POTENTIAL FOR THE APPLICATION OF TRENCHLESS REHABILITATION TECHNOLOGIES IN KENYA: A FOCUS ON PIPE BURSTING.
|
|
|
- Hilda Moody
- 9 years ago
- Views:
Transcription
1 POTENTIAL FOR THE APPLICATION OF TRENCHLESS REHABILITATION TECHNOLOGIES IN KENYA: A FOCUS ON PIPE BURSTING. Lameck Onsarigo, S.M. ASCE College of Technology, Architecture, and Applied Engineering, Bowling Green State University, Bowling Green, Ohio. Abstract: Urban populations in Kenya have been expanding over the years. This growth is a result of the high birth rate and migration of people from the countryside in search of better job opportunities and better living standards. With an increase in population comes the need for infrastructure developments. This includes the need for increased capacity of the sewer and water supply networks, and the need for development of new networks capable of meeting the increased demand. However, most of the pipes that need to be replaced are located under congested pavements and can cause a lot of disruption when replaced using the conventional open-cut construction method.trenchless technologies offer economic alternatives that also reduce disturbance to businesses and residents. This paper gives an overview of the trenchless rehabilitation systems available in the industry today. The paper, especially, focuses on pipe bursting and its potential for application in the rehabilitation of Kenyan sewage disposal and water supply systems. Keywords: Trenchless Technology, Open-cut, Pipe Bursting. Introduction Urban populations in Kenya have been expanding over the years. This growth is a result of, increased industrialization, high birth rate, and migration of people from the countryside in search of better job opportunities and better living standards. Nairobi s population, for instance, was 8,000 in It grew to 11,500 in 1906 and then to 108,900 in By 1969, the city had a population of 509,286. This upward trend continued and by 1989, the population was 1,324,570. By 1999, the population was 2,143,254, and by 2009, the population in the capital had grown to 3,138,369Invalid source specified.. With everexpanding populations, urban communities are bound to grow and to maintain reasonable living standards demands infrastructure developments such as sewage disposal, water supply, gas supply, electricity, and internet connectivity. As the society becomes more environmentally conscious there will be a demand to treat all sewage to a high standard before disposal to water courses and a need to treat all water to a high standard before distribution (Read 2004). As a result of the high population, there is a tremendous increase in the volume of flow in the existing sewer main lines and water mains that has, to a great extent, exceeded the flow design capacities of the pipelines. Not only are the sewerage pipelines incapable of handling the flows, but the treatment plants are not designed to handle the large volumes of flow either. This strain on the system contributes to the accelerated rate of aging of the pipelines, reducing their life cycle. The water supply system is far from perfect, with most of the water produced being lost in the system before it reaches the consumer. It is estimated that unaccounted-for-water is, on average, about 50% of all the water produced. A good proportion of the unaccounted-forwater can be attributed to waterline breaks and leakages mainly because of aging. The rest of this unaccounted-for-water is attributed to administrative losses due to illegal connections and non/under-registration of water meters. The water pipelines are also under strain because of the higher quantity demanded with the need for an increase in capacity of the existing network. It is clear that most of these pipelines require immediate replacement/expansion or rehabilitation. In order to meet the current high demands without exceeding the limited available funding, construction method alternatives that are both functional and cost effective have to be used. Trenchless technologies offer an alternative for the replacement and rehabilitation of these pipelines. Pipe bursting, in particular, can be an economic pipe replacement alternative when compared to the open-cut technique. It is especially costeffective if the existing pipe is out of capacity, deep, and/or below the ground water table (Plastic Pipe Institute, 2008). Beyond the direct cost advantage of pipe bursting over open-cut, trenchless techniques do have several indirect cost advantages over the traditional open-cut and considerably lower impact on the environment. This paper explores some of these trenchless alternatives and introduces pipe bursting as a viable option for Kenya s pipeline replacement needs. State of the Underground Infrastructure in Kenya Urban cities in Kenya have been rapidly growing over the years. Industrialization, increased rural-urban migration, and immigration of refugees are all contributing factors to the high population that has put a strain on the utility services. There is a tremendous increase in flow into the existing main sewer lines that has exceeded their design capacities. The problem is compounded with the inability of our treatment plants to handle the large flows which reduces the life of the pipelines by accelerating their rate of aging. The Department of Water Supply and Wastewater Management Services at Nairobi City Council (NCC) is now faced with acute challenges while using conventional open-cut method to replace the under-sized defective pipes located in congested sites and where deep excavations are required. The Nairobi City Council (NCC) in partnership with Nairobi City Water & Sewerage (NCWS) Management Company has embarked on plans to revamp and make major replacements of the existing municipal main sewer lines in Nairobi city streets because of their inability to handle the current flows (Masudi, 2009). Most of the wastewater pipes in Nairobi have not met or exceeded their design life (most average about 30 years). But their rapid aging can be attributed to persistent overflows, and over utilization of these pipes that are under-sized. During the design of these networks, the population growth projections were grossly inaccurate and as a result, they are unable to meet the current demand. Most of these pipes require immediate replacement or rehabilitation using the most convenient and cost effective methods in order to meet the current high demands while operate within the limited available funding (Irungu, 2007). 37
2 Following the report by the City Council of Nairobi (2008), approximately 48% of Nairobi s population is served by the existing water-borne sewerage system which suffers from a number of problems including poor maintenance, illegal connections, use of toilets for the disposal of garbage and deliberate blocking of sewage pipes for irrigation. For instance, at Maili Saba, farmers remove manhole covers and block the city s main sewer, diverting raw sewage to their land to irrigate their crops. Their plots, typically 20 x 40 m, are irrigated by surface irrigation from a hand-dug canal system. Irrigators grow kale, sweet potato, arrowroot and some green maize - crops that are cooked before being eaten (Scott, Faruqui, & Rashid-Sally, 2004). To meet the growing water demand in Nairobi and other major cities, the water has to be pumped for reasonably long distances. Apart from occasional water shortages, however, especially during the dry seasons, the basic problem has been distribution (City Council of Nairobi, 2008). This report, City Council of Nairobi (2008) further indicates that despite the fact that production exceeds demand, only about 187,000 (or 42 per cent) of households in Nairobi have proper water connections. This highlights the need for increase in capacity of the existing network and construction of new pipelines that can complement the existing pipes and help meet the needs of the city residents. Unaccounted-for water is the difference between the quantity of water supplied to a city s network and the metered quantity of water used by the customers. According to the Citizen Report Card (2007), unaccounted-for water was 40% in Nairobi, 66% in the city of Kisumu, and 35% for Mombasa. This loss can be attributed to both: (a) physical losses due to leakage from pipes, and (b) administrative losses due to illegal connections and under-registration of water meters. UFW in a well-run utility is generally in the order of 15 to 20 percent (Citizen Report Card, 2007). City Council of Nairobi (2008) estimates the losses due to leakages and illegal connections in Nairobi to constitute about 50% of the volume of water produced. Overview of Trenchless Rehabilitation Systems There are several alternatives available for rehabilitation and replacement of pipelines. Currently, the conventional open-cut is the most common method used for underground utility construction because of its basic approach of excavating soil, laying the pipe and backfilling. Open-cut can get a little more complicated when unstable ground conditions are encountered necessitating shoring. Ground water can also pose problems requiring a dewatering plan that could be costly. But in areas where surface drainage is not an issue and the ground is not muddled with utilities, open-cut construction usually is the least expensive and most cost effective way to install a product. Personnel training requirements are less rigorous and laborious with this traditional method, but when it is neither acceptable nor desirable, trenchless methods offer various alternatives that can be employed in renewing and replacing aging pipelines. The North American Society for Trenchless Technology (NASTT) defines trenchless technology as a family of techniques for utility line installation, replacement, rehabilitation, renovation, repair, inspection, location and leak detection, with minimum excavation from the ground surface (North American Society for Trenchless Technology, 2013). Some of the most common trenchless replacement and rehabilitation systems include: CIPP, Fold and Form, Sliplining, Spiral wound pipe, Spray applied systems, segmental liner and Pipe Bursting. Cured-In-Place Pipe (CIPP) CIPP was invented in 1970, being one of the first truly trenchless pipeline renewal processes. The method is used in renewing sever pipelines, water pipelines, pressure pipelines, gas pipelines, industrial pipelines and other pipelines. Cured-in-place pipe comprises a flexible fabric tube manufactured to the required diameter and length (designed to line the inside of the host pipe/existing deteriorated pipe). The fabric tube is saturated with a thermosetting resin, inserted into the pipeline and inflated with air or water pressure. It is then cured by using hot water, hot air, or UV light resulting in a new, tight-fitting pipe within a pipe (Najafi, 2013). The liner can be a structural pipe, designed to take the loads it is subjected to. The most common thermosetting resin systems used are unsaturated polyester, vinyl ester, and epoxy resin all of which have different chemical, physical, and thermal properties Fold and Form In this method, the new plastic pipe is deformed / reduced in size at the factory for easy entry into the old deteriorated / damaged pipe. After it is installed in the old pipe, the new pipe is restored / expanded back to its original size and shape, forming a tight fit with the inside surface of the host pipe. The new pipe can be designed to serve either structural or nonstructural purposes. Sliplining This method has been around since the mid twentieth century and is one of the simplest and cost effective trenchless renewal systems. Sliplining is the process of inserting a new pipeline into an existing pipeline and grouting the annular space. Although sliplining decreases the total cross sectional area of a culvert, using a smoother pipe material with a smaller Manning s Roughness coefficient may eliminate this problem (Najafi, Salem, Bhattachar, Salman, & Patil, 2008). The liner can be designed as a structural or nonstructural liner. Different pipe materials can be installed using sliplining including, but not limited to, high density polyethylene (HDPE), polyvinyl chloride (PVC), coated steel pipe and fiberglass reinforced polyester. Spiral wound pipe This is a trenchless method for installing a liner within the old pipe that is not structural. A polyvinyl chloride strip is spirally wound using a special winding machine at the job site hence obtaining a new lining within the old pipe. The annular space between the new spiral wound liner and the existing culvert is grouted, usually using cementitious grout. The continuous spiral lining is watertight and fits very closely to the existing structure (Najafi et al., 2008). Spray applied systems / Spray-in-Place Pipe (SIPP) Spray applied systems are widely used to protect new pipelines and renew aging pipelines. The systems are also used to protect and renew other water, sewer, oil, and gas infrastructure. SIPP could be cementitious materials or polymers (Najafi, 2013). Cementitious coatings are used mainly to protect against corrosion and are commonly used because they are considered cost effective. The most common cement materials used are Portland cement and calcium aluminate which coats the underground structure inhibiting corrosion in metal pipes. The cement has the additional benefit of creating a relatively smooth 38
3 internal surface that improves hydraulic conductivity (Suleiman, Stevens, Jahren, Ceylan, & Conway, 2010). Polymers possess superior chemical resistance when compared to cementitious products and can be a better alternative in corrosive environments. They can also be structural or nonstructural and could be epoxies, polyurethanes and polyureas, or polyesters (Najafi, 2013) Pipe Bursting Pipe bursting is a static and dynamic method of breaking an existing pipe and simultaneously installing, by pulling or pushing, a new pipe of equal or larger diameter along the same alignment as the existing pipe. The International Society for Trenchless Technology (2013) defines pipe bursting as a trenchless replacement method in which an existing pipe is broken by brittle fracture, using mechanically applied force from within. The pipe fragments are forced into the surrounding ground. At the same time a new pipe, of the same or larger diameter, is drawn in as shown in Figure 1. Figure 1. Pipe bursting layout (Plastic Pipe Institute, 2008) Pipe bursting is an economic pipe replacement alternative that reduces disturbance to business and residents when it is compared to the open-cut technique. Pipe bursting is especially cost-effective if the existing pipe is out of capacity, deep, and/or below the ground water table (GWT) (Plastic Pipe Institute, 2008). Pipe bursting was developed in the late 1970's in the UK by D.J. Ryan & Sons and British Gas mainly for the replacement of small diameter gas lines. The process involved a pneumatically driven, cone-shaped bursting head operated by a reciprocating impact process. This method was patented in the UK in 1981 and in the United States in 1986; these patents expired in April, 2005 (Plastic Pipe Institute, 2008). The method was initially used to replace cast iron gas distribution lines but has been continuously developed and is today used to replace water lines, sewer mains and sewer service lines, gas lines, culverts, and communication ducts worldwide (Ariaratnam & Hahn, 2007). Replacement by pipe bursting is commonly done size-for-size or one upsize above the diameter of the existing pipe. Atalah (2006) notes that larger upsizes (up to three pipe sizes) have been successfully done, but the larger the upsizing, the more the energy needed to burst the pipe and the more the ground movement experienced from the displacement. Almost all types of pipes can be burst which would include cast iron, steel, ductile iron, high density polyethylene (HDPE), polyvinyl chloride (PVC), cast in place concrete, clay, reinforced concrete and asbestos cement (AC). Reinforced concrete cylinder pipes (RCCP) cannot be replaced using this method. Because you can either pull the new pipe or push it in place, almost all types of pipe can be installed using pipe bursting. This would include: high density polyethylene (HDPE), polyvinyl chloride (PVC), clay, steel, fiberglass, polymer, ductile iron, and concrete (Timberlake, 2011) (Plastic Pipe Institute, 2008) (The International Pipe Bursting Association, 2012). Sectional pipes are pushed in place while the continuous pipes that can take tension can be pulled behind the bursting head. Pipe Bursting Systems Pipe bursting systems are typically classified into three main classes based on the type of bursting head used as shown in Figure 2. Figure 2. Bursting heads for the different PB systems Pneumatic pipe bursting, which uses pulsating air pressure to drive the head forward and burst the old pipe. A small pulling device guides the head via a constant tension winch and cable. In the pneumatic system, the bursting tool is a soil displacement hammer driven by compressed air and operated at a rate of 180 to 580 blows per minute. With each stroke, the bursting tool cracks and breaks the old pipe, the expander combined with the percussive action of the bursting tool, push the fragments and the surrounding soil providing space to pull in the new pipe. The expander can be front-end (attached to the front end of the hammer) for pipes smaller than 12 or back-end (attached to the backend of the hammer) for pipes larger than 12 (Plastic Pipe Institute, 2008). Static pull, where a static head with no moving internal parts is used. The head is simply pulled through the pipe by a heavy-duty pulling device via a segmented drill rod assembly or heavy anchor chain (Atalah, Sterling, Hadala, & Akl, 1998). In this system, tremendous tensile force is applied to the cone-shaped expansion head through a pulling rod assembly or cable inserted through the existing pipe. The cone transfers the horizontal pulling force into a radial force, breaking the old pipe and expanding the cavity providing space for the new pipe (Plastic Pipe Institute, 2008). The new pipe is then pushed or pulled into place behind the bursting head. Hydraulic expansion, where the hydraulic head expands and closes sequentially as it is pulled through the pipe, bursting the pipe on its way. In this system, the bursting process advances from the insertion pit to the reception (pulling) pit in sequences which are repeated until the full length of the existing pipe is replaced. In each sequence, one segment of the pipe (which matches the length of the bursting head) is burst in two steps: (1). the bursting head is pulled into the old pipe for the length of the segment, and (2). the head is expanded laterally to break the pipe as shown in Figure 3 (Atalah et al., 1998). 39
4 Figure 3. Hydraulic bursting head (Xpandit) in both expanded and contracted positions (Atalah et al., 1998). Additions/modification can be made to these three pipe bursting systems to enable the replacement of flexible pipes, to advance segmental pipes, or to assist in the bursting. These systems include: Pipe Splitting, Pipe Reaming (Inneream), Impactor (Earthtool) Process and Tenbusch Method. Application Range and Limitations of Pipe Bursting The application range for the pipe bursting systems follows: Typically used to replace water lines, sewer mains and lateral connections, and gas lines. Typical length of replacement run is between 300 feet and 500 feet; however, longer drives have been completed successfully in favorable conditions. The size of pipes being burst typically range from 2 to 30, although pipes of larger sizes can be burst. Commonly performed replacements are size-for-size and one-size upsize above the diameter of the existing pipe. Larger upsize (up to three pipe sizes) have been successful, but the larger the pipe upsizing, the more energy needed and the more ground movement will be experienced. It is important to pay close attention to the project surroundings, depth of installation, and soil conditions when replacing an existing pipe especially in unfavorable conditions such as expansive soils, repairs made with ductile material, collapsed pipe, concrete encasement, sleeves and adjacent utility lines (Atalah et al., 1998). For pipelines with shallow cover, typically less than 36 inches, bursting could cause heaving on the surface which can, potentially, damage nearby structures. Open-cut is usually the economical replacement alternative when dealing with these shallow pipelines. For large diameter pipe bursting operations, particularly those requiring upsizing, there is legitimate concern about potential damage to nearby facilities and structures. Atalah (2007) identified the following as further limitations of pipe bursting: (1) excavation for the lateral connections is needed, (2) expansive soils could cause difficulties for bursting, (3) a collapsed pipe at a certain point along the old pipe may require excavation at that point to allow the insertion of pulling cable or rod and to fix the pipe sag, (4) point repairs with ductile material can also interfere with the replacement process, (5) if the old sewer line is significantly out of line and grade, the new line will also tend to be out of line and grade although some corrections of localized sags are possible, and (6) insertion and pulling shafts are needed especially for larger bursts. Pipe bursting also requires bypassing the flow to allow work on the pipeline that needs to be replaced. Bypass pumping must be part of the design protocol when dealing with live lines. The Case for Pipe Bursting Pipelines can be rehabilitated by inserting a new lining or replaced by pipe bursting or open-cut. There are several pipe lining technologies available such as cured-in-place pipe, fold and form, and sliplining. The main advantage of the lining methods over pipe bursting is the need for small or no access excavation to the pipeline. However, pipe bursting has the advantage of increasing the capacity of the pipeline by more than 100%. With the ability to upsize the service lines, one can increase the capacity of the pipeline tremendously using pipe bursting. For pressure applications, a 41% increase in the inside pipe diameter doubles the cross sectional area of the pipe and consequently doubles the flow capacity of the line. For gravity applications, a 15% and 32% increase in the inside diameter of the pipe combined with the smoother surface of the new pipe can produce an increase in the flow capacity of 100% and 200% respectively. Pipe bursting is most cost advantageous compared to the lining techniques when: (1) there are few lateral connections to be reconnected within a replacement section, (2) the old pipe is structurally deteriorated, and (3) additional capacity is needed. Pipe bursting has substantial advantages over open-cut replacements; it is much faster, more efficient, and often less expensive than open-cut especially in deep installations. With open-cut, increased depth translates to extra excavation, increased shoring/ need for trench support, and dewatering which substantially increases the cost of the pipe replacement. But for pipe bursting, the increased depth has a minimal effect on the cost per foot as shown in Figure 4 (Poole, Rosbrook, & Reynolds, 1985). Figure 4. Cost comparison between pipe bursting and open-cut (Poole et al., 1985). 40
5 In addition to the potential direct cost advantage of pipe bursting over open-cut, as a trenchless technique, it has several indirect cost savings which include: Table 1. Indirect Cost Advantages of Trenchless Technology over Open-cut Construction less traffic lower business interruption disturbance reduced road or minimal interference with lane closure other utilities less time for lower impact on the replacement environment superior safety (for both working crew & public) due to reduced open excavation Conclusions Urban cities in Kenya have been rapidly growing over the years. Industrialization, increased rural-urban migration, and immigration of refugees are all contributing factors to the high population that has put a strain on the utility services. There is a tremendous increase in flow into the existing main sewer lines that has exceeded their design capacities. The problem is compounded by the inability of our treatment plants to handle References the large flows which reduces the life of the pipelines by accelerating their rate of aging. The water supply is also a problem with unaccounted-for-water averaging 50% of all the water produced. A good proportion of the unaccounted-forwater can be attributed to waterline breaks and leakages mainly because of aging. A majority of these pipelines require immediate replacement or rehabilitation and, in order to meet the current high demands while not exceeding the limited available funding, construction method alternatives that are both functional and cost effective have to be used. Pipe bursting is an economic pipe replacement alternative that reduces disturbance to businesses and residents when it is compared to the open-cut technique. It is especially costeffective if the existing pipe is out of capacity, deep, and/or below the ground water table. Beyond the direct cost advantage of pipe bursting over open-cut, pipe bursting has several indirect cost advantages over the traditional open-cut and has a considerably lower impact on the environment. Investors, utility owners, and local governments need to consider pipe bursting alongside other trenchless technologies and the conventional open-cut construction when making decisions on pipeline rehabilitation. Ariaratnam, S. T., & Hahn, U.-H. (2007). Simplified model for numerical calculation of pull forces in static pipe-bursting operations. Tunnelling and Underground Space Technology, Atalah, A. (2006). The Safe Distance between Large-Diameter Rock Pipe Bursting and Nearby Buildings and Buried Structures. ASCE Journal of Transportation Engineering. Atalah, A. (2007). The Need for Trenchless Pipe Replacement Techniques in Developing Countries. North American Society for Trenchless Technology 2007 No-Dig Conference & Exhibition (pp. Paper A ). San Diego, California: North American Society for Trenchless Technology (NASTT). Atalah, A., Sterling, R. S., Hadala, P., & Akl, F. (1998). The Effect of Pipe Bursting on Nearby Utilities, Pavement and Structures - TTC book #TTC Ruston, LA: Louisiana Tech University. Citizen Report Card. (2007). Citizens' Report Card on Urban Water, Sanitation, and Solid Waste Services in Kenya: Summary of Results from Nairobi, Kisumu, and Mombasa Nairobi, Kenya: Citizen Report Card (CRC). City Council of Nairobi. (2008). City of Nairobi Environment Outlook. Nairobi, Kenya: City Council of Nairobi. Irungu, Z. K. (2007). Nairobi urban transportation challenges- Learning from Japan. Nairobi, Kenya: MoRPW. Masudi, M. W. (2009). A Cost Comparison Between Open Cut and Pipe Bursting Construction Techniques: A Case Study of Wastewater Replacement System in a Typical Nairobi City Street-Kenya. Bowling Green, Ohio: Bowling Green State University. Najafi, M. (2013). Trenchless Technology: Planning, Equipment, and Methods. New York: McGraw-Hill Companies, Inc. Najafi, M. (2013). Trenchless Technology: Planning, Equipment, and Methods. New York: McGraw-Hill Companies, Inc. Najafi, M., Salem, S., Bhattachar, D., Salman, B., & Patil, R. (2008). An Asset Management Approach for Drainage Infrastructure and Culverts. Wisconsin, Madison: Midwest Regional University Transportation Center. College of Engineering. University of Wisconsin, Madison. North American Society for Trenchless Technology. (2013, September 15). Glossary of Terms and Definitions. Retrieved from North American Society for Trenchless Technology: Plastic Pipe Institute. (2008). Chapter 16- Pipe Bursting. In P. P. Institute, Handbook of Polyethylene Pipe-Second Edition. Irving, TX: Plastic Pipe Institute. Poole, A., Rosbrook, R., & Reynolds, J. (1985). Replacement of Small-Diameter Pipes by Pipe Bursting. Proc. of 1st Intl.Conf. on Trenchless Construction for Utilities: No-Dig 85, April 16-18, (pp ). London, UK. Scott, C. A., Faruqui, N. I., & Rashid-Sally, L. (2004). Wastewater Use in Irrigated Agriculture: Confronting the Livelihood and Environmental Realities. Oxfordshire: CAB International, International Water Management Institute, International Development Research Centre. Suleiman, M., Stevens, L., Jahren, C., Ceylan, H., & Conway, W. (2010). Identification of Practices, Design, Construction, and Repair Using Trenchless Technology. Ames, IA: Iowa Highway Research Board. Iowa Department of Transportation. The International Pipe Bursting Association. (2012). Guideline for Pipe Bursting. Owing Mills, MD: The International Pipe Bursting Association (IPBA). The International Society for Trenchless Technology. (2013). Glossary. Retrieved from The International Society for Trenchless Technology: Timberlake, M. (2011). Pipe Bursting Various Types Of Pipes. Underground Construction, 66(6), pp
Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology
2007 Pumper & Cleaner Environmental Expo International Wednesday February 7, 2007 Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology What is Cured-In-Place Pipe (CIPP)
REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS. Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC
REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC What is really out there? DO YOU DIG IT? INDUSTRY CONCERNS UNEXPECTED DEVELOPMENTS
Rehabilitation Alternatives. MWEA Collection System Seminar October 1, 2009
Rehabilitation Alternatives MWEA Collection System Seminar October 1, 2009 Overview Types of Rehabilitation Trenchless Categories On-Line Replacement In-Situ Options Selecting the Best Solution Types of
Trenchless Technology for Drainage Structures
Trenchless Technology for Drainage Structures Richard S. Williammee, Jr., MSCE, P.E. District Materials Engineer Fort Worth District TxDOT 2011 Transportation Short Course October 11, 2011 There are textbooks
12/8/2014. Brought To You By: This webcast is sponsored by NASSCO with the support of IPBA.
Brought To You By: This webcast is sponsored by NASSCO with the support of IPBA. 1 Pipe Bursting A Mature and Diverse Trenchless Technology December 10, 2014 1:00 3:00 pm Eastern How to Participate Today
Pipe Bursting. Case Study at Zeeland, MI Collections Seminar September 6, 2012. Presentation Agenda. What is Pipe Bursting? What is Pipe Bursting?
Pipe Bursting Case Study at Zeeland, MI Collections Seminar September 6, 2012 By: Brian Hannon, PE and John Racek, PE Presentation Agenda What is Pipe Bursting? History of Pipe Bursting Types of Pipe Bursting
Sewer systems: Failures and rehabilitation
Water Utility Journal 8: 17-24, 2014. 2014 E.W. Publications Sewer systems: Failures and rehabilitation C. N. Damvergis Hellenic Association of Hydraulic Works and Water Resources Management Consulting
Rehabilitation or Replacement? That Is The Question
Rehabilitation or Replacement? That Is The Question Chris L. Windley PE Greg Anderson, PE 94th Annual Conference November 18, 2014 Overview Project Background Existing Sewer Condition Flow Projections
1.3.2 Method of construction and restoration of existing water service connections. This shall include:
1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing water lines using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting
Sewer Rehabilitation Design Requirements
Sanitary Sewer Overflow (SSO) Control and Wastewater Facilities Program Sewer Rehabilitation Design Requirements City of Baton Rouge/Parish of East Baton Rouge Department of Public Works Submitted by Prepared
Pipe Bursting. Chapter 16
535 Introduction Underground service utilities in many American cities have been in place for over 100 years. While existing systems have functioned well beyond reasonably anticipated service life, underground
SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)
SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) 1 Intent: The intent of trenchless sewer pipe Insertion is to rehabilitate the existing sewer
Pipe bursting provides viable alternative for rehab work By Greg Key, U.S. Pipe
Pipe bursting provides viable alternative for rehab work By Greg Key, U.S. Pipe As the Environmental Protection Agency tightens groundwater quality regulations, old leaking sewers lines made of pipe clay,
CONSTRUCTION COST OF UNDERGROUND INFRASTRUCTURE RENEWAL: A COMPARISON OF TRADITIONAL OPEN-CUT AND PIPE BURSTING TECHNOLOGY SEYED BEHNAM HASHEMI
CONSTRUCTION COST OF UNDERGROUND INFRASTRUCTURE RENEWAL: A COMPARISON OF TRADITIONAL OPEN-CUT AND PIPE BURSTING TECHNOLOGY by SEYED BEHNAM HASHEMI Presented to the Faculty of the Graduate School of The
Storm Sewer Trenchless Upgrade Alternatives and Recommendations
Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for
1-800-327-8276 www.jfcson.com
Trenchless Cost Effective Internal Pipe Rehabilitation 101 East Broadway, Hackensack, N.J. 07601 Folsom, NJ Linden, NJ Beltsville, MD Sylmar, CA 1-800-327-8276 www.jfcson.com In-Weg Internal Joint Sealing
PLANNING CAREFUL NORTH VANCOUVER PIPE BURST REQUIRES
WATER & SEWER REHAB TECHNOLOGIES NORTH VANCOUVER PIPE BURST REQUIRES CAREFUL PLANNING Close proximity to storage silos, poor ground conditions and clogged storm sewer pipe puts trenchless contractor to
A Revolution for Telecom, Electric, Gas, & Water"
"Pipe Bursting A Revolution for Telecom, Electric, Gas, & Water" Presented by the Leadership of the IPBA International Pipe Bursting Association A Division of NASSCO National Association of Sewer Service
INTERNATIONAL PIPE BURSTING ASSOCIATION. Guideline for Pipe Bursting
INTERNATIONAL PIPE BURSTING ASSOCIATION Prepared for: The International Pipe Bursting Association (IPBA) www.nassco.org/about_nassco/an_div_ipba.html Division of NASSCO 11521 Cronridge Drive, Suite J Owings
Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe
Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe 1. GENERAL The following supplemental sewer main specifications are intended to address the installation of high-density polyethylene
WEFTEC.06. Kent Von Aspern,* Collins Orton** *Carollo Engineers 2700 Ygnacio Valley Rd Suite 300 Walnut Creek, CA 94598
Lessons Learned from Large Diameter Sanitary Sewer Pipe Bursting Project: Conversion of Abandoned Gravity Sewer Main Into Upsized Sanitary Force Main South San Francisco, CA Kent Von Aspern,* Collins Orton**
ENGINEERED SOLUTIONS. A2 Liner Pipe for Trenchless Technology
ENGINEERED SOLUTIONS A2 Liner Pipe for Trenchless Technology A2 Liner Pipe Restores Deteriorated Sewers Cost-Effective Rehabilitation The increasing rate of sanitary and storm sewer deterioration requires
PIPE REHABILITATION. Industrial Wastewater Municipal Wastewater Drinking Water Pressure Pipes
PIPE REHABILITATION Industrial Wastewater Municipal Wastewater Drinking Water Pressure Pipes About Us An HDPE after mechanical insertion into an egg-shaped brick work sewer sized 1400 x 2100 mm (or 56
PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY
PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY Cured-In-Place Pipe Pressure & Gravity Lines Pipe Splitting Trenchless Pipe Replacement EcoCast Advanced
LEE S SUMMIT USES PIPE BURSTING TO BROADEN ITS ASSET MANAGEMENT TOOLBOX AND REHABILITATE POTABLE WATER DISTRIBUTION SYSTEM
North American Society for Trenchless Technology (NASTT) No-Dig Show 2010 Chicago, Illinois May 2-7, 2010 Paper D-4-02 LEE S SUMMIT USES PIPE BURSTING TO BROADEN ITS ASSET MANAGEMENT TOOLBOX AND REHABILITATE
SASTT contact details:
SASTT contact details: Web: www.sastt.org.za President: Andries Lötz Tel: (011) 688 1483 Fax: (011) 688 1524 E-mail: [email protected] Honorary director: Joop van Wamelen Tel: (012) 567 4026 Fax: 086
TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe
TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TN 5.14 February 2010 Introduction It may be at times necessary, in an aging infrastructure, to rehabilitate drainage and sanitary lines
Greensboro s Pilot Program for Water Pipe Bursting Leads to Expanded City Wide Program
North American Society for Trenchless Technology (NASTT) NASTT s 2013 No-Dig Show Sacramento, California March 3-7, 2013 TA-T3-05 Greensboro s Pilot Program for Water Pipe Bursting Leads to Expanded City
Water Technology Fact Sheet Pipe Bursting
Water Technology Fact Sheet INTRODUCTION Under the traditional dig-and-replace method of sewer rehabilitation, a replacement or additional parallel sewer line is constructed by digging along the entire
Culvert Rehabilitation Practices
Culvert Rehabilitation Practices TABLE OF CONTENTS Report Objective...1 Introduction...1 General Culvert Rehabilitation...3 Culvert Cleaning...3 Grouting...4 REHABILITATION METHODS Slip Lining...5 Sprial
Installation of Large Diameter Buried Pipes
Installation of Large Diameter Buried Pipes Sullivan (Sully) Curran P. E., Executive Director I. Introduction and Scope There is an ongoing need to provide designers, specifiers, engineers, consultants
Guidelines for Pipe Bursting
Guidelines for Pipe Bursting TTC Technical Report #2001.02 Jadranka Simicevic Raymond L. Sterling Prepared for: U.S. Army Corps of Engineers Engineering Research and Development Center (ERDC) 3909 Halls
SPR PE Steel Reinforced Liner
ENGINEERED SOLUTIONS SPR PE Steel Reinforced Liner Reline Done Right Contech is your single source for rehabilitation of sanitary & storm sewers, culverts and bridges. Contech Engineered Solutions has
The leader in trenchless rehabilitation
The leader in trenchless rehabilitation The trenchless rehabilitation of underground water and sewer pipes is a solution that s more ecological, more cost efficient, faster and less invasive for taxpayers
Section 402. STORM SEWERS
402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide
IS THAT LINER THICK ENOUGH?
IS THAT LINER THICK ENOUGH? Philip McFarlane, Opus International Consultants Ltd ABSTRACT The amount of pipeline rehabilitation being undertaken in New Zealand is increasing each year. Larger diameter
53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines:
Division 53: Slip-Lining of Existing Sewer Line 53.01 GENERAL: This section includes all labor, materials, transportation, equipment necessary to rehabilitate by means of Instituform deteriorated sections
FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation
644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING
San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS
ITEM NO. 1100 SLIP-LINING SANITARY SEWERS 1100.1 DESCRIPTION: This item shall consist of slip-lining sanitary sewer pipe, which is accomplished by pulling or pushing liner pipe into existing sewers by
Relining of Water Mains with. Flexible High Pressure Pipelines. Raedlinger Primus Line, Inc. Ivan Zubiaga Executive Vice President 2014
Relining of Water Mains with Flexible High Pressure Pipelines Raedlinger Primus Line, Inc. Ivan Zubiaga Executive Vice President 2014 Aging water main infrastructure The American Society of Civil Engineers
Repair or Replacement - Band-Aids vs. Surgery
Repair or Replacement - Band-Aids vs. Surgery Using RCP for the Replacement of Failed or Undersized Culverts www.concrete-pipe.org Introduction and Background Our Nation s infrastructure owners are facing
INSTALLATION OF INSITUFORM LINER
PART 1 GENERAL 1.1 SCOPE: A. This item shall include all work and materials to install, insert a flexible polyester felt liner saturated with a thermo-setting resin into the existing sewer line for rehabilitation
REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES WITH CURED-IN-PLACE-PIPE LINER SECTION 02542
1.0 INTENT REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES 1.01 It is the intent of this specification to provide for the reconstruction of pipelines and conduits by the installation of a resin-impregnated
Utilizing Trenchless Technology to Achieve Watermain Asset Management Objectives
North American Society for Trenchless Technology (NASTT) NASTT s 2015 No-Dig Show Denver, Colorado March 15-19, 2015 MM-T6-05 Utilizing Trenchless Technology to Achieve Watermain Asset Management Objectives
San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS
ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. 2. Repair of service laterals located
INTERNATIONAL PIPE BURSTING ASSOCIATION. Guideline for Sewer Lateral Pipe Bursting
INTERNATIONAL PIPE BURSTING ASSOCIATION Guideline for Sewer Lateral Pipe Bursting Prepared for: The International Pipe Bursting Association (IPBA) www.nassco.org/about_nassco/an_div_ipba.html Division
Pipeline Replacement using Relining
Pipeline Replacement using Relining Mark Heathcote, March 2006 Relining of old pipeline systems is becoming an increasingly attractive option to asset owners and operators as an effective alternative to
SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.
SECTION 02763 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Repairs to existing sewer lines by replacing short lengths of failed pipe. 1.02 UNIT PRICES A. Measurement for point repairs is on a unit price
Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority
Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority Abstract The United States Virgin Islands Waste Management Authority
Guideline Specification for the Replacement of Mainline Sewer Pipes By Pipe Bursting
Guideline Specification for the Replacement of Mainline Sewer Pipes By Pipe Bursting Setting the Industry Standard for the Rehabilitation of Underground Utilities The International Pipe Bursting Association
FY08 SEWER POINT REPAIRS BID TABULATION
6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "
REHABILITATION OF THE LONG WHARF SEWER FORCE MAIN USING SLIPLINING METHODOLOGY IN NEWPORT, RHODE ISLAND
North American Society for Trenchless Technology (NASTT) No-Dig Show 2011 Washington, D.C. March 27-31, 2011 Paper A-5-04 REHABILITATION OF THE LONG WHARF SEWER FORCE MAIN USING SLIPLINING METHODOLOGY
Meeting the Challenge of Pipeline Emergency Repair
Meeting the Challenge of Pipeline Emergency Repair Michael R. McReynolds, PE, SE 1 Tao Peng, PE, SE 2 ABSTRACTS The Metropolitan Water District of Southern California (MWD) is the nation s largest provider
Ultraviolet (UV) Light Cured Fiberglass Reinforced Cured-In-Place Pipe (CIPP) It is not just for sanitary sewer rehabilitation
Ultraviolet (UV) Light Cured Fiberglass Reinforced Cured-In-Place Pipe (CIPP) It is not just for sanitary sewer rehabilitation Dan Broderick Director of Pipeline Rehabilitation ACHEN-GARDNER ENGINEERING,
DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL
DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant
Sewer Line Rehabilitation
1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing sanitary sewers using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting
Trenchless Construction Technology and Issues
Trenchless Construction Technology and Issues Dr. Mohammad Najafi, P.E., F. ASCE Director, Center for Underground Infrastructure Research & Education (CUIRE) Professor and Director of Construction Engineering
by Leonard Friesenhahn, P.E.
by Leonard Friesenhahn, P.E. of sight, out of mind is an adage your top administrators may apply to your campus Out wastewater collection system but as a facilities professional, you know how serious a
TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth
TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20
Structural Lining for Water Mains. Presenters: Stephen Marcino, PE and Micah Blate, EIT (JMT)
Structural Lining for Water Mains Presenters: Stephen Marcino, PE and Micah Blate, EIT (JMT) 2015 PA-AWWA Annual Conference Thursday, April 23 rd, 2015 Agenda 1. Introduction 2. Purpose of Lining 3. Lining
High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines
High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines Jeff Schell General Manager United Pipeline Middle East, Inc. Introduction HDPE Liners A cost effective and environmentally beneficial
Pneumatic Pipe Bursting
A Guide to Pneumatic Pipe Bursting with the GRUNDOCRACK SYSTEM Table of Contents 1) Foreword...4 2) Company Background...5 3) Pipe Bursting History...6 4) GRUNDOCRACK Concept...7 5) Project Considerations...
SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD
SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD 21.01 SCOPE: It is the intent of the Specification to define the approved methods and materials
VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10
VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 SECTION B1: PREPARATION GUIDE B1.1 INTRODUCTION... B1-1
PORTLAND BES ADVANCES IN SEWER MAINTENANCE AND REPAIRS BY OPERATING MULTIPLE CIPP CREWS.
North American Society for Trenchless Technology 2007 No-Dig Conference & Exhibition San Diego, California April 15-20, 2007 Paper # PORTLAND BES ADVANCES IN SEWER MAINTENANCE AND REPAIRS BY OPERATING
LIFELINE PIPELINE RESTORATION AND SEISMIC MITIGATION
LIFELINE PIPELINE RESTORATION AND SEISMIC MITIGATION Le Val LUND 1 And P E M ASCE 2 SUMMARY A number of methods are discussed which can be used for lifeline pipeline rehabilitation and improving the seismic
The Environmental Implications of Road Culvert Repair Technologies. Bridget Donaldson Senior Research Scientist
The Environmental Implications of Road Culvert Repair Technologies Bridget Donaldson Senior Research Scientist Presentation Overview Culvert repair technologies Past and ongoing research by VCTIR Cured-in-Place
Earthquake damage in wastewater systems and postearthquake repair methods; limitation and practice
Earthquake damage in wastewater systems and postearthquake repair methods; limitation and practice M. R. Zare 1, S. Wilkinson 2, R. Potangaroa 3 1. PhD candidate, University of Auckland, Auckland, New
Section 2100-Trenching and Tunneling
SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial
PRACTICES REVIEW FOR SASKATCHEWA MU ICIPALITIES
PROJECT: TRE CHLESS TECH OLOGIES A D WORK PRACTICES REVIEW FOR SASKATCHEWA MU ICIPALITIES PREPARED FOR: COMMU ITIES OF TOMORROW TRE CHLESS TECH OLOGIES A D WORK PRACTICES REVIEW FOR SASKATCHEWA MU ICIPALITIES
TRENCHLESS TECHNOLOGY GUIDELINES CLOSE FIT THERMOPLASTIC LINING
TRENCHLESS TECHNOLOGIES RESOURCE CENTRE TRENCHLESS TECHNOLOGY GUIDELINES SECOND EDITION CLOSE FIT THERMOPLASTIC LINING NEW VERSION AUGUST 2005 1. OVERVIEW The use of liners that are deliberately deformed
REHABILITATION OR REPLACEMENT? THAT IS THE QUESTION
REHABILITATION OR REPLACEMENT? THAT IS THE QUESTION ABSTRACT Chris L. Windley PE, McKim & Creed, Inc. Ben R. Latino, Jr., PE, McKim & Creed, Inc. Greg Anderson, PE, McKim & Creed, Inc. When designing to
San Antonio, TX July 28, 2011
Rehabilitation of a Deteriorated 60 RCP Wastewater Interceptor Using Competing Trenchless Technologies Bruce Cole, PE Corey Anderson, EIT TAWWA/WEAT Summer Seminar San Antonio, TX July 28, 2011 Wendy Martinez,
SECTION IX SLIP LINING PIPELINES
AN SECTION IX SLIP LINING PIPELINES February, 2008 TABLE OF CONTENTS SECTION IX - SLIP LINING PIPELINES 9.01.00 GENERAL...2 9.01.01 SCOPE... 2 9.02.00 MATERIAL...2 9.03.00 CONSTRUCTION...2 9.03.01 REQUIREMENTS...
Industrial Pipeline Integrity Management & Remote Polyurea Pipe Lining Systems.
Industrial Pipeline Integrity Management & Remote Polyurea Pipe Lining Systems. Aging pipeline infrastructure and industry s inability to evaluate and inspect has left many engineers and plant managers
SECTION 02400 - STORM DRAIN SYSTEM
SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And
BEST PRACTICE GUIDELINES FOR CULVERT LINER SELECTION
BEST PRACTICE GUIDELINES FOR CULVERT LINER SELECTION GENERAL Rehabilitation of culverts with pipe liners is one of several methods available for extending the life of an existing culvert. It is often cost
Waste Collection Systems
Waste Collection Systems System Maintenance and Repair Maintenance and Repair Training Objectives To gain an understanding of: System Maintenance and Repair vocabulary System Maintenance and Repair techniques
Emerging Technologies in Wastewater Collection Systems
Keville Enterprises Emerging Technologies in Wastewater Collection Systems Douglas McCutchen, CCM Brian Karmasin, P.E., BCEE CMAA Annual Conference Oct 2008 San Francisco, California Today s s Presentation
Trenchless Methods for Service and Mainline Pipe Rehab and New Install
Trenchless Methods for Service and Mainline Pipe Rehab and New Install Eddie Ward TT Technologies, Inc. Tennessee Gas Association Distribution & Operations Conference April 9 th 11 th Murfreesboro, TN
REHABILITATION METHOD FOR INCREASING FLOW VELOCITY AND REDUCING SEDIMENTATION
.asu/ North American Society for Trenchless Technology (NASTT) NO-DIG 2005 Orlando, Florida April 24-27, 2005 REHABILITATION METHOD FOR INCREASING FLOW VELOCITY AND REDUCING SEDIMENTATION Hwan-Kook Hwang
The surface roughness of the polyurethane lining is 10 times lower than cement-lined pipes.
QUALITY INSIDE When it comes to long life piping for drinking water, sewage, industrial water or gas, there is one name that continues to lead the way - ECOPUR by vonroll. Delivering precision-engineered
June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL
7.0 7.1 GENERAL For the purpose of this manual, culverts are defined as structures that are completely surrounded by soil and located below the surface of the roadway parallel to the general direction
STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.
STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill
Session: HDPE Pipe Test Rafael Ortega, Vice President, Lockwood, Andrews & Newnam
Session: HDPE Pipe Test Rafael Ortega, Vice President, Lockwood, Andrews & Newnam Education Master of Business Administration University of Houston, 1985 Bachelor of Science, Civil Engineering University
Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development
7 SPECIFICATIONS There is currently no Irish specification for construction of drainage works, or water supply works. There are several publications that give guidance on drainage works, such as the Building
SECTION 33 31 00.11 GRAVITY SANITARY SEWERS
SECTION 33 31 00.11 GRAVITY SANITARY SEWERS PART 1: GENERAL 1.01 SCOPE A. Gravity sanitary sewers and appurtenances. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 Submittals. B. Submit
Annular Space Grouting of Slipline Products
Annular Space Grouting of Slipline Products by David Gellings(, M.APWA & John Jurgens(, M.WWCPA Traditional methods of using neat cement slurries, (Portland cement and water, cement with fly ash or cement
SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE
SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE PART 1: GENERAL 1.01 SECTION INCLUDES PVC pressure pipe and fabricated fittings in nominal sizes 4-inches through 12-inches with cast iron pipe equivalent
Wastewater Capital Projects Management Standard Construction Specification
CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,
Module 3: Sewer Material Lecture 3: Sewer Material
Module 3: Sewer Material Lecture 3: Sewer Material [NPTEL, IIT Kharagpur, Prof. M.M.Ghangrekar, Department of Civil Engineering Page 1 3.0 SEWER MATERIAL 3.1 Important Factors Considered for Selecting
Native InDesign 2890 SaniTite Brochure 1/8" 100 300 CMYK April 17, 07
Sanitary Sewer Pipe Tough pipe for a tough environment SaniTite Sanitary Sewer Pipe delivers the features that engineers, contractors and municipalities demand durability, performance, handling, toughness
