Rev Issue Status Prepared / Date Approved/Date. - Draft 1 LOA / JSE /
|
|
|
- Doreen Merritt
- 9 years ago
- Views:
Transcription
1 Nancy Hawksworth Barn Conversion: Moor Farm, London Road, Shardlow, Derbyshire Bat Survey Report September 2014
2 FPCR Environment and Design Ltd Registered Office: Lockington Hall, Lockington, Derby DE74 2RH Company No [T] [F] [E] [W] This report is the property of FPCR Environment and Design Ltd and is issued on the condition it is not reproduced, retained or disclosed to any unauthorised person, either wholly or in part without the written consent of FPCR Environment and Design Ltd. Ordnance Survey material is used with permission of The Controller of HMSO, Crown copyright Rev Issue Status Prepared / Date Approved/Date - Draft 1 LOA / JSE /
3 CONTENTS 1.0 INTRODUCTION METHODOLOGY RESULTS DISCUSSION & RECOMMENDATIONS... 6 TABLES Table 1: Nocturnal survey dates 2014 FIGURES Figure 1: Site Location Figure 2: Nocturnal Survey Plan Figure 3: Nocturnal Survey Plan Figure 4: Nocturnal Survey Plan Figure 5: Nocturnal Survey Plan Figure 6: Bat Mitigation :
4 Bat Survey Report 1.0 INTRODUCTION 1.1 The following report has been prepared by FPCR Environment & Design Ltd on behalf of Nancy Hawksworth. It provides details of an external bat building assessment and four nocturnal bat surveys on the Barn building off London Road, Shardlow, Derbyshire. The surveys were conducted on the 15 th July 2014, 11 th and 12 th August 2014 and 28 th August 2014, to determine the presence/absence of roosting bats within the building which is affected by a proposed development. Site Context 1.2 The site comprises a Barn building used for storage, surrounded by working farm buildings with a domestic residence on the south west end. The site is located in the north west of Shardlow, Derbyshire (Figure 1). Habitats within the survey area include hard-standing, a domestic residence, and active farm buildings. Surrounding the site is a mixture or arable and grazed land and the village of Shardlow extending in a westerly direction. Development Proposals 1.3 This planning application is for the conversion of the barn building in the centre of the farm. This is to become a domestic residence for use by the current owners. The barn itself will remain intact but significant changes are proposed for the interior as well as some repair and alteration to the external features. J:\6400\6414\ECO\Bats\Bat Report 1
5 Bat Survey Report 2.0 METHODOLOGY Assessment of Building 2.1 An external survey of the building present within the site boundary was carried out on 15 th July 2014 by a Natural England licensed bat worker from FPCR (Licence reference number CLS01531). This involved examination of the exterior of the building to determine the potential for bat roost sites. From this, areas of likely / potential value for bats can be broadly identified and a decision made over the selection of locations for more detailed work, if required. Any potential bat access points observed together with any suitable features were noted, in addition to evidence of occupation. These works were undertaken by a Natural England licensed bat worker and this methodology takes into account the statutory guidance from English Nature (now Natural England) 1 and further guidelines introduced by the Bat Conservation Trust 2 and JNCC On the same occasion an internal inspection of the building was carried out to identify any signs of bat activity within the building as well as to assess the potential of the building for habitation by bats. These works were undertaken by a Natural England licensed bat worker and this methodology takes into account the statutory guidance from English Nature (now Natural England) and further guidelines introduced by the Bat Conservation Trust and JNCC. Nocturnal Surveys 2.3 A single dusk nocturnal bat survey was undertaken on the building within the site boundary on 15 th July 2014, followed by a dusk and dawn survey on the 11 th 12 th August 2014 and a final dusk survey on the 28 th August 2014 (Table 1). Surveyors were positioned on all aspects of the buildings from 20 minutes prior to sunset until 115 minutes following sunset for the dusk emergence surveys, and from 90 minutes prior to sunrise until sunrise for the dawn re-entry survey. 2.4 All bat contacts were recorded by number and species, including any bats observed foraging within the vicinity of the buildings. 2.5 Ultrasonic bat detectors were used by surveyors to aid in identification. All of the nocturnal surveys were conducted in appropriate conditions, i.e. ambient temperature exceeding 10 C and little wind and no rain. Table 1 Nocturnal survey dates 2014 Survey ref/date Buildings surveyed Time (sunset/sunrise) Conditions All buildings 21:12 to 23:25 (21:25) 19 C, 0% cloud cover, Still, no rain All buildings 20:25 to 22:39 (20:39) 17 C, 30% cloud cover, medium breeze, no rain. 1 English Nature (2001) Bat Mitigation Guidelines 2 Bat Conservation Trust (2012) Bat Surveys- Good Practice Guidelines 3 JNCC (1999) Bat Workers Manual J:\6400\6414\ECO\Bats\Bat Report 2
6 Bat Survey Report Survey ref/date Buildings surveyed Time (sunset/sunrise) Conditions All Buildings 04:10 to 05:41 (05:41) 15 C, 20% cloud cover, light breeze, no rain All Buildings 19:51 to 22:06 (20:06) 14 C, 0% cloud cover, light breeze, no rain. 3.0 RESULTS Site Survey Assessment of Buildings for Bats (Figures 2 and 3) 3.1 Building 1 (B1) was a single storey, brick built barn with a pitched, clay tiled roof with bitumen felt underlining. Potential bat access points comprised open windows, missing bricks, and occasional gaps under tiles. Some roosting potential was identified on the wooden roof spars and in the gap between the roof tiles and underfelt. In addition to this a small section of the southern end of B1 had a separate roof void with access through gaps in the external lattice brick work. This space was inaccessible to surveyors and so no inspection of its interior was possible. One old bat dropping was identified within B The only area identified as offering potential for hibernation purposes was the ridge of the roof which offered very limited potential for hibernation in the form of a few gaps in the mortar and slate work. J:\6400\6414\ECO\Bats\Bat Report 3
7 Bat Survey Report Building Inspection Photos Internal roof construction; wooden framework, bitumen felt underlining. Gaps in brickwork provide potential access points for bats. Gable end showing potential access points through lattice brickwork. Gable verge was very well sealed Inaccessible roof void at southern end of B1. External view of front face of B1. Open archways provide access to potential internal roosting. Missing tiles on roof provide bats access to void between tiles and underlay felt. J:\6400\6414\ECO\Bats\Bat Report 4
8 Bat Survey Report Nocturnal Surveys Emergence Survey No bats were observed entering or emerging from the building during the survey. The first bat observed was a common pipistrelle foraging along the southern aspect of B1 between B1 and the residential building (Figure 2). Bat activity throughout the survey was evenly distributed for the first hour and foraging / commuting common pipistrelle was the dominant species recorded. Towards the end of the survey the contacts at the southern end of B1 declined but several contacts were recorded foraging around the yard and farm buildings at the northern end of B1. Two passes by a Noctule were recorded, neither of which were visually observed. One pass by a soprano pipistrelle was recorded at 21:47. All other activity comprised common pipistrelles foraging around the farm buildings. Emergence Survey No bats were observed entering or emerging from the building during the survey. Three species / genus of bat were recorded during the survey: common pipistrelle, a Myotis species and Noctule. The first bat recorded was a Myotis species at 21:05 and this was the only contact with this species. Common pipistrelle were the dominant species throughout the survey with multiple passes and foraging consistently until 22:03. Only one pass by a Noctule was recorded at 22:00 but this was faint and was not visually observed by the surveyor. More activity was noted at the northern end of B1, where nearly twice the contacts were recorded as the southern surveyor position. Dawn Survey Common pipistrelle was the only species recorded during this survey, with the first contact at 04:24 foraging at the northern end of B1. Only two contacts were recorded at the southern end of the building; one pass at 04:45 and one bat foraging around the garden and barn from 04:47 until 05:05. The activity at the northern end of B1 was fairly constant with foraging passes from 04:24 until 05:11. At 05:11 one common pipistrelle was observed entering a roost in the roof via a gap left by a missing tile. Emergence Survey No bats were observed entering or emerging from the building during the survey. The first bat contact was a common pipistrelle at 20:25 commuting over the site from east to west. Common pipistrelle was the dominant species though a soprano pipistrelle was recorded at 20:32 foraging around the barn. One pass by a noctule was also noted at 20:45 commuting high over the site from east to west. All the activity for the survey was concentrated between 20:25 and 20:50 and equally spread around B1 and the surrounding area. J:\6400\6414\ECO\Bats\Bat Report 5
9 Bat Survey Report 4.0 DISCUSSION & RECOMMENDATIONS Proposal 4.1 This planning application is for the conversion of the barn building in the centre of the farm. This is to become a domestic residence for use by the current owners. The barn itself will remain intact but significant changes are proposed for the interior as well as some repair and alterations to the external features. No alterations are proposed to the areas identified as being currently used by roosting bats. Survey Conclusion 4.2 Throughout the four nocturnal survey occasions only one roost location was recorded. This was a single Common Pipistrelle entering the north western corner of the roof via a gap under a tile. It was concluded that, due to its infrequent use, this roost is only likely to be used as an occasional roost for a single or a very low number of bats at any one time. It was also noted that due to the location of the roost it was unlikely to provide any potential for hibernation and is most likely used only as an occasional roost during the summer. Development Impact 4.3 Given the location of the identified roost it was concluded that the proposed works will not involve the movement or alteration of any materials comprising the roost feature. It is understood that insulation installed outside the proposed living space, and below the newly created roof voids, will help to reduce the impact of increased heat and noise to the current and potential roost habitat. Roost Loss 4.4 It is understood that none of the current roost features will be lost as a result of the development proposal. Roost Disturbance 4.5 In the absence of mitigation, during the construction phase it is possible that operations carried out in close proximity to the identified roost could cause disturbance to single or small numbers of bats present. Though the roost itself with not be altered in any way the excess noise and vibration caused by works has potential for disturbance. Furthermore anthropogenic activity in the long term, could result in disturbance of bats using the current roost feature. Roost Modification 4.6 The development proposal does not involve the removal or alteration of any materials associated with the current roost feature. In the absence of mitigation it is likely that heat loss into the roof void could alter the environmental conditions associated with the current roost feature. Summary of Impacts J:\6400\6414\ECO\Bats\Bat Report 6
10 Bat Survey Report 4.7 Given the evidence it is established that the roost is only likely to support an individual or very small numbers of bats, and it does not constitute a maternity roost. In light of this the impacts described above are likely to amount to a low level impact at most. Mitigation and Compensation 4.8 In order to ensure that the impacts arising from the disturbance of bats are avoided, any works to be carried out in close proximity internally to the identified roost, will be implemented outside the active period for bats (May September). As such all works in the stated areas will be implemented in the period October to April. As the roost feature is unlikely to be suitable for use as a hibernation roost, the likelihood of any bats being present within this period will be negligible. 4.9 It is understood that insulation will be installed above and around the outside walls of the proposed living accommodation to be created within the current roof space. As such this is considered to be sufficient to minimise any long term effects of noise disturbance on any roosting bats once the construction phase is completed. Similarly any impact arising from potential heat loss into the roof void will be minimised by the application of aforementioned insulation In order to enhance the sites potential for bats it is recommended that a small number of additional bat access points be installed in the roof to allow bats access to the proposed roof void and current void between the tiles and bitumen felt. These access points should be in the form of bat tiles (see figure 7) and will be installed on the opposite side of the roof to the current roost to avoid modification of roost habitat With the implementation of the mitigation outlined above there will be no impact of development on any roosting population of bats in the building. In light of this it is not anticipated that proposals will result in any breach of legislation protecting roosting bats therefore it Is not deemed necessary for a license to be obtained in order to carry out the work proposed in the development. However if any work is required outside the period outlined above (October to April) then it is recommended that a license be obtained from Natural England in order to facilitate the work. In this scenario all work must be suspended until such time as a license is obtained. Full planning permission (or outline) along with all relevant conditions/reserved matters discharged must be in place in order to be able to provide the level of detail and certainty required prior to any EPS licence applications. Natural England requires at least 30 working days to process EPS licence applications Given the size and status of the roost, comprising of individual bats of a common species Natural England s Bat Mitigation Guidelines (2004) recommends minimum mitigation and compensation with flexibility over provision of bat boxes, access to new buildings etc. No conditions about timing or monitoring. As such it is anticipated that work under license would be undertaken as described above. However in addition to a license being obtained it is recommended that a pre-dawn survey be carried out prior to any work in order to identify the presence of any roosting bats at that exact time. In the event that the roost (or any other area of B1) is occupied by more than five bats it will be required that work be postponed until such time as the roost is occupied by five or less common pipistrelle If works are not carried out within one year of the last nocturnal assessment the building should be subject to further survey to re-asses the roost size and status The proposed above enhancements contribute to the requirement of biodiversity J:\6400\6414\ECO\Bats\Bat Report 7
11 Bat Survey Report 4.15 The National Planning Policy Framework NPPF NPPF places emphasis on sustainable development, and minimising impacts on biodiversity whilst providing net gains in biodiversity where possible, contributing to the Government s commitment to halt the overall decline in biodiversity. The proposed above biodiversity enhancements will contribute to this requirement. J:\6400\6414\ECO\Bats\Bat Report 8
12 Site Location Nancy Hawksworth Barn Conversion London Road, Shardlow This drawing is the property of FPCR Environment and Design Ltd and is issued on the condition it is not reproduced, retained or disclosed to any unauthorised person, either wholly or in part without written consent of FPCR Environment and Design Ltd. Site Location A4 N Figure 1 Ordnance Survey material is used with the permission of The Controller of HMSO, Crown copyright J:\6400\6414\Bats\Figure1sitelocation.cdr FPCR Environment and Design Ltd, Lockington Hall, Lockington, Derby, DE74 2RH t: masterplanning environmental assessment landscape design urban design f: e: [email protected] w: ecology architecture arboriculture
13
14
15
16
17
Orchard Barn, Newcastle Road, Blakelow, Cheshire, CW5 7ET. New Detached Double Garage Block with Integrated Garden Store and Loft Storage Area.
Application No: 13/2596N Location: Proposal: Applicant: Expiry Date: Orchard Barn, Newcastle Road, Blakelow, Cheshire, CW5 7ET New Detached Double Garage Block with Integrated Garden Store and Loft Storage
Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site.
Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site. Background & Planning Context The Site The site is an area
Glossop Design & Place Making Strategy
Supplementary Planning Document to the High Peak Local Plan June 2011 Design Brief for the Town Hall Complex GILLESPIES I GERALD EVE Reproduced from the Ordnance Survey map with the permission of Ordnance
Experience in Bat Mitigation: Guidance for Ecologists and Developers
Experience in Bat Mitigation: Guidance for Ecologists and Developers 1. Aims of this note: To help ecological consultants to assess their skills and experience levels before applying for a EPS mitigation
Palmer Street/Great Barr Street, (former MacDermid warehouse), Digbeth, Birmingham, B9 4AY
Committee Date: 23/01/2014 Application Number: 2013/09236/PA Accepted: 16/12/2013 Application Type: Full Planning Target Date: 17/03/2014 Ward: Nechells Palmer Street/Great Barr Street, (former MacDermid
Handsworth Library, Soho Road, Handsworth, Birmingham, B21 9DP
Committee Date: 2/08/204 Application Number: 204/064/PA Accepted: 07/03/204 Application Type: Listed Building Target Date: 02/05/204 Ward: Lozells and East Handsworth Handsworth Library, Soho Road, Handsworth,
Camp. plan template. elements. This section that need to. identify the. vegetation. of flying-fox. also
Camp management plan template Introduction The following templatee guides local government in compiling a Camp Management Plan that will facilitate licensing of camp management actions for a five-year
General Advice. 2 front extensions
Introduction This advice leaflet has been produced to help in the planning of your house extension, by identifying the main points to consider, in order to achieve an acceptable proposal. This leaflet
Planning Act 2008: Guidance on Changes to Development Consent Orders. December 2015 Department for Communities and Local Government
Planning Act 2008: Guidance on Changes to Development Consent Orders December 2015 Department for Communities and Local Government Crown copyright, 2015 Copyright in the typographical arrangement rests
Introduction. Two storey & first floor rear extensions. two storey rear 1
Introduction This advice leaflet has been produced to help in the planning of your house extension, by identifying the main points to consider, in order to achieve an acceptable proposal. This leaflet
Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015
Site Deliverability Statement Development at: Beech Lane, Kislingbury Persimmon Homes Midlands March 2015 Contents Site Deliverability Statement Development at: Beech Lane, Kislingbury 1.INTRODUCTION 1.1
K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU
Application No: 11/2196N Location: Proposal: Applicant: Expiry Date: K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU Extension and New Store Mr Dan Mellor 17-Aug-2011 SUMMARY RECOMMENDATION Approve
Tree Condition Survey for Proposed Taplow Footbridge at Ray Mill Island and Taplow Riverside, Mill Lane Taplow, Buckinghamshire
Tree Condition Survey for Proposed Taplow Footbridge at Ray Mill Island and Taplow Riverside, Mill Lane Taplow, Buckinghamshire Tree Condition Survey for Proposed Taplow Footbridge at Ray Mill Island and
A Guide for Residents. Sutton Garden Suburb Conservation Area
A Guide for Residents Sutton Garden Suburb Conservation Area Introduction This leaflet is designed to provide residents with information and advice about living in the Sutton Garden Suburb Conservation
DESIGN AND ACCESS STATEMENT
CHANGE OF USE OF EXISTING RESIDENTIAL ANNEXE TO A SEPARATE DWELLING AND CONSTRUCTION OF A NEW WALL FENCE AND GATES AT LITTLE NOOKE CHAPEL LANE WYRE PIDDLE PERSHORE WORCESTERSHIRE WR10 2JA 1.0 INTRODUCTION
Contents. Who is Premier Guarantee? Your Structural Warranty. What to look out for in your New Home. Running in your New Home. DIY and Maintenance
Homeowners Handbook Contents Who is Premier Guarantee? Your Structural Warranty What to look out for in your New Home Running in your New Home DIY and Maintenance Structural Warranty Cover This booklet
Historic Preservation Principles and Approaches
Section 4: Historic Preservation Principles & Approaches four section Historic Preservation Principles and Approaches Before any preservation project is begun, a number of fundamental decisions need to
Subject: APPLICATION 10/02650/CA. DEMOLITION OF YOUTH CLUB, DEEPDALE LANE, BOSTON SPA, WETHERBY.
Originator: Victoria Hinchliff Walker Tel: 39 51343 Report of the Chief Planning Officer PLANS PANEL EAST Date: 28 th October 2010 Subject: APPLICATION 10/02650/CA. DEMOLITION OF YOUTH CLUB, DEEPDALE LANE,
OFFICES TO LET Hackthorpe Hall Nr Penrith Cumbria
OFFICES TO LET Hackthorpe Hall Nr Penrith Cumbria Tel 01768 862135 www.pfandk.co.uk LOCATION Hackthorpe Hall Business Centre is set in the Eastern Fells of the Lake District at the heart of the Lowther
The Granary, Back Street, Reepham, Norwich NR10 4SJ Tel. 01603 308 051 [email protected] www.internetsurveysltd.com
The Granary, Norwich NR10 4SJ Tel. 01603 308 051 [email protected] www.internetsurveysltd.com R E P O R T P R E P A R E D F O R Mrs J McCleave P R O P E R T Y A D D R E S S R I S K M A N
CONSENT, PURSUANT TO SECTIONS 34A, 88, 104, 104C, and 108 OF THE RESOURCE MANAGEMENT ACT, IS GRANTED. THE FULL DECISION IS SET OUT BELOW
A U C K L A N D C O U N C I L Decision following the hearing of an application for resource consent SUBJECT: Application for resource consent under section 88 of the Resource Management Act 1991 by D C
LAND AT MONGER LANE MIDSOMER NORTON DESIGN COMPLIANCE STATEMENT CIR.T.0241 DECEMBER 2014 PREPARED BY PEGASUS URBAN DESIGN
LAND AT MONGER LANE MIDSOMER NORTON DESIGN COMPLIANCE STATEMENT CIR.T.0241 DECEMBER 2014 PREPARED BY PEGASUS URBAN DESIGN THE GOVERNMENT ATTACHES GREAT IMPORTANCE TO THE DESIGN OF THE BUILT ENVIRONMENT.
1 Welcome. The exhibition comprises a series of boards which provide some background information to show you our initial ideas for the site.
1 Welcome Thank you for taking the time to attend this public exhibition of our proposals for residential development on Land at Daws Farm, Back Road, Writtle (site shown opposite). The exhibition comprises
PERMISSION A GUIDE FOR EXTENDING A DETACHED OR SEMI-DETACHED HOUSE
PLANNING PERMISSION A GUIDE FOR EXTENDING A DETACHED OR SEMI-DETACHED HOUSE Introduction Foreword by Councilor Dave Smith - Chair of the Planning & Highways Committee. Planning Permissions B Owners of
General Advice. 2 rear single storey
Introduction This advice leaflet has been produced to help in the planning of your house extension, by identifying the main points to consider, in order to achieve an acceptable proposal. This leaflet
Exempted Development - Frequently Asked Questions
Exempted Development - Frequently Asked Questions Important Pre-Conditions Please note all exempted development is subject to certain restrictions as set out in Articles 6, 7, 8, 9 and 10 of the Regulations.
Design and Access Statement. 141-145 Earls Court Road London SW5 9RH
J U L I A N A R E N D T A S S O C I A T E S 1 7 a P i n d o c k M e w s L i t t l e V e n i c e L o n d o n W 9 2 P Y F + 4 4 2 0 7 2 8 6 9 9 0 1 Design and Access Statement T + 4 4 2 0 7 2 8 6 9 9 9 1
Environmental Impact Assessment of Forestry Projects
Environmental Impact Assessment of Forestry Projects Flow chart of EIA process Developer submits grant application FC screens when sufficient info received, normally at "Proposal Submit stage Developer
Site Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons
Site Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons Representor Number 1135 AS(N)4 Persimmon Homes 9 th February 2015 Contents Site Deliverability Statement Alternative Site
Proposed Sports Hall at. Oldfield School. Kelston Road. Bath BA1 9AB. Construction Management Plan June 2011
Proposed Sports Hall at Oldfield School Kelston Road Bath BA1 9AB Construction Management Plan June 2011 CONTENTS 1.0 Introduction 2.0 Site Location 3.0 Proposed Development 4.0 Construction Management
143 RUMBUSH LANE SHIRLEY SOLIHULL
2014/514 143 RUMBUSH LANE SHIRLEY Application No: Ward/Area: Location: 2014/514/S BLYTHE 143 RUMBUSH LANE SHIRLEY SOLIHULL Date Registered: 14/03/2014 Applicant: Proposal: MR JAMIE LONG DEMOLITION OF GARAGE
Homeowner s Handbook
Homeowner s Handbook Congratulations on buying your new home This booklet will provide you with important information on the warranty cover for your new home which has been arranged by your developer.
H2 Opening Statement Asbestos
H2 Opening Statement Asbestos Every year there are thousands of asbestos related deaths. Asbestos fibres accumulate in the lungs, therefore several diseases can occur, among these are two main types of
Office Units 10-11 Buckminster Yard, Buckminster, Grantham, Lincolnshire
Office Units 10-11 Buckminster Yard, Buckminster, Grantham, Lincolnshire Office Units 10-11 Buckminster Yard, Main Street, Buckminster, Grantham, Lincs NG33 5SB A1 4 miles Grantham 11 miles Stamford 16
Tree Management Policy
Tree Management Policy This policy is designed to be a policy framework for the management of trees owned and managed by the Connect HA. It sets out the guiding principles for managing our stock, to assist
VALIDATION REQUIREMENTS FOR PLANNING APPLICATIONS
Planning Services, Civic Offices, New Road, Grays, Essex RM17 6SL VALIDATION REQUIREMENTS FOR PLANNING APPLICATIONS Checklists to ensure prompt validation: Checklist 1 for ALL applications for planning
Access onto roof from Center Block
2 2 Tap 4 Tank 3 3 4 5 5 6 4 1 Services PV panels Forth floor structure (later additions) Rooflights Access / Walkways Access onto roof from Center Block muf architecture/art LLP 4.3 Roof alterations and
Councillor R. Hollingworth has requested that this application be considered by the Committee, rather than being determined under delegated powers.
Name of Applicant Type of Certificate Proposal Map/Plan Policy Plan Date Mr Timothy D. Hosking A Proposed extension to form bespoke living accommodation for disabled family member (As augmented by information
Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.
Bournemouth Airport & Business Park 7 7 Bournemouth Airport & Business Park Introduction 7.1 Bournemouth Airport is a key asset for the region, one of the UK s fastest growing regional airports and is
Aircraft Noise Control at London Luton Airport. August 2015
Aircraft Noise Control at London Luton Airport August 2015 Aircraft Noise Control at London Luton Airport Foreword London Luton Airport (LLA) continues to place aircraft noise high on its agenda. We recognise
WARDS AFFECTED: Bridge. Land At Corner Of Arkwright Street And Crocus Street, Nottingham. 10/01839/PFUL3 for planning permission
WARDS AFFECTED: Bridge Item No: REPORT OF INTERIM DIRECTOR OF CITY PLANNING DEVELOPMENT CONTROL COMMITTEE 22nd September 2010 Land At Corner Of Arkwright Street And Crocus Street, Nottingham 1 SUMMARY
REFERENCE NUMBER : PPC/54. POLLUTION PREVENTION AND CONTROL ACT 1999 POLLUTION PREVENTION & CONTROL (ENGLAND AND WALES) REGULATIONS 2000(as amended)
LOCAL AUTHORITY POLLUTION PREENTION AND CONTROL PERMIT Yeovil Motor Company REFERENCE NUMBER : PPC/54 POLLUTION PREENTION AND CONTROL ACT 1999 POLLUTION PREENTION & CONTROL (ENGLAND AND WALES) REGULATIONS
A GUIDE TO OWNING OR BUYING A LISTED BUILDING
A GUIDE TO OWNING OR BUYING A LISTED BUILDING 00 Pages The 0 Listed 0 Property Owners Club CONTENTS INTRODUCTION 1 Introduction 2 What is a listed building? 4 How are listed buildings chosen? 8 The conservation
Earls Court Farm Worcester
Earls Court Farm Worcester LOCAL DEVELOPMENT FRAMEWORK www.worcestercitycouncil.gov.uk SUPPLEMENTARY PLANNING DOCUMENT Earls Court Farm Development & Design Brief SPD FEBRUARY 07 4 2 Site-Context
Guidance on Householder permitted development rights
FORWARD CONTENTS CLOSE Guidance on Householder permitted development rights Circular 1/2012 CONTENTS BACK FORWARD CLOSE 1. INTRODUCTION 04 2. BEFORE STARTING 05 3. MAIN CONCEPTS 07 Principal elevation
Planning for Bushfire Risk Mitigation General Code
Planning for Bushfire Risk Mitigation General Code March 2008 Contents 0H1. Introduction 14H1 1H1.1 Purpose... 2H1.2 Aim... 3H2. Principles 17H2 4H2.1 Shared Responsibility... 5H2.2 Prevention, Preparedness,
Sustainability Appraisal of the Lichfield Local Plan: Strategy
Lichfield District Council Sustainability Appraisal of the Lichfield Local Plan: Strategy Post Adoption Statement February 2015 U R S U S C O N S U L T I N G L T D Quality Management URSUS Consulting Ltd
Development Management Officer Report Committee Application. Summary
Development Management Officer Report Committee Application Summary Committee Meeting Date: 15 Dec 2015 Item Number: Application ID: Z/2014/0978/F Target Date: 31 st October 2014 Proposal: Single storey
Northern Long-eared Bat - Interim Final 4(d) Rule Questions and Answers
Northern Long-eared Bat - Interim Final 4(d) Rule Questions and Answers 1. What action is the Service taking? On January 15, 2015, the Service published a proposed rule under section 4(d) of the Endangered
HEDDERMAN ENGINEERING, INC. www.heddermanengineering.com Office 281-355-9911, Fax 281-355-9903 [email protected]
HEDDERMAN ENGINEERING, INC. www.heddermanengineering.com Office 281-355-9911, Fax 281-355-9903 [email protected], 2011 TO: Mr. REF: CONDITION OF PROPERTY SURVEY Dear Mr. : At your request,
2051 Coventry Road, Sheldon, Birmingham, B26 3DY
Committee Date: 20/03/2014 Application Number: 2014/00456/PA Accepted: 23/01/2014 Application Type: Variation of Condition Target Date: 20/03/2014 Ward: Sheldon 2051 Coventry Road, Sheldon, Birmingham,
building on success Trees and Basements Partial Review of the Core Strategy February 2014
building on success Trees and Basements Partial Review of the Core Strategy February 2014 Regulation 19, Town and Country Planning (Local Planning) (England) Regulations 2012. 2 Contents 1. Introduction...
Validation of Planning Applications. Bedford Borough Council Local Planning Application Requirements for Biodiversity and Geological Conservation
Validation of Planning Applications Bedford Borough Council Local Planning Application Requirements for Biodiversity and Geological Conservation In Accordance with The Town and Country Planning (General
A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth. university of surrey November 2013
A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth university of surrey November 2013 A new Garden Neighbourhood for West Guildford Preface Since the County and Borough Councils
Building Control Guidance Note
Elements Renovation / Replacement. Issued 25/01/13 Rev a Page 1 of 9 (Applies to both Domestic and Non-Domestic Premises) Works relating to thermal elements can arise in building an extension, a material
Chapter 2 Spatial Portrait
15 November 2013 Dear Julie Fylde Local Plan to 2030 Part 1 Preferred Options Thank you for the opportunity to meet with you on 9 October in respect of the above mentioned document. As discussed at the
Proposed Terms of Reference for EIA studies
1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.
Explanatory Memorandum to the Conservation of Habitats and Species (Amendment) Regulations 2012
Explanatory Memorandum to the Conservation of Habitats and Species (Amendment) Regulations 2012 This Explanatory Memorandum has been prepared by the Environment and Sustainable Development Department and
4 Alternatives and Design Evolution
4 Introduction 4.1 This Chapter describes the considerations and constraints influencing the siting, layout and massing of the Development. It also describes the main alternatives to the Development that
Engineers, Architects, Surveyors and Relation Professions
Application Form Professional Indemnity Insurance Send quotation requests to: Email: [email protected] Phone: 1300 556 826 Engineers, Architects, Surveyors and Relation Professions IMPORTANT
13 Oakleigh Gardens London N20 9AB
Location 13 Oakleigh Gardens London N20 9AB Reference: 15/00608/HSE Received: 2nd February 2015 Accepted: 2nd February 2015 Ward: Oakleigh Expiry 30th March 2015 Applicant: Mr A Peqini Proposal: Single
Landlord Insurance. Summary of cover
Landlord Insurance Summary of cover March 2013 Why choose AXA s Landlord Insurance policy? The Landlord Insurance offers a range of covers and caters for a variety of customers, from individuals who own
Asbestos Policy Lead officer: Date agreed: Review date: Working together to deliver quality homes and a better environment for all
Asbestos Policy Lead officer: Jeff Scott Date agreed: May 2013 Review date: May 2016 Working together to deliver quality homes and a better environment for all Page 1 of 11 Contents Page 1 Introduction
Landlord Insurance. Summary of cover. October 2013. 35039_ACLD0520ZB_BRO_A5.indd 1 23/10/2013 16:20
Landlord Insurance Summary of cover October 2013 35039_ACLD0520ZB_BRO_A5.indd 1 23/10/2013 16:20 Why choose AXA s Landlord Insurance policy? The Landlord Insurance offers a range of covers and caters for
Development proposals will require to demonstrate, according to scale, type and location, that they:-
Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on
MACCLESFIELD TOWN COUNCIL
MACCLESFIELD TOWN COUNCIL PLANNING COMMITTEE Agenda for the meeting to be held on Monday 22 nd February 2016 at 7pm at Macclesfield Town Hall. 1. APOLOGIES FOR ABSENCE 2. DECLARATIONS OF INTEREST To provide
Department for Communities and Local Government
Department for Communities and Local Government Permitted development for householders Technical Guidance April 2014 Department for Communities and Local Government Please note: This technical guidance
BEDFORD DESIGN GROUP REPORT NUMBER 61892 ASBESTOS SURVEY AT: ALL HALLOWS CAR PARK GREENHILL BEDFORD
BEDFORD DESIGN GROUP REPORT NUMBER ASBESTOS SURVEY AT: ALL HALLOWS CAR PARK GREENHILL BEDFORD CARRIED OUT BY: VINTEC LABORATORIES LTD SURVEY DATE: 08-01-2009 PREPARED BY: JAMES BROTHERTON CHECKED BY: ANDREW
Building Permit Information House Relocation
Building Permit Information House Relocation About private Building Surveyors Until about 1992 all building permits were issued by Councils. This function was then privatised, and while many Councils still
DESIGN GUIDANCE NOTE: 11 PORCHES
DESIGN GUIDANCE NOTE: 11 PORCHES 1. INTRODUCTION This guidance note is one of a series giving advice on various types of development within Barnet. It advises on designing porch extensions including canopies.
Syston Dry Cleaners and Laundry Schedule 1 CHARNWOOD BOROUGH COUNCIL POLLUTION PREVENTION AND CONTROL ACT 1999
CHARNWOOD BOROUGH COUNCIL POLLUTION PREVENTION AND CONTROL ACT 1999 ENVIRONMENTAL PERMITTING (ENGLAND AND WALES) REGULATIONS 2010 (As Amended) PERMIT REF. NO. 123 Charnwood Borough Council hereby permits,
1. That the application be REFUSED for the following reason :
Page 1 7. FULL APPLICATION CHANGE OF USE OF LAND FOR THE SITING OF ONE RESIDENTIAL CARAVAN AT MOORSIDE QUARRY, MOORSIDE LANE, POTT SHRIGLEY. (NP/CEC/0810/0814, P5394, 09.08.2010, 394699/379646/JK) APPLICANT:
COMMONWEALTH OF VIRGINIA CITY OF RICHMOND REHABILITATION AGREEMENT W I T N E S S E T H:
COMMONWEALTH OF VIRGINIA CITY OF RICHMOND REHABILITATION AGREEMENT THIS AGREEMENT, made and entered into this day of 201_, by and between RICHMOND AFFORDABLE HOUSING, a nonprofit corporation organized
3.0 Planning Policies
3.0 Planning Policies 3.1 National Policy 3.1.1 Government Planning Policy Guidance Notes (PPGs), and Planning Policy Statements (PPSs) provide the background to most aspects of the planning system. The
THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA PLANNING APPLICATIONS COMMITTEE 16/06/2015
THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA PLANNING APPLICATIONS COMMITTEE 16/06/2015 REPORT BY THE EXECUTIVE DIRECTOR, PLANNING AND BOROUGH DEVELOPMENT Application: /PP/15/02000 Agenda Item: N34 Address:
CHAPTER 24: ENVIRONMENTAL MANAGEMENT
Central Eyre Iron Project Environmental Impact Statement CHAPTER 24: ENVIRONMENTAL MANAGEMENT CHAPTER 24 ENVIRONMENTAL MANAGEMENT COPYRIGHT Copyright Iron Road Limited, 2015 All rights reserved This document
Former Barn, Pincents Manor Hotel, Pincents Lane, Tilehurst, West Berkshire
Former Barn, Pincents Manor Hotel, Pincents Lane, Tilehurst, West Berkshire An Archaeological Watching Brief For Mr M Webb by Jennifer Lowe Thames Valley Archaeological Services Ltd Site Code PMH08/105
HERITAGE PROPERTY TAX RELIEF PROGRAM GUIDELINES & APPLICATION Community Services Department Planning Division
PART 1 - PURPOSE HERITAGE PROPERTY TAX RELIEF PROGRAM GUIDELINES & APPLICATION Community Services Department Planning Division 1.1 Heritage property tax relief is a financial tool for municipalities to
SOUND INSULATION FOR AIR CONDITIONERS AND OTHER EXTERNAL MECHANICAL PLANT. Installing and Maintaining Air Conditioning Units
SOUND INSULATION FOR AIR CONDITIONERS AND OTHER EXTERNAL MECHANICAL PLANT Excessive noise from the operation of machines and external mechanical plant can disturb neighbours, disrupt sleep, interfere with
Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement. November 2013. with
Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement November 2013 with Tibbalds Planning & Urban Design 19 Maltings Place 169 Tower Bridge Road London SE1 3JB Telephone 020
23.1 RENEWABLE ENERGY
Proposed Hastings District Plan as Amended 23.1 Renewable Energy 23.1 RENEWABLE ENERGY 23.1.1 INTRODUCTION The use of energy is of fundamental importance to the function and development of our society.
PLANNING SERVICES UNIT
SUPPLEMENTARY PLANNING GUIDANCE DEVELOPMENT INVOLVING HORSES PLANNING SERVICES UNIT 1. INTRODUCTION 1.1 This document provides supplementary planning guidance on development involving horses, which is
K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU
Application No: 11/2196N Location: Proposal: Applicant: Expiry Date: K M D Hire Services, LONDON ROAD, NANTWICH, CW5 6LU Extension and New Store Mr Dan Mellor 17-Aug-2011 SUMMARY RECOMMENDATION Approve
10.1 WILL HEY FARM WATFORD LANE NEW MILLS RETENSION OF NEW STABLE BLOCK, SAND PADDOCK AND ASSOCIATED EARTHWORKS AND LANDSCAPING (FULL - MINOR)
HPK/2012/0207 03/04/2012 WILL HEY FARM WATFORD LANE NEW MILLS MR & MRS M WILSON KIRSTY WILSON EQUINE AND WILL HEY FARM BED & BREAKFAST RETENSION OF NEW STABLE BLOCK, SAND PADDOCK AND ASSOCIATED EARTHWORKS
REQUEST FOR PROPOSALS FOR: THE PURCHASE AND RENOVATION OF ADJOINING PROPERTIES AT 200/240 SOUTH 16 TH STREET ORD, NEBRASKA BY:
REQUEST FOR PROPOSALS FOR: THE PURCHASE AND RENOVATION OF ADJOINING PROPERTIES AT 200/240 SOUTH 16 TH STREET ORD, NEBRASKA BY: THE COMMUNITY DEVELOPMENT AGENCY OF THE CITY OF ORD JULY 2014 A. STATEMENT
Defence College of Technical Training. Former RAF Lyneham Geo-Environmental Report 32655 Appendix D: Preliminary Qualitative Risk Assessment
Item No. Area/ Building Pathway to 1 Identified areas of / (redevelopment Ingestion Inhalation Severe Likely High SKM Enviros desk study highlights several known areas of significant historical. Areas
Rotherham Metropolitan Borough Council
Rotherham Metropolitan Borough Council Town and Country Planning Act 1990 Eton Construction Ltd Mr P Harris 79a Wellgate Rotherham S60 2LZ Reference RB2014/1538 Decision Date 08 January 2015 Description
The Smoke and Carbon Monoxide Alarm (England) Regulations 2015
The Smoke and Carbon Monoxide Alarm (England) Regulations 2015 Q&A Booklet for the Private Rented Sector landlords and tenants September 2015 Department for Communities and Local Government Crown copyright,
Application for Planning Permit and Certification
Application for Planning Permit and Certification Supplied by Don Perry Submitted Date 18/04/2016 Application Details Application Type Applicant Reference Number Application name or Estate name Responsible
