1 Toranomon Roppongi Area Project (Ark Hills Sengoku yama Mori Tower) Shuichi Otaka, Building Structure Design Dept., Obayashi Corporation PLAN SUMMARY PRECAST METHOD DAMPER PANORAMA CONSTRUCTION SITE The SKY TREE The SINJUKU STATION The TOKYO STATION The SITE The TOKYO TOWER Pelli Clarke Pelli Architects Japan,Inc. Google LAYOUT ELEVATION : SECTION m COMPLEX TOWER OFFICE RESIDENTIAL BUILDING RESIDENCE Mori Building Co.,LTD. Irie Miyake Architects & Engineers 1
2 PLAN FLOOR FRAMING PLAN 50m Viscous Damper Hybrid Girder (RC-S Girder) 50m 21.6m 14.4m Brake Damper Irie Miyake Architects & Engineers AXIS Soaring Prices of Iron Viscous Damper Hybrid Girder (RC-S Girder) Steel Structure Reinforced Concrete Structure Brake Damper Large Space Of The Office Construction Period Hybrid Girder (RC-S Girder) Precast Concrete Method Raft Foundation (t=4.5m) Left Right Vertical Installation Precast Method (LRV / LRV-H Method) COMPONENT MEMBER THE CONCEPT OF METHOD Left Right Vertical Installation Precast Method H-COLUMN V-COLUMN LR-BEAM V-COLUMN LR-BEAM H-BEAM The Previous Step LRV Method LRV-H Method 2
3 COMPARISON OF PRECAST THE METHOD Day 1 Column The day before Concrete Day 1 Slab Day 2 Girder The day before Concrete Day 3 Slab Day 2 Bar Arrangement V Column Day 3 LR Beam Formwork Day 4 Bar Arrangement Day 4 Slab Concrete Can Not Proceed To Next Step Day 5 Formwork Day 5 Slab (as Day 1) Day 6 Slab And Panel Concrete Can Not Proceed To Next Step Day 6 Bar Arrangement V Column (as Day 2) Can Not Proceed To Next Step Next Floor 3
4 Conventional PC Method LRV Method Up To Two Upstairs IMAGE OF MOUNTING (In shortest ) ONE FLOOR THREE DAYS Reduce Of Days (Over 40 Storey class) The Previous Step HYBRID GIRDER (RC-S GIRDER) HYBRID GIRDER (RC-S GIRDER) DAY1 Shoring Assembly Work Lifting Material PC Slab Mounting Rebar Assembly Work 4
5 主 筋 貫 通 孔 トップスジョイント 排 出 口 排 出 確 認 モルタル 型 枠 エア 式 型 枠 木 製 型 枠 のいづれかを 使 用 モルタル 注 入 充 填 口 DAY2 DAY3 Formwork of the step portion N+1 Floor Girder Assembly Work N+1 Floor Mounting Column N Floor Casting Concrete Cantilever Slab Joint Of Girder Mounting V Column DAY1 DAY2 N Floor Rebar Assembly Work N+1 Floor LR BEAM Assembly Work N+1 Floor RC S Girder Assembly Work N 1 Floor Shoring Assembly Work N+1 Floor RC S Girder Rebar Assembly Work N 1 Floor RC S Girder Formwork N Floor Slab Rebar Assembly Work N Floor Formwork of the step portion N 1 Floor RC S Girder Formwork DAY3 JOINT OF PRECAST METHOD 排 出 確 認 注 入 材 : トーテツライト H120 モルタル 注 入 N+1 Floor Laid Deck Plate N+1 Floor Preceding Shoring Assembly Work Rebar 型 枠 ギャップガード のいづれかを 使 用 Mechanical Joint LRV Method (girder joint) LRV Method (panel joint) N+1 Floor Setting Stud Dowel N+1 Floor Cantilever Slab N+1 Floor Mounting Column モルタル 注 入 排 出 確 認 鉄 筋 貫 通 孔 トップスジョイント LRV H Method N Floor Casting Concrete 5
6 LRV METHOD (PANEL JOINT) LRV METHOD (GIRDER JOINT) Vent LR Beam (Joint) Joint Width 20mm V Column (underfoot) LR Beam (Fixing Rebar) Injection Vent Bar through hole LR Beam (panel) Mechanical Joint V Column (capital) Mechanical Joint Injection DAMPER SAFETY / SECURITY BUILDING as SHELTER BRAKE DAMPER VISCOUS DAMPING WALL Mori Building Co.,LTD. VISCOUS DAMPER WALL Resistance BRAKE DAMPER DETAIL Inner Plate Horizontal Displacement Washer Disc Spring Inner Plate Outer Plate Plate Washer Viscous Material Elongate Hole Inner Plate Outer Plate Fixed Lower Structure Outer Plate Brake Material Stainless Plate 6
7 DISC SPRING CHARACTERISTIC BRAKE DAMPER INSTALLATION PROCEDURE P P δ δ Disc Spring Coil Spring P Target Value Disc Spring Coil Spring δ Managing Value SUMMRY BUILDING as SHELTER 1 SAFETY / SECURITY / SATISFACTION HIGH PERFORMANCE / SHORT CONSTRUCTION PERIOD / REASONABLE COST BRAKE DAMPER VISCOUS DAMPER LRV METHOD RC-S GIRDER THANK YOU Mori Building Co.,LTD. 7
If stepping is required, step at 180mm as seen in this picture.
Cast Foundations to standard building regulations requirements. Foundations must be cast completely level, 600mm wide by 230mm deep for single storey, double storey is not allowed by NHBRC. If stepping
Residential Deck Safety, Construction, and Repair
Juneau Permit Center, 4 th Floor Marine View Center, (907)586-0770 This handout is designed to help you build your deck to comply with the 2006 International Residential Building code as modified by the
COMMONLY USED RESIDENTIAL BUILDING CODES
COMMONLY USED RESIDENTIAL BUILDING CODES INTERNATIONAL RESIDENTIAL CODE (2009) form revised 5/10 FOUNDATION 1. DESIGN OF FORMWORK. Section 1906.1 IBC 2009, Section R404.1.2.3.6 IRC 2009, ACI 318 Section
Diameter. Swift Lift Round Recess Plug. Note: The diameter of the narrow recess plug is the same as the diameter of the round recess plug.
P-5 The P-5 is hot forged from carbon steel. The formed head provis spherical seating that the Lifting Eye engages, while a disc-shaped foot is embedd in the concrete. Due to its being a forged part, the
HOW TO LOAD A TRUCK OR A CONTAINER IN 5 MINUTES? www.progecovigo.com
AUTOMATIC LOADING SYSTEMS HOW TO LOAD A TRUCK OR A CONTAINER IN 5 MINUTES? www.progecovigo.com 1 LOADING PLATFORM TYPES ADJUSTABLE HEIGHT PLATFORMS PF-V DESIGNED FOR LOADING OR UNLOADING OF TRUCKS AND
FUTURE SLAB. PENETRATIONS and. DEMOLITION of POST-TENSIONED FLOORS
FUTURE SLAB PENETRATIONS and DEMOLITION of POST-TENSIONED FLOORS 1.0 INTRODUCTION Post-tensioned floor slabs in Australia and South East Asia are now universally regarded as the most cost effective form
REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE
REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE A.Rito Proponte, Lda, Lisbon, Portugal J. Appleton A2P Consult, Lda, Lisbon, Portugal ABSTRACT: The Figueira da Foz Bridge includes a 405 m long cable stayed
Analysis and Repair of an Earthquake-Damaged High-rise Building in Santiago, Chile
Analysis and Repair of an Earthquake-Damaged High-rise Building in Santiago, Chile J. Sherstobitoff Ausenco Sandwell, Vancouver, Canada P. Cajiao AMEC, Vancouver, Canada P. Adebar University of British
COLUMN-FREE OFFICE SPACE RISES IN CHICAGO S LOOP
COLUMN-FREE OFFICE SPACE RISES IN CHICAGO S LOOP 30 x45 bay provides maximum tenant flexibility and increases leasing marketability By David E. Eckmann AIA, S.E. P.E. SURGING DEMANDS FOR RENTABLE OFFICE
Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components
Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development
DESIGN OF SLABS. 3) Based on support or boundary condition: Simply supported, Cantilever slab,
DESIGN OF SLABS Dr. G. P. Chandradhara Professor of Civil Engineering S. J. College of Engineering Mysore 1. GENERAL A slab is a flat two dimensional planar structural element having thickness small compared
INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE.
INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE. M.Sc. Gediminas Viršilas Head of Bridge Division, Lithuanian Road Administration Working group 2 of PIARC Technical Committee
Hanson Building Products. precast basement solutions
Hanson Building Products precast basement solutions Hanson Building Products Basement Systems Add an extra dimension and combine the inherent flexible, structural and waterproof properties of concrete
ick Foundation Analysis and Design
ick Foundation Analysis and Design Work: ick Foundation Location: Description: Prop: Detail analysis and design of ick patented foundation for Wind Turbine Towers Gestamp Hybrid Towers Date: 31/10/2012
Safe & Sound Bridge Terminology
Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries
HIGH LEVEL SEISMIC UPGRADE COST ESTIMATE FOR CENTRE BLOCK, PARLIAMENT HILL
HIGH LEVEL SEISMIC UPGRADE COST ESTIMATE FOR CENTRE BLOCK, PARLIAMENT HILL Prepared for: Public Works and Government Services Canada Parliamentary Precinct Branch Prepared by: Halsall Associates 210 Gladstone
Formwork for Concrete
UNIVERSITY OF WASHINGTON DEPARTMENT OF CONSTRUCTION MANAGEMENT CM 420 TEMPORARY STRUCTURES Winter Quarter 2007 Professor Kamran M. Nemati Formwork for Concrete Horizontal Formwork Design and Formwork Design
Technical handbook Panel Anchoring System
1 Basic principles of sandwich panels 3 Design conditions 4 Basic placement of anchors and pins 9 Large elements (muliple rows) 10 Small elements (two rows) 10 Turned elements 10 Slender elements 10 Cantilevering
Technical Assignment 2 TABLE OF CONTENTS
2 TABLE OF CONTENTS Executive Summary...3 Introduction..5 Gravity Loads......6 Design Codes......7 Materials..8 Existing Structural System.. 10 Existing Floor System 15 Alternate Floor Framing Systems...17
Chapter 3 Pre-Installation, Foundations and Piers
Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory
CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION
CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION General 7 www.meadowburke.com 877-518-7665 MB1109 CONCRETE FLOOR SLAB AND CASTING BED CONSTRUCTION Quality Construction Begins at Ground Level Everything
609 West Rock Road, Radford,VA 24141 540-633-5000 / (fax) 540-731-3712 RECOMMENDED ATTACHMENTS & CONNECTION DETAILS
609 West Rock Road, Radford,VA 24141 540-633-5000 / (fax) 540-731-3712 RECOMMENDED ATTACHMENTS & CONNECTION DETAILS INDEX OF DRAWINGS SECTION A: A-1 = METAL TRACK TO PANEL ATTACHMENT A-2 = WOOD PLATE TO
SECTION 7: C - STRUCTURAL ENGINEERS SPECIFICATIONS
SECTION 7: C - STRUCTURAL ENGINEERS SPECIFICATIONS SITE C SHOPPING CENTRE, KHAYELITSHA PROJECT NO 2369 Project Specification Refer all queries to: John Meiring Tel: +27 21 425 0065 REVISION P01 E-mail:
CHAPTER 2 QUANTITY TAKE-OFF
CHAPTER 2 QUANTITY TAKEOFF The quantity takeoff is an important part of the cost estimate. It must be as accurate as possible and should be based on all available engineering and design data. Use of appropriate
HOUSE BUILDING DIGEST
HOUSE BUILDING DIGEST (Construction Specifications-Foundations) Creating Enabling Environment for Affordable Housing for All This is an attempt by BMTPC to provide useful but often ignored information
REPAIR AND STRENGTHENING OF HISTORICAL CONCRETE BRIDGE OVER VENTA RIVER IN LATVIA
1 REPAIR AND STRENGTHENING OF HISTORICAL CONCRETE BRIDGE OVER VENTA RIVER IN LATVIA Verners Straupe, M.sc.eng., Rudolfs Gruberts, dipl. eng. JS Celuprojekts, Murjanu St. 7a, Riga, LV 1024, Latvia e-mail:
Chapter 5 FLOOR LOADING AND WEIGHTS
Chapter 5 FLOOR LOADING AND WEIGHTS Section 1.0 Floor Loading Section 2.0 Seismic Data The CT system has a total floor load of approximately 6660 lbs (3021 kg). About 5050 lbs (2291 kg), including patient
Since it was established in 1989, with a small manufacturing base in Qwa Qwa and a hire yard in Botswana, Uni-Span
formwork formwork Since it was established in 1989, with a small manufacturing base in Qwa Qwa and a hire yard in Botswana, Uni-Span has grown to become one of the major players in the scaffolding and
Virginia Approach Spans
Virginia Concrete Conference 2009 Woodrow Virginia Approach Spans David Tackoor, HNTB Formerly of URS Corp for Potomac Crossing Consultants Woodrow 1 Second Severn Crossing 2 Medway Crossing (Channel Tunnel
The minimum reinforcement for the stem wall is the placement of:
PolySteel creates an ideal insulated stem wall for concrete slabs that can make this part of your project easier and faster, in addition to making your finished project more energy-efficient. Figures 3.20
16. Beam-and-Slab Design
ENDP311 Structural Concrete Design 16. Beam-and-Slab Design Beam-and-Slab System How does the slab work? L- beams and T- beams Holding beam and slab together University of Western Australia School of Civil
Hunter College school of Social Work Thesis Proposal
Fall 2009 Hunter College school of Social Work Thesis Proposal To analyze how energy efficiency can be implemented using facade and green roof redesign. It ties structural engineering concepts with existing
The unit costs are based on the trend line of the 3 low bids for the average quantity.
Page 1 of 8 COST ESTIMATE GENERAL INSTRUCTIONS The unit costs are based on the trend line of the 3 low bids for the average quantity. Apply the Unit Costs to ordinary structures. Unit Costs should generally
Chapter 2 Basis of design and materials
Chapter 2 Basis of design and materials 2.1 Structural action It is necessary to start a design by deciding on the type and layout of structure to be used. Tentative sizes must be allocated to each structural
TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE
TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION PART 8000 - PRECAST CONCRETE TABLE OF CONTENTS Item Number Page 8100 PRECAST CONCRETE CONSTRUCTION - GENERAL 8-3 8101 General
DESIGN OF SLABS. Department of Structures and Materials Engineering Faculty of Civil and Environmental Engineering University Tun Hussein Onn Malaysia
DESIGN OF SLABS Department of Structures and Materials Engineering Faculty of Civil and Environmental Engineering University Tun Hussein Onn Malaysia Introduction Types of Slab Slabs are plate elements
After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE
86 :: Certificate in Construction Supervision (CIVIL) 12 ROOF 12.1 INTRODUCTION The structure provided to cover the house surface (floor) is known as roof. For different situation and requirement, it is
CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE
CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE 9.1 INTRODUCTION An important reason that composite piles have not gained wide acceptance in the civil engineering practice is the lack of a long
Park View Place. Compass. House. Royal Wharf Gardens Endeavour. House. Thameside. Sienna. House. House. Apartments Townhouses.
The Townhouses Park View Place A A Compass House A T T T Royal Wharf Gardens Endeavour House T A A Thameside House T Sienna House A A A A T Apartments Townhouses River Thames Compass House Compass House
Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections
Materials Standard shapes W sections, C channels, Structural T, Angles, Pipes, Tubes, Rods and Plates Fabricated members, Built-up sections Adding plates to beam flanges, Stiffeners to beam webs Built
SECTION 5 ANALYSIS OF CONTINUOUS SPANS DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE LEAD AUTHOR: BRYAN ALLRED
SECTION 5 ANALYSIS OF CONTINUOUS SPANS DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE LEAD AUTHOR: BRYAN ALLRED NOTE: MOMENT DIAGRAM CONVENTION In PT design, it is preferable to draw moment diagrams
METHOD OF STATEMENT FOR STATIC LOADING TEST
Compression Test, METHOD OF STATEMENT FOR STATIC LOADING TEST Tension Test and Lateral Test According to the American Standards ASTM D1143 07, ASTM D3689 07, ASTM D3966 07 and Euro Codes EC7 Table of Contents
Construction of precast reinforced concrete structures. Prefabricated reinforced concrete construction:
Construction of precast reinforced concrete structures István VidovszkyPhD definition 2 Prefabricated reinforced concrete construction: Construction of RC components of buildings, the majority of which
Simplifying design and construction. Alan Tovey, Director The Basement Information Centre
Simplifying design and construction Alan Tovey, Director The Basement Information Centre Simplifying design and construction Grades of construction Construction options Design and waterproofing issues
Timber Frame Construction
Timber Frame Construction Introduction Design and Detailing What is timber? Failure modes History of timber frame construction Forms of timber frame construction Live and dead loads Wind loads Roof construction
Reticulation sewers in basements Technical guidelines
Reticulation sewers in basements Technical guidelines Overview What These guidelines explain our technical requirements for laying sewers in building basements. The scope of the guide is restricted to
Buildings Construction Procurement Strategy
Buildings Construction Procurement Strategy Graham Strickleton Site, Buildings and Power supplies Procurement Manager JOURNEE DEDIEE AUX INDUSTRIELS ET AUX MEMBRES DU RESEAU A.P.I Disclaimer: these slides
6 RETROFITTING POST & PIER HOUSES
Retrofitting Post & Pier Houses 71 6 RETROFITTING POST & PIER HOUSES by James E. Russell, P.E. 72 Retrofitting Post & Pier Houses Retrofitting Post & Pier Houses 73 RETROFITTING POST AND PIER HOUSES This
Residential Prototype III. Multi-Story. The Multi-Story. Your connection to ideas + answers. Prepared by: AISC Steel Solutions Center
Multi-Story Residential Prototype III The Multi-Story Residential Prototype III Prepared by: AISC Steel Solutions Center What s this? This package tells the story of a fictitious project with an imaginary
STRUCTURAL ASSESSMENT. Full Metal Jacket Building 0 Prince Street, Alexandria, VA
STRUCTURAL ASSESSMENT FOR Full Metal Jacket Building 0 Prince Street, Prepared by: ALPHA CORPORATION (Alpha) 1850 S. Loudoun Street, Suite 200 Winchester, VA 22601 540-723-0704 September 22, 2010 J. Michael
INSTRUCTIONS FOR USE
2/2013 ANCHOR BOLTS INSTRUCTIONS FOR USE - Threaded rebars ATP, AHP, AJP - Threaded high strength steel bolts ALP-L, ALP-P, AMP ATP AHP ALP-L ALP-P AMP Eurocode design according to EN1993-1-8 (2005) &
BLADE S-MAX Cabinet for Blade Server
Cabinet for Blade Server 1 2 Overview Material specification Corner verticals: 1.5 mm steel End frames: 1.5 mm steel Panel mounts: 2.0 mm steel Panel mount supports: 1.5 mm steel Side panels, door and
Miss S. S. Nibhorkar 1 1 M. E (Structure) Scholar,
Volume, Special Issue, ICSTSD Behaviour of Steel Bracing as a Global Retrofitting Technique Miss S. S. Nibhorkar M. E (Structure) Scholar, Civil Engineering Department, G. H. Raisoni College of Engineering
Chapter 36 - STRAW BALE CONSTRUCTION SECTION 3601 - PURPOSE. SECTION 3602 - SCOPE. SECTION 3603 - DEFINITIONS.
Austin City Code - Volume II TITLE 25 LAND DEVELOPMENT\CHAPTER 25-12 TECHNICAL CODES\ARTICLE 1: UNIFORM BUILDING CODE\25-12-3 LOCAL AMENDMENTS TO THE BUILDING CODE Chapter 36 - STRAW BALE CONSTRUCTION
City of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures
City of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures SECTION 7201 - PURPOSE The purpose of this appendix chapter is to establish minimum prescriptive standards
WI LEY Blackwell. Multi-storey Precast Concrete Framed Structures. Colin K. Jolly MSc, PhD, CEng, MICE, FIStructE
Multi-storey Precast Concrete Framed Structures Kim S. Elliott BTech, PhD, CEng, MICE Colin K. Jolly MSc, PhD, CEng, MICE, FIStructE WI LEY Blackwell Contents Preface Notation Precast Concepts, History
FORM DESIGN. easy to work with, and generally available.
Forms play a major role in concrete construction. They give the plastic concrete its shape and hold it until it hardens. Forms protect the concrete, assist in curing it, and support any reinforcing rods
Residential Decks. Planning and Development Services Department
Building Safety Division 8500 Santa Fe Drive Overland Park, KS 66212 (913) 895-6225 Fax (913) 895-5016 Email: [email protected] Planning and Development Services Department Residential Decks
INSTALLATION. General. Important Note. Design. Transport
General The roof trusses you are about to install have been manufactured to precise engineering standards. To ensure that the trusses perform as designed, it is essential that they be handled, erected
(1) Minami Nagamachi and Naka Nagamachi viaducts between Shiraishi Zao and Sendai Stations on the Tohoku Shinkansen line
Report by the First Joint Survey Team of the JSCE Concrete and Structural Engineering Committees on the damage caused by the Great East Japan Earthquake April 5, 2011 (First Report) 1. Survey team members
MONDOATHENS BASKETBALL SET (Reference PK110)
MONDOATHENS BASKETBALL SET (Reference PK110) DESCRIPTION The MONDOATHENS backstop unit is mainly designed for multi-sports pavilions and installations where the highest-level basketball competitions are
Detailing of Reinforcment in Concrete Structures
Chapter 8 Detailing of Reinforcment in Concrete Structures 8.1 Scope Provisions of Sec. 8.1 and 8.2 of Chapter 8 shall apply for detailing of reinforcement in reinforced concrete members, in general. For
Sisal Composite Ltd. Apparel 4 Ltd. JM Knit Ltd. Natun Para, Hemayetpur, Savar, Dhaka-1340 (23.789416N,90.266135E)
Revision: issue 1 Date: 11 June 2014 Sisal Composite Ltd. Apparel 4 Ltd. JM Knit Ltd. Natun Para, Hemayetpur, Savar, Dhaka-1340 (23.789416N,90.266135E) 24 th May 2014 Structural Inspection Report Observations
DESIGNERS GUIDE TO DOMESTIC CONSERVATORIES
WBCA 403 DESIGNERS GUIDE TO DOMESTIC CONSERVATORIES A guide to assist those intending to install or who are involved in installing conservatories. Includes information about: conservatory and component
Report on. Wind Resistance of Signs supported by. Glass Fiber Reinforced Concrete (GFRC) Pillars
Report on Wind Resistance of Signs supported by Glass Fiber Reinforced Concrete (GFRC) Pillars Prepared for US Sign and Fabrication Corporation January, 2006 SUMMARY This study found the attachment of
Optimum proportions for the design of suspension bridge
Journal of Civil Engineering (IEB), 34 (1) (26) 1-14 Optimum proportions for the design of suspension bridge Tanvir Manzur and Alamgir Habib Department of Civil Engineering Bangladesh University of Engineering
The ACR : Advanced Design Features for a Short Construction Schedule
Transactions of the 17 th International Conference on Structural Mechanics in Reactor Technology (SMiRT 17) Prague, Czech Republic, August 17 22, 2003 Paper # S01-3 The ACR : Advanced Design Features for
LAYING BLOCK AND BRICK
LAYING BLOCK AND BRICK Products highlighted in this section: SAKRETE Type N Mortar Mix SAKRETE Type S Mortar Mix Brick And Block Laying Basics The first step in building a brick or block wall is to construct
US 51 Ohio River Bridge Engineering and Environmental Study
US 51 Ohio River Bridge Engineering and Environmental Study ITEM NOS. 1-100.00 & 1-1140.00 Prepared by: Michael Baker Jr., Inc. 9750 Ormsby Station Rd Louisville, KY 40223 August 16, 2013 Table of Contents
4B-2. 2. The stiffness of the floor and roof diaphragms. 3. The relative flexural and shear stiffness of the shear walls and of connections.
Shear Walls Buildings that use shear walls as the lateral force-resisting system can be designed to provide a safe, serviceable, and economical solution for wind and earthquake resistance. Shear walls
Internal USB port kit installation
Internal USB port kit installation Introduction The internal USB port kit provides a Type A female USB port compatible with Type A USB devices internal to the computer chassis. This document describes
3M Mobile SkyWalk Series Horizontal Lifeline Product Return Form
3M Mobile SkyWalk Series Horizontal Lifeline Product Return Form THIS FULLY COMPLETED DOCUMENT MUST BE INCLUDED WITH EACH RETURN SHIPMENT IN ORDER FOR CREDIT TO BE ISSUED. ALL CREDITS WILL BE ISSUED TO
INSTALLATION INSTRUCTIONS COMPETITION SERIES COILOVER SUSPENSION SYSTEM 03+ Scion xb
INSTALLATION INSTRUCTIONS COMPETITION SERIES COILOVER SUSPENSION SYSTEM 03+ Scion xb NOTE: Progress Technology products should only be installed by a qualified licensed mechanic experienced in the installation
Dr. K.N.Jha Department of Civil Engineering Indian Institute of Technology Delhi Block V, Room No. 322 [email protected]
1 Some case studies of construction accidents in India Special emphasis on safety of temporary structures Dr. K.N.Jha Department of Civil Engineering Indian Institute of Technology Delhi Block V, Room
Occupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School
Introduction Background The Duke School of Nursing building offers a new three-story state of the art facility that has helped strengthen the quality and integrity of the School of Nursing at Duke. The
TABLE OF CONTENTS. INTRODUCTION... 5 Advance Concrete... 5 Where to find information?... 6 INSTALLATION... 7 STARTING ADVANCE CONCRETE...
Starting Guide TABLE OF CONTENTS INTRODUCTION... 5 Advance Concrete... 5 Where to find information?... 6 INSTALLATION... 7 STARTING ADVANCE CONCRETE... 7 ADVANCE CONCRETE USER INTERFACE... 7 Other important
How To Build The Burj Dubai Tower
Burj Dubai Tower History Rising Burj Dubai Tower History Rising 2003 All rights reserved. 1 Burj Dubai Tower History Rising Burj Dubai Tower Introduction Architecture Structure Sustainability Issues Construction
Brief on the Construction Planning of the Burj Dubai Project, Dubai, UAE
Brief on the Construction Planning of the Burj Dubai Project, Dubai, UAE Ahmad Abdelrazaq 1*, S.E., Kyung Jun Kim 2 and Jae Ho Kim 3 1 Executive Vice President, Highrise Building Team, Samsung Engineering
WORLD S TALLEST TIMBER BUILDING, BERGEN
WORLD S TALLEST TIMBER BUILDING, BERGEN Trondheim, Norway. 2014-09-26 M. Sc. Rune B Abrahamsen, Sweco, Lillehammer, Norway Bergen- og omegn boligbyggelag (BOB) is a Norwegian housing association. They
Floor structures Building constructure 2 REINFORCED CONCRETE FLOOR STRUCTURES
REINFORCED CONCRETE FLOOR STRUCTURES Structure of RC floors joist structures Floor structures Building constructure 2 slab structures Classification of RC floor structures Floor structures Building constructure
ADVANCED SYSTEMS FOR RATIONAL SLAB REINFORCEMENT
ADVANCED SYSTEMS FOR RATIONAL SLAB REINFORCEMENT CASPER ÅLANDER M. Sc. (Civ. Eng.) Development manager Fundia Reinforcing Abstract This paper deals with rational and fast ways to reinforce concrete slabs.
MULTI-RESIDENTIAL BUILDING SOLUTIONS
MULTI-RESIDENTIAL BUILDING SOLUTIONS OUR EXPERTISE AT YOUR SERVICE Canam has been offering owners, real estate developers, architects, engineers and contractors an array of construction solutions since
STEP-BY-STEP. construction guide. Delivering better priced Conservatories, Sun Lounges and Garden Rooms via the Internet.
STEP-BY-STEP construction guide Delivering better priced Conservatories, Sun Lounges and Garden Rooms via the Internet. Welcome to our CONSERVATORY AND SUNROOM CONSTRUCTION GUIDE What is the specification
Wisconsin Building Products Evaluation
Safety & Buildings Division 201 West Washington Avenue P.O. Box 2658 Madison, WI 53701-2658 Evaluation # 200813-O Wisconsin Building Products Evaluation Material Best Management Standards for Foundation
Reinforcement detail drawing & Preparation of bar bending schedule - Necessity for every builder
Reinforcement detail drawing & Preparation of bar bending schedule - Necessity for every builder Reji Zachariah., B.Tech, M.B.A., M.S Chief Executive S&R Consultants, Kochi, Kerala, India, www.aadspro.com
Analysis II Façade Redesign: Architectural Precast Panels
Analysis II Façade Redesign: Architectural Precast Panels Analysis II Façade Redesign: Architectural Precast Panels Overview: This analysis covers the comparison of the current EIFS façade and my proposed
CODE OF PRACTICE ON. Buildable Design September 2005
CODE OF PRACTICE ON Buildable Design September 2005 The Code of Practice on Buildable Design is published by the Building and Construction Authority. Building and Construction Authority, September 2005
Mark Cramer Inspection Services, Inc.
Mark Cramer Inspection Services, Inc. 492 Twentieth Avenue, Indian Rocks Beach, FL 34635-2970 (727) 595-4211 Fax (727) 596-7583 Certified Member #12085 American Society of Home Inspectors Construction
INSTALLING SEISMIC RESTRAINTS FOR MECHANICAL EQUIPMENT
VISCMA 412/August 2014 INSTALLING SEISMIC RESTRAINTS FOR MECHANICAL EQUIPMENT August 2014 Developed originally by the Vibration Isolation and Seismic Control Manufacturers Association under a cooperative
CHAPTER 6 CONSTRUCTION TYPES
CHAPTER 6 CONSTRUCTION TYPES SECTION 601 GENERAL 601.1 Scope. Provisions of this chapter shall govern the classification of construction type by materials and fire resistance of its elements and the use
How To Build A Luxury Apartment Complex In London
Post Tensioning Awards 2009 Project Summary Type of structure Location Architects Structural Engineer Residential with leisure suites including Swimming pool, Cinema, Virtual Golf, Wine Cellars, and Parking
Buildable Design Appraisal System
Guideline BCA Technology Development Division Guide to the Buildable Design Appraisal System!" The Guide to the Buildable Design Appraisal System is electronically published by the Technology Development
Design of Bridges. Introduction. 3 rd to 4 th July 2012. Lecture for SPIN Training at the University of Dar es Salaam
Design of Bridges Introduction 3 rd to 4 th July 2012 1 FUNCTION OF A BRIDGE To connect two communities which are separated by streams, river, valley, or gorge, etc. 2 EVOLUTION OF BRIDGES 1. Log Bridge
The Collapse of Building 7 by Arthur Scheuerman December 8, 06
The Collapse of Building 7 by Arthur Scheuerman December 8, 06 WTC s Building 7 was a 47-story office building completed in 1987 by Silverstein Properties on land owned by the Port Authority. It was built
9.3 Two-way Slabs (Part I)
9.3 Two-way Slabs (Part I) This section covers the following topics. Introduction Analysis and Design Features in Modeling and Analysis Distribution of Moments to Strips 9.3.1 Introduction The slabs are
BROWACOM PRODUCTS. Our web-pages can be found from: http://www.browacom.fi
BROWACOM PRODUCTS manufactures and sells telecom solutions for professional users. Products include CityCabinet-product family, as a service Browacom offers subcontracting services in electromechanical
ASHULIA APPARELS LTD. Client Summary Report
Revision : Issue 1 Date: 18 March 2014 ASHULIA APPARELS LTD Samad Mansion, Sec # 6, Block # kha, Road No# 1, Plot #14, Shenpara Parbata, Mirpur, Dhaka (23.8065N,90.3683E) 4th March 2014 Client Summary
TRIO 330 The framed panel formwork for heights of up to 3.30 m
TRIO 330 The framed panel formwork for heights of up to 3.30 m product range 4.30 3.30 2 ties up to 3.30 m TRIO 330 The framed panel formwork for floor heights up to 3.30 m TRIO 330 is an independent formwork
Structural Failures Cost Lives and Time
Structural Failures Cost Lives and Time Recent failures of storage bins, silos and other structures highlight the need to increase awareness of hazards associated with these structures. Since 2010, one