1 Commissioning of Existing Buildings State of the Technology and It s Implementation David E. Claridge, Texas A&M University Mingsheng Liu, University of Nebraska W.D. Turner, Texas A&M University Abstract This paper provides an overview of the motivation and processes for commissioning new and existing buildings, with an emphasis on the processes for existing buildings. It also provides summary information on the results of commissioning existing buildings in the United States and shows the need for continuing follow-up. It concludes with a brief summary of the uses and ownership of about 20 million ft 2 of existing buildings that have been reported in the literature to have been commissioned and estimates that 100 to 200 million ft 2 of existing buildings have undergone some form of commissioning subsequent to initial occupancy. Introduction to Commissioning The energy crisis of the early 1970s spurred U.S. realization that buildings could be made much more efficient without sacrificing comfort. Over the last 30 years, the building industry has made revolutionary changes: chiller systems have decreased their power requirements by a factor of two, from over one kw/ton to less than 0.5 kw/ton; use of the variable air volume system has become common practice; and the use of building automation systems has become the norm with digital controls increasingly replacing pneumatics. These HVAC technology advances have greatly improved building comfort and have significantly decreased building energy consumption. The technological advances have increased the importance of proper operational practices in achieving the efficiency potential of the HVAC systems. Commissioning of HVAC systems has been growing in popularity over the last decade, but is still not the norm in construction practice or building operation. So many people have offered definitions of commissioning that one of the recommendations in the National Strategy for Building Commissioning (PECI, 1999) was to develop a standard definition of commissioning. The definition in ASHRAE Guideline (ASHRAE, 1996, p. 23) is probably closest to a standard or consensus definition: Commissioning is the process of ensuring systems are designed, installed, functionally tested, and operated in conformance with the design intent. Commissioning begins with planning and includes design, construction, start-up, acceptance, and training and can be applied throughout the life of the building. Furthermore, the commissioning process encompasses and coordinates the traditionally separate functions of systems documentation, equipment start-up, control system calibration, testing and balancing, and performance testing. It is important to note that commissioning is a process, not a formula, or a body of technical knowledge. Consequently, the process, the stakeholders who participate in the process, the benefits of the process, and approaches for overcoming the disincentives that have limited use of commissioning must be emphasized; not a set of engineering formulas. However, commissioning relies on the broad body of technical HVAC knowledge, just as does the HVAC design process. In principle, all building systems should be designed, installed, documented, tested, and building staff trained in their use. In practice, competitive pressures and fee structures, and financial pressures to occupy new buildings as quickly as possible generally result in buildings which are handed over to the owners with minimal contact between designers and operators, minimal functional testing of systems, documentation that largely consists of manufacturers system component manuals, and little or no training for operators. This in turn has lead to numerous horror stories such as mold growth in walls of new buildings, rooms which never cool properly, air quality problems, etc. Such experiences were doubtless the motivation for the facility manager for a large university medical center who stated a few years ago that he didn t want to get any new buildings. He only wanted to get three-year old buildings where the problems had already been fixed. The principal motivation for commissioning HVAC systems is to really achieve HVAC systems that work properly to provide comfort to all the occupants of a building unobtrusively and at low cost. They should work as soon as the building is occupied, and continue to work throughout the building s life. It has been estimated that a properly commissioned new building which operates according to design intent will save 8% in energy cost alone compared with the average building that is not commissioned (PECI, 1999). This offers a payback for the cost of commissioning in just over four years from the energy savings alone and also provides improved comfort and air quality. The motivation for commissioning existing buildings is similar. Deferred maintenance and changes in building uses and functions typically lead to problems that are not fully resolved by the operating staff. Efficiency is further compromised, and PECI estimated

2 that commissioning the typical existing building would result in energy savings of 12%, with a payback of just over one year. So why are a growing, but still tiny fraction of new buildings commissioned each year and a miniscule fraction of existing buildings? Three main factors have been identified: - lack of awareness of the commissioning process and its benefits on the part of building owners and other industry professionals; - a perception that commissioning drives up initial cost and slows the construction process; and - insufficient data on the costs and benefits of commissioning (PECI, 1999). Commissioning is a term and process that was originally used by the navy to ensure that battleships and submarines functioned properly before they were sent out to sea. It has been adopted and adapted within the building construction industry to apply to many different levels. Total building commissioning refers to the commissioning of all systems and components within a building, to include the envelope, life safety systems, lighting systems, etc. as well as the HVAC systems. This paper will be restricted to the HVAC systems in buildings. Initial HVAC system commissioning efforts were restricted to new buildings, but it later became evident that while initial start-up problems were not an issue in older buildings, most of the other problems which commissioning tackled were even more prevalent in older systems. Finding budgets to fund the work and making the case for the services was initially difficult, but the economics for commissioning existing HVAC systems today are even more compelling than for new buildings Most buildings continuously evolve in terms of use and function. Hence, the HVAC systems tend to become outdated over time. Consequently, while commissioning an existing HVAC system to the design intent generally improves comfort and efficiency significantly, it is still likely to result in a sub-optimal system set-up. Continuous commissioning addresses these problems by explicitly considering current functions and uses of the building and requirements on its systems and attempts to optimize the efficiency of the systems for the current application, to the point that design intent is not addressed. Application of this approach to commissioning of existing HVAC systems has been found to typically result in 20% reductions in building energy use, with typical paybacks of one to three years (Claridge et al., 1998). Another important element in this approach is periodic examination of energy performance with follow-up as needed to maintain systems in a continuously commissioned state (Claridge et al. 2002). While some owners have adopted commissioning primarily because they find that it provides higher quality buildings and results in fewer initial and subsequent operational problems, the direct and rapid payback of the commissioning expense from lowered operating costs is the principal motivation for many owners. Documenting these lower operational costs is much easier if a specific plan is implemented to monitor and verify the results of the commissioning process. Commissioning New HVAC Systems The goal of the commissioning process for a new HVAC system is to achieve a properly operating system that provides comfort to the occupants in every room from the first day a building is occupied. The motivation for commissioning a building is sometimes the desire to achieve this state as quickly, painlessly and inexpensively as possible. In other cases, the primary motivation is to achieve operating savings and secondarily to minimize operating problems, while motivations are more complex in some cases. Disney Development Corporation has constructed over $10 billion in new facilities since 1990 and has concluded that commissioning is an essential element for their company. The corporation often uses innovative construction techniques and creative designs in highly utilized facilities where the occupants have very high expectations. Many if not most of their facilities are expected to be aesthetically and operationally at the cutting edge of technology (Odom and Parsons, 1998). Other major private sector property owners who have adopted commissioning include Westin Hotels, Boeing, Chevron, Kaiser Permanente, and Target. The U.S. General Services Administration has taken steps to integrate commissioning into its design and construction program. State and local governments have also been leaders in the move toward commissioning, with significant programs at the state or local level in Florida, Idaho, Maryland, Montana, New York, Oregon, Tennessee, Texas, and Washington (Haasl and Wilkinson, 1998). The Commissioning Process Perhaps the major reason that commissioning is needed is that in many projects, commissioning the project simply consists of turning everything on and verifying that all motors, chillers, and boilers run. The HVAC commissioning process ideally begins during the building programming phase and continues through the design phase, the construction phase, the acceptance phase, and into a post acceptance phase. It requires the participation of the owner (or representative), the commissioning coordinator (commissioning authority), the design professionals, and the construction manager. There is considerable agreement that a strong commissioning program requires a commissioning coordinator, often called the commissioning authority. The commissioning authority is the person or company who implements the overall commissioning process and coordinates commissioning related interactions between

3 the other parties involved in the design, construction, and commissioning process. The commissioning authority (CA) reports to the owner and works with the other design professionals during the project. The construction manager then has primary responsibility for ensuring that the various contractors carry out the intent of the design developed, with the CA providing a detailed verification that the project, as built, does in fact meet the design intent. To maximize the benefits of commissioning, the owner selects the CA early in the programming phase so they can develop a preliminary commissioning plan before the design phase begins. During the design phase, the principal responsibility of the CA is to review and comment on the design as it evolves and update the commissioning plan as necessary. During the construction phase, the full commissioning team comes on board, and training of the building staff begins, while the CA continues to closely observe the construction process. The major commissioning activity does occur during the acceptance phase, with a multitude of checks and tests performed, further staff training, and finally, reporting and documentation of the process. The new commissioning process for new buildings has been described in more detail in many places, including ASHRAE (1996) and Claridge and Liu (2000). The remainder of this paper will be devoted to the commissioning of existing buildings. Commissioning Existing HVAC Systems In buildings that are not commissioned, numerous problems are identified and corrected over time, but many are more subtle and are never identified or corrected. Problems with sensor and actuator calibration, damper leakage, control strategies, etc. tend to remain hidden, and the operators are generally unaware that they exist unless they lead to a comfort complaint. Other problems may be known to the operators, but their significance can go unrecognized, so they are not corrected. Examples include higher air-side and water-side pressures than needed, inefficient hot-deck and cold-deck set-points, reset ranges, etc. Operators and maintenance personnel often increase consumption when dealing with an immediate problem, e.g. by lowering chilled water supply temperature in response to a hot call. Buildings are modified almost continuously in response to changes in tenants, remodels for existing tenants, changes in use of a space, etc. These changes may be accompanied by band-aid changes to the HVAC system, but often lead to further inefficiency. Consequently, there is tremendous opportunity for commissioning to benefit existing buildings. The commissioning of existing buildings has been called retrocommissioning (commissioning of an existing building that has never been commissioned) and recommissioning (commissioning an existing building subsequent to one or more previous commissioning processes). Whatever it may be called, commissioning of existing buildings is intended to identify any unresolved problems that occurred during construction, just as commissioning does in a new building, and to go beyond this point to identify and correct problems that have developed during subsequent operation of the building. Benefits of Commissioning Existing Buildings The specific benefits of commissioning existing buildings have been enumerated by Haasl and Sharp (1999) as follows: 1. Identifies system operating, control and maintenance problems 2. Aids in long-term planning and major maintenance budgeting 3. Helps ensure a healthy, comfortable, and productive working environment for occupants 4. Reduces energy waste and ensures that energy-using equipment operates efficiently 5. Provides energy cost savings that often pay back investment. 6. Reduces maintenance costs; reduces premature equipment failure 7. Provides complete and accurate building documentation; expedites troubleshooting 8. Provides appropriate training to operating staff to increase skill levels; increases staff effectiveness in serving customers or tenants 9. Reduces risk and increases the asset value of the building One study found that commissioning of existing buildings is very attractive economically, even if the only benefit considered is energy savings. Gregerson (1997) presented results from commissioning of 44 existing buildings that showed simple paybacks which ranged from 0.1 years to 4.2 years, with 28 having a payback of less than one year, 12 between 1.0 and 2.0 years and only 4 had a payback longer than 2.0 years. The buildings in this study were generally large buildings, with the smallest having 48,000 ft 2, and only 12 were less than 100,000 ft 2. Energy use in these buildings was reduced by 2% to 49% with an average reduction of 17.5%. The cost of commissioning was quite evenly distributed over the range from U.S. $0.03/ft 2 to U.S. $0.43/ft 2 with 11 buildings less than U.S. $0.10/ft 2 and nine at more than U.S. $0.30/ft 2. Procedures for Commissioning Existing Buildings In 1999, the U. S. Department of Energy (DOE) developed a practical guide for commissioning existing buildings (Haasl and Sharp 1999). While this guidebook discusses several building commissioning processes including new building commissioning, it emphasizes retro-commissioning. The main purpose of the retrocommissioning process is to solve existing problems in

4 buildings where new building commissioning was not conducted and to operate the building efficiently and effectively. Retro-commissioning primarily focuses on operation and maintenance (O&M) issues and solves existing problems using commonly available technical or operational solutions. The Continuous Commissioning SM (CC SM ) 1 process developed by the authors and emphasized in the description of commissioning procedures for existing buildings that follows is somewhat different from retrocommissioning and new building commissioning in its goals, methods, and results. The goals of the CC process are to optimize the HVAC system operation and control to minimize building energy consumption and to maximize comfort based on the current building conditions and requirements. The design intent is considered only as a reference, not as the performance target, realizing that (1) the building designer rarely has enough information to specify optimal operation of the design, and (2) the building function and use have often changed significantly from original expectations. The CC process is not limited to solving O&M problems. It focuses on innovative engineering solutions using state-of-the-art technologies. For example, calibrated simplified engineering models are used to identify system faults and to develop optimal operation schedules (Liu and Claridge 1998, 1999). The CC process has resulted in an average energy reduction of over 20% in 130 buildings (Liu et al. 1994, 1999a, Claridge et al. 1994, 2000) with simple paybacks typically less than two years. Innovative engineering solutions have been used to solve numerous engineering problems (Liu et al 1999b, Wei et al. 2002) that have eliminated or greatly reduced retrofit savings. The CC process maintains long-term savings by monitoring and verifying energy savings using dedicated meters and/or building automation systems. The CC process also upgrades the operating staff s skills by allowing direct participation of O&M staff, as well as reducing O&M costs. Continuous Commissioning is an ongoing process to resolve operating problems, improve comfort, optimize energy use and identify retrofits for existing commercial and institutional buildings and central plant facilities. This statement defines the objectives and scope of the CC process, but does not indicate how the process is implemented. Any CC project must initially go through a project development phase in which the CC project scope is clearly defined and a contract is signed. This phase typically involves a CC audit followed by a proposal leading to a contract, which differs little from a normal 1 Continuous Commissioning and CC have been service marked by the Energy Systems Laboratory of the Texas A&M University System to ensure a consistent meaning for these terms as used in this paper. retrofit project except in terms of the measures identified in the audit. Hence, it will not be discussed further. During the second phase of the CC process, the CC measures identified in the audit are refined and implemented. This phase includes six steps: (1) develop the CC plan and form the project team, (2) develop performance baselines, (3) conduct system measurements and refine proposed CC measures, (4) implement CC measures, (5) document comfort improvements and energy savings, and (6) keep the commissioning continuous. Step 1: Develop the CC plan and form the project team The objective is to develop a detailed work plan with a qualified team that includes a project manager, at least one CC engineer, one or more technicians and at least one member of the facility staff. When the work plan is developed, the following issues have to be considered: (1) the availability of funding for replacing/repairing broken parts, (2) the time commitment of in-house staff, and (3) the training needs of in-house staff. Step 2: Develop performance baselines The objectives are to document existing comfort and system conditions, and to develop baseline energy consumption models. Documentation of comfort conditions emphasizes existing comfort problems, e.g. areas that are too cold, too hot, too noisy, or too humid. The documentation of system conditions focuses on system operation problems such as valve and damper hunting, disabled mechanical and control systems or components, frequently replaced parts, and simultaneous heating and cooling. This is often done through detailed field measurements and inspections using skilled engineers or technicians. Baseline models of building energy performance are necessary if energy savings are to be documented after the building is commissioned. The energy baseline models normally developed include whole building electricity, cooling energy, and heating energy models. The energy baselines can be determined from regression models or a calibrated simulation program. Regression models typically express energy consumption as a function of outside air temperature. Baseline models can be developed from one or more of the following types of data: (1) shortterm measured data obtained from data loggers or the EMCS system; (2) long-term hourly or 15-minute whole building energy data, such as whole building electricity, cooling and heating consumption, and/or (3) data from utility bills for electricity, gas, and/or chilled or hot water. Techniques used to determine savings should be consistent with the International Performance Measurement and Verification Protocol (IPMVP 2001) and/or ASHRAE Guideline 14 (ASHRAE 2002).

5 Step 3: Conduct System Measurements and Develop CC Measures The objectives are to (1) identify current operating schedules and problems, (2) develop solutions to existing problems, (3) develop improved operation and control schedules, and (4) identify potential cost-effective energy retrofit measures. Detailed measurements are conducted to investigate the accuracy of sensors, the condition of actuators, and control schedules. Detailed engineering analysis is conducted, based on the measured data collected, to develop solutions for the existing problems; improved operation and control schedules are developed for terminal boxes, air handling units (AHUs), exhaust systems, water and steam distribution systems, heat exchangers, chillers, boilers, and other components as appropriate. Potential cost-effective energy retrofit measures are identified and evaluated. Step 4: Implement CC Measures The objectives are to (1) obtain approval for each CC measure from the building owner s representative prior to implementation, (2) solve existing operational and comfort problems, and (3) implement and refine improved operation and control schedules. The building owner s representative and building staff must be comfortable with each CC measure implemented or the measure will be quickly disabled. Measures should be modified if necessary to obtain staff buy-in. Implementation should start by solving existing problems. Difficult comfort and control problems are the first priority of the occupants, operating staff, and facility owners. Solving these problems improves occupant comfort and increases cooperation from operating staff. The economic benefits of comfort improvements are sometimes greater than the energy cost savings, though less easily quantified. Implementation of the improved operation and control schedules should start at the end of the comfort delivery system, such as at the terminal boxes, and should end with the central plant. This procedure provides benefits to the building occupants as quickly as possible. It also reduces the overall working load on the plant. If the process is reversed, the chiller plant is commissioned first and the chiller sequences are developed based on the current load. After building commissioning, the chiller load may be decreased by 30%. The chiller operating schedules are then very likely to need revision. Step 5: Document comfort improvements and energy savings The objectives are to (1) document improved comfort conditions, (2) document improved system conditions, and (3) document improved energy performance. The comfort measurements taken in step 2 should be repeated at the same locations under comparable conditions to determine commissioning impact on room conditions. The measured parameters, such as temperature and humidity, should be compared with the results of step 2. The measurements and methods adopted in step 2 should be used to evaluate post CC energy performance. Energy performance should be compared using appropriate occupancy and weather normalization (IPMVP 2001, ASHRAE 2002). Typically, building energy consumption is regressed as a function of outside air temperature if annual projections are desired from short-term data. Step 6: Keep the Commissioning Continuous The objectives are to (1) maintain improved comfort and energy performance, and (2) provide measured annual energy savings through ongoing help from CC experts, who may provide follow-up phone consultation, review the energy data, and monitor and analyze system operation through the Internet or other remote means as needed. One year after initial CC implementation is complete, the CC engineer should write a project follow-up report that documents the first-year savings, recommendations or changes resulting from any consultation or site visits provided, and any recommendations to further improve building operations. Subsequent follow-up should be provided when energy use increases or difficult comfort problems occur (Claridge et al. 2002). CC Measures The CC process implements measures ranging from typical improved O&M measures to innovative engineering measures (Liu et al. 2002). Improved O&M measures refer to good operating practices such as shutting off systems at night and repairing malfunctioning components. These measures align the building systems with design requirements and specifications adapted to current building use. The innovative engineering measures can be grouped into two categories: control optimization measures and system modifications. The control optimization measures focus on optimizing operating schedules such as schedules for maximum airflow, minimum airflow, supply air temperature and static pressure, supply water temperature and differential pressure, primary/secondary loop pump control, and parallel pump control and are described in detail in Liu et al. (2002). The implementation of these control optimization measures requires a high level of engineering skill and results in significant energy savings. The innovative system modification measures integrate minor system retrofits with the control measures to achieve additional system optimization and savings (Liu et al. 2003). These measures are not typical energy conservation retrofit measures. Since the capital requirement for these measures is small, the payback for these measures is

6 routinely three years or less, similar to that of other CC measures. Cases Where Continuous Commissioning May Be Used The CC process has been applied almost exclusively to buildings with a floor area of at least 50,000 ft 2. About 90% of the buildings to which the process has been applied are in cooling dominated climates where typical cooling consumption in large buildings is at least two times the heating consumption. However, it has also been successfully applied to buildings in the coldest parts of the continental United States. It is a relatively labor intense process at this time, making it generally more applicable to buildings with large air handlers and large total energy use. Automated control systems tend to simplify implementation of CC and it has been particularly effective in buildings that exhibit significant simultaneous heating and cooling. If the CC process were to be implemented in all in the commercial buildings larger than 50,000 ft 2 in the United States, and achieve comparable savings, it would have the potential to reduce consumption in the commercial buildings sector by 8%. Of course, if it were successfully implemented on that scale, it can be anticipated that a variety of automated techniques would make it applicable to smaller buildings and expand the potential impact. Case Study - Kleberg Building The Kleberg Building is a teaching/research facility on the Texas A&M University campus consisting of classrooms, offices and laboratories, with a total floor area of approximately 165,030 ft 2. Ninety percent of the building is heated and cooled by two (2) single duct variable air volume (VAV) air handling units (AHU) each having a pre-heat coil, a cooling coil, one supply air fan (100 hp), and a return air fan (25 hp). Two smaller constant volume units handle the teaching/lecture rooms in the building. The campus plant provides chilled water and hot water to the building. The two (2) parallel chilled water pumps (2 20 hp) have variable frequency drive control. There are 120 fan-powered VAV boxes with terminal reheat in 12 laboratory zones and 100 fan-powered VAV boxes with terminal reheat in the offices. There are six (6) exhaust fans (10-20 hp, total 90 hp) for fume hoods and laboratory general exhaust. The air handling units, chilled water pumps and 12 laboratory zones are controlled by a direct digital control (DDC) system. DDC controllers modulate dampers to control exhaust airflow from fume hoods and laboratory general exhaust. A CC investigation was initiated in the summer of 1996 due to the extremely high level of simultaneous heating and cooling observed in the building (Abbas, 1996). Figures 1 and 2 show daily heating and cooling consumption (expressed in average kbtu/hr) as functions of daily average temperature. The Pre-CC data heating given in Figure 1 shows very little temperature dependence as indicted by the regression line derived from the data. Data values were typically between 5 and 6 MMBtu/hr with occasional lower values. The cooling data (Figure 2) shows more temperature dependence and the regression line indicates that average consumption on a design day would exceed 10 MMBtu/hr. This corresponds to only 198 sq.ft./ ton based on average load K le b erg B u ild in g Hot Water Consumption Pre-CC Post-CC HW Btu (KBtu/h) OA Te m p, F Figure 1. Pre-CC and post-cc heating water consumption at the Kleberg Building vs. daily average outdoor temperature.

7 Kleberg Building Chilled Water Consumption Pre-CC Post-CC CW Btu (KBtu/h) OA Tem p, F Figure 2. Pre-CC and post-cc cooling water consumption at the Kleberg Building vs. daily average outdoor temperature. It was soon found that the preheat was operating continuously, heating the mixed air entering the cooling coil to approximately 105 F, instituted in response to a humidity problem in the building. The preheat was turned off and heating and cooling consumption both dropped by about 2 MMBtu/hour as shown by the middle clouds of data in Figures 1 and 2. Subsequently, the building was thoroughly examined and a comprehensive list of commissioning measures was developed and implemented. The principal measures implemented that led to reduced heating and cooling consumption were: Preheat to 105 F was changed to preheat to 40 F Cold deck schedule changed from 55 F fixed to vary from 62 F to 57 F as ambient varies from 40 F to 60 F Economizer set to maintain mixed air at 57 F whenever outside air below 60 F Static pressure control reduced from 1.5 inh2o to 1.0 inh2o and implemented night-time set back to 0.5 inh2o Replaced or repaired a number of broken VFD boxes Chilled water pump VFDs were turned on. Additional measures implemented included changes in CHW pump control changed so one pump modulates to full speed before second pump comes on instead of operating both pumps in parallel at all times, building static pressure was reduced from 0.05 inh2o to 0.02 inh2o, and control changes were made to eliminate hunting in several valves. It was also observed that there was a vibration at a particular frequency in the pump VFDs that influenced the operators to place these VFDs in the manual mode, so it was recommended that the mountings be modified to solve this problem. These changes further reduced chilled water and heating hot water use as shown in Figures 1 and 2 for a total annualized reduction of 63% in chilled water use and 84% in hot water use. Additional follow-up conducted from June 1998 through April 1999 focused on air balance in the 12 laboratory zones, general exhaust system rescheduling, VAV terminal box calibration, adjusting the actuators and dampers, and calibrating fume hoods and return bypass devices to remote DDC control (Lewis, et al. 1999). These changes reduced electricity consumption by about 7% or 30,000 kwh/mo. In 2001 it was observed that chilled water savings for 2000 had declined to 38% and hot water savings to 62% as shown in Table 1. Chilled water data for 2001 and the first three months of 2002 are shown in Figure 3. The two lines shown are the regression fits to the chilled water data before CC implementation and after implementation of CC measures in 1996 as shown in Figure 2. It is evident that consumption during 2001 is generally appreciably higher than immediately following implementation of CC measures. The CC group performed field tests and analyses that soon focused on two SDVAV AHU systems, two chilled water pumps, and the Energy Management Control System (EMCS) control algorithms as described in Chen et al. (2002). Several problems were observed as noted below.

8 Table 1. Cooling water and heating water usage and saving in the Kleberg Building for three different years normalized to 1995 weather. Type Pre-CC Baseline Post-CC Use/Savings 2000 Use/Savings (MMBtu/yr) Use (MMBtu/yr) Savings (%) Use (MMBtu/yr) Savings (%) CHW % % HW % % Problems Identified The majority of the VFDs were running at a constant speed near 100% speed. VFD control on two chilled water pumps was again by passed to run at full speed. Two chilled water control valves were leaking badly. Combined with a failed electronic to pneumatic switch and the high water pressure noted above, this resulted in discharge air temperatures of 50F and lower and activated preheat continuously. A failed pressure sensor and two failed CO2 sensors put all outside air dampers to the full open position. The damper actuators were leaking and unable to maintain pressure in some of the VAV boxes. This caused cold air to flow through the boxes even when they were in the heating mode, resulting in simultaneous heating and cooling. Furthermore some of the reheat valves were malfunctioning. This caused the reheat to remain on continuously in some cases. Additional problems identified from the field survey included the following: 1) high air resistance from the filters and coils, 2) errors in a temperature sensor and static pressure sensor, 3) high static pressure set points in AHU1 and AHU2. A combination of equipment failure compounded by control changes that returned several pumps and fans to constant speed operation had the consequence of increasing chilled water use by 18,894 MMBtu and hot water use by 9,510 MMBtu. This amounted to an increase of 71% in chilled water use and more than doubled hot water use from two years earlier These problems have now been largely corrected and building performance has returned to previously low levels as illustrated by the data for April-June 2002 in Figure 3. This data is all below the lower of the two regression lines and is comparable to the level achieved after additional CC measures were implemented in ChW Consumption (kbtu/hr) /1/01-3/31/02 4/1/02-6/30/ OA Temp, F Figure 3. Cooling water data for the Kleberg Building since January When Is Follow-Up Commissioning Needed? For the Kleberg Building, it is clear that a combination of control changes and component problems led to a need for follow-up commissioning measures. In principle, these measures could be viewed as routine maintenance, but since they had not led to comfort problems, it is unlikely that they would have been addressed unless they ultimately resulted in a comfort problem. Even then without the evidence of the $66,500/year increase in consumption, it is unlikely that a comprehensive follow-up effort would have occurred. But how often do such problems occur? The ESL has conducted a study of 10 buildings on the A&M campus that had CC measures implemented in Table 2 shows the baseline cost of combined heating, cooling and electricity use of each building and the commissioning savings for 1998 and The baseline consumption and savings for each year were normalized to remove any differences due to weather (see Turner, et al for details). Looking at the totals for the group of 10 buildings, savings decreased by over $207,258 (17%) from 1998 to 2000, but were still very substantial. However, it may also be observed that almost ¾ of this decrease occurred in two buildings, the Kleberg Building, and G. Rollie White Coliseum. The increased consumption of the Kleberg Building was due to a combination of component failures and control problems as already discussed. The increased consumption in G. Rollie White Coliseum was due

9 Table 2. Commissioning savings in 1998 and 2000 for 10 buildings on the Texas A&M campus. Building Baseline Use ($/yr) 1998 Savings ($/yr) 2000 Savings($/yr) Kleberg Building $ 484,899 $ 313,958 $ 247,415 G.R. White Coliseum $ 229,881 $ 154,973 $ 71,809 Blocker Building $ 283,407 $ 76,003 $ 56,738 Eller O&M Building $ 315,404 $ 120,339 $ 89,934 Harrington Tower $ 145,420 $ 64,498 $ 48,816 Koldus Building $ 192,019 $ 57,076 $ 61,540 Richardson Petroleum Building $ 273,687 $ 120,745 $120,666 Veterinary Medical Center Addition $ 324,624 $ 87,059 $ 92,942 Wehner Business Building $ 224,481 $ 47,834 $ 68,145 Zachry Engineering Center $ 436,265 $ 150,400 $127,620 Totals $ 2,910,087 $ 1,192,884 $ 985,626 to different specific failures and changes, but was qualitatively similar to Kleberg since it resulted from a combination of component failures and control changes. The five buildings that showed consumption increases above 5% from 1998 to 2000 were all found to have different control settings that appear to account for the changed consumption (including the decrease in the Wehner Business Building). This data does not explicitly answer the question When is follow-up commissioning needed?, but the authors believe it suggests that tracking consumption and investigating the reasons for significant increases is likely to provide real benefits. Existing Buildings Commissioned There have been no comprehensive surveys of the extent of commissioning of existing buildings. The proceedings of the National Conference on Building Commissioning from were scanned to identify the basic characteristics of commissioned buildings as reported in case studies or papers that gave sufficient information to determine the size and use of different existing buildings that have been commissioned in the U.S. and Canada in recent years. Table 3 summarizes the findings of this effort. Three fourths of the buildings and over 85% of the area commissioned were offices and medical facilities. Some of the offices reported here are private buildings, but many are public sector buildings, including some that include classroom space on university campuses. The Lab./Office category shown in Table 3 is primarily public sector buildings that include substantial laboratory space, but generally include significant office space as well. Table 3. Summary of the area and types of existing buildings reported as commissioned in the Proceedings of the National Conference on Building Commissioning: (NCBC ). Building Use Number Area (ft 2 ) Commissioned Office 38 9,509,213 Retail 6 1,053,238 Lab./Office 7 912,711 Library 2 187,380 Medical 22 7,514,488 School 4 312,489 Gym 1 177,838 Total 80 19,667,357 Of the total of 19,667,357 ft 2 of space commissioned, only 4,333,238 ft 2 is clearly privately owned. Another 1,595,000 ft 2 did not have ownership clearly specified. 13,739,119 ft 2, or about 70% of the total area commissioned was owned by various public entities. Clearly, this does not constitute the total area that has been commissioned in the existing buildings sector. The amount or thoroughness of commissioning that has occurred in these buildings also varies considerably. We estimate that 100 million to 200 million ft 2 of existing commercial buildings have received some form of retrocommissioning. We also expect that the sample above is skewed more heavily toward the public sector than the total set of commissioned buildings. It is also probable that a larger fraction of existing public sector buildings have been commissioned than is true of private sector buildings. The commercial sector in the United States includes 67.3 billion ft 2 of floor space (EIA 1999) and 41.1 billion ft 2 of this is in buildings of 25,000 ft 2 or larger, which constitutes the vast bulk of the buildings reported as retrocommissioned to date. Hence, it would appear that even the upper limit of our estimate suggests that considerably less than 1% of the larger buildings in the commercial sector have yet been retro-commissioned.

10 Acknowledgements The introduction to commissioning presented in this paper has been adapted from Claridge and Liu (2000), the description of the CC process from Liu et al. (2003), and the examples of the need for follow-up commissioning from Claridge et al. (2002). References Abbas, M., CC at the Kleberg Building, Internal ESL Memo, August. ASHRAE, ASHRAE Guideline : The HVAC Commissioning Process, American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc., Atlanta, GA. ASHRAE, ASHRAE Guideline : Measurement of Energy and Demand Savings, American Society of Heating, Refrigerating and Air-Conditioning Engineers, Atlanta, GA. Chen, H., Deng, S., Bruner, H., Claridge, D. and Turner, W.D., Continuous Commissioning SM Results Verification And Follow-Up For An Institutional Building - A Case Study, Proc. 13 th Symposium on Improving Building Systems in Hot and Humid Climates, Houston, TX, May. Claridge D. E., Haberl J., Liu M., Houcek J., and Athar A., Can You Achieve 150% of Predicted Retrofit Savings: Is It Time for Recommissioning? ACEEE 1994 Summer Study on Energy Efficiency In Buildings Proceedings: Commissioning, Operation and Maintenance, Vol. 5, pp , American Council for an Energy Efficient Economy, Washington, D.C. Claridge, D.E., Liu, M., Turner, W.D., Zhu, Y.,, Abbas, M., and Haberl, J.S., Energy and Comfort Benefits of Continuous Commissioning in Buildings, Proceedings of the International Conference Improving Electricity Efficiency in Commercial Buildings, September, Amsterdam, The Netherlands, pp Claridge, David E. and Liu, Mingsheng, "HVAC System Commissioning," in Handbook of Heating, Ventilation, and Air Conditioning, Jan F. Kreider, ed., CRC Press, Boca Raton, FL, pp. 7-1 through 7-25, Claridge D. E., Culp C. H., Liu M., Deng S., Turner W. D., and Haberl J. S., "Campus-Wide Continuous Commissioning SM of University Buildings," Proc. of ACEEE 2000 Summer Study on Energy Efficiency in Buildings, Pacific Grove, CA, Aug , Vol. 3, pp Claridge, D.E., Turner, W.D., Liu, M., Deng, S., Wei, G., Culp, C., Chen, H. and Cho, S.Y., Is Commissioning Once Enough?, Solutions for Energy Security & Facility Management Challenges: Proc. of the 25 th WEEC, Atlanta, GA, Oct. 9-11, 2002, pp EIA, Commercial Buildings Energy Consumption Survey, Energy Information Agency, U. S. Department of Energy, Gregerson, Joan, "Cost Effectiveness of Commissioning 44 Existing Buildings," Fifth National Conference on Building Commissioning, Huntington Beach, CA April Haasl, Tudi and Wilkinson, Ronald, Using Building Commissioning to Improve Performance in State Buildings, Proc. 11 th Symposium on Improving Building Systems in Hot and Humid Climates, June 1-2, Fort Worth, Texas, pp Haasl, Tudi and Sharp, Terry, A Practical Guide for Commissioning Existing Buildings, Portland Energy Conservation, Inc. and Oak Ridge National Laboratory for U.S. DOE, ORNL/TM-1999/34, 69 pp. + App. IPMVP IPMVP Committee, International Performance Measurement & Verification Protocol: Concepts and Options for Determining Energy and Water Savings, Vol. 1, U.S. Dept. of Energy, DOE/GO Lewis, T., H. Chen, and M. Abbas, CC Summary for the Kleberg Building, Internal ESL Report, July. Liu, M., Houcek, J., Athar, A., Reddy, A., and Claridge, D. E., Identifying and Implementing Improved Operation and Maintenance Measures in Texas LoanSTAR Buildings, ACEEE 1994 Summer Study on Energy Efficiency In Buildings Proceedings: Commissioning, Operation and Maintenance, Vol. 5, pp , American Council for an Energy Efficient Economy, Washington, D.C. Liu M., Claridge D. E., Use of Calibrated HVAC Models to Optimize System Operation, ASME Journal of Solar Energy Engineering, Vol. 120, pp Liu M., Claridge D. E., The Maximum Potential Energy Savings from Optimizing Cold and Hot Deck Reset Schedules for Dual Duct VAV Systems. ASME Journal of Solar Energy Engineering, Vol. 121, pp Liu M., Claridge D. E., and Turner W. D., 1999a. "Improving Building Energy System Performance by Continuous Commissioning," Energy Engineering, Vol. 96, No. 5, pp Liu M., Veteto B., and Claridge D. E., 1999b. Rehabilitating A Thermal Storage System Through Commissioning, ASHRAE Transactions, Vol. 105, Part 2, pp Liu M., Claridge D. E. and Turner W. D., Continuous Commissioning SM Guidebook: Maximizing

11 Building Energy Efficiency and Comfort, Federal Energy Management Program, U.S. Dept. of Energy, Liu, M., Claridge, D.E., and Turner, W.D., Continuous Commissioning SM of Building Energy Systems, to be published in ASME Journal of Solar Energy Engineering. NCBC Proc. 4 th National Conference on Building Commissioning, April 29 May 1, St. Pete Beach, FL. NCBC Proc. 5 th National Conference on Building Commissioning, April 28-30, Huntington Beach, CA. NCBC Proc. 6 th National Conference on Building Commissioning, May 18-20, Lake Buena Vista, FL. NCBC Proc. 7 th National Conference on Building Commissioning, May 3-5, Portland, OR. NCBC Proc. 8 th National Conference on Building Commissioning, May 3-5, Kansas City, MO. NCBC Proc. 9 th National Conference on Building Commissioning, May 9-11, Cherry Hill, NJ. Odom, J. David and Parsons, Scotty, The Evolution of Building Commissioning at Walt Disney World, 6 th National Conference on Building Commissioning, Lake Buena Vista, FL, May PECI, National Strategy for Building Commissioning, PECI, Inc., Portland, OR. Turner, W.D., Claridge, D.E., Deng, S., Cho, S., Liu, M., Hagge, T., Darnell, C., Jr., and Bruner, H., Jr., 2001; "Persistence of Savings Obtained from Continuous Commissioning SM," Proc. of 9th National Conference on Building Commissioning, Cherry Hill, NJ, May 9-11, pp Wei G., Liu M., Sakurai Y., Claridge D. E., Turner W. D., Practical Optimization of Full Storage Systems Operation, ASHRAE Transactions-Research, Vol. 108, Part 2, pp

Impacts of Static Pressure Set Level on the HVAC Energy Consumption and Indoor Conditions

Impacts of Static Pressure Set Level on the HVAC Energy Consumption and Indoor Conditions Impacts of Static Pressure Set Level on the HVAC Energy Consumption and Indoor Conditions M. Liu, Y. Zhu, D. E. Claridge Energy Systems Laboratory Texas A&M University Ed. White Energy Management Operation

More information

The Chilled Water and Hot Water Building Deferential Pressure Setpoint Calculation Chilled Water and Hot Water Pump Speed Control

The Chilled Water and Hot Water Building Deferential Pressure Setpoint Calculation Chilled Water and Hot Water Pump Speed Control The Chilled Water and Hot Water Building Deferential Pressure Setpoint Calculation Chilled Water and Hot Water Pump Speed Control Chenggang Liu Research Associate Homer L. Bruner, Jr., CEM Mechanical Systems

More information

Sample - Existing Building Commissioning Plan

Sample - Existing Building Commissioning Plan Sample - Existing Building Commissioning Plan Version: Draft for Review Final Approved: Owner Site Address: Primary Site Contact Name and Telephone Number: Date Building Description The site consists of

More information

Continuous Commissioning of the Dallas/Fort Worth International Airport

Continuous Commissioning of the Dallas/Fort Worth International Airport Continuous Commissioning of the Dallas/Fort Worth International Airport Jerry R. Dennis, CEM, CEP Rusty T., P.E., CEM, CEP, LEED AP Larry Kramer, P.E., CEM DFW International Airport Energy and Transportation

More information

REAL OPERATING COST SAVINGS FROM RETRO- COMMISSIONING OPPORTUNITIES FOR SAVINGS IN ACADEMIC MEDICAL CENTERS

REAL OPERATING COST SAVINGS FROM RETRO- COMMISSIONING OPPORTUNITIES FOR SAVINGS IN ACADEMIC MEDICAL CENTERS REAL OPERATING COST SAVINGS FROM RETRO- COMMISSIONING OPPORTUNITIES FOR SAVINGS IN ACADEMIC MEDICAL CENTERS Ken L. Hansen P.E. University of Nebraska Medical Center hansenkl@unmc.edu 402-559- 5301 402-630-

More information

Modeling and Simulation of HVAC Faulty Operations and Performance Degradation due to Maintenance Issues

Modeling and Simulation of HVAC Faulty Operations and Performance Degradation due to Maintenance Issues LBNL-6129E ERNEST ORLANDO LAWRENCE BERKELEY NATIONAL LABORATORY Modeling and Simulation of HVAC Faulty Operations and Performance Degradation due to Maintenance Issues Liping Wang, Tianzhen Hong Environmental

More information

Printing and Publishing Energy Savings Guide

Printing and Publishing Energy Savings Guide Printing and Publishing Energy Savings Guide Oregon printing and publishing plants face challenges of rising operating costs, environmental and other regulations, outdated equipment and customer demand

More information

Example Retrocommissioning Measure: Opening Throttled Discharge Valves

Example Retrocommissioning Measure: Opening Throttled Discharge Valves Opening Throttled Discharge Valves This 21-story building, constructed in 1997, is located in Oregon and contains 589,000 gross square feet of mostly office occupancy. The HVAC system includes six large

More information

UNIVERSITY OF MISSOURI 23 0000 - Heating Ventilating and Air-Conditioning (HVAC) March 2015.01

UNIVERSITY OF MISSOURI 23 0000 - Heating Ventilating and Air-Conditioning (HVAC) March 2015.01 GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per

More information

AIR COOLED CHILLER CHILLED WATER PUMP CONTROL: The chilled water pump with the lowest runtime will automatically start when the outside air temperature rises above the system enable setpoint. When the

More information

Ventilation Retrofit Opportunities for Packaged HVAC

Ventilation Retrofit Opportunities for Packaged HVAC Ventilation Retrofit Opportunities for Packaged HVAC Reid Hart, PE National Energy Efficiency Technology Summit September 2012 PNNL-SA-90782 Acknowledgements Bonneville Power Administration City of Eugene

More information

CONTROL STRATEGIES FOR HVAC SYSTEMS

CONTROL STRATEGIES FOR HVAC SYSTEMS CONROL SRAEGIES FOR HVAC SYSEMS ZBIGNIEW POPIOLEK Department of Heating, Ventilation and Dust Removal echnology Silesian University of echnology, Poland 1 Definition of control: to apply a regulating influence

More information

Building Analytics Improve the efficiency, occupant comfort, and financial well-being of your building.

Building Analytics Improve the efficiency, occupant comfort, and financial well-being of your building. Building Analytics Improve the efficiency, occupant comfort, and financial well-being of your building. Make the most of your energy SM Building confidence knowing the why behind your facility s operations

More information

Advanced Energy Design Guide LEED Strategies for Schools. and High Performance Buildings

Advanced Energy Design Guide LEED Strategies for Schools. and High Performance Buildings Advanced Energy Design Guide LEED Strategies for Schools and High Performance Buildings Today s Presenters Stephen Koontz, LEED AP Energy Services Leader Tampa Bay Trane Allen Irvine General Sales Manager

More information

Impact of Control System Technologies on Industrial Energy Savings

Impact of Control System Technologies on Industrial Energy Savings Impact of Control System Technologies on Industrial Energy Savings Priyam Parikh Industrial Assessment Center Texas A&M University Bryan P. Rasmussen Industrial Assessment Center Texas A&M University http://farolconsulting.com/?page_id=110

More information

Applying Pressure Independent Control Valves in H.V.A.C. Systems. A Presentation to: Orange Empire ASHRAE Santa Ana Nov. 17, 2009

Applying Pressure Independent Control Valves in H.V.A.C. Systems. A Presentation to: Orange Empire ASHRAE Santa Ana Nov. 17, 2009 Applying Pressure Independent Control Valves in H.V.A.C. Systems A Presentation to: Orange Empire ASHRAE Santa Ana Nov. 17, 2009 1 Introduction I know, as building design consultants, so much of your effort

More information

NEBB STANDARDS SECTION-8 AIR SYSTEM TAB PROCEDURES

NEBB STANDARDS SECTION-8 AIR SYSTEM TAB PROCEDURES NEBB STANDARDS SECTION-8 AIR SYSTEM TAB PROCEDURES 8.1 INTRODUCTION Testing, adjusting, and balancing of HVAC systems can best be accomplished by following a series of systematic procedures. The NEBB TAB

More information

Rev. No. 0 January 5, 2009

Rev. No. 0 January 5, 2009 ENERGY & ENVIRONMENTAL ENERGY ISSUES COMMITTEE 415 Main Building Telephone (574) 631-6666 Notre Dame, Indiana Facsimile (574) 631-5883 46556 USA Energy Conservation Plan For HVAC Systems Rev. No. 0 January

More information

Continuous Energy Management at UC San Diego. Anna Levitt, P.E. Assistant Energy Manager June 13, 2013

Continuous Energy Management at UC San Diego. Anna Levitt, P.E. Assistant Energy Manager June 13, 2013 Continuous Energy Management at UC San Diego Anna Levitt, P.E. Assistant Energy Manager June 13, 2013 UC San Diego: A 42 megawatt Microgrid With a daily population of over 45,000, UC San Diego is the size

More information

ULTRA-EFFICIENT HVAC DESIGN AND CONTROL

ULTRA-EFFICIENT HVAC DESIGN AND CONTROL CASE STUDY ULTRA-EFFICIENT HVAC DESIGN AND CONTROL MAJOR HEATING, VENTILATING AND AIR- CONDITIONING REPLACEMENT AT THE COUNTY OF SAN DIEGO CRIME LAB December 30, 2005 8520 Tech Way, Suite 110 San Diego,

More information

Commissioning - Construction Documents (Page 1 of 6)

Commissioning - Construction Documents (Page 1 of 6) Commissioning - Construction Documents (Page 1 of 6) A. General Information Climate Zone: Building Type: Conditioned Area (sf): Reviewer's Name: Reviewer's Agency: Note: Design Review for each system/subsystem

More information

Using Time-of-Day Scheduling To Save Energy

Using Time-of-Day Scheduling To Save Energy The following article was published in ASHRAE Journal, May 29. Copyright 29 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. It is presented for educational purposes only.

More information

CHAPTER 8 HVAC (Heating, Ventilation, and Air-Conditioning)

CHAPTER 8 HVAC (Heating, Ventilation, and Air-Conditioning) CHAPTER 8 HVAC (Heating, Ventilation, and Air-Conditioning) Objectives Survey current HVAC system(s), operating procedures, and maintenance schedule. Analyze results of energy audit for HVAC system(s)

More information

SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP

SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP research journal 2013 / VOL 05.01 www.perkinswill.com SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP ARCHITECTURE AND ENGINEERING OF SUSTAINABLE BUILDINGS Current Trends in Low-Energy HVAC Design

More information

ENERGY AUDITS FOR EXISTING BUILDINGS: It s like (nearly) free money! FSi consulting engineers

ENERGY AUDITS FOR EXISTING BUILDINGS: It s like (nearly) free money! FSi consulting engineers ENERGY AUDITS FOR EXISTING BUILDINGS: It s like (nearly) free money! Who is FSi?, established 1985 We are a single discipline mechanical engineering firm based out of Seattle and Baltimore. FSi places

More information

Design Guide. Retrofitting Options For HVAC Systems In Live Performance Venues

Design Guide. Retrofitting Options For HVAC Systems In Live Performance Venues Design Guide Retrofitting Options For HVAC Systems In Live Performance Venues Heating, ventilation and air conditioning (HVAC) systems are major energy consumers in live performance venues. For this reason,

More information

Enclosed Football Stadium Design History and Lessons Learned

Enclosed Football Stadium Design History and Lessons Learned Enclosed Football Stadium Design History and Lessons Learned Robert L. Towell, P.E., LEED AP, QCxP btowell@cxegroup.com CxE Group LLC St. Louis, Missouri 314-436-6543 With thanks to the St. Louis Convention

More information

Building Diagnostic Market Deployment Final Report

Building Diagnostic Market Deployment Final Report PNNL-21366 Prepared for the U.S. Department of Energy under Contract DE-AC05-76RL01830 Building Diagnostic Market Deployment Final Report S Katipamula N Gayeski April 2012 1 . PNNL-21366 Building Diagnostics

More information

HVAC Processes. Lecture 7

HVAC Processes. Lecture 7 HVAC Processes Lecture 7 Targets of Lecture General understanding about HVAC systems: Typical HVAC processes Air handling units, fan coil units, exhaust fans Typical plumbing systems Transfer pumps, sump

More information

Company name Date submitted. Building address City State ZIP. E-mail* Building Sq. Ft.

Company name Date submitted. Building address City State ZIP. E-mail* Building Sq. Ft. Recommissioning Application Business Customer Information Company name Date submitted Building address City State ZIP Mailing address (if different) City State ZIP Contact person (print) Phone Fax E-mail*

More information

Cornell University Chilled Water Best Management Practices Program

Cornell University Chilled Water Best Management Practices Program Cornell University Chilled Water Best Management Practices Program Prepared by: Cornell University Facilities Services Energy and Sustainability Utilities Report Date: 29 January 2014 Report Number: 2014_LSC_BMP

More information

EnergyPro Building Energy Analysis. Assisted Living Building

EnergyPro Building Energy Analysis. Assisted Living Building EnergyPro Building Energy Analysis Assisted Living Building EnergyPro Building Energy Analysis for an assisted living building Project Scope The purpose of the EnergyPro energy model was to evaluate the

More information

Fundamentals of HVAC Control Systems

Fundamentals of HVAC Control Systems ASHRAE Hong Kong Chapter Technical Workshop Fundamentals of HVAC Control Systems 18, 19, 25, 26 April 2007 2007 ASHRAE Hong Kong Chapter Slide 1 Chapter 5 Control Diagrams and Sequences 2007 ASHRAE Hong

More information

Presentation Outline. Common Terms / Concepts HVAC Building Blocks. Links. Plant Level Building Blocks. Air Distribution Building Blocks

Presentation Outline. Common Terms / Concepts HVAC Building Blocks. Links. Plant Level Building Blocks. Air Distribution Building Blocks Presentation Outline Common Terms / Concepts HVAC Building Blocks Plant Level Building Blocks Description / Application Data Green opportunities Selection Criteria Air Distribution Building Blocks same

More information

Case Study: Innovative Energy Efficiency Approaches in NOAA s Environmental Security Computing Center in Fairmont, West Virginia

Case Study: Innovative Energy Efficiency Approaches in NOAA s Environmental Security Computing Center in Fairmont, West Virginia Case Study: Innovative Energy Efficiency Approaches in NOAA s Environmental Security Computing Center in Fairmont, West Virginia Prepared for the U.S. Department of Energy s Federal Energy Management Program

More information

ENERGY SAVING STUDY IN A HOTEL HVAC SYSTEM

ENERGY SAVING STUDY IN A HOTEL HVAC SYSTEM ENERGY SAVING STUDY IN A HOTEL HVAC SYSTEM J.S. Hu, Philip C.W. Kwong, and Christopher Y.H. Chao Department of Mechanical Engineering, The Hong Kong University of Science and Technology Clear Water Bay,

More information

Comparing Energy Savings of Different VAV Systems

Comparing Energy Savings of Different VAV Systems Comparing Energy Savings of Different VAV Systems Prepared By: Martyn Dodd mart@energysoft.com EnergySoft LLC 1025 5th Street, Suite A Novato, CA 94945 415-897-6400 www.energysoft.com Last Modified: March

More information

1. What percent of a commercial business s energy usage comes from their HVAC system? A. 13% B. 23% C. 33% D. 43% E. 53%

1. What percent of a commercial business s energy usage comes from their HVAC system? A. 13% B. 23% C. 33% D. 43% E. 53% 1 1. What percent of a commercial business s energy usage comes from their HVAC system? A. 13% B. 23% C. 33% D. 43% E. 53% 2. How much money do commercial facilities spend per square foot on energy costs

More information

Life Cycle Costing Analysis of Water-cooled Chillers. Chillventa Nuremburg, Germany

Life Cycle Costing Analysis of Water-cooled Chillers. Chillventa Nuremburg, Germany Life Cycle Costing Analysis of Water-cooled Chillers Chillventa Nuremburg, Germany Spring 2012 Description Life Cycle Cost Analysis is a method of determining and comparing the total costs of investment

More information

HVAC Systems: Overview

HVAC Systems: Overview HVAC Systems: Overview Michael J. Brandemuehl, Ph.D, P.E. University of Colorado Boulder, CO, USA Overview System Description Secondary HVAC Systems Air distribution Room diffusers and air terminals Duct

More information

KU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM

KU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM KU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM AIR HANDLING UNITS... 1 CHILLERS... 2 COOLING TOWERS... 2 CLOSED LOOP COOLERS... 2 MISCELLANEOUS SUPPLY FANS...

More information

for Plans Examiners and Building Inspectors

for Plans Examiners and Building Inspectors Building Technologies Program HVAC Controls Guide for Plans Examiners and Building Inspectors September 2011 Authors: Eric Makela, PNNL James Russell, PECI Sarah Fujita, PECI Cindy Strecker, PECI Prepared

More information

OEH Energy Efficient HVAC for Business Training Course

OEH Energy Efficient HVAC for Business Training Course OEH Energy Efficient HVAC for Business Training Course www.environment.nsw.gov.au/training Presenter: Chris Warris, BCW Carbon and Energy Agenda for Today Overview of OEH Energy Efficiency Training Program

More information

COMPARATIVE LIFE-CYCLE ANALYSIS OF ENERGY-EFFICIENCY MEASURES AT TVA S CHATTANOOGA OFFICE COMPLEX: PHASE II RESULTS & FINAL DESIGN

COMPARATIVE LIFE-CYCLE ANALYSIS OF ENERGY-EFFICIENCY MEASURES AT TVA S CHATTANOOGA OFFICE COMPLEX: PHASE II RESULTS & FINAL DESIGN COMPARATIVE LIFE-CYCLE ANALYSIS OF ENERGY-EFFICIENCY MEASURES AT TVA S CHATTANOOGA OFFICE COMPLEX: PHASE II RESULTS & FINAL DESIGN Umesh Atre Innovative Design Inc 850 W Morgan St Raleigh, NC 27603 umesh@innovativedesign.net

More information

Automated Commissioning for Energy (ACE) Platform for Large Retail Property. Overview

Automated Commissioning for Energy (ACE) Platform for Large Retail Property. Overview Automated Commissioning for Energy (ACE) Platform for Large Retail Property $62,900 dollars of energy savings identified during the first 6 weeks Overview The ability to pull large amounts of complex data

More information

DATA CENTER COOLING INNOVATIVE COOLING TECHNOLOGIES FOR YOUR DATA CENTER

DATA CENTER COOLING INNOVATIVE COOLING TECHNOLOGIES FOR YOUR DATA CENTER DATA CENTER COOLING INNOVATIVE COOLING TECHNOLOGIES FOR YOUR DATA CENTER DATA CENTERS 2009 IT Emissions = Aviation Industry Emissions Nations Largest Commercial Consumers of Electric Power Greenpeace estimates

More information

Demand Based Static Pressure Reset Control for Laboratories

Demand Based Static Pressure Reset Control for Laboratories LLC Demand Based Static Pressure Reset Control for Laboratories Laboratories are generally the largest users of energy in any facility. Whether in a pharmaceutical research facility, a university or a

More information

Case Studies: Infrared Heating in Industrial Applications

Case Studies: Infrared Heating in Industrial Applications Case Studies: Infrared Heating in Industrial Applications Chao Chen, Puget Sound Energy ABSTRACT Puget Sound Energy (PSE) is a utility which serves more than one million electric customers and over 700,000

More information

Scope of Work. See www.sei.ie for resources available

Scope of Work. See www.sei.ie for resources available HVAC SWG Summary Background Pool energy-efficiency knowledge Increase cost-competitiveness Develop resources aimed at assisting in reducing HVAC energy consumption Address barriers to energy-saving HVAC

More information

Flexibility, Efficiency In San Antonio Arena

Flexibility, Efficiency In San Antonio Arena 2005, American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. (www.ashrae.org). Reprinted by permission from ASHRAE Journal, (Vol. 47, No. 9, September 2005). This article may not

More information

Bring the fresh in. Dedicated Outside Air Systems

Bring the fresh in. Dedicated Outside Air Systems Bring the fresh in. Dedicated Outside Air Systems The inside story on outside air. On average, we breathe in 3,400 gallons of air each day. Ambient indoor air pollution is a major problem, affecting health

More information

Mechanical Insulation. Hospitals and Schools

Mechanical Insulation. Hospitals and Schools Study on Mechanical Insulation in Hospitals and Schools March 1, 2011 Study Mechanical Insulation in Hospitals and Schools G. Christopher P. Crall, P.E. Ronald L. King Executive Summary Mechanical insulation

More information

RFI Response RFP: HSCG88-16-R-PQQ015 Replace HVAC Bldg A & C San Diego, CA.

RFI Response RFP: HSCG88-16-R-PQQ015 Replace HVAC Bldg A & C San Diego, CA. 1. There is verbiage in the hazardous material report referring to a state licensed abatement contractor. Within the recommendations part of the report (page 64 of 111 of the specification pdf) is the

More information

HVAC Costs. Reducing Building. Building owners are caught between two powerful forces the need to lower energy costs. By Stephen J.

HVAC Costs. Reducing Building. Building owners are caught between two powerful forces the need to lower energy costs. By Stephen J. Reducing Building HVAC Costs of site rec By Stephen J. Pargeter Building owners are caught between two powerful forces the need to lower energy costs and the need to meet or exceed outdoor air ventilation

More information

Mechanical Systems Proposal revised

Mechanical Systems Proposal revised Mechanical Systems Proposal revised Prepared for: Dr. William Bahnfleth, Professor The Pennsylvania State University, Department of Architectural Engineering Prepared by: Chris Nicolais Mechanical Option

More information

The main steam enters the building in the basement mechanical room; this is where the condensate line also leaves the building.

The main steam enters the building in the basement mechanical room; this is where the condensate line also leaves the building. MSV: Square Footage: 24,844 No. of Floors: 1 Year Built: 1963 Type of Use: Lounge and dining area open all night for snacks Steam Water-cooled condenser, 50-Ton York unit with a 6 cylinder-reciprocating

More information

Outline. CC objectives Site and building description Typical data floor overview CC measures Results Lessons learned

Outline. CC objectives Site and building description Typical data floor overview CC measures Results Lessons learned Outline CC objectives Site and building description ypical data floor overview CC measures Results Lessons learned 2 CC Objectives Identify and solve existing operating problems Improve building thermal

More information

Creating Efficient HVAC Systems

Creating Efficient HVAC Systems Creating Efficient HVAC Systems Heating and Cooling Fundamentals for Commercial Buildings Heating, ventilating, and air conditioning (HVAC) systems account for nearly half of the energy used in a typical

More information

85 F 80 F 50% 75 F 70 F 73.0/61.8 45 F 10% Figure 1

85 F 80 F 50% 75 F 70 F 73.0/61.8 45 F 10% Figure 1 Feb. 07 INTRODUCTION: Wrap around heat pipes are air-to-air heat exchangers that are installed in the airstream upstream and downstream of a cooling coil to deliberately reduce the Sensible Heat Ratio

More information

HVAC Simplified Approach Option

HVAC Simplified Approach Option HVAC Simplified Approach Option Part I Project Address: City: HVAC System Designer of Record: Date: Zip: Qualification The building is 2 stories or less in height and has a gross floor area is less than

More information

Measurement & Verification Plan

Measurement & Verification Plan Measurement & Verification Plan University of Florida UF-# Project Name City, Florida Insert Project Rendering/Photo Here Prepared By: University of Florida Department of Facilities, Planning & construction

More information

Building Commissioning 17900-1

Building Commissioning 17900-1 SECTION 17900 BUILDING COMMISSIONING PART 1 - GENERAL 1.01 WORK DESCRIPTION: A. General: 1. The Commissioning process is a joint team effort to ensure that all mechanical equipment, controls, and systems

More information

Causes of High Relative Humidity Inside Air Conditioned Buildings. Roger G.Morse AIA, Paul Haas CSP, CIH Morse Zehnter Associates

Causes of High Relative Humidity Inside Air Conditioned Buildings. Roger G.Morse AIA, Paul Haas CSP, CIH Morse Zehnter Associates Causes of High Relative Humidity Inside Air Conditioned Buildings Roger G.Morse AIA, Paul Haas CSP, CIH Morse Zehnter Associates S. FLORIDA AVE. AMBIENT 91 F db / 78 F wb 16,000 HOURS ANNUALLY THAT wb

More information

HEATING, VENTILATION & AIR CONDITIONING

HEATING, VENTILATION & AIR CONDITIONING HEATING, VENTILATION & AIR CONDITIONING as part of the Energy Efficiency Information Grants Program Heating and cooling can account for approximately 23 % of energy use in pubs and hotels 1. Reducing heating

More information

Energy Action Plan 2015

Energy Action Plan 2015 Energy Action Plan 2015 Purpose: In support of the Texas A&M University Vision 2020: Creating a Culture of Excellence and Action 2015: Education First Strategic Plan, the Energy Action Plan (EAP) 2015

More information

Variable Refrigerant Flow Systems

Variable Refrigerant Flow Systems The following article was published in ASHRAE Journal, April 2007. Copyright 2007 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. It is presented for educational purposes

More information

Building Energy Systems. - HVAC: Heating, Distribution -

Building Energy Systems. - HVAC: Heating, Distribution - * Some of the images used in these slides are taken from the internet for instructional purposes only Building Energy Systems - HVAC: Heating, Distribution - Bryan Eisenhower Associate Director Center

More information

Building Optimization: Recommissioning Your Building to Deliver Peak Performance

Building Optimization: Recommissioning Your Building to Deliver Peak Performance Building Optimization: Recommissioning Your Building to Deliver Peak Performance Recommissioning uses simple solutions to improve building performance, value, and employee productivity. March 2009 / White

More information

The Building Commissioning Association

The Building Commissioning Association Best Practices in Commissioning Existing Buildings Building Commissioning Association EXECUTIVE SUMMARY The Building Commissioning Association (BCA) defines Existing Building Commissioning (EBCx) as: a

More information

How to Reduce Energy Costs in Your Commercial Building

How to Reduce Energy Costs in Your Commercial Building How to Reduce Energy Costs in Your Commercial Building Mark Steinmetz, Energy Advisor, GDS Associates, Inc., an ActOnEnergy Partner Mary Bentsen, Education and Training Coordinator SAIC, an Ameren Illinois

More information

HVAC Technologies for Building Energy Efficiency Improvements 2013 National Symposium on Market Transformation. Richard Lord Carrier Fellow

HVAC Technologies for Building Energy Efficiency Improvements 2013 National Symposium on Market Transformation. Richard Lord Carrier Fellow HVAC Technologies for Building Energy Efficiency Improvements 2013 National Symposium on Market Transformation Richard Lord Carrier Fellow HVAC Industry Challenges and Issues Ozone Deletion Global Warming

More information

Heating & Cooling Efficiency

Heating & Cooling Efficiency Heating & Cooling Efficiency Advantages of Geothermal HVAC Efficiency Keith Swilley Gulf Power Company Why Gulf Power Promotes Energy Efficiency? Customer Satisfaction Education Help Customers Make Smart

More information

Tips and Tricks for Estimating Energy Savings. Celeste Cizik, P.E. Project Manager E M C Engineers, Inc.

Tips and Tricks for Estimating Energy Savings. Celeste Cizik, P.E. Project Manager E M C Engineers, Inc. Tips and Tricks for Estimating Energy Savings Celeste Cizik, P.E. Project Manager E M C Engineers, Inc. AIA Quality Assurance Learning Objectives 1. Understand the pros and cons of various energy calculation

More information

Ener.co & Viridian Energy & Env. Using Data Loggers to Improve Chilled Water Plant Efficiency. Randy Mead, C.E.M, CMVP

Ener.co & Viridian Energy & Env. Using Data Loggers to Improve Chilled Water Plant Efficiency. Randy Mead, C.E.M, CMVP Ener.co & Viridian Energy & Env. Using Data Loggers to Improve Chilled Water Plant Efficiency Randy Mead, C.E.M, CMVP Introduction Chilled water plant efficiency refers to the total electrical energy it

More information

ENHANCED LABORATORY HVAC SYSTEM

ENHANCED LABORATORY HVAC SYSTEM ENHANCED LABORATORY HVAC SYSTEM INTRODUCTION Since the early 1980's the attention to more energy efficient laboratory designs has been on the rise due to the increase in energy cost and the emergence of

More information

Datacenter Efficiency Program

Datacenter Efficiency Program Datacenter Efficiency Program Yuming Qiu, CLEAResult Anna Stieve, CLEAResult Michael Stachowiak, CLEAResult Abstract Worldwide, datacenter energy consumption is skyrocketing and datacenter energy efficiency

More information

ENERGY EFFICIENCY/RENEWABLE ENERGY (EERE) PROJECTS IN TEXAS PUBLIC SCHOOLS

ENERGY EFFICIENCY/RENEWABLE ENERGY (EERE) PROJECTS IN TEXAS PUBLIC SCHOOLS ENERGY EFFICIENCY/RENEWABLE ENERGY (EERE) PROJECTS IN TEXAS PUBLIC SCHOOLS N Jeff S. Haberl, Ph.D., P.E Zi Liu, Ph.D. Hyojin Kim Jaya Mukhopadhyay Sunglok Do Bahman Yazdani, P.E. Charles Culp, Ph.D., P.E.

More information

5.6 Technical Specification: Premium Efficiency Electric Air Conditioning Equipment

5.6 Technical Specification: Premium Efficiency Electric Air Conditioning Equipment 5.6 Technical Specification: Premium Efficiency Electric Conditioning Equipment Small Premium Project Type: For Premium Conditioning Retrofit Projects: Projects that voluntarily replace existing unitary

More information

A. The Commissioning Authority (CxA) has been contracted or will be contracted directly with the Owner for this project.

A. The Commissioning Authority (CxA) has been contracted or will be contracted directly with the Owner for this project. DIVISION 23 HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) SECTION 23 08 02 PART 1 GENERAL 1.01 AUTHORITY (CxA) A. The Commissioning Authority (CxA) has been contracted or will be contracted directly

More information

Texas A&M University. usa.siemens.com/tamu

Texas A&M University. usa.siemens.com/tamu Texas A&M University A detailed account of how one university is improving its energy efficiency and campus environment through effective management and performance contracting usa.siemens.com/tamu One

More information

SUCCESS STORY ENERGY TO CARE UF HEALTH SHANDS VISTA REHAB & UF HEALTH SHANDS CANCER HOSPITAL (SOUTH TOWER)

SUCCESS STORY ENERGY TO CARE UF HEALTH SHANDS VISTA REHAB & UF HEALTH SHANDS CANCER HOSPITAL (SOUTH TOWER) ENERGY TO CARE SUCCESS STORY UF HEALTH SHANDS VISTA REHAB & UF HEALTH SHANDS CANCER HOSPITAL (SOUTH TOWER) UF Shands uses commissioning and automation to save more than $5 million in less than five years

More information

Common Boiler Excess Air Trends and Strategies to Optimize Efficiency

Common Boiler Excess Air Trends and Strategies to Optimize Efficiency Common Boiler Excess Air Trends and Strategies to Optimize Efficiency Kevin Carpenter and Chris Schmidt, Energy & Resource Solutions Kelly Kissock, University of Dayton ABSTRACT Boilers are among the most

More information

MULTIZONE APPLICATION OF SOLUTION UNITS

MULTIZONE APPLICATION OF SOLUTION UNITS MULTIZONE APPLICATION OF SOLUTION UNITS APPLICATION GUIDE Supersedes: 102.20-AG12 (206) Form: 102.20-AG12 (307) GENERAL Multi-zone heating and air conditioning units offer design and application advantages

More information

ENERGY AUDITS AND RETRO- COMMISSIONING Local Law 87

ENERGY AUDITS AND RETRO- COMMISSIONING Local Law 87 ENERGY AUDITS AND RETRO- COMMISSIONING Local Law 87 Overview Although energy-efficiency retrofits generally result in major cost and energy savings, many buildings are not participating in the audits that

More information

2 STEPS TO CONDUCTING YOUR HVAC ASSESSMENT

2 STEPS TO CONDUCTING YOUR HVAC ASSESSMENT Presentation Synopsis Heating, Ventilating and Air Conditioning Building Condition Assessment Vancouver, B.C. Prepared for: EPIC Prepared by: Douglas Spratt, P.Eng Douglas Spratt & Associates Ltd. www.dspratt-associates.com

More information

Q1 2011 Utility Rebate Report. Houston, TX

Q1 2011 Utility Rebate Report. Houston, TX Q1 2011 Utility Rebate Report A service of the Sustainable Corporate Real Estate Roundtable Houston, TX April 7, 2011 (Captures regulations through March 31, 2011) This Report is one of a series of reports

More information

Operation and Maintenance Assessments

Operation and Maintenance Assessments PECI O&M Best Practices Series Operation and Maintenance Assessments A Best Practice for Energy-Efficient Building Operations Prepared with funding from the U.S. EPA and U.S. DOE September 1999 A CKNOWLEDGEMENTS

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-23 09 93 (November 2015) ----------------------------- Preparing Activity: USACE Superseding UFGS-23 09 23 (May 2011) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

HVAC System Optimization

HVAC System Optimization UNITED TECHNOLOGIES CARRIER CORPORATION HVAC System Optimization MAXIMIZING PERFORMANCE, ENERGY SAVINGS & COMFORT Revitalize Your Building s System Sometime between the initial purchase and the need to

More information

HIGH EFFICIENCY RTU. www.reznorhvac.com HIGH EFFICIENCY, PACKAGED SPACE CONDITIONING. DX System IEER> 13.2 Gas Heat Efficiency > 92% Capacities Tons

HIGH EFFICIENCY RTU. www.reznorhvac.com HIGH EFFICIENCY, PACKAGED SPACE CONDITIONING. DX System IEER> 13.2 Gas Heat Efficiency > 92% Capacities Tons Capacities 10-25 Tons 100-400 MBH HIGH EFFICIENCY, PACKAGED SPACE CONDITIONING DX System IEER> 13.2 Gas Heat Efficiency > 92% HIGH EFFICIENCY RTU 30-120 kw 3,000-11,550 CFM Comfort Comfort is determined

More information

IDEA Presentation SMALL CAMPUS CHILLED WATER PLANT OPTIMIZATION.

IDEA Presentation SMALL CAMPUS CHILLED WATER PLANT OPTIMIZATION. IDEA Presentation SMALL CAMPUS CHILLED WATER PLANT OPTIMIZATION. Pre-Project Details Hawaiian Community College Campus consisting of 16 individual buildings totaling 308,000 sq.ft of conditioned space.

More information

SAM HOUSTON STATE UNIVERSITY

SAM HOUSTON STATE UNIVERSITY PART 1: GENERAL 1.01 General Requirements A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the

More information

CHILLER PLANT CONTROL MULTIPLE CHILLER CONTROLS

CHILLER PLANT CONTROL MULTIPLE CHILLER CONTROLS CHILLER PLANT CONTROL MULTIPLE CHILLER CONTROLS By: Michael J. Bitondo, Mark J. Tozzi Carrier Corporation Syracuse, New York August 1999 INTRODUCTION In December of 1998, the American Refrigeration Institute

More information

Case Study: Opportunities to Improve Energy Efficiency in Three Federal Data Centers

Case Study: Opportunities to Improve Energy Efficiency in Three Federal Data Centers Case Study: Opportunities to Improve Energy Efficiency in Three Federal Data Centers Prepared for the U.S. Department of Energy s Federal Energy Management Program Prepared By Lawrence Berkeley National

More information

Frequently Asked Questions

Frequently Asked Questions Frequently Asked Questions System and Valve Basics: 1. Q: What is good cooling coil performance? A: The temperature range is controlled within +/- 0.5 F (0.28 C) off the cooling coil at set point or below.

More information

Considerations for Building Controls

Considerations for Building Controls Considerations for Building Controls Does Nighttime Setback really save energy? Natalia Camblor, CEM Project Engineer Sustainable Engineering Group LLC AIA Quality Assurance Learning Objectives 1. Recognize

More information

Dallas/Fort Worth International Airport District Energy Plant Upgrades Project Making More with Less Sustainable Communities Conference Dallas, TX

Dallas/Fort Worth International Airport District Energy Plant Upgrades Project Making More with Less Sustainable Communities Conference Dallas, TX Dallas/Fort Worth International Airport District Energy Plant Upgrades Project Making More with Less Sustainable Communities Conference Dallas, TX March 10, 2009 Agenda DFW Capital Development Program

More information

HVAC Checklist - Long Form

HVAC Checklist - Long Form HVAC Checklist - Long Form Page 1 of 14 Appendix B discusses HVAC system components in relation to indoor air quality. utside Air Intake Location pen during occupied hours? Unobstructed? Standing water,

More information

POLK STATE COLLEGE CHILLER PLANT EVALUATION WINTER HAVEN, FLORIDA APRIL 2, 2014. C arastro & A ssociates, C&A# 5747

POLK STATE COLLEGE CHILLER PLANT EVALUATION WINTER HAVEN, FLORIDA APRIL 2, 2014. C arastro & A ssociates, C&A# 5747 POLK STATE COLLEGE WINTER HAVEN, FLORIDA CHILLER PLANT EVALUATION APRIL 2, 2014 C&A# 5747 C arastro & A ssociates, c o n s u l t i n g e n g i n e e r s inc. 2609 W. De Leon Street, Tampa, Florida 33609

More information

Section 2: Estimating Energy Savings and Incentives

Section 2: Estimating Energy Savings and Incentives Section 2: Estimating Energy Savings and Incentives 2.1 Estimating Energy Savings and Incentives... 2 2.2 Customized Measures - Estimation Software... 2 2.2.1 AC&R I - High Efficiency Chiller... 3 2.2.2

More information