancements incorporated over the last several years which include the following: Combustor basket design improvements to reduce emissions, improve reliability and increase the time between inspection intervals Steam cooled transition improvements to reduce metal temperatures and extend inspection intervals based on both hours and starts Improved compressor and turbine sealing for increased performance and reduced emissions Optimized cooling on the first four rows of turbine airfoils Optimized rotor cooling air temperature to enhance operational flexibility Enhanced turbine disk material, which is utilized in the existing Siemens V-fleet Redesigned exhaust system to improve performance and service life
5 Power-Gen International Orlando, Florida December Improved starting reliability and reduced capital costs from changing the starting motor to a Static Frequency Converter (SFC) Optimized and simplified gas turbine and plant controls to improve the engines operational flexibility and starting reliability. [1] Figure 1: Siemens W501G Gas Turbine
6 Power-Gen International Orlando, Florida December Market drivers for low load operational flexibility Since the beginning of the power market s liberalization in the mid 1990 s, the power plant business has been changing. Today, power plant operators find themselves in a more challenging market environment with the presence of strong competition, higher fluctuation of fuel prices, and many without long term power purchase agreements. Despite these new challenges, the market liberalization also presents new business opportunities such as the utilization of market price fluctuations for operation and maintenance optimization, participation in ancillary service markets, and short term trading. All of these opportunities can contribute to significantly improved operating margins. By knowing how to approach these opportunities, an operator can in some cases achieve higher profits when compared to a long term power purchase agreement. [3] The changed market conditions have an influence on the operating profile of virtually every power plant. Combined cycle power plants often do not strictly operate in a base load regime running 8,000 hours per year. Many units are operating in a daily start-stop regime with some units starting up to twice a day. In this market environment, an economic model that incorporates only a certain amount of base load hours with fixed power revenues will not describe the full picture. Additional earnings from the above mentioned market opportunities would not be considered. To be more accurate, an extended approach for evaluating a cycling plant with high flexibility is necessary. Key parameters for operational flexibility are, for example, start-up time, standby operation and shut-down time. [3] From the mid-1990 s to 2000 there was a steady reduction in the US electric power reserve margins. It was believed that deregulation and cleaner, more efficient combined cycle plants would replace aging base load generation stations, such as nuclear and coal-based plants. Increasing demand for electricity and high electricity prices caused a surge in new orders for both simple cycle and combined cycle plants. The result was an increase in total generated electricity capacity and reserve margins in all U.S. regions, as well as a decrease in CC capacity factor (defined as the ratio of actual generation to the total possible generation over a time period). The capacity factor reduction forced operators to operate in peaking and intermediate modes rather than in the planned base load, thus increasing demand for cyclic operation capability. [4] Demand growth, economic dispatchability and operational flexibility are key factors that determine the electricity-generating plant s ability to improve its dispatch rate (i.e. the order in which it is dispatched as demand for electric power increases during the day). Due to current overcapacity and the increase in reserve margins, the units that excel in economic dispatchability and operational flexibility will dispatch before other competing units. The dispatch order is determined by the unit s variable production cost (VPC). Fuel cost and variable Operation and Maintenance (O&M) cost
7 Power-Gen International Orlando, Florida December are used to calculate VPC. Small changes in VPC can significantly affect the unit s dispatch ranking. Fuel cost is directly impacted by the gas turbine s efficiency, thus increased efficiency improves not only the revenue per megawatt hour but also the unit s total dispatch hours. Reduced O&M costs will also lower VPC, improve dispatchability and increase net cash flow. Units that are operationally flexible and can load follow, cycle on and off more economically which will allow improved dispatchability and a competitive advantage in the current market. Design improvements have been made in the Siemens fleet of SGT6-5000F (formerly called W501F), intended to help enhance the units dispatchability, increase efficiency and lower life cycle costs (hence reduced VPC), and improve operational flexibility. [4]
8 Power-Gen International Orlando, Florida December Design & Implementation A key issue in operating at lower loads is an increase in carbon monoxide (CO) emissions. When the engines are base loaded, the combustion system operates at a higher firing temperatures and most of the CO is oxidized to carbon dioxide (CO 2 ). However, at part loads, when the firing temperature is lower and the CO to CO 2 oxidation reaction is quenched by the cool regions near the walls of the combustion liner. This can result in increased CO emissions at low loads which can in some cases exceed the environmental operating permits of the commercial gas turbines. To overcome this, Siemens has developed a modification to the engine designed to allow the gas turbine to continue to operate at some lower loads while maintaining emissions within set limits. The low load turndown design is three-fold: Closed loop Inlet Guide Vane (IGV) control allowing for more closed IGV settings at a given engine load Compressed air is bypassed around the combustor into the turbine to increase the fuel-to-air ratio inside the combustor The rotor air cooler temperature is lowered to maximize flow bypassing the combustor. The combination of the above is designed to result in higher firing temperatures at lower loads - thus resulting in improved CO to CO 2 conversion. This Low Load Carbon Monoxide (LLCO) design was installed in one of the operating engines of the Siemens G-class gas turbine fleet in October However, before the implementation of the LLCO upgrade, a baseline inspection was conducted on the critical components of the gas turbine and the findings were recorded in order to compare with inspections after LLCO operation. The installation included modification to the piping and installation of additional valves (Figure 2). Changes were made to the control logic to accommodate the changes to the operation of the gas turbine. Several sections of the gas turbine were instrumented to record the impact of this new LLCO product. The same test was conducted on the unit before and after LLCO was implemented in order to obtain a direct comparison of the engine response between the baseline and LLCO operation. A combined cycle emissions and performance test was also conducted in order to measure the differences in emissions and performance between the baseline and LLCO operation.
9 Power-Gen International Orlando, Florida December Figure 2: LLCO upgrade implemented on site After the initial testing in October 2007 (Figure 3), another inspection was conducted in December 2007 to confirm that there was no detrimental impact to the components due to the test. The test data was analyzed and a potential to improve the capability of the system was identified. In order to validate this, a second test was conducted in December 2007 to confirm that the model predictions were accurate and further turndown was possible Implementation 2. Baseline inspection 3. LLCO Test Completed LLCO Commercial Operation Starts 1. 1st Inspection (~350 EBH) 2. LLCO Phase 2 Test (for lower turndown) Data Review 2nd inspection (2500 EBH) Data Review Fleet Release 1. Expected next outage 2. Expected final inspection Planned G LLCO Validation Figure 3: Target Implementation and Validation Schedule
10 Power-Gen International Orlando, Florida December Results In close cooperation with the customer, Siemens was able to test this design while the engine was in commercial operation. The focus of the test was to turndown the engine to the lowest load possible while maintaining CO emissions at or below 10 parts per million (ppm) (corrected to 15% O 2 ). All the instrumentation was continuously monitored for deviation from pre-set limits. Emissions were being measured using an external probe inserted into the exhaust section and the data was analyzed using Environmental Protection Agency approved testing methods. The standard Continuous Emissions Monitoring System (CEMS) data was also recorded and compared to the previously collected data. Performance testing was performed per ASME test standards. Figure 4 represents a calculated turndown capability of the tested engine. Using the data obtained from the tests conducted in October 2007, the gas turbine and steam turbine thermal cycle models were refined and the closed loop control logic was adjusted. With these adjustments, the turndown capability was calculated for two cases: 10 ppm CO (corrected to 15% O 2 ) out of the gas turbine (represented by the blue curve) and 10 ppm CO (corrected to 15% O 2 ) out of the exhaust stack (represented by the green curve). It should be noted that this unit is equipped with a CO conversion catalyst which helped reduce the CO emissions. The brown diamonds in this figure represent actually measured data points with the initial control settings. The red diamonds indicate the turndown capabilities as measured during the tests performed in December 2007 after the refined control settings were incorporated. It can be seen that a minimum turndown of approximately 40% GT load can be obtained while maintaining 10 ppm CO out of the engine and the turndown is up to 28% GT load with 10 ppm CO out of the exhaust stack using the CO catalyst. There are potential methods of improving the turndown capability at lower temperatures such as - combining LLCO with an inlet heating upgrade.
11 Power-Gen International Orlando, Florida December Percentage of Engine Load (%) G: Predicted Engine Turndown Capability 10 CO from Engine 10 CO from HRSG Measured Oct 11/07 Measured Dec 7/ Compressor Inlet Temperature (F) Figure 4: Calculated Turndown Capability to 10 ppm CO emissions * The demonstration plant was a 2x1 combined cycle configuration with the LLCO product installed only on GT-1. Figure 5 shows that above 70% GT load, the LLCO control settings yielded an improvement in combined cycle heat rate. The blue curve indicates the baseline case when neither unit was equipped with the LLCO upgrade. The green curve shows the 2x1 plant heat rate vs. power with only one GT activated on LLCO. The red curve is a calculation of a potential heat rate benefit when both gas turbines are equipped with the LLCO upgrade. * Calculated value only actual results may be different
12 Power-Gen International Orlando, Florida December Calculated CC HHV Heat Rate CT1-Std Control: CT2-Std Control CT1-LLCO: CT2-Std Control CT1-LLCO: CT2-LLCO 70% Combined Cycle Net Heat Rate, HHV (Btu/kWhr) 80% Note: % engine loads are shown in the boxes. 90% 95% 97% 100% Combined Cycle Net Power (MW) Figure 5: Calculated Combined Cycle Heat Rate Benefit On Demonstration plant at Higher Loads * LLCO control settings are activated between 28% and 97% GT load. At these very low loads, this control methodology is calculated to provide a significant CO reduction during start-up and shut-down. Figure 6 shows that the CO emissions out of the gas turbine are calculated to drop from about 2,200 ppm (corrected to 15% O 2 ) at about 30% load with normal control to about 200 ppm when LLCO is installed. It is also significant to note that the relatively high CO emissions period appears to last for a much shorter load transient. With the normal control, the high CO emissions are calculated at approximately between 30% and 70% GT load. With LLCO implemented, the relatively higher CO emissions transient period is only between 30% and 40% load. This can be particularly beneficial for plants with permit restrictions capped by total annual CO emissions. * Calculated value only actual results may be different
13 Power-Gen International Orlando, Florida December CO 15% O2) 501G: CO vs %Load 59F LLCO 59F Base IGV %Load Figure 6: Potential Reduction in Start-up CO Emissions On Demonstration plant * Safe and reliable operation of the steam turbine was also demonstrated during this combined cycle test. The primary goal was to maintain enough heat input to the HRSG to generate enough steam to keep the steam turbine operational which was successfully demonstrated. In the case of the G-class gas turbines, the transition section of the combustion system is cooled with steam. It was also demonstrated that transition steam temperatures were within design operating limits. Impact to the HRSG due to LLCO operation was also not quantified before the test. No apparent failure modes were observed during the test. Furthermore, appropriate steam cycle data from the LLCO tests were evaluated by the HRSG vendor using their analytical models. The results of the evaluation were that all as tested conditions were within the design criteria and no detrimental impact was reported by them in their analysis. In fact, the vendor reported that it was its view that the LLCO operation was actually better in comparison to daily cycling due to the reduced thermal cycling fatigue. * Calculated value only actual results may be different
14 Power-Gen International Orlando, Florida December Validation Operation After the successful tests, the data was reviewed and the unit started its validation operation on January 11, After a few initial adjustments to the control logic to meet the dispatch requirements, the unit has operated down to ~50% load as needed. Since the LLCO upgrade was installed it has been extensively used as is demonstrated in Figure 7. Approximately 35% of the total operating hours have been spent on lower loads (20%-70% GT load). Before the LLCO upgrade, this unit was reported to have shut down nightly and now it is reportedly simply turned down to minimum load and left there while the demand is low. When demand for electricity is higher, the GT is brought to higher loads as needed in a relatively short period of time LLCO operation Low Load (20%-70%) hrs EBH EBH Feb April April May Jun Figure 7: Operational data on demonstration plant A second inspection was performed in May 2008 to monitor the critical components. Typical findings were observed by Siemens there was no evidence of any detrimental impact of LLCO operation observed. Validation is ongoing (expected to be completed in October/November, 2008) and further inspections will follow until completion of the validation period.
15 Power-Gen International Orlando, Florida December Conclusions Low load turndown flexibility is extremely desirable to gas turbine operators especially in light of the changes in the power generation market. There can be several benefits with this kind of flexibility including improved load following capability, reduced start-up time, less start-up CO emissions to name a few. The low load turndown upgrade was successfully installed in a commercially operating Siemens W501G engine. Tests were performed to demonstrate the operational capability of the upgrade. After successful testing, the data was evaluated and the engine was released for validation operation with this upgrade. The engine continues to operate in this mode during this validation period which is expected to be completed by this calendar year. After this validation, the data will be reviewed and if considered successful, the product will be released for fleet-wide operation.
16 Power-Gen International Orlando, Florida December References [1] Bancalari, E., Chan, P., Adaptation of the SGT6-6000G to a Dynamic Power Generation Market, POWER-GEN International 2005 Las Vegas, Nevada. [2] Engelbert, C., Fadok, J., Fuller, R., Lueneburg, B., Introducing the 1S.W501G Single-Shaft Combined Cycle Reference Power Plant ; Proceedings of ASME Power 2004, Baltimore, Maryland.. [3] Emberger, H., Hofmann, D., Kolk, C., Economic Evaluation of Cycling Plants An Approach to Show the Value of Operational Flexibility, Power-Gen Europe 2006, Cologne [4] Xia, J., Kovac, J., McQuiggan, J., Wolfe, B., SGT6-5000F (W501F) Engine Enhancements to Improve Operational Flexibility, POWER-GEN International 2005 Las Vegas, Nevada. Permission for Use The content of this paper is copyrighted by Siemens Power Generation, Inc. and is licensed only to PennWell for publication and distribution. Any inquiries regarding permission to use the content of this paper, in whole or in part, for any purpose must be addressed to Siemens Power Generation, Inc. directly.
17 Power-Gen International Orlando, Florida December Abbreviations CC CEMS CO CO 2 GT HRSG IGV LLCO MMBtu O 2 O&M PPM SFC VPC Combined Cycle Continuous Emissions Monitoring System Carbon Monoxide Carbon Dioxide Gas Turbine Heat Recovery Steam Generator Inlet Guide Vane Low Load Carbon Monoxide Million British Thermal Unit Oxygen Operation and Maintenance Parts Per Million Static Frequency Converter Variable Production Cost
SGT6-5000F (W501F) 3 MILLION HOURS FLEET OPERATIONAL EXPERIENCE
SGT6-5000F (W501F) 3 MILLION HOURS FLEET OPERATIONAL EXPERIENCE POWER-GEN International 2006 Orlando, FL November 28-30, 2006 1 Copyright 2006 Siemens Power Generation, Inc. Copyright Siemens AG 2006.
Adaptation of the SGT6-6000G to a Dynamic Power Generation Market
Adaptation of the SGT6-6000G to a Dynamic Power Generation Market Ed Bancalari - Manager, SGT6-6000G Frame Pedy Chan - Project Engineer, SGT6-6000G Frame POWER-GEN International 2005 Las Vegas, Nevada
Power-Gen International 2008 Orlando, Florida www.siemens.com
ULTRA LOW NOX COMBUSTION TECHNOLOGY Power-Gen International 2008 Orlando, Florida www.siemens.com PowerGen International Orlando, Florida December 2008 2 ULTRA LOW NOX COMBUSTION TECHNOLOGY Clifford Johnson,
The SGT5-8000H proven in commercial operation
www.siemens.com/energy The SGT5-8000H proven in commercial operation Answers for energy. 2 375 MW Output of the Siemens Gas Turbine SGT5-8000H.* * Gross: ISO ambient conditions 375 MW Rated output of 375
GT2007-28337 GT 2007-28337
Proceedings of GT2007 ASME Turbo Expo 2007: Power Proceedings for Land, Sea of and GT2007 Air ASME Turbo Expo May 2007: 14-17, Power 2007, for Montreal, Land, Sea Canada and Air May 14-17, 2007, Montreal,
Senoko Power Station CCP2 performance increase with focus on efficiency. www.siemens.com/energy. Answers for energy.
www.siemens.com/energy Senoko Power Station CCP2 performance increase with focus on efficiency POWER-GEN Asia 2011 KLCC, Malaysia, Kuala Lumpur September 27 29, 2011 Authors: Stuart McWilliams Vice President
Siemens Gas Turbines over 100 MW
Siemens Gas Turbines over 100 MW Proven and reliable Answers for energy. State-of-the-art and innovative gas turbines to meet today s energy needs Changes in today s energy markets are presenting power
Improving Flexibility of the Combined Cycle Power Plant Hamm Uentrop to Cover the Operational Profiles of the Future
in cooperation with siemens.com/energy Improving Flexibility of the Combined Cycle Power Plant Hamm Uentrop to Cover the Operational Profiles of the Future Reprint from Track 6, Session 4, Wednesday June
Adapting Gas-Power Generation to New Role in Low-Carbon Energy Systems
Adapting Gas-Power Generation to New Role in Low-Carbon Energy Systems Sandra Scalari Enel Ingegneria e Ricerca SpA Copenhagen, May 27-28 th 2014 Enel Presentation Generation Shift & Market in Europe Enel
Operational Flexibility Enhancements of Combined Cycle Power Plants. Dr. Norbert Henkel, Erich Schmid and Edwin Gobrecht
Operational Flexibility Enhancements of Combined Cycle Power Plants Dr. Norbert Henkel, Erich Schmid and Edwin Gobrecht Siemens AG, Energy Sector Germany POWER-GEN Asia 2008 Kuala Lumpur, Malaysia October
Design and Test Operation Performance of 1,500 C Class Gas Turbine Combined-Cycle Power Plant:
31 Design and Test Operation Performance of 1,500 C Class Gas Turbine Combined-Cycle Power Plant: Construction of Group 1 of the Tokyo Electric Power Company s Kawasaki Thermal Power Station KIYOSHI KAWAKAMI
The Lodi Energy Center, owned
Lodi s 300MW Flex 30 plant ushers in a new era for the US By Junior Isles The Siemens Flex Plant 30 at Lodi designed to deliver 200MW of power to the grid within 30 minutes of startup is capable of daily
SGT5-4000F Trusted Operational Excellence
Power Gen Europe, Cologne / June 2014 SGT5-4000F Trusted Operational Excellence Dr. Eberhard Deuker, Siemens Energy siemens.com/answers Table of Content SGT5-4000F Trusted Operational Excellence Fleet
OVERVIEW OF GENERAL ELECTRIC S ADVANCED TURBINE SYSTEMS PROGRAM
OVERVIEW OF GENERAL ELECTRIC S ADVANCED TURBINE SYSTEMS PROGRAM CONTRACT INFORMATION Cooperative Agreement Contractor Contractor Project Manager Principal Investigators DOE Project Manager DE-FC21-95MC31176
Natural Gas Conversions of Existing Coal-Fired Boilers
White Paper MS-14 Natural Gas Conversions of Existing Coal-Fired s Authors: F.J. Binkiewicz Jr., P.E. R.J. Kleisley B.E. McMahon J.E. Monacelli D.A. Roth D.K. Wong Babcock & Wilcox Power Generation Group,
Source: EIA Natural Gas Issues and Trends 1998
7.0 System Redesign Analysis 7.1 Emissions Natural gas is a clean burning fossil fuel. It consists of a mixture of hydrocarbon gases, primarily Methane (CH 4 ). In analyzing the combustion process, it
Ansaldo Energia: la flessibilità operativa dei cicli combinati coniugata all efficienza energetica
Ansaldo Energia: la flessibilità operativa dei cicli combinati coniugata all efficienza energetica Federico Calzolari R&D Project Manager Milano, 11 luglio 2013 Scenario o Electrical Market & Future Scenario
GE Energy LMS100. Flexible Power
GE Energy LMS100 Flexible Power GE Energy is a leading supplier of aeroderivative gas turbines and packaged generator sets for industrial and marine applications. We provide power-generating equipment
Description of Thermal Oxidizers
Description of Thermal Oxidizers NESTEC, Inc. is a full service equipment supplier specializing in solutions for plant emission problems. The benefit in working with NESTEC, Inc. is we bring 25+ years
Siemens Steam Turbine-Generator SST-5000 Series. for combined cycle and subcritical steam applications. Answers for energy.
Siemens Steam Turbine-Generator SST-5000 Series for combined cycle and subcritical steam applications Answers for energy. SST-5000 series steam turbine-generator For combined cycle and subcritical steam
SGT5-8000H SCC5-8000H 1S. Experience of Commercial Operation at Irsching 4. ANIMP-ATI, Sesto San Giovanni 26 June 2012
SGT5-8000H SCC5-8000H 1S Experience of Commercial Operation at Irsching 4 ANIMP-ATI, Sesto San Giovanni 26 June 2012 Massimo Gianfreda 8000H Overview Validation Status Summary Fig. 2 Siemens Large Scale
The new Gas Turbine Portfolio to meet the market requirements for Distributed Generation
PowerGen Europe, 9-11 June 2015 The new Gas Turbine Portfolio to meet the market requirements for Distributed Generation Nicholas Muntz, Dr. Thorsten Krol Security classification Siemens AG 2015 All rights
SRS: THE STANDARDIZED REPOWERING SOLUTION FOR 300MW STEAM POWER PLANTS IN RUSSIA. Matthias Fränkle Siemens Power Generation (PG), Germany
SRS: THE STANDARDIZED REPOWERING SOLUTION FOR 300MW STEAM POWER PLANTS IN RUSSIA Matthias Fränkle Siemens Power Generation (PG), Germany Page 1 of 11 1 Introduction Deregulation and competition are further
Wärtsilä modular power plant comprised of multiple ICE generating units provides output flexibility.
[ ENERGY / IN DETAIL ] [ ENERGY / IN DETAIL ] Wärtsilä modular power plant comprised of multiple ICE generating units provides output flexibility. Defining true flexibility a comparison of gas-fired power
Fast cycling and rapid start-up: new generation of plants achieves impressive results
Fast cycling and rapid start-up: new generation of plants achieves impressive results Reprint from: Modern Power Systems, January 2011 Author: Lothar Balling, Siemens AG, Erlangen, Germany Answers for
The Problem Solving of Exhaust Frame Air Cooling System Pressure Low in GE Frame 9 Gas Turbine
The Problem Solving of Exhaust Frame Air Cooling System Pressure Low in GE Frame 9 Gas Turbine Author: Nattapon Pinitchan, Kanyarat Tankong, EGAT (Bangpakong Power Plant), Thailand 1 of 10 ABSTRACT EGAT's
Providing training for the life of your plant. Siemens Power Plant Operations Support and Training. Customer Training Overview
Providing training for the life of your plant Siemens Power Plant Operations Support and Training Customer Training Overview Background A well-trained and knowledgeable team of plant Operations and Maintenance
The Technology and Business of Power Andrew Valencia, P.E. Lower Colorado River Authority
The Technology and Business of Power Andrew Valencia, P.E. Lower Colorado River Authority 1 2 What is Efficiency? Efficiency: What you get divided by what you pay for Heatrate is a measure of plant efficiency
ALUMINUM. BestPractices Assessment Case Study. Alcoa North American Extrusions Implements Energy Use Assessments at Multiple Facilities.
ALUMINUM BestPractices Assessment Case Study August 2001 OFFICE OF INDUSTRIAL TECHNOLOGIES ENERGY EFFICIENCY AND RENEWABLE ENERGY, U.S. DEPARTMENT OF ENERGY BENEFITS Assesses core systems commonly found
INDEX 9-7-100 GENERAL
REGULATION 9 INORGANIC GASEOUS POLLUTANTS RULE 7 NITROGEN OXIDES AND CARBON MONOXIDE FROM INDUSTRIAL, INSTITUTIONAL AND COMMERCIAL BOILERS, STEAM GENERATORS AND PROCESS HEATERS INDEX 9-7-100 GENERAL 9-7-101
Carbon Dioxide Membrane Separation for Carbon Capture using Direct FuelCell Systems
Carbon Dioxide Membrane Separation for Carbon Capture using Direct FuelCell Systems DFC Technology Used as Electrochemical Membrane for CO 2 Purification and Capture during Power Generation FCE s Direct
GAS TURBINE PERFORMANCE UPGRADE OPTIONS
GAS TURBINE PERFORMANCE UPGRADE OPTIONS By Jeffrey Phillips and Philip Levine This article reviews some specific methods for boosting power and improving heat rate either by increasing inlet air density
Steam Power Plants as Partners for Renewable Energy Systems
Steam Power Plants as Partners for Renewable Energy Systems Hans-Joachim Meier Head of VGB Competence Centre 4 Environmental Technology, Chemistry, Safety and Health VGB PowerTech e.v., Essen, Germany
Clean Power Plan: MISO Analysis ADEQ/APSC Stakeholder Meeting
Clean Power Plan: MISO Analysis ADEQ/APSC Stakeholder Meeting 8/28/2014 The generation fleet in MISO is being affected by timing, fuel prices and multiple phases of environmental regulations. MATS CSAPR
FULL ELECTRICAL LNG PLANTS: HIGHEST AVAILABILITY AND ENERGY EFFICIENCY THROUGH OVERALL SYSTEM DESIGN
FULL ELECTRICAL LN PLANTS: HIHEST AVAILABILITY AND ENERY EFFICIENCY THROUH OVERALL SYSTEM DESIN Dr. Edwin Lerch Siemens A Infrastructure and Cities Sector, IC S SE PTI, ermany Phone: 49-9131-7-34052 Fax:
Hybrid Power Generations Systems, LLC
Coal Integrated Gasification Fuel Cell System Study Pre-Baseline Topical Report April 2003 to July 2003 Gregory Wotzak, Chellappa Balan, Faress Rahman, Nguyen Minh August 2003 Performed under DOE/NETL
Miglioramenti nella flessibilità dei cicli combinati: esperienze recenti di Ansaldo Energia. Alice Pesenti Federico Calzolari
Miglioramenti nella flessibilità dei cicli combinati: esperienze recenti di Ansaldo Energia Alice Pesenti Federico Calzolari 1 Miglioramenti nella flessibilità dei cicli combinati: esperienze recenti di
O&M and Lifecycle Management for CCGT Power Plants Flex Power Services Enhancing a plant s market capability
International Conference: 17-18 May, 2016 Birmingham, UK O&M and Lifecycle Management for CCGT Power Plants Flex Power Services Enhancing a plant s market capability siemens.com/energy Flex Power Services
COMBUSTION STUDIES OF NATURAL GAS AND SYN-GAS WITH HUMID AIR
COMBUSTION STUDIES OF NATURAL GAS AND SYN-GAS WITH HUMID AIR Abstract Dr. Michael Nakhamkin Eric Swensen Hubert Paprotna Energy Storage and Power Consultants 200 Central Avenue Mountainside, New Jersey
SGT5-4000F Gas Turbine and Combined Cycle Power Plant Evolution reflecting the changing Market Requirements
SGT5-4000F Gas Turbine and Combined Cycle Power Plant Evolution reflecting the changing Market Requirements Eberhard Deuker Siemens AG, Energy Sector, Germany Mike H. Koenig Siemens Energy Inc, U.S.A.
SGT-800 GAS TURBINE CONTINUED AVAILABILITY AND MAINTAINABILITY IMPROVEMENTS. Dr. Vladimir Navrotsky Lena Strömberg Claes Uebel
SGT-800 GAS TURBINE CONTINUED AVAILABILITY AND MAINTAINABILITY IMPROVEMENTS Dr. Vladimir Navrotsky Lena Strömberg Claes Uebel Siemens Industrial Turbomachinery AB Finspong, Sweden POWER-GEN Asia 2009 Bangkok,
Making Coal Use Compatible with Measures to Counter Global Warming
Making Use Compatible with Measures to Counter Global Warming The J-POWER Group is one of the biggest coal users in Japan, consuming approximately 2 million tons of coal per year at eight coal-fired power
ON-LINE MONITORING OF POWER PLANTS
ON-LINE MONITORING OF POWER PLANTS Dr. Hans-Gerd Brummel Siemens Power Generation (PG), Huttenstrasse 12-16, 10553 Berlin, Germany Phone: +49 30 3464 4158, E-mail: [email protected] Table of
ANCILLARY SERVICES SUPPLIED TO THE GRID: THE CASE OF THISVI CCGT POWER PLANT (GREECE)
Claudio Cavandoli, Alessandro Crippa EDISON S.p.A., Engineering Department ANCILLARY SERVICES SUPPLIED TO THE GRID: THE CASE OF THISVI CCGT POWER PLANT (GREECE) 1 ANCILLARY SERVICES SUPPLIED TO THE GRID:
USC Steam Turbine technology for maximum efficiency and operational flexibility. Dr. Rainer Quinkertz Andreas Ulma Edwin Gobrecht Michael Wechsung
USC Steam Turbine technology for maximum efficiency and operational flexibility Dr. Rainer Quinkertz Andreas Ulma Edwin Gobrecht Michael Wechsung Siemens AG POWER-GEN Asia 2008 Kuala Lumpur, Malaysia October
EFFICIENT ENERGY SUPPLY (ELECTRICITY AND DISTRICT HEAT) FOR THE CITY OF LINZ
Parallel session Producing more with less: Efficiency in Power Generation EFFICIENT ENERGY SUPPLY (ELECTRICITY AND DISTRICT HEAT) FOR THE CITY OF LINZ Johann Gimmelsberger Linz Strom GmbH EFFICIENT ENERGY
Half the cost Half the carbon
Half the cost Half the carbon the world s most efficient micro-chp What is BlueGEN? The most efficient small-scale electricity generator BlueGEN uses natural gas from the grid to generate electricity within
The Future of Coal-Based Power Generation With CCS UN CCS Summit James Katzer MIT Energy Initiative web.mit.edu/coal/
The Future of Coal-Based Power Generation With CCS UN CCS Summit James Katzer MIT Energy Initiative web.mit.edu/coal/ 1 Times Are Changing As Yogi Berra said: The Future Ain t What It Used to Be 2 Overview
THE NET BENEFITS OF LOW AND NO-CARBON ELECTRICITY TECHNOLOGIES
GLOBAL ECONOMY & DEVELOPMENT WORKING PAPER 73 MAY 2014 Global Economy and Development at BROOKINGS THE NET BENEFITS OF LOW AND NO-CARBON ELECTRICITY TECHNOLOGIES Charles R. Frank, Jr. Global Economy and
The. Brendan P. Sheehan, Honeywell Process Solutions, USA, and Xin Zhu, UOP, a Honeywell Company, USA, explore energy optimisation in plant processes.
The Brendan P. Sheehan, Honeywell Process Solutions, USA, and Xin Zhu, UOP, a Honeywell Company, USA, explore energy optimisation in plant processes. The global trends and challenges driving the need for
ABSTRACT DCMCCT PROJECT OVERVIEW
Title: Case Study of the Austin Energy Dell Regional Children s Medical Center of Central Texas Packaged Hybrid CHP Energy Plant in Austin, Texas Authors: Mr. Ed Mardiat, Burns & McDonnell Mr. Jim Teigen,
HEAT RECOVERY OPTIONS FOR DRYERS AND OXIDIZERS
HEAT RECOVERY OPTIONS FOR DRYERS AND OXIDIZERS William K. Scullion, Application Engineering Leader, MEGTEC Systems, De Pere, WI Introduction Competitive pressures continuously motivate us to examine our
ASPE Seminar Water Heater Piping Strategies. Presented by Joe Kalarickal, EIT Regional Sales Manager AERCO International
ASPE Seminar Water Heater Piping Strategies Presented by Joe Kalarickal, EIT Regional Sales Manager AERCO International Presentation Overview Water Heater Piping Strategies How to size a water heater?
Dallas/Fort Worth International Airport District Energy Plant Upgrades Project Making More with Less Sustainable Communities Conference Dallas, TX
Dallas/Fort Worth International Airport District Energy Plant Upgrades Project Making More with Less Sustainable Communities Conference Dallas, TX March 10, 2009 Agenda DFW Capital Development Program
Control Device Requirements Charts For Oil and Gas Handling and Production Facilities
Device Charts For Oil and Gas Handling and Production Facilities Purpose/Scope: The purpose of this document is to provide standardized guidance for use by the regulated community and air permit reviewers,
Draft Electric Resource Plan 2009 2018 Technical Workshop. Technology Screening Analysis
Draft Electric Resource Plan 2009 2018 Technical Workshop Technology Screening Analysis June 15, 2009 www.lipower.org Resource Planning Process Overview Process Methodology Screening Analysis Determine
Perspective on R&D Needs for Gas Turbine Power Generation
Perspective on R&D Needs for Gas Turbine Power Generation Eli Razinsky Solar Turbine Incorporated 2010 UTSR Workshop October 26, 2011 1 Research Requirements Overview Specific Requirements 2 Society Requirements
Efficiency Metrics for CHP Systems: Total System and Effective Electric Efficiencies
Efficiency Metrics for CHP Systems: Total System and Effective Electric Efficiencies Combined heat and power (CHP) is an efficient and clean approach to generating power and thermal energy from a single
PERFORMANCE EVALUATION OF NGCC AND COAL-FIRED STEAM POWER PLANTS WITH INTEGRATED CCS AND ORC SYSTEMS
ASME ORC 2015 3rd International Seminar on ORC Power Systems 12-14 October 2015, Brussels, Belgium PERFORMANCE EVALUATION OF NGCC AND COAL-FIRED STEAM POWER PLANTS WITH INTEGRATED CCS AND ORC SYSTEMS Vittorio
CHP - The Business Case
CHP - The Business Case An Introduction to Combined Heat and Power CHP 100 1 Acknowledgements 2 Overview! When Does CHP Make Sense! Where is CHP Practical?! Problems in CHP Economic Analysis 3 When Does
Vogt Power Emission Control Solutions
ONE SOURCE ONE PURPOSE MANY SOLUTIONS Vogt Power Emission Control Solutions Kelly Flannery Kristen Cooper Andrew Heid Chief Thermal Engineer Simple Cycle Design Lead Emission Catalyst Design Lead Presented
Power Plants. BENSON Once-Through Heat Recovery Steam Generator. Power Generation
Power Plants BENSON Once-Through Heat Recovery Steam Generator Power Generation BENSON Once-Through technology for Heat Recovery Steam Generators New application of proven technology Siemens development
Steam Turbine Concepts for the Future Volatile Power Market
Steam Turbine Concepts for the Future Volatile Power Market Power-Gen Europe June 12 14, 2012 Michael Wechsung Thomas Loeper Radim Znajda Siemens AG - Energy Sector Fossil Power Generation Agenda Situation
THERMAL POWER PLANTS Vol. III - Gas Turbines For Electric Power Generation - H.I.H. Saravanamuttoo GAS TURBINES FOR ELECTRIC POWER GENERATION
GAS TURBINES FOR ELECTRIC POWER GENERATION H.I.H. Saravanamuttoo Department of Mechanical and Aerospace Engineering, Carleton University, Canada. Keywords: Heavy Frame, aeroderivative, combined cycles,
PI System O&M Management Tool in Power Generation Industry. 27 October 2011. Barış Başer O&M Group Manager
PI System O&M Management Tool in Power Generation Industry 27 October 2011 Barış Başer O&M Group Manager Scope of Presentation AK Enerji Generation Portfolio Changing Market Conditions, Impacts to CCGTs
Gas turbine performance and maintenance continuous improvement
Gas turbine performance and maintenance continuous improvement Dr. V. Navrotsky, Siemens Industrial Turbomachinery AB, Sweden Abstract To meet the dynamic market changes and to improve power plant competitiveness
Levelized Cost and Levelized Avoided Cost of New Generation Resources in the Annual Energy Outlook 2015
June 2015 Levelized Cost and Levelized Avoided Cost of New Generation Resources in the Annual Energy Outlook 2015 This paper presents average values of levelized costs for generating technologies that
Smart solutions for fleets of all types & sizes of power generation. Marcus König, E F IE SGS / September 2013
Smart solutions for fleets of all types & sizes of power generation Marcus König, E F IE SGS / September 2013 Instrumentation, Controls & Electrical The Siemens structure: Four Sectors close to the customer
Continuous flow direct water heating for potable hot water
Continuous flow direct water heating for potable hot water An independently produced White Paper for Rinnai UK 2013 www.rinnaiuk.com In the 35 years since direct hot water systems entered the UK commercial
Power Island. Industrial Power Plants. www.siemens.com / energy
Power Island Industrial Power Plants www.siemens.com / energy Flexible combined-cycle power plants With today s increasing demands for flexible power plants, intensified by the increased amount of electricity
Siemens H: uprate and commercial release follow design validation
Siemens H: uprate and commercial release follow design validation Update on the Siemens SGT5-8000H, currently the world s largest gas turbine Reprint from Modern Power Systems, September 2009 Authors:
GENERATION TECHNOLOGY ASSESSMENT
SPO PLANNING ANALYSIS GENERATION TECHNOLOGY ASSESSMENT Technology Cost & Performance Milestone 2 Public Technical Conference OCTOBER 30, 2014 NOTE: ALL IRP MATERIALS ARE PRELIMINARY & SUBJECT TO CHANGE
MHI Air-Blown IGCC Technology & Application to Chinese Project
MHI -Blown Technology & Application to Chinese Project Mitsubishi Blown in Japan November, 2011 Outline of MHI -blown System Gasification / Gas Clean-up Island Produce clean syngas from coal effectively
Levelized Cost of New Electricity Generating Technologies
Levelized Cost of New Electricity Generating Technologies The Energy Information Administration (EIA) produces forecasts of energy supply and demand for the next 20 years using the National Energy Modeling
Den Haag and Leiden Repowering
Den Haag and Leiden Repowering Deltalings Feb. 2011 Hette Hylkema (E.ON ENT) Content E.ON Benelux Den Haag en Leiden; 2 projecten met GE LM gasturbines Den Haag: design/project summary Den Haag: operating
Presentation Outline. Background
Introduction ENVIRONMENTAL SYSTEMS, INC. Innovative Air Pollution Control Solutions Air Pollution Abatement Technologies for the Oil and Natural Gas Processing Industries. Jeff Kudronowicz / Application
SULFURIC ACID MIST PERFORMANCE TEST PROTOCOL. Duke Energy Florida, Inc. Crystal River Power Plant Units 4&5 Crystal River, Citrus County, Florida
SULFURIC ACID MIST PERFORMANCE TEST PROTOCOL Duke Energy Florida, Inc. Crystal River Power Plant Units 4&5 Crystal River, Citrus County, Florida August 2013 CONTENTS SECTION 1.0 INTRODUCTION...3 SECTION
THE EUROPEAN GREEN BUILDING PROGRAMME. Technical Module on Combined Heat and Power
THE EUROPEAN GREEN BUILDING PROGRAMME Technical Module on Combined Heat and Power Contents Foreword...1 1. Introduction...2 2. Inventory of the CHP system...3 3. Assessment of technical energy saving measures...5
Making power plants energy efficient
Making power plants energy efficient The Italian utility Enel has transformed its Torrevaldaliga Nord thermal power plant from heavy fuel to clean coal with the help of ABB power and automation technologies,
CHAPTER 3 EXPERIMENTAL SET UP
CHAPTER 3 EXPERIMENTAL SET UP 3.1 INTRODUCTION The emission tests were conducted on an Izusu, four stroke, 4 cylinder petrol engine test-rig with hydraulic dynamometer loading system. The specifications
GAS HEATING IN COMMERCIAL PREMISES
ENERGY EFFICIENCY OFFICES GAS HEATING IN COMMERCIAL PREMISES www.energia.ie www.energia.ie Typically, energy reductions of 10% or more can be made easily through maintenance and low cost improvements.
Torino Nord. Cogeneration Plant. The gas turbine. The steam generator. The Torino Nord cogeneration plant produces electricity and heat for district
PLANT TORINO NORD Iren Energia is the company in the Iren Group whose core businesses are the production and distribution of electricity, the production and distribution of thermal energy for district
Loviisa 3 unique possibility for large scale CHP generation and CO 2 reductions. Nici Bergroth, Fortum Oyj FORS-seminar 26.11.
Loviisa 3 unique possibility for large scale CHP generation and CO 2 reductions Nici Bergroth, Fortum Oyj FORS-seminar 26.11.2009, Otaniemi Loviisa 3 CHP Basis for the Loviisa 3 CHP alternative Replacement
Gas-Fired Power HIGHLIGHTS
Gas-Fired Power HIGHLIGHTS PROCESS AND TECHNOLOGY STATUS Approximately 21% of the world s electricity production is based on natural gas. The global gas-fired generation capacity amounts to 1168 GW e (2007).
Copyright 1984 by ASME. NOx ABATEMENT VIA WATER INJECTION IN AIRCRAFT-DERIVATIVE TURBINE ENGINES. D. W. Bahr. and T. F. Lyon
= THE AMERICAN SOCIETY OF MECHANICAL ENGINEERS 345 E. 47 St., New York, N.Y. 117 84-GT-13 [^^ The Society shall not be responsible for statements or opinions advanced in papers or In S discussion at meetings
White paper Combustion engine power plants
White paper Combustion engine power plants Niklas Haga General Manager, Marketing Marketing & Business Development Power Plants White paper Combustion engine power plants Niklas Haga General Manager, Marketing
Making power plants energy efficient ABB, integrated power and automation solutions
Making power plants energy efficient ABB, integrated power and automation solutions Making power plants energy efficient ABB has a singularly broad and comprehensive offering in power generation. It covers
CSP-gas hybrid plants: Cost effective and fully dispatchable integration of CSP into the electricity mix
CSP-gas hybrid plants: Cost effective and fully dispatchable integration of CSP into the electricity mix Erik Zindel Director Marketing CSP (Power Block) Siemens AG PowerGen Europe 2012 Köln Messe, 12-14
From today s systems to the future renewable energy systems. Iva Ridjan US-DK summer school AAU Copenhagen 17 August 2015
From today s systems to the future renewable energy systems Iva Ridjan US-DK summer school AAU Copenhagen 17 August 2015 STRUCTURE OF ENERGY SYSTEMS 8/17/2015 Copenhagen, Denmark 2 Components Demand Heat
ELECTRODE BOILERS VAPOR POWER INTERNATIONAL
ELECTRODE BOILERS WITH JET-FLO Technology VAPOR POWER INTERNATIONAL ELECTRODE boilers The Electrode Steam Boiler with Jet-Flo technology consists of an insulated pressure vessel and is fully enclosed in
10 Nuclear Power Reactors Figure 10.1
10 Nuclear Power Reactors Figure 10.1 89 10.1 What is a Nuclear Power Station? The purpose of a power station is to generate electricity safely reliably and economically. Figure 10.1 is the schematic of
Financing New Coal-Fired Power Plants
Financing New Coal-Fired Power Plants Guidance Note 2011 Coal is likely to be part of the energy mix for the foreseeable future. Therefore, to limit dangerous climate change, coal-fired power generation
Development and Operating Results of Low SO2 to SO3 Conversion Rate Catalyst for DeNOx Application
Development and Operating Results of Low SO2 to SO3 Conversion Rate Catalyst for DeNOx Application By Isato Morita Yoshinori Nagai Dr. Yasuyoshi Kato Babcock-Hitachi K.K., Japan Dr.Howard N. Franklin Hitachi
Aspen Utilities. Energy Management and Optimization System for energy intensive industry sectors. The Challenge: Reduction of Production Costs
Aspen Utilities Energy Management and Optimization System for energy intensive industry sectors The Challenge: Reduction of Production Costs Energy is often the single largest operating expense after raw
Company Profile. New and overhauled Power Plants for sale
1 Company Profile New and overhauled Power Plants for sale - Combined Cycle - Gas & Steam Turbines - Gas & Diesel Engines - Wind Turbines & Green Energy - Coal fired Power & Waste to Energy - Biomass &
Printing and Publishing Energy Savings Guide
Printing and Publishing Energy Savings Guide Oregon printing and publishing plants face challenges of rising operating costs, environmental and other regulations, outdated equipment and customer demand
INTEC Engineering GmbH Heating Solutions for the Marine Industry
INTEC Engineering GmbH Heating Solutions for the Marine Industry Thermal Oil Heaters Heating Solutions for the Marine Industry Compared to conventional plants using hot water or steam, thermal oil as a