1 Process CSM Cutter Soil Mixing Process and equipment
2 X_01-16_CSM.qxd :27 Uhr Seite 2 CSM-Process Mixing of self-hardening slurries with native soils by using a modified trench cutter technique is a new and effective method for constructing: Cut-off walls; earth retaining walls; soil improvement or for constructing foundation elements. CSM is used mainly for stabilizing soft or loose soils (non cohesive and cohesive), however the machinery used, derived from Bauer s cutter technology, extends the applicability of the method to much harder strata when compared to other methods of soil mixing. Main advantages of the method are: High productivity The in-situ soil is used as a construction material Very little generation of spoil (important factor in contaminated areas) No vibrations induced during construction Extended depths (up to 60 m) can be reached when using the rope suspended units. MBG xx Bauer Maschinen GmbH, 2
3 Construction sequence Preparation: Excavation of a guide trench for collecting surplus slurry Step 1: Positioning of the cutter head in wall axis. The construction of a guide wall is not required Step 2: The mixing tool is driven into the ground at a continuous rate. The soil matrix is broken up by the cutting wheels and at the same time a fluid is pumped to the nozzles, set between the cutting wheels, where it is mixed thoroughly with the loosened soil. Adding a compressed airstream can improve the breaking and mixing process in the downstroke phase. The direction of rotation of the wheels can be varied at any time. The rotating wheels and cutting teeth push the soil particles through vertically mounted shear plates that have the effect of a compulsory mixer. Penetration speed of the cutter and the volume of fluid pumped in are adjusted by the operator to optimise the absorption of power and to create a homogeneous, plastic soil mass which permits easy penetration and extraction of the machine. Typical speed of penetration is cm/min. Step 3: After reaching the design depth, the mixing tool is slowly extracted while cement slurry is continuously added. Homogenization of the fluidified soil mixture with the fresh cement slurry is ensured by the rotation of the wheels. Step 4: Reinforcing elements required for structural purposes can be inserted into the completed wall. A standard case is the insertion of steel stanchions. In shallow depths these will usually penetrate under their own weight; otherwise a light vibrator can be used to assist their installation. The distance of the beams and beam cross-sections are designed on the basis of the applied loads and on the results of the characteristic strength of the soil. BAUER Maschinen GmbH, 1/2016 CSM Cutter Soil Mixing 3
4 Construction sequence A continuous wall is formed in a series of overlapping primary and secondary panels. Overcutting into fresh adjacent panels is called fresh-in-fresh method. The cutter technique also allows the hard-in-hard method, whereby secondary panels are cut into the already hardened primary panels. The cutting and mixing procedure can be executed in two ways: mm / mm / mm P1 S1 P2 variable / mm One-phase system During the penetration (downstroke) phase, cutting, mixing, fluidifying and homogenising is performed while pumping the binder slurry into the soil. Adding compressed air is recommended for assisting the downstroke phase. As a rule of thumb about 70 % of the total slurry volume is pumped during this phase. The backflow of soil and binder slurry is collected in the pre-excavated trench or stored in a settling pond to be removed later off the site. After reaching the design depth air flow is stopped. In the upstroke phase the remaining volume of binder slurry is blended into the soil. The speed of extraction can be high as the majority of the binder slurry has already been mixed with the soil in the downstroke phase. Panel CSM-Rig Deliverypump Agitator Cement Cement Silo Compressor Mixer Bentonite Silo Trench Backhoe Advantages of the one-phase system are: No auxiliary desanding circuit required. Higher speed of extraction Preferred application in easy and uniform soils, depth range < 20 m CSM Cutter Soil Mixing BAUER Maschinen GmbH, 1/2016 4
5 Two-phase system The soil is fluidified and homogenised in the downstroke phase by pumping of bentonite slurry into the soil. The mixing process can be supported by adding compressed air. The backflow of soil and bentonite can be pumped to a desanding plant where the sand is separated from the slurry which is then pumped back to the rig. When the backflow becomes too heavy for pumping, it can be removed by a backhoe or a scratching belt from the trench onto a screen where primary separation occurs. Using a hose pump the fluid fraction is then Panel Trench Hose pump CSM-rig Deliverypump Compressor Agitator Cement Agitator Bentonite Desander Mixer Soil Cement Silo Bentonite Silo Panel CSM-Rig Soil Deliverypump Compressor Agitator Cement Agitator Bentonite Mixer Cement Silo Bentonite Silo pumped to the desanding plant unit for further treatment. After reaching the design depth, the flow of bentonite is stopped and replaced by cement slurry. On the upstroke movement cement slurry is mixed thoroughly with the fluidified soil. The speed of extraction and flow of binder are adjusted to ensure that the total calculated quantity of binder is blended with the soil. Trench Scratching belt Hose pump Mobile sieve unit Soil Desander Advantages of the two-phase system are: Increased safety when working at extended depths or when the working process is interrupted. Reduced wear and tear on the cutting wheels. Reduced cost for removal of spoil (a certain percentage of the slurry can be reused), the remaining spoil can be easily removed as it is a dry material. Preferred application in difficult soil conditions and for extended depths. BAUER Maschinen GmbH, 1/2016 CSM Cutter Soil Mixing 5
6 Productivity factors The average productivity is highly influenced by the following site parameters. favourable conditions unfavourable conditions Soil structure uniform soil structure layered soil structure Soil type loose to medium dense gravelly sand, dense to very dense soil, cobbles and boulders silty sand embedded in soil, stiff or hard soil, cohesive or organic soil (reduction of the final strength) Site geometry long, straight wall sections irregular wall layout Wall depth wall depth > 10 m wall depth < 10 m (influence of non-productive periods such as moving, setting-up) Slurry specifications Components of the binder The components of binders normally used in the construction of CSM panels are: cement (OPC or Blast furnace cement CEM III/B 32,5), bentonite, and water. When required, it is also possible to use additives (plasticizer, retarder) or admixtures (such as fly-ash). When working with bentonite slurries for premixing (two-phase system), polymer additives have shown good results in terms of decreasing viscosity and the reduction of fluid loss. Mix design The mix design should always be determined by suitability tests prior to the start of construction. The following tables give values for an initial design of the mix proportions. They should be used for reference only. Bentonite suspension (for fluidifying the soil in the two phase system) approx kg bentonite/m 3 slurry 400 l slurry/m 3 soil (minimum quantity for fluidifying the soil) Binder slurry (typical mix design) Cut-off wall Retaining wall Cement kg/m 3 slurry Bentonit kg/m 3 slurry w/c ratio 2,0 4,0 0,5 1,0 The mix design and the applicability of the system is highly dependent upon: The application: Cut-off wall (permeability, strength, plasticity, erosion stability) Retaining wall (strength, permeability, plasticity of the fresh material as precondition for installation of reinforcement) The soil conditions: Particle size distribution, grain size, fines content, organic content, density, SPT values, porosity, groundwater level, groundwater chemistry are the main influencing factors. Wall characteristics Cut-off wall Retaining wall Compressive strength qu MPa 0, Permeability kf m/sec ca. 1x10-8 Cement kg/m 3 soil In-situ sampling tool CSM Cutter Soil Mixing BAUER Maschinen GmbH, 1/2016 6
7 Site examples Wall construction in limited conditions (Malaysia) CSM-wall for start shaft microtunneling (USA) Retaining wall and underpinning for a heritage building with CSM (Australia) CSM-protection wall around a shut-down nuclear reactor building (USA) BAUER Maschinen GmbH, 1/2016 CSM Cutter Soil Mixing 7
8 CSM-rigs
9 Cutting and mixing head BCM BCM 5 BCM 10 BCM 5 BCM 10 Torque 0 57 knm knm Rotation speed 0 35 U/min 0 30 U/min Height 2,35 m 2,8 m Panel length 2,4 m 2,8 m Panel width B mm mm Weight (with wheels) * kg kg * at min. panel width Types of wheels The wheels are designed to cut and loosen the soil matrix and then to mix it with the slurry. The soil type dictates whether more emphasis needs to be put on the wheel s cutting or mixing capability. As the cutter wheels cut into the ground they break up the soil matrix and then mix the loosened soil thoroughly with the injected binder slurry. The prevailing soil type dictates whether more emphasis needs to be put on the cutting or the mixing capability of the wheels. The use of symmetrical tooth holders in conjunction with the application of DC teeth allows troublefree breaking up and mixing of the soil in both rotational directions. A cutter wheel mixing set does consists of four identical mixing wheels. This and the application of BAUER-exclusive TungStuds result in low wear costs. Four tooth holders in one row of teeth loose to dense non-cohesive soil, gravely soil with stones, cohesive soil good mixing capacity (due to four tooth holders) Three tooth holders in one row of teeth dense non-cohesive soil, gravely soil with stones hard cohesive soil good cutting capacity (due to three tooth holders) BAUER Maschinen GmbH, 1/2016 CSM Cutter Soil Mixing 9
10 Kelly-guided CSM-rigs Monokelly (round shaped) The BCM unit is supported by a Monokelly system. For smaller rigs and for a maximum depth of approx. 20 m, a round Kelly bar (Ø 368 mm) is used. Two guide sledges connect the Kelly bar to the drill rig s mast, they provide alignment, crowd and extraction forces and rotational movement. A hydraulically operated locking mechanism transfers crowd and extraction forces to the Kelly bar and a rotating arrangement incorporated in the guides enables the CSM unit to be turned +45 to -90. Systems with round Kelly bar (with rotation device, without Kelly extension, further base carriers on request) Mixing head Motor output Extraction force Operating weight Overall height Mixing depth (kw) (kn) (t) (m) (m) BG 28 (BS 80) BCM 5 / BCM ,0 26,2 18,0 BG 30 (BS 95) BCM 5 / BCM ,0 26,2 18,0 RG 16 T (BS 65 RS) BCM ,0 21,5 14,5 RG 19 T (BS 65 RS) BCM ,0 24,5 17,5 RG 21 T (BS 65 RS) BCM ,0 27,5 20,0 RG 18 S (BS 65 RS) BCM / ,0 23,5 17,0 RG 22 S (BS 65 RS) BCM / ,0 26,1 21,0 RG 25 S (BS 90 RS) BCM 5 / BCM / ,0 29,5 23,0 CSM Cutter Soil Mixing BAUER Maschinen GmbH, 1/
11 Monokelly (rectangular type) For greater treatment depth, the BCM unit is held and guided by a Monokelly with rectangular (600 x 340 mm) crosssection. The full string length is made of sectional pipes. The Kelly string can be extended above the height of the rig mast. The connectors can transfer all forces (especially bending moments resulting from the load case assembling ) and they are covered with protection shields to ensure a flush surface. Hydraulic hoses, slurry pipes and air hose are located inside of the hollow kelly bar. Systems with round Kelly bar (with Kelly extension, further base carriers on request) Mixing head Motor output Extraction force Operating weight Overall height Mixing depth (kw) (kn) (t) (m) (m) BG 28 (BS 80) * BCM 5 / BCM / ,0 42,0 35,0 BG 30 (BS 95) * BCM 5 / BCM / ,0 42,0 35,0 BG 39 (BS 95) * BCM 5 / BCM ,0 48,9 43,0 BG 42 (BS 115) * BCM 5 / BCM ,0 43,4 38,0 BG 46 (BS 115) * BCM 5 / BCM ,0 49,0 43,0 BG 50 (BT 180) * BCM 5 / BCM ,0 60,5 53,0 RG 25 S (BS 90RS) BCM 5 / BCM / ,0 39,0 30,5 * with rotation facility as option BAUER Maschinen GmbH, 1/2016 CSM Cutter Soil Mixing 11
12 Rope suspended CSM-rigs Rope suspended CSM rigs are made for big mixing depth with minimized rig dimensions. The machine concept can be offered in four variants with the base components: base carrier, hose handling system, boom, mixing unit. QuattroCutter 2 x BCM 5 Mixing unit (4 gear boxes) QuattroCutter Standard on MT 75 Quattro SideCutter on MT 75 TandemCutter 1 x BCM 10 Mixing unit (2 gear boxes) TandemCutter Standard on MC 64 Tandem SideCutter on MT 75 QuattroCutter TandemCutter Standard SideCutter Standard SideCutter Hose handling system and boom not turnable turnable not turnable turnable Overall height (m) 6,6 8,1 8,6 6,6 8,1 8,6 Working width (m) * 8,0 min. 4,5 8,0 min. 4,5 Max. mixing depth (m) ** 60 Installed power (kw) 2 x x x x 205 * Width perpendicular to panel axis ** 80 m on MC 64 base, 60 m on MT 75 base CSM Cutter Soil Mixing BAUER Maschinen GmbH, 1/
13 Auxiliary equipment The list is intended as a guide for auxiliary equipment to ensure an efficient working sequence. Mixing station For one-phase and two-phase working sequence: Slurry mixing station minimum capacity 20 m 3 /h Delivery pump frequency controlled slurry pump with remote control, capacity depends on volume of panel and speed of mixing. (typically: l/min, bar) Agitator tank approx. 3 5 m 3 (as buffer for cement slurry) Silos for cement and bentonite with screw conveyors Hydraulic backhoe for excavation of guide trench, maintenance of working platform, handling of backflow Hoses for conveying cement or bentonite slurry from the agitator to the rig. Typically 1,5 or 2 rubber hose (length to suit site requirements) Air compressor recommended 7 14 bar / 7 10 m 3 /min (for air assisted mixing) Service crane and vibrator optional for inserting universal beams or other reinforcement into the panel of retaining wall. Size of crane depends on length and weight of beams and vibrator use. Combined mixing and pumping station additionally for two-phase working sequence: Agitator tank as buffer for bentonite slurry Delivery pump optional pumping of reflux slurry from trench to desanding plant Scratching belt optional transporting of reflux slurry from trench to primary desanding plant Desanding plant optional for separating soil out of the reflux slurry Mobile sieve unit optional located near the trench for pre-screening dense reflux slurry Scratching belt It is placed on top of the trench, immerging into the trench and conveying the bentonite/soil mixture automatically upwards into a dewatering screen. The fully automated process does not require any additional workforce. Mobile sieve unit BAUER Maschinen GmbH, 1/2016 CSM Cutter Soil Mixing 13
14 X_01-16_CSM.qxd :01 Uhr Seite 14 Quality control Control of production parameters (displayed on the monitor of the rig operator) An electronic monitoring and control system B-Tronic can be installed in all CSM rigs. This data acquisition system monitors and controls construction parameters as well as general rig functions. Production data as listed below are continuously acquired, visualised and stored. Depth Volume Slurry pressure in hoses Slurry-soil pressure in trench Pumped volume vs. time Pumped volume vs. depth Inclination (in two directions) Speed of mixing tool General rig parameters Documentation All production parameters are monitored, recorded and stored inside the rig throughout the construction process and can be printed out in the form of a quality assurance record for each individual panel. CSM Cutter Soil Mixing 14 BAUER Maschinen GmbH, 1/2016
15 In-situ sampling of soil mix material Quality control of the completed soil mix elements is carried out on samples obtained either before or after the soil/binder slurry mixture has hardened. Samples of the fresh soil mix material prior to hardening can be obtained by using a special sampling tool. Obtaining fresh samples using a special sampling tool Insitu samples of hardened soil mix material can be obtained by techniques such as: Taking horizontal core samples with hand-held drills Drilling vertical core holes with drilling rigs used for exploratory boreholes Insertion of double-walled plastic tubes into the fresh soil/slurry mix elements and. after hardening. extraction of the inner tube together with the embedded hardened core Horizontal core sampling with a hand-held drill Cut-open inner plastic tube with hardened core Drilling a vertical core hole with a drilling rig used for exploratory boreholes BAUER Maschinen GmbH, 1/2016 CSM Cutter Soil Mixing 15
16 bma.bauer.de BAUER Maschinen GmbH BAUER-Strasse Schrobenhausen Germany Tel [email protected] Design developments and process improvements may require the specification and materials to be updated and changed without prior notice or liability. Illustrations may include optional equipment and not show all possible configurations. These and the technical data are provided as indicative information only, with any errors and misprints reserved /2016
California Department of Transportation Doyle Drive Test Program Contract No. 04A3362
California Department of Transportation Doyle Drive Test Program Deep Soil Mixing (DSM) /Cutter Soil Mixing (CSM) Testing Report By Malcolm Drilling Company, Inc. 3524 Breakwater Ave., Suite 108 Hayward,
TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL
TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL SCOPE This section of the specifications includes requirements for the Slurry Trench Cutoff Wall and related work as indicated on the
Proceedings 2005 Rapid Excavation & Tunneling Conference, Seattle
Proceedings 2005 Rapid Excavation & Tunneling Conference, Seattle EPB-TBM Face Support Control in the Metro do Porto Project, Portugal S. Babendererde, Babendererde Engineers LLC, Kent, WA; E. Hoek, Vancouver,
Product catalogue, pipe and sewer cleaning systems
Product catalogue, pipe and sewer cleaning systems Nozzles Rotorjet trolley Hose reels Cleaning devices www.hammelmann.com Contents (Navigation via Bookmarks) Rotorjet trolley Rotary joints, spray pipes
KWANG SING ENGINEERING PTE LTD
KWANG SING ENGINEERING PTE LTD 1. INTRODUCTION This report represents the soil investigation works at Aljunied Road / Geylang East Central. The objective of the soil investigation is to obtain soil parameters
Batching and Mixing Plants
Batching and Mixing Plants Technique Strength Results Ready-mix plant with sheeted, square steel in-line bins. Precast and pipe factory with concrete in-line bins and bucket elevator. Individual solutions
Worldwide network in over 40 countries.
Worldwide network in over 40 countries. April 2012 56 rue de Neuilly 93136 Noisy le Sec Cedex - France Tel : +33 (0)1 49 42 72 95 Fax : +33 (0)1 48 44 00 02 E-mail : [email protected] PTC s vibrodrivers
BAUER. Ground Improvement. Process
BAUER Ground Improvement Process Ground Improvement Characteristic Features Increase in load-bearing capacity Reduction of settlement Reduction of soil liquefaction during earthquakes No excavation no
SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS
SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS Vince Luongo Petrifond Foundation Co., Ltd. PROJECT DESCRIPTION The York Durham Sanitary System (YDSS) Interceptor in the Town of Richmond Hill located
product manual HS-4210 HS-4210_MAN_09.08 Digital Static Cone Penetrometer
HS-4210_MAN_09.08 product manual HS-4210 Digital Static Cone Penetrometer Introduction This Manual covers the measurement of bearing capacity using the Humboldt Digital Static Cone Penetrometer (DSCP).
BUTE Department of Construction Management and Technology
BUTE Department of Construction Management and Technology 02.10.2012 Definition 1: Foundation: The structure, that transmits the load of the building to the soil Definition 2: Load bearing soil (strata):
INDIRECT METHODS SOUNDING OR PENETRATION TESTS. Dr. K. M. Kouzer, Associate Professor in Civil Engineering, GEC Kozhikode
INDIRECT METHODS SOUNDING OR PENETRATION TESTS STANDARD PENETRATION TEST (SPT) Reference can be made to IS 2131 1981 for details on SPT. It is a field edtest to estimate e the penetration e resistance
Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing
Brussels, 18-20 February 2008 Dissemination of information workshop 1 Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing Dr.-Ing. Bernd Schuppener, Federal Waterways Engineering
SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS
Page 1 of 9 SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS 1. GENERAL REQUIREMENTS 1. Description of Work: This work consists of furnishing all materials, equipment and
INSITU TESTS! Shear Vanes! Shear Vanes! Shear Vane Test! Sensitive Soils! Insitu testing is used for two reasons:!
In-situ Testing! Insitu Testing! Insitu testing is used for two reasons:! To allow the determination of shear strength or penetration resistance or permeability of soils that would be difficult or impossible
I BEAM TRACK INSTALLATION
PDQ 0/700 FESTOON SYSTEM INSTALLATION AND MAINTENANCE INSTRUCTIONS INTRODUCTION The PDQ Festoon System was designed to run on one of three sizes of I-beams: S x., S8 x 8. and S x.. System trolleys must
ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT
ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT Description: This work shall consist of furnishing all materials, equipment and labor necessary for conducting an Osterberg Cell (O-Cell) Load
GUIDELINE FOR HAND HELD SHEAR VANE TEST
GUIDELINE FOR HAND HELD SHEAR VANE TEST NZ GEOTECHNICAL SOCIETY INC August 2001 CONTENTS Page 1.0 Introduction 2 2.0 Background 2 3.0 Recommended Practice 3 4.0 Undrained Shear Strength 3 5.0 Particular
TRENCHLESS TECHNOLOGY RESOURCE CENTRE TRENCHLESS TECHNOLOGY GUIDELINES
TRENCHLESS TECHNOLOGY RESOURCE CENTRE TRENCHLESS TECHNOLOGY GUIDELINES SECOND EDITION PIPEJACKING AND MICROTUNNELING NEW VERSION AUGUST 2005 1 OVERVIEW Pipe jacking and microtunnelling, including pilot
VeMet, Utrecht, NL «Solution in Wear Protection» 26.10.2011 Dipl.-Ing. Wolfgang Leichnitz. Quit
VeMet, Utrecht, NL «Solution in Wear Protection» 26.10.2011 Dipl.-Ing. Wolfgang Leichnitz Quit Theory and Practice of Wear Definition In materials science, wear is the erosion of material from a solid
Tool Holder Catalog INDEX ABC VDI 25 LL3602.30051-10.04.2014. 0414/Rö
Tool Holder Catalog INDEX ABC VDI 25 LL3602.30051-10.04.2014 0414/Rö Disclaimer The illustrations in this documents may deviate from the delivered product. We reserve the right to make changes due to errors
FAG Hydraulic nuts. Technical Product Information
FAG Hydraulic nuts Technical Product Information Contents Application 2 Design 2 Design variants 3 Pressure generators, connectors 4 Dimension tables for FAG hydraulic nuts (metric) 6 Dimension tables
Design and Construction of Auger Cast Piles
Design and Construction of Auger Cast Piles 101 th Annual Road School 2015 3/11/2015 Malek Smadi, Ph.D., P.E. Principal Engineer - GEOTILL - Fishers, IN [email protected] - www.geotill.com CONTENTS 1.
Geotechnical Investigation using Standard Penetration Test (SPT) in Rangamati, Bandarban and Khagrachari Towns
1. Introduction 1.1 Scope of Work The Asian Disaster Preparedness Centre (ADPC) is implementing the project Seismic Hazard and Vulnerability Mapping for Rangamati, Bandarban and Khagrachari Municipality.
Guth Portable gitators R The long-term solution pplications Guth Portable gitators R are used for the mixing, stirring and the homogenization of water-like or medium viscosity products. They are most often
High Capacity Helical Piles Limited Access Projects
High Capacity Helical Piles Limited Access Projects Tel 403 228-1767 Canada, USA, Russia Brendan ODonoghue 519 830-6113 Presentation Summary 1. Helical piles Background on large diameter shafts and helices
Product catalogue, abrasive cutting
Product catalogue, abrasive cutting Cutting nozzle assemblies Abrasive jet cutting system Abrasive hopper Abrasive material www.hammelmann.com Contents (Navigation via Bookmarks) Cutting nozzle assemblies
The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11
Page 1 of 11 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the excavation of trenches (or excavation of tunnels); the supply and placing of bedding and backfill materials;
Manual piston sampler...m 11
SAMPLING Manual piston sampler...m 11 Screw sampler...prec 22...PREC 100 Slide sampler...pr 55 Rotative screw sampler...prv Piston sampler...p 11 Sampler on belt conveyor...pba Rotating cup sampler...pgr
Supplier ID: 26421. Local Office: GLASGOW 69 Buchanan Street Glasgow G1 3HL
M D & FOUNDATIONS MIDLANDS Supplier ID: 26421 MINI PILING PILING REINFORCED CONCRETE UNDERPINNING DRILLING & GROUTING SITE INVESTIGATION & PILE TESTING NATIONWIDE SPECIALIST PILING & FOUNDATION SERVICES
Module 1 : Site Exploration and Geotechnical Investigation. Lecture 4 : In-situ tests [ Section 4.1: Penetrometer Tests ] Objectives
Lecture 4 : In-situ tests [ Section 4.1: Penetrometer Tests ] Objectives In this section you will learn the following Penetrometer Tests Standard penetration test Static cone penetration test Dynamic cone
E-82. Access Roads and Crane Platforms. 77m steel tower. 1 of 12. Specification Access Roads and Crane Platforms E-82/ 77m steel tower.
E82/ 77m steel tower 1 of 12 E82 77m steel tower PMCWSP023E8277m Zuwegung und Kranstellfläche Rev005gereng E82/ 77m steel tower 2 of 12 CONTENTS 1. Assembling the tower and wind energy converter 3 2. Crane
Titan Makina Ltd. Şti. 1160. Sok. No: 9 Ostim 06370 Ankara Tel: + 90 312 354 9977 Fax: + 90 312 385 5611 Web: www.titanltd.com.
IS26 Concrete Spraying Machine IS26 Concrete Spraying Machine TECHNICAL SPECIFICATIONS Manipulator Max. vertical spraying reach : Max. horizontal spraying reach : Working lights : Spraying Head Rotation
Geotechnical Investigation Reports and Foundation Recommendations - Scope for Improvement - Examples
Geotechnical Investigation Reports and Foundation Recommendations - Scope for Improvement - Examples Prof. V.S.Raju (Formerly: Director, IIT Delhi & Professor and Dean, IIT Madras) Email: [email protected]
SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS
July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional
Shotcrete Quality Control and Testing for an Underground Mine in Canada
Shotcrete Quality Control and Testing for an Underground Mine in Canada By Dudley R. (Rusty) Morgan and Mazin Ezzet AMEC Earth & Environmental, a division of AMEC Americas Limited SHOTCRETE FOR AFRICA
King Post Wall Information
King Post Wall Information DAWSON-WAM specialise in the installation of piled retaining wall systems including steel sheet piling, concrete piled walls and king post walls. This document is our guide to
Quality control: Annex-A.
Quality control: Quality of the constructed work has been checked by our staff as per frequency and provision mentioned section 900 in MoRT&H and as per provision mentioned in Concession Agreement. The
Tremie Concrete CM 420 CM 420 CM 420 CM 420. Temporary Structures. Tremie Concrete
Tremie Concrete Underwater concrete plays an important role in the construction of offshore structures. It may be used to tie together various elements in composite action (i.e., to tie piling to the footing).
WANJET. Sprayers. Wanjet sprayers has been produced since 1978.
Sprayers Wanjet sprayers has been produced since 1978. Already from beginning was our assortment mainly based on high pressure sprayers with a pressure up to 150 bar. The idea about the high pressure is
TBA 100 A Performance Study of the New Generation 100-ton Advanced Technology Rig. Maximilian Trombitas, Product Manager Bauer Deep Drilling GmbH
TBA 100 A Performance Study of the New Generation 100-ton Advanced Technology Rig Maximilian Trombitas, Product Manager Bauer Deep Drilling GmbH Outline Field study Lessons learned Rig design changes Mechanization
Site Investigation. Some unsung heroes of Civil Engineering. buried right under your feet. 4. Need good knowledge of the soil conditions
This is an attempt to create a stand alone self learning module on site investigation. Fasten your seat belts. Sit back, relax and enjoy. 1 2 Site Investigation Some unsung heroes of Civil Engineering
Technical handbook Panel Anchoring System
1 Basic principles of sandwich panels 3 Design conditions 4 Basic placement of anchors and pins 9 Large elements (muliple rows) 10 Small elements (two rows) 10 Turned elements 10 Slender elements 10 Cantilevering
Installation information. METTLER TOLEDO MultiRange Floor scales / Pit scales
Installation information METTLER TOLEDO MultiRange Floor scales / Pit scales KC300/KCS300 KC600/KCS600 KD600/KD1500 KE1500/KE3000 KES1500/KES3000 KG3000/KG6000 KN1500 Floor scales / Pit scales Contents
AGREGADOS RECICLADOS MITOS Y REALIDADES
The Production and Use of Recycled Concrete in the USA Thomas Van Dam, Ph.D., P.E., FACI Principal Engineer CTL Group Introduction In the United States, concrete is the most commonly used recycled material
Installation information. METTLER TOLEDO MultiRange DW150 / DW150T wall scale
Installation information METTLER TOLEDO MultiRange DW150 / DW150T wall scale DW150 / DW150T wall scale Contents Contents Page 1. Installation... 2 1.1 Preparatory work... 2 1.2 Installing the wall plates
LABORATORY DETERMINATION OF CALIFORNIA BEARING RATIO
LABORATORY DETERMINATION OF CALIFORNIA BEARING RATIO STANDARD IS: 2720 (Part 16) 1979. DEFINITION California bearing ratio is the ratio of force per unit area required to penetrate in to a soil mass with
How To Design A Foundation
The Islamic university - Gaza Faculty of Engineering Civil Engineering Department CHAPTER (2) SITE INVESTIGATION Instructor : Dr. Jehad Hamad Definition The process of determining the layers of natural
System. Stability. Security. Integrity. 150 Helical Anchor
Model 150 HELICAL ANCHOR System PN #MBHAT Stability. Security. Integrity. 150 Helical Anchor System About Foundation Supportworks is a network of the most experienced and knowledgeable foundation repair
Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains
Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains Doug Jenkins 1, Chris Lawson 2 1 Interactive Design Services, 2 Reinforced
INDUSTRIAL DIRECT DRIVEN PISTON COMPRESSORS CL - CH - CK
INDUSTRIAL DIRECT DRIVEN PISTON COMPRESSORS CL - CH - CK CL - CH - CK Direct driven solution for industry Proven technology, solid construction The CL - CH - CK units are directly driven air-cooled, single
Highly flexible couplings
Construction and operation 8.03.00 Instructions for installation 8.03.00 Types of stress 8.04.00 Diagrams for static deformation of the coupling ring 8.05.00 Coupling size 8.07.00 Examples of combinations
2. Crane standing on firm, horizontal ground.
The operating weight includes the basic machine with HD undercarriage, 2 main winches 300 kn with speed change gear and 11 m boom, consisting of A frame, boom foot (4 m), boom head section (6.4 m), boom
CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE
CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE 9.1 INTRODUCTION An important reason that composite piles have not gained wide acceptance in the civil engineering practice is the lack of a long
SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION
SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION 1. SCOPE Pipe subsoil drains shall be constructed in accordance with this specification and in conformity with the lines, grades and cross-sections shown
Commonwealth of Pennsylvania PA Test Method No. 632 Department of Transportation October 2013 5 Pages LABORATORY TESTING SECTION. Method of Test for
Commonwealth of Pennsylvania PA Test Method No. 632 Department of Transportation 5 Pages LABORATORY TESTING SECTION Method of Test for TIME OF SETTING OF CONCRETE MIXTURES BY PENETRATION RESISTANCE 1.
VZ/VZM SERIES Heavy Duty Shredders 600-2,100 kg/h
VZ/VZM SERIES Heavy Duty Shredders 600-2,100 kg/h Technical Specifications VZ/VZM SERIES Heavy Duty Shredders VZ 17.00 / VZ 18.00 Inline set-up VZM 17.00 / VZM 18.00 Inline set-up Technical Data VZ/VZM
Polishing and finishing barrels BTV
Polishing and finishing barrels BTV Polishing barrels for buttons, products in polyester, urea, galalith and related item. Strengthened model with rubber lining for finishing of metallic minuteness. Steel
Profile rail guides LLR
Profile rail guides LLR Content The SKF brand now stands for more than ever before, and means more to you as a valued customer. While SKF maintains its leadership as the hallmark of quality bearings throughout
XFE. The cost effective starter for all AC induction motors from 4A 2800A The choice for small to medium industrial applications
The cost effective starter for all AC induction motors from 4A 2800A The choice for small to medium industrial applications The XFE Soft Starter range provides a combination of competitive prices, flexible
SPEEDROC D30. Surface Drill Rig for marble, granite, sandstone and limestone in the dimension stone industry.
SPEEDROC D0 Surface Drill Rig for marble, granite, sandstone and limestone in the dimension stone industry. SPEED UP YOUR PROFITS SPEEDROC D0 IS A VERSATILE AND FLEXIBLE DRILL RIG, TAILORMADE FOR THE DIMENSION
Open center control block in monoblock design MO-40
Open center control block in monoblock design MO-40 RE 64370 Edition: 02.2015 Replaces: 02.1985 Size 40 Series 1X Maximum working pressure on pump side 350 bar on consumer side 420 bar Maximum flow 680
DUGARD. Machine Tools Since 1939. Dugard 700L Series Heavy Duty CNC Lathes. www.dugard.com
DUGARD Machine Tools Since 1939 Dugard 700L Series Heavy Duty CNC Lathes www.dugard.com Dugard 700L Heavy Duty CNC Lathe 2000, 3000 or 4000mm bed length Designed for easy and convenient operation The concave
ELECTRIC PERISTALTIC MORTAR POINTING PUMP
ELECTRIC PERISTALTIC MORTAR POINTING PUMP pointing gun & control valve ACF405 PERISTALTIC PuMP hopper feed roller & tube pump for refurbishment & repair trades heritage & conservation bridge & underground
High Security Heavy Duty Shredders VZ 14.00. Perfect shredding and high performance in DIN security levels 4 and 5
High Security Heavy Duty Shredders Perfect shredding and high performance in DIN security levels 4 and 5 Documentation High Security Heavy Duty Shredders / Page 1of 5 Perfect shredding and high performance.
SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT
SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT 1.0 SOIL IMPROVEMENT 1.1 General Soil Investigation Information are provided in Part B1 annex as a guide to the Contractor for his consideration
50AI01oe 02/15. Labko GRP cesspools. Instructions for installation, operation and maintenance
02/15 Labko GRP cesspools Instructions for installation, operation and maintenance Reliable solutions Wastewater treatment systems Contents 1 LABKO CESSPOOLS... 3 1.1 GENERAL... 3 1.2 IMPORTANT TO KNOW
TBM CROSSING OF STATIONS
TBM CROSSING OF STATIONS Eng. Marco Barbanti Astaldi S.p.A. Eng. Tommaso Grosso Astaldi S.p.A. 18-11-2011 In the presence of groundwater the permeability of the ground is of great interest. It is important
STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.
STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill
DMU 75 / 95 monoblock
www.dmgmori.com Five-axis universal milling machines DMU 75 / 95 monoblock High tech as standard Five-axis simultaneous machining at the best price. DMU 75 / 95 monoblock Top features for five-axis simultaneous
Stability. Security. Integrity.
Stability. Security. Integrity. PN #MBHPT Foundation Supportworks provides quality helical pile systems for both new construction and retrofit applications. 288 Helical Pile System About Foundation Supportworks
CEEN 162 - Geotechnical Engineering Laboratory Session 7 - Direct Shear and Unconfined Compression Tests
PURPOSE: The parameters of the shear strength relationship provide a means of evaluating the load carrying capacity of soils, stability of slopes, and pile capacity. The direct shear test is one of the
Ecoflex Wall Penetration Systems: An efficient, sustainable solution for penetrating concrete or block walls
Pre- insulated pipe systems ecoflex Wall Penetration installation guide Ecoflex Wall Penetration Systems: An efficient, sustainable solution for penetrating concrete or block walls Pre-insulated Pipe Systems
EXCAVATOR SAFETY TRAINING
EXCAVATOR SAFETY TRAINING INSPECTION CHECKLIST INSPECTION AREA INSPECTION RESULTS Sat. Unsat. N/A Comments Carrier & Car Body Rotation system Tracks Rollers Frame, welds, bolts Drive system Upper Structure
PLM series Permanent load lifting magnets
Lifting gear Load lifting magnets/chain hoists PLM series Permanent load lifting magnets Load-bearing capacity of up to 1 t depending on model despite light weight High standard of safety with simple lever
METHOD OF STATEMENT FOR STATIC LOADING TEST
Compression Test, METHOD OF STATEMENT FOR STATIC LOADING TEST Tension Test and Lateral Test According to the American Standards ASTM D1143 07, ASTM D3689 07, ASTM D3966 07 and Euro Codes EC7 Table of Contents
FRANKIPILE. High Pile Loads Optimum Adaptation to Foundation Soil Low-noise Manufacturing Process
FRANKIPILE High Pile Loads Optimum Adaptation to Foundation Soil Low-noise Manufacturing Process The FRANKIPILE Application possibilities The FRANKIPILE can be used in a wide range of foundation soil conditions
ENGINEERING SCIENCE H1 OUTCOME 1 - TUTORIAL 3 BENDING MOMENTS EDEXCEL HNC/D ENGINEERING SCIENCE LEVEL 4 H1 FORMERLY UNIT 21718P
ENGINEERING SCIENCE H1 OUTCOME 1 - TUTORIAL 3 BENDING MOMENTS EDEXCEL HNC/D ENGINEERING SCIENCE LEVEL 4 H1 FORMERLY UNIT 21718P This material is duplicated in the Mechanical Principles module H2 and those
UNIVERSAL CLEANERS. Seed Conditioning And Processing Global Solution UNIVERSAL 240
UNIVERSAL CLEANERS Seed Conditioning And Processing Global Solution UNIVERSAL 240 UNIVERSAL EXCELLPRE CLEANERS High Effective Pre-cleaning Performance Akyurek Technology develops and manufactures solutions
Concremote calibration box
999808502-02/2014 en-gb The Formwork Experts. Concremote calibration box User Information Instructions for assembly and use (Method statement) Introduction User Information Concremote calibration box Introduction
Operation Manual For NDJ-8S Digital Rotary Viscometer
Operation Manual For NDJ-8S Digital Rotary Viscometer 1 Contents 1. General... 2 2. Main technical data... 2 3. Working principle... 2 4. Installation... 3 5. Operation procedures... 4 6. Precautions...
MECHANICS OF SOLIDS - BEAMS TUTORIAL 2 SHEAR FORCE AND BENDING MOMENTS IN BEAMS
MECHANICS OF SOLIDS - BEAMS TUTORIAL 2 SHEAR FORCE AND BENDING MOMENTS IN BEAMS This is the second tutorial on bending of beams. You should judge your progress by completing the self assessment exercises.
Monitoring of Tunnel End Plug Performance in ONKALO
Monitoring of Tunnel End Plug Performance in ONKALO Erika Holt, VTT Technical Research Centre of Finland Presentation at IGDTP-Geodisposal 2014 Manchester, UK, 24th to 26th of June 2014 Co-authors: I.
Safe & Sound Bridge Terminology
Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries
CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST
CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST 1 Permeability is a measure of the ease in which water can flow through a soil volume. It is one of the most important geotechnical parameters. However,
PERMEABILITY TEST. To determine the coefficient of permeability of a soil using constant head method.
PERMEABILITY TEST A. CONSTANT HEAD OBJECTIVE To determine the coefficient of permeability of a soil using constant head method. need and Scope The knowledge of this property is much useful in solving problems
Operating instructions. SCORP 220 Plus SCORP 360. Pipe Cutter. Code 790 014 762 Machine-no.:
precision. power. simplicity. Operating instructions Pipe Cutter SCORP 220 Plus SCORP 360 Code 790 014 762 Machine-no.: All rights reserved, in particular the rights of duplication and distribution as
The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.
GOWANUS EXPRESSWAY TUNNEL PRIMER
GOWANUS EXPRESSWAY TUNNEL PRIMER T he New York State Department of Transportation is currently studying the replacement of the Gowanus Expressway with a tunnel. This investigation involves looking at a
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
valid as of 1 April 2014 Intec injection hose system
FRANK Product List valid as of 1 April 2014 Intec injection hose system Intec injection hose systems Intec injection hose systems ensure secure, simple and rapid sealing of horizontal and vertical construction
Cooling system components, removing and installing
Page 1 of 34 19-1 Cooling system components, removing and installing WARNING! The cooling system is pressurized when the engine is warm. When opening the expansion tank, wear gloves and other appropriate
Geotechnical Investigation Test Report
Geotechnical Investigation Test Report Report No. htsc/rcd/ 3457 Dated: - 20/03/2010 Asphalt Standard Penetration Test as per IS 2131 ------------- IS 6403 Soil Job Card No - 1649 Cement Client/Department
DIRECTIONAL DRILLING
DIRECTIONAL DRILLING 1. General. Installation of pipelines through the levee embankment using directional drilling technology is prohibited. Installation of pipelines through a flood control project foundation
DYNAMIX COMPACT DISC HARROWS FOR TRACTORS FROM 100 TO 200 HP
DYNAMIX COMPACT DISC HARROWS FOR TRACTORS FROM 100 TO 200 HP DYNAMIX DYNAMIX KA RANGE OF COMPACT DISC HARROWS MAIN FEATURES www.rabe-gb.de STUBBLE CULTIVATION Todays farmers are facing new tasks: the ever-changing
BOREHOLE SEALING IN A COAXIAL HEAT EXCHANGER BY BENTONITE TREATMENT
BOREHOLE SEALING IN A COAXIAL HEAT EXCHANGER BY BENTONITE TREATMENT Frank.B.Cruickshanks, Olof Andersson, James Bardsley Climate Change Division, Meteorological Service of Canada, 45 Alderney Drive, Dartmouth,
PLQE. The base of the economy gearboxes with square output flange. Economy Line. Formerly PLE
20 ormerly PL The base of the economy gearboxes with square output flange The PL series with square output flange. A powerful alternative for additional higher radial and axial loads. Low backlash High
Linear modules Lifting units Rotary modules Grip modules Inductive proximity switches Plug connectors
20000 Linear modules Lifting units Rotary modules Grip modules Inductive proximity switches Plug connectors 23000 22000 21000 20000 09000 08000 07000 06000 05000 04000 03000 02000 01000 823 Notes 824 Technical
italtec PRINTED CIRCUITS EQUIPMENT PRINTED CIRCUITS EQUIPMENT Insulator machines Echting machines Special equipment and machines
PRINTED CIRCUITS EQUIPMENT PRINTED CIRCUITS EQUIPMENT Insulator machines Echting machines Special equipment and machines On customer request it is possible to supply: Benches for PCB Oven for PCB Chemicals
SIENA STONE GRAVITY RETAINING WALL INSTALLATION SPECIFICATIONS. Prepared by Risi Stone Systems Used by permission.
SIENA STONE GRAVITY RETAINING WALL INSTALLATION SPECIFICATIONS Prepared by Risi Stone Systems Used by permission. 1-800-UNILOCK www.unilock.com FOREWORD This outline specification has been prepared for