TRANSFORMER SECONDARY FAULT CURRENTS TABLES

Size: px
Start display at page:

Download "TRANSFORMER SECONDARY FAULT CURRENTS TABLES"

Transcription

1 TRANSFORMER SECONDARY FAULT CURRENTS TABLES The information contained herein is made available to engineers, consultants and contractors solely for the purpose of providing help to Alabama Power Company customers in their selection of customer-owned service equipment. This data should be used for no other purpose. Assuming incorrect transformer or service sizes, when choosing values from the tables, can lead to errors in equipment selection and result in catastrophic failure of equipment. Alabama Power Company does not warrant this information and reserves the right to change the data in these tables without notice. The user of the information contained herein is fully responsible for correct use of this data; by making this data available, Alabama Power does not assume any responsibility relating to the use of the data or the customer-owned equipment. The information is not to be used for determining personal protective equipment requirements for arc flash hazards. Use of this data for such purposes may lead to incorrect selection of personal protective equipment and could result in injuries. SEE NEXT PAGE FOR TABLE OF CONTENTS

2 Effective October 24, 2013 Page 2 of 27 TABLE OF CONTENTS Pad Mounted Transformers KVA Overhead Transformer (#1/0 Aluminum Multiplex) KVA Overhead Transformer (#1/0 Aluminum Multiplex) KVA Overhead Transformer (#1/0 Aluminum Multiplex) KVA Overhead Transformer (#1/0 Aluminum Multiplex) KVA Overhead Transformer (#4/0 Aluminum Multiplex) KVA Overhead Transformer (#1/0 Aluminum Multiplex) KVA Overhead Transformer (#4/0 Aluminum Multiplex) KVA Overhead Transformer (4 # 500 KCM Aluminum) KVA Overhead Transformer (#1/0 Aluminum Multiplex) KVA Overhead Transformer (#4/0 Aluminum Multiplex) KVA Overhead Transformer (4 # 500 KCM Aluminum) KVA Overhead Transformer (4 # 1000 KCM Aluminum) KVA Overhead Transformer (#1/0 Aluminum Multiplex) KVA Overhead Transformer (#4/0 Aluminum Multiplex) KVA Overhead Transformer (4 # 500 KCM Aluminum) KVA Overhead Transformer (4 # 1000 KCM Aluminum) KVA Overhead Transformer (#4/0 Aluminum Multiplex) KVA Overhead Transformer (4 # 500 KCM Aluminum) KVA Overhead Transformer (4 # 1000 KCM Aluminum) KVA Overhead Transformer (4 X 2 # 1000 KCM Aluminum) KVA Overhead Transformer (4 X 3 # 1000 KCM Aluminum) KVA Overhead Transformer (4 # 1000 KCM Aluminum) KVA Overhead Transformer (4 X 3 # 1000 KCM Aluminum) KVA Overhead Transformer (4 X 3 # 1000 KCM Aluminum)... 27

3 Effective October 24, 2013 Page 3 of 27 Pad Mounted Transformers Three Phase Padmounts Size (KVA) Impedance (%) (Ph-Ph) Sym Fault Current (Amps) , , , , , , , , , , , , , , ,523 Single Phase Padmounts Size (KVA) Impedance (%) Sym Fault Current (Amps) , , , , , , , , , , , ,792

4 Effective October 24, 2013 Page 4 of KVA Overhead Transformer (#1/0 Aluminum Multiplex) %Z: 1.4 Three Phase Bank (3-10 KVA) Service Length (Ft.) ,949 5, ,425 4, ,985 4, ,610 4, ,287 3, ,006 3, ,759 3, ,540 3, ,346 3, ,171 3, ,014 2, ,871 2, ,742 2,746 Single Phase 1 Ph Sym Fault Current (Amps) Service Length (Ft.) ,953 2, ,987 2, ,288 2, ,759 2, ,346 2, ,014 2, ,742 2, ,514 2, ,322 2, ,156 2, ,013 2, ,887 2, ,777 1,940

5 Effective October 24, 2013 Page 5 of KVA Overhead Transformer (#1/0 Aluminum Multiplex) %Z: 1.4 Three Phase Bank (3-15 KVA) Service Length (Ft.) ,922 7, ,986 7, ,190 6, ,516 6, ,943 5, ,454 5, ,033 4, ,669 4, ,351 4, ,072 4, ,825 3, ,605 3, ,408 3,526 Single Phase 1 Ph Sym Fault Current (Amps) Service Length (Ft.) ,928 4, ,193 4, ,944 3, ,034 3, ,351 3, ,824 3, ,407 3, ,070 3, ,793 3, ,560 2, ,363 2, ,194 2, ,047 2,618

6 Effective October 24, 2013 Page 6 of KVA Overhead Transformer (#1/0 Aluminum Multiplex) %Z: 1.4 Three Phase Bank (3-25 KVA) 0 14,865 12,883 6, ,472 11,279 6, ,612 9,947 6, ,175 8,851 5, ,052 7,947 5, ,158 7,196 5, ,434 6,565 5, ,837 6,029 5, ,339 5,571 4, ,917 5,174 4, ,555 4,829 4, ,242 4,525 4, ,968 4,257 4,426 Single Phase 1 Ph Sym Fault Current (Amps) Service Length (Ft.) ,876 7, ,615 6, ,052 6, ,433 5, ,337 5, ,553 4, ,967 4, ,512 4, ,150 4, ,855 3, ,610 3, ,404 3, ,227 3,216

7 Effective October 24, 2013 Page 7 of KVA Overhead Transformer (#1/0 Aluminum Multiplex) %Z: 1.4 Three Phase Bank ( KVA) 0 22,306 19,332 9, ,751 16,284 9, ,308 13,764 8, ,831 11,788 8, ,025 10,246 8, ,670 9,029 7, ,624 8,053 7, ,795 7,258 7, ,125 6,600 6, ,573 6,047 6, ,110 5,578 6, ,718 5,174 6, ,380 4,824 5,894 Single Phase 1 Ph Sym Fault Current (Amps) Service Length (Ft.) ,323 11, ,310 9, ,023 8, ,621 7, ,123 7, ,108 6, ,378 5, ,829 5, ,401 5, ,059 4, ,779 4, ,546 4, ,349 3,810

8 Effective October 24, 2013 Page 8 of KVA Overhead Transformer (#4/0 Aluminum Multiplex) %Z: 1.4 Three Phase Bank ( KVA) 0 22,306 19,332 9, ,477 17,452 9, ,113 15,802 9, ,170 14,372 8, ,573 13,140 8, ,250 12,077 8, ,145 11,156 8, ,211 10,354 8, ,415 9,651 7, ,728 9,032 7, ,132 8,484 7, ,609 7,995 7, ,148 7,557 7,186 Single Phase 1 Ph Sym Fault Current (Amps) Service Length (Ft.) ,323 11, ,119 10, ,574 9, ,144 9, ,413 8, ,130 8, ,146 7, ,370 7, ,743 6, ,227 6, ,795 6, ,428 5, ,113 5,572

9 Effective October 24, 2013 Page 9 of KVA Overhead Transformer (#1/0 Aluminum Multiplex) %Z: 2.0 Three Phase Bank (3-50 KVA) 0 20,813 18,038 9, ,716 15,293 8, ,613 13,031 8, ,350 11,241 7, ,679 9,830 7, ,411 8,705 7, ,424 7,795 7, ,637 7,049 6, ,997 6,427 6, ,467 5,903 6, ,022 5,455 6, ,642 5,069 5, ,316 4,733 5,621 Single Phase 1 Ph Sym Fault Current (Amps) Service Length (Ft.) ,828 10, ,615 9, ,677 8, ,422 7, ,995 6, ,020 6, ,313 5, ,780 5, ,363 4, ,028 4, ,753 4, ,524 3, ,330 3,711

10 Effective October 24, 2013 Page 10 of KVA Overhead Transformer (#4/0 Aluminum Multiplex) %Z: 2.0 Three Phase Bank (3-50 KVA) 0 20,813 18,038 9, ,275 16,351 8, ,154 14,872 8, ,400 13,587 8, ,948 12,474 8, ,737 11,508 7, ,718 10,667 7, ,851 9,930 7, ,108 9,281 7, ,464 8,707 7, ,902 8,196 7, ,408 7,739 6, ,970 7,329 6,794 Single Phase 1 Ph Sym Fault Current (Amps) Service Length (Ft.) ,828 10, ,160 9, ,950 9, ,717 8, ,106 8, ,900 7, ,968 7, ,229 6, ,628 6, ,132 6, ,715 5, ,360 5, ,055 5,359

11 Effective October 24, 2013 Page 11 of KVA Overhead Transformer (4 # 500 KCM Aluminum) %Z: 2.0 Three Phase Bank (3-50 KVA) 0 20,813 18,038 9, ,936 16,099 8, ,757 14,535 8, ,049 13,248 8, ,675 12,170 8, ,545 11,254 7, ,600 10,466 7, ,798 9,781 7, ,109 9,180 7, ,510 8,649 7, ,985 8,176 6, ,522 7,752 6, ,109 7,369 6,624

12 Effective October 24, 2013 Page 12 of KVA Overhead Transformer (#1/0 Aluminum Multiplex) %Z: 2.0 Three Phase Bank (3-75 KVA) 0 31,219 27,057 13, ,852 21,384 12, ,273 17,102 12, ,690 14,055 11, ,274 11,854 10, ,558 10,215 10, ,284 8,958 9, ,303 7,968 9, ,527 7,171 8, ,899 6,515 8, ,379 5,967 7, ,943 5,503 7, ,572 5,106 7,027 Single Phase 1 Ph Sym Fault Current (Amps) Service Length (Ft.) ,242 15, ,273 13, ,271 11, ,280 9, ,524 8, ,376 7, ,570 6, ,972 6, ,512 5, ,148 5, ,851 4, ,606 4, ,399 4,140

13 Effective October 24, 2013 Page 13 of KVA Overhead Transformer (#4/0 Aluminum Multiplex) %Z: 2.0 Three Phase Bank (3-75 KVA) 0 31,219 27,057 13, ,945 23,527 13, ,836 20,578 12, ,695 18,165 12, ,271 16,192 11, ,366 14,568 11, ,839 13,217 10, ,594 12,082 10, ,562 11,117 10, ,694 10,289 9, ,955 9,571 9, ,319 8,944 9, ,765 8,393 9,082 Single Phase 1 Ph Sym Fault Current (Amps) Service Length (Ft.) ,242 15, ,841 14, ,270 12, ,837 11, ,559 10, ,952 10, ,762 9, ,847 8, ,124 8, ,537 7, ,052 7, ,645 6, ,298 6,418

14 Effective October 24, 2013 Page 14 of KVA Overhead Transformer (4 # 500 KCM Aluminum) %Z: 2.0 Three Phase Bank (3-75 KVA) 0 31,219 27,057 13, ,153 22,907 12, ,060 19,861 12, ,113 17,529 11, ,889 15,688 11, ,152 14,197 11, ,757 12,964 10, ,612 11,929 10, ,656 11,046 9, ,845 10,285 9, ,149 9,623 9, ,545 9,040 9, ,016 8,524 8,765

15 Effective October 24, 2013 Page 15 of KVA Overhead Transformer (4 # 1000 KCM Aluminum) %Z: 2.0 Three Phase Bank (3-75 KVA) 0 31,219 27,057 13, ,250 22,980 12, ,176 19,957 12, ,225 17,630 11, ,992 15,785 11, ,244 14,288 11, ,839 13,048 10, ,685 12,006 10, ,722 11,117 9, ,904 10,351 9, ,203 9,683 9, ,594 9,095 9, ,060 8,575 8,815

16 Effective October 24, 2013 Page 16 of KVA Overhead Transformer (#1/0 Aluminum Multiplex) %Z: 2.5 Three Phase Bank (3-100 KVA) 0 33,299 28,859 14, ,667 23,099 13, ,466 18,384 12, ,480 14,982 12, ,823 12,537 11, ,957 10,733 10, ,586 9,361 10, ,539 8,290 9, ,716 7,432 9, ,053 6,731 8, ,508 6,149 8, ,052 5,659 7, ,665 5,239 7,491 Single Phase 1 Ph Sym Fault Current (Amps) Service Length (Ft.) ,323 16, ,465 14, ,819 12, ,582 10, ,713 9, ,505 8, ,663 7, ,042 6, ,567 5, ,192 5, ,887 4, ,636 4, ,425 4,291

17 Effective October 24, 2013 Page 17 of KVA Overhead Transformer (#4/0 Aluminum Multiplex) %Z: 2.5 Three Phase Bank (3-100 KVA) 0 33,299 28,859 14, ,892 25,275 13, ,433 22,117 13, ,963 19,471 13, ,279 17,290 12, ,177 15,491 12, ,501 13,998 11, ,142 12,748 11, ,022 11,689 11, ,085 10,785 10, ,290 10,005 10, ,609 9,326 10, ,020 8,730 9,736 Single Phase 1 Ph Sym Fault Current (Amps) Single Phase Service Length (Ft.) ,323 16, ,438 15, ,278 13, ,498 12, ,018 11, ,286 10, ,016 9, ,046 9, ,283 8, ,668 8, ,162 7, ,738 7, ,378 6,749

18 Effective October 24, 2013 Page 18 of KVA Overhead Transformer (4 # 500 KCM Aluminum) %Z: 2.5 Three Phase Bank (3-100 KVA) 0 33,299 28,859 14, ,510 24,204 13, ,014 20,839 13, ,820 18,293 12, ,434 16,300 12, ,584 14,698 11, ,109 13,383 11, ,904 12,283 10, ,902 11,351 10, ,055 10,549 10, ,331 9,854 9, ,703 9,244 9, ,155 8,706 9,146 Single Phase 1 Ph Sym Fault Current (Amps) Service Length (Ft.) ,323 16, ,020 14, ,434 13, ,107 12, ,899 11, ,328 10, ,152 9, ,240 8, ,511 8, ,915 7, ,420 7, ,001 6, ,642 6,553

19 Effective October 24, 2013 Page 19 of KVA Overhead Transformer (4 # 1000 KCM Aluminum) %Z: 2.5 Three Phase Bank (3-100 KVA) 0 33,299 28,859 14, ,508 24,203 13, ,015 20,838 13, ,822 18,293 12, ,437 16,302 12, ,589 14,701 11, ,114 13,386 11, ,909 12,287 10, ,908 11,355 10, ,061 10,554 10, ,337 9,859 9, ,710 9,249 9, ,161 8,711 9,147

20 Effective October 24, 2013 Page 20 of KVA Overhead Transformer (#4/0 Aluminum Multiplex) %Z: 2.5 Three Phase Bank (3-167 KVA) 0 55,623 48,206 24, ,878 38,973 22, ,118 31,611 21, ,643 26,195 20, ,203 22,204 19, ,019 19,197 18, ,640 16,871 17, ,804 15,029 16, ,346 13,539 15, ,163 12,311 15, ,184 11,283 14, ,362 10,411 13, ,661 9,662 13,097

21 Effective October 24, 2013 Page 21 of KVA Overhead Transformer (4 # 500 KCM Aluminum) %Z: 2.5 Three Phase Bank (3-167 KVA) 0 55,623 48,206 24, ,007 36,528 22, ,006 29,383 20, ,372 24,568 19, ,517 21,105 18, ,713 18,496 17, ,582 16,461 16, ,909 14,828 15, ,560 13,490 14, ,450 12,373 14, ,519 11,427 13, ,729 10,615 12, ,049 9,911 12,284

22 Effective October 24, 2013 Page 22 of KVA Overhead Transformer (4 # 1000 KCM Aluminum) %Z: 2.5 Three Phase Bank (3-167 KVA) 0 55,623 48,206 24, ,925 36,460 22, ,937 29,315 20, ,320 24,511 19, ,478 21,060 18, ,684 18,461 17, ,561 16,433 16, ,893 14,806 15, ,548 13,472 14, ,441 12,359 13, ,513 11,416 13, ,724 10,606 12, ,046 9,904 12,256

23 Effective October 24, 2013 Page 23 of KVA Overhead Transformer (4 x 2 # 1000 KCM Aluminum) %Z: 2.5 Three Phase Bank (3-167 KVA) Service Length (Ft.) ,623 48, ,800 41, ,925 36, ,845 32, ,937 29, ,838 26, ,320 24, ,235 22, ,478 21, ,979 19, ,684 18, ,555 17, ,561 16,433

24 Effective October 24, 2013 Page 24 of KVA Overhead Transformer (4 x 3 # 1000 KCM Aluminum) %Z: 2.5 Three Phase Bank (3-250 KVA) Service Length (Ft.) , , , , , , , , , , , , ,635

25 Effective October 24, 2013 Page 25 of KVA Overhead Transformer (4 # 1000 KCM Aluminum) %Z: 2.5 Three Phase Bank (3-250 KVA) Service Length (Ft.) , , , , , , , , , , , , ,746

26 Effective October 24, 2013 Page 26 of KVA Overhead Transformer (4 x 3 # 1000 KCM Aluminum) %Z: 3.0 Three Phase Bank (3-333 KVA) Service Length (Ft.) , , , , , , , , , , , , ,088

27 Effective October 24, 2013 Page 27 of KVA Overhead Transformer (4 x 3 # 1000 KCM Aluminum) %Z: 3.0 Three Phase Bank (1500 KVA) Service Length (Ft.) , , , , , , , , , , , , ,333

INDUSTRIAL AND COMMERCIAL SERVICE TRANSFORMER & METERING INSTALLATION SPECIFICATION

INDUSTRIAL AND COMMERCIAL SERVICE TRANSFORMER & METERING INSTALLATION SPECIFICATION INDUSTRIAL AND COMMERCIAL SERVICE TRANSFORMER & METERING INSTALLATION SPECIFICATION February 2013 NOTE: If conflict exists between St. Thomas Energy s Conditions of Service and this document, the Conditions

More information

How To Get A Power Line Extension

How To Get A Power Line Extension GUIDELINES FOR COMMERCIAL ELECTRIC SERVICE HOOKUP 1 Steps to Commercial Service Pay the Design Deposit Commercial Buildings: Up to 1, sq ft = $1,. 1, 5, sq ft = $2,. Over 5, sq ft = $3,. Commercial jobs

More information

Underground Commercial Electric Service

Underground Commercial Electric Service Underground Commercial Electric Service SCANA Corporation 2013 Revised: June 2013 Table of Contents SECTION PAGE I. Specification and Requirements 2 A. General B. Definition of Terms C. Company and Developer

More information

Approved Meter Sockets and Cabinets

Approved Meter Sockets and Cabinets Single Unit Residential Guide 1 PHASE, 120/240 VOLT S METERING (Metering sockets and cabinets are supplied by Customer). Outdoor meter mounting height is 1730 mm ( 5 8 ) to center of meter ± 100 mm ( 4

More information

4160: THE GREEN 480 MEDIUM VOLTAGE ELECTRICAL SYSTEMS

4160: THE GREEN 480 MEDIUM VOLTAGE ELECTRICAL SYSTEMS 4160: THE GREEN 480 MEDIUM VOLTAGE ELECTRICAL SYSTEMS for DATA CENTERS Michael Mosman, PE Chief Technical Officer CCG Facilities Integration Incorporated FACILITIES INTEGRATION INCORPORATED MEDIUM VOLTAGE

More information

RISK MITIGATION for ELECTRICAL WORK. Feb 2013 San Diego CA

RISK MITIGATION for ELECTRICAL WORK. Feb 2013 San Diego CA RISK MITIGATION for ELECTRICAL WORK Feb 2013 San Diego CA Agenda I. RISK Define the Risks Arc Flash Review II. MITIGATION 3 Easy Steps New Designs Vs. Existing Systems III. DUKE UNIVERSITY EXAMPLE I. Risk

More information

misconceptions about arc-flash hazard assessments

misconceptions about arc-flash hazard assessments misconceptions about arc-flash hazard assessments There are some common misconceptions about Arc-Flash Hazard Assessments which reduce the effectiveness of the Assessments and can increase electrical hazards.

More information

Short Circuit Current Calculations

Short Circuit Current Calculations Introduction Several sections of the National Electrical Code relate to proper overcurrent protection. Safe and reliable application of overcurrent protective devices based on these sections mandate that

More information

MEDIUM VOLTAGE. Michael Mosman, PE. CCG Facilities Integration Incorporated FACILITIES INTEGRATION INCORPORATED

MEDIUM VOLTAGE. Michael Mosman, PE. CCG Facilities Integration Incorporated FACILITIES INTEGRATION INCORPORATED MEDIUM VOLTAGE ELECTRICAL SYSTEMS for DATA CENTERS Michael Mosman, PE Chief Technical Officer CCG Facilities Integration Incorporated FACILITIES INTEGRATION INCORPORATED CCG Facilities Integration Incorporated

More information

Management Systems 10 Electrical Safety Audit 14 PPE 20 Arc Mitigation 22 Hazard Assessment 26

Management Systems 10 Electrical Safety Audit 14 PPE 20 Arc Mitigation 22 Hazard Assessment 26 Management Systems 10 Electrical Safety Audit 14 PPE 20 Arc Mitigation 22 Hazard Assessment 26 Assessing The Hazards Of High and Low Voltage Single-Phase Arc-Flash By Albert Marroquin One common question

More information

BGE Service Application Guidelines Commercial & Industrial Projects

BGE Service Application Guidelines Commercial & Industrial Projects BGE Service Application Guidelines Commercial & Industrial Projects To the Customer Following is important information to assist you in applying for BGE gas and/or electric service and in completing the

More information

CIRCUIT BREAKER INTERRUPTING CAPACITY AND SHORT-TIME CURRENT RATINGS

CIRCUIT BREAKER INTERRUPTING CAPACITY AND SHORT-TIME CURRENT RATINGS CIRCUIT BREAKER INTERRUPTING CAPACITY AND SHORT-TIME CURRENT RATINGS David D. Roybal, P.E. Senior Member, IEEE Eaton Electrical 3697 Mount Diablo Boulevard Lafayette, CA 94549 Abstract Low-voltage circuit

More information

Electric Service Rules

Electric Service Rules 2016 Electric Service Rules GENERAL INFORMATION TEMPORARY SERVICES OVERHEAD SERVICES UNDERGROUND SERVICES DISTRIBUTED GENERATION METERING HUD MANUFACTURED HOMES FARM SERVICES UTILITY/CATV SERVICES PRIMARY

More information

Arc Flash Avoidance and its Application to Overhead Traveling Cranes

Arc Flash Avoidance and its Application to Overhead Traveling Cranes Arc Flash Avoidance and its Application to Overhead Traveling Cranes Whitepaper August 2012 Jason Wellnitz, Controls Product Manager Material Handling Numerous technical papers, bulletins, magazine articles

More information

Landscaping around electrical equipment

Landscaping around electrical equipment Landscaping around electrical equipment Electrical equipment and natural gas lines are a part of every home s landscaping. Whether these are visible, such as an overhead powerline or a padmount transformer,

More information

SECTION DVD01: VOLTAGE DROP/VOLTAGE FLICKER AND TRANSFORMER SIZING GUIDELINES

SECTION DVD01: VOLTAGE DROP/VOLTAGE FLICKER AND TRANSFORMER SIZING GUIDELINES Issued 06-01-07 DESIGN Section DVD00 INFORMATION SECTION Page 1 of 1 INDEX SECTION DVD01: VOLTAGE DROP/VOLTAGE FLICKER AND TRANSFORMER INTRODUCTION... Page 2 LOAD ESTIMATING AND TRANSFORMER SIZING GUIDELINES...Page

More information

What Are the Qualifications to Conduct Arc Flash Studies? Where Do You Begin?

What Are the Qualifications to Conduct Arc Flash Studies? Where Do You Begin? What Are the Qualifications to Conduct Arc Flash Studies? Where Do You Begin? Comparing apples-to-apples bids Plant Services Special Report A shock hazard analysis should be included as part of an arc

More information

Wellesley Municipal Light Plant. Standard Requirements for Electric Service

Wellesley Municipal Light Plant. Standard Requirements for Electric Service Wellesley Municipal Light Plant Standard Requirements for Electric Service Index Section 1... General Information Section 2..General Requirements for Service Section 3. Types of Available Service Section

More information

Bypass transfer switch mechanisms

Bypass transfer switch mechanisms Power topic #6013 Technical information from Cummins Power Generation transfer switch mechanisms > White paper By Gary Olson, Director, Power Systems Development This paper describes the configuration

More information

11 Guardrail. W-Beam Guardrail Pre-Installation Inspection During Installation Basis for Use. Modified Guardrail. End Treatments and Transitions

11 Guardrail. W-Beam Guardrail Pre-Installation Inspection During Installation Basis for Use. Modified Guardrail. End Treatments and Transitions 11 Guardrail W-Beam Guardrail Pre-Installation Inspection During Installation Basis for Use Modified Guardrail End Treatments and Transitions Footings and Anchors Impact Attenuators Measurement and Payment

More information

Issued 06-01-07 E.C.S. Section WTR00 INFORMATION SECTION Page 1 of 1

Issued 06-01-07 E.C.S. Section WTR00 INFORMATION SECTION Page 1 of 1 Issued 06-01-07 E.C.S. Section WTR00 INFORMATION SECTION Page 1 of 1 INDEX SECTION WTR01: ELECTRICAL CONNECTIONS PRIMARY.. Page 1 SERVICE DROPS FROM THREE-PHASE TRANSFORMER BANKS.. Page 9 SECTION WTR02:

More information

NEGLIGENCE BY DOCTORS AND OTHER HEALTH PROFESSIONALS A GUIDE TO YOUR ENTITLEMENTS

NEGLIGENCE BY DOCTORS AND OTHER HEALTH PROFESSIONALS A GUIDE TO YOUR ENTITLEMENTS NEGLIGENCE BY DOCTORS AND OTHER HEALTH PROFESSIONALS A GUIDE TO YOUR ENTITLEMENTS This guide includes the following: Adverse outcomes contrasted with negligent outcomes. What is negligence? If my treatment

More information

Arc Flash Mitigation. Remote Racking and Switching for Arc Flash danger mitigation in distribution class switchgear.

Arc Flash Mitigation. Remote Racking and Switching for Arc Flash danger mitigation in distribution class switchgear. Arc Flash Mitigation Remote Racking and Switching for Arc Flash danger mitigation in distribution class switchgear. Distance is Safety We will discuss through examples of actual occurrences and possible

More information

Town of Maiden. Request for Proposals For Sign Replacement Project

Town of Maiden. Request for Proposals For Sign Replacement Project Town of Maiden 19 N. Main Avenue Maiden, NC 28650 (828) 428-5000 Request for Proposals For Sign Replacement Project Section I Introduction and Intent of RFP: Pursuant to the General Statutes of North Carolina

More information

IO-DIM6 6-Channel, Digital to Analogue Converters

IO-DIM6 6-Channel, Digital to Analogue Converters Page 1 of 6 IO-DIM6 6-Channel, Digital to Analogue Converters Features: Benefits: Input status indication Calibrated output DIN Rail mounting Expands controller input capacity Fault finding LED indication

More information

Transformer-coupled passive transmit path with a fixed insertion loss of approximately 1.0dB.

Transformer-coupled passive transmit path with a fixed insertion loss of approximately 1.0dB. Charles Industries, Ltd. Section 319 29P 201 Equipment Issue 1 Second Printing, August 1999 STS 3192 9P Short Loop Office Repeater CONTENTS Complies with UL Standard 1459 Second Edition. PAGE Part 1. GENERAL.............................................................................

More information

This section applies to the design and installation of transformers.

This section applies to the design and installation of transformers. ELECTRICAL: TRANSFORMERS BASIS OF DESIGN This section applies to the design and installation of transformers. Design Criteria 13.8-kV equipment shall be 15-kV class. Coordinate with short-circuit studies

More information

ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS

ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS Prepared by: ABB1 ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS 052521 Asset Type: Electric Metering Function: Construction Issued by: Quoc Hoang (QxH1) Date: 07-01-16 Rev. #06: This document

More information

BRANDON AND CLARK INC. // SCOTT W. CLARK, P.E. ELECTRICAL CONTINUING EDUCATION ARC FLASH - NFPA 70E

BRANDON AND CLARK INC. // SCOTT W. CLARK, P.E. ELECTRICAL CONTINUING EDUCATION ARC FLASH - NFPA 70E BRANDON AND CLARK INC. // SCOTT W. CLARK, P.E. ELECTRICAL CONTINUING EDUCATION ARC FLASH - NFPA 70E Training is not a substitute for following corporate safety guidelines. Always refer to the latest safety

More information

Call the Experts at REA Energy Services for all of Your Electrical and HVAC Needs.

Call the Experts at REA Energy Services for all of Your Electrical and HVAC Needs. Call the Experts at REA Energy Services for all of Your Electrical and HVAC Needs. REA Energy Services Sells and Installs: Heating and Air Conditioning Electrical Contracting Geothermal Heat Pumps Back-Up

More information

4/1/2016 Revision of the CNP Service Standards Book (Effective Date 5-1-2016)

4/1/2016 Revision of the CNP Service Standards Book (Effective Date 5-1-2016) 0 4/1/2016 Revision of the CNP Service Standards Book (Effective Date 5-1-2016) 1. Article 422.1 Meter Pole Installations - Requirements (Page 59). Revised paragraph - Steel poles shall be truck accessible.

More information

Changes in the 10/2/2013 Revision of the CNP Service Standards Book

Changes in the 10/2/2013 Revision of the CNP Service Standards Book 0 Changes in the 10/2/2013 Revision of the CNP Service Standards Book 1. Article 303 - Three Phase (Page 19). Revised 240/120V Delta, Added Max Load to Overhead and Underground 2. Article 408 - Service

More information

Low Voltage Transformer Through-Fault Protection: A System Approach

Low Voltage Transformer Through-Fault Protection: A System Approach Data Bulletin 7400DB1001 Nashville, TN USA Low Voltage Transformer Through-Fault Protection: A System Approach Introduction Low Voltage Transformer Protection Criteria NEC Article 450 Transformers and

More information

FIT TIER 2 Application

FIT TIER 2 Application FIT TIER 2 Application Application Information The below information Auto-Fills from your registration information: Building Permit Application Date: Project Completion Date: Name: Address: City: State:

More information

Simple Methods for Calculating Short Circuit Current Without a Computer By Dennis McKeown, PE GE Senior System Application Engineer

Simple Methods for Calculating Short Circuit Current Without a Computer By Dennis McKeown, PE GE Senior System Application Engineer Simple Methods for Calculating Short Circuit Current Without a Computer By Dennis McKeown, PE GE Senior System Application Engineer A Short Circuit analysis is used to determine the magnitude of short

More information

November 2014. Stray Voltage Test Procedure for Electrical Contractors

November 2014. Stray Voltage Test Procedure for Electrical Contractors Stray Voltage Test Procedure for Electrical Contractors 1 LIMITATION OF LIABILITY AND DISCLAIMER Any person who uses, relies on, or otherwise deals with this document and the information herein, does so

More information

Policy and Guidelines for Electric Service

Policy and Guidelines for Electric Service Policy and Guidelines for Electric Service FRANKLIN MUNICIPAL POWER & LIGHT 1050 Pretlow Street Franklin, VA 23851 757-562-8568 757-562-7883 Fax January 2008 Franklin Power & Light HELPFUL TELEPHONE NUMBERS

More information

3. TYPES OF SERVICE AVAILABLE. 3.1 Scope

3. TYPES OF SERVICE AVAILABLE. 3.1 Scope 3. TYPES OF SERVICE AVAILABLE 3.1 Scope UI supplies 60 hertz, alternating current with different voltage and ampere ratings. Not all voltage and ampere ratings are available throughout the entire service

More information

Technical Guide. SKM Arc Flash Line Side vs. Load Side

Technical Guide. SKM Arc Flash Line Side vs. Load Side SKM Arc Flash Line vs. Load The option of choosing the line-side or the load-side arc flash incident energy for arc flash labels is an important decision when performing an arc flash hazard analysis. When

More information

Litigation Services & Information

Litigation Services & Information Litigation Services & Information Laurence "Lo" Lehman, P.E. Lehman Engineering Company Lehman Engineering has been providing engineering, design, and consulting services for electrical power systems to

More information

4. REQUEST FOR ELECTRIC SERVICE. 4.1 General Service Information

4. REQUEST FOR ELECTRIC SERVICE. 4.1 General Service Information 4. REQUEST FOR ELECTRIC SERVICE To establish an electric service, temporary or permanent, contact UI s Customer Care Center by calling: 1-800-722-5584 (7:00 a.m. 7:00 p.m., Monday Friday and 7:00 AM to

More information

Welcome to Home Wiring Repair Essential. No-cost, no hassle home wiring repairs.

Welcome to Home Wiring Repair Essential. No-cost, no hassle home wiring repairs. Welcome to Home Wiring Repair Essential. No-cost, no hassle home wiring repairs. Important program terms and conditions are inside. Please file for future reference. 2015 Duke Energy Corporation 151299-hw

More information

2012 Canadian Electrical Code, Part I (CEC) Top Fifteen changes

2012 Canadian Electrical Code, Part I (CEC) Top Fifteen changes 2012 Canadian Electrical Code, Part I (CEC) Top Fifteen changes 1) Tamper resistant receptacles. 2009 CEC Required in dwelling units 2012 CEC Expanded to child care facilities First introduced in the 2009

More information

Ceiling Mount Air Handler Manual

Ceiling Mount Air Handler Manual www.surna.com 303.993.5271 Ceiling Mount Air Handler Manual Models: CMAH12, CMAH18, CMAH24, CMAH30, CMAH36, CMAH48, CMAH60 Revised: September 2014 Table of Contents Warranty Information 4 Limited Warranty

More information

Electrical. This section applies to the design and installation of building power distribution systems.

Electrical. This section applies to the design and installation of building power distribution systems. Basis of Design This section applies to the design and installation of building power distribution systems. Design Criteria This section contains the architectural, structural and mechanical provisions

More information

Oracle Health Sciences Network Patient Recruiter Cloud Service - Overview

Oracle Health Sciences Network Patient Recruiter Cloud Service - Overview Oracle Health Sciences Network Patient Recruiter Cloud Service Services Description Version: 2.0 Effective Date: 01-April-2013 Oracle Health Sciences Network Patient Recruiter Cloud Service - Services

More information

Considering UNDERGROUND. tampaelectric.com

Considering UNDERGROUND. tampaelectric.com Considering UNDERGROUND Electric Service? tampaelectric.com INTRODUCTION The majority of Tampa Electric s customers receive their electric service through overhead construction, which is the standard type

More information

Help protect your home, possessions and family.

Help protect your home, possessions and family. Help protect your home, possessions and family. A guide to your Square D electrical distribution system SM Make the most of your energy Understanding your home s electrical distribution system As one of

More information

Primary and Secondary Electrical Distribution Systems

Primary and Secondary Electrical Distribution Systems Primary and Secondary Electrical Distribution Systems Critical Facilities Round Table 12th Quarterly Membership Meeting June 2, 2006 David D. Roybal. P.E. Eaton Electrical Cutler-Hammer Products Utility

More information

2.4 kv to 34.5 kv SP-1099

2.4 kv to 34.5 kv SP-1099 Specifications for Customer Electric Service 2.4 kv to 34.5 kv SP-1099 FORWARD...1 CHAPTER 1 - PRIMARY METERED SERVICE...4 General Service Information...4 CA-206...6 CA-208A...7 Section 1...8 Existing

More information

MOBILE HOME SERVICE REQUIREMENTS GAS

MOBILE HOME SERVICE REQUIREMENTS GAS ELECTRIC AND GAS 1.0 INDEX 1.0 INDEX 2.0 PURPOSE 3.0 GENERAL 4.0 REFERENCE MATERIAL 5.0 TYPICAL UNDERGROUND UTILITY LAYOUT 6.0 METER PAD DETAILS 7.0 GENERAL INSTALLATION PROCEDURES 8.0 PEDESTAL SPECIFICATIONS

More information

BroadBand PowerShield. User Manual

BroadBand PowerShield. User Manual BroadBand PowerShield User Manual 990-0375G 12/2006 Chapter 1 General Information The PowerShield provides a power source for broadband telephony and other DC applications. Safety This Safety Guide contains

More information

School District Design and Project Management For Rochester, NY

School District Design and Project Management For Rochester, NY The following is a list of projects completed by Engineered Solutions or its President Eric Sheffer, P.E.: Medium Voltage Design and project management for replacement of 1500KVA double ended substation

More information

MODEL VG08008 CONTENT PACKING LIST / TOOLS NEEDED PANEL DIMENSIONS FITTINGS / TECHNICAL DATA WALL/CORNER INSTALLATION CARE AND TROUBLE SHOOTING

MODEL VG08008 CONTENT PACKING LIST / TOOLS NEEDED PANEL DIMENSIONS FITTINGS / TECHNICAL DATA WALL/CORNER INSTALLATION CARE AND TROUBLE SHOOTING CONTENT PACKING LIST / TOOLS NEEDED PANEL DIMENSIONS FITTINGS / TECHNICAL DATA WALL/CORNER INSTALLATION CARE AND TROUBLE SHOOTING WARRANTY 1 PACKING LIST DESCRIPTION MODEL NUMBER - PANEL HOUSING 88062

More information

TABLE OF CONTENTS 1.0 INTRODUCTION... 2 1.1 PURPOSE... 2 1.2 DEVIATION... 2 4.0 INTERTIE PROTECTION REQUIREMENTS... 4

TABLE OF CONTENTS 1.0 INTRODUCTION... 2 1.1 PURPOSE... 2 1.2 DEVIATION... 2 4.0 INTERTIE PROTECTION REQUIREMENTS... 4 Page: 1 of 14 KEY BULLETIN POINTS: THIS GUIDE OUTLINES MINIMUM REQUIREMENTS FOR CONNECTION OF CUSTOMER-OWNED EMERGENCY AND STANDBY (ESG) TO THE GEORGIA POWER COMPANY (GPC) DISTRIBUTION SYSTEM. THESE ARE

More information

Element D Services Electrical

Element D Services Electrical Service and PART 1 - GENERAL 1.01 OVERVIEW A. This Section includes design standards and requirements for electrical service and distribution. This is a design standard and is not intended to be used as

More information

Applying For New or Revised Electric Service

Applying For New or Revised Electric Service Applying For New or Revised Electric Service Dear Customer: ComEd is happy to assist you in initiating new or revised electric service to your location. Please complete, sign and return the attached service

More information

ATS Overhead Table Shelf System INSTRUCTION MANUAL

ATS Overhead Table Shelf System INSTRUCTION MANUAL ATS Overhead Table Shelf System INSTRUCTION MANUAL ATS Overhead Table Shelf System Instruction Manual Warranty Newport Corporation warrants this product to be free of defects in material and workmanship

More information

ELECTRIC SERVICE GUIDELINES (For Indiana)

ELECTRIC SERVICE GUIDELINES (For Indiana) ELECTRIC SERVICE GUIDELINES (For Indiana) FOR COMMERCIAL / INDUSTRIAL DEVELOPMENTS ELECTRIC SERVICE GUIDELINES FOR COMMERCIAL/INDUSTRIAL DEVELOPMENTS INTRODUCTION... 2 WHAT YOU NEED TO OBTAIN ELECTRIC

More information

Snow/Ice Melt Heating Cable System Gutters & Roof Drains Installation Manual Nexans TXLP/1 Series Resistance Cables

Snow/Ice Melt Heating Cable System Gutters & Roof Drains Installation Manual Nexans TXLP/1 Series Resistance Cables 1. GENERAL INFORMATION Description Snow or ice dams that have built up on a roof can cause water damage to the interior of homes as well as damage to gutters and downspouts. This custom TXLP/1 single conductor

More information

NFPA 70E Updates Affect Your Most Valuable Assets

NFPA 70E Updates Affect Your Most Valuable Assets NFPA 70E Updates Affect Your Most Valuable Assets EXECUTIVE SUMMARY Electrocution is a well-known hazard associated with direct contact with electrical energy. According to the U.S. Department of Labor,

More information

AN96-07. Surging Ideas TVS Diode Application Note PROTECTION PRODUCTS. TRANSIENT IMMUNITY STANDARDS: IEC 61000-4-x

AN96-07. Surging Ideas TVS Diode Application Note PROTECTION PRODUCTS. TRANSIENT IMMUNITY STANDARDS: IEC 61000-4-x TRANSIENT IMMUNITY STANDARDS: IEC 61000-4-x On January 1, 1996, exports into Europe began facing some tough transient immunity standards. The International Electrotechnical Commission (IEC), a worldwide

More information

Written Program ELECTRICAL SAFETY. Based on OSHA Subpart S and NFPA 70E Standards

Written Program ELECTRICAL SAFETY. Based on OSHA Subpart S and NFPA 70E Standards Written Program ELECTRICAL SAFETY Based on OSHA Subpart S and NFPA 70E Standards Revised November 2012 Disclaimer The presentations and program provided by Workplace Safety Solutions, Inc. are based on

More information

Critical SQL Server Databases:

Critical SQL Server Databases: Webinar Critical SQL Server Databases: Provide HA with SQL Server Failover Clustering and Cluster Shared Volumes Edwin Sarmiento Microsoft MVP/Microsoft Certified Master: http://www.edwinmsarmiento.com

More information

L5354 ControlNet Communications Interface

L5354 ControlNet Communications Interface L5354 ControlNet Communications Interface Technical Manual HA470733 Issue 2 Copyright SSD Drives Inc 2005 All rights strictly reserved. No part of this document may be stored in a retrieval system, or

More information

Transmission Business Electrical Incident & Safety Performance Reporting Guide

Transmission Business Electrical Incident & Safety Performance Reporting Guide Transmission Business Electrical Incident & Safety Performance Reporting Guide December 2011 Version 1.0 Energy Safe Victoria PO Box 262 Collins Street West MELBOURNE VIC 8007 AUSTRALIA Telephone (03)

More information

BS5839 Part 1:2002 Overview

BS5839 Part 1:2002 Overview BS5839 Part 1:2002 Overview 1 Contents Introduction So why is the current standard being revised? The brief for the new standard Changes to structure of current Standard Enhanced certification of Fire

More information

PIPELINE AND UTILLITY PERMIT APPLICATION PACKET

PIPELINE AND UTILLITY PERMIT APPLICATION PACKET Orange County Drainage District 8081 Old Hwy 90 Orange, Texas 77630 Main Office (409) 745-3225 Fax (409) 745-3004 PIPELINE AND UTILLITY PERMIT APPLICATION PACKET Contact the Orange County Drainage District

More information

Heat Tracing is the use of an externally applied heat source to a pipeline to compensate for heat losses through the thermal insulation.

Heat Tracing is the use of an externally applied heat source to a pipeline to compensate for heat losses through the thermal insulation. Heat Tracing is the use of an externally applied heat source to a pipeline to compensate for heat losses through the thermal insulation. Heat tracing evolved from the need to maintain the flow of low,

More information

Application for. Commercial New Service

Application for. Commercial New Service Application for Commercial New Service Welcome to Lake Country Power! In order to make your new service installation easy, we provide individualized help to process and install a new service. In order

More information

BC Hydro. Electric Distribution System Cost of Service Study

BC Hydro. Electric Distribution System Cost of Service Study BC Hydro Electric Distribution System Reimer Consulting Group Inc. Arnie Reimer May 7, 2010 Table of Contents 1. Executive Summary... 3 2. BC Hydro Electric Distribution System... 4 2.1. General Description...

More information

UL 508A Industrial Control Panels Power Distribution and Control. Lunch & Learn Training. 2002 Eaton Corporation. All rights reserved.

UL 508A Industrial Control Panels Power Distribution and Control. Lunch & Learn Training. 2002 Eaton Corporation. All rights reserved. UL 508A Industrial Control Panels Power Distribution and Control Lunch & Learn Training 2002 Eaton Corporation. All rights reserved. Agenda Who is UL and what role do they play? What is the UL 508A Standard?

More information

Hyperlinks are Inactive

Hyperlinks are Inactive Prepared by: NIB/EOB PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES 05503 Department: Electric T&D Section: T&D Engineering and Technical Support Approved by: G.O. Duru (GOD)

More information

How Much Voltage Drop Is Acceptable?

How Much Voltage Drop Is Acceptable? How Much Voltage Drop Is Acceptable? Article supplied by Ideal The National Electrical Code (NEC) recommends that the combined voltage drop of the electrical system (branch circuit and feeders) not exceed

More information

Welcome to Home Wiring Repair Premium. No-cost, no hassle home wiring repairs.

Welcome to Home Wiring Repair Premium. No-cost, no hassle home wiring repairs. For more information about all the powerful ways Duke Energy can help you, please visit duke-energy.com/homeprotection or call 888.999.8856. Welcome to Home Wiring Repair Premium. No-cost, no hassle home

More information

SPECIFICATIONS FOR ELECTRIC SERVICE GARLAND POWER & LIGHT

SPECIFICATIONS FOR ELECTRIC SERVICE GARLAND POWER & LIGHT FOREWORD This booklet is issued by the Electric Department of the City of Garland, herein after referred to Garland Power & Light or GP & L, to acquaint electric customers of Garland Power & Light, or

More information

Data Center Server Cart User Guide

Data Center Server Cart User Guide Data Center Server Cart User Guide Contents General Safety Information 1 Correct Use 1 Improper Use 1 Personnel Qualifications 2 Product Description 2 Operating Data 2 Setting Up the Data Center Server

More information

MAJOR EQUIPMENT PURCHASE CONTRACT

MAJOR EQUIPMENT PURCHASE CONTRACT MAJOR EQUIPMENT PURCHASE CONTRACT CONSUMERS ENERGY COMPANY ONE ENERGY PLAZA JACKSON, MI 49201 ( Buyer ) ( Seller ) Date:, 20 Subject to the provisions of this Major Equipment Purchase Contract ( Contract

More information

Distribution Substation Manual (DSM) Section 3 Substation Arrangements

Distribution Substation Manual (DSM) Section 3 Substation Arrangements (DSM) Section 3 Substation Arrangements July 2015 Document release information Client Project name Western Power Distribution Substation Manual Document number 5 Document title Revision status Substation

More information

OVR-3SP Recloser with PCD Control Style Guide 1VAL263901-SG March 30, 2009 Revision B

OVR-3SP Recloser with PCD Control Style Guide 1VAL263901-SG March 30, 2009 Revision B OVR-3SP Recloser with PCD Control Style Guide 1VAL263901-SG March 30, 2009 Revision B The OVR-3SP three-phase recloser style guide aids in the proper selection of your OVR-3SP style number. The OVR-3SP

More information

Information and Requirements for Electric Service. Chapters 1, 2, 4, 6 and Appendix

Information and Requirements for Electric Service. Chapters 1, 2, 4, 6 and Appendix Organization: Manual: Section: Electric Distribution Information and Requirements for Electric Service Chapters 1, 2, 4, 6 and Appendix Tracking Number: 05-077 Date: January 6, 2006 SME: Jim Calore Contact

More information

3.) Remove Page Nos. 15, 16, 17, 18, 19, 20, 21, 22 of 30 and replace with Page Nos. 15, 16, 17, 18, 19 & 20 of 28 marked, REVISED 10/18/2013.

3.) Remove Page Nos. 15, 16, 17, 18, 19, 20, 21, 22 of 30 and replace with Page Nos. 15, 16, 17, 18, 19 & 20 of 28 marked, REVISED 10/18/2013. CITY OF HOUSTON Annise D. Parker Mayor P.O. Box 1562 Houston, Texas 77251-1562 Telephone Dial 311 www.houstontx.gov http://purchasing.houstontx.gov October 22, 2013 Subject: To: Letter of Clarification

More information

Power plant safety: a wise business move

Power plant safety: a wise business move Power plant safety: a wise business move Power plant safety: a wise business move Going to work in a controlled and safe environment is not an unreasonable expectation for any worker. In many occupations,

More information

2013WWOA Conference Technical Conference Program

2013WWOA Conference Technical Conference Program 2013WWOA Conference Technical Conference Program Understanding Arc-Flash Hazards, Its Implications on Operations and Solutions that Mitigate Such Exposure Presented by Jerry Baskin Senior Product Manager

More information

ELECTRIC RATE SCHEDULES

ELECTRIC RATE SCHEDULES LITTLETON WATER & LIGHT DEPARTMENT 65 LAFAYETTE AVENUE LITTLETON, NH 03561 ELECTRIC RATE SCHEDULES 1. Table of Contents 2. Residential Service Rate 3. Special Service Rate a. Churches b. Municipal Public

More information

16300 MEDIUM VOLTAGE DISTRIBUTION

16300 MEDIUM VOLTAGE DISTRIBUTION 16300 MEDIUM VOLTAGE PART 1: GENERAL 1.01 SYSTEM DESCRIPTION A. Most new loads will be served from the underground electric distribution system. This system is a primary open loop configuration served

More information

Job Site Electrical Safety A Matter of Life and Death

Job Site Electrical Safety A Matter of Life and Death Job Site Electrical Safety A Matter of Life and Death Scott Forsyth, PE Senior Engineer Johnson Controls Performing the Job Right and on Time is Top Priority!!!! Right? Wrong!!!! Performing the Job Safely

More information

-1- HARDWICK ELECTRIC DEPARTMENT STREET LIGHTING RATE 06

-1- HARDWICK ELECTRIC DEPARTMENT STREET LIGHTING RATE 06 -1- AVAILABILITY: To be available for street lighting purposes and billed to the appropriate municipality, village, town, governmental unit and unincorporated community within the Hardwick Electric Department

More information

QUESTIONS and ANSWERS RFB 745-15-9894, Metal Clad Switchgear and Power Control Room

QUESTIONS and ANSWERS RFB 745-15-9894, Metal Clad Switchgear and Power Control Room QUESTIONS and ANSWERS RFB 745-15-9894, Metal Clad Switchgear and Power Control Room 1) When you click on the UTHSCSA Drawing the site takes you to the E-1 drawing no other. Will there be other drawings

More information

Internet Application for New Multi-Family Electric Service Builders/Developers Fax to: (800) 351-3853 or call (800) 454-3853 Date Faxed: 1

Internet Application for New Multi-Family Electric Service Builders/Developers Fax to: (800) 351-3853 or call (800) 454-3853 Date Faxed: 1 Internet Application for New Multi-Family Electric Service Builders/Developers Fax to: (800) 351-3853 or call (800) 454-3853 Date Faxed: 1 2 Service address City 3 (Inside city: Yes No) State 4 Complex

More information

Best Practices to Minimize Action Over Claims

Best Practices to Minimize Action Over Claims Best Practices to Minimize Action Over Claims David Matthiessen Vice President, Claims Everest National Insurance Company The information presented in this material has been developed from sources believed

More information

Radial Distribution Test Feeders

Radial Distribution Test Feeders Radial Distribution Test Feeders Distribution System Analysis Subcommittee Report Abstract: Many computer programs are available for the analysis of radial distribution feeders. In 1992 a paper was published

More information

In the year Two Thousand Eleven.. Resolved by the City Council of the City of Burlington, as follows:

In the year Two Thousand Eleven.. Resolved by the City Council of the City of Burlington, as follows: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 APPROVAL OF AMENDMENTS TO BURLINGTON ELECTRIC DEPARTMENT S OPERATING GUIDELINES In the year Two Thousand Eleven.. Resolved

More information

10 ma LED driver in SOT457

10 ma LED driver in SOT457 SOT457 in SOT457 Rev. 1 20 February 2014 Product data sheet 1. Product profile 1.1 General description LED driver consisting of resistor-equipped PNP transistor with two diodes on one chip in an SOT457

More information

HIGH-RELIABILITY DESIGNS FOR ECONOMICAL DATA CENTERS

HIGH-RELIABILITY DESIGNS FOR ECONOMICAL DATA CENTERS HIH-RLIABILITY DSINS FOR CONOMICAL DATA CNTRS Design Features that Add Reliability to Data Centers while Reducing Costs per kw Michael Mosman, P Vice President, Chief Technology Officer Baltimore, MD Discussion

More information

What s up with Arc Flash?

What s up with Arc Flash? What s up with Arc Flash? Presented by Mark Haskins, CSP Practical Safety Solutions, LLC CONN OSHA Breakfast Roundtable February 18, 2014 2014 Practical Safety Solutions, LLC What is Arc Flash? Definition

More information

Choosing the Best Solution for Reducing Arc Energy

Choosing the Best Solution for Reducing Arc Energy CONVENTION SESSION HANDOUT Choosing the Best Solution for Reducing Arc Energy Terry L. Schiazza, Business Development Manager Square D / Schneider Electric SESSION #11 Independent Electrical Contractors

More information

Preliminary Feasibility Assessment For. The Rio Tinto Alcan to BCH Transfer Limit of 460 MW. With 50% Series Compensation on Both KMO KIT lines

Preliminary Feasibility Assessment For. The Rio Tinto Alcan to BCH Transfer Limit of 460 MW. With 50% Series Compensation on Both KMO KIT lines Preliminary Feasibility Assessment For The Rio Tinto Alcan to BCH Transfer Limit of 460 MW With 50% Series Compensation on Both KMO KIT lines Report : ASP2010-T001 July 2010 Asset Strategy & Planning,

More information

SUPPLEMENT TO SPECIFICATIONS FOR ELECTRICAL INSTALLATIONS

SUPPLEMENT TO SPECIFICATIONS FOR ELECTRICAL INSTALLATIONS SUPPLEMENT TO SPECIFICATIONS FOR ELECTRICAL INSTALLATIONS PRIMARY METER POLE ELECTRIC SYSTEM BULLETIN No. 753 JUNE 1993, 2 ND PRINTING APRIL 2002 (Supersedes issue dated March 1983 and incorporates Nov.

More information

ABB ! CAUTION. Type COQ Negative Sequence Generator Relay. (50/60 Hertz) 41-161J. Instruction Leaflet

ABB ! CAUTION. Type COQ Negative Sequence Generator Relay. (50/60 Hertz) 41-161J. Instruction Leaflet ABB Instruction Leaflet 41-161J Effective: May 1997 Supersedes I.L. 41-161H Dated July 1984 ( ) Denotes Change Since Previous Issue Type COQ Negative Sequence Generator Relay (50/60 Hertz)! CAUTION Before

More information